Вы находитесь на странице: 1из 2

Calculation of Air Content (P/V Plot)

CLIENT
: KUWAIT OIL COMPANY
CONTRACT NO : 42649
CONTRACT NAME :INSTALLATION & REPLACEMENT OF CRUDE TRANSIT LINE IN SEK AREA
Where

v/P = V(0.044 D/t +4.50)10-5.


Incremental volume of water added (m3)
v=
3
518.91 m internal volume of test section (m3)
V=
P=
1 incremental presuure (bar)

Pressure (Bar)

Pressure (PSI)

0.0000

14.5000

29.0000

0.0329

Theortical Volume
0.0000
Intake M3
Actual Volume
0.0000
Intake M3

D=
t=

0.4752 Pipe external Diameter (m)


0.010310 nominal wall thickness (m)

10

11

43.5000 58.0000 72.5000

87.0000

101.5000

116.0000

130.5

145

159.5

0.0658

0.0987

0.1316

0.1645

0.1974

0.2303

0.2632

0.2961

0.33

0.36

0.0815

0.1400

0.1914

0.2337

0.2699

0.3092

0.3370

0.3762

0.4082

0.4444

0.4776

Pressure (Bar)

12

13

14

15

16

17

18

19

20

21

22

23

Pressure (PSI)

174

188.5

203

217.5

232

246.5

261

275.5

290

304.5

319

333.5

0.4277

0.4606

0.4935

0.5264

0.5593

0.5922

0.6251

0.6580

0.6909

0.7238

0.7567

25

26

Theortical Volume
0.3948
Intake M3
Actual Volume
Intake M3
Pressure (Bar)

24

Air Content (P/V Plot)

27
26

0.8554

25

0.8225

24

0.7896

23

0.7567

22

0.7238

21

0.6909

20

0.6580

19

0.6251

18

0.5922

17

0.5593

Pressure (Bar)

16

0.5264

15

0.4935

14

0.4606

13

Series1

0.4277

12

Series2

0.3948

11

0.36

10

0.33

0.2961

0.2632

0.2303

0.1974

0.1645

0.1316

0.0987

0.0658

0.0329

0.0000
0

1
Water Volume Intake (m3)

Вам также может понравиться