Вы находитесь на странице: 1из 3

Railway Route Optimization System

Railway Route Optimization System is a product to serve to users who


are tourists. The Main purpose of the project is to let the end users or passengers
to know the shortest path to reach the destination with in short period and with
amount as minimum as possible and as early as possible when more than one
Railways route is to there to reach the destination. This optimization
system shows the graphical representation of the train route from staring point to
ending point, this is very use full in now a days to know the train details i.e. train
Starting Point and Ending Point, Starting time and arrival time Charge for A
Starting point to Ending Point
SYSTEM ANALYSIS
System Analysis is first stage according to System Development Life Cycle
model. This System Analysis is a process that starts with the analyst. Analysis is a
detailed study of the various operations performed by a system and their
relationships within and outside the system. One aspect of analysis is defining the
boundaries of the system and determining whether or not a candidate should
consider other related systems. During analysis, data is collected from the available
files, decision points, and transactions handled by the present system. Logical
system models and tools are used in analysis. Training, experience, and common
sense are required for collection of the information needed to do the analysis.

Existing System
This project mainly deals with automating the task of the Rail Way Route
Optimization System that helps many end-users to know the Shortest Path for
their requested route, You can find the shortest path of a train route by manually
but there may be problems that have to be faced so to overcome such problems
we need to help the Optimization Techniques to know the shortest path If the
system is maintain all the details of trains, stations, and route of the trains manually
it will take lot of time to retrieve even a single information for a train or route from
starting point to ending point it will take lot of time problem statement
This project mainly deals with automating the task of the
Railway route details that helps many end-users to know the route for their
requested starting point and ending point within a milliseconds of time.
Proposed System
Proposed system are those that are automated, so that it is easy to
retrieve the responses from the system fastly and updating the details once the
response or services are provided to the end-users upon their request without any
difficulty and saves time.

PROJECT MODULES

The Railways Route Optimization has 4 Modules
Stations
Trains
Route
Search


Stations module :
This module maintains the data about station and allow operations like addition,
deletion, modification. This module maintains stations tables and fields are station-
id, station-name, and district, state. In this table Station-id, station-name is unique
does not allow any unique values.
For arranging a route Starting station, ending station, via stations are must be
registered in stations module, after registration of the stations administrator can
arrange the path among that stations. This station module is handled by
administrator only, can not handle end user
Trains module :
This module maintains the data about trains and allows operations like
additions, deletion, and modification. The train module handles trains table and
fields are train-id, train-name, starting-station, ending station, starting-time,
ending-time, train-type.
In this train-id unique and this attribute does not allow any duplicate values
Route :
This module maintains the data about routes between stations and This
module handle the routes tables and fields are route-id, starting-station,
destination, time taken for ordinary, and time taken for express. The module
shows the graphical representation of a route between starting-station and
destination.
This module is very useful to know routes between any two stations and also know
shortest path among the routes, and also gives graphical representation of the
corresponding routes

Search :
This module maintains the data about trains, routes tables and this module
gives reports on trains and routes, this module
HARDWARE AND SOFTWARE REQUIREMENTS

HARDWARE REQUIREMENTS
PROCESSOR : Intel 2.0 GHz or above
HARD DISK : 80 GB
RAM : 512 MB RAM.

SOFTWARE REQUIREMENTS

OPERATING SYSTEM : WINDOWS XP with SP2.
LANGUAGE (FRONT END) : JAVA (JDK1.5/1.6)
SERVER : APACHE TOMCAT 5.5/6.0
WEB TECHNOLOGY : HTML, JAVASCRIPT, CSS.
DATABASE (BACK END) : ORACLE 10G.
ARCHITECTURE : 3-TIER ARCHITECTURE.

Вам также может понравиться