KHOKAR MARBLE

SHOP NO : - 01 KHOKAR HOUSE NAYA NAGAR,


MIRA ROAD (EAST) THANE 401107.
QUATATION
PLUMBING WORK
NO. DESCRIPTION UNIT PRICE NOS. AMOUNT
1. 4 PVC SOIL PIPE FROM GR TO 5 TH FLOOR
WITH FOUL AIR PIPE FITTED WITH PVC COUL
AND EVERY PIPE WOULD BE HOLD BY TWO
PLASTIC CLIP.
2150/- 05 10750/-
2. 4 PVC SINGLE Y BEND AT EVERY JUNCTION
WITH WATER PROOF ELEMENT.
1650/- 05 8250/-
3. 4 PVC ELBOW WILL BE FITTED TO EVERY P
TRAP WITH WATER PROOF.
1850/- 05 9250/-
TOTAL 28250/-
WITH MATERIAL AND LABOUR.
WHILE WORKING ONLY SINGLE MAN WILL BE INTERRECT WITH US.
ALL PLUMBING WORK WILL DONE BY SKILED LABOUR
ALL PIPE WILL BE REMOVED AND RESTALL NEW PIPE WITH PERFECT FITTING.
IF REQUIRED OLD PIPE WILL BE CLEAN AND REUSE AT CERTAIN PLACE.
THIS QUATION IS VALID FOR ONE SIDE, 5 TOILET WILL BE COVERED.
WATER AND ELECTRIC SHOULD PROVIDE BY SOCIETY.
THE SOCIETY MEMBER SHOULD CORPORATE WHILE WORKING FOR BETTER RESULT.
PAYMENT PERIOD.
40% OF TOTAL AMOUNT IN STARTING.
30% OF AMOUNT LESS THE EARLIER WHEN MATERIALS IS BROUGHT AND WORK STARTED.
20% OF AMOUNT LESS THE EARLIER WHEN HALF WORK IS FINISHED.
AND REMANING AMOUNT WILL BE RECIVED AFTER COMPLITION OF WORK.
MOB NO:- 9892234282
To,
Secreatry /Chairman,
Grishma Enclave E-Type III,
Mira Road East Thane
CHAMBER WORK
NO. DESCRIPTION UNIT PRICE Nos. AMOUNT
1. INCREASE THE HIGHT OF A CHAMBER
BY 2FT FROM GROUND LEVEL BY 9
BRICK WORK
3550/- 03 10650/-
2. 2 COAT PLASTER OF ALL FOUR SIDE OF
CHAMBER OUT SIDE.
950/- 03 2850/-
3. THE MAIN CHAMBER WILL BE
CONNECTED BY 6 DIA CHINI PIPE AND
OTHER TWO WILL BE CONNECTED BY
4 DIA PIPE.
12800/- 01 12800/-
TOTAL 26300/-
WITH MATERIAL AND LABOUR.
WHILE WORKING ONLY SINGLE MAN WILL BE INTERRECT WITH US.
ALL CIVIL WORK WILL DONE BY SKILED LABOUR.
THIS QUATION WILL COVER 3 CHAMBER BRICK WORK AND CONNECTION PIPE.
THE OLD CHAMBER COVER WILL BE USE.
WATER AND ELECTRIC SHOULD PROVIDE BY SOCIETY.
THE SOCIETY MEMBER SHOULD CORPORATE WHILE WORKING FOR BETTER RESULT.
PAYMENT PERIOD.
40% OF TOTAL AMOUNT IN STARTING.
30% OF AMOUNT LESS THE EARLIER WHEN MATERIALS IS BROUGHT AND WORK STARTED.
20% OF AMOUNT LESS THE EARLIER WHEN HALF WORK IS FINISHED.
AND REMANING AMOUNT WILL BE RECIVED AFTER COMPLITION OF WORK.
KHOKAR MARBLE
SHOP NO : - 01 KHOKAR HOUSE NAYA NAGAR,
MIRA ROAD (EAST) THANE 401107.
To,
Secreatry /Chairman,
Grishma Enclave E-Type III,
Mira Road East Thane
QUATATION MOB NO:- 9892234282
1. THE PVC COWL WILL BE FITTED AT THE
HIGHT OF 3 FROM PEREPIT WALL ON SOIL
PIPE TO PREVENT VACCUM IN PIPE.
2. 4 DIA PVC PIPE HOLDED WITH THE HELP OF
PVC CLIP.
3. PVC SINGLE Y BEND WILL BE FIXED BY
HEAVY AMOUNT OF FIXING PAST.(CAMICAL)
WITH WATER PROOFING.
4. PVC ELBOW BEND WILL BE FIXED TO THE P
TRAPE FIRST CHISEL AROUND THE BEND
ANE FILLED WITH HIGH GRADE OF CEMENT
BEST WATER PROOFING.


DETAIL EXPLANATION
NEW BRICK WORK
CEMENT COVER
GROUND LEVEL
PCC CONCRETE
OLD 6 CHINI PIPE
PCC CONCRETE
NEW 6 CHINI PIPE
DETAIL EXPLANATION
1. THE HIGHT OF CHAMBER WILL BE INCREASE BY 2 FROM
GROUND LEVEL BY 9 BRICK WALL SO THAT THE OUTER
WATER WIL NOT ENTER IN CHAMBER
2. 6 DIA CHINI PIPE WILL BE CONNETTED TO CHAMBER TO
CHAMBER IF IN CASE THE OLD PIPE MIGHT BE GET
CHOCK UP THE NEW PIPE WILL TAKE WATER.
3. THE CEMENT COVER WILL BE FIXED BY HIGH GRADE OF
CEMENT.