0 оценок0% нашли этот документ полезным (0 голосов)
3K просмотров13 страниц
This document contains a quotation for meter bodies in different sizes from 15mm to 50mm made of DIN/ANSI 3.1 material. It requests additional information on tooling costs, initial sampling process and timelines, payment terms, raw material details, forging weights, machining costs, overhead costs, and a price breakdown. Annual production quantity is estimated to be 10 pieces of each item, with a batch size to be confirmed.
This document contains a quotation for meter bodies in different sizes from 15mm to 50mm made of DIN/ANSI 3.1 material. It requests additional information on tooling costs, initial sampling process and timelines, payment terms, raw material details, forging weights, machining costs, overhead costs, and a price breakdown. Annual production quantity is estimated to be 10 pieces of each item, with a batch size to be confirmed.
This document contains a quotation for meter bodies in different sizes from 15mm to 50mm made of DIN/ANSI 3.1 material. It requests additional information on tooling costs, initial sampling process and timelines, payment terms, raw material details, forging weights, machining costs, overhead costs, and a price breakdown. Annual production quantity is estimated to be 10 pieces of each item, with a batch size to be confirmed.
1 50049023 Meter body HD mach 40 DIN/ANSI 3.1 2 50049026 Meter body HD mach 50 DIN/ANSI 3.1 3 50049020 Meter body HD mach 25 DIN/ANSI 3.1 4 Meter body HD mach 15 DIN/ANSI 3.1 Terms of Delivery: "CFR- E+H , Aurangabad" Packing : Export type SEA worthy wooden packing. Currency : All prices in INDIAN RUPEES. Following additional information required with quotation TOOLING INFORMATION Tooling Description Tooling price (for forging and machining) Tool lifespan (Per number of produced parts) Tool development period INITIAL SAMPLING INFORMATION Initial sample quantity (pcs) with Mesure Protocol Initial samples lead time ( days) Payment Terms for Toolings for regular supply. Drawing No.: Drawing Index.: Annual Qty Batch Size Raw Material 314879-1000 C 314882-1000 D 314910-1000 D 330176-1000 As per the above list. 10 PCS EACH. Forging Batch Qty Raw Mat. Size MM Raw Mat. Wt. (Kg.) Raw Mat. Cost/ Kg (Rs.) Raw Mat. Cost/pc. Calculated Forging Wt. (Kg) Forge Scrapped Wt (Kg) PRICE BREAK UP Cost of Forging /pc (Rs.) Cost of Forging Scrap/pc (Rs.) Machined Finish Wt. (Kg) Machining Scrap wt (Kg) Machining cost / pc (Rs.) Machining Scrap Cost (Rs.) OH, PROFIT & INTEREST @ PRICE BREAK UP Total Packing Cost /pc (Rs.) Transportatio n Cost/pc (Rs.) Total Cost / pc (Rs) Selling Price (Rs.) TOOLING COST (Rs.) PRICE BREAK UP