Вы находитесь на странице: 1из 2

Main Item Level Billing / Sub Item Level Billing

In Billing there can be two types of Billing. Main Item Level Billing & Sub item Level
billing. For example in a omputer bill one can have a total bill of the entire computer
an! its sub parts mentione! along with it or one can have Bill of the sub parts with the
omputer with it in a total bill.
"his is !one through #eneral Item ategory & Item ategory #roup configuration in
Material Master.
For Main Item Level Billing use #eneral Item ategory & Item ategory #roup
$%L& Structure / Material &bove.
For Sub Item Level Billing use #eneral Item ategory & Item ategory #roup
L'MF Structure / Material Below.
Menu (ath) Sales an! *istribution Sales Sales *ocuments Sales *ocument Item
*efine Item ategory #roups
1
#eneral Item ategory #roup
Materials grouping that help the system to !etermine item categories !uring sales
!ocument processing.
If a group is configure! specific to !istribution channel+ it has priority if the
correspon!ing activity is !istribution channel,!epen!ent.
"he system automatically suggests an item type in the !ocument !epen!ing on the item
category group you assign an! the sales !ocument type you are processing.
$xample
In the stan!ar! system+ there are normal items+ items that signify services -an! therefore
nee! no !elivery processing. an! items that signify pac/ing material+ for example.
Item ategory #roup from Material Master
Item ategory is a grouping of materials that the system uses to !etermine item
categories !uring the processing of sales !ocuments.
*epen!ing on the item category group that you apply an! the sales !ocument type you
are processing+ the system automatically proposes an item category in the !ocument.
In the stan!ar! system+ for example+ there are stan!ar! items+ items that represent
services -an! !o not re0uire !elivery processing.+ an! items that represent pac/aging
materials.
2

Вам также может понравиться