Вы находитесь на странице: 1из 5

DATE

Volt Current Load Volt Current Load Volt Current Load


U WDG
TEMP
V WDG
TEMP
W WDG
TEMP
OIL
TEMP
GAS
PRESS.
GAS
PRESS.
GAS
PRESS. AC Input DC OutputDC Output
KV Amp KW KV Amp KW MWh(Imp) KV Amp MW MWh(Imp)
0
C
0
C
0
C
0
C Kg/CM
2
Kg/CM
2
Kg/CM
2
Volt Amp Volt Amp Volt Volt Amp
11.00PM
12.00AM
1.00AM
2.00AM
3.00AM
4.00AM
5.00AM
6.00AM
7.00AM
8.00AM
9.00AM
10.00AM
11.00AM
12.00MD
1.00PM
2.00PM
3.00PM
4.00PM
5.00PM
6.00PM
7.00PM
8.00PM
9.00PM
10.00PM
Energy
Metery
Reading
.
SF6 Gas pressure
MWH MVARH MVAH M.D.I.
Phase 2 TR Main line
Main Tank OLTC Tank
GAS
PRESS.
GAS
PRESS.
GAS
PRESS. A SHIFT
7AM
11 KV
incomer R 2 TR
Line
Breaker B SHIFT
7AM Y
Bus
coupler C SHIFT
7AM
220 TR
panel B
7AM
Time
MWh(Imp)
220 kv Reading
Station
transformer
CONTROL RELAY PANEL
G.S.S. BATTERIES(HBL Make)
Silicagel Colour
Oil
level
JINDAL SAWLIMITED
DHEDWAS IRON ORE MINE
220KV Substation Control & Relay Panel LOGSHEET
Desc-
ription
SF6
counter
Radetron Make Charger
BOOST FLOAT
Lighting Arrester Counter Reading
Transformer 2 TR Bus coupler
BATTERY AND CHARGER Switchyard equipments
2 TR 2 TR SF6 CKT BKR
CONTROL AND RELAY PANEL
JINDAL SAW LIMITED
Dhedwas iron ore Mines
11KV SWITCH BOARD LOG SHEET
Annexure-2 DATE
Time Incomer O/G Spare
1
BNF 1 Pellet 1 pellet 2 BNF 2 Capac O/G spare
2
500 KVA O/G spare
3
Bus PT
Amp Amp Amp Amp Amp Amp Amp Amp Amp Amp
11.00PM
12.00AM
1.00AM
2.00AM
3.00AM
4.00AM
5.00AM
6.00AM
7.00AM
8.00AM
9.00AM
10.00AM
11.00AM
12.00MD
1.00PM
2.00PM
3.00PM
4.00PM
5.00PM
6.00PM
7.00PM
8.00PM
9.00PM
10.00PM
EnergyMtr
reading 9PM
JINDAL SAW LIMITED
Dhedwas Iron Ore Mines
220 KV SWITCH YARD EQUIPMENTS LOGSHEET
TIME REAC.1
WDG
TEMP
OIL
TEMP OIL TEMP
GAS
PRESS.
AIR
PRESS.
0
C
0
C
0
C Kg/CM
2
Kg/CM
2
11.00PM
12.00AM
1.00AM
2.00AM
3.00AM
4.00AM
5.00AM
6.00AM
7.00AM
8.00AM
9.00AM
10.00AM
11.00AM
12.00MD
1.00PM
2.00PM
3.00PM
4.00PM
5.00PM
6.00PM
7.00PM
8.00PM
9.00PM
10.00PM
Phase 2 TR Main line
R Main Tank OLTC Tank
Y 2 TR
B
Station
transformer
Lighting Arrester Counter Reading
2 TR
Silicagel Colour SF6
count
er
Desc- ription
2 TR SF6 CKT BKR
Oil level
"C" SHIFT
Relief
Vent
Diaph.
DUTY STAFF "A" SHIFT "B" SHIFT
ELECT.
AFM
JINDAL SAW LIMITED
Dhedwas Iron ore mines
Annexure-5 DATE
AC Input DC Output DC Output
Volt Amp Volt Amp Volt Amp Volt Volt Amp
11.00PM
12.00AM
1.00AM
2.00AM
3.00AM
4.00AM
5.00AM
6.00AM
7.00AM
8.00AM
9.00AM
10.00AM
11.00AM
12.00MD
1.00PM
2.00PM
3.00PM
4.00PM
5.00PM
6.00PM
7.00PM
8.00PM
9.00PM
10.00PM
TIME TRICKLE SERVICE RECTIFIER
G.S.S. BATTERIES(HBL Make)
BOOST
Radetron Make Charger
Time
Volt Current Load Volt Current Load Volt Current Load Volt Current Load Volt Current Load Volt Current Load Volt Current Load
KV Amp KW KV Amp KW KV Amp KW KV Amp KW KV Amp KW KV Amp KW KV Amp KW
11.00PM
12.00AM
1.00AM
2.00AM
3.00AM
4.00AM
5.00AM
6.00AM
7.00AM
8.00AM
9.00AM
10.00AM
11.00AM
12.00MD
1.00PM
2.00PM
3.00PM
4.00PM
5.00PM
6.00PM
7.00PM
8.00PM
9.00PM
10.00PM
Energy
Metery
Reading.
Energy
Metery
Reading.
Energy
Metery
Reading.
Energy
Metery
Reading.
MWH MVARH MVAH M.D.I. MWH MVARH MVAH M.D.I. MWH MVARH MVAH M.D.I. MWH MVARH MVAH M.D.I.
7AM 7AM 7AM 7AM
7AM 7AM 7AM 7AM
7AM 7AM 7AM 7AM
7AM 7AM 7AM 7AM
DATE:-
220KV SUBSTATION
500 KVA Transformer
Power
Factor
MWh
Pellet 2
Power
Factor
MWh
Capacitor Bank
Power
Factor
Incomer
MWh
Power
Factor
Benificiation Plant 1
Capacitor
Bank
Power
Factor
MWh
11 KV/220VK Panel 11 KV Panel 11 KV Panel
JINDAL SAW LIMITED
Dhedwas iron ore Mines
11KV Panels Log Sheet
MWh
Benificiation Plant 2
Power
Factor
MWh
Pellet 1
Power
Factor
MWh
500 KVA
Transform
er
11 KV Panel
220KV
Feeder
BNF 1
BNF 2
Pellet 1
Pellet 2
11 KV
incomer

Вам также может понравиться