Outdoor December January February March

1st to 15th 16th to 31st 1st to 15th 16th to 31st 1st to 15th 16th to 28nd 1st to 15th 16th to 31st
Main cable (a) Trenching
(b) Laying
Tail cable (a) Trenching
(b) Laying
Location (a) Foundation
(b) Erection
( c) Termination
of main and tail
cable
Point
Machines
(a) Installation of
Pt.M/C.
(b) Termination
of pt.JB.
( c) Wiring in
pt.M/C&JB
Signals (a) Foundation
(b) Erection
(c ) Fixing of
LED signals
(d) Termination
and wiring
Track circuits (a) TF wiring
(b) TR wiring
(c ) Installation
of TF charger
(d) Installation of
batteries
(e) Bonding
(f) Jumpering
LC Gates
(a) Foundation
of pedestal, CI
foundations etc
(b) Wiring of GI
rope across
horizontal
wheels
(c ) Boom lock
foundation and
testing of LC
gate
Indoor
Installation of
relay rack
Installation of
CT rack
Fixing of relay
bases
Wiring of relay
racks
Termination of
signaling cable
on CT rack
Soldering, fixing
of connectors
and hooking of
wires into relay
bases
Hooking of relays
Continuity test
ASM
Room
Fixing of ASM
panel
Termination of
dalton/signalig
cable iside ASM
panel
Termination of
KLCR
Simulation panel