NO. PARTICULARS OF WORK


Wt. per
No kg UNIT QTY UNIT RATE
1
33 KV D/C Lattice Structures (Height 13 MTR)
with v cross 576.54 NOS. 14.00 35745.38
2 33 KV D/C Lattice Structures (Height 13 MTR) 510.00 NOS. 3.00 31620.00
3 33 KV DISC POINT CHANNEL 100X50X6 MM 17.21 NOS. 18.00 1066.90
4 GUARDING BRACKET (M.S.Angle 50x50x6 mm) 6.75 NOS. 4.00 418.50
5 33 KV Clamp (per Clamp) 1.83 NOS. 4.00 113.46
6 MS Rod type Earthing Sets 8.00 NOS. 3.00 625.00
7 Stay Clamp 50x6 mm (per Clamp) 1.70 NOS. 36.00 105.40
8 G.I.Wire 6 SWG/5 mm KG. 160.00 65.00
9 G.I.Wire 8 SWG /4 mm KG. 50.00 65.00
10 G.I.Stay Wire 7/8 SWG KG. 250.00 68.00
11 BARBED WIRE FOR ANTI CLIMBING FIXTURE KG. 180.00 86.25
12 M.S NUT BOLT ASSORTED TYPE KG. 500.00 75.00
13 33KV Stay Insulator NOS. 18.00 60.00
14 33KV GI Stay sets 20x2400mm NOS. 18.00 1250.00
15 33 KV PIN INSULATOR NOS. 102.00 190.00
16 33 KV G.I. PIN NOS. 102.00 190.00
17 11 KV B&S TYPE DISC INSULATOR 120 KN NOS. 72.00 740.00
18 DISC H/W FOR PANTHER CONDUCTOR NOS. 24.00 1000.00
19 DANGER PLATE 150X200 NOS. 17.00 80.00
20 PG CLAMP FOR PANTHER NOS. 36.00 265.00
21 PANTHER CONDUCTOR KM 6.20 149000.00
22 MASONARY WORK CUM 58.00
23
PAINT+TRANSPORTATION+PETTY ITEMS+
MIS. ITEMS & WORKS
24
Cost towards Struts and D/C chakri for 1 angular
points of line 350 kg NOS 2.00 21700.00
TOTAL
25
OVER HEAD EXPENDITURE LIKE- ENGINEER SITE
VISIT + ROUTE SURVEY,+TOWER LOCATION
MARKING+ DESIGINING+ SITE OFFICE
EXPENDITURE +MATERIAL PROCUREMENT
EXPENDITURE+ MATERIAL TESTING
EXP.+ETC.+PROFIT
G.TOTAL
1
2
3
4
ESTIMATE FOR 1 KM 33 KV D/C LINE ON PANTHER CONDUCTOR ERECTED ON LATTICE TOWER HAVING
AVG. SPAN LENGTH OF 60 MTRS.
ALL MATERIAL WILL BE PURCHASED FROM REGISTERED VENDORS OF JVVNL & AS PER SPECIFICATIONS OF JVVNL
MATERIAL WILL BE DULY TESTED AT MANUFACTURER & COPIES OF TEST REPORT SHALL BE FURNISHED
SITE WILL BE HANDED OVER AFTER DULY CLEANED & CLEAREING THE UNUSED MATERIAL & AFTER REMOVAL OF GARBAG & SAND ETC.
PROPER CURING WILL BE DONE FOR CONCRETE STRUCTURE
5
6
7
8
THE QTY. OF MATERIAL IS ON STANDARD PRACTICE BASIS FOR THE REQUIRED LENGTH OF LINE. QTY OF ANY ITEMS UPTO A VARIATION OF
+/- 5% WILL NOT BE DR. OR CR. TO THE EITHER SIDE. IF THERE IS VARIATION OF MORE THAN +/- 5% OF ENTIRE QTY. THEN DR. OR CR. WILL
BE TAKES PLACE FROM ZERO TO FULL DEVIATION.(FOR THE COMPLETE VARIATION)
IN CASE IF CABLE IS REQUIRED TO BE LAID AT SITE DUE TO ANY REASONS, OR SITE CONDITIONS, THAN THE CABLE & ITS ACCESSORIES
WILL HAVE TO BE MADE AVAILABE BY THE CUSTOMER OR THE PAYMENT OF THESE ITEMS WILL HAVE TO BE MADE EXTRA, AS PER THE
MUTUALLY AGGRED RATE. HOWEVER THE CREDIT FOR THE COST OF THE ITEMS SAVED DUE TO CABLE WORK WILL PASSED ON TO THE
CUSTOMER BUT NO BENIFIT IN THE LABOUR RATE WILL BE GIVEN & IF ANY MATERIAL WHICH IS REQUIRED WILL BE CHARGED EXTRA.(BAJRI,
BRICKS, ETC.)
IF ANY PROBLEMS ARISES DUE TO RIGHT OF WAY, THEN THE CUSTOMER WILL HAVE TO HANDLE THE SAME & IF ANY EXPENDITURE IS
REQUIRED TO BE INCURED IN THIS ACCOUNT THEN THIS WILL BE THE LIABILITY OF CUSTOMER.
IF THE WORK IS AWARDED THEN THE SURVEY WILL BE CONDUCTED WITHIN 15 DAYS FROM THE DATE OF AWARDED W.O. & AFTER
APPROVAL OF THE ROUTE SURVEY MAP, THE WORK WILL BE TRIGGERED UP WITHIN 15 DAYS.& IT WILL BE COMPLETED AS PER QUANTAM
OF WORK & TIME CONSUMED IN RIGHT OF WAY DISPUTES & WEATHER CONDITIONS.
MATERIAL
AMOUNT
ERECTION
RATE
ERECTION
AMOUNT
TOTAL
AMOUNT
500435.32 3200.00 44800.00 545235.32
94860.00 3200.00 9600.00 104460.00
19204.20 138.00 2484.00 21688.20
1674.00 49.45 197.80 1871.80
453.84 0.00 0.00 453.84
1875.00 336.95 1010.85 2885.85
3794.40 0.00 0.00 3794.40
10400.00 11.50 1840.00 12240.00
3250.00 28.75 1437.50 4687.50
17000.00 0.00 0.00 17000.00
15525.00 46.00 8280.00 23805.00
37500.00 28.75 14375.00 51875.00
1080.00 0.00 0.00 1080.00
22500.00 517.50 9315.00 31815.00
19380.00 14.95 1524.90 20904.90
19380.00 5.75 586.50 19966.50
53280.00 200.00 14400.00 67680.00
24000.00 50.00 1200.00 25200.00
1360.00 11.50 195.50 1555.50
9540.00 10.00 360.00 9900.00
923800.00 8000.00 49600.00 973400.00
3420.00 198360.00 198360.00
112000 9137.20 121137.20
43400.00 1000.00 2000.00 45400.00
1935691.76 370704.25 2306396.01
60000.000
2366396.01
ESTIMATE FOR 1 KM 33 KV D/C LINE ON PANTHER CONDUCTOR ERECTED ON LATTICE TOWER HAVING
AVG. SPAN LENGTH OF 60 MTRS.
ALL MATERIAL WILL BE PURCHASED FROM REGISTERED VENDORS OF JVVNL & AS PER SPECIFICATIONS OF JVVNL
MATERIAL WILL BE DULY TESTED AT MANUFACTURER & COPIES OF TEST REPORT SHALL BE FURNISHED
SITE WILL BE HANDED OVER AFTER DULY CLEANED & CLEAREING THE UNUSED MATERIAL & AFTER REMOVAL OF GARBAG & SAND ETC.
PROPER CURING WILL BE DONE FOR CONCRETE STRUCTURE
THE QTY. OF MATERIAL IS ON STANDARD PRACTICE BASIS FOR THE REQUIRED LENGTH OF LINE. QTY OF ANY ITEMS UPTO A VARIATION OF
+/- 5% WILL NOT BE DR. OR CR. TO THE EITHER SIDE. IF THERE IS VARIATION OF MORE THAN +/- 5% OF ENTIRE QTY. THEN DR. OR CR. WILL
BE TAKES PLACE FROM ZERO TO FULL DEVIATION.(FOR THE COMPLETE VARIATION)
IN CASE IF CABLE IS REQUIRED TO BE LAID AT SITE DUE TO ANY REASONS, OR SITE CONDITIONS, THAN THE CABLE & ITS ACCESSORIES
WILL HAVE TO BE MADE AVAILABE BY THE CUSTOMER OR THE PAYMENT OF THESE ITEMS WILL HAVE TO BE MADE EXTRA, AS PER THE
MUTUALLY AGGRED RATE. HOWEVER THE CREDIT FOR THE COST OF THE ITEMS SAVED DUE TO CABLE WORK WILL PASSED ON TO THE
CUSTOMER BUT NO BENIFIT IN THE LABOUR RATE WILL BE GIVEN & IF ANY MATERIAL WHICH IS REQUIRED WILL BE CHARGED EXTRA.(BAJRI,
BRICKS, ETC.)
IF ANY PROBLEMS ARISES DUE TO RIGHT OF WAY, THEN THE CUSTOMER WILL HAVE TO HANDLE THE SAME & IF ANY EXPENDITURE IS
REQUIRED TO BE INCURED IN THIS ACCOUNT THEN THIS WILL BE THE LIABILITY OF CUSTOMER.
IF THE WORK IS AWARDED THEN THE SURVEY WILL BE CONDUCTED WITHIN 15 DAYS FROM THE DATE OF AWARDED W.O. & AFTER
APPROVAL OF THE ROUTE SURVEY MAP, THE WORK WILL BE TRIGGERED UP WITHIN 15 DAYS.& IT WILL BE COMPLETED AS PER QUANTAM
OF WORK & TIME CONSUMED IN RIGHT OF WAY DISPUTES & WEATHER CONDITIONS.

Вам также может понравиться