Cast a concrete base for the basic mast of the crane with timber formwork
2. Assemble the telescopic cage section on top of basic mast
3. Assemble the top mast section just under the mast cabin on top of cage
section
4. Erect the section of top tower containing the mast cabin above top mast
section
5. Fix the counter-jib perpendicular to the vertical tower using the counter-jib
tie
6. Hang the counterweights at the end of the counter-jib
7. Install the main jib with the main jib tie
8. Hang the jib trolley on the main jib
After erecting the whole tower crane, it was ready for "raising" to the required
operating height. This was achieved by jacking up hydraulically the telescopic cage
section and then bringing extra standard mast sections into the telescopic cage
consecutively until sufficient height was reached.