INT0100

INT0110
INT0120
INT0130
INT0140 Ordering of Steam
Generation Package 25-Oct-10 A 0
INT0150 Ordering of Air Compressor
Package 16-Mar-11 A 0
INT0170 Ordering of Oily Water
Treatment Package (OWS) 28-Oct10 A 0
INT0180 Ordering of Gate/Ball
Valves 16-Mar-11 A 0
INT0190 Ordering of Control Valves
11-Feb-11 A 0
INT0191 Ordering of Emergency
Shut Down Valves 11-Feb-11 A 0
INT0200 Ordering of Nitrogen
Package 01-Dec-10 A 0
INT0210 Ordering of Panel /
Switchgear 01-Dec-10 A 0
INT0220 Ordering of Power
Transformer 31-Dec-10 A 0
INT0230 Ordering of FF Pumps 09Jun-11 A 0
INT0240 Ordering of DG set 14-Jan11 A 0
INT0250 Receipt of Steam
Generation Package 16-May-12 A 0
INT0260 Receipt of Air Compressor
Package 10-May-12 A 0
INT0280 Receipt of Oily Water
Treatment Package (OWS) 20-Nov13 A 0
INT0290 Receipt of Gate/Ball Valves
24-Jul-13 A 0
INT0300 Receipt of Control Valves
05-Aug-13 A 0
INT0301 Receipt of Emergency Shut
Down Valves 16-Jul-13 A 0

INT0140

INT0150

INT0170
INT0180
INT0190
INT0191
INT0200
INT0210
INT0220
INT0230
INT0240

INT0250

INT0260

INT0280
INT0290
INT0300
INT0301

INT0310 Receipt of Nitrogen


Package 04-Jun-12 A 0
INT0320 Receipt of Panel /
Switchgear 11-Oct-12 A 0
INT0330 Receipt of Power
Transformer 15-Jul-12 A 0
INT0340 Receipt of Fire Water
System 16-Jul-13 A 0
INT0350 Receipt of DG set 21-Apr12 A 0
INT0360 All Building's Construction
Completion 22-Oct-13 A 0
INT0380 Hydrotesting Completion
08-Jan-14 A 0
INT0390 Erection of Equipments
completion 15-Jul-13 A 0
INT0400 Electrical works completion
12-Feb-13 A 0
INT0410 Instrument works
completion 11-Mar-14 A 0
INT0420 Fire Fighting Work
Completion 18-Nov-13 0
INT0430 Mechanical Completion 13Jan-14 0
INT440 Receipt of FIM-GT 06-Apr-12
A0
INT450 Receipt of FIM-Export
Booster Pumps 11-Apr-12 A 0
INT460 Receipt of Heat Tracing
System 21-Oct-13 A 0
INT470 Receipt of Foam
Concentrate Tank 27-Mar-12 A 0
INT480 Receipt of Deludge Valve 15May-13 A 0
INT490 Receipt of Electronic Flow
Meter 04-Jun-13 A 0
INT500 Mobilization of Mechanical
Contractor 07-Nov-11 A 0
INT510 Mobilization of Electrical
Contractor 10-Apr-12 A 0
INT520 Mobilization of
Instrumentation Contractor 10-Apr12 A 0

INT0310
INT0320
INT0330
INT0340
INT0350

INT0360
INT0380
INT0390
INT0400
INT0410
INT0420
INT0430
INT440
INT450
INT460
INT470
INT480
INT490

INT500

INT510

INT520

INT530 Receipt of Intrusion


Detection System 13-Apr-12 A 0
INT540 Mobilization of Insulation
Contractor 05-Jun-12 A 0
INT550 Completion of Piping
Erection 14-Dec-13 A 0
INT560 Installation of Jockey Pump
22-Nov-12 A 0
INT570 Delivery of Gate Valves 15Jul-13 A 0
INT580 RCC Completion of Dyke
Wall 18-Sep-13 A 0
INT590 Installation of Booster Pump
31-May-12 A 0
COMIM4.11
COMIM4.15 UNPRICED PO COPIES
OF E & I WORKS SUB-CONTRACT 15Mar-12 A 0
COMIM4.16 UNPRICED PO COPIES
OF HVAC WORKS SUB-CONTRACT 12Dec-11 A 0
COMIM4.9 UNPRICED PO COPIES OF
HEAT TRACING 29-Dec-11 A 0
COMIM5.1.1 COMPLETION OF CIVIL
FDN. FOR FIRE WATER STORAGE
TANKS 15-Mar-12 A 0
COMIM5.1.10 COMPLETION OF
CIVIL FDN. FOR DIESEL GENERATOR
24-Feb-12 A 0
COMIM5.1.11 COMPLETION OF
CIVIL FDN. FOR VENT STACK 15-May12 A 0
COMIM5.1.13 COMPLETION OF
CIVIL FDN. FOR DIESEL STORAGE
TANK 24-Feb-12 A 0
COMIM5.1.2 COMPLETION OF CIVIL
FDN. FOR RAW WATER STORAGE
TANKS 13-Sep-12 A 0
COMIM5.1.3 COMPLETION OF CIVIL
FDN. FOR CLOSED DRAIN TANKS 13Sep-12 A 0

INT530

INT540
INT550
INT560
INT570
INT580
INT590
COMIM4.11

COMIM4.15

COMIM4.16

COMIM4.9

COMIM5.1.1

COMIM5.1.10

COMIM5.1.11

COMIM5.1.13

COMIM5.1.2

COMIM5.1.3

COMIM5.1.4 COMPLETION OF CIVIL


WORKS FOR TANK DYKE WALLS AND
PAVING 20-Nov-13 A 0
COMIM5.1.5 COMPLETION OF CIVIL
FDN. FOR EXPORT PUMPS 07-Dec11 A 0
COMIM5.1.6 COMPLETION OF CIVIL
FDN. FOR GAS TURBINES 15-Jan-12
A0
COMIM5.1.7 COMPLETION OF CIVIL
FDN. FOR CUSTODY TRANSFER
METERING SKID 17-Jan-12 A 0
COMIM5.1.8 COMPLETION OF CIVIL
FDN. FOR FIRE WATER & JOCKEY
PUMPS 28-Apr-12 A 0
COMIM5.1.9 COMPLETION OF CIVIL
FDN. FOR STEAM GENERATION
PACKAGE 26-Mar-12 A 0
COMIM5.2.1 RECEIPT AT SITE OF
STEAM GENERATION PACKAGE 14Nov-12 A 0
COMIM5.2.10 RECEIPT AT SITE OF
FIRE WATER AND JOCKEY PUMPS 16Oct-12 A 0

COMIM5.1.4

COMIM5.1.5

COMIM5.1.6

COMIM5.1.7

COMIM5.1.8

COMIM5.1.9

COMIM5.2.1

COMIM5.2.10

COMIM5.2.12 RECEIPT AT SITE OF


HT & LT CABLES 13-Nov-12 A 0

COMIM5.2.12

COMIM5.2.13 RECEIPT AT SITE OF


PIPING BULKS PIPE, FLANGES,
FITTINGS, GASKETS 18-Sep-13 A 0

COMIM5.2.13

COMIM5.2.15 RECEIPT AT SITE OF


ELECTRICAL BULKS 18-Jul-13 A 0
COMIM5.2.2 RECEIPT AT SITE OF
DIESEL GENERATOR PACKAGE 21Apr-12 A 0
COMIM5.2.3 RECEIPT AT SITE OF
RAW WATER TREATMENT PACKAGE
15-Nov-12 A 0
COMIM5.2.4 RECEIPT AT SITE OF
INSTRUMENT AIR PACKAGE 24-Oct12 A 0

COMIM5.2.15

COMIM5.2.2

COMIM5.2.3

COMIM5.2.4

COMIM5.2.5 RECEIPT AT SITE OF


OWS PACKAGE 20-Nov-13 A 0
COMIM5.2.6 RECEIPT AT SITE OF
SEWAGE/EFFLUENT TREATMENT
PACKAGES 21-Oct-13 A 0
COMIM5.2.7 RECEIPT AT SITE OF
POWER & DISTRIBUTION
TRANSFORMERS 20-Dec-12 A 0
COMIM5.2.8 RECEIPT AT SITE OF
HEAT TRACING 21-Nov-13 A 0
COMIM5.2.9 RECEIPT AT SITE OF HV
/ LV SWITCHGEAR 23-Jan-13 A 0
COMIM5.3.1 COMP. INSTAL. OF
STEAM GENERATION PACKAGE 15Nov-12 A 0
COMIM5.3.10 COMP. INSTAL. OF HV
/ LV SWITCHGEAR 18-Sep-13 A 0
COMIM5.3.11 COMP. INSTAL. OF
FIRE WATER AND JOCKEY PUMPS 22Jul-13 A 0
COMIM5.3.13 COMP. INSTAL. OF
FREE-ISSUE ITEMS 15-May-13 0
COMIM5.3.14 COMP. INSTAL. OF
ALL EXPORT PUMPS 31-May-12 A 0
COMIM5.3.15 COMP. INSTAL. OF
GAS TURBINES 25-Jan-12 A 0
COMIM5.3.16 COMP. INSTAL. OF
SEHMS HARDWARE / EQUIPMENT
15-May-13 0
COMIM5.3.17 COMP. INSTAL. OF
CUSTODY TRANSFER METERING
PACKAGE 20-Mar-12 A 0
COMIM5.3.2 COMP. INSTAL. OF
INSTRUMENT AIR PACKAGE 16-Nov12 A 0
COMIM5.3.3 COMP. INSTAL. OF
RAW WATER TREATMENT PACKAGE
17-Jan-13 A 0
COMIM5.3.4 COMP. INSTAL. OF
TREATED WATER PACKAGE 20-Nov13 A 0
COMIM5.3.5 COMP. INSTAL. OF
DIESEL GENERATOR PACKAGE 30Apr-12 A 0

COMIM5.2.5

COMIM5.2.6

COMIM5.2.7
COMIM5.2.8

COMIM5.2.9

COMIM5.3.1

COMIM5.3.10

COMIM5.3.11
COMIM5.3.13

COMIM5.3.14
COMIM5.3.15

COMIM5.3.16

COMIM5.3.17

COMIM5.3.2

COMIM5.3.3

COMIM5.3.4

COMIM5.3.5

COMIM5.3.6 COMP. INSTAL. OF


OWS PACKAGE 19-Mar-14 A 0
COMIM5.3.7 COMP. INSTAL. OF
SEWAGE/EFFLUENT TREATMENT
PACKAGES 13-Jun-13 A 0
COMIM5.3.8 COMP. INSTAL. OF
POWER & DISTRIBUTION
TRANSFORMERS 23-Jul-13 0
COMIM5.3.9 COMP. INSTAL. OF
HEAT TRACING 30-Dec-13 0
COMIM5.4.1 COMPLETION OF
SUPER-STRUCTURE FOR ADMIN
BUILDING 01-Nov-12 A 0
COMIM5.4.2 COMPLETION OF SUBSTRUCTURE FOR ADMIN BUILDING
15-May-13 0
COMIM5.4.3 COMPLETION OF
INTERNAL FIT-OUT FOR CONTROL
BUILDINGS 15-May-13 0
COMIM5.5.1 COMPLETION OF
WORKSHOP/WAREHOUSE/LABORAT
ORY 15-May-13 0
COMIM5.5.2 COMPLETION OF
ADMINISTRATION BDLG 15-May-13
0
COMIM5.5.3 COMPLETION OF
SECURITY BUILDINGS & CABINS 15May-13 0
COMIM5.5.4 COMPLETION OF FIRE
STATION & MEDICAL CENTRE 15May-13 0
COMIM5.5.5 COMPLETION OF MAIN
PLANT SUBSTATION 15-May-13 0
COMIM5.5.6 COMPLETION OF 11KV
SUBSTATION 15-May-13 0
COMIM5.5.7 COMPLETION OF
SEHMS SUBSTATION 15-May-13 0
COMIM5.5.8 COMPLETION OF MAIN
DG ROOM 15-May-13 0
COMIM5.5.9 COMPLETION OF
VARIOUS MCC ROOMS 03-Jul-13 0

COMIM5.3.6

COMIM5.3.7

COMIM5.3.8
COMIM5.3.9

COMIM5.4.1

COMIM5.4.2

COMIM5.4.3

COMIM5.5.1

COMIM5.5.2

COMIM5.5.3

COMIM5.5.4

COMIM5.5.5
COMIM5.5.6

COMIM5.5.7
COMIM5.5.8

COMIM5.5.9

COMIM5.6.1 COMPLETION OF
WALLS, FENCING INCL. SECURITY
GATES, CABINS, TOWERS 15-May-13
0
COMIM5.6.10 COMPLETION OF ALL
OTHER CIVIL, MECHANICAL,
ELECTRICAL & INSTRUMENT... 06Jan-14 0
COMIM5.6.12 TEST. & COMMI. OF
STEAM GENERATION PACKAGE 17Aug-13 0
COMIM5.6.13 TEST. & COMMI. OF
DIESEL GENERATOR PACKAGE 15May-13 0
COMIM5.6.14 TEST. & COMMI. OF
RAW WATER TREATMENT PACKAGE
02-Oct-13 0
COMIM5.6.15 TEST. & COMMI. OF
TREATED WATER PACKAGE 29-Oct13 0
COMIM5.6.16 TEST. & COMMI. OF
INSTRUMENT AIR PACKAGE 15-May13 0
COMIM5.6.17 TEST. & COMMI. OF
OWS PACKAGE 03-Jul-13 0
COMIM5.6.18 TEST. & COMMI. OF
SEWAGE/EFFLUENT TREATMENT
PACKAGES 29-Oct-13 0
COMIM5.6.19 TEST. & COMMI. OF
POWER & DISTRIBUTION
TRANSFORMERS 23-Jul-13 0
COMIM5.6.2 COMPLETION OF
TERMINAL ROADS AND DRAINS 09Sep-13 0
COMIM5.6.20 TEST. & COMMI. OF
HEAT TRACING 30-Dec-13 0
COMIM5.6.21 TEST. & COMMI. OF
HV / LV SWITCHGEAR 15-May-13 0
COMIM5.6.22 TEST. & COMMI. OF
FIRE WATER AND FOAM SYSTEM 09Aug-13 0
COMIM5.6.24 TEST. & COMMI. OF
TERMINAL PIPING 06-Jan-14 0

COMIM5.6.1

COMIM5.6.10

COMIM5.6.12

COMIM5.6.13

COMIM5.6.14

COMIM5.6.15

COMIM5.6.16
COMIM5.6.17

COMIM5.6.18

COMIM5.6.19

COMIM5.6.2
COMIM5.6.20

COMIM5.6.21

COMIM5.6.22

COMIM5.6.24

COMIM5.6.25 TEST. & COMMI. OF


TERMINAL TANKS FIRE WATER,
CLOSED DRAIN, FOAM C... 09-Aug13 0
COMIM5.6.26 TEST. & COMMI. OF
DIESEL STORAGE AND
DISTRIBUTION SYSTEM 15-May-13 0
COMIM5.6.3 COMPLETION OF
DRILLING OF 5 BORE WELLS AND
ASSOCIATED PUMP & ITS P... 01-Jun13 0
COMIM5.6.4 COMPLETION OF
TERMINAL PIPING, VALVES (INCL
FREE-ISSUE), PIPING RACK... 14-Dec13 0
COMIM5.6.5 COMPLETION OF
POWER AND CONTROL CABLING 30Nov-13 0
COMIM5.6.7 COMPLETION OF
DIESEL STORAGE AND
DISTRIBUTION SYSTEM 15-May-13 0
COMIM5.6.8 COMPLETION OF ALL
TANKS & VESSELS FIRE WATER,
CLOSED DRAIN, FOA... 15-May-13 0
EPR100 Receive of Package Scheme,
Flow Diagrams, system data sheets,
equipment layout ... 15-Sep-1... 16Sep-10 A 1
EPR110 Review of Package Scheme,
Flow Diagrams, system data sheets,
equipment layout ... 18-Sep-1... 26Nov-10 A 25
EPR140 Release of P&ID for package
items by IOT 19-Jan-1... 08-Aug-11 A
30
EPR150 Release of Final Equipment
Layout drawings, GADs by IOT 17Jan-1... 04-Jul-11 A 15
EPR160 Participation of Hazop study
for package equipments 04-Aug-1...
24-Aug-11 A 7

COMIM5.6.25

COMIM5.6.26

COMIM5.6.3

COMIM5.6.4

COMIM5.6.5

COMIM5.6.7

COMIM5.6.8

EPR100

EPR110

EPR140

EPR150

EPR160

EPR170 Incorporatiion of
recommendations as per Hazop
Review 12-Jun-1... 24-Jun-11 A 10
ECV050 Receipt of AFC Architectural
Drawing from TCEL / CEIL 12-Oct-1...
15-Oct-10 A 5
ECV100 Receipt of AFC Drawing of
Admin Building from TCEL / CEIL 21Sep-1... 23-Sep-10 A 2
ECV110 Receipt AFC Drawing for
Control Building from TCEL / CEIL 21Sep-1... 23-Sep-10 A 2
ECV120 Receipt of AFC Drawing of
canopy at entrance from TCEL / CEIL
15-Oct-1... 18-Oct-10 A 2
ECV130 Receipt of AFC Drawing of
laboratory Building from TCEL / CEIL
20-Sep-1... 21-Sep-10 A 2
ECV140 Receipt of AFC Drawing of
Warehouse/ Workshop Building
from TCEL / CEIL 21-Sep-1... 23-Sep10 A 2
ECV150 Receipt of AFC Drawing of
Electrical substation from TCEL /
CEIL 21-Sep-1... 25-Sep-10 A 5
ECV160 Receipt AFC Drawing for
Fire station Building from TCEL /
CEIL 18-Sep-1... 23-Sep-10 A 5
ECV170 Receipt of AFC Drawing of
Medical Centre from TCEL / CEIL 18Sep-1... 20-Sep-10 A 2
ECV180 Receipt of AFC Drawing for
Fire Water Pump House from TCEL /
CEIL 20-Oct-1... 29-Oct-10 A 10
ECV190 Receipt of AFC Drawing for
Pump/Package Foundation from
TCEL / CEIL 19-Oct-1... 27-Oct-10 A
10
ECV200 Release of Pipe Sleepers
Drgs for Fire Water Network 13-Jul11 A 24-Jul-11 A 1

EPR170

ECV050

ECV100

ECV110

ECV120

ECV130

ECV140

ECV150

ECV160

ECV170

ECV180

ECV190

ECV200

ECV210 Receipt of AFC Drawing of


Roads,Culverts, walkways, etc from
TCEL / CEIL 17-Sep-1... 20-Sep-10 A
3
ECV220 Receipt of AFC Drawing of
Dyke wall and Paving in the Tank
Farm from TCEL / CEIL 23-Sep-1... 24Sep-10 A 2
ECV240 Receipt AFC Drawing of
MCC & Substation from TCEL / CEIL
20-Sep-1... 21-Sep-10 A 2
ECV250 Receipt of AFC Drawing for
Drains system from TCEL / CEIL 17Sep-1... 18-Sep-10 A 2
ECV260 Detail Engineeing for
Foundations of Package items 10Sep-1... 22-Sep-10 A 15
ECV270 Fdn Drgs for Air Compressor
10-Jan-1... 10-Feb-12 A 25
ECV280 Fdn Drgs for STP Package 12Dec-1... 30-Dec-11 A 25
ECV290 Fdn Drgs for Water
Treatment Package 16-Jan-1... 27Feb-12 A 25
ECV300 Fdn Drgs for OWS
Treatment Package 23-Apr-1... 27Apr-12 A 15
ECV310 Fdn Drgs for Nitrogen
Package 02-Jan-1... 10-Feb-12 A 25
ECV320 Fdn Drgs for Steam
Generation Package / Boiler 01-Feb1... 10-Feb-12 A 25
ECV330 Fdn Drgs for Pumps 21-Apr1... 25-Apr-12 A 25
ECV340 Fdn Drgs for Fuel & Gas
System (KO Drum,Cartridge Filter,
Electric Heater) 28-Mar-1... 09-Apr12 A 25
ECV350 Fdn Drgs for NGR 26-Mar1... 20-Apr-12 A 25
ECV360 Fdn Drgs for Transformer 06Dec-1... 23-Dec-11 A 25

ECV210

ECV220

ECV240

ECV250

ECV260

ECV270

ECV280

ECV290

ECV300

ECV310

ECV320
ECV330

ECV340
ECV350

ECV360

ECV370 Fdn Drgs for SHEMS


Transformer 05-Dec-1... 30-Dec-11
A 25
ECV380 Fdn Drgs for Vent Stack 05Sep-1... 23-Feb-12 A 25
ECV390 Fdn Drgs for DG Set 05-Dec1... 29-Dec-11 A 25
ECV400 Fdn Drgs for Foam Pump
Skid 16-Jan-1... 22-Feb-12 A 25
ECV410 Fdn Drgs for Foam
Concentrate Tank 27-Feb-1... 03-Apr12 A 25
ECV420 Fdn Drgs for Fire Water
Tank (New) 01-Feb-1... 26-Mar-12 A
25
ECV430 Fdn Drgs for Fire Water
Pump 01-Mar-1... 11-Apr-12 A 25
EPIP090 Incorporate Vendor datas
and Finalisation of Plot Plan 22-Feb1... 08-May-12 A 30
EPIP100 Receipt of P&ID Piping
Layout, GAD, Sectional Drawings
from TCEL/CEIL 08-Sep-1... 09-Sep10 A 2
EPIP110 Receipt of Updated PMS
and VMS from TCEL / CEIL 08-Sep1... 09-Sep-10 A 2
EPIP120 Layout & Isometric drgs for
U/G Services like OWS / CBD /
Sewage 13-Apr-1... 29-Apr-11 A 1
EPIP130 Layout & Isometric for Fire
Water Network 21-Apr-1... 21-Apr11 A 1
EPIP140 Issue of Piping/ Fitting MTO1 by IOT 21-Sep-1... 10-Nov-10 A 10
EPIP150 Issue of Piping / Fitting
MTO-2 15-Feb-1... 15-Feb-11 A 10
EPIP160 Issue of Isometric from
CEIL/Vendor 22-Feb-1... 12-Jul-12 A
60

ECV370
ECV380
ECV390

ECV400

ECV410

ECV420

ECV430

EPIP170 Detail Engineeing for


Package items 18-Jan-1... 08-Apr-11
A 15
Mechanical 16-Sep-1... 01-Jun-12 A
46
EME120 Issue of MR for Oily water/
Sewage water treatment package 16Sep-1... 18-Sep-10 A 2
EME140 Issue of MR for Plant and
Treated water package 16-Sep-1...
21-Sep-10 A 2
EME150 Issue of MR for Plant and
Instrument Air Package 16-Sep-1...
21-Sep-10 A 2
EME160 Issue of MR for Raw Water
Treatment Package 16-Sep-1... 21Sep-10 A 1
EME170 Issue of MR for Steam
generation system package 16-Sep1... 21-Sep-10 A 2
EME175 Issue of MR for Nitrogen
Generation System 16-Sep-1... 21Sep-10 A 5
EME180 Issue of MR for Fuel Gas
System 29-Sep-1... 03-Dec-10 A 20
EME220 Issue of MR for Pipes Bulks
21-Sep-1... 23-Sep-10 A 2
EME250 Issue of MR for Fire water
pump package 16-Sep-1... 21-Sep-10
A2
EME260 Issue of MR for Closed
Drain Pump 16-Sep-1... 21-Sep-10 A
2
EME270 Issue of MR for Diesel
Unloading pump 16-Sep-1... 21-Sep10 A 2
EME280 Issue of MR for
Reinforecement Steel / Structural
Steel Bulk items 21-Sep-1... 26-Oct10 A 40
EME290 Issue of MR for Air
conditioning and Ventiliation system
16-Sep-1... 20-Nov-10 A 2

EME300 Issue of MR for EOT Crane


or Material Handling system 16-Sep1... 21-Sep-10 A 6
EME310 Detail Engineering for
Tanks (Fabrication Drawings.) 28Oct-1... 01-Jun-12 A 25
Electrical 02-Sep-1... 11-Apr-12 A 91
EEL100 Receipt of SLDs from TCEL /
CEIL 27-Sep-1... 28-Sep-10 A 1
EEL120 Receipt of Approved Area
classification Drawing from TCEL /
CEIL 29-Oct-1... 06-Nov-10 A 10
EEL130 Receipt of Approvevd Load
List from TCEL / CEIL 27-Sep-1... 28Sep-10 A 1
EEL140 Issue of MR for Transformer
28-Sep-1... 30-Sep-10 A 2
EEL150 Issue of MR for UPS 28-Sep1... 30-Sep-10 A 2
EEL160 Issue of MR for
Switchgear/Panel 28-Sep-1... 30-Sep10 A 2
EEL170 Receipt of Approvevd data
sheet & Cable Schedule from TCEL /
CEIL 02-Sep-1... 21-Sep-10 A 5
EEL180 Issue of MR C.P. System 30Sep-1... 08-Oct-10 A 10
EEL190 Issue of MR for DG 30-Sep1... 01-Oct-10 A 2
EEL200 Issue of MR for Battery and
Battery Charger 30-Sep-1... 01-Oct10 A 2
EEL210 Issue of MR for NGR 30-Sep1... 01-Oct-10 A 2
EEL220 Detail Engineeing for
Package items 01-Dec-1... 11-Apr-12
A 15
Instrumentation 25-Sep-1... 09-May12 A 82

EIN100 Receipt of Approvevd


instrument index from TCEL / CEIL
11-Oct-1... 15-Oct-10 A 5
EIN110 Receipt of Approvevd I/O list
from TCEL / CEIL 28-Sep-1... 02-Oct10 A 5
EIN120 Receipt of Approvevd
Instrument data sheet from TCEL
/CEIL 25-Sep-1... 30-Sep-10 A 5
EIN130 Receipt of Approvevd
Instrument Hook up drawing from
TCEL / CEIL 31-Dec-1... 03-Jan-11 A 7
EIN140 Issue of MR for Bulk Items
(MOV / PCV / Transmitters / Gauges
etc.) 16-Oct-1... 12-Nov-10 A 30
EIN150 Detail Engineeing for
Package items 20-Dec-1... 09-May12 A 15
Addition Engineering-F Fire Fighting
Changes 25-Apr-1... 05-Sep-11 A 74
MDPP-FPSC-0001 RECEIPT OF
CONSOLIDATED CHANGE LIST ON
FPS FROM CEIL AND CHANGE ... 15Jul-11 A 0
MDPP-FPSC-E-00001RECEIPT OF
REVISED PLOT PLAN 02-Sep-1... 05Sep-11 A 1
MDPP-FPSC-E-0002MR FOR FIRE
WATER MAIN & JOCKEY PUMP 25Apr-1... 25-Apr-11 A 1
MDPP-FPSC-E-0003MR FOR FOAM
CONCENTRATE TANK 25-Apr-1... 25Apr-11 A 1
MDPP-FPSC-E-0004MR FOR FOAM
CONCENTRATE 25-Apr-1... 25-Apr11 A 1
MDPP-FPSC-E-0005MR FOR FOAM
SYSTEM ACCESSORIES 24-May-1...
24-May-11 A 1
MDPP-FPSC-E-0006MR FOR DELUGE
VALVES 24-May-1... 24-May-11 A 1

MDPP-FPSC-E-0007MR FOR
STRAINERS 24-May-1... 24-May-11 A
1
MDPP-FPSC-E-0008MR FOR GATE
VALVES 24-May-1... 24-May-11 A 1
MDPP-FPSC-E-0009MR FOR CHECK
VALVES 24-May-1... 24-May-11 A 1
MDPP-FPSC-E-0010MR FOR
ELECTROMAGNETIC FLOW METER
24-May-1... 24-May-11 A 1
MDPP-FPSC-E-0011MR FOR PLC FOR
PUMPS 24-May-1... 24-May-11 A 1
MDPP-FPSC-E-0012MR FOR RUBBER
EXPANSION BELLOW 24-May-1... 24May-11 A 1
MDPP-FPSC-E-0022MR FOR CP
SYSTEM 24-May-1... 24-May-11 A 1
MDPP-FPSC-E-0032MR FOR FPSPIPES 24-May-1... 24-May-11 A 1
MDPP-FPSC-E-0042MR FOR FPSFITTINGS 24-May-1... 24-May-11 A 1
MDPP-FPSC-E-0052MR FOR FPSFLANGES & MISCELLENOUS 24-May1... 24-May-11 A 1
ENGINEERING-FREE ISSUE
MATERIAL 20-Sep-1... 09-Jan-13 A
601
EFI010 Receipt of Input of free issue
material from CEIL 20-Sep-1... 28Sep-10 A 10
EFI030 Receipt of Electrical Input for
GT / MAIN LINE PUMP / BOOSTER
PUMPS/ CTM Pkg 20-Oct-1... 28-Feb11 A 10
EFI040 Receipt of Civil Foundation
drawing of free issue material from
CEIL 31-Jan-1... 01-May-12 A 10

EFI050 Detail Engineering for Clean


agent system, location of Fire
Extinguisher by Vendor 20-Mar-1...
30-Mar-12 A 10
EFI051 Receipt of Hydrant Layout
form CEIL/TCE 11-Dec-1... 09-Jan-13
A 10
AS BUILT DRAWING 18-Nov-13 10Jan-14 39
EBD100 As Built drawing & Final
Documentation 18-Nov-13 10-Jan14 60
PROCUREMENT 17-Sep-1... 20-Sep13 777
SUBCONTRACTING 30-Sep-1... 14Feb-12 A 129
CIVIL/STRUCTURAL 30-Sep-1... 08Jan-11 A 40
SC120 Prep. of Tender & award of
contract for all Civil Package (Road,
Dyke wall, drain etc.) 30-Sep-1... 25Oct-10 A 25
SC130 Finalisation of Civil
Contractor for all packages
(Equipment foundations etc.) 02-Oct1... 03-Jan-11 A 60
SC140 Prep. of Tender & award of
contract for Building Contractor 04Oct-1... 08-Jan-11 A 25
MECHANICAL/PIPING 03-Jan-1... 06Jul-11 A 22
SC160 Prep. of Tender Mechanical (
Piping & Fire Fighting) 03-Jan-1... 04Feb-11 A 20
SC170 Finalisation of Mechanical
Contractor 12-Feb-1... 06-Jul-11 A 5
ELECTRICAL 30-Dec-1... 14-Feb-12 A
16
SC260 Preparation and Issue Tender
for Electrical 30-Dec-1... 07-Feb-11 A
22
SC270 Finalisation of Tender for
Electrical Contractor 11-Feb-1... 14Feb-12 A 25

INSTRUMENT 29-Dec-1... 14-Feb-12


A 29
SC180 Preparation and Issue
Instrumentation Tender 29-Dec-1...
01-Feb-11 A 22
SC190 Finalisation of
Instrumentation Contractor 09-Feb1... 14-Feb-12 A 5
INSULATION 29-Dec-1... 21-Dec-11 A
9
SC200 Preparation and Issue Tender
for piping Insulation 29-Dec-1... 02Feb-11 A 15
SC210 Finalisation of Tender for
Insulation contractor 08-Feb-1... 21Dec-11 A 7
PAINTING 30-Dec-1... 01-Jun-11 A
22
SC220 Preparation and Issue Tender
for Painting 30-Dec-1... 07-Feb-11 A
15
SC230 Finalisation of Tender for
Painting Contractor 15-Feb-1... 01Jun-11 A 5
MECHANICAL/ EQUIPMENT 17-Sep1... 17-Sep-13 587
OWS Package 20-Sep-1... 13-Aug-13
127
PRE120 Issue Enquiry 20-Sep-1... 20Sep-10 A 1
PRE122 Bids received 20-Sep-1... 01Oct-10 A 10
PRE123 TBA / CBA 29-Sep-1... 25Oct-10 A 20
PRE124 Ordering for Oily water
treatment package 25-Oct-1... 28Oct-10 A 8
PRE130 Mfg and Del at site-Oily
water treatment package 28-Oct-1...
13-Aug-13 160
Water Treatment Package 17-Sep1... 14-Sep-13 163
PRE191 Issue Enquiry 17-Sep-1... 21Sep-10 A 1
PRE192 Bids received 18-Sep-1... 05Oct-10 A 10

PRE193 TBA / CBA 27-Sep-1... 25Oct-10 A 15


PRE194 Ordering of Raw Water
Treatment Package 25-Oct-1... 28Oct-10 A 8
PRE195 Mfg and Del at site-Water
Treatment Package 28-Oct-1... 14Sep-13 200
STP Package 18-Sep-1... 08-Jun-13
133
PRE160 Issue Enquiry 18-Sep-1... 21Sep-10 A 1
PRE162 Bids received 20-Sep-1... 05Oct-10 A 10
PRE163 TBA / CBA 05-Oct-1... 25Oct-10 A 12
PRE164 Ordering for Sewage water
treatment package 25-Oct-1... 28Oct-10 A 8
PRE170 Mfg and Del at site- Sewage
water treatment package 28-Oct-1...
08-Jun-13 160
Closed Drain Pump 18-Sep-1... 23Jul-12 A 207
PRE100 Issue Enquiry 18-Sep-1... 20Sep-10 A 1
PRE102 Bids received 20-Sep-1... 30Oct-10 A 8
PRE103 TBA / CBA 31-Oct-1... 28-Jan11 A 14
PRE104 Ordering for Closed Drain
Pump 28-Jan-1... 07-Feb-11 A 7
PRE110 Mfg and Del at site-Closed
Drain pump 28-Feb-1... 23-Jul-12 A
150
Diesel Unloading Pump 18-Sep-1...
30-May-12 A 172
PRE260 Issue Enquiry 18-Sep-1... 21Sep-10 A 1
PRE262 Bids received 25-Sep-1... 28Oct-10 A 8
PRE263 TBA / CBA 28-Oct-1... 23Nov-10 A 15

PRE264 Ordering for Diesel


unloading pump 27-Nov-1... 17-Dec10 A 8
PRE270 Mfg and Del at site-Diesel
unloading pump 17-Dec-1... 30-May12 A 150
Interface Transfer Pump 18-Sep-1...
20-Dec-12 A 172
PRE272 Bids received 25-Sep-1... 28Oct-10 A 8
PRE273 TBA / CBA 28-Oct-1... 23Nov-10 A 15
PRE274 Ordering for Interface
Transfer Pump 27-Nov-1... 17-Dec10 A 8
PRE280 Issue Enquiry 18-Sep-1... 21Sep-10 A 1
PRE290 Mfg and Del at siteInterface Transfer Pump 17-Dec-1...
20-Dec-12 A 150
Structural Steel / Reinforcement
Steel/ Plates 23-Sep-1... 12-Dec-12 A
80
PRE300 Issue Enquiry 23-Sep-1... 24Sep-10 A 1
PRE302 Bids received 24-Sep-1... 20Oct-10 A 10
PRE303 TBA / CBA 20-Oct-1... 02Nov-10 A 15
PRE304 Ordering of Structural Steel
/ Reinforcement Steel 05-Nov-1...
01-Jun-11 A 25
PRE310 Mfg and Del at siteStructural steel and Plate 06-Nov1... 12-Dec-12 A 80
Treated Water Package 0
Air Compressor 18-Sep-1... 28-Nov12 A 292
PRE180 Issue Enquiry 18-Sep-1... 21Sep-10 A 1
PRE182 Bids received 20-Sep-1... 19Oct-10 A 10
PRE183 TBA / CBA 20-Oct-1... 16Feb-11 A 15
PRE184 Ordering of Air Compressor
16-Feb-1... 16-Mar-11 A 8

PRE190 Mfg and Del at site-Air


Compressor-(Dryer & receiver
pending) 23-May-1... 28-Nov-12 A
160
Nitrogen Package 21-Sep-1... 22-Nov12 A 240
PRE201 Issue Enquiry 21-Sep-1... 22Sep-10 A 1
PRE202 Bids received 22-Sep-1... 29Oct-10 A 12
PRE203 TBA / CBA 29-Oct-1... 24Nov-10 A 20
PRE204 Ordering for Nitrogen
Generation System 24-Nov-1... 01Dec-10 A 10
PRE210 Mfg and Del at site-Nitrogen
Generation System 02-Dec-1... 22Nov-12 A 230
HVAC System 18-Sep-1... 25-Dec-12
A 256
PRE340 Issue Enquiry 18-Sep-1... 04Nov-10 A 1
PRE342 Bids received 04-Nov-1... 14Dec-10 A 10
PRE343 TBA / CBA 15-Dec-1... 17Jan-11 A 25
PRE345 Ordering of Air conditioning
and Ventiliation system 19-Jan-1...
03-Feb-11 A 7
PRE350 Mfg and Del at site-Air
conditioning and Ventiliation system
28-Feb-1... 25-Dec-12 A 200
EOT Crane 27-Sep-1... 17-Jan-13 A
233
PRE360 Issue Enquiry 27-Sep-1... 28Sep-10 A 1
PRE362 Bids received 28-Sep-1... 16Oct-10 A 8
PRE363 TBA / CBA 16-Oct-1... 10Feb-11 A 15
PRE364 Ordering of -EOT Crane or
Material Handling system 10-Feb1... 15-Mar-11 A 8
PRE370 Mfg and Del at site-EOT
Crane 17-Mar-1... 17-Jan-13 A 160

Fuel & Gas System 30-Sep-1... 27Dec-12 A 238


PRE400 Issue Enquiry 30-Sep-1... 03Dec-10 A 1
PRE402 Bids received 15-Dec-1... 20Dec-10 A 10
PRE403 TBA / CBA 23-Dec-1... 24Jan-11 A 15
PRE405 Ordering of Fuel & Gas
System 25-Jan-1... 10-Feb-11 A 8
PRE410 Mfg and Del at site-Fuel &
Gas System 15-Feb-1... 27-Dec-12 A
200
Steam Generation System / Boiler
18-Sep-1... 16-Oct-12 A 232
PRE420 Issue Enquiry 18-Sep-1... 21Sep-10 A 1
PRE422 Bids received 20-Sep-1... 04Oct-10 A 10
PRE423 TBA / CBA 04-Oct-1... 21Oct-10 A 22
PRE424 Ordering of Steam
generation system 21-Oct-1... 25Oct-10 A 8
PRE430 Mfg and Del at site-Steam
generation system 26-Oct-1... 16Oct-12 A 240
SMC Panel Tank 01-Jun-1... 28-Jun13 135
PRE434 Ordering of SMC Panel Tank
01-Jun-1... 09-Jun-11 A 8
PRE470 Mfg and Del at site-SMC
Panel Tank 13-Jun-1... 28-Jun-13 180
Fire Fighting System 18-Sep-1... 17Sep-13 587
PRE440 Issue Enquiry 18-Sep-1... 18Sep-10 A 1
PRE442 Bids received 20-Sep-1... 10Dec-10 A 8
PRE443 TBA / CBA 11-Dec-1... 20Jan-11 A 20
PRE444 Ordering of Fire Fighting
System 31-Jan-1... 12-Apr-11 A 20

PRE450 Mfg and Del at site of Fire


Fighting System 07-Jun-1... 17-Sep13 140
PIPING 27-Sep-1... 22-Jul-13 301
Pipes - 1st MTO 27-Sep-1... 15-Dec11 A 131
PPIP100 Issue Enquiry 27-Sep-1... 28Sep-10 A 1
PPIP102 Bids received 28-Sep-1... 07Oct-10 A 10
PPIP103 TBA / CBA 07-Oct-1... 30Oct-10 A 5
PPIP104 Ordering for Pipes -1st
MTO (in Lots) 30-Oct-1... 16-Nov-10
A 60
PPIP110 Mfg and Del at site-Pipe 1st
MTO-A1 18-Nov-1... 15-Dec-11 A
150
Pipes - 2nd MTO 15-Feb-1... 14-Nov12 A 79
PPIP120 Issue Enquiry 15-Feb-1... 15Feb-11 A 1
PPIP122 Bids received 15-Feb-1... 31Oct-11 A 1
PPIP123 TBA / CBA 15-Feb-1... 15Feb-11 A 5
PPIP124 Ordering for Pipes -2nd
MTO 15-Feb-1... 15-Feb-11 A 30
PPIP130 Mfg and Delivery at site2nd MTO-A3 15-Feb-1... 14-Nov-12
A 70
Fittings / Flanges 12-Oct-1... 04-Jul13 193
PPIP140 Issue Enquiry 12-Oct-1... 13Oct-10 A 1
PPIP142 Bids received 13-Oct-1... 30Oct-10 A 10
PPIP143 TBA / CBA 03-Nov-1... 06Nov-10 A 5
PPIP144 Ordering for Fitting /
Flanges 09-Nov-1... 11-Apr-11 A 25
PPIP150 Mfg and Del at site- Fittings
/ Flanges 15-Apr-1... 04-Jul-13 90
Gate / Ball Valve 27-Sep-1... 22-Jul13 301

PRE320 Issue Enquiry 27-Sep-1... 28Sep-10 A 1


PRE322 Bids received 28-Sep-1... 16Oct-10 A 8
PRE323 TBA / CBA 16-Oct-1... 23Oct-10 A 8
PRE324 Ordering of Ball / Gate
Valve 15-Nov-1... 16-Mar-11 A 14
PRE330 Mfg and Del at site- Ball and
Gate Valve 25-May-1... 22-Jul-13
180
ELECTRICAL 21-Sep-1... 20-Sep-13
438
6.6KV Switchgear 23-Sep-1... 08May-12 A 177
PELE131 Issue Enquiry for 6.6KV
Switchgear 23-Sep-1... 24-Sep-10 A
1
PELE132 Bids received 30-Sep-1... 15Oct-10 A 7
PELE133 TBA / CBA 15-Oct-1... 24Nov-10 A 15
PELE134 Ordering of Switchgear 24Nov-1... 01-Dec-10 A 12
PELE135 Mfg and Del at site- 6.6KV
Switchgear 02-Dec-1... 08-May-12 A
220
11KV Switchgear 22-Sep-1... 13-Jul12 A 184
PELE120 Issue Enquiry 22-Sep-1... 23Sep-10 A 1
PELE122 Bids received 30-Sep-1... 15Oct-10 A 10
PELE124 TBA / CBA 15-Oct-1... 24Nov-10 A 12
PELE125 Ordering of Switchgear 25Nov-1... 01-Dec-10 A 22
PELE130 Mfg and Del at site-11KV
Switchgear 02-Dec-1... 13-Jul-12 A
220
Distribution Transformer 21-Sep-1...
12-Mar-12 A 192

EPR130 Preparation of Detail


specifications, data sheets, standard
drawings and documents f... 28-Oct1... 03-Feb-11 A 30
PELE151 Issue Enquiry 21-Sep-1... 21Sep-10 A 1
PELE152 Bids received 05-Oct-1... 15Oct-10 A 8
PELE153 TBA / CBA 19-Oct-1... 24Nov-10 A 20
PELE154 Ordering of Transformer 24Nov-1... 01-Dec-10 A 8
PELE155 Mfg and Del at siteDistribution Transformer 02-Dec-1...
12-Mar-12 A 240
415 V Panel 22-Sep-1... 13-Nov-12 A
177
PELE100 Issue Enquiry 22-Sep-1... 23Sep-10 A 1
PELE102 Bids received 04-Oct-1... 15Oct-10 A 7
PELE104 TBA / CBA 15-Oct-1... 24Nov-10 A 18
PELE105 Ordering of Panel 25-Nov1... 01-Dec-10 A 8
PELE110 Mfg and Del at site- Panel
02-Dec-1... 13-Nov-12 A 220
Power Transformer 21-Sep-1... 12Nov-12 A 201
PELE140 Issue Enquiry 21-Sep-1... 21Sep-10 A 1
PELE141 Bids received 04-Oct-1... 13Nov-10 A 10
PELE142 TBA / CBA 13-Nov-1... 24Nov-10 A 20
PELE143 Ordering of Power
Transformer 24-Nov-1... 31-Dec-10
A8
PELE150 Mfg and Del at site-Power
transformer 31-Dec-1... 12-Nov-12 A
210
DG Sets 21-Sep-1... 21-Apr-12 A 248

PELE160 Issue Enquiry 21-Sep-1... 21Sep-10 A 1


PELE162 Bids received 04-Oct-1... 12Nov-10 A 8
PELE163 TBA / CBA 13-Nov-1... 15Dec-10 A 20
PELE164 Ordering of DG sets 16-Dec1... 14-Jan-11 A 10
PELE170 Mfg and Del at site-DG sets
14-Jan-1... 21-Apr-12 A 180
Cables 21-Sep-1... 03-Dec-12 A 152
PELE180 Issue Enquiry 21-Sep-1... 21Sep-10 A 1
PELE182 Bids received 09-Oct-1... 15Oct-10 A 7
PELE183 TBA / CBA 15-Oct-1... 22Nov-10 A 12
PELE184 Ordering of Cables 29-Nov1... 30-Dec-10 A 25
PELE190 Mfg and Del at site-Cable
30-Dec-1... 03-Dec-12 A 150
UPS / Battery Charger 04-Oct-1... 05Nov-11 A 227
PELE200 Issue Enquiry 04-Oct-1... 04Oct-10 A 1
PELE202 Bids received 04-Oct-1... 11Oct-10 A 7
PELE203 TBA / CBA 11-Oct-1... 23Dec-10 A 20
PELE204 Ordering of UPS and
battery charger 23-Dec-1... 11-Feb11 A 8
PELE210 Mfg and Del at site-UPS
and Battery charger 28-Feb-1... 05Nov-11 A 175
Heat Tracing System 25-Nov-1... 20Sep-13 433
PELE220 Issue Enquiry 25-Nov-1...
25-Nov-10 A 1
PELE222 Bids received 26-Nov-1...
30-Nov-10 A 8
PELE223 TBA / CBA 01-Dec-1... 13May-11 A 18

PELE224 Ordering of Heat Tracing


System 13-May-1... 21-Dec-11 A 10
PELE230 Mfg and Del at site-Heat
tracing 15-Nov-1... 20-Sep-13 145
CP System 04-Nov-1... 30-Jan-12 A
196
PELE240 Issue Enquiry 04-Nov-1...
04-Nov-10 A 1
PELE242 Bids received 05-Nov-1...
25-Nov-10 A 8
PELE243 TBA / CBA 25-Nov-1... 03Jan-11 A 20
PELE244 Ordering of CP System 03Jan-1... 04-Feb-11 A 10
PELE250 Mfg and Del at site-CP
System 15-Feb-1... 30-Jan-12 A 150
Electrical Bulk Material 04-Oct-1...
01-Jul-13 187
PELE260 Issue Enquiry 04-Oct-1... 06Oct-10 A 2
PELE262 Bids received 30-Oct-1... 06Nov-10 A 8
PELE263 TBA / CBA 06-Nov-1... 04Feb-11 A 15
PELE264 Ordering of Electrical Bulk
material (Cable Tray, Switches, DB
etc.) 17-Jan-1... 14-Feb-11 A 20
PELE270 Mfg and Del at siteElectrical Bulk material 17-Feb-1...
01-Jul-13 120
NGR 01-Oct-1... 31-Dec-10 A 149
PELE280 Issue Enquiry 01-Oct-1... 02Oct-10 A 1
PELE282 Bids received 02-Oct-1... 11Oct-10 A 8
PELE283 TBA / CBA 11-Oct-1... 25Nov-10 A 20
PELE284 Ordering of NGR 26-Nov1... 17-Dec-10 A 10
PELE290 Mfg and Del at site-NGR 18Dec-1... 31-Dec-10 A 130
INSTRUMENTATION 21-Sep-1... 05Aug-13 452

Tank Farm Management System


(TFMS) 22-Sep-1... 30-Nov-12 A 145
PINS100 Issue Enquiry 22-Sep-1... 22Sep-10 A 1
PINS102 Bids received 01-Oct-1... 15Nov-10 A 10
PINS103 TBA / CBA 15-Nov-1... 24Nov-10 A 10
PINS104 Ordering of TFMS 26-Nov1... 03-Jan-11 A 15
PINS110 Mfg and Del at site-TFMS
03-Jan-1... 30-Nov-12 A 150
Control Valve / MOV/On-Off /ESV
23-Sep-1... 05-Aug-13 249
PINS120 Issue Enquiry 23-Sep-1... 23Sep-10 A 1
PINS122 Bids received 14-Oct-1... 18Nov-10 A 8
PINS123 TBA / CBA 18-Nov-1... 28Dec-10 A 8
PINS124 Ordering of Control
valve/On Off Valve/ESV/MOV's 28Dec-1... 10-Feb-11 A 20
PINS130 Mfg and Del at site-Control
Valve/MOV's /On off valves/ESV 15Feb-1... 05-Aug-13 230
Instrumentation Bulk items 02-Oct1... 15-Jul-13 186
PINS140 Issue Enquiry 02-Oct-1... 02Oct-10 A 1
PINS142 Bids received 08-Oct-1... 10Nov-10 A 10
PINS143 TBA / CBA 12-Nov-1... 07Feb-11 A 8
PINS144 Ordering of Instruments
Bulk item 29-Dec-1... 01-Mar-11 A
25
PINS150 Mfg and Del at siteInstrumentation Bulk items 15-Mar1... 15-Jul-13 150
Instrument Cables 21-Sep-1... 21-Jul13 237
PINS160 Issue Enquiry 21-Sep-1... 21Sep-10 A 1

PINS162 Bids received 09-Oct-1... 19Oct-10 A 10


PINS163 TBA / CBA 19-Oct-1... 16Dec-10 A 8
PINS164 Ordering for Instrument
Cable 25-Nov-1... 26-Feb-11 A 25
PINS170 Mfg and Del at siteInstrument Cable 11-Apr-1... 21-Jul13 150
Instrustion Detection System 16-Jan1... 13-Apr-12 A 156
PINS172 Bids received 13-Feb-1... 13Feb-11 A 10
PINS173 TBA / CBA 25-Mar-1... 25Mar-11 A 8
PINS174 Ordering for Instrusion
Detection System 04-Apr-1... 04-Apr11 A 25
PINS180 Issue Enquiry 16-Jan-1... 16Jan-11 A 1
PINS190 Mfg and Del at siteInstrusion Detection System 05-Apr1... 13-Apr-12 A 180
Fire & Gas Detection System 12-Oct1... 20-Jul-13 236
PINS182 Bids received 17-Dec-1...
20-Dec-10 A 10
PINS183 TBA / CBA 19-Oct-1... 16Dec-10 A 8
PINS184 Ordering for Fire & Gas
Detection System 25-Nov-1... 26Feb-11 A 25
PINS200 Issue Enquiry 12-Oct-1... 13Oct-10 A 1
PINS210 Mfg and Del at site-Fire &
Gas Detection System 11-Apr-1... 20Jul-13 155
Nitrogen Blanketing Valves 19-Nov1... 01-May-12 A 157
PINS192 Bids received 17-Jan-1... 27Jan-11 A 10
PINS193 TBA / CBA 27-Jan-1... 16Mar-11 A 8
PINS194 Ordering for Nitrogen
Blanketing Valves 17-Mar-1... 09-Jun11 A 25

PINS220 Issue Enquiry 19-Nov-1...


19-Nov-10 A 1
PINS230 Mfg and Del at siteNitrogen Blanketing Valves 20-Jun1... 01-May-12 A 180
Instruments Cable Trays / Conduits
02-Jan-1... 10-Jun-13 93
PINS202 Bids received 25-Jan-1... 31Jan-12 A 10
PINS203 TBA / CBA 02-Feb-1... 15Feb-12 A 8
PINS204 Ordering for Instrument
Cable Trays / Conduits 16-Mar-1...
17-Apr-12 A 25
PINS240 Issue Enquiry 02-Jan-1... 02Jan-12 A 1
PINS250 Mfg and Del at siteInstrument Cable Trays / Conduits
23-Apr-1... 10-Jun-13 69
In-Line Instruments 16-Nov-1... 23Sep-11 A 170
PINS212 Bids received 19-Nov-1...
29-Nov-10 A 30
PINS213 TBA / CBA 30-Nov-1... 31Dec-10 A 8
PINS214 Ordering for In-line
Instruments 03-Jan-1... 25-Jan-11 A
25
PINS260 Issue Enquiry 16-Nov-1...
17-Nov-10 A 1
PINS270 Mfg and Del at site-In-line
Instruments 01-Feb-1... 23-Sep-11 A
180
Additional / Procurement- Fire
Fighting Changes 10-Nov-1... 27-Aug13 599
FIRE WATER PUMPS (3 NOS) 31-May1... 14-Aug-12 A 216
MDPP-FPSC-P-00IS01SUE ENQUIRY
31-May-1... 31-May-11 A 1
MDPP-FPSC-P-00R1E1CEIPT BIDS 01Jun-1... 01-Jun-11 A 1

MDPP-FPSC-P-00T2E1CHNICAL BID
ANALYSIS 02-Jun-1... 06-Jun-11 A 1
MDPP-FPSC-P-00C3O1MMERCIAL
BID ANALYSIS 06-Jun-1... 07-Jun-11
A1
MDPP-FPSC-P-00IS41SUE LOI 07-Jun1... 08-Jun-11 A 1
MDPP-FPSC-P00M51ANUFACTURING & DELIVERY
AT SITE 01-Jul-11 A 14-Aug-12 A 250
MDPP-FPSC-P-00IS61SUE PO / PR
TO VENDOR 08-Jun-1... 09-Jun-11 A
1
MDPP-FPSC-P-00R7E1CEIPT OF
VENDOR DRAWINGS 07-Jul-11 A 10Feb-12 A 15
MDPP-FPSC-P-00A8P1PROVAL OF
VENDOR DRAWINGS 05-Dec-1... 19Mar-12 A 15
JOCKEY PUMP (2 NOS) 31-May-1...
20-Mar-12 A 217
MDPP-FPSC-P-02IS51SUE ENQUIRY
31-May-1... 31-May-11 A 1
MDPP-FPSC-P-02R6E1CEIPT BIDS 01Jun-1... 03-Jun-11 A 1
MDPP-FPSC-P-13T2E1CHNICAL BID
ANALYSIS 03-Jun-1... 06-Jun-11 A 1
MDPP-FPSC-P-13C3O1MMERCIAL
BID ANALYSIS 06-Jun-1... 06-Jun-11
A1
MDPP-FPSC-P-13IS41SUE LOI 06-Jun1... 07-Jun-11 A 1
MDPP-FPSC-P13M51ANUFACTURING & DELIVERY
AT SITE 20-Jul-11 A 04-Oct-11 A 230
MDPP-FPSC-P-13IS61SUE PO / PR
TO VENDOR 08-Jun-1... 09-Jun-11 A
1

MDPP-FPSC-P-13R7E1CEIPT OF
VENDOR DRAWINGS 07-Jul-11 A 05Jan-12 A 15
MDPP-FPSC-P-13A8P1PROVAL OF
VENDOR DRAWINGS 05-Dec-1... 20Mar-12 A 15
FOAM CONCENTRATE TANK 03-Jan1... 26-Mar-12 A 260
MDPP-FPSC-P-00IS91SUE ENQUIRY
03-Jan-1... 03-Jan-11 A 1
MDPP-FPSC-P-01R0E1CEIPT BIDS 28Feb-1... 28-Feb-11 A 26
MDPP-FPSC-P-01T1E1CHNICAL BID
ANALYSIS 14-Mar-1... 06-Jun-11 A 1
MDPP-FPSC-P-01C2O1MMERCIAL
BID ANALYSIS 06-Jun-1... 10-Jun-11
A1
MDPP-FPSC-P-01IS31SUE LOI 10-Jun1... 13-Jun-11 A 1
MDPP-FPSC-P01M41ANUFACTURING & DELIVERY
AT SITE 15-Feb-1... 26-Mar-12 A 75
MDPP-FPSC-P-01IS51SUE PO / PR
TO VENDOR 13-Jun-1... 13-Jun-11 A
1
MDPP-FPSC-P-01R6E1CEIPT OF
VENDOR DRAWINGS 30-Jun-1... 27Dec-11 A 18
MDPP-FPSC-P-01A7P1PROVAL OF
VENDOR DRAWINGS 26-Dec-1... 13Feb-12 A 15
FIRE WATER TANK- PLATE'S 15-Dec1... 31-May-12 A 140
MDPP-FPSC-P-10IS81SUE ENQUIRY
15-Dec-1... 15-Dec-11 A 1
MDPP-FPSC-P-10R9E1CEIPT BIDS 16Dec-1... 30-Dec-11 A 18
MDPP-FPSC-P-11T0E1CHNICAL BID
ANALYSIS 02-Jan-1... 03-Jan-12 A 1

MDPP-FPSC-P-11C1O1MMERCIAL
BID ANALYSIS 04-Jan-1... 04-Jan-12
A1
MDPP-FPSC-P-11IS21SUE LOI 16-Jan1... 16-Jan-12 A 1
MDPP-FPSC-P11M31ANUFACTURING & DELIVERY
AT SITE 28-Mar-1... 31-May-12 A 90
FIRE PROTECTION SYSTEM-PIPES 02Aug-1... 23-Nov-11 A 156
MDPP-FPSC-P-11IS41SUE ENQUIRY
02-Aug-1... 02-Aug-11 A 1
MDPP-FPSC-P-11R5E1CEIPT BIDS 03Aug-1... 05-Aug-11 A 18
MDPP-FPSC-P-11T6E1CHNICAL BID
ANALYSIS 05-Aug-1... 05-Aug-11 A 1
MDPP-FPSC-P-11C7O1MMERCIAL
BID ANALYSIS 08-Aug-1... 08-Aug-11
A1
MDPP-FPSC-P-11IS81SUE LOI 09Aug-1... 09-Aug-11 A 1
MDPP-FPSC-P11M91ANUFACTURING & DELIVERY
AT SITE 11-Aug-1... 23-Nov-11 A 120
FIRE PROTECTION SYSTEM-FITTINGS
28-Jul-11 A 08-May-12 A 187
MDPP-FPSC-P-12IS01SUE ENQUIRY
28-Jul-11 A 28-Jul-11 A 1
MDPP-FPSC-P-12R1E1CEIPT BIDS 29Jul-11 A 05-Aug-11 A 18
MDPP-FPSC-P-12T2E1CHNICAL BID
ANALYSIS 05-Aug-1... 09-Aug-11 A 1
MDPP-FPSC-P-12C3O1MMERCIAL
BID ANALYSIS 09-Aug-1... 12-Aug-11
A1
MDPP-FPSC-P-12IS41SUE LOI 09-Sep1... 12-Sep-11 A 1

MDPP-FPSC-P12M51ANUFACTURING & DELIVERY


AT SITE 15-Mar-1... 08-May-12 A 30
FIRE PROTECTION SYSTEM-FLANGES
& MISC. 29-Jul-11 A 05-Jun-12 A 214
MDPP-FPSC-P-12IS61SUE ENQUIRY
29-Jul-11 A 29-Jul-11 A 1
MDPP-FPSC-P-12R7E1CEIPT BIDS 29Jul-11 A 05-Aug-11 A 18
MDPP-FPSC-P-12T8E1CHNICAL BID
ANALYSIS 05-Aug-1... 09-Aug-11 A 1
MDPP-FPSC-P-12C9O1MMERCIAL
BID ANALYSIS 09-Aug-1... 12-Aug-11
A1
MDPP-FPSC-P-13IS01SUE LOI 09-Sep1... 15-Sep-11 A 1
MDPP-FPSC-P13M11ANUFACTURING & DELIVERY
AT SITE 19-Apr-1... 05-Jun-12 A 40
FOAM CONCENTRATE 24-Jan-1... 15May-13 195
MDPP-FPSC-P-01IS81SUE ENQUIRY
24-Jan-1... 24-Jan-11 A 1
MDPP-FPSC-P-01R9E1CEIPT BIDS 26Jan-1... 28-Jan-11 A 26
MDPP-FPSC-P-02T0E1CHNICAL BID
ANALYSIS 31-Jan-1... 31-Jan-11 A 1
MDPP-FPSC-P-02C1O1MMERCIAL
BID ANALYSIS 02-Feb-1... 02-Feb-11
A1
MDPP-FPSC-P-02IS21SUE LOI 03-Feb1... 24-Feb-11 A 1
MDPP-FPSC-P-02P3R1ODUCTION &
DELIVERY AT SITE 30-May-1... 15May-13 90

MDPP-FPSC-P-02IS41SUE PO / PR
TO VENDOR 25-Feb-1... 28-Feb-11 A
1
FOAM SYSTEM ACCESSORIES 10-Nov1... 27-Aug-13 379
MDPP-FPSC-P-02IS71SUE ENQUIRY
14-Nov-1... 21-Nov-11 A 1
MDPP-FPSC-P-02R8E1CEIPT BIDS 16Nov-1... 25-Nov-11 A 20
MDPP-FPSC-P-02T9E1CHNICAL BID
ANALYSIS 30-Nov-1... 30-Nov-11 A 1
MDPP-FPSC-P-03C0O1MMERCIAL
BID ANALYSIS 01-Dec-1... 01-Dec-11
A1
MDPP-FPSC-P-03IS11SUE LOI 05-Dec1... 06-Dec-11 A 1
MDPP-FPSC-P03M21ANUFACTURING & DELIVERY
AT SITE 14-Dec-1... 27-Aug-13 105
MDPP-FPSC-P-03IS31SUE PO / PR
TO VENDOR 07-Dec-1... 07-Dec-11 A
1
MDPP-FPSC-P-03R4E1CEIPT OF
VENDOR DRAWINGS 10-Nov-1... 21Nov-11 A 18
MDPP-FPSC-P-03A5P1PROVAL OF
VENDOR DRAWINGS 30-Nov-1... 30Nov-11 A 15
DELUGE VALVES 19-Jan-1... 06-Nov12 A 433
MDPP-FPSC-P-03IS61SUE ENQUIRY
12-Dec-1... 12-Dec-11 A 1
MDPP-FPSC-P-03R7E1CEIPT BIDS 13Dec-1... 13-Jan-12 A 26
MDPP-FPSC-P-03T8E1CHNICAL BID
ANALYSIS 14-Jan-1... 17-Jan-12 A 1
MDPP-FPSC-P-03C9O1MMERCIAL
BID ANALYSIS 19-Jan-1... 02-Feb-11
A1

MDPP-FPSC-P-04IS01SUE LOI 08Mar-1... 07-Jun-12 A 1


MDPP-FPSC-P04M11ANUFACTURING & DELIVERY
AT SITE 11-Jul-12 A 06-Nov-12 A 120
MDPP-FPSC-P-04IS21SUE PO / PR
TO VENDOR 02-Mar-1... 02-Mar-11
A1
MDPP-FPSC-P-04R3E1CEIPT OF
VENDOR DRAWINGS 04-Feb-1... 08Feb-11 A 18
MDPP-FPSC-P-04A4P1PROVAL OF
VENDOR DRAWINGS 13-Feb-1... 15Feb-11 A 12
STRAINERS 02-Mar-1... 12-Aug-13
358
MDPP-FPSC-P-04IS51SUE ENQUIRY
02-Mar-1... 02-Mar-11 A 1
MDPP-FPSC-P-04R6E1CEIPT BIDS 04Mar-1... 10-Mar-11 A 15
MDPP-FPSC-P-04T7E1CHNICAL BID
ANALYSIS 11-Mar-1... 12-Mar-11 A 1
MDPP-FPSC-P-04C8O1MMERCIAL
BID ANALYSIS 13-Mar-1... 14-Mar-11
A1
MDPP-FPSC-P-04IS91SUE LOI 15Mar-1... 15-Mar-11 A 1
MDPP-FPSC-P05M01ANUFACTURING & DELIVERY
AT SITE 12-Apr-1... 12-Aug-13 90
MDPP-FPSC-P-05IS11SUE PO / PR
TO VENDOR 15-Mar-1... 15-Mar-11
A1
MDPP-FPSC-P-05R2E1CEIPT OF
VENDOR DRAWINGS 03-Mar-1... 07Mar-11 A 18
MDPP-FPSC-P-05A3P1PROVAL OF
VENDOR DRAWINGS 04-Mar-1... 04Mar-11 A 15
GATE VALVES 02-Aug-1... 15-Jul-13
222

MDPP-FPSC-P-05IS41SUE ENQUIRY
02-Aug-1... 02-Aug-11 A 1
MDPP-FPSC-P-05R5E1CEIPT BIDS 03Aug-1... 05-Aug-11 A 20
MDPP-FPSC-P-05T6E1CHNICAL BID
ANALYSIS 15-Aug-1... 22-Aug-11 A 1
MDPP-FPSC-P-05C7O1MMERCIAL
BID ANALYSIS 24-Aug-1... 25-Aug-11
A1
MDPP-FPSC-P-05IS81SUE LOI 02-Sep1... 05-Sep-11 A 1
MDPP-FPSC-P05M91ANUFACTURING & DELIVERY
AT SITE 31-Oct-1... 15-Jul-13 220
MDPP-FPSC-P-06IS01SUE PO / PR
TO VENDOR 03-Aug-1... 09-Aug-11 A
1
MDPP-FPSC-P-06R1E1CEIPT OF
VENDOR DRAWINGS 04-Aug-1... 11Aug-11 A 18
MDPP-FPSC-P-06A2P1PROVAL OF
VENDOR DRAWINGS 19-Aug-1... 19Aug-11 A 15
CHECK VALVES 03-Aug-1... 27-Jun-13
203
MDPP-FPSC-P-06IS31SUE ENQUIRY
03-Aug-1... 03-Aug-11 A 1
MDPP-FPSC-P-06R4E1CEIPT BIDS 04Aug-1... 08-Aug-11 A 26
MDPP-FPSC-P-06T5E1CHNICAL BID
ANALYSIS 10-Aug-1... 16-Aug-11 A 1
MDPP-FPSC-P-06C6O1MMERCIAL
BID ANALYSIS 17-Aug-1... 18-Aug-11
A1
MDPP-FPSC-P-06IS71SUE LOI 05-Sep1... 05-Sep-11 A 1
MDPP-FPSC-P06M81ANUFACTURING & DELIVERY
AT SITE 13-Sep-1... 27-Jun-13 72

MDPP-FPSC-P-06IS91SUE PO / PR
TO VENDOR 16-Aug-1... 04-Sep-11 A
1
MDPP-FPSC-P-07R0E1CEIPT OF
VENDOR DRAWINGS 23-Aug-1... 25Aug-11 A 18
MDPP-FPSC-P-07A1P1PROVAL OF
VENDOR DRAWINGS 29-Aug-1... 29Aug-11 A 15
ELECTROMAGNETIC FLOW METER
03-Jan-1... 22-May-13 239
MDPP-FPSC-P-07IS21SUE ENQUIRY
03-Jan-1... 03-Jan-11 A 1
MDPP-FPSC-P-07R3E1CEIPT BIDS 04Jan-1... 17-Jan-11 A 26
MDPP-FPSC-P-07T4E1CHNICAL BID
ANALYSIS 17-Jan-1... 28-Jan-11 A 1
MDPP-FPSC-P-07C5O1MMERCIAL
BID ANALYSIS 31-Jan-1... 08-Feb-11
A1
MDPP-FPSC-P-07IS61SUE LOI 28-Jan1... 29-Jan-11 A 1
MDPP-FPSC-P07M71ANUFACTURING & DELIVERY
AT SITE 06-Mar-1... 22-May-13 150
MDPP-FPSC-P-07IS81SUE PO / PR
TO VENDOR 24-Feb-1... 24-Feb-11 A
1
MDPP-FPSC-P-07R9E1CEIPT OF
VENDOR DRAWINGS 16-Jan-1... 24Jan-11 A 18
MDPP-FPSC-P-08A0P1PROVAL OF
VENDOR DRAWINGS 26-Jan-1... 31Jan-11 A 15
PLC FOR PUMPS 11-Jan-1... 17-Aug11 A 482
MDPP-FPSC-P-08IS11SUE ENQUIRY
11-Jan-1... 11-Jan-11 A 1
MDPP-FPSC-P-08R2E1CEIPT BIDS 14Jan-1... 19-Jan-11 A 26

MDPP-FPSC-P-08T3E1CHNICAL BID
ANALYSIS 25-Jan-1... 25-Jan-11 A 1
MDPP-FPSC-P-08C4O1MMERCIAL
BID ANALYSIS 02-Feb-1... 04-Feb-11
A1
MDPP-FPSC-P-08IS51SUE LOI 07-Feb1... 10-Feb-11 A 1
MDPP-FPSC-P08M61ANUFACTURING & DELIVERY
AT SITE 09-Feb-1... 17-Aug-11 A 137
MDPP-FPSC-P-08IS71SUE PO / PR
TO VENDOR 25-Jan-1... 26-Jan-11 A
1
MDPP-FPSC-P-08R8E1CEIPT OF
VENDOR DRAWINGS 21-Jan-1... 30Jan-11 A 18
MDPP-FPSC-P-08A9P1PROVAL OF
VENDOR DRAWINGS 28-Jan-1... 01Feb-11 A 12
RUBBER EXPANSION BELLOW 09Mar-1... 13-Oct-12 A 114
MDPP-FPSC-P-09IS01SUE ENQUIRY
09-Mar-1... 09-Mar-11 A 1
MDPP-FPSC-P-09R1E1CEIPT BIDS 10Mar-1... 21-Mar-11 A 26
MDPP-FPSC-P-09T2E1CHNICAL BID
ANALYSIS 29-Mar-1... 04-Apr-11 A 1
MDPP-FPSC-P-09C3O1MMERCIAL
BID ANALYSIS 06-Apr-1... 08-Apr-11
A1
MDPP-FPSC-P-09IS41SUE LOI 15-Apr1... 15-Apr-11 A 1
MDPP-FPSC-P09M51ANUFACTURING & DELIVERY
AT SITE 31-May-1... 13-Oct-12 A 120
MDPP-FPSC-P-09IS61SUE PO / PR
TO VENDOR 15-Apr-1... 15-Apr-11 A
1

MDPP-FPSC-P-09R7E1CEIPT OF
VENDOR DRAWINGS 17-Apr-1... 30Apr-11 A 18
MDPP-FPSC-P-09A8P1PROVAL OF
VENDOR DRAWINGS 01-May-1... 11May-11 A 15
CP SYSTEM 10-Mar-1... 20-Jul-11 A
157
MDPP-FPSC-P-09IS91SUE ENQUIRY
10-Mar-1... 10-Mar-11 A 1
MDPP-FPSC-P-10R0E1CEIPT BIDS 14Mar-1... 14-Mar-11 A 1
MDPP-FPSC-P-10T1E1CHNICAL BID
ANALYSIS 15-Mar-1... 17-Mar-11 A 1
MDPP-FPSC-P-10C2O1MMERCIAL
BID ANALYSIS 19-Mar-1... 22-Mar-11
A1
MDPP-FPSC-P-10IS31SUE LOI /
AMMENDMENT 23-Mar-1... 23-Mar11 A 1
MDPP-FPSC-P10M41ANUFACTURING & DELIVERY
AT SITE 21-Apr-1... 20-Jul-11 A 100
MDPP-FPSC-P-10IS51SUE PO / PR
TO VENDOR 23-Mar-1... 23-Mar-11
A1
MDPP-FPSC-P-10R6E1CEIPT OF
VENDOR DRAWINGS 31-Mar-1... 07Apr-11 A 18
MDPP-FPSC-P-10A7P1PROVAL OF
VENDOR DRAWINGS 09-Apr-1... 12Apr-11 A 13
PROCUREMENT- FREE ISSUE
MATERIAL 06-Jun-1... 01-Jun-13 679
PRFI001 Delivery at Site of GT 06Jun-1... 29-Jun-11 A 20
PRFI011 Delivery at Site of Export
Booster Pumps 12-Jul-11 A 31-Jul-11
A 20

PRFI021 Delivery at Site of Custody


Transfer Metering system 05-Jul-11
A 20-Jul-11 A 20
PRFI031 Delivery at Site of
Butterfly/Ball Valves above 24" size
15-May-13* 01-Jun-13 20
CONSTRUCTION 07-Oct-1... 06-Jan14 891
CNCM001 Site Mobilization 07-Oct1... 28-Oct-10 A 20
CNCM011 Camp Establishment 28Oct-1... 03-Dec-10 A 30
MOBILISATION 28-Oct-1... 22-Nov11 A 407
CNM100 Mobilise Civil Contractor For Roads, Dyke Wall 30-Oct-1... 18Nov-10 A 22
CNM105 Mobilise Civil Contractor For Packages (foundations etc.) 16Dec-1... 28-Dec-10 A 22
CNM110 Mobilise Building
Contractor 12-Nov-1... 27-Dec-10 A
12
CNM130 Mobilise Mechanical /
Piping Contractor 07-Apr-1... 30-Apr11 A 15
CNM140 Mobilization of Batching
Plant-II 28-Oct-1... 03-Dec-10 A 45
CNM150 Mobilise ContractorInstrumentation Contractor 24-May1... 13-Jun-11 A 20
CNM160 Mobilise Electrical
Contractor 03-May-1... 25-May-11 A
12
CNM180 Mobilise Insulation & C.P.
Contractor 02-Nov-1... 22-Nov-11 A
15
CNM190 Mobilise Plant and
Machinery at site 31-Dec-1... 02Mar-11 A 90
PHASE-1 23-Nov-1... 06-Jan-14 846

THREE OIL TANKS (TAG NO.-2,3,4)


11-Feb-1... 04-May-13 A 357
Construction of Vertical Dyke Wall V2 11-Feb-1... 07-Jun-11 A 183
CNCV550 Release of Front 11-Feb11 A 0
CNCV592 RCC 17-Mar-1... 07-Jun-11
A 72
CNCV610 Excavation 22-Feb-1... 28Feb-11 A 15
CNCV651 PCC 02-Mar-1... 09-Mar11 A 15
Construction of Horizontal Dyke
Wall H-1 18-Apr-1... 06-Nov-12 A
273
CNCV270 Release of Front 15-Feb12 A 0
CNCV331 PCC 11-Mar-1... 03-Sep-12
A 101
CNCV332 RCC 18-Apr-1... 06-Nov-12
A 150
CNCV390 Excavation 22-Feb-1... 18Jul-12 A 97
Construction of Vertical Dyke Wall V4 15-Jul-12 A 03-Nov-12 A 68
CNCV612 RCC 10-Sep-1... 03-Nov-12
A 79
CNCV640 Release of Front 15-Jul-12
A0
CNCV650 Excavation 30-Jul-12 A 08Aug-12 A 15
CNCV671 PCC 13-Aug-1... 29-Aug-12
A 15
Construction of Vertical Dyke Wall V3 15-Feb-1... 11-Jun-12 A 317
CNCV602 RCC 23-Mar-1... 11-Jun-12
A 79
CNCV620 Release of Front 15-Feb12 A 0
CNCV630 Excavation 22-Feb-1... 28Feb-12 A 15
CNCV661 PCC 02-Mar-1... 15-Mar12 A 15

Construction of Vertical Dyke Wall V5 17-Feb-1... 25-Jun-12 A 320


CNCV622 RCC 21-Mar-1... 25-Jun-12
A 80
CNCV660 Release of Front 17-Feb12 A 0
CNCV670 Excavation 20-Feb-1... 29Feb-12 A 15
CNCV681 PCC 06-Mar-1... 16-Mar12 A 15
Construction of Horizontal Dyke
Wall H-2 15-Feb-1... 18-Aug-12 A
274
CNCV280 Release of Front 15-Feb12 A 0
CNCV352 RCC 06-Mar-1... 18-Aug-12
A 152
CNCV400 Excavation 21-Feb-1... 27Mar-12 A 97
CNCV401 PCC 01-Mar-1... 03-Jul-12
A 101
Construction of Horizontal Dyke
Wall H-3 15-Feb-1... 04-Dec-12 A
200
CNCV310 Release of Front 15-Feb12 A 0
CNCV362 RCC 31-Jul-12 A 04-Dec-12
A 84
CNCV410 Excavation 15-Feb-1... 11Apr-12 A 35
CNCV411 PCC 31-May-1... 20-Jun-12
A 65
Construction of Vertical Dyke Wall V8 07-Feb-1... 04-Aug-12 A 247
CNCV382 RCC 30-May-1... 04-Aug12 A 90
CNCV431 PCC 30-Mar-1... 05-Jun-12
A 75
CNCV440 Release of Front 07-Feb12 A 0
CNCV450 Excavation 10-Feb-1... 22Mar-12 A 45
Construction of Vertical Dyke Wall V7 09-Feb-1... 03-Apr-13 A 103

CNCV372 RCC 02-May-1... 21-Aug12 A 90


CNCV420 Release of Front 09-Feb12 A 0
CNCV421 PCC 11-Apr-1... 11-Jul-12
A 75
CNCV430 Excavation 15-Feb-1... 03Apr-13 A 45
Construction of Vertical Dyke Wall V6 16-Feb-1... 04-Sep-12 A 355
CNCV402 RCC 12-Apr-1... 04-Sep-12
A 90
CNCV451 PCC 30-Mar-1... 10-Jul-12
A 75
CNCV480 Release of Front 16-Feb12 A 0
CNCV490 Excavation 22-Feb-1... 22Mar-12 A 35
Construction of Vertical Dyke Wall V1 26-Dec-1... 13-Jun-12 A 266
CNCV392 RCC 14-Mar-1... 13-Jun-12
A 60
CNCV441 PCC 24-Jan-1... 17-Apr-12
A 45
CNCV460 Release of Front 26-Dec11 A 0
CNCV470 Excavation 02-Jan-1... 31Jan-12 A 35
Construction of Vertical Dyke Wall V9 18-Jan-1... 04-May-13 A 98
CNCV412 RCC 02-Mar-1... 04-May13 A 58
CNCV461 PCC 29-Feb-1... 20-Mar-13
A 47
CNCV500 Release of Front 18-Jan-12
A0
CNCV510 Excavation 08-Feb-1... 04Mar-12 A 35
EXPORT MANIFOLD,BOOSTER AND
EXPORT PUMPS ETC (TAG-22,25 &
70) 15-Jun-1... 25-Jun-13 482
Export Booster Pumps 14-Nov-1...
31-May-12 A 182

CNCV380 Excavation 14-Nov-1... 16Nov-11 A 6


CNCV385 Foundation 15-Nov-1... 07Dec-11 A 21
INT150 Installation of Export and
Booster Pump 21-Apr-1... 31-May12 A 31
Export & Booster Pump House
(SHED) 03-Oct-1... 25-Jun-13 334
CNCV224 Brick works -deleted 31May-1... 31-May-12 A 45
CNCV232 Superstructure -deleted
31-May-1... 31-May-12 A 75
CNCV233 Structural Fab.,Shot
Blasting & primer Painting 29-May1... 25-Jun-13 60
CNCV234 Structural Erection & Final
painting 12-Sep-1... 26-Oct-12 A 45
CNCV251 Substructure 03-Oct-1...
10-Jan-12 A 60
CNCV324 Sheet Fixing 08-Aug-1... 20Sep-12 A 45
CNCV445 Finishing (Paving,Elect.
Inst.,Doors & Window
fixing,Painting) 12-Jun-1... 15-Oct-12
A 80
Custody Transfer Metering (CTM) 16Nov-1... 15-Mar-12 A 68
CNCV370 Excavation 16-Nov-1... 22Nov-11 A 15
CNCV375 Foundation 26-Dec-1... 17Jan-12 A 31
INT140 Installation of Custody
Transfer Metering 15-Feb-1... 15Mar-12 A 21
Panel Room for CTM 19-Dec-1... 14Nov-12 A 270
CNCV242 Superstructure 01-Mar-1...
26-Mar-12 A 65
CNCV253 Structural Fab.,Shot
Blasting & primer Painting 01-May1... 25-Jul-12 A 60
CNCV474 Brick works 10-Apr-1... 13Jun-12 A 45

CNCV475 Finishing (Paving,Elect.


Inst.,Doors & Window
fixing,Painting) 25-Jun-1... 08-Aug12 A 70
CNCV484 Structural Erection & Final
painting 12-Sep-1... 14-Nov-12 A 60
CNCV494 Sheet Fixing 23-Oct-1... 07Nov-12 A 30
CNCV761 Substructure 19-Dec-1...
25-Feb-12 A 45
CTM Package Shed 15-Jun-1... 29Nov-12 A 482
CNCV181 Substructure 15-Jun-1...
25-Jan-12 A 60
CNCV184 Sheet Fixing 01-Jun-1... 04Aug-12 A 45
CNCV192 Superstructure 26-Jan-1...
02-May-12 A 75
CNCV193 Masonary 17-May-1... 19Jun-12 A 45
CNCV255 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 02-Jul-12 A 29-Nov12 A 110
CNCV691 Structural Fab.,Shot
Blasting & primer Painting 26-Jan1... 10-May-12 A 75
CNCV701 Structural Erection. & final
Painting 07-Aug-1... 23-Aug-12 A
110
LFO TANKS (TAG NO-44,45 & 46) 0
LFO MANIFOLD,EXPORT PUMP (TAG
NO-65,66 & 67) 03-Oct-1... 19-Dec12 A 357
Interface Storage tanks 03-Oct-1...
31-May-12 A 80
CNCV132 Excavation 03-Oct-1... 25Nov-11 A 15
CNCV134 Barbending 28-Oct-1... 22Nov-11 A 25
CNCV136 Form Work 28-Oct-1... 22Nov-11 A 25
CNCV138 RCC 29-Dec-1... 05-Feb-12
A 35

CNCV140 Backfilling & Compaction


02-Apr-1... 31-May-12 A 8
Interface Transfer Pump Bay 06-Jul12 A 30-Aug-12 A 222
CNCV158 RCC 14-Jul-12 A 14-Jul-12
A 35
CNCV210 Backfilling & Compaction
19-Jul-12 A 28-Jul-12 A 10
CNCV244 Barbending 09-Jul-12 A 11Jul-12 A 3
CNCV246 Form Work 11-Jul-12 A 13Jul-12 A 25
CNCV262 Excavation 06-Jul-12 A 11Jul-12 A 15
CNEQ180 Installation of Interface
Transfer pump 08-Aug-1... 30-Aug12 A 15
INTERFACE HOLDUP TANK 01-Mar1... 19-Dec-12 A 204
CNME460 Fabtication of Tank 01Mar-1... 02-Jul-12 A 90
CNME470 Erection of Tank 15-Jun1... 05-Nov-12 A 65
CNME480 Hydrotesting of Tank 20Nov-1... 30-Nov-12 A 10
CNME490 Painting of Tank 01-Dec1... 19-Dec-12 A 21
INTERFACE STORAGE TANK-DYKE
WALL 10-Jul-12 A 29-Aug-12 A 53
CNCV520 Excavation 10-Jul-12 A 14Jul-12 A 11
CNCV632 RCC & RELATED FACILITIES
02-Aug-1... 29-Aug-12 A 75
CNCV711 PCC 13-Jul-12 A 31-Jul-12
A 21
INTERFACE HOLD UP TANK-DYKE
WALL 08-Aug-1... 22-Nov-12 A 111
CNCV530 Excavation 08-Aug-1... 15Aug-12 A 90
CNCV642 RCC & RELATED FACILITIES
25-Oct-1... 14-Nov-12 A 120

CNCV721 PCC 06-Sep-1... 22-Nov-12


A 90
DYKE WALL AROUND TANK -9,10,11
25-May-1... 07-Nov-12 A 131
CNCV662 RCC & RELATED FACILITIES
16-Aug-1... 07-Nov-12 A 120
CNCV680 Excavation 25-May-1... 14Jul-12 A 90
CNCV741 PCC 28-May-1... 28-Aug12 A 90
AIR COMPRESSOR & PSA NITROGEN
SYSTEM (TAG NO-12) 22-Jan-1... 20Dec-12 A 380
Air Compressor 22-Jan-1... 23-Aug12 A 119
CNCV273 Earth Work 22-Jan-1... 24Mar-12 A 26
CNCV283 PCC 26-Mar-1... 26-Mar12 A 36
CNCV313 Barbending 26-Mar-1... 30Mar-12 A 31
CNCV323 Form Work 26-Mar-1... 30Mar-12 A 31
CNCV333 RCC 31-Mar-1... 31-Mar12 A 46
CNCV442 Back filling & Compaction
16-Apr-1... 23-Apr-12 A 11
CNEQ120 Installation of Air
Compressor 15-May-1... 23-Aug-12
A 61
Nitrogen Package 20-Mar-1... 17Sep-12 A 295
CNCV276 Earth Work 20-Mar-1... 24Mar-12 A 26
CNCV286 PCC 26-Mar-1... 26-Mar12 A 31
CNCV296 Barbending 26-Mar-1... 30Mar-12 A 31
CNCV306 Form Work 26-Mar-1... 30Mar-12 A 31
CNCV316 RCC 31-Mar-1... 16-May12 A 46

CNCV472 Back filling & Compaction


30-May-1... 05-Jun-12 A 11
CNEQ130 Installation of Nitrogen
Generation Package 21-Aug-1... 17Sep-12 A 46
Air Compressor Shed 22-Jan-1... 20Dec-12 A 380
CNCV343 Earth Work 22-Jan-1... 25Mar-12 A 15
CNCV353 PCC 26-Mar-1... 26-Mar12 A 1
CNCV363 Barbending 28-Mar-1... 02Jul-12 A 30
CNCV373 Form Work 30-Mar-1... 13Jul-12 A 30
CNCV383 RCC 20-Feb-1... 19-Apr-12
A 40
CNCV393 Structural Fab. Shot
Blasting & Primer painting 15-Jun1... 04-Sep-12 A 60
CNCV403 Structural Erection & Final
painting 26-Jul-12 A 04-Sep-12 A 40
CNCV413 Metal Sheet Fixing & Side
Cladding 17-Sep-1... 10-Oct-12 A 60
CNCV423 Internal & External
Painting 15-Nov-1... 20-Dec-12 A 50
FUEL GAS HANDLING (TAG NO-38)
15-May-1... 02-Oct-12 A 298
Fuel Gas system foundation (KO
Drum,Cartridge Filter, Electric
Heater) 15-May-1... 02-Oct-12 A 298
CNCV349 Earth Work 15-May-1... 30May-12 A 26
CNCV359 PCC 04-Jun-1... 14-Jun-12
A6
CNCV369 Form Work 20-Jun-1... 04Jul-12 A 15
CNCV379 RCC 10-Jul-12 A 18-Jul-12
A 16
CNCV512 Back filling & Compaction
24-Jul-12 A 09-Aug-12 A 10

CNEQ250 Installation of Fuel & Gas


system 03-Sep-1... 02-Oct-12 A 45
RAW WATER SYSTEM (TAG NO-34)
14-Jun-1... 02-Oct-13 307
CNCV414 Earth Work 15-Jun-1... 09Jul-12 A 25
CNCV424 PCC 25-Jun-1... 18-Jul-12 A
60
CNCV434 Barbending 20-Jul-12 A 22Aug-12 A 60
CNCV444 Form Work 08-Aug-1... 04Sep-12 A 60
CNCV454 RCC 23-Aug-1... 16-Oct-12
A 90
CNCV464 Handover of Area 14-Jun12 A 0
CNCV502 Back filling & Compaction
14-Nov-1... 23-Nov-12 A 11
CNEQ185 Installation of Raw Water
Package(Water Treatment Package
22-Nov-1... 02-Oct-13 55
WATER TREATMENT SYSTEM (TAG
NO-35,36,37,51,56 & 72) 10-May1... 29-Oct-13 369
Water Treatment Package (WTP) 10May-1... 29-Oct-13 363
CNCV274 Earth Work 10-May-1... 25May-12 A 26
CNCV284 PCC 25-May-1... 30-May12 A 31
CNCV294 Barbending 01-Jun-1... 02Jul-12 A 31
CNCV304 Form Work 06-Jun-1... 03Jul-12 A 21
CNCV314 RCC 06-Jun-1... 18-Jul-12 A
46
CNCV452 Back filling & Compaction
01-Aug-1... 13-Aug-12 A 11
CNEQ195 Installation Testing &
Commissioning of Water Treatment
Package 16-Oct-1... 29-Oct-13 60

Treated Water Storage Tank (1263TK-21) 15-Jun-1... 14-Nov-12 A 273


CNME660 Pre-Fabtication of Plates
15-Jun-1... 26-Jun-12 A 90
CNME710 Hydrotesting of Tank 04Sep-1... 14-Nov-12 A 10
CNME720 Erection & Painting of
Tank 11-Jul-12 A 04-Oct-12 A 90
Treated Water Overhead Storage
Tank-(1263-TK-22) 15-Jun-1... 11Sep-13 107
CNEQ200 FDN & Fabrication &
Erection of SMC Panel Tank 15-Jun1... 11-Sep-13 150
DM Water Tank 15-May-1... 09-Nov12 A 114
CNME730 Pre-Fabtication of Plates
17-May-1... 18-Jul-12 A 90
CNME740 Erection & Painting of
Tank 15-May-1... 10-Sep-12 A 90
CNME750 Hydrotesting of Tank 10Oct-1... 09-Nov-12 A 10
Filter Water Storage Tank 11-May1... 12-Nov-12 A 223
CNME760 Pre-Fabtication of Plates
11-May-1... 25-May-12 A 90
CNME770 Erection & Painting of
Tank 25-May-1... 12-Sep-12 A 90
CNME780 Hydrotesting of Tank 04Nov-1... 12-Nov-12 A 10
DUG BOREWELL 18-May-1... 29-Oct13 369
CNCV334 DRILLING 18-May-1... 01Jun-13 45
CNCV354 INSTALLATION OF PIPES
18-May-1... 16-Jul-13 60
CNCV364 FDN / FIXING OF PUMPS
17-Jul-13 14-Sep-13 60
CNCV374 CONNECTION OF PUMPS
31-Aug-13 29-Oct-13 60
STEAM GENERATION PLANT (TAG
NO-21) 02-Jan-1... 17-Aug-13 404

Steam Generation System / Boiler


Foundation 25-Jan-1... 17-Aug-13
169
CNCV277 Earth Work 25-Jan-1... 15Feb-12 A 31
CNCV287 PCC 31-Jan-1... 09-Mar-12
A 46
CNCV297 Barbending 31-Jan-1... 12Mar-12 A 36
CNCV307 Form Work 02-Feb-1... 15Mar-12 A 36
CNCV317 RCC 15-Feb-1... 24-Mar-12
A 76
CNCV482 Back filling & Compaction
29-Mar-1... 04-Apr-12 A 11
CNEQ260 Installation Testing &
Commissioning of Steam Generation
system 04-Sep-1... 17-Aug-13 95
Boiler House Shed (32MX24MX9H)
02-Jan-1... 26-Dec-12 A 355
CNCV523 Earth Work 02-Jan-1... 06Jan-12 A 15
CNCV533 PCC 09-Jan-1... 20-Jan-12
A 30
CNCV543 Barbending 02-Apr-1... 04Jun-12 A 30
CNCV553 Form Work 05-Apr-1... 12Jun-12 A 30
CNCV563 Structural Fab. Shot
Blasting & Primer painting 17-May1... 24-Aug-12 A 60
CNCV573 RCC 04-Jun-1... 27-Jun-12
A 40
CNCV583 Structural Erection & Final
painting 20-Jul-12 A 23-Oct-12 A 40
CNCV593 Sheet Fixing 05-Sep-1... 03Dec-12 A 80
CNCV603 Final Painting 14-Nov-1...
26-Dec-12 A 40
CLOSED DRAIN SYSTEM (TAG NO-10
& 59) 06-Jun-1... 14-Dec-12 A 380

CNEQ100 Installation of Closed


drain Pump 14-Nov-1... 14-Dec-12 A
30
CLOSED DRAIN TANK PIT (CRUDE &
LIGHT FLUSING OIL -1 NOS) 22-Dec1... 31-May-12 A 380
CNCV090 Excavation 22-Dec-1... 22Feb-12 A 20
CNCV100 Barbending 27-Feb-1... 08May-12 A 40
CNCV110 Form Work 28-Feb-1... 10May-12 A 10
CNCV120 RCC 10-Mar-1... 16-May12 A 60
CNCV125 Backfilling & Compaction
23-May-1... 31-May-12 A 16
CLOSED DRAIN TANK-FABRICATION
(CRUDE & LIGHT FLUSING OIL -1
NOS) 15-May-1... 13-Dec-12 A 237
CNME630 Pre-Fabtication &
Transportation of Dish End &
Fabrication 15-May-1... 04-Sep-12 A
120
CNME640 Erection & Painting of
Tank 18-Jul-12 A 22-Nov-12 A 60
CNME650 Hydrotesting of Tank 04Dec-1... 13-Dec-12 A 20
CLOSED DRAIN TANK-DYKE WALL (
LIGHT & FLUSHING OIL) 06-Jun-1...
08-Aug-12 A 122
CNCV540 Excavation 06-Jun-1... 09Jul-12 A 90
CNCV652 RCC & RELATED FACILITIES
26-Jun-1... 08-Aug-12 A 120
CNCV731 PCC 06-Jun-1... 16-Jul-12 A
90
DG SET ( TAG NO-52 & 23) 02-Aug1... 05-Dec-12 A 552
CNEL190 Installation of DG set
outside of substation bldg 23-Apr1... 12-Sep-12 A 31
DG Set Foundation 13-Jan-1... 28Feb-12 A 64

CNCV561 Earth Work 13-Jan-1... 14Jan-12 A 9


CNCV562 Back filling & Compaction
17-Feb-1... 28-Feb-12 A 11
CNCV571 PCC 16-Jan-1... 30-Jan-12
A 11
CNCV581 RCC 24-Jan-1... 15-Feb-12
A 21
Diesel Storage tanks-Foundation 02Aug-1... 13-Apr-12 A 167
CNCV122 Excavation 08-Aug-1... 12Aug-11 A 20
CNCV124 Barbending 13-Aug-1... 18Feb-12 A 30
CNCV126 Form Work 02-Aug-1... 23Feb-12 A 45
CNCV128 RCC 19-Aug-1... 24-Feb-12
A 60
CNCV130 Backfilling & Compaction
02-Apr-1... 13-Apr-12 A 20
DIESEL STORAGE TANK-Fabrication
15-Nov-1... 05-Dec-12 A 356
CNEQ170 Installation of Diesel
Unloading pump 26-May-1... 09-Aug12 A 15
CNME670 Fabtication of Tank 15Nov-1... 15-Feb-12 A 45
CNME680 Erection of Tank 22-May1... 30-May-12 A 40
CNME690 Hydrotesting of Tank 13Nov-1... 20-Nov-12 A 14
CNME700 Painting of Tank 22-Nov1... 05-Dec-12 A 23
DIESEL STORAGE TANK-DYKE WALL
21-Mar-1... 06-Jul-12 A 129
CNCV672 RCC & RELATED FACILITIES
21-May-1... 06-Jul-12 A 120
CNCV690 Excavation 21-Mar-1... 02Apr-12 A 45
CNCV751 PCC 08-Apr-1... 22-May-12
A 90

FIRE PROTECTION SYSTEM (TAG NO18,19,47 & 53) 24-Jan-1... 25-Aug-13


715
FW PUMP HOUSE 09-Feb-1... 09Aug-12 A 603
CNCV215 Substructure 09-Feb-1...
20-Mar-12 A 45
CNCV216 Superstructure 26-Mar-1...
14-Jun-12 A 75
CNCV218 Flooring 03-Jul-12 A 09Aug-12 A 35
FIRE STATION BUILDING ( Drill Yard)
02-Jan-1... 23-Aug-13 A 567
CNCV204 Flooring 10-Jul-12 A 28-Jul12 A 30
CNCV212 Superstructure 07-Feb-1...
03-Apr-12 A 95
CNCV213 Masonary 21-Mar-1... 13Jun-12 A 60
CNCV221 Substructure 02-Jan-1...
04-Feb-12 A 60
CNCV350 Installation of Split Air
Conditioner 29-Aug-1... 04-Sep-12 A
10
CNCV425 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 08-Aug-1... 23-Aug13 A 90
FIRE WATER TANK FOUNDATION - 2
NOS 24-Jan-1... 05-Jul-11 A 304
CNCV050 Excavation 24-Jan-1... 04Feb-11 A 8
CNCV060 Barbending 31-Jan-1... 31Mar-11 A 12
CNCV070 Form Work 16-Mar-1... 13Apr-11 A 15
CNCV080 RCC 19-Apr-1... 30-May-11
A 90
CNCV085 Backfilling & Compaction
15-Jun-1... 05-Jul-11 A 30
FIRE WATER TANK FABRICATION - 2
NOS 28-Oct-1... 28-Dec-12 A 423

CNME590 Fabtication of Tank 28Oct-1... 06-Jan-12 A 105


CNME600 Erection of Tank 04-Dec1... 05-Mar-12 A 120
CNME610 Hydrotesting of Tank 20Nov-1... 04-Dec-12 A 90
CNME620 Painting of Tank 11-Dec1... 28-Dec-12 A 90
FIRE WATER PUMP HOUSE -SHED 15Nov-1... 22-Jan-13 A 403
CNCV433 Earth Work 15-Nov-1... 09Jan-12 A 15
CNCV443 PCC 09-Feb-1... 20-Mar-12
A 30
CNCV453 Barbending 09-Feb-1... 20Mar-12 A 30
CNCV463 Form Work 09-Feb-1... 20Mar-12 A 30
CNCV473 Structural Fab. Shot
Blasting & Primer painting 15-Aug1... 29-Nov-12 A 60
CNCV483 RCC 26-Mar-1... 16-May12 A 40
CNCV493 Structural Erection & Final
painting 27-Sep-1... 13-Nov-12 A 40
CNCV503 Metal Sheet Fixing & Side
Cladding 05-Nov-1... 14-Jan-13 A 80
CNCV513 Internal & External
Painting 18-Dec-1... 22-Jan-13 A 60
CNCV613 Installation of Monorail 16Nov-1... 13-Dec-12 A 78
Impact Fire Fighting ChangesConstruction 15-Feb-1... 25-Aug-13
390
CIVIL 15-Feb-1... 13-Jul-12 A 108
MDPP-FPSCF-DCNC.- 0F0O0R1 FIRE
WATER PUMP 24-Feb-1... 30-Apr-12
A 45
MDPP-FPSCF-DCNC.- 0F0O1R1
JOCKEY PUMP 07-Mar-1... 30-Apr-12
A 45

MDPP-FPSCF-DCNC.- 0F0O2R1
FOAM CONCENTRATE TANK 15-Jun1... 13-Jul-12 A 60
MDPP-FPSCF-DCNC.- 0F0O3R1 FIRE
WATER TANK (NEW TANK) 15-Feb1... 16-Mar-12 A 60
MECHANICAL & PIPING 05-Mar-1...
09-Aug-13 348
FIRE WATER TANK FABRICATION 05Mar-1... 12-Dec-12 A 312
MDPP-FPCSACT-CHCO-D0I0C5
1PROTECTION FOR FIRE WATER
TANK (NEW TANK) 08-May-1... 28May-12 A 60
MDPP-FPFSACB-CRMICPA-T0I0O5N1
OF PLATES 05-Mar-1... 15-May-12 A
50
MDPP-FPASLCIG-CNMMPE-0N1T2
&1 ERECTION OF ROLLED
SEGMENTS 16-Apr-1... 03-Oct-12 A
120
MDPP-FPNSDCT-CMP-0131 27-Nov1... 12-Dec-12 A 30
MDPP-FPPSICP-INCGM PCO01N4N1ECTION 05-Jun-1... 10-Oct12 A 30
FIRE WATER PUMP 07-Aug-1... 28May-13 31
MDPP-FPASSCS-CEMPBL0Y0,2IN1STALLATION OF FIRE
WATER PUMP 07-Aug-1... 09-Oct-12
A 30
MDPP-FPPSICP-INCGM PCO00N6N1ECTION 17-Oct-1... 24May-13 10
MDPP-FPNSDCT-C &M HPY0D0R7O1TESTING 12-Mar-1... 28May-13 10
JOCKEY PUMP 03-Oct-1... 08-Jun-13
63
MDPP-FPISNCS-TCAMLLPA0T0IO31N OF JOCKEY PUMP 03-Oct1... 23-Oct-12 A 12
MDPP-FPPSICP-INCGM PCO00N8N1ECTION 04-Dec-1... 08-Jun13 25

FOAM CONCENTRATE TANK 12-Sep1... 09-Aug-13 35


MDPP-FPESRCE-CCMTIPO-N00
A4N1D ALLIGNMENT 12-Sep-1... 04Oct-12 A 12
MDPP-FPPSICP-INCGM PCO01N0N1ECTION 12-Nov-1... 09-Aug13 20
ELECTRICAL 21-Aug-1... 13-Jun-13 21
MDPP-FPSCIN-CSET-A0L0L0A1TION
& TERMINATION OF CABLES 21-Aug1... 13-Jun-13 30
INSTRUMENTATION 04-Oct-1... 25Aug-13 65
MDPP-FPSCIN-CSI-T0A0L0L1ATION
OF INSTRUMENTATION ITEMS 04Oct-1... 25-Aug-13 90
SEWAGE TREATMENT SYSTEM (TAG
NO-32) 22-Jan-1... 13-Jun-13 339
Sewage Treatment Package (STP) 22Jan-1... 13-Jun-13 339
CNCV272 Earth Work 22-Jan-1... 26Apr-12 A 30
CNCV282 PCC 28-Jan-1... 29-Mar-12
A 35
CNCV302 Barbending 30-Jan-1... 11May-12 A 30
CNCV312 Form Work 30-Jan-1... 15May-12 A 30
CNCV322 RCC 20-Apr-1... 26-May-12
A 45
CNCV432 Back filling & Compaction
28-May-1... 29-Jun-12 A 10
CNEQ150 Installation of Sewage
water treatment plant 11-Sep-1...
13-Jun-13 30
OILY WATE TREATMENT
SYSTEM(TAG NO-11 & 71) 13-Jun1... 03-Jul-13 304
Oily Water Package (OWP) 13-Jun1... 03-Jul-13 304

CNCV271 Earth Work 13-Jun-1... 18Jul-12 A 25


CNCV281 PCC 08-Aug-1... 12-Aug-12
A 12
CNCV301 Barbending 16-Aug-1... 04Sep-12 A 45
CNCV311 Form Work 21-Aug-1... 10Sep-12 A 30
CNCV321 RCC 14-Sep-1... 09-Oct-12
A 60
CNCV462 Back filling & Compaction
09-Oct-1... 18-Oct-12 A 10
CNEQ140 Installation of Oily water
treatment plant 11-Feb-1... 03-Jul13 50
SUB STATION ( TAG NO-27) 15-Mar1... 23-Jul-13 664
Main Substation Building 15-Mar1... 20-Mar-13 A 664
CNCV185 Substructure 15-Mar-1...
30-Oct-11 A 75
CNCV186 Superstructure 20-Oct-1...
30-Dec-11 A 110
CNCV187 Masonary 15-Feb-1... 10May-12 A 60
CNCV188 Flooring 08-May-1... 17Aug-12 A 60
CNCV190 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 29-Aug-1... 04-Nov12 A 95
CNCV191 HVAC ducting work 12Nov-1... 12-Dec-12 A 30
CNEL175 Installation of Switchgear
& Panel 29-Nov-1... 10-Jan-13 A 50
CNEL185 Installation of Substation
Equipment incl. testing 10-Jan-1...
12-Mar-13 A 90
CNEL200 Installation of Substation
Automation System 10-Jan-1... 20Mar-13 A 90
Transformer 14-Jan-1... 23-Jul-13
328

CNCV471 Earth Work 14-Jan-1... 16Jan-12 A 8


CNCV481 PCC 18-Jan-1... 18-Jan-12
A 10
CNCV491 RCC 22-Jan-1... 08-Feb-12
A 20
CNCV532 Back filling & Compaction
20-Feb-1... 28-Feb-12 A 10
CNEL177 Installation of
Transformers 28-Nov-1... 23-Jul-13
70
NGR 08-May-1... 05-Dec-12 A 55
CNCV371 Earth Work 08-May-1... 24May-12 A 8
CNCV381 PCC 28-May-1... 06-Jun-12
A 10
CNCV391 RCC 11-Jun-1... 28-Jun-12
A 20
CNCV522 Back filling & Compaction
11-Jul-12 A 30-Jul-12 A 10
CNEQ190 Installation of NGR 13-Nov1... 05-Dec-12 A 45
Gas Turbine 11-Nov-1... 25-Jan-12 A
90
CNCV342 Excavation 11-Nov-1... 30Nov-11 A 12
CNCV344 Foundation 20-Nov-1... 15Jan-12 A 60
INT160 Installation of Gas turbine
Generator 21-Jan-1... 25-Jan-12 A 60
11-KV Kiosk 31-Jul-12 A 03-Oct-12 A
40
CNCV700 Excavation & Foundation
31-Jul-12 A 20-Aug-12 A 21
CNCV720 Installation of kiosk 29Aug-1... 03-Oct-12 A 40
2 Pole Structure for incoming Grid
Structure 10-Sep-1... 06-Dec-12 A 54
CNCV730 Excavation & Foundation
10-Sep-1... 04-Oct-12 A 21

CNCV740 Erection of Structure 08Nov-1... 06-Dec-12 A 60


CONTROL ROOM BUILDING (TAG NO30) 23-Nov-1... 21-May-13 486
Control Room Building 23-Nov-1...
21-May-13 486
CNCV150 Substructure 23-Nov-1...
15-Feb-12 A 75
CNCV151 Superstructure 08-Dec-1...
27-Apr-12 A 120
CNCV152 Masonary 14-Feb-1... 01May-12 A 60
CNCV153 Flooring 03-May-1... 11-Jul12 A 40
CNCV155 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 14-Mar-1... 12-Jun12 A 120
CNCV156 HVAC ducting work 18-Jul12 A 10-Oct-12 A 75
CNEL140 Installation of UPS in
Control Room 07-May-1... 21-May13 25
BUILDING AND INFRASTRUCTURE 28Jan-1... 21-Nov-13 759
BUILDING WORKS 28-Jan-1... 21-Nov13 739
Administration Building 04-Apr-1...
10-Apr-13 A 706
CNCV141 Substructure 04-Apr-1...
05-Jun-12 A 75
CNCV142 Superstructure 11-Jun-1...
11-Sep-12 A 66
CNCV143 Masonary 24-Aug-1... 04Oct-12 A 60
CNCV144 Flooring 04-Mar-1... 10Apr-13 A 40
CNCV145 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 09-Oct-1... 13-Feb13 A 120
CNCV146 HVAC ducting work 18Dec-1... 09-Apr-13 A 40
Medical Centre Building 28-Jan-1...
15-Oct-13 A 672

CNCV235 Substructure 28-Jan-1...


15-Feb-12 A 75
CNCV236 Superstructure 01-Feb-1...
13-Apr-12 A 90
CNCV237 Masonary 15-Mar-1... 06Jun-12 A 60
CNCV238 Flooring 02-Oct-1... 01Nov-12 A 30
CNCV240 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 17-May-1... 15-Oct13 A 120
CNCV250 Installation of Split Air
Conditioner 04-Apr-1... 24-Apr-13 A
10
Security Building 12-Oct-1... 08-May13 A 567
CNCV195 Substructure 12-Oct-1...
10-Jan-12 A 75
CNCV196 Superstructure 13-Jan-1...
13-Mar-12 A 90
CNCV197 Masonary 05-Mar-1... 24Apr-12 A 60
CNCV198 Flooring 14-Nov-1... 04Dec-12 A 50
CNCV200 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 23-May-1... 12-Sep12 A 120
CNCV201 HVAC ducting work 27Mar-1... 08-May-13 A 40
Admin MCC Substation 28-Nov-1...
13-Jun-13 237
CNCV225 Substructure 28-Nov-1...
22-Feb-12 A 30
CNCV226 Superstructure 12-Mar-1...
16-May-12 A 70
CNCV227 Masonary 09-May-1... 13Jun-12 A 55
CNCV228 Flooring 07-Aug-1... 12Dec-12 A 55
CNCV230 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 13-Aug-1... 12-Dec12 A 120
CNCV231 HVAC ducting work 08-Jan1... 13-Jun-13 30

Workshop / Warehouse Building /


Laboratory 04-Feb-1... 23-May-13
609
CNCV165 Substructure 04-Feb-1...
02-Jul-12 A 75
CNCV166 Superstructure 15-Feb-1...
05-Jun-12 A 90
CNCV167 Masonary 01-May-1... 13Jun-12 A 45
CNCV168 Flooring 03-Dec-1... 10-Jan13 A 60
CNCV170 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 26-Sep-1... 13-Feb13 A 80
CNCV176 Fab. & Erection of
Structural Steel Works 07-May-1...
15-Nov-12 A 120
CNCV180 Sheet Fixing 06-Nov-1... 28Nov-12 A 90
CNCV320 Installation of Split Air
Conditioner 15-May-13 23-May-13
10
CNEQ220 Erection of EOT crane 24Oct-1... 10-Jan-13 A 60
Canopy at Entrance -DELETED 15Feb-1... 25-Nov-12 A 440
CNCV112 Substructure 15-Feb-1...
19-May-12 A 30
CNCV113 Superstructure 20-May1... 08-Jul-12 A 50
CNCV116 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 10-May-1... 18-Jul-12
A 70
CNCV123 Sheet Fixing 26-Sep-1... 25Nov-12 A 60
CNCV133 Fabrication & Erection of
Structural Steel 09-Jul-12 A 26-Sep12 A 90
Security Cabin /Sheds (2 Nos) 21Sep-1... 05-Feb-13 A 159
CNCV243 Masonary 07-Feb-1... 06Jun-12 A 45
CNCV261 Substructure 21-Sep-1...
04-Nov-11 A 40

CNCV264 Flooring 29-Nov-1... 05Feb-13 A 40


CNCV422 Superstructure 14-Dec-1...
25-Apr-12 A 45
CNCV455 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 03-Jul-12 A 02-Nov12 A 75
SEHMS Sub Station 15-Apr-1... 08Jan-13 A 143
CNCV154 Flooring 11-Dec-1... 08-Jan13 A 30
CNCV160 Release of Front 15-Apr12 A 0
CNCV161 Substructure 09-May-1...
04-Jul-12 A 45
CNCV162 Superstructure 19-Jul-12 A
03-Sep-12 A 55
CNCV163 Masonary 02-Aug-1... 20Sep-12 A 45
CNCV205 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 12-Sep-1... 03-Dec12 A 60
Hazardous Waste Area Shed 08-Jun1... 18-Jul-13 267
CNCV164 Flooring 24-Jan-1... 13-Jun13 30
CNCV169 Release of Front 08-Jun-12
A0
CNCV171 Substructure 31-Jul-12 A
15-Aug-12 A 14
CNCV182 Superstructure 31-Aug-1...
11-Oct-12 A 20
CNCV183 Masonary 19-Sep-1... 14Nov-12 A 35
CNCV245 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 21-Nov-1... 18-Jul-13
45
Raw Water MCC Room 06-Mar-1...
08-Jul-13 321
CNCV194 Flooring 23-Jan-1... 23-Jun13 40
CNCV202 Superstructure 24-Apr-1...
13-Jun-12 A 70

CNCV203 Masonary 14-Jun-1... 16Jul-12 A 45


CNCV209 Release of Front 30-Mar12 A 0
CNCV211 Substructure 06-Mar-1...
12-Apr-12 A 60
CNCV260 Installation of Split Air
Conditioner 29-Jun-13 08-Jul-13 10
CNCV265 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 13-Aug-1... 03-Jul-13
50
Chemical House 15-Jun-1... 22-Aug13 290
CNCV214 Flooring 12-Dec-1... 05Feb-13 A 30
CNCV222 Superstructure 30-Jul-12 A
30-Oct-12 A 75
CNCV223 Masonary 25-Sep-1... 18Oct-12 A 45
CNCV241 Substructure 15-Jun-1...
18-Jul-12 A 45
CNCV435 Finishing ( Elect.
Inst.,Doors & Window
fixing,Painting) 12-Dec-1... 22-Aug13 100
Car parking 04-Sep-1... 21-Nov-13 A
83
CNCV570 Excavation 04-Sep-1... 18Sep-12 A 30
CNCV580 PCC & Foundation 17-Sep1... 21-Nov-13 A 45
CNCV590 Erection of Purlin 04-Dec1... 09-Jan-13 A 40
CNCV600 Erection of Roof Sheet 06Feb-1... 16-Apr-13 A 60
HVAC System (AC Screw
Chillers,Water Pumps Etc) 17-Feb1... 02-Aug-13 433
CNCV384 Foundation 22-Feb-1... 28Feb-12 A 45
CNCV394 Installation of Chillers,
Pumps & Connention of Air handling
Unit-AHU) 23-Jul-12 A 14-Nov-12 A
180

CNCV404 Installation of Ventilation


System in Buildings 07-Jan-1... 02Aug-13 60
CNCV682 Excavation 17-Feb-1... 20Feb-12 A 20
INFRASTRUCTURE WORKS 07-Nov1... 10-Nov-13 725
Civil Work- Foundation of
Equipments 28-Apr-1... 12-Dec-12 A
283
Pump's Foundation 02-Aug-1... 12Dec-12 A 94
CNCV318Earth Work 08-Aug-1... 29Aug-12 A 20
CNCV328PCC 02-Aug-1... 11-Oct-12
A 65
CNCV338Form Work 29-Aug-1... 17Oct-12 A 50
CNCV348RCC 13-Sep-1... 01-Dec-12
A 80
CNCV492Back filling & Compaction
03-Dec-1... 12-Dec-12 A 10
SHEMS Transformer Foundation 28Apr-1... 27-Aug-12 A 162
CNCV501Earth Work 28-Apr-1... 07May-12 A 8
CNCV511PCC 03-May-1... 25-Jun-12
A 10
CNCV521RCC 25-May-1... 04-Jul-12
A 20
CNCV542Back filling & Compaction
07-Aug-1... 27-Aug-12 A 10
Vent Stack 14-May-1... 14-Nov-12 A
283
CNCV531Earth Work 14-May-1... 14May-12 A 8
CNCV541PCC 15-May-1... 15-May12 A 10
CNCV551RCC 30-May-1... 31-May12 A 20
CNCV552Back filling & Compaction
15-Jun-1... 29-Jun-12 A 10
CNEQ270Installation of Vent Stack
16-Aug-1... 14-Nov-12 A 45

Foam Pump Skid Foundation 15-Jun1... 21-Aug-12 A 164


CNCV572Back filling & Compaction
06-Aug-1... 21-Aug-12 A 10
CNCV591Earth Work 15-Jun-1... 22Jun-12 A 8
CNCV601PCC 18-Jun-1... 28-Jun-12 A
10
CNCV611RCC 05-Jul-12 A 31-Jul-12 A
20
Foam Concentrate Tank Foundation
15-Jun-1... 16-Aug-12 A 35
CNCV582Back filling & Compaction
09-Aug-1... 16-Aug-12 A 10
CNCV621Earth Work 15-Jun-1... 29Jun-12 A 15
CNCV631PCC 18-Jun-1... 02-Jul-12 A
30
CNCV641RCC 03-Jul-12 A 13-Jul-12 A
30
Construction of Roads 07-Nov-1...
12-Aug-13 125
CNCV252 WBM (63-40) 07-Nov-1...
15-May-13 90
CNCV254 WBM (50-20) 28-Nov-1...
12-Aug-13 100
Civil Works - Drains 11-Sep-1... 10Nov-13 665
CNCV290 Excavation 11-Sep-1... 15May-13 140
CNCV291 PCC 18-Sep-1... 25-Sep-13
140
CNCV292 Bar Bending 24-Sep-1... 05Oct-13 140
CNCV293 Form Work 27-Sep-1... 08Aug-13 90
CNCV298 RCC 03-Oct-1... 09-Sep-13
120
CNCV303 Plastering 15-May-13 10Nov-13 180
Construction of Cable Trenches
around Building 18-Jun-1... 26-Aug13 115

CNCV300 Excavation 18-Jun-1... 01Aug-12 A 60


CNCV340 PCC 11-Sep-1... 15-May-13
60
CNCV341 Bar Bending 17-Sep-1... 28Jul-13 75
CNCV351 Form Work 19-Sep-1... 07Aug-13 70
CNCV361 RCC 10-Oct-1... 26-Aug-13
90
Civil works- Pipe Sleepers 07-Nov1... 08-Jun-13 70
Contruction of Pipe Sleepers ( PreCast) 0
Contruction of Pipe Sleepers ( CastIn-Citu) 07-Nov-1... 08-Jun-13 70
CNCV560Excavation & Pedestal
Casting 12-Nov-1... 15-May-13 100
CNCV710Release of Front 07-Nov1... 08-Jun-13 70
Civil works- Paving 22-Aug-1... 11Sep-13 86
CNCV330 Civil works - Paving in
Tank Farm area 22-Aug-1... 11-Sep13 120
Construction of Watch Towers
Installation 10-Nov-1... 26-Oct-13
474
CNCV335 Excavation 03-Jan-1... 25Jan-12 A 32
CNCV345 PCC 10-Nov-1... 14-Mar12 A 32
CNCV355 RCC 01-Dec-1... 18-May13 46
CNCV365 Backing Filling &
Compaction 24-Feb-1... 14-Aug-13 A
48
CNCV395 Fabrication 21-Nov-1... 17Jun-13 152
CNCV405 Blasting & Painting 30-Nov1... 20-Jul-13 93
CNCV415 Installation & Start up of
Watch Towers (11 Nos.) 29-Feb-1...
30-Aug-13 110

CNCV465 Final Painting & Touch up


03-Sep-13 26-Oct-13 61
Pathways 02-Aug-1... 08-Nov-13 127
CNCV505 Construction of Pathways
around Terminal 02-Aug-1... 08-Nov13 200
COMMON AREAS 15-Feb-1... 06-Jan14 696
PIPING WORKS 06-Jun-1... 06-Jan-14
646
U/G PIPING 04-Sep-1... 05-Nov-13
124
CNME501 Excavation & Lowering of
Pipes 04-Sep-1... 02-Aug-13 90
CNME502 Piping Laying & Erection
& Connection 07-Nov-1... 07-Oct-13
120
CNME512 NDT & Hydrotesting 20Nov-1... 05-Nov-13 60
CS PIPING/AG PIPING 05-Dec-1... 06Jan-14 646
CNME500 Pipe Fabrication 10-Jul-12
A 15-May-13 240
CNME510 Pipe Laying, Erection &
Connections 05-Dec-1... 14-Dec-13
200
CNME515 NDT Works 12-Dec-1... 18Dec-13 240
CNME520 Hydrotesting 10-Nov-1...
20-Dec-13 120
CNME530 Insulation 15-Sep-13 03Jan-14 110
CNME540 Painting 14-Aug-1... 30Dec-13 220
Civil Works - Drains 11-Sep-1... 10Nov-13 665
CNCV290 Excavation 11-Sep-1... 15May-13 140
CNCV291 PCC 18-Sep-1... 25-Sep-13
140
CNCV292 Bar Bending 24-Sep-1... 05Oct-13 140
CNCV293 Form Work 27-Sep-1... 08Aug-13 90

CNCV298 RCC 03-Oct-1... 09-Sep-13


120
CNCV303 Plastering 15-May-13 10Nov-13 180
Construction of Cable Trenches
around Building 18-Jun-1... 26-Aug13 115
CNCV300 Excavation 18-Jun-1... 01Aug-12 A 60
CNCV340 PCC 11-Sep-1... 15-May-13
60
CNCV341 Bar Bending 17-Sep-1... 28Jul-13 75
CNCV351 Form Work 19-Sep-1... 07Aug-13 70
CNCV361 RCC 10-Oct-1... 26-Aug-13
90
Civil works- Pipe Sleepers 07-Nov1... 08-Jun-13 70
Contruction of Pipe Sleepers ( PreCast) 0
Contruction of Pipe Sleepers ( CastIn-Citu) 07-Nov-1... 08-Jun-13 70
CNCV560Excavation & Pedestal
Casting 12-Nov-1... 15-May-13 100
CNCV710Release of Front 07-Nov1... 08-Jun-13 70
Civil works- Paving 22-Aug-1... 11Sep-13 86
CNCV330 Civil works - Paving in
Tank Farm area 22-Aug-1... 11-Sep13 120
Construction of Watch Towers
Installation 10-Nov-1... 26-Oct-13
474
CNCV335 Excavation 03-Jan-1... 25Jan-12 A 32
CNCV345 PCC 10-Nov-1... 14-Mar12 A 32
CNCV355 RCC 01-Dec-1... 18-May13 46
CNCV365 Backing Filling &
Compaction 24-Feb-1... 14-Aug-13 A
48

CNCV395 Fabrication 21-Nov-1... 17Jun-13 152


CNCV405 Blasting & Painting 30-Nov1... 20-Jul-13 93
CNCV415 Installation & Start up of
Watch Towers (11 Nos.) 29-Feb-1...
30-Aug-13 110
CNCV465 Final Painting & Touch up
03-Sep-13 26-Oct-13 61
Pathways 02-Aug-1... 08-Nov-13 127
CNCV505 Construction of Pathways
around Terminal 02-Aug-1... 08-Nov13 200
COMMON AREAS 15-Feb-1... 06-Jan14 696
PIPING WORKS 06-Jun-1... 06-Jan-14
646
U/G PIPING 04-Sep-1... 05-Nov-13
124
CNME501 Excavation & Lowering of
Pipes 04-Sep-1... 02-Aug-13 90
CNME502 Piping Laying & Erection
& Connection 07-Nov-1... 07-Oct-13
120
CNME512 NDT & Hydrotesting 20Nov-1... 05-Nov-13 60
CS PIPING/AG PIPING 05-Dec-1... 06Jan-14 646
CNME500 Pipe Fabrication 10-Jul-12
A 15-May-13 240
CNME510 Pipe Laying, Erection &
Connections 05-Dec-1... 14-Dec-13
200
CNME515 NDT Works 12-Dec-1... 18Dec-13 240
CNME520 Hydrotesting 10-Nov-1...
20-Dec-13 120
CNME530 Insulation 15-Sep-13 03Jan-14 110
CNME540 Painting 14-Aug-1... 30Dec-13 220

CNME500

CNME510
CNME515
CNME520
CNME530
CNME540

Award of Contract (LOA)


Kick of meeting
Site Enabling works ( Site
office,Warehouse)
Completion of Residual Basic Engg.
for Packages
Ordering of Steam Generation
Package

25-Oct-10 A

A0

Ordering of Air Compressor Package 16-Mar-11 A

Ordering of Oily Water Treatment


Package (OWS)

28-Oct-10 A

Ordering of Gate/Ball Valves

16-Mar-11 A

Ordering of Control Valves


Ordering of Emergency Shut Down
Valves
Ordering of Nitrogen Package 01Dec-10 A 0
Ordering of Panel / Switchgear 01Dec-10 A 0
Ordering of Power Transformer 31Dec-10 A 0

11-Feb-11 A

11-Feb-11

01-Dec-10 A

01-Dec-10 A

31-Dec-10 A

Ordering of FF Pumps 09-Jun-11 A 0 09-Jun-11 A

Ordering of DG set 14-Jan-11 A 0

14-Jan-11 A

Receipt of Steam Generation


Package 16-May-12 A 0

16-May-12 A

Receipt of Air Compressor Package


10-May-12 A 0

10-May-12 A

20-Nov-13 A

24-Jul-13 A

05-Aug-13 A

16-Jul-13 A

Receipt of Oily Water Treatment


Package (OWS) 20-Nov-13 A 0
Receipt of Gate/Ball Valves 24-Jul13 A 0
Receipt of Control Valves 05-Aug-13
A0
Receipt of Emergency Shut Down
Valves 16-Jul-13 A 0

Receipt of Nitrogen Package 04-Jun12 A 0


04-Jun-12 A
Receipt of Panel / Switchgear 11-Oct12 A 0
11-Oct-12 A
Receipt of Power Transformer 15-Jul12 A 0
15-Jul-12 A
Receipt of Fire Water System 16-Jul13 A 0
16-Jul-13 A
Receipt of DG set 21-Apr-12 A 0
All Building's Construction
Completion 22-Oct-13 A 0
Hydrotesting Completion 08-Jan-14
A0
Erection of Equipments completion
15-Jul-13 A 0
Electrical works completion 12-Feb13 A 0
Instrument works completion 11Mar-14 A 0
Fire Fighting Work Completion 18Nov-13 0

0
0
0
0

21-Apr-12 A

22-Oct-13 A

08-Jan-14 A

15-Jul-13 A

12-Feb-13 A

11-Mar-14 A

n 18-Nov-13

Mechanical Completion 13-Jan-14 0 n 13-Jan-14

Receipt of FIM-GT 06-Apr-12 A 0


Receipt of FIM-Export Booster
Pumps 11-Apr-12 A 0
Receipt of Heat Tracing System 21Oct-13 A 0
Receipt of Foam Concentrate Tank
27-Mar-12 A 0
Receipt of Deludge Valve 15-May-13
A0
Receipt of Electronic Flow Meter 04Jun-13 A 0

06-Apr-12 A

11-Apr-12 A

21-Oct-13 A

27-Mar-12 A

15-May-13 A

04-Jun-13 A

07-Nov-11 A

Mobilization of Electrical Contractor


10-Apr-12 A 0
10-Apr-12 A

Mobilization of Instrumentation
Contractor 10-Apr-12 A 0

Mobilization of Mechanical
Contractor 07-Nov-11 A 0

10-Apr-12 A

Receipt of Intrusion Detection


System 13-Apr-12 A 0

13-Apr-12 A

Mobilization of Insulation
Contractor 05-Jun-12 A 0
05-Jun-12 A
Completion of Piping Erection 14Dec-13 A 0
14-Dec-13 A
Installation of Jockey Pump 22-Nov12 A 0
22-Nov-12 A
Delivery of Gate Valves 15-Jul-13 A 0
RCC Completion of Dyke Wall 18Sep-13 A 0
Installation of Booster Pump 31May-12 A 0
UNPRICED PO COPIES OF FIRE
PROTECTION SYSTEM
UNPRICED PO COPIES OF E & I
WORKS SUB-CONTRACT 15-Mar-12
A
UNPRICED PO COPIES OF HVAC
WORKS SUB-CONTRACT 12-Dec-11
A0
UNPRICED PO COPIES OF HEAT
TRACING 29-Dec-11 A 0
COMPLETION OF CIVIL FDN. FOR
FIRE WATER STORAGE TANKS 15Mar-12 A 0

0
0

18-Sep-13 A

31-May-12 A 0

31-May-12 A

16-Aug-12 A

15-Mar-12 A

15-Mar-12

12-Dec-11 A 0

12-Dec-11 A

29-Dec-11 A 0

29-Dec-11 A

15-Mar-12 A 0

15-Mar-12 A

24-Feb-12 A 0

COMPLETION OF CIVIL FDN. FOR


VENT STACK 15-May-12 A 0

15-May-12 A 0

COMPLETION OF CIVIL FDN. FOR


CLOSED DRAIN TANKS 13-Sep-12 A

15-Jul-13 A

COMPLETION OF CIVIL FDN. FOR


DIESEL GENERATOR 24-Feb-12 A 0

COMPLETION OF CIVIL FDN. FOR


DIESEL STORAGE TANK 24-Feb-12
COMPLETION OF CIVIL FDN. FOR
RAW WATER STORAGE TANKS 13Sep

NK 24-Feb-12

TANKS 13-Sep

S 13-Sep-12 A

COMPLETION OF CIVIL WORKS FOR


TANK DYKE WALLS AND PAVING 20 AND PAVING 20
COMPLETION OF CIVIL FDN. FOR
EXPORT PUMPS 07-Dec-11 A 0

07-Dec-11 A 0

COMPLETION OF CIVIL FDN. FOR


GAS TURBINES 15-Jan-12 A 0

15-Jan-12 A 0

COMPLETION OF CIVIL FDN. FOR


CUSTODY TRANSFER METERING
SKID

METERING SKID

COMPLETION OF CIVIL FDN. FOR


FIRE WATER & JOCKEY PUMPS 28-A EY PUMPS 28-A
COMPLETION OF CIVIL FDN. FOR
STEAM GENERATION PACKAGE 26Ma
PACKAGE 26-Ma
RECEIPT AT SITE OF STEAM
GENERATION PACKAGE 14-Nov-12 A
0
14-Nov-12 A 0
RECEIPT AT SITE OF FIRE WATER
AND JOCKEY PUMPS 16-Oct-12 A

16-Oct-12 A

RECEIPT AT SITE OF HT & LT CABLES


13-Nov-12 A 0
13-Nov-12 A 0

RECEIPT AT SITE OF PIPING BULKS


PIPE, FLANGES, FITTINGS,
S, FITTINGS,
RECEIPT AT SITE OF ELECTRICAL
BULKS 18-Jul-13 A 0
18-Jul-13 A 0
RECEIPT AT SITE OF DIESEL
GENERATOR PACKAGE 21-Apr-12 A
0
21-Apr-12 A 0
RECEIPT AT SITE OF RAW WATER
TREATMENT PACKAGE 15-Nov-12 A

15-Nov-12 A

RECEIPT AT SITE OF INSTRUMENT


AIR PACKAGE 24-Oct-12 A 0

24-Oct-12 A 0

RECEIPT AT SITE OF OWS PACKAGE


20-Nov-13 A 0
RECEIPT AT SITE OF
SEWAGE/EFFLUENT TREATMENT
PACKAGES 21-Oc
RECEIPT AT SITE OF POWER &
DISTRIBUTION TRANSFORMERS 20Dec
RECEIPT AT SITE OF HEAT TRACING
21-Nov-13 A 0

20-Nov-13 A 0

ACKAGES 21-Oc

ORMERS 20-Dec
21-Nov-13 A 0

RECEIPT AT SITE OF HV / LV
SWITCHGEAR 23-Jan-13 A 0
23-Jan-13 A 0
COMP. INSTAL. OF STEAM
GENERATION PACKAGE 15-Nov-12 A
0
15-Nov-12 A 0
COMP. INSTAL. OF HV / LV
SWITCHGEAR 18-Sep-13 A 0
COMP. INSTAL. OF FIRE WATER
AND JOCKEY PUMPS 22-Jul-13 A 0
COMP. INSTAL. OF FREE-ISSUE
ITEMS 15-May-13 0
COMP. INSTAL. OF ALL EXPORT
PUMPS 31-May-12 A 0
COMP. INSTAL. OF GAS TURBINES
25-Jan-12 A 0
COMP. INSTAL. OF SEHMS
HARDWARE / EQUIPMENT 15-May13 0
COMP. INSTAL. OF CUSTODY
TRANSFER METERING PACKAGE 20Mar-1
COMP. INSTAL. OF INSTRUMENT
AIR PACKAGE 16-Nov-12 A 0

18-Sep-13 A 0

22-Jul-13 A 0
S 15-May-13 0

31-May-12 A 0
25-Jan-12 A 0

T 15-May-13 0

KAGE 20-Mar-1

16-Nov-12 A 0

COMP. INSTAL. OF RAW WATER


TREATMENT PACKAGE 17-Jan-13 A 0 17-Jan-13 A 0
COMP. INSTAL. OF TREATED WATER
PACKAGE 20-Nov-13 A 0
20-Nov-13 A 0
COMP. INSTAL. OF DIESEL
GENERATOR PACKAGE 30-Apr-12 A
0
30-Apr-12 A 0

COMP. INSTAL. OF OWS PACKAGE


19-Mar-14 A 0
COMP. INSTAL. OF
SEWAGE/EFFLUENT TREATMENT
PACKAGES 13-JunCOMP. INSTAL. OF POWER &
DISTRIBUTION TRANSFORMERS 23Jul-1
COMP. INSTAL. OF HEAT TRACING
30-Dec-13 0
COMPLETION OF SUPERSTRUCTURE FOR ADMIN BUILDING
01-Nov-12

19-Mar-14 A 0

KAGES 13-Jun-

MERS 23-Jul-1
G 30-Dec-13 0

NG 01-Nov-12

COMPLETION OF SUB-STRUCTURE
FOR ADMIN BUILDING 15-May-13 0 G 15-May-13 0

COMPLETION OF INTERNAL FIT-OUT


FOR CONTROL BUILDINGS 15-May LDINGS 15-May
COMPLETION OF
WORKSHOP/WAREHOUSE/LABORAT
ORY 15-May-13 0
Y 15-May-13 0
COMPLETION OF ADMINISTRATION
BDLG 15-May-13 0
G 15-May-13 0
COMPLETION OF SECURITY
BUILDINGS & CABINS 15-May-13 0

S 15-May-13 0

COMPLETION OF FIRE STATION &


MEDICAL CENTRE 15-May-13 0

E 15-May-13 0

COMPLETION OF MAIN PLANT


SUBSTATION 15-May-13 0
N 15-May-13 0
COMPLETION OF 11KV SUBSTATION
15-May-13 0
N 15-May-13 0
COMPLETION OF SEHMS
SUBSTATION 15-May-13 0
COMPLETION OF MAIN DG ROOM
15-May-13 0
COMPLETION OF VARIOUS MCC
ROOMS 03-Jul-13 0

N 15-May-13 0
M 15-May-13 0

S 03-Jul-13 0

COMPLETION OF WALLS, FENCING


INCL. SECURITY GATES, CABINS,

TES, CABINS,

COMPLETION OF ALL OTHER CIVIL,


MECHANICAL, ELECTRICAL & INS
CTRICAL & INS
TEST. & COMMI. OF STEAM
GENERATION PACKAGE 17-Aug-13 0 E 17-Aug-13 0
TEST. & COMMI. OF DIESEL
GENERATOR PACKAGE 15-May-13 0 E 15-May-13 0
TEST. & COMMI. OF RAW WATER
TREATMENT PACKAGE 02-Oct-13 0

E 02-Oct-13 0

TEST. & COMMI. OF TREATED


WATER PACKAGE 29-Oct-13 0

E 29-Oct-13 0

TEST. & COMMI. OF INSTRUMENT


AIR PACKAGE 15-May-13 0
E 15-May-13 0
TEST. & COMMI. OF OWS PACKAGE
03-Jul-13 0
E 03-Jul-13 0
TEST. & COMMI. OF
SEWAGE/EFFLUENT TREATMENT
PACKAGES 29-Oct
CKAGES 29-Oct
TEST. & COMMI. OF POWER &
DISTRIBUTION TRANSFORMERS 23JulRMERS 23-JulCOMPLETION OF TERMINAL ROADS
AND DRAINS 09-Sep-13 0
S 09-Sep-13 0
TEST. & COMMI. OF HEAT TRACING
30-Dec-13 0
G 30-Dec-13 0
TEST. & COMMI. OF HV / LV
SWITCHGEAR 15-May-13 0

R 15-May-13 0

TEST. & COMMI. OF FIRE WATER


AND FOAM SYSTEM 09-Aug-13 0

M 09-Aug-13 0

TEST. & COMMI. OF TERMINAL


PIPING 06-Jan-14 0

G 06-Jan-14 0

TEST. & COMMI. OF TERMINAL


TANKS FIRE WATER, CLOSED
DRAIN

CLOSED DRAIN

TEST. & COMMI. OF DIESEL


STORAGE AND DISTRIBUTION
SYSTEM 15

ION SYSTEM 15

COMPLETION OF DRILLING OF 5
BORE WELLS AND ASSOCIATED
PUMP

OCIATED PUMP

COMPLETION OF TERMINAL PIPING,


VALVES (INCL FREE-ISSUE), PIPING
RACK... 14-Dec-13 0
. 14-Dec-13 0
COMPLETION OF POWER AND
CONTROL CABLING 30-Nov-13 0

G 30-Nov-13 0

COMPLETION OF DIESEL STORAGE


AND DISTRIBUTION SYSTEM 15-May13 0
M 15-May-13 0
COMPLETION OF ALL TANKS &
VESSELS FIRE WATER, CLOSED
DRAIN, FOA... 15-May-13 0

. 15-May-13 0

INT0140 Ordering of Steam Generation Package 25Oct-10 A 0


INT0150 Ordering of Air Compressor Package 16Mar-11 A 0
INT0170 Ordering of Oily Water Treatment Package
(OWS) 28-Oct-10 A 0
INT0180 Ordering of Gate/Ball Valves 16-Mar-11 A
0
INT0190 Ordering of Control Valves 11-Feb-11 A 0
INT0191 Ordering of Emergency Shut Down Valves
11-Feb-11 A 0
INT0200 Ordering of Nitrogen Package 01-Dec-10 A
0
INT0210 Ordering of Panel / Switchgear 01-Dec-10
A0
INT0220 Ordering of Power Transformer 31-Dec-10
A0
INT0230 Ordering of FF Pumps 09-Jun-11 A 0
INT0240 Ordering of DG set 14-Jan-11 A 0
INT0250 Receipt of Steam Generation Package 16May-12 A 0
INT0260 Receipt of Air Compressor Package 10May-12 A 0
INT0280 Receipt of Oily Water Treatment Package
(OWS) 20-Nov-13 A 0
INT0290 Receipt of Gate/Ball Valves 24-Jul-13 A 0
INT0300 Receipt of Control Valves 05-Aug-13 A 0
INT0301 Receipt of Emergency Shut Down Valves
16-Jul-13 A 0
INT0310 Receipt of Nitrogen Package 04-Jun-12 A 0
INT0320 Receipt of Panel / Switchgear 11-Oct-12 A
0
INT0330 Receipt of Power Transformer 15-Jul-12 A
0
INT0340 Receipt of Fire Water System 16-Jul-13 A 0
INT0350 Receipt of DG set 21-Apr-12 A 0
INT0360 All Building's Construction Completion 22Oct-13 A 0

INT0380 Hydrotesting Completion 08-Jan-14 A 0


INT0390 Erection of Equipments completion 15-Jul13 A 0
INT0400 Electrical works completion 12-Feb-13 A 0
INT0410 Instrument works completion 11-Mar-14 A
0
INT0420 Fire Fighting Work Completion 18-Nov-13
0
INT0430 Mechanical Completion 13-Jan-14 0
INT440 Receipt of FIM-GT 06-Apr-12 A 0
INT450 Receipt of FIM-Export Booster Pumps 11Apr-12 A 0
INT460 Receipt of Heat Tracing System 21-Oct-13 A
0
INT470 Receipt of Foam Concentrate Tank 27-Mar12 A 0
INT480 Receipt of Deludge Valve 15-May-13 A 0
INT490 Receipt of Electronic Flow Meter 04-Jun-13
A0
INT500 Mobilization of Mechanical Contractor 07Nov-11 A 0
INT510 Mobilization of Electrical Contractor 10-Apr12 A 0
INT520 Mobilization of Instrumentation Contractor
10-Apr-12 A 0
INT530 Receipt of Intrusion Detection System 13Apr-12 A 0
INT540 Mobilization of Insulation Contractor 05-Jun12 A 0
INT550 Completion of Piping Erection 14-Dec-13 A
0
INT560 Installation of Jockey Pump 22-Nov-12 A 0
INT570 Delivery of Gate Valves 15-Jul-13 A 0
INT580 RCC Completion of Dyke Wall 18-Sep-13 A 0
INT590 Installation of Booster Pump 31-May-12 A 0
COMIM4.11
COMIM4.15 UNPRICED PO COPIES OF E & I WORKS
SUB-CONTRACT 15-Mar-12 A 0
COMIM4.16 UNPRICED PO COPIES OF HVAC
WORKS SUB-CONTRACT 12-Dec-11 A 0

COMIM4.9 UNPRICED PO COPIES OF HEAT TRACING


29-Dec-11 A 0
COMIM5.1.1 COMPLETION OF CIVIL FDN. FOR FIRE
WATER STORAGE TANKS 15-Mar-12 A 0
COMIM5.1.10 COMPLETION OF CIVIL FDN. FOR
DIESEL GENERATOR 24-Feb-12 A 0
COMIM5.1.11 COMPLETION OF CIVIL FDN. FOR
VENT STACK 15-May-12 A 0
COMIM5.1.13 COMPLETION OF CIVIL FDN. FOR
DIESEL STORAGE TANK 24-Feb-12 A 0
COMIM5.1.2 COMPLETION OF CIVIL FDN. FOR RAW
WATER STORAGE TANKS 13-Sep-12 A 0
COMIM5.1.3 COMPLETION OF CIVIL FDN. FOR
CLOSED DRAIN TANKS 13-Sep-12 A 0
COMIM5.1.4 COMPLETION OF CIVIL WORKS FOR
TANK DYKE WALLS AND PAVING 20-Nov-13 A 0
COMIM5.1.5 COMPLETION OF CIVIL FDN. FOR
EXPORT PUMPS 07-Dec-11 A 0
COMIM5.1.6 COMPLETION OF CIVIL FDN. FOR GAS
TURBINES 15-Jan-12 A 0
COMIM5.1.7 COMPLETION OF CIVIL FDN. FOR
CUSTODY TRANSFER METERING SKID 17-Jan-12 A 0
COMIM5.1.8 COMPLETION OF CIVIL FDN. FOR FIRE
WATER & JOCKEY PUMPS 28-Apr-12 A 0
COMIM5.1.9 COMPLETION OF CIVIL FDN. FOR
STEAM GENERATION PACKAGE 26-Mar-12 A 0
COMIM5.2.1 RECEIPT AT SITE OF STEAM
GENERATION PACKAGE 14-Nov-12 A 0
COMIM5.2.10 RECEIPT AT SITE OF FIRE WATER AND
JOCKEY PUMPS 16-Oct-12 A 0
COMIM5.2.12 RECEIPT AT SITE OF HT & LT CABLES
13-Nov-12 A 0
COMIM5.2.13 RECEIPT AT SITE OF PIPING BULKS
PIPE, FLANGES, FITTINGS, GASKETS 18-Sep-13 A 0
COMIM5.2.15 RECEIPT AT SITE OF ELECTRICAL
BULKS 18-Jul-13 A 0
COMIM5.2.2 RECEIPT AT SITE OF DIESEL
GENERATOR PACKAGE 21-Apr-12 A 0
COMIM5.2.3 RECEIPT AT SITE OF RAW WATER
TREATMENT PACKAGE 15-Nov-12 A 0
COMIM5.2.4 RECEIPT AT SITE OF INSTRUMENT AIR
PACKAGE 24-Oct-12 A 0
COMIM5.2.5 RECEIPT AT SITE OF OWS PACKAGE 20Nov-13 A 0

COMIM5.2.6 RECEIPT AT SITE OF


SEWAGE/EFFLUENT TREATMENT PACKAGES 21-Oct13 A 0
COMIM5.2.7 RECEIPT AT SITE OF POWER &
DISTRIBUTION TRANSFORMERS 20-Dec-12 A 0
COMIM5.2.8 RECEIPT AT SITE OF HEAT TRACING 21Nov-13 A 0
COMIM5.2.9 RECEIPT AT SITE OF HV / LV
SWITCHGEAR 23-Jan-13 A 0
COMIM5.3.1 COMP. INSTAL. OF STEAM
GENERATION PACKAGE 15-Nov-12 A 0
COMIM5.3.10 COMP. INSTAL. OF HV / LV
SWITCHGEAR 18-Sep-13 A 0
COMIM5.3.11 COMP. INSTAL. OF FIRE WATER AND
JOCKEY PUMPS 22-Jul-13 A 0
COMIM5.3.13 COMP. INSTAL. OF FREE-ISSUE ITEMS
15-May-13 0
COMIM5.3.14 COMP. INSTAL. OF ALL EXPORT
PUMPS 31-May-12 A 0
COMIM5.3.15 COMP. INSTAL. OF GAS TURBINES 25Jan-12 A 0
COMIM5.3.16 COMP. INSTAL. OF SEHMS
HARDWARE / EQUIPMENT 15-May-13 0
COMIM5.3.17 COMP. INSTAL. OF CUSTODY
TRANSFER METERING PACKAGE 20-Mar-12 A 0
COMIM5.3.2 COMP. INSTAL. OF INSTRUMENT AIR
PACKAGE 16-Nov-12 A 0
COMIM5.3.3 COMP. INSTAL. OF RAW WATER
TREATMENT PACKAGE 17-Jan-13 A 0
COMIM5.3.4 COMP. INSTAL. OF TREATED WATER
PACKAGE 20-Nov-13 A 0
COMIM5.3.5 COMP. INSTAL. OF DIESEL
GENERATOR PACKAGE 30-Apr-12 A 0
COMIM5.3.6 COMP. INSTAL. OF OWS PACKAGE 19Mar-14 A 0
COMIM5.3.7 COMP. INSTAL. OF
SEWAGE/EFFLUENT TREATMENT PACKAGES 13-Jun13 A 0
COMIM5.3.8 COMP. INSTAL. OF POWER &
DISTRIBUTION TRANSFORMERS 23-Jul-13 0
COMIM5.3.9 COMP. INSTAL. OF HEAT TRACING 30Dec-13 0
COMIM5.4.1 COMPLETION OF SUPER-STRUCTURE
FOR ADMIN BUILDING 01-Nov-12 A 0

COMIM5.4.2 COMPLETION OF SUB-STRUCTURE


FOR ADMIN BUILDING 15-May-13 0
COMIM5.4.3 COMPLETION OF INTERNAL FIT-OUT
FOR CONTROL BUILDINGS 15-May-13 0
COMIM5.5.1 COMPLETION OF
WORKSHOP/WAREHOUSE/LABORATORY 15-May13 0
COMIM5.5.2 COMPLETION OF ADMINISTRATION
BDLG 15-May-13 0
COMIM5.5.3 COMPLETION OF SECURITY BUILDINGS
& CABINS 15-May-13 0
COMIM5.5.4 COMPLETION OF FIRE STATION &
MEDICAL CENTRE 15-May-13 0
COMIM5.5.5 COMPLETION OF MAIN PLANT
SUBSTATION 15-May-13 0
COMIM5.5.6 COMPLETION OF 11KV SUBSTATION
15-May-13 0
COMIM5.5.7 COMPLETION OF SEHMS SUBSTATION
15-May-13 0
COMIM5.5.8 COMPLETION OF MAIN DG ROOM 15May-13 0
COMIM5.5.9 COMPLETION OF VARIOUS MCC
ROOMS 03-Jul-13 0
COMIM5.6.1 COMPLETION OF WALLS, FENCING
INCL. SECURITY GATES, CABINS, TOWERS 15-May13 0
COMIM5.6.10 COMPLETION OF ALL OTHER CIVIL,
MECHANICAL, ELECTRICAL & INSTRUMENT... 06-Jan14 0
COMIM5.6.12 TEST. & COMMI. OF STEAM
GENERATION PACKAGE 17-Aug-13 0
COMIM5.6.13 TEST. & COMMI. OF DIESEL
GENERATOR PACKAGE 15-May-13 0
COMIM5.6.14 TEST. & COMMI. OF RAW WATER
TREATMENT PACKAGE 02-Oct-13 0
COMIM5.6.15 TEST. & COMMI. OF TREATED
WATER PACKAGE 29-Oct-13 0
COMIM5.6.16 TEST. & COMMI. OF INSTRUMENT
AIR PACKAGE 15-May-13 0
COMIM5.6.17 TEST. & COMMI. OF OWS PACKAGE
03-Jul-13 0
COMIM5.6.18 TEST. & COMMI. OF
SEWAGE/EFFLUENT TREATMENT PACKAGES 29-Oct13 0
COMIM5.6.19 TEST. & COMMI. OF POWER &
DISTRIBUTION TRANSFORMERS 23-Jul-13 0

COMIM5.6.2 COMPLETION OF TERMINAL ROADS


AND DRAINS 09-Sep-13 0
COMIM5.6.20 TEST. & COMMI. OF HEAT TRACING
30-Dec-13 0
COMIM5.6.21 TEST. & COMMI. OF HV / LV
SWITCHGEAR 15-May-13 0
COMIM5.6.22 TEST. & COMMI. OF FIRE WATER
AND FOAM SYSTEM 09-Aug-13 0
COMIM5.6.24 TEST. & COMMI. OF TERMINAL
PIPING 06-Jan-14 0
COMIM5.6.25 TEST. & COMMI. OF TERMINAL
TANKS FIRE WATER, CLOSED DRAIN, FOAM C... 09Aug-13 0
COMIM5.6.26 TEST. & COMMI. OF DIESEL STORAGE
AND DISTRIBUTION SYSTEM 15-May-13 0
COMIM5.6.3 COMPLETION OF DRILLING OF 5 BORE
WELLS AND ASSOCIATED PUMP & ITS P... 01-Jun-13
0
COMIM5.6.4 COMPLETION OF TERMINAL PIPING,
VALVES (INCL FREE-ISSUE), PIPING RACK... 14-Dec13 0
COMIM5.6.5 COMPLETION OF POWER AND
CONTROL CABLING 30-Nov-13 0
COMIM5.6.7 COMPLETION OF DIESEL STORAGE
AND DISTRIBUTION SYSTEM 15-May-13 0
COMIM5.6.8 COMPLETION OF ALL TANKS &
VESSELS FIRE WATER, CLOSED DRAIN, FOA... 15May-13 0
EPR100 Receive of Package Scheme, Flow
Diagrams, system data sheets, equipment layout ...
15-Sep-1... 16-Sep-10 A 1
EPR110 Review of Package Scheme, Flow Diagrams,
system data sheets, equipment layout ... 18-Sep-1...
26-Nov-10 A 25
EPR140 Release of P&ID for package items by IOT
19-Jan-1... 08-Aug-11 A 30
EPR150 Release of Final Equipment Layout
drawings, GADs by IOT 17-Jan-1... 04-Jul-11 A 15
EPR160 Participation of Hazop study for package
equipments 04-Aug-1... 24-Aug-11 A 7
EPR170 Incorporatiion of recommendations as per
Hazop Review 12-Jun-1... 24-Jun-11 A 10

ECV050 Receipt of AFC Architectural Drawing from


TCEL / CEIL 12-Oct-1... 15-Oct-10 A 5
ECV100 Receipt of AFC Drawing of Admin Building
from TCEL / CEIL 21-Sep-1... 23-Sep-10 A 2
ECV110 Receipt AFC Drawing for Control Building
from TCEL / CEIL 21-Sep-1... 23-Sep-10 A 2
ECV120 Receipt of AFC Drawing of canopy at
entrance from TCEL / CEIL 15-Oct-1... 18-Oct-10 A 2
ECV130 Receipt of AFC Drawing of laboratory
Building from TCEL / CEIL 20-Sep-1... 21-Sep-10 A 2
ECV140 Receipt of AFC Drawing of Warehouse/
Workshop Building from TCEL / CEIL 21-Sep-1... 23Sep-10 A 2
ECV150 Receipt of AFC Drawing of Electrical
substation from TCEL / CEIL 21-Sep-1... 25-Sep-10 A
5
ECV160 Receipt AFC Drawing for Fire station
Building from TCEL / CEIL 18-Sep-1... 23-Sep-10 A 5
ECV170 Receipt of AFC Drawing of Medical Centre
from TCEL / CEIL 18-Sep-1... 20-Sep-10 A 2
ECV180 Receipt of AFC Drawing for Fire Water
Pump House from TCEL / CEIL 20-Oct-1... 29-Oct-10
A 10
ECV190 Receipt of AFC Drawing for Pump/Package
Foundation from TCEL / CEIL 19-Oct-1... 27-Oct-10
A 10
ECV200 Release of Pipe Sleepers Drgs for Fire
Water Network 13-Jul-11 A 24-Jul-11 A 1
ECV210 Receipt of AFC Drawing of Roads,Culverts,
walkways, etc from TCEL / CEIL 17-Sep-1... 20-Sep10 A 3
ECV220 Receipt of AFC Drawing of Dyke wall and
Paving in the Tank Farm from TCEL / CEIL 23-Sep1... 24-Sep-10 A 2
ECV240 Receipt AFC Drawing of MCC & Substation
from TCEL / CEIL 20-Sep-1... 21-Sep-10 A 2
ECV250 Receipt of AFC Drawing for Drains system
from TCEL / CEIL 17-Sep-1... 18-Sep-10 A 2

ECV260 Detail Engineeing for Foundations of


Package items 10-Sep-1... 22-Sep-10 A 15
ECV270 Fdn Drgs for Air Compressor 10-Jan-1... 10Feb-12 A 25
ECV280 Fdn Drgs for STP Package 12-Dec-1... 30Dec-11 A 25
ECV290 Fdn Drgs for Water Treatment Package 16Jan-1... 27-Feb-12 A 25
ECV300 Fdn Drgs for OWS Treatment Package 23Apr-1... 27-Apr-12 A 15
ECV310 Fdn Drgs for Nitrogen Package 02-Jan-1...
10-Feb-12 A 25
ECV320 Fdn Drgs for Steam Generation Package /
Boiler 01-Feb-1... 10-Feb-12 A 25
ECV330 Fdn Drgs for Pumps 21-Apr-1... 25-Apr-12 A
25
ECV340 Fdn Drgs for Fuel & Gas System (KO
Drum,Cartridge Filter, Electric Heater) 28-Mar-1...
09-Apr-12 A 25
ECV350 Fdn Drgs for NGR 26-Mar-1... 20-Apr-12 A
25
ECV360 Fdn Drgs for Transformer 06-Dec-1... 23Dec-11 A 25
ECV370 Fdn Drgs for SHEMS Transformer 05-Dec1... 30-Dec-11 A 25
ECV380 Fdn Drgs for Vent Stack 05-Sep-1... 23-Feb12 A 25
ECV390 Fdn Drgs for DG Set 05-Dec-1... 29-Dec-11
A 25
ECV400 Fdn Drgs for Foam Pump Skid 16-Jan-1... 22Feb-12 A 25
ECV410 Fdn Drgs for Foam Concentrate Tank 27Feb-1... 03-Apr-12 A 25
ECV420 Fdn Drgs for Fire Water Tank (New) 01-Feb1... 26-Mar-12 A 25
ECV430 Fdn Drgs for Fire Water Pump 01-Mar-1...
11-Apr-12 A 25
EPIP090 Incorporate Vendor datas and Finalisation
of Plot Plan 22-Feb-1... 08-May-12 A 30
EPIP100 Receipt of P&ID Piping Layout, GAD,
Sectional Drawings from TCEL/CEIL 08-Sep-1... 09Sep-10 A 2
EPIP110 Receipt of Updated PMS and VMS from
TCEL / CEIL 08-Sep-1... 09-Sep-10 A 2

EPIP120 Layout & Isometric drgs for U/G Services


like OWS / CBD / Sewage 13-Apr-1... 29-Apr-11 A 1
EPIP130 Layout & Isometric for Fire Water Network
21-Apr-1... 21-Apr-11 A 1
EPIP140 Issue of Piping/ Fitting MTO-1 by IOT 21Sep-1... 10-Nov-10 A 10
EPIP150 Issue of Piping / Fitting MTO-2 15-Feb-1...
15-Feb-11 A 10
EPIP160 Issue of Isometric from CEIL/Vendor 22Feb-1... 12-Jul-12 A 60
EPIP170 Detail Engineeing for Package items 18-Jan1... 08-Apr-11 A 15
Mechanical 16-Sep-1... 01-Jun-12 A 46
EME120 Issue of MR for Oily water/ Sewage water
treatment package 16-Sep-1... 18-Sep-10 A 2
EME140 Issue of MR for Plant and Treated water
package 16-Sep-1... 21-Sep-10 A 2
EME150 Issue of MR for Plant and Instrument Air
Package 16-Sep-1... 21-Sep-10 A 2
EME160 Issue of MR for Raw Water Treatment
Package 16-Sep-1... 21-Sep-10 A 1
EME170 Issue of MR for Steam generation system
package 16-Sep-1... 21-Sep-10 A 2
EME175 Issue of MR for Nitrogen Generation
System 16-Sep-1... 21-Sep-10 A 5
EME180 Issue of MR for Fuel Gas System 29-Sep1... 03-Dec-10 A 20
EME220 Issue of MR for Pipes Bulks 21-Sep-1... 23Sep-10 A 2
EME250 Issue of MR for Fire water pump package
16-Sep-1... 21-Sep-10 A 2
EME260 Issue of MR for Closed Drain Pump 16-Sep1... 21-Sep-10 A 2
EME270 Issue of MR for Diesel Unloading pump 16Sep-1... 21-Sep-10 A 2
EME280 Issue of MR for Reinforecement Steel /
Structural Steel Bulk items 21-Sep-1... 26-Oct-10 A
40
EME290 Issue of MR for Air conditioning and
Ventiliation system 16-Sep-1... 20-Nov-10 A 2
EME300 Issue of MR for EOT Crane or Material
Handling system 16-Sep-1... 21-Sep-10 A 6
EME310 Detail Engineering for Tanks (Fabrication
Drawings.) 28-Oct-1... 01-Jun-12 A 25

Electrical 02-Sep-1... 11-Apr-12 A 91


EEL100 Receipt of SLDs from TCEL / CEIL 27-Sep-1...
28-Sep-10 A 1
EEL120 Receipt of Approved Area classification
Drawing from TCEL / CEIL 29-Oct-1... 06-Nov-10 A
10
EEL130 Receipt of Approvevd Load List from TCEL /
CEIL 27-Sep-1... 28-Sep-10 A 1
EEL140 Issue of MR for Transformer 28-Sep-1... 30Sep-10 A 2
EEL150 Issue of MR for UPS 28-Sep-1... 30-Sep-10 A
2
EEL160 Issue of MR for Switchgear/Panel 28-Sep1... 30-Sep-10 A 2
EEL170 Receipt of Approvevd data sheet & Cable
Schedule from TCEL / CEIL 02-Sep-1... 21-Sep-10 A 5
EEL180 Issue of MR C.P. System 30-Sep-1... 08-Oct10 A 10
EEL190 Issue of MR for DG 30-Sep-1... 01-Oct-10 A
2
EEL200 Issue of MR for Battery and Battery Charger
30-Sep-1... 01-Oct-10 A 2
EEL210 Issue of MR for NGR 30-Sep-1... 01-Oct-10 A
2
EEL220 Detail Engineeing for Package items 01-Dec1... 11-Apr-12 A 15
Instrumentation 25-Sep-1... 09-May-12 A 82
EIN100 Receipt of Approvevd instrument index
from TCEL / CEIL 11-Oct-1... 15-Oct-10 A 5
EIN110 Receipt of Approvevd I/O list from TCEL /
CEIL 28-Sep-1... 02-Oct-10 A 5
EIN120 Receipt of Approvevd Instrument data
sheet from TCEL /CEIL 25-Sep-1... 30-Sep-10 A 5
EIN130 Receipt of Approvevd Instrument Hook up
drawing from TCEL / CEIL 31-Dec-1... 03-Jan-11 A 7
EIN140 Issue of MR for Bulk Items (MOV / PCV /
Transmitters / Gauges etc.) 16-Oct-1... 12-Nov-10 A
30
EIN150 Detail Engineeing for Package items 20-Dec1... 09-May-12 A 15
Addition Engineering-F Fire Fighting Changes 25-Apr1... 05-Sep-11 A 74

MDPP-FPSC-0001 RECEIPT OF CONSOLIDATED


CHANGE LIST ON FPS FROM CEIL AND CHANGE ...
15-Jul-11 A 0
MDPP-FPSC-E-00001RECEIPT OF REVISED PLOT
PLAN 02-Sep-1... 05-Sep-11 A 1
MDPP-FPSC-E-0002MR FOR FIRE WATER MAIN &
JOCKEY PUMP 25-Apr-1... 25-Apr-11 A 1
MDPP-FPSC-E-0003MR FOR FOAM CONCENTRATE
TANK 25-Apr-1... 25-Apr-11 A 1
MDPP-FPSC-E-0004MR FOR FOAM CONCENTRATE
25-Apr-1... 25-Apr-11 A 1
MDPP-FPSC-E-0005MR FOR FOAM SYSTEM
ACCESSORIES 24-May-1... 24-May-11 A 1
MDPP-FPSC-E-0006MR FOR DELUGE VALVES 24May-1... 24-May-11 A 1
MDPP-FPSC-E-0007MR FOR STRAINERS 24-May-1...
24-May-11 A 1
MDPP-FPSC-E-0008MR FOR GATE VALVES 24-May1... 24-May-11 A 1
MDPP-FPSC-E-0009MR FOR CHECK VALVES 24-May1... 24-May-11 A 1
MDPP-FPSC-E-0010MR FOR ELECTROMAGNETIC
FLOW METER 24-May-1... 24-May-11 A 1
MDPP-FPSC-E-0011MR FOR PLC FOR PUMPS 24May-1... 24-May-11 A 1
MDPP-FPSC-E-0012MR FOR RUBBER EXPANSION
BELLOW 24-May-1... 24-May-11 A 1
MDPP-FPSC-E-0022MR FOR CP SYSTEM 24-May-1...
24-May-11 A 1
MDPP-FPSC-E-0032MR FOR FPS-PIPES 24-May-1...
24-May-11 A 1
MDPP-FPSC-E-0042MR FOR FPS-FITTINGS 24-May1... 24-May-11 A 1
MDPP-FPSC-E-0052MR FOR FPS-FLANGES &
MISCELLENOUS 24-May-1... 24-May-11 A 1
ENGINEERING-FREE ISSUE MATERIAL 20-Sep-1... 09Jan-13 A 601
EFI010 Receipt of Input of free issue material from
CEIL 20-Sep-1... 28-Sep-10 A 10
EFI030 Receipt of Electrical Input for GT / MAIN
LINE PUMP / BOOSTER PUMPS/ CTM Pkg 20-Oct1... 28-Feb-11 A 10

EFI040 Receipt of Civil Foundation drawing of free


issue material from CEIL 31-Jan-1... 01-May-12 A 10
EFI050 Detail Engineering for Clean agent system,
location of Fire Extinguisher by Vendor 20-Mar-1...
30-Mar-12 A 10
EFI051 Receipt of Hydrant Layout form CEIL/TCE 11Dec-1... 09-Jan-13 A 10
AS BUILT DRAWING 18-Nov-13 10-Jan-14 39
EBD100 As Built drawing & Final Documentation 18Nov-13 10-Jan-14 60
PROCUREMENT 17-Sep-1... 20-Sep-13 777
SUBCONTRACTING 30-Sep-1... 14-Feb-12 A 129
CIVIL/STRUCTURAL 30-Sep-1... 08-Jan-11 A 40
SC120 Prep. of Tender & award of contract for all
Civil Package (Road, Dyke wall, drain etc.) 30-Sep1... 25-Oct-10 A 25
SC130 Finalisation of Civil Contractor for all
packages (Equipment foundations etc.) 02-Oct-1...
03-Jan-11 A 60
SC140 Prep. of Tender & award of contract for
Building Contractor 04-Oct-1... 08-Jan-11 A 25
MECHANICAL/PIPING 03-Jan-1... 06-Jul-11 A 22
SC160 Prep. of Tender Mechanical ( Piping & Fire
Fighting) 03-Jan-1... 04-Feb-11 A 20
SC170 Finalisation of Mechanical Contractor 12-Feb1... 06-Jul-11 A 5
ELECTRICAL 30-Dec-1... 14-Feb-12 A 16
SC260 Preparation and Issue Tender for Electrical
30-Dec-1... 07-Feb-11 A 22
SC270 Finalisation of Tender for Electrical
Contractor 11-Feb-1... 14-Feb-12 A 25
INSTRUMENT 29-Dec-1... 14-Feb-12 A 29
SC180 Preparation and Issue Instrumentation
Tender 29-Dec-1... 01-Feb-11 A 22
SC190 Finalisation of Instrumentation Contractor
09-Feb-1... 14-Feb-12 A 5
INSULATION 29-Dec-1... 21-Dec-11 A 9
SC200 Preparation and Issue Tender for piping
Insulation 29-Dec-1... 02-Feb-11 A 15
SC210 Finalisation of Tender for Insulation
contractor 08-Feb-1... 21-Dec-11 A 7
PAINTING 30-Dec-1... 01-Jun-11 A 22
SC220 Preparation and Issue Tender for Painting 30Dec-1... 07-Feb-11 A 15

SC230 Finalisation of Tender for Painting Contractor


15-Feb-1... 01-Jun-11 A 5
MECHANICAL/ EQUIPMENT 17-Sep-1... 17-Sep-13
587
OWS Package 20-Sep-1... 13-Aug-13 127
PRE120 Issue Enquiry 20-Sep-1... 20-Sep-10 A 1
PRE122 Bids received 20-Sep-1... 01-Oct-10 A 10
PRE123 TBA / CBA 29-Sep-1... 25-Oct-10 A 20
PRE124 Ordering for Oily water treatment package
25-Oct-1... 28-Oct-10 A 8
PRE130 Mfg and Del at site-Oily water treatment
package 28-Oct-1... 13-Aug-13 160
Water Treatment Package 17-Sep-1... 14-Sep-13
163
PRE191 Issue Enquiry 17-Sep-1... 21-Sep-10 A 1
PRE192 Bids received 18-Sep-1... 05-Oct-10 A 10
PRE193 TBA / CBA 27-Sep-1... 25-Oct-10 A 15
PRE194 Ordering of Raw Water Treatment Package
25-Oct-1... 28-Oct-10 A 8
PRE195 Mfg and Del at site-Water Treatment
Package 28-Oct-1... 14-Sep-13 200
STP Package 18-Sep-1... 08-Jun-13 133
PRE160 Issue Enquiry 18-Sep-1... 21-Sep-10 A 1
PRE162 Bids received 20-Sep-1... 05-Oct-10 A 10
PRE163 TBA / CBA 05-Oct-1... 25-Oct-10 A 12
PRE164 Ordering for Sewage water treatment
package 25-Oct-1... 28-Oct-10 A 8
PRE170 Mfg and Del at site- Sewage water
treatment package 28-Oct-1... 08-Jun-13 160
Closed Drain Pump 18-Sep-1... 23-Jul-12 A 207
PRE100 Issue Enquiry 18-Sep-1... 20-Sep-10 A 1
PRE102 Bids received 20-Sep-1... 30-Oct-10 A 8
PRE103 TBA / CBA 31-Oct-1... 28-Jan-11 A 14
PRE104 Ordering for Closed Drain Pump 28-Jan-1...
07-Feb-11 A 7
PRE110 Mfg and Del at site-Closed Drain pump 28Feb-1... 23-Jul-12 A 150
Diesel Unloading Pump 18-Sep-1... 30-May-12 A
172

PRE260 Issue Enquiry 18-Sep-1... 21-Sep-10 A 1


PRE262 Bids received 25-Sep-1... 28-Oct-10 A 8
PRE263 TBA / CBA 28-Oct-1... 23-Nov-10 A 15
PRE264 Ordering for Diesel unloading pump 27-Nov1... 17-Dec-10 A 8
PRE270 Mfg and Del at site-Diesel unloading pump
17-Dec-1... 30-May-12 A 150
Interface Transfer Pump 18-Sep-1... 20-Dec-12 A
172
PRE272 Bids received 25-Sep-1... 28-Oct-10 A 8
PRE273 TBA / CBA 28-Oct-1... 23-Nov-10 A 15
PRE274 Ordering for Interface Transfer Pump 27Nov-1... 17-Dec-10 A 8
PRE280 Issue Enquiry 18-Sep-1... 21-Sep-10 A 1
PRE290 Mfg and Del at site-Interface Transfer
Pump 17-Dec-1... 20-Dec-12 A 150
Structural Steel / Reinforcement Steel/ Plates 23Sep-1... 12-Dec-12 A 80
PRE300 Issue Enquiry 23-Sep-1... 24-Sep-10 A 1
PRE302 Bids received 24-Sep-1... 20-Oct-10 A 10
PRE303 TBA / CBA 20-Oct-1... 02-Nov-10 A 15
PRE304 Ordering of Structural Steel /
Reinforcement Steel 05-Nov-1... 01-Jun-11 A 25
PRE310 Mfg and Del at site-Structural steel and
Plate 06-Nov-1... 12-Dec-12 A 80
Treated Water Package 0
Air Compressor 18-Sep-1... 28-Nov-12 A 292
PRE180 Issue Enquiry 18-Sep-1... 21-Sep-10 A 1
PRE182 Bids received 20-Sep-1... 19-Oct-10 A 10
PRE183 TBA / CBA 20-Oct-1... 16-Feb-11 A 15
PRE184 Ordering of Air Compressor 16-Feb-1... 16Mar-11 A 8
PRE190 Mfg and Del at site-Air Compressor-(Dryer
& receiver pending) 23-May-1... 28-Nov-12 A 160
Nitrogen Package 21-Sep-1... 22-Nov-12 A 240
PRE201 Issue Enquiry 21-Sep-1... 22-Sep-10 A 1

PRE202 Bids received 22-Sep-1... 29-Oct-10 A 12


PRE203 TBA / CBA 29-Oct-1... 24-Nov-10 A 20
PRE204 Ordering for Nitrogen Generation System
24-Nov-1... 01-Dec-10 A 10
PRE210 Mfg and Del at site-Nitrogen Generation
System 02-Dec-1... 22-Nov-12 A 230
HVAC System 18-Sep-1... 25-Dec-12 A 256
PRE340 Issue Enquiry 18-Sep-1... 04-Nov-10 A 1
PRE342 Bids received 04-Nov-1... 14-Dec-10 A 10
PRE343 TBA / CBA 15-Dec-1... 17-Jan-11 A 25
PRE345 Ordering of Air conditioning and
Ventiliation system 19-Jan-1... 03-Feb-11 A 7
PRE350 Mfg and Del at site-Air conditioning and
Ventiliation system 28-Feb-1... 25-Dec-12 A 200
EOT Crane 27-Sep-1... 17-Jan-13 A 233
PRE360 Issue Enquiry 27-Sep-1... 28-Sep-10 A 1
PRE362 Bids received 28-Sep-1... 16-Oct-10 A 8
PRE363 TBA / CBA 16-Oct-1... 10-Feb-11 A 15
PRE364 Ordering of -EOT Crane or Material
Handling system 10-Feb-1... 15-Mar-11 A 8
PRE370 Mfg and Del at site-EOT Crane 17-Mar-1...
17-Jan-13 A 160
Fuel & Gas System 30-Sep-1... 27-Dec-12 A 238
PRE400 Issue Enquiry 30-Sep-1... 03-Dec-10 A 1
PRE402 Bids received 15-Dec-1... 20-Dec-10 A 10
PRE403 TBA / CBA 23-Dec-1... 24-Jan-11 A 15
PRE405 Ordering of Fuel & Gas System 25-Jan-1...
10-Feb-11 A 8
PRE410 Mfg and Del at site-Fuel & Gas System 15Feb-1... 27-Dec-12 A 200
Steam Generation System / Boiler 18-Sep-1... 16Oct-12 A 232
PRE420 Issue Enquiry 18-Sep-1... 21-Sep-10 A 1
PRE422 Bids received 20-Sep-1... 04-Oct-10 A 10
PRE423 TBA / CBA 04-Oct-1... 21-Oct-10 A 22

PRE424 Ordering of Steam generation system 21Oct-1... 25-Oct-10 A 8


PRE430 Mfg and Del at site-Steam generation
system 26-Oct-1... 16-Oct-12 A 240
SMC Panel Tank 01-Jun-1... 28-Jun-13 135
PRE434 Ordering of SMC Panel Tank 01-Jun-1... 09Jun-11 A 8
PRE470 Mfg and Del at site-SMC Panel Tank 13-Jun1... 28-Jun-13 180
Fire Fighting System 18-Sep-1... 17-Sep-13 587
PRE440 Issue Enquiry 18-Sep-1... 18-Sep-10 A 1
PRE442 Bids received 20-Sep-1... 10-Dec-10 A 8
PRE443 TBA / CBA 11-Dec-1... 20-Jan-11 A 20
PRE444 Ordering of Fire Fighting System 31-Jan-1...
12-Apr-11 A 20
PRE450 Mfg and Del at site of Fire Fighting System
07-Jun-1... 17-Sep-13 140
PIPING 27-Sep-1... 22-Jul-13 301
Pipes - 1st MTO 27-Sep-1... 15-Dec-11 A 131
PPIP100 Issue Enquiry 27-Sep-1... 28-Sep-10 A 1
PPIP102 Bids received 28-Sep-1... 07-Oct-10 A 10
PPIP103 TBA / CBA 07-Oct-1... 30-Oct-10 A 5
PPIP104 Ordering for Pipes -1st MTO (in Lots) 30Oct-1... 16-Nov-10 A 60
PPIP110 Mfg and Del at site-Pipe 1st MTO-A1 18Nov-1... 15-Dec-11 A 150
Pipes - 2nd MTO 15-Feb-1... 14-Nov-12 A 79
PPIP120 Issue Enquiry 15-Feb-1... 15-Feb-11 A 1
PPIP122 Bids received 15-Feb-1... 31-Oct-11 A 1
PPIP123 TBA / CBA 15-Feb-1... 15-Feb-11 A 5
PPIP124 Ordering for Pipes -2nd MTO 15-Feb-1...
15-Feb-11 A 30
PPIP130 Mfg and Delivery at site- 2nd MTO-A3 15Feb-1... 14-Nov-12 A 70
Fittings / Flanges 12-Oct-1... 04-Jul-13 193
PPIP140 Issue Enquiry 12-Oct-1... 13-Oct-10 A 1
PPIP142 Bids received 13-Oct-1... 30-Oct-10 A 10
PPIP143 TBA / CBA 03-Nov-1... 06-Nov-10 A 5

PPIP144 Ordering for Fitting / Flanges 09-Nov-1...


11-Apr-11 A 25
PPIP150 Mfg and Del at site- Fittings / Flanges 15Apr-1... 04-Jul-13 90
Gate / Ball Valve 27-Sep-1... 22-Jul-13 301
PRE320 Issue Enquiry 27-Sep-1... 28-Sep-10 A 1
PRE322 Bids received 28-Sep-1... 16-Oct-10 A 8
PRE323 TBA / CBA 16-Oct-1... 23-Oct-10 A 8
PRE324 Ordering of Ball / Gate Valve 15-Nov-1... 16Mar-11 A 14
PRE330 Mfg and Del at site- Ball and Gate Valve 25May-1... 22-Jul-13 180
ELECTRICAL 21-Sep-1... 20-Sep-13 438
6.6KV Switchgear 23-Sep-1... 08-May-12 A 177
PELE131 Issue Enquiry for 6.6KV Switchgear 23-Sep1... 24-Sep-10 A 1
PELE132 Bids received 30-Sep-1... 15-Oct-10 A 7
PELE133 TBA / CBA 15-Oct-1... 24-Nov-10 A 15
PELE134 Ordering of Switchgear 24-Nov-1... 01-Dec10 A 12
PELE135 Mfg and Del at site- 6.6KV Switchgear 02Dec-1... 08-May-12 A 220
11KV Switchgear 22-Sep-1... 13-Jul-12 A 184
PELE120 Issue Enquiry 22-Sep-1... 23-Sep-10 A 1
PELE122 Bids received 30-Sep-1... 15-Oct-10 A 10
PELE124 TBA / CBA 15-Oct-1... 24-Nov-10 A 12
PELE125 Ordering of Switchgear 25-Nov-1... 01-Dec10 A 22
PELE130 Mfg and Del at site-11KV Switchgear 02Dec-1... 13-Jul-12 A 220
Distribution Transformer 21-Sep-1... 12-Mar-12 A
192
EPR130 Preparation of Detail specifications, data
sheets, standard drawings and documents f... 28Oct-1... 03-Feb-11 A 30
PELE151 Issue Enquiry 21-Sep-1... 21-Sep-10 A 1
PELE152 Bids received 05-Oct-1... 15-Oct-10 A 8
PELE153 TBA / CBA 19-Oct-1... 24-Nov-10 A 20
PELE154 Ordering of Transformer 24-Nov-1... 01Dec-10 A 8

PELE155 Mfg and Del at site-Distribution


Transformer 02-Dec-1... 12-Mar-12 A 240
415 V Panel 22-Sep-1... 13-Nov-12 A 177
PELE100 Issue Enquiry 22-Sep-1... 23-Sep-10 A 1
PELE102 Bids received 04-Oct-1... 15-Oct-10 A 7
PELE104 TBA / CBA 15-Oct-1... 24-Nov-10 A 18
PELE105 Ordering of Panel 25-Nov-1... 01-Dec-10 A
8
PELE110 Mfg and Del at site- Panel 02-Dec-1... 13Nov-12 A 220
Power Transformer 21-Sep-1... 12-Nov-12 A 201
PELE140 Issue Enquiry 21-Sep-1... 21-Sep-10 A 1
PELE141 Bids received 04-Oct-1... 13-Nov-10 A 10
PELE142 TBA / CBA 13-Nov-1... 24-Nov-10 A 20
PELE143 Ordering of Power Transformer 24-Nov1... 31-Dec-10 A 8
PELE150 Mfg and Del at site-Power transformer 31Dec-1... 12-Nov-12 A 210
DG Sets 21-Sep-1... 21-Apr-12 A 248
PELE160 Issue Enquiry 21-Sep-1... 21-Sep-10 A 1
PELE162 Bids received 04-Oct-1... 12-Nov-10 A 8
PELE163 TBA / CBA 13-Nov-1... 15-Dec-10 A 20
PELE164 Ordering of DG sets 16-Dec-1... 14-Jan-11
A 10
PELE170 Mfg and Del at site-DG sets 14-Jan-1... 21Apr-12 A 180
Cables 21-Sep-1... 03-Dec-12 A 152
PELE180 Issue Enquiry 21-Sep-1... 21-Sep-10 A 1
PELE182 Bids received 09-Oct-1... 15-Oct-10 A 7
PELE183 TBA / CBA 15-Oct-1... 22-Nov-10 A 12
PELE184 Ordering of Cables 29-Nov-1... 30-Dec-10
A 25
PELE190 Mfg and Del at site-Cable 30-Dec-1... 03Dec-12 A 150
UPS / Battery Charger 04-Oct-1... 05-Nov-11 A 227
PELE200 Issue Enquiry 04-Oct-1... 04-Oct-10 A 1

PELE202 Bids received 04-Oct-1... 11-Oct-10 A 7


PELE203 TBA / CBA 11-Oct-1... 23-Dec-10 A 20
PELE204 Ordering of UPS and battery charger 23Dec-1... 11-Feb-11 A 8
PELE210 Mfg and Del at site-UPS and Battery
charger 28-Feb-1... 05-Nov-11 A 175
Heat Tracing System 25-Nov-1... 20-Sep-13 433
PELE220 Issue Enquiry 25-Nov-1... 25-Nov-10 A 1
PELE222 Bids received 26-Nov-1... 30-Nov-10 A 8
PELE223 TBA / CBA 01-Dec-1... 13-May-11 A 18
PELE224 Ordering of Heat Tracing System 13-May1... 21-Dec-11 A 10
PELE230 Mfg and Del at site-Heat tracing 15-Nov1... 20-Sep-13 145
CP System 04-Nov-1... 30-Jan-12 A 196
PELE240 Issue Enquiry 04-Nov-1... 04-Nov-10 A 1
PELE242 Bids received 05-Nov-1... 25-Nov-10 A 8
PELE243 TBA / CBA 25-Nov-1... 03-Jan-11 A 20
PELE244 Ordering of CP System 03-Jan-1... 04-Feb11 A 10
PELE250 Mfg and Del at site-CP System 15-Feb-1...
30-Jan-12 A 150
Electrical Bulk Material 04-Oct-1... 01-Jul-13 187
PELE260 Issue Enquiry 04-Oct-1... 06-Oct-10 A 2
PELE262 Bids received 30-Oct-1... 06-Nov-10 A 8
PELE263 TBA / CBA 06-Nov-1... 04-Feb-11 A 15
PELE264 Ordering of Electrical Bulk material (Cable
Tray, Switches, DB etc.) 17-Jan-1... 14-Feb-11 A 20
PELE270 Mfg and Del at site-Electrical Bulk material
17-Feb-1... 01-Jul-13 120
NGR 01-Oct-1... 31-Dec-10 A 149
PELE280 Issue Enquiry 01-Oct-1... 02-Oct-10 A 1
PELE282 Bids received 02-Oct-1... 11-Oct-10 A 8
PELE283 TBA / CBA 11-Oct-1... 25-Nov-10 A 20

PELE284 Ordering of NGR 26-Nov-1... 17-Dec-10 A


10
PELE290 Mfg and Del at site-NGR 18-Dec-1... 31Dec-10 A 130
INSTRUMENTATION 21-Sep-1... 05-Aug-13 452
Tank Farm Management System (TFMS) 22-Sep-1...
30-Nov-12 A 145
PINS100 Issue Enquiry 22-Sep-1... 22-Sep-10 A 1
PINS102 Bids received 01-Oct-1... 15-Nov-10 A 10
PINS103 TBA / CBA 15-Nov-1... 24-Nov-10 A 10
PINS104 Ordering of TFMS 26-Nov-1... 03-Jan-11 A
15
PINS110 Mfg and Del at site-TFMS 03-Jan-1... 30Nov-12 A 150
Control Valve / MOV/On-Off /ESV 23-Sep-1... 05Aug-13 249
PINS120 Issue Enquiry 23-Sep-1... 23-Sep-10 A 1
PINS122 Bids received 14-Oct-1... 18-Nov-10 A 8
PINS123 TBA / CBA 18-Nov-1... 28-Dec-10 A 8
PINS124 Ordering of Control valve/On Off
Valve/ESV/MOV's 28-Dec-1... 10-Feb-11 A 20
PINS130 Mfg and Del at site-Control Valve/MOV's
/On off valves/ESV 15-Feb-1... 05-Aug-13 230
Instrumentation Bulk items 02-Oct-1... 15-Jul-13
186
PINS140 Issue Enquiry 02-Oct-1... 02-Oct-10 A 1
PINS142 Bids received 08-Oct-1... 10-Nov-10 A 10
PINS143 TBA / CBA 12-Nov-1... 07-Feb-11 A 8
PINS144 Ordering of Instruments Bulk item 29-Dec1... 01-Mar-11 A 25
PINS150 Mfg and Del at site-Instrumentation Bulk
items 15-Mar-1... 15-Jul-13 150
Instrument Cables 21-Sep-1... 21-Jul-13 237
PINS160 Issue Enquiry 21-Sep-1... 21-Sep-10 A 1
PINS162 Bids received 09-Oct-1... 19-Oct-10 A 10
PINS163 TBA / CBA 19-Oct-1... 16-Dec-10 A 8
PINS164 Ordering for Instrument Cable 25-Nov-1...
26-Feb-11 A 25

PINS170 Mfg and Del at site-Instrument Cable 11Apr-1... 21-Jul-13 150


Instrustion Detection System 16-Jan-1... 13-Apr-12
A 156
PINS172 Bids received 13-Feb-1... 13-Feb-11 A 10
PINS173 TBA / CBA 25-Mar-1... 25-Mar-11 A 8
PINS174 Ordering for Instrusion Detection System
04-Apr-1... 04-Apr-11 A 25
PINS180 Issue Enquiry 16-Jan-1... 16-Jan-11 A 1
PINS190 Mfg and Del at site-Instrusion Detection
System 05-Apr-1... 13-Apr-12 A 180
Fire & Gas Detection System 12-Oct-1... 20-Jul-13
236
PINS182 Bids received 17-Dec-1... 20-Dec-10 A 10
PINS183 TBA / CBA 19-Oct-1... 16-Dec-10 A 8
PINS184 Ordering for Fire & Gas Detection System
25-Nov-1... 26-Feb-11 A 25
PINS200 Issue Enquiry 12-Oct-1... 13-Oct-10 A 1
PINS210 Mfg and Del at site-Fire & Gas Detection
System 11-Apr-1... 20-Jul-13 155
Nitrogen Blanketing Valves 19-Nov-1... 01-May-12
A 157
PINS192 Bids received 17-Jan-1... 27-Jan-11 A 10
PINS193 TBA / CBA 27-Jan-1... 16-Mar-11 A 8
PINS194 Ordering for Nitrogen Blanketing Valves 17Mar-1... 09-Jun-11 A 25
PINS220 Issue Enquiry 19-Nov-1... 19-Nov-10 A 1
PINS230 Mfg and Del at site-Nitrogen Blanketing
Valves 20-Jun-1... 01-May-12 A 180
Instruments Cable Trays / Conduits 02-Jan-1... 10Jun-13 93
PINS202 Bids received 25-Jan-1... 31-Jan-12 A 10
PINS203 TBA / CBA 02-Feb-1... 15-Feb-12 A 8
PINS204 Ordering for Instrument Cable Trays /
Conduits 16-Mar-1... 17-Apr-12 A 25
PINS240 Issue Enquiry 02-Jan-1... 02-Jan-12 A 1
PINS250 Mfg and Del at site-Instrument Cable Trays
/ Conduits 23-Apr-1... 10-Jun-13 69

In-Line Instruments 16-Nov-1... 23-Sep-11 A 170


PINS212 Bids received 19-Nov-1... 29-Nov-10 A 30
PINS213 TBA / CBA 30-Nov-1... 31-Dec-10 A 8
PINS214 Ordering for In-line Instruments 03-Jan-1...
25-Jan-11 A 25
PINS260 Issue Enquiry 16-Nov-1... 17-Nov-10 A 1
PINS270 Mfg and Del at site-In-line Instruments 01Feb-1... 23-Sep-11 A 180
Additional / Procurement- Fire Fighting Changes 10Nov-1... 27-Aug-13 599
FIRE WATER PUMPS (3 NOS) 31-May-1... 14-Aug-12
A 216
MDPP-FPSC-P-00IS01SUE ENQUIRY 31-May-1... 31May-11 A 1
MDPP-FPSC-P-00R1E1CEIPT BIDS 01-Jun-1... 01-Jun11 A 1
MDPP-FPSC-P-00T2E1CHNICAL BID ANALYSIS 02Jun-1... 06-Jun-11 A 1
MDPP-FPSC-P-00C3O1MMERCIAL BID ANALYSIS 06Jun-1... 07-Jun-11 A 1
MDPP-FPSC-P-00IS41SUE LOI 07-Jun-1... 08-Jun-11
A1
MDPP-FPSC-P-00M51ANUFACTURING & DELIVERY
AT SITE 01-Jul-11 A 14-Aug-12 A 250
MDPP-FPSC-P-00IS61SUE PO / PR TO VENDOR 08Jun-1... 09-Jun-11 A 1
MDPP-FPSC-P-00R7E1CEIPT OF VENDOR
DRAWINGS 07-Jul-11 A 10-Feb-12 A 15
MDPP-FPSC-P-00A8P1PROVAL OF VENDOR
DRAWINGS 05-Dec-1... 19-Mar-12 A 15
JOCKEY PUMP (2 NOS) 31-May-1... 20-Mar-12 A
217
MDPP-FPSC-P-02IS51SUE ENQUIRY 31-May-1... 31May-11 A 1
MDPP-FPSC-P-02R6E1CEIPT BIDS 01-Jun-1... 03-Jun11 A 1
MDPP-FPSC-P-13T2E1CHNICAL BID ANALYSIS 03Jun-1... 06-Jun-11 A 1
MDPP-FPSC-P-13C3O1MMERCIAL BID ANALYSIS 06Jun-1... 06-Jun-11 A 1
MDPP-FPSC-P-13IS41SUE LOI 06-Jun-1... 07-Jun-11
A1
MDPP-FPSC-P-13M51ANUFACTURING & DELIVERY
AT SITE 20-Jul-11 A 04-Oct-11 A 230

MDPP-FPSC-P-13IS61SUE PO / PR TO VENDOR 08Jun-1... 09-Jun-11 A 1


MDPP-FPSC-P-13R7E1CEIPT OF VENDOR
DRAWINGS 07-Jul-11 A 05-Jan-12 A 15
MDPP-FPSC-P-13A8P1PROVAL OF VENDOR
DRAWINGS 05-Dec-1... 20-Mar-12 A 15
FOAM CONCENTRATE TANK 03-Jan-1... 26-Mar-12 A
260
MDPP-FPSC-P-00IS91SUE ENQUIRY 03-Jan-1... 03Jan-11 A 1
MDPP-FPSC-P-01R0E1CEIPT BIDS 28-Feb-1... 28-Feb11 A 26
MDPP-FPSC-P-01T1E1CHNICAL BID ANALYSIS 14Mar-1... 06-Jun-11 A 1
MDPP-FPSC-P-01C2O1MMERCIAL BID ANALYSIS 06Jun-1... 10-Jun-11 A 1
MDPP-FPSC-P-01IS31SUE LOI 10-Jun-1... 13-Jun-11
A1
MDPP-FPSC-P-01M41ANUFACTURING & DELIVERY
AT SITE 15-Feb-1... 26-Mar-12 A 75
MDPP-FPSC-P-01IS51SUE PO / PR TO VENDOR 13Jun-1... 13-Jun-11 A 1
MDPP-FPSC-P-01R6E1CEIPT OF VENDOR
DRAWINGS 30-Jun-1... 27-Dec-11 A 18
MDPP-FPSC-P-01A7P1PROVAL OF VENDOR
DRAWINGS 26-Dec-1... 13-Feb-12 A 15
FIRE WATER TANK- PLATE'S 15-Dec-1... 31-May-12
A 140
MDPP-FPSC-P-10IS81SUE ENQUIRY 15-Dec-1... 15Dec-11 A 1
MDPP-FPSC-P-10R9E1CEIPT BIDS 16-Dec-1... 30Dec-11 A 18
MDPP-FPSC-P-11T0E1CHNICAL BID ANALYSIS 02-Jan1... 03-Jan-12 A 1
MDPP-FPSC-P-11C1O1MMERCIAL BID ANALYSIS 04Jan-1... 04-Jan-12 A 1
MDPP-FPSC-P-11IS21SUE LOI 16-Jan-1... 16-Jan-12
A1
MDPP-FPSC-P-11M31ANUFACTURING & DELIVERY
AT SITE 28-Mar-1... 31-May-12 A 90
FIRE PROTECTION SYSTEM-PIPES 02-Aug-1... 23-Nov11 A 156
MDPP-FPSC-P-11IS41SUE ENQUIRY 02-Aug-1... 02Aug-11 A 1
MDPP-FPSC-P-11R5E1CEIPT BIDS 03-Aug-1... 05Aug-11 A 18

MDPP-FPSC-P-11T6E1CHNICAL BID ANALYSIS 05Aug-1... 05-Aug-11 A 1


MDPP-FPSC-P-11C7O1MMERCIAL BID ANALYSIS 08Aug-1... 08-Aug-11 A 1
MDPP-FPSC-P-11IS81SUE LOI 09-Aug-1... 09-Aug-11
A1
MDPP-FPSC-P-11M91ANUFACTURING & DELIVERY
AT SITE 11-Aug-1... 23-Nov-11 A 120
FIRE PROTECTION SYSTEM-FITTINGS 28-Jul-11 A 08May-12 A 187
MDPP-FPSC-P-12IS01SUE ENQUIRY 28-Jul-11 A 28Jul-11 A 1
MDPP-FPSC-P-12R1E1CEIPT BIDS 29-Jul-11 A 05Aug-11 A 18
MDPP-FPSC-P-12T2E1CHNICAL BID ANALYSIS 05Aug-1... 09-Aug-11 A 1
MDPP-FPSC-P-12C3O1MMERCIAL BID ANALYSIS 09Aug-1... 12-Aug-11 A 1
MDPP-FPSC-P-12IS41SUE LOI 09-Sep-1... 12-Sep-11
A1
MDPP-FPSC-P-12M51ANUFACTURING & DELIVERY
AT SITE 15-Mar-1... 08-May-12 A 30
FIRE PROTECTION SYSTEM-FLANGES & MISC. 29-Jul11 A 05-Jun-12 A 214
MDPP-FPSC-P-12IS61SUE ENQUIRY 29-Jul-11 A 29Jul-11 A 1
MDPP-FPSC-P-12R7E1CEIPT BIDS 29-Jul-11 A 05Aug-11 A 18
MDPP-FPSC-P-12T8E1CHNICAL BID ANALYSIS 05Aug-1... 09-Aug-11 A 1
MDPP-FPSC-P-12C9O1MMERCIAL BID ANALYSIS 09Aug-1... 12-Aug-11 A 1
MDPP-FPSC-P-13IS01SUE LOI 09-Sep-1... 15-Sep-11
A1
MDPP-FPSC-P-13M11ANUFACTURING & DELIVERY
AT SITE 19-Apr-1... 05-Jun-12 A 40
FOAM CONCENTRATE 24-Jan-1... 15-May-13 195
MDPP-FPSC-P-01IS81SUE ENQUIRY 24-Jan-1... 24Jan-11 A 1
MDPP-FPSC-P-01R9E1CEIPT BIDS 26-Jan-1... 28-Jan11 A 26
MDPP-FPSC-P-02T0E1CHNICAL BID ANALYSIS 31-Jan1... 31-Jan-11 A 1
MDPP-FPSC-P-02C1O1MMERCIAL BID ANALYSIS 02Feb-1... 02-Feb-11 A 1

MDPP-FPSC-P-02IS21SUE LOI 03-Feb-1... 24-Feb-11


A1
MDPP-FPSC-P-02P3R1ODUCTION & DELIVERY AT
SITE 30-May-1... 15-May-13 90
MDPP-FPSC-P-02IS41SUE PO / PR TO VENDOR 25Feb-1... 28-Feb-11 A 1
FOAM SYSTEM ACCESSORIES 10-Nov-1... 27-Aug-13
379
MDPP-FPSC-P-02IS71SUE ENQUIRY 14-Nov-1... 21Nov-11 A 1
MDPP-FPSC-P-02R8E1CEIPT BIDS 16-Nov-1... 25Nov-11 A 20
MDPP-FPSC-P-02T9E1CHNICAL BID ANALYSIS 30Nov-1... 30-Nov-11 A 1
MDPP-FPSC-P-03C0O1MMERCIAL BID ANALYSIS 01Dec-1... 01-Dec-11 A 1
MDPP-FPSC-P-03IS11SUE LOI 05-Dec-1... 06-Dec-11
A1
MDPP-FPSC-P-03M21ANUFACTURING & DELIVERY
AT SITE 14-Dec-1... 27-Aug-13 105
MDPP-FPSC-P-03IS31SUE PO / PR TO VENDOR 07Dec-1... 07-Dec-11 A 1
MDPP-FPSC-P-03R4E1CEIPT OF VENDOR
DRAWINGS 10-Nov-1... 21-Nov-11 A 18
MDPP-FPSC-P-03A5P1PROVAL OF VENDOR
DRAWINGS 30-Nov-1... 30-Nov-11 A 15
DELUGE VALVES 19-Jan-1... 06-Nov-12 A 433
MDPP-FPSC-P-03IS61SUE ENQUIRY 12-Dec-1... 12Dec-11 A 1
MDPP-FPSC-P-03R7E1CEIPT BIDS 13-Dec-1... 13-Jan12 A 26
MDPP-FPSC-P-03T8E1CHNICAL BID ANALYSIS 14-Jan1... 17-Jan-12 A 1
MDPP-FPSC-P-03C9O1MMERCIAL BID ANALYSIS 19Jan-1... 02-Feb-11 A 1
MDPP-FPSC-P-04IS01SUE LOI 08-Mar-1... 07-Jun-12
A1
MDPP-FPSC-P-04M11ANUFACTURING & DELIVERY
AT SITE 11-Jul-12 A 06-Nov-12 A 120
MDPP-FPSC-P-04IS21SUE PO / PR TO VENDOR 02Mar-1... 02-Mar-11 A 1
MDPP-FPSC-P-04R3E1CEIPT OF VENDOR
DRAWINGS 04-Feb-1... 08-Feb-11 A 18
MDPP-FPSC-P-04A4P1PROVAL OF VENDOR
DRAWINGS 13-Feb-1... 15-Feb-11 A 12
STRAINERS 02-Mar-1... 12-Aug-13 358

MDPP-FPSC-P-04IS51SUE ENQUIRY 02-Mar-1... 02Mar-11 A 1


MDPP-FPSC-P-04R6E1CEIPT BIDS 04-Mar-1... 10Mar-11 A 15
MDPP-FPSC-P-04T7E1CHNICAL BID ANALYSIS 11Mar-1... 12-Mar-11 A 1
MDPP-FPSC-P-04C8O1MMERCIAL BID ANALYSIS 13Mar-1... 14-Mar-11 A 1
MDPP-FPSC-P-04IS91SUE LOI 15-Mar-1... 15-Mar11 A 1
MDPP-FPSC-P-05M01ANUFACTURING & DELIVERY
AT SITE 12-Apr-1... 12-Aug-13 90
MDPP-FPSC-P-05IS11SUE PO / PR TO VENDOR 15Mar-1... 15-Mar-11 A 1
MDPP-FPSC-P-05R2E1CEIPT OF VENDOR
DRAWINGS 03-Mar-1... 07-Mar-11 A 18
MDPP-FPSC-P-05A3P1PROVAL OF VENDOR
DRAWINGS 04-Mar-1... 04-Mar-11 A 15
GATE VALVES 02-Aug-1... 15-Jul-13 222
MDPP-FPSC-P-05IS41SUE ENQUIRY 02-Aug-1... 02Aug-11 A 1
MDPP-FPSC-P-05R5E1CEIPT BIDS 03-Aug-1... 05Aug-11 A 20
MDPP-FPSC-P-05T6E1CHNICAL BID ANALYSIS 15Aug-1... 22-Aug-11 A 1
MDPP-FPSC-P-05C7O1MMERCIAL BID ANALYSIS 24Aug-1... 25-Aug-11 A 1
MDPP-FPSC-P-05IS81SUE LOI 02-Sep-1... 05-Sep-11
A1
MDPP-FPSC-P-05M91ANUFACTURING & DELIVERY
AT SITE 31-Oct-1... 15-Jul-13 220
MDPP-FPSC-P-06IS01SUE PO / PR TO VENDOR 03Aug-1... 09-Aug-11 A 1
MDPP-FPSC-P-06R1E1CEIPT OF VENDOR
DRAWINGS 04-Aug-1... 11-Aug-11 A 18
MDPP-FPSC-P-06A2P1PROVAL OF VENDOR
DRAWINGS 19-Aug-1... 19-Aug-11 A 15
CHECK VALVES 03-Aug-1... 27-Jun-13 203
MDPP-FPSC-P-06IS31SUE ENQUIRY 03-Aug-1... 03Aug-11 A 1
MDPP-FPSC-P-06R4E1CEIPT BIDS 04-Aug-1... 08Aug-11 A 26
MDPP-FPSC-P-06T5E1CHNICAL BID ANALYSIS 10Aug-1... 16-Aug-11 A 1
MDPP-FPSC-P-06C6O1MMERCIAL BID ANALYSIS 17Aug-1... 18-Aug-11 A 1

MDPP-FPSC-P-06IS71SUE LOI 05-Sep-1... 05-Sep-11


A1
MDPP-FPSC-P-06M81ANUFACTURING & DELIVERY
AT SITE 13-Sep-1... 27-Jun-13 72
MDPP-FPSC-P-06IS91SUE PO / PR TO VENDOR 16Aug-1... 04-Sep-11 A 1
MDPP-FPSC-P-07R0E1CEIPT OF VENDOR
DRAWINGS 23-Aug-1... 25-Aug-11 A 18
MDPP-FPSC-P-07A1P1PROVAL OF VENDOR
DRAWINGS 29-Aug-1... 29-Aug-11 A 15
ELECTROMAGNETIC FLOW METER 03-Jan-1... 22May-13 239
MDPP-FPSC-P-07IS21SUE ENQUIRY 03-Jan-1... 03Jan-11 A 1
MDPP-FPSC-P-07R3E1CEIPT BIDS 04-Jan-1... 17-Jan11 A 26
MDPP-FPSC-P-07T4E1CHNICAL BID ANALYSIS 17-Jan1... 28-Jan-11 A 1
MDPP-FPSC-P-07C5O1MMERCIAL BID ANALYSIS 31Jan-1... 08-Feb-11 A 1
MDPP-FPSC-P-07IS61SUE LOI 28-Jan-1... 29-Jan-11
A1
MDPP-FPSC-P-07M71ANUFACTURING & DELIVERY
AT SITE 06-Mar-1... 22-May-13 150
MDPP-FPSC-P-07IS81SUE PO / PR TO VENDOR 24Feb-1... 24-Feb-11 A 1
MDPP-FPSC-P-07R9E1CEIPT OF VENDOR
DRAWINGS 16-Jan-1... 24-Jan-11 A 18
MDPP-FPSC-P-08A0P1PROVAL OF VENDOR
DRAWINGS 26-Jan-1... 31-Jan-11 A 15
PLC FOR PUMPS 11-Jan-1... 17-Aug-11 A 482
MDPP-FPSC-P-08IS11SUE ENQUIRY 11-Jan-1... 11Jan-11 A 1
MDPP-FPSC-P-08R2E1CEIPT BIDS 14-Jan-1... 19-Jan11 A 26
MDPP-FPSC-P-08T3E1CHNICAL BID ANALYSIS 25-Jan1... 25-Jan-11 A 1
MDPP-FPSC-P-08C4O1MMERCIAL BID ANALYSIS 02Feb-1... 04-Feb-11 A 1
MDPP-FPSC-P-08IS51SUE LOI 07-Feb-1... 10-Feb-11
A1
MDPP-FPSC-P-08M61ANUFACTURING & DELIVERY
AT SITE 09-Feb-1... 17-Aug-11 A 137
MDPP-FPSC-P-08IS71SUE PO / PR TO VENDOR 25Jan-1... 26-Jan-11 A 1
MDPP-FPSC-P-08R8E1CEIPT OF VENDOR
DRAWINGS 21-Jan-1... 30-Jan-11 A 18

MDPP-FPSC-P-08A9P1PROVAL OF VENDOR
DRAWINGS 28-Jan-1... 01-Feb-11 A 12
RUBBER EXPANSION BELLOW 09-Mar-1... 13-Oct-12
A 114
MDPP-FPSC-P-09IS01SUE ENQUIRY 09-Mar-1... 09Mar-11 A 1
MDPP-FPSC-P-09R1E1CEIPT BIDS 10-Mar-1... 21Mar-11 A 26
MDPP-FPSC-P-09T2E1CHNICAL BID ANALYSIS 29Mar-1... 04-Apr-11 A 1
MDPP-FPSC-P-09C3O1MMERCIAL BID ANALYSIS 06Apr-1... 08-Apr-11 A 1
MDPP-FPSC-P-09IS41SUE LOI 15-Apr-1... 15-Apr-11
A1
MDPP-FPSC-P-09M51ANUFACTURING & DELIVERY
AT SITE 31-May-1... 13-Oct-12 A 120
MDPP-FPSC-P-09IS61SUE PO / PR TO VENDOR 15Apr-1... 15-Apr-11 A 1
MDPP-FPSC-P-09R7E1CEIPT OF VENDOR
DRAWINGS 17-Apr-1... 30-Apr-11 A 18
MDPP-FPSC-P-09A8P1PROVAL OF VENDOR
DRAWINGS 01-May-1... 11-May-11 A 15
CP SYSTEM 10-Mar-1... 20-Jul-11 A 157
MDPP-FPSC-P-09IS91SUE ENQUIRY 10-Mar-1... 10Mar-11 A 1
MDPP-FPSC-P-10R0E1CEIPT BIDS 14-Mar-1... 14Mar-11 A 1
MDPP-FPSC-P-10T1E1CHNICAL BID ANALYSIS 15Mar-1... 17-Mar-11 A 1
MDPP-FPSC-P-10C2O1MMERCIAL BID ANALYSIS 19Mar-1... 22-Mar-11 A 1
MDPP-FPSC-P-10IS31SUE LOI / AMMENDMENT 23Mar-1... 23-Mar-11 A 1
MDPP-FPSC-P-10M41ANUFACTURING & DELIVERY
AT SITE 21-Apr-1... 20-Jul-11 A 100
MDPP-FPSC-P-10IS51SUE PO / PR TO VENDOR 23Mar-1... 23-Mar-11 A 1
MDPP-FPSC-P-10R6E1CEIPT OF VENDOR
DRAWINGS 31-Mar-1... 07-Apr-11 A 18
MDPP-FPSC-P-10A7P1PROVAL OF VENDOR
DRAWINGS 09-Apr-1... 12-Apr-11 A 13
PROCUREMENT- FREE ISSUE MATERIAL 06-Jun-1...
01-Jun-13 679
PRFI001 Delivery at Site of GT 06-Jun-1... 29-Jun-11
A 20
PRFI011 Delivery at Site of Export Booster Pumps
12-Jul-11 A 31-Jul-11 A 20

PRFI021 Delivery at Site of Custody Transfer


Metering system 05-Jul-11 A 20-Jul-11 A 20
PRFI031 Delivery at Site of Butterfly/Ball Valves
above 24" size 15-May-13* 01-Jun-13 20
CONSTRUCTION 07-Oct-1... 06-Jan-14 891
CNCM001 Site Mobilization 07-Oct-1... 28-Oct-10 A
20
CNCM011 Camp Establishment 28-Oct-1... 03-Dec10 A 30
MOBILISATION 28-Oct-1... 22-Nov-11 A 407
CNM100 Mobilise Civil Contractor - For Roads, Dyke
Wall 30-Oct-1... 18-Nov-10 A 22
CNM105 Mobilise Civil Contractor - For Packages
(foundations etc.) 16-Dec-1... 28-Dec-10 A 22
CNM110 Mobilise Building Contractor 12-Nov-1...
27-Dec-10 A 12
CNM130 Mobilise Mechanical / Piping Contractor
07-Apr-1... 30-Apr-11 A 15
CNM140 Mobilization of Batching Plant-II 28-Oct1... 03-Dec-10 A 45
CNM150 Mobilise Contractor- Instrumentation
Contractor 24-May-1... 13-Jun-11 A 20
CNM160 Mobilise Electrical Contractor 03-May-1...
25-May-11 A 12
CNM180 Mobilise Insulation & C.P. Contractor 02Nov-1... 22-Nov-11 A 15
CNM190 Mobilise Plant and Machinery at site 31Dec-1... 02-Mar-11 A 90
PHASE-1 23-Nov-1... 06-Jan-14 846
THREE OIL TANKS (TAG NO.-2,3,4) 11-Feb-1... 04May-13 A 357
Construction of Vertical Dyke Wall V-2 11-Feb-1...
07-Jun-11 A 183
CNCV550 Release of Front 11-Feb-11 A 0
CNCV592 RCC 17-Mar-1... 07-Jun-11 A 72
CNCV610 Excavation 22-Feb-1... 28-Feb-11 A 15
CNCV651 PCC 02-Mar-1... 09-Mar-11 A 15
Construction of Horizontal Dyke Wall H-1 18-Apr1... 06-Nov-12 A 273
CNCV270 Release of Front 15-Feb-12 A 0
CNCV331 PCC 11-Mar-1... 03-Sep-12 A 101
CNCV332 RCC 18-Apr-1... 06-Nov-12 A 150

CNCV390 Excavation 22-Feb-1... 18-Jul-12 A 97


Construction of Vertical Dyke Wall V-4 15-Jul-12 A
03-Nov-12 A 68
CNCV612 RCC 10-Sep-1... 03-Nov-12 A 79
CNCV640 Release of Front 15-Jul-12 A 0
CNCV650 Excavation 30-Jul-12 A 08-Aug-12 A 15
CNCV671 PCC 13-Aug-1... 29-Aug-12 A 15
Construction of Vertical Dyke Wall V-3 15-Feb-1...
11-Jun-12 A 317
CNCV602 RCC 23-Mar-1... 11-Jun-12 A 79
CNCV620 Release of Front 15-Feb-12 A 0
CNCV630 Excavation 22-Feb-1... 28-Feb-12 A 15
CNCV661 PCC 02-Mar-1... 15-Mar-12 A 15
Construction of Vertical Dyke Wall V-5 17-Feb-1...
25-Jun-12 A 320
CNCV622 RCC 21-Mar-1... 25-Jun-12 A 80
CNCV660 Release of Front 17-Feb-12 A 0
CNCV670 Excavation 20-Feb-1... 29-Feb-12 A 15
CNCV681 PCC 06-Mar-1... 16-Mar-12 A 15
Construction of Horizontal Dyke Wall H-2 15-Feb1... 18-Aug-12 A 274
CNCV280 Release of Front 15-Feb-12 A 0
CNCV352 RCC 06-Mar-1... 18-Aug-12 A 152
CNCV400 Excavation 21-Feb-1... 27-Mar-12 A 97
CNCV401 PCC 01-Mar-1... 03-Jul-12 A 101
Construction of Horizontal Dyke Wall H-3 15-Feb1... 04-Dec-12 A 200
CNCV310 Release of Front 15-Feb-12 A 0
CNCV362 RCC 31-Jul-12 A 04-Dec-12 A 84
CNCV410 Excavation 15-Feb-1... 11-Apr-12 A 35
CNCV411 PCC 31-May-1... 20-Jun-12 A 65
Construction of Vertical Dyke Wall V-8 07-Feb-1...
04-Aug-12 A 247
CNCV382 RCC 30-May-1... 04-Aug-12 A 90
CNCV431 PCC 30-Mar-1... 05-Jun-12 A 75
CNCV440 Release of Front 07-Feb-12 A 0
CNCV450 Excavation 10-Feb-1... 22-Mar-12 A 45
Construction of Vertical Dyke Wall V-7 09-Feb-1...
03-Apr-13 A 103
CNCV372 RCC 02-May-1... 21-Aug-12 A 90

CNCV420 Release of Front 09-Feb-12 A 0


CNCV421 PCC 11-Apr-1... 11-Jul-12 A 75
CNCV430 Excavation 15-Feb-1... 03-Apr-13 A 45
Construction of Vertical Dyke Wall V-6 16-Feb-1...
04-Sep-12 A 355
CNCV402 RCC 12-Apr-1... 04-Sep-12 A 90
CNCV451 PCC 30-Mar-1... 10-Jul-12 A 75
CNCV480 Release of Front 16-Feb-12 A 0
CNCV490 Excavation 22-Feb-1... 22-Mar-12 A 35
Construction of Vertical Dyke Wall V-1 26-Dec-1...
13-Jun-12 A 266
CNCV392 RCC 14-Mar-1... 13-Jun-12 A 60
CNCV441 PCC 24-Jan-1... 17-Apr-12 A 45
CNCV460 Release of Front 26-Dec-11 A 0
CNCV470 Excavation 02-Jan-1... 31-Jan-12 A 35
Construction of Vertical Dyke Wall V-9 18-Jan-1...
04-May-13 A 98
CNCV412 RCC 02-Mar-1... 04-May-13 A 58
CNCV461 PCC 29-Feb-1... 20-Mar-13 A 47
CNCV500 Release of Front 18-Jan-12 A 0
CNCV510 Excavation 08-Feb-1... 04-Mar-12 A 35
EXPORT MANIFOLD,BOOSTER AND EXPORT PUMPS
ETC (TAG-22,25 & 70) 15-Jun-1... 25-Jun-13 482
Export Booster Pumps 14-Nov-1... 31-May-12 A 182
CNCV380 Excavation 14-Nov-1... 16-Nov-11 A 6
CNCV385 Foundation 15-Nov-1... 07-Dec-11 A 21
INT150 Installation of Export and Booster Pump 21Apr-1... 31-May-12 A 31
Export & Booster Pump House (SHED) 03-Oct-1...
25-Jun-13 334
CNCV224 Brick works -deleted 31-May-1... 31-May12 A 45
CNCV232 Superstructure -deleted 31-May-1... 31May-12 A 75
CNCV233 Structural Fab.,Shot Blasting & primer
Painting 29-May-1... 25-Jun-13 60
CNCV234 Structural Erection & Final painting 12Sep-1... 26-Oct-12 A 45

CNCV251 Substructure 03-Oct-1... 10-Jan-12 A 60


CNCV324 Sheet Fixing 08-Aug-1... 20-Sep-12 A 45
CNCV445 Finishing (Paving,Elect. Inst.,Doors &
Window fixing,Painting) 12-Jun-1... 15-Oct-12 A 80
Custody Transfer Metering (CTM) 16-Nov-1... 15Mar-12 A 68
CNCV370 Excavation 16-Nov-1... 22-Nov-11 A 15
CNCV375 Foundation 26-Dec-1... 17-Jan-12 A 31
INT140 Installation of Custody Transfer Metering 15Feb-1... 15-Mar-12 A 21
Panel Room for CTM 19-Dec-1... 14-Nov-12 A 270
CNCV242 Superstructure 01-Mar-1... 26-Mar-12 A
65
CNCV253 Structural Fab.,Shot Blasting & primer
Painting 01-May-1... 25-Jul-12 A 60
CNCV474 Brick works 10-Apr-1... 13-Jun-12 A 45
CNCV475 Finishing (Paving,Elect. Inst.,Doors &
Window fixing,Painting) 25-Jun-1... 08-Aug-12 A 70
CNCV484 Structural Erection & Final painting 12Sep-1... 14-Nov-12 A 60
CNCV494 Sheet Fixing 23-Oct-1... 07-Nov-12 A 30
CNCV761 Substructure 19-Dec-1... 25-Feb-12 A 45
CTM Package Shed 15-Jun-1... 29-Nov-12 A 482
CNCV181 Substructure 15-Jun-1... 25-Jan-12 A 60
CNCV184 Sheet Fixing 01-Jun-1... 04-Aug-12 A 45
CNCV192 Superstructure 26-Jan-1... 02-May-12 A
75
CNCV193 Masonary 17-May-1... 19-Jun-12 A 45
CNCV255 Finishing ( Elect. Inst.,Doors & Window
fixing,Painting) 02-Jul-12 A 29-Nov-12 A 110
CNCV691 Structural Fab.,Shot Blasting & primer
Painting 26-Jan-1... 10-May-12 A 75

CNCV701 Structural Erection. & final Painting 07Aug-1... 23-Aug-12 A 110


LFO TANKS (TAG NO-44,45 & 46) 0
LFO MANIFOLD,EXPORT PUMP (TAG NO-65,66 &
67) 03-Oct-1... 19-Dec-12 A 357
Interface Storage tanks 03-Oct-1... 31-May-12 A 80
CNCV132 Excavation 03-Oct-1... 25-Nov-11 A 15
CNCV134 Barbending 28-Oct-1... 22-Nov-11 A 25
CNCV136 Form Work 28-Oct-1... 22-Nov-11 A 25
CNCV138 RCC 29-Dec-1... 05-Feb-12 A 35
CNCV140 Backfilling & Compaction 02-Apr-1... 31May-12 A 8
Interface Transfer Pump Bay 06-Jul-12 A 30-Aug-12
A 222
CNCV158 RCC 14-Jul-12 A 14-Jul-12 A 35
CNCV210 Backfilling & Compaction 19-Jul-12 A 28Jul-12 A 10
CNCV244 Barbending 09-Jul-12 A 11-Jul-12 A 3
CNCV246 Form Work 11-Jul-12 A 13-Jul-12 A 25
CNCV262 Excavation 06-Jul-12 A 11-Jul-12 A 15
CNEQ180 Installation of Interface Transfer pump 08Aug-1... 30-Aug-12 A 15
INTERFACE HOLDUP TANK 01-Mar-1... 19-Dec-12 A
204
CNME460 Fabtication of Tank 01-Mar-1... 02-Jul-12
A 90
CNME470 Erection of Tank 15-Jun-1... 05-Nov-12 A
65
CNME480 Hydrotesting of Tank 20-Nov-1... 30-Nov12 A 10
CNME490 Painting of Tank 01-Dec-1... 19-Dec-12 A
21
INTERFACE STORAGE TANK-DYKE WALL 10-Jul-12 A
29-Aug-12 A 53
CNCV520 Excavation 10-Jul-12 A 14-Jul-12 A 11
CNCV632 RCC & RELATED FACILITIES 02-Aug-1... 29Aug-12 A 75
CNCV711 PCC 13-Jul-12 A 31-Jul-12 A 21
INTERFACE HOLD UP TANK-DYKE WALL 08-Aug-1...
22-Nov-12 A 111

CNCV530 Excavation 08-Aug-1... 15-Aug-12 A 90


CNCV642 RCC & RELATED FACILITIES 25-Oct-1... 14Nov-12 A 120
CNCV721 PCC 06-Sep-1... 22-Nov-12 A 90
DYKE WALL AROUND TANK -9,10,11 25-May-1... 07Nov-12 A 131
CNCV662 RCC & RELATED FACILITIES 16-Aug-1... 07Nov-12 A 120
CNCV680 Excavation 25-May-1... 14-Jul-12 A 90
CNCV741 PCC 28-May-1... 28-Aug-12 A 90
AIR COMPRESSOR & PSA NITROGEN SYSTEM (TAG
NO-12) 22-Jan-1... 20-Dec-12 A 380
Air Compressor 22-Jan-1... 23-Aug-12 A 119
CNCV273 Earth Work 22-Jan-1... 24-Mar-12 A 26
CNCV283 PCC 26-Mar-1... 26-Mar-12 A 36
CNCV313 Barbending 26-Mar-1... 30-Mar-12 A 31
CNCV323 Form Work 26-Mar-1... 30-Mar-12 A 31
CNCV333 RCC 31-Mar-1... 31-Mar-12 A 46
CNCV442 Back filling & Compaction 16-Apr-1... 23Apr-12 A 11
CNEQ120 Installation of Air Compressor 15-May-1...
23-Aug-12 A 61
Nitrogen Package 20-Mar-1... 17-Sep-12 A 295
CNCV276 Earth Work 20-Mar-1... 24-Mar-12 A 26
CNCV286 PCC 26-Mar-1... 26-Mar-12 A 31
CNCV296 Barbending 26-Mar-1... 30-Mar-12 A 31
CNCV306 Form Work 26-Mar-1... 30-Mar-12 A 31
CNCV316 RCC 31-Mar-1... 16-May-12 A 46
CNCV472 Back filling & Compaction 30-May-1... 05Jun-12 A 11
CNEQ130 Installation of Nitrogen Generation
Package 21-Aug-1... 17-Sep-12 A 46
Air Compressor Shed 22-Jan-1... 20-Dec-12 A 380
CNCV343 Earth Work 22-Jan-1... 25-Mar-12 A 15
CNCV353 PCC 26-Mar-1... 26-Mar-12 A 1
CNCV363 Barbending 28-Mar-1... 02-Jul-12 A 30

CNCV373 Form Work 30-Mar-1... 13-Jul-12 A 30


CNCV383 RCC 20-Feb-1... 19-Apr-12 A 40
CNCV393 Structural Fab. Shot Blasting & Primer
painting 15-Jun-1... 04-Sep-12 A 60
CNCV403 Structural Erection & Final painting 26-Jul12 A 04-Sep-12 A 40
CNCV413 Metal Sheet Fixing & Side Cladding 17Sep-1... 10-Oct-12 A 60
CNCV423 Internal & External Painting 15-Nov-1...
20-Dec-12 A 50
FUEL GAS HANDLING (TAG NO-38) 15-May-1... 02Oct-12 A 298
Fuel Gas system foundation (KO Drum,Cartridge
Filter, Electric Heater) 15-May-1... 02-Oct-12 A 298
CNCV349 Earth Work 15-May-1... 30-May-12 A 26
CNCV359 PCC 04-Jun-1... 14-Jun-12 A 6
CNCV369 Form Work 20-Jun-1... 04-Jul-12 A 15
CNCV379 RCC 10-Jul-12 A 18-Jul-12 A 16
CNCV512 Back filling & Compaction 24-Jul-12 A 09Aug-12 A 10
CNEQ250 Installation of Fuel & Gas system 03-Sep1... 02-Oct-12 A 45
RAW WATER SYSTEM (TAG NO-34) 14-Jun-1... 02Oct-13 307
CNCV414 Earth Work 15-Jun-1... 09-Jul-12 A 25
CNCV424 PCC 25-Jun-1... 18-Jul-12 A 60
CNCV434 Barbending 20-Jul-12 A 22-Aug-12 A 60
CNCV444 Form Work 08-Aug-1... 04-Sep-12 A 60
CNCV454 RCC 23-Aug-1... 16-Oct-12 A 90
CNCV464 Handover of Area 14-Jun-12 A 0
CNCV502 Back filling & Compaction 14-Nov-1... 23Nov-12 A 11
CNEQ185 Installation of Raw Water Package(Water
Treatment Package 22-Nov-1... 02-Oct-13 55
WATER TREATMENT SYSTEM (TAG NO35,36,37,51,56 & 72) 10-May-1... 29-Oct-13 369
Water Treatment Package (WTP) 10-May-1... 29Oct-13 363

CNCV274 Earth Work 10-May-1... 25-May-12 A 26


CNCV284 PCC 25-May-1... 30-May-12 A 31
CNCV294 Barbending 01-Jun-1... 02-Jul-12 A 31
CNCV304 Form Work 06-Jun-1... 03-Jul-12 A 21
CNCV314 RCC 06-Jun-1... 18-Jul-12 A 46
CNCV452 Back filling & Compaction 01-Aug-1... 13Aug-12 A 11
CNEQ195 Installation Testing & Commissioning of
Water Treatment Package 16-Oct-1... 29-Oct-13 60
Treated Water Storage Tank (1263-TK-21) 15-Jun1... 14-Nov-12 A 273
CNME660 Pre-Fabtication of Plates 15-Jun-1... 26Jun-12 A 90
CNME710 Hydrotesting of Tank 04-Sep-1... 14-Nov12 A 10
CNME720 Erection & Painting of Tank 11-Jul-12 A
04-Oct-12 A 90
Treated Water Overhead Storage Tank-(1263-TK22) 15-Jun-1... 11-Sep-13 107
CNEQ200 FDN & Fabrication & Erection of SMC
Panel Tank 15-Jun-1... 11-Sep-13 150
DM Water Tank 15-May-1... 09-Nov-12 A 114
CNME730 Pre-Fabtication of Plates 17-May-1... 18Jul-12 A 90
CNME740 Erection & Painting of Tank 15-May-1...
10-Sep-12 A 90
CNME750 Hydrotesting of Tank 10-Oct-1... 09-Nov12 A 10
Filter Water Storage Tank 11-May-1... 12-Nov-12 A
223
CNME760 Pre-Fabtication of Plates 11-May-1... 25May-12 A 90
CNME770 Erection & Painting of Tank 25-May-1...
12-Sep-12 A 90
CNME780 Hydrotesting of Tank 04-Nov-1... 12-Nov12 A 10
DUG BOREWELL 18-May-1... 29-Oct-13 369
CNCV334 DRILLING 18-May-1... 01-Jun-13 45
CNCV354 INSTALLATION OF PIPES 18-May-1... 16Jul-13 60
CNCV364 FDN / FIXING OF PUMPS 17-Jul-13 14-Sep13 60

CNCV374 CONNECTION OF PUMPS 31-Aug-13 29Oct-13 60


STEAM GENERATION PLANT (TAG NO-21) 02-Jan1... 17-Aug-13 404
Steam Generation System / Boiler Foundation 25Jan-1... 17-Aug-13 169
CNCV277 Earth Work 25-Jan-1... 15-Feb-12 A 31
CNCV287 PCC 31-Jan-1... 09-Mar-12 A 46
CNCV297 Barbending 31-Jan-1... 12-Mar-12 A 36
CNCV307 Form Work 02-Feb-1... 15-Mar-12 A 36
CNCV317 RCC 15-Feb-1... 24-Mar-12 A 76
CNCV482 Back filling & Compaction 29-Mar-1... 04Apr-12 A 11
CNEQ260 Installation Testing & Commissioning of
Steam Generation system 04-Sep-1... 17-Aug-13 95
Boiler House Shed (32MX24MX9H) 02-Jan-1... 26Dec-12 A 355
CNCV523 Earth Work 02-Jan-1... 06-Jan-12 A 15
CNCV533 PCC 09-Jan-1... 20-Jan-12 A 30
CNCV543 Barbending 02-Apr-1... 04-Jun-12 A 30
CNCV553 Form Work 05-Apr-1... 12-Jun-12 A 30
CNCV563 Structural Fab. Shot Blasting & Primer
painting 17-May-1... 24-Aug-12 A 60
CNCV573 RCC 04-Jun-1... 27-Jun-12 A 40
CNCV583 Structural Erection & Final painting 20-Jul12 A 23-Oct-12 A 40
CNCV593 Sheet Fixing 05-Sep-1... 03-Dec-12 A 80
CNCV603 Final Painting 14-Nov-1... 26-Dec-12 A 40
CLOSED DRAIN SYSTEM (TAG NO-10 & 59) 06-Jun1... 14-Dec-12 A 380
CNEQ100 Installation of Closed drain Pump 14-Nov1... 14-Dec-12 A 30
CLOSED DRAIN TANK PIT (CRUDE & LIGHT FLUSING
OIL -1 NOS) 22-Dec-1... 31-May-12 A 380
CNCV090 Excavation 22-Dec-1... 22-Feb-12 A 20

CNCV100 Barbending 27-Feb-1... 08-May-12 A 40


CNCV110 Form Work 28-Feb-1... 10-May-12 A 10
CNCV120 RCC 10-Mar-1... 16-May-12 A 60
CNCV125 Backfilling & Compaction 23-May-1... 31May-12 A 16
CLOSED DRAIN TANK-FABRICATION (CRUDE &
LIGHT FLUSING OIL -1 NOS) 15-May-1... 13-Dec-12
A 237
CNME630 Pre-Fabtication & Transportation of Dish
End & Fabrication 15-May-1... 04-Sep-12 A 120
CNME640 Erection & Painting of Tank 18-Jul-12 A
22-Nov-12 A 60
CNME650 Hydrotesting of Tank 04-Dec-1... 13-Dec12 A 20
CLOSED DRAIN TANK-DYKE WALL ( LIGHT &
FLUSHING OIL) 06-Jun-1... 08-Aug-12 A 122
CNCV540 Excavation 06-Jun-1... 09-Jul-12 A 90
CNCV652 RCC & RELATED FACILITIES 26-Jun-1... 08Aug-12 A 120
CNCV731 PCC 06-Jun-1... 16-Jul-12 A 90
DG SET ( TAG NO-52 & 23) 02-Aug-1... 05-Dec-12 A
552
CNEL190 Installation of DG set outside of
substation bldg 23-Apr-1... 12-Sep-12 A 31
DG Set Foundation 13-Jan-1... 28-Feb-12 A 64
CNCV561 Earth Work 13-Jan-1... 14-Jan-12 A 9
CNCV562 Back filling & Compaction 17-Feb-1... 28Feb-12 A 11
CNCV571 PCC 16-Jan-1... 30-Jan-12 A 11
CNCV581 RCC 24-Jan-1... 15-Feb-12 A 21
Diesel Storage tanks-Foundation 02-Aug-1... 13-Apr12 A 167
CNCV122 Excavation 08-Aug-1... 12-Aug-11 A 20
CNCV124 Barbending 13-Aug-1... 18-Feb-12 A 30
CNCV126 Form Work 02-Aug-1... 23-Feb-12 A 45
CNCV128 RCC 19-Aug-1... 24-Feb-12 A 60
CNCV130 Backfilling & Compaction 02-Apr-1... 13Apr-12 A 20
DIESEL STORAGE TANK-Fabrication 15-Nov-1... 05Dec-12 A 356

CNEQ170 Installation of Diesel Unloading pump 26May-1... 09-Aug-12 A 15


CNME670 Fabtication of Tank 15-Nov-1... 15-Feb12 A 45
CNME680 Erection of Tank 22-May-1... 30-May-12
A 40
CNME690 Hydrotesting of Tank 13-Nov-1... 20-Nov12 A 14
CNME700 Painting of Tank 22-Nov-1... 05-Dec-12 A
23
DIESEL STORAGE TANK-DYKE WALL 21-Mar-1... 06Jul-12 A 129
CNCV672 RCC & RELATED FACILITIES 21-May-1... 06Jul-12 A 120
CNCV690 Excavation 21-Mar-1... 02-Apr-12 A 45
CNCV751 PCC 08-Apr-1... 22-May-12 A 90
FIRE PROTECTION SYSTEM (TAG NO-18,19,47 & 53)
24-Jan-1... 25-Aug-13 715
FW PUMP HOUSE 09-Feb-1... 09-Aug-12 A 603
CNCV215 Substructure 09-Feb-1... 20-Mar-12 A 45
CNCV216 Superstructure 26-Mar-1... 14-Jun-12 A
75
CNCV218 Flooring 03-Jul-12 A 09-Aug-12 A 35
FIRE STATION BUILDING ( Drill Yard) 02-Jan-1... 23Aug-13 A 567
CNCV204 Flooring 10-Jul-12 A 28-Jul-12 A 30
CNCV212 Superstructure 07-Feb-1... 03-Apr-12 A 95
CNCV213 Masonary 21-Mar-1... 13-Jun-12 A 60
CNCV221 Substructure 02-Jan-1... 04-Feb-12 A 60
CNCV350 Installation of Split Air Conditioner 29Aug-1... 04-Sep-12 A 10
CNCV425 Finishing ( Elect. Inst.,Doors & Window
fixing,Painting) 08-Aug-1... 23-Aug-13 A 90
FIRE WATER TANK FOUNDATION - 2 NOS 24-Jan-1...
05-Jul-11 A 304
CNCV050 Excavation 24-Jan-1... 04-Feb-11 A 8
CNCV060 Barbending 31-Jan-1... 31-Mar-11 A 12
CNCV070 Form Work 16-Mar-1... 13-Apr-11 A 15
CNCV080 RCC 19-Apr-1... 30-May-11 A 90

CNCV085 Backfilling & Compaction 15-Jun-1... 05Jul-11 A 30


FIRE WATER TANK FABRICATION - 2 NOS 28-Oct-1...
28-Dec-12 A 423
CNME590 Fabtication of Tank 28-Oct-1... 06-Jan-12
A 105
CNME600 Erection of Tank 04-Dec-1... 05-Mar-12 A
120
CNME610 Hydrotesting of Tank 20-Nov-1... 04-Dec12 A 90
CNME620 Painting of Tank 11-Dec-1... 28-Dec-12 A
90
FIRE WATER PUMP HOUSE -SHED 15-Nov-1... 22Jan-13 A 403
CNCV433 Earth Work 15-Nov-1... 09-Jan-12 A 15
CNCV443 PCC 09-Feb-1... 20-Mar-12 A 30
CNCV453 Barbending 09-Feb-1... 20-Mar-12 A 30
CNCV463 Form Work 09-Feb-1... 20-Mar-12 A 30
CNCV473 Structural Fab. Shot Blasting & Primer
painting 15-Aug-1... 29-Nov-12 A 60
CNCV483 RCC 26-Mar-1... 16-May-12 A 40
CNCV493 Structural Erection & Final painting 27Sep-1... 13-Nov-12 A 40
CNCV503 Metal Sheet Fixing & Side Cladding 05Nov-1... 14-Jan-13 A 80
CNCV513 Internal & External Painting 18-Dec-1...
22-Jan-13 A 60
CNCV613 Installation of Monorail 16-Nov-1... 13Dec-12 A 78
Impact Fire Fighting Changes- Construction 15-Feb1... 25-Aug-13 390
CIVIL 15-Feb-1... 13-Jul-12 A 108
MDPP-FPSCF-DCNC.- 0F0O0R1 FIRE WATER PUMP
24-Feb-1... 30-Apr-12 A 45
MDPP-FPSCF-DCNC.- 0F0O1R1 JOCKEY PUMP 07Mar-1... 30-Apr-12 A 45
MDPP-FPSCF-DCNC.- 0F0O2R1 FOAM
CONCENTRATE TANK 15-Jun-1... 13-Jul-12 A 60
MDPP-FPSCF-DCNC.- 0F0O3R1 FIRE WATER TANK
(NEW TANK) 15-Feb-1... 16-Mar-12 A 60
MECHANICAL & PIPING 05-Mar-1... 09-Aug-13 348

FIRE WATER TANK FABRICATION 05-Mar-1... 12-Dec12 A 312


MDPP-FPCSACT-CHCO-D0I0C5 1PROTECTION FOR
FIRE WATER TANK (NEW TANK) 08-May-1... 28-May12 A 60
MDPP-FPFSACB-CRMICPA-T0I0O5N1 OF PLATES 05Mar-1... 15-May-12 A 50
MDPP-FPASLCIG-CNMMPE-0N1T2 &1 ERECTION OF
ROLLED SEGMENTS 16-Apr-1... 03-Oct-12 A 120
MDPP-FPNSDCT-CMP-0131 27-Nov-1... 12-Dec-12 A
30
MDPP-FPPSICP-INCGM PC-O01N4N1ECTION 05-Jun1... 10-Oct-12 A 30
FIRE WATER PUMP 07-Aug-1... 28-May-13 31
MDPP-FPASSCS-CEMPB-L0Y0,2IN1STALLATION OF
FIRE WATER PUMP 07-Aug-1... 09-Oct-12 A 30
MDPP-FPPSICP-INCGM PC-O00N6N1ECTION 17-Oct1... 24-May-13 10
MDPP-FPNSDCT-C &M HPY-0D0R7O1TESTING 12Mar-1... 28-May-13 10
JOCKEY PUMP 03-Oct-1... 08-Jun-13 63
MDPP-FPISNCS-TCAMLLPA-0T0IO31N OF JOCKEY
PUMP 03-Oct-1... 23-Oct-12 A 12
MDPP-FPPSICP-INCGM PC-O00N8N1ECTION 04-Dec1... 08-Jun-13 25
FOAM CONCENTRATE TANK 12-Sep-1... 09-Aug-13
35
MDPP-FPESRCE-CCMTIPO-N00 A4N1D
ALLIGNMENT 12-Sep-1... 04-Oct-12 A 12
MDPP-FPPSICP-INCGM PC-O01N0N1ECTION 12-Nov1... 09-Aug-13 20
ELECTRICAL 21-Aug-1... 13-Jun-13 21
MDPP-FPSCIN-CSET-A0L0L0A1TION &
TERMINATION OF CABLES 21-Aug-1... 13-Jun-13 30
INSTRUMENTATION 04-Oct-1... 25-Aug-13 65
MDPP-FPSCIN-CSI-T0A0L0L1ATION OF
INSTRUMENTATION ITEMS 04-Oct-1... 25-Aug-13 90

INT0100
INT0110
INT0120
INT0130

Award of Contract (LOA)


Kick of meeting
Site Enabling works ( Site office,Warehouse)
Completion of Residual Basic Engg. for Packages

INT0140

Ordering of Steam Generation Package

INT0150

Ordering of Air Compressor Package

INT0170

Ordering of Oily Water Treatment Package (OWS)

INT0180

Ordering of Gate/Ball Valves

INT0190

Ordering of Control Valves

INT0191

Ordering of Emergency Shut Down Valves

INT0200

Ordering of Nitrogen Package

INT0210

Ordering of Panel / Switchgear

INT0220
INT0230
INT0240

Ordering of Power Transformer


Ordering of FF Pumps
Ordering of DG set

INT0250

Receipt of Steam Generation Package

INT0260

Receipt of Air Compressor Package

INT0280

Receipt of Oily Water Treatment Package (OWS)

INT0290

Receipt of Gate/Ball Valves

INT0300

Receipt of Control Valves

INT0301

Receipt of Emergency Shut Down Valves

INT0310

Receipt of Nitrogen Package

INT0320

Receipt of Panel / Switchgear

INT0330

Receipt of Power Transformer

INT0340
INT0350

Receipt of Fire Water System


Receipt of DG set

INT0360

All Building's Construction Completion

INT0380

Hydrotesting Completion

INT0390

Erection of Equipments completion

INT0400

Electrical works completion

INT0410

Instrument works completion

INT0420
INT0430
INT440

Fire Fighting Work Completion


Mechanical Completion
Receipt of FIM-GT

INT450

Receipt of FIM-Export Booster Pumps

INT460

Receipt of Heat Tracing System

INT470

Receipt of Foam Concentrate Tank

INT480

Receipt of Deludge Valve

INT490

Receipt of Electronic Flow Meter

INT500

Mobilization of Mechanical Contractor

INT510

Mobilization of Electrical Contractor

INT520

Mobilization of Instrumentation Contractor

INT530

Receipt of Intrusion Detection System

INT540

Mobilization of Insulation Contractor

INT550

Completion of Piping Erection

INT560
INT570

Installation of Jockey Pump


Delivery of Gate Valves

INT580

RCC Completion of Dyke Wall

INT590
COMIM4.11

Installation of Booster Pump


UNPRICED PO COPIES OF FIRE PROTECTION SYSTEM

COMIM4.15

UNPRICED PO COPIES OF E & I WORKS SUB-CONTRACT

COMIM4.16

UNPRICED PO COPIES OF HVAC WORKS SUB-CONTRACT

COMIM5.1.1

UNPRICED PO COPIES OF HEAT TRACING


COMPLETION OF CIVIL FDN. FOR FIRE WATER STORAGE
TANKS

COMIM5.1.10

COMPLETION OF CIVIL FDN. FOR DIESEL GENERATOR

COMIM5.1.11

COMPLETION OF CIVIL FDN. FOR VENT STACK

COMIM5.1.13
COMIM5.1.2

COMPLETION OF CIVIL FDN. FOR DIESEL STORAGE TANK


COMPLETION OF CIVIL FDN. FOR RAW WATER STORAGE
TANKS

COMIM5.1.3

COMPLETION OF CIVIL FDN. FOR CLOSED DRAIN TANKS

COMIM5.1.4

COMPLETION OF CIVIL WORKS FOR TANK DYKE WALLS


AND PAVING

COMIM5.1.5

COMPLETION OF CIVIL FDN. FOR EXPORT PUMPS

COMIM5.1.6

COMPLETION OF CIVIL FDN. FOR GAS TURBINES

COMIM4.9

COMIM5.1.9

COMPLETION OF CIVIL FDN. FOR CUSTODY TRANSFER


METERING SKID
COMPLETION OF CIVIL FDN. FOR FIRE WATER & JOCKEY
PUMPS
COMPLETION OF CIVIL FDN. FOR STEAM GENERATION
PACKAGE

COMIM5.2.1

RECEIPT AT SITE OF STEAM GENERATION PACKAGE

COMIM5.2.10

RECEIPT AT SITE OF FIRE WATER AND JOCKEY PUMPS

COMIM5.2.12

RECEIPT AT SITE OF HT & LT CABLES

COMIM5.2.13

RECEIPT AT SITE OF PIPING BULKS PIPE, FLANGES,


FITTINGS, GASKETS

COMIM5.2.15

RECEIPT AT SITE OF ELECTRICAL BULKS

COMIM5.2.2
COMIM5.2.3

RECEIPT AT SITE OF DIESEL GENERATOR PACKAGE


RECEIPT AT SITE OF RAW WATER TREATMENT PACKAGE
15-Nov-12 A

COMIM5.2.4

RECEIPT AT SITE OF INSTRUMENT AIR PACKAGE

COMIM5.2.5

RECEIPT AT SITE OF OWS PACKAGE

COMIM5.1.7
COMIM5.1.8

COMIM5.2.7

RECEIPT AT SITE OF SEWAGE/EFFLUENT TREATMENT


PACKAGES
RECEIPT AT SITE OF POWER & DISTRIBUTION
TRANSFORMERS

COMIM5.2.8

RECEIPT AT SITE OF HEAT TRACING

COMIM5.2.9

RECEIPT AT SITE OF HV / LV SWITCHGEAR

COMIM5.3.1

COMP. INSTAL. OF STEAM GENERATION PACKAGE

COMIM5.3.10

COMP. INSTAL. OF HV / LV SWITCHGEAR

COMIM5.3.11

COMP. INSTAL. OF FIRE WATER AND JOCKEY PUMPS

COMIM5.3.13

COMP. INSTAL. OF FREE-ISSUE ITEMS

COMIM5.3.14

COMP. INSTAL. OF ALL EXPORT PUMPS

COMIM5.3.15

COMP. INSTAL. OF GAS TURBINES

COMIM5.3.16

COMP. INSTAL. OF SEHMS HARDWARE / EQUIPMENT


COMP. INSTAL. OF CUSTODY TRANSFER METERING
PACKAGE
COMP. INSTAL. OF INSTRUMENT AIR PACKAGE 16-Nov-12
A0

COMIM5.2.6

COMIM5.3.17
COMIM5.3.2

COMIM5.3.5

COMP. INSTAL. OF RAW WATER TREATMENT PACKAGE


COMP. INSTAL. OF TREATED WATER PACKAGE 20-Nov-13
A0
COMP. INSTAL. OF DIESEL GENERATOR PACKAGE 30-Apr12 A 0

COMIM5.3.6

COMP. INSTAL. OF OWS PACKAGE 19-Mar-14 A 0

COMIM5.3.3
COMIM5.3.4

COMIM5.3.8

COMP. INSTAL. OF SEWAGE/EFFLUENT TREATMENT


PACKAGES 13-JunCOMP. INSTAL. OF POWER & DISTRIBUTION
TRANSFORMERS 23-Jul-1

COMIM5.3.9

COMP. INSTAL. OF HEAT TRACING 30-Dec-13 0

COMIM5.4.1

COMPLETION OF SUPER-STRUCTURE FOR ADMIN


BUILDING 01-Nov-12

COMIM5.3.7

COMIM5.4.3

COMPLETION OF SUB-STRUCTURE FOR ADMIN BUILDING


15-May-13 0
COMPLETION OF INTERNAL FIT-OUT FOR CONTROL
BUILDINGS 15-May

COMIM5.5.1

COMPLETION OF WORKSHOP/WAREHOUSE/LABORATORY
15-May-13 0

COMIM5.4.2

COMIM5.5.4

COMPLETION OF ADMINISTRATION BDLG 15-May-13 0


COMPLETION OF SECURITY BUILDINGS & CABINS 15-May13 0
COMPLETION OF FIRE STATION & MEDICAL CENTRE 15May-13 0

COMIM5.5.5

COMPLETION OF MAIN PLANT SUBSTATION 15-May-13 0

COMIM5.5.6

COMPLETION OF 11KV SUBSTATION 15-May-13 0

COMIM5.5.7

COMPLETION OF SEHMS SUBSTATION 15-May-13 0

COMIM5.5.8

COMPLETION OF MAIN DG ROOM 15-May-13 0

COMIM5.5.9

COMPLETION OF VARIOUS MCC ROOMS 03-Jul-13 0

COMIM5.6.1

COMPLETION OF WALLS, FENCING INCL. SECURITY GATES,


CABINS,

COMIM5.6.10

COMPLETION OF ALL OTHER CIVIL, MECHANICAL,


ELECTRICAL & INS

COMIM5.6.12

TEST. & COMMI. OF STEAM GENERATION PACKAGE

COMIM5.6.13

TEST. & COMMI. OF DIESEL GENERATOR PACKAGE

COMIM5.6.14

TEST. & COMMI. OF RAW WATER TREATMENT PACKAGE

COMIM5.6.15

TEST. & COMMI. OF TREATED WATER PACKAGE

COMIM5.6.16

TEST. & COMMI. OF INSTRUMENT AIR PACKAGE

COMIM5.6.17

TEST. & COMMI. OF OWS PACKAGE

COMIM5.5.2
COMIM5.5.3

COMIM5.6.18
COMIM5.6.19

TEST. & COMMI. OF SEWAGE/EFFLUENT TREATMENT


PACKAGES
TEST. & COMMI. OF POWER & DISTRIBUTION
TRANSFORMERS

COMIM5.6.2

COMPLETION OF TERMINAL ROADS AND DRAINS

COMIM5.6.20

TEST. & COMMI. OF HEAT TRACING

COMIM5.6.21

TEST. & COMMI. OF HV / LV SWITCHGEAR

COMIM5.6.22

TEST. & COMMI. OF FIRE WATER AND FOAM SYSTEM

COMIM5.6.24

TEST. & COMMI. OF TERMINAL PIPING

COMIM5.6.25

TEST. & COMMI. OF TERMINAL TANKS FIRE WATER,


CLOSED DRAIN FOAM C...

COMIM5.6.26

TEST. & COMMI. OF DIESEL STORAGE AND DISTRIBUTION


SYSTEM

COMIM5.6.3

COMPLETION OF DRILLING OF 5 BORE WELLS AND


ASSOCIATED PUMP

COMIM5.6.4

COMPLETION OF TERMINAL PIPING, VALVES (INCL FREEISSUE), PIPING RACK.

COMIM5.6.5

COMPLETION OF POWER AND CONTROL CABLING

COMIM5.6.7

COMPLETION OF DIESEL STORAGE AND DISTRIBUTION


SYSTEM

COMIM5.6.8

COMPLETION OF ALL TANKS & VESSELS FIRE WATER,


CLOSED DRAIN, FOA

EPR100

Receive of Package Scheme, Flow Diagrams, system data


sheets, equipment layout

EPR110

Review of Package Scheme, Flow Diagrams, system data


sheets, equipment layout

EPR140

Release of P&ID for package items by IOT

EPR150

Release of Final Equipment Layout drawings, GADs by IOT

EPR160

Participation of Hazop study for package equipments

EPR170

Incorporatiion of recommendations as per Hazop Review

ECV050

Receipt of AFC Architectural Drawing from TCEL / CEIL

ECV100

Receipt of AFC Drawing of Admin Building from TCEL / CEIL

ECV110

Receipt AFC Drawing for Control Building from TCEL / CEIL

ECV120

Receipt of AFC Drawing of canopy at entrance from TCEL /


CEIL

ECV130

Receipt of AFC Drawing of laboratory Building from TCEL /


CEIL

ECV140

Receipt of AFC Drawing of Warehouse/ Workshop Building


from TCEL / CEIL

ECV150

Receipt of AFC Drawing of Electrical substation from TCEL


/ CEIL

ECV160

Receipt AFC Drawing for Fire station Building from TCEL /


CEIL

ECV170

Receipt of AFC Drawing of Medical Centre from TCEL / CEIL

ECV180

Receipt of AFC Drawing for Fire Water Pump House from


TCEL / CEIL

ECV190

Receipt of AFC Drawing for Pump/Package Foundation


from TCEL / CEIL

ECV200

Release of Pipe Sleepers Drgs for Fire Water Network

ECV210

Receipt of AFC Drawing of Roads,Culverts, walkways, etc


from TCEL / CEIL

ECV220

Receipt of AFC Drawing of Dyke wall and Paving in the


Tank Farm from TCEL / CEIL

ECV240

Receipt AFC Drawing of MCC & Substation from TCEL /


CEIL

ECV250

Receipt of AFC Drawing for Drains system from TCEL / CEIL

ECV260

Detail Engineeing for Foundations of Package items

ECV270

Fdn Drgs for Air Compressor 10-Jan-1... 10-Feb-12 A

ECV280

Fdn Drgs for STP Package

ECV290

Fdn Drgs for Water Treatment Package

ECV300

Fdn Drgs for OWS Treatment Package

ECV310

Fdn Drgs for Nitrogen Package

ECV320

Fdn Drgs for Steam Generation Package / Boiler

ECV330

Fdn Drgs for Pumps

ECV340

Fdn Drgs for Fuel & Gas System (KO Drum,Cartridge Filter,
Electric Heater)

ECV350

Fdn Drgs for NGR

ECV360

Fdn Drgs for Transformer

ECV370

Fdn Drgs for SHEMS Transformer

ECV380

Fdn Drgs for Vent Stack

ECV390

Fdn Drgs for DG Set

ECV400

Fdn Drgs for Foam Pump Skid

ECV410

Fdn Drgs for Foam Concentrate Tank

ECV420

Fdn Drgs for Fire Water Tank (New)

ECV430

Fdn Drgs for Fire Water Pump

EPIP090

Incorporate Vendor datas and Finalisation of Plot Plan

EPIP100

Receipt of P&ID Piping Layout, GAD, Sectional Drawings


from TCEL/CEIL

EPIP110

Receipt of Updated PMS and VMS from TCEL / CEIL

EPIP120

Layout & Isometric drgs for U/G Services like OWS / CBD /
Sewage

EPIP130

Layout & Isometric for Fire Water Network

EPIP140

Issue of Piping/ Fitting MTO-1 by IOT

EPIP150

Issue of Piping / Fitting MTO-2

EPIP160

Issue of Isometric from CEIL/Vendor

EPIP170

Detail Engineeing for Package items

EME120

Issue of MR for Oily water/ Sewage water treatment


package

EME140

Issue of MR for Plant and Treated water package

EME150

Issue of MR for Plant and Instrument Air Package

EME160

Issue of MR for Raw Water Treatment Package

EME170

Issue of MR for Steam generation system package

EME175

Issue of MR for Nitrogen Generation System

EME180

Issue of MR for Fuel Gas System

EME220

Issue of MR for Pipes Bulks

EME250

Issue of MR for Fire water pump package

EME260

Issue of MR for Closed Drain Pump

EME270

Issue of MR for Diesel Unloading pump

EME280

Issue of MR for Reinforecement Steel / Structural Steel


Bulk items

EME290

Issue of MR for Air conditioning and Ventiliation system

EME300

Issue of MR for EOT Crane or Material Handling system

EME310

Detail Engineering for Tanks (Fabrication Drawings.)

EEL100

Receipt of SLDs from TCEL / CEIL

EEL120

Receipt of Approved Area classification Drawing from TCEL


/ CEIL

EEL130

Receipt of Approvevd Load List from TCEL / CEIL

EEL140

Issue of MR for Transformer

EEL150

Issue of MR for UPS

EEL160

Issue of MR for Switchgear/Panel

EEL170

Receipt of Approvevd data sheet & Cable Schedule from


TCEL / CEIL

EEL180

Issue of MR C.P. System

EEL190

Issue of MR for DG

EEL200

Issue of MR for Battery and Battery Charger

EEL210

Issue of MR for NGR

EEL220

Detail Engineeing for Package items

EIN100

Receipt of Approvevd instrument index from TCEL / CEIL

EIN110

Receipt of Approvevd I/O list from TCEL / CEIL

EIN120

Receipt of Approvevd Instrument data sheet from TCEL


/CEIL

EIN130

Receipt of Approvevd Instrument Hook up drawing from


TCEL / CEIL 31

EIN140

Issue of MR for Bulk Items (MOV / PCV / Transmitters /


Gauges etc.)

EIN150

Detail Engineeing for Package items

MDPP-FPSC-0001

RECEIPT OF CONSOLIDATED CHANGE LIST ON FPS FROM


CEIL AND CHANGE

MDPP-FPSC-E-00001

RECEIPT OF REVISED PLOT PLAN

MDPP-FPSC-E-0002

FOR FIRE WATER MAIN & JOCKEY PUMP

MDPP-FPSC-E-0003

FOR FOAM CONCENTRATE TANK

MDPP-FPSC-E-0004

FOR FOAM CONCENTRATE

MDPP-FPSC-E-0005

FOR FOAM SYSTEM ACCESSORIES

MDPP-FPSC-E-0006

FOR DELUGE VALVES

MDPP-FPSC-E-0007

FOR STRAINERS

MDPP-FPSC-E-0008

FOR GATE VALVES

MDPP-FPSC-E-0009

FOR CHECK VALVES

MDPP-FPSC-E-0010

FOR ELECTROMAGNETIC FLOW METER

MDPP-FPSC-E-0011

FOR PLC FOR PUMPS

MDPP-FPSC-E-0012

FOR RUBBER EXPANSION BELLOW

MDPP-FPSC-E-0022

FOR CP SYSTEM

MDPP-FPSC-E-0032

FOR FPS-PIPES

MDPP-FPSC-E-0042

FOR FPS-FITTINGS

MDPP-FPSC-E-0052

FOR FPS-FLANGES & MISCELLENOUS

EFI010

Receipt of Input of free issue material from CEIL

EFI030

Receipt of Electrical Input for GT / MAIN LINE PUMP /


BOOSTER PUMPS/ CTM Pkg

EFI040

Receipt of Civil Foundation drawing of free issue material


from CEIL

EFI050

Detail Engineering for Clean agent system, location of Fire


Extinguisher by Vendor

EFI051

Receipt of Hydrant Layout form CEIL/TCE

EBD100

As Built drawing & Final Documentation

SC120

Prep. of Tender & award of contract for all Civil Package


(Road, Dyke wall, drain etc.)

SC140

Finalisation of Civil Contractor for all packages (Equipment


foundations etc.)
Prep. of Tender & award of contract for Building
Contractor

SC160

Prep. of Tender Mechanical ( Piping & Fire Fighting)

SC170

Finalisation of Mechanical Contractor

SC260

Preparation and Issue Tender for Electrical

SC270

Finalisation of Tender for Electrical Contractor

SC180

Preparation and Issue Instrumentation Tender

SC190

Finalisation of Instrumentation Contractor

SC200

Preparation and Issue Tender for piping Insulation

SC210

Finalisation of Tender for Insulation contractor

SC220

Preparation and Issue Tender for Painting

SC130

SC230

Finalisation of Tender for Painting Contractor

PRE120

Issue Enquiry

PRE122
PRE123

Bids received
TBA / CBA

PRE124

Ordering for Oily water treatment package

PRE130

Mfg and Del at site-Oily water treatment package

PRE191

Issue Enquiry

PRE192
PRE193

Bids received
TBA / CBA

PRE194

Ordering of Raw Water Treatment Package

PRE195

Mfg and Del at site-Water Treatment Package

PRE160

Issue Enquiry1

PRE162
PRE163

Bids received
TBA / CBA

PRE164

Ordering for Sewage water treatment package

PRE170

Mfg and Del at site- Sewage water treatment package

PRE100

Issue Enquiry

PRE102
PRE103

Bids received
TBA / CBA

PRE104

Ordering for Closed Drain Pump

PRE110

Mfg and Del at site-Closed Drain pump

PRE260

Issue Enquiry

PRE262
PRE263

Bids received
TBA / CBA

PRE264

Ordering for Diesel unloading pump

PRE270

Mfg and Del at site-Diesel unloading pump

PRE272
PRE273

Bids received
TBA / CBA

PRE274

Ordering for Interface Transfer Pump

PRE280

Issue Enquiry

PRE290

Mfg and Del at site-Interface Transfer Pump

Struct

ural Steel / Reinforcement Steel/ Plates

PRE300

Issue Enquiry

PRE302
PRE303

Bids received
TBA / CBA

PRE304

Ordering of Structural Steel / Reinforcement Steel

PRE310

Mfg and Del at site-Structural steel and Plate

PRE180

Issue Enquiry

PRE182
PRE183

Bids received
TBA / CBA

PRE184

Ordering of Air Compressor

PRE190

Mfg and Del at site-Air Compressor-(Dryer & receiver


pending)
en Package

PRE201

Issue Enquiry

PRE202
PRE203

Bids received
TBA / CBA

PRE204

Ordering for Nitrogen Generation System

PRE210

Mfg and Del at site-Nitrogen Generation System

PRE340

Issue Enquiry

PRE342
PRE343

Bids received
TBA / CBA

PRE345

Ordering of Air conditioning and Ventiliation system

PRE350

Mfg and Del at site-Air conditioning and Ventiliation


system

PRE360

Issue Enquiry

PRE362
PRE363

Bids received
TBA / CBA

PRE364

Ordering of -EOT Crane or Material Handling system

PRE370

Mfg and Del at site-EOT Crane


Gas System

PRE400

Issue Enquiry

PRE402
PRE403

Bids received
TBA / CBA

PRE405

Ordering of Fuel & Gas System

PRE410

Mfg and Del at site-Fuel & Gas System


Generation System / Boiler

PRE420

Issue Enquiry

PRE422
PRE423

Bids received
TBA / CBA

PRE424

Ordering of Steam generation system

PRE430

Mfg and Del at site-Steam generation system

PRE434

Ordering of SMC Panel Tank

PRE470

Mfg and Del at site-SMC Panel Tank


ighting System

PRE440

Issue Enquiry

PRE442
PRE443

Bids received
TBA / CBA

PRE444

Ordering of Fire Fighting System

PRE450

Mfg and Del at site of Fire Fighting System

PPIP100

Issue Enquiry

PPIP102
PPIP103

Bids received
TBA / CBA

PPIP104

Ordering of Fire Fighting System

PPIP110

Mfg and Del at site of Fire Fighting System


2nd MTO 15-Feb-1... 14-Nov-12 A 79

PPIP120

Issue Enquiry

PPIP122
PPIP123

Bids received
TBA / CBA

PPIP124

Ordering of Fire Fighting System

PPIP130

Mfg and Del at site of Fire Fighting System


s / Flanges 12-Oct-1... 04-Jul-13 193

PPIP140

Issue Enquiry

PPIP142
PPIP143

Bids received
TBA / CBA

PPIP144

Ordering of Fire Fighting System

PPIP150

Mfg and Del at site of Fire Fighting System


Ball Valve 27-Sep-1... 22-Jul-13 301

PRE320

Issue Enquiry

PRE322
PRE323

Bids received
TBA / CBA

PRE324

Ordering of Fire Fighting System

PRE330

Mfg and Del at site of Fire Fighting System


CAL 21-Sep-1... 20-Sep-13 438
witchgear 23-Sep-1... 08-May-12 A 177

PELE131

Issue Enquiry

PELE132
PELE133

Bids received
TBA / CBA

PELE134

Ordering of Fire Fighting System

PELE135

Mfg and Del at site of Fire Fighting System


itchgear 22-Sep-1... 13-Jul-12 A 184

PELE120

Issue Enquiry

PELE122
PELE124

Bids received
TBA / CBA

PELE125

Ordering of Fire Fighting System

PELE130

Mfg and Del at site of Fire Fighting System


ution Transformer 21-Sep-1... 12-Mar-12 A 192

EPR130

Preparation of Detail specifications, data sheets, standard


drawings and documents

PELE151

Issue Enquiry

PELE152
PELE153

Bids received
TBA / CBA

PELE154

Ordering of Fire Fighting System

PELE155

Mfg and Del at site of Fire Fighting System


anel 22-Sep-1... 13-Nov-12 A 177

PELE100

Issue Enquiry

PELE102
PELE104

Bids received
TBA / CBA

PELE105

Ordering of Fire Fighting System

PELE110

Mfg and Del at site of Fire Fighting System


ransformer 21-Sep-1... 12-Nov-12 A 201

PELE140

Issue Enquiry

PELE141
PELE142

Bids received
TBA / CBA

PELE143

Ordering of Fire Fighting System

PELE150

Mfg and Del at site of Fire Fighting System


21-Sep-1... 21-Apr-12 A 248

PELE160

Issue Enquiry

PELE162
PELE163

Bids received
TBA / CBA

PELE164

Ordering of Fire Fighting System

PELE170

Mfg and Del at site of Fire Fighting System


21-Sep-1... 03-Dec-12 A 152

PELE180

Issue Enquiry

PELE182
PELE183

Bids received
TBA / CBA

PELE184

Ordering of Fire Fighting System

PELE190

Mfg and Del at site of Fire Fighting System


attery Charger 04-Oct-1... 05-Nov-11 A 227

PELE200

Issue Enquiry

PELE202
PELE203

Bids received
TBA / CBA

PELE204

Ordering of Fire Fighting System

PELE210

Mfg and Del at site of Fire Fighting System


acing System 25-Nov-1... 20-Sep-13 433

PELE220

Issue Enquiry

PELE222
PELE223

Bids received
TBA / CBA

PELE224

Ordering of Fire Fighting System

PELE230

Mfg and Del at site of Fire Fighting System


em 04-Nov-1... 30-Jan-12 A 196

PELE240

Issue Enquiry

PELE242
PELE243

Bids received
TBA / CBA

PELE244

Ordering of Fire Fighting System

PELE250

Mfg and Del at site of Fire Fighting System


cal Bulk Material 04-Oct-1... 01-Jul-13 187

PELE260

Issue Enquiry

PELE262
PELE263

Bids received
TBA / CBA

PELE264

Ordering of Fire Fighting System

PELE270

Mfg and Del at site of Fire Fighting System


Oct-1... 31-Dec-10 A 149

PELE280

Issue Enquiry

PELE282
PELE283

Bids received
TBA / CBA

PELE284

Ordering of Fire Fighting System

PELE290

Mfg and Del at site of Fire Fighting System


ENTATION 21-Sep-1... 05-Aug-13 452
rm Management System (TFMS) 22-Sep-1... 30-Nov-12 A
145

PINS100

Issue Enquiry

PINS102
PINS103

Bids received
TBA / CBA

PINS104

Ordering of Fire Fighting System

PINS110

Mfg and Del at site of Fire Fighting System


Valve / MOV/On-Off /ESV 23-Sep-1... 05-Aug-13 249

PINS120

Issue Enquiry

PINS122
PINS123

Bids received
TBA / CBA

PINS124

Ordering of Fire Fighting System

PINS130

Mfg and Del at site of Fire Fighting System


entation Bulk items 02-Oct-1... 15-Jul-13 186

PINS140

Issue Enquiry

PINS142
PINS143

Bids received
TBA / CBA

PINS144

Ordering of Fire Fighting System

PINS150

Mfg and Del at site of Fire Fighting System


ent Cables 21-Sep-1... 21-Jul-13 237

PINS160

Issue Enquiry

PINS162
PINS163

Bids received
TBA / CBA

PINS164

Ordering of Fire Fighting System

PINS170

Mfg and Del at site of Fire Fighting System


tion Detection System 16-Jan-1... 13-Apr-12 A 156

PINS172
PINS173

Issue Enquiry
Bids received

PINS174

TBA / CBA

PINS180

Ordering of Fire Fighting System

PINS190

Mfg and Del at site of Fire Fighting System


Gas Detection System 12-Oct-1... 20-Jul-13 236

PINS182
PINS183

Issue Enquiry
Bids received

PINS184

TBA / CBA

PINS200

Ordering of Fire Fighting System

PINS210

Mfg and Del at site of Fire Fighting System


n Blanketing Valves 19-Nov-1... 01-May-12 A 157

PINS192
PINS193

Issue Enquiry
Bids received

PINS194

TBA / CBA

PINS220

Ordering of Fire Fighting System

PINS230

Mfg and Del at site of Fire Fighting System


ents Cable Trays / Conduits 02-Jan-1... 10-Jun-13 93

PINS202
PINS203

Issue Enquiry
Bids received

PINS204

TBA / CBA

PINS240

Ordering of Fire Fighting System

PINS250

Mfg and Del at site of Fire Fighting System

Instruments 16-Nov-1... 23-Sep-11 A 170


PINS212
PINS213

Issue Enquiry
Bids received

PINS214

TBA / CBA

PINS260

Ordering of Fire Fighting System

PINS270

Mfg and Del at site of Fire Fighting System

MDPP-FPSC-P-00IS01

ISSUE ENQUIRY

MDPP-FPSC-P-00R1E1

RECEIPT BIDS

MDPP-FPSC-P-00T2E1

TECHNICAL BID ANALYSIS

MDPP-FPSC-P-00C3O1

COMMERCIAL BID ANALYSIS

MDPP-FPSC-P-00IS41

ISSUE LOI

MDPP-FPSC-P-00M51A

MANUFACTURING & DELIVERY AT SITE

MDPP-FPSC-P-00IS61

ISSUE PO / PR TO VENDOR

MDPP-FPSC-P-00R7E1

RECEIPT OF VENDOR DRAWINGS

MDPP-FPSC-P-00A8P1

APPROVAL OF VENDOR DRAWINGS

MDPP-FPSC-P-02IS51

ISSUE ENQUIRY

MDPP-FPSC-P-02R6E1

RECEIPT BIDS

MDPP-FPSC-P-13T2E1

TECHNICAL BID ANALYSIS

MDPP-FPSC-P-13C3O1

COMMERCIAL BID ANALYSIS

MDPP-FPSC-P-13IS41

ISSUE LOI

MDPP-FPSC-P-13M51A

MANUFACTURING & DELIVERY AT SITE

MDPP-FPSC-P-13IS61

ISSUE PO / PR TO VENDOR

MDPP-FPSC-P-13R7E1

RECEIPT OF VENDOR DRAWINGS

MDPP-FPSC-P-13A8P1

APPROVAL OF VENDOR DRAWINGS


ONCENTRATE TANK 03-Jan-1... 26-Mar-12 A 260

MDPP-FPSC-P-00IS91

ISSUE ENQUIRY

MDPP-FPSC-P-01R0E1

RECEIPT BIDS

MDPP-FPSC-P-01T1E1

TECHNICAL BID ANALYSIS

MDPP-FPSC-P-01C2O1

COMMERCIAL BID ANALYSIS

MDPP-FPSC-P-01IS31

ISSUE LOI

MDPP-FPSC-P-01M41A

MANUFACTURING & DELIVERY AT SITE

MDPP-FPSC-P-01IS51

ISSUE PO / PR TO VENDOR

MDPP-FPSC-P-01R6E1

RECEIPT OF VENDOR DRAWINGS

MDPP-FPSC-P-01A7P1

APPROVAL OF VENDOR DRAWINGS

MDPP-FPSC-P-10IS81

ISSUE ENQUIRY

MDPP-FPSC-P-10R9E1

RECEIPT BIDS

MDPP-FPSC-P-11T0E1

TECCHNICAL BID ANALYSIS

MDPP-FPSC-P-11C1O1

COMMMERCIAL BID ANALYSIS

MDPP-FPSC-P-11IS21

ISSUE LOI

MDPP-FPSC-P-11M31A

MANUFACTURING & DELIVERY AT SITE

MDPP-FPSC-P-11IS41

ISSUE ENQUIRY

MDPP-FPSC-P-11R5E1

RECEIPT BIDS

MDPP-FPSC-P-11T6E1

TECCHNICAL BID ANALYSIS

MDPP-FPSC-P-11C7O1

COMMMERCIAL BID ANALYSIS

MDPP-FPSC-P-11IS81

ISSUE LOI

MDPP-FPSC-P-11M91A
FIRE PROTECTION SY

MANUFACTURING & DELIVERY AT SITE


ROTECTION SYSTEM-FITTINGS 28-Jul-11 A 08-May-12 A
187

MDPP-FPSC-P-12IS01

ISSUE ENQUIRY

MDPP-FPSC-P-12R1E1

RECEIPT BIDS

MDPP-FPSC-P-12T2E1

TECCHNICAL BID ANALYSIS

MDPP-FPSC-P-12C3O1

COMMMERCIAL BID ANALYSIS

MDPP-FPSC-P-12IS41

ISSUE LOI

MDPP-FPSC-P-12M51A

MANUFACTURING & DELIVERY AT SITE


ROTECTION SYSTEM-FLANGES & MISC. 29-Jul-11 A 05-Jun12 A 214

MDPP-FPSC-P-12IS61

ISSUE ENQUIRY

MDPP-FPSC-P-12R7E1

RECEIPT BIDS

MDPP-FPSC-P-12T8E1

TECCHNICAL BID ANALYSIS

MDPP-FPSC-P-12C9O1

COMMMERCIAL BID ANALYSIS

MDPP-FPSC-P-13IS01

ISSUE LOI

MDPP-FPSC-P-13M11A

MANUFACTURING & DELIVERY AT SITE


ONCENTRATE 24-Jan-1... 15-May-13 195

MDPP-FPSC-P-01IS81

ISSUE ENQUIRY

MDPP-FPSC-P-01R9E1

RECEIPT BIDS

MDPP-FPSC-P-02T0E1

TECCHNICAL BID ANALYSIS

MDPP-FPSC-P-02C1O1

COMMMERCIAL BID ANALYSIS

MDPP-FPSC-P-02IS21

ISSUE LOI

MDPP-FPSC-P-02P3R1

MANUFACTURING & DELIVERY AT SITE

MDPP-FPSC-P-02IS41

ISSUE PO / PR TO VENDOR
YSTEM ACCESSORIES 10-Nov-1... 27-Aug-13 379

MDPP-FPSC-P-02IS71

ISSUE ENQUIRY

MDPP-FPSC-P-02R8E1

RECEIPT BIDS

MDPP-FPSC-P-02T9E1

TECCHNICAL BID ANALYSIS

MDPP-FPSC-P-03C0O1

COMMMERCIAL BID ANALYSIS

MDPP-FPSC-P-03IS11

ISSUE LOI

MDPP-FPSC-P-03M21A

MANUFACTURING & DELIVERY AT SITE

MDPP-FPSC-P-03IS31

ISSUE PO / PR TO VENDOR

MDPP-FPSC-P-03R4E1

RECEIPT OF VENDOR DRAWINGS

MDPP-FPSC-P-03A5P1

APPROVAL OF VENDOR DRAWINGS


VALVES 19-Jan-1... 06-Nov-12 A 433

MDPP-FPSC-P-03IS61

ISSUE ENQUIRY

MDPP-FPSC-P-03R7E1

RECEIPT BIDS

MDPP-FPSC-P-03T8E1

TECCHNICAL BID ANALYSIS

MDPP-FPSC-P-03C9O1

COMMMERCIAL BID ANALYSIS

MDPP-FPSC-P-04IS01

ISSUE LOI

MDPP-FPSC-P-04M11A

MANUFACTURING & DELIVERY AT SITE

MDPP-FPSC-P-04IS21

ISSUE PO / PR TO VENDOR

MDPP-FPSC-P-04R3E1

RECEIPT OF VENDOR DRAWINGS


APPROVAL OF VENDOR DRAWINGS
ERS 02-Mar-1... 12-Aug-13 358

MDPP-FPSC-P-04IS51

ISSUE ENQUIRY

MDPP-FPSC-P-04R6E1

RECEIPT BIDS

MDPP-FPSC-P-04T7E1

TECCHNICAL BID ANALYSIS

MDPP-FPSC-P-04C8O1

COMMMERCIAL BID ANALYSIS

MDPP-FPSC-P-04IS91

ISSUE LOI

MDPP-FPSC-P-05M01A

MANUFACTURING & DELIVERY AT SITE

MDPP-FPSC-P-05IS11

ISSUE PO / PR TO VENDOR

MDPP-FPSC-P-05R2E1

RECEIPT OF VENDOR DRAWINGS

MDPP-FPSC-P-05A3P1

APPROVAL OF VENDOR DRAWINGS


ALVES 02-Aug-1... 15-Jul-13 222

MDPP-FPSC-P-05IS41

ISSUE ENQUIRY

MDPP-FPSC-P-05R5E1

RECEIPT BIDS

MDPP-FPSC-P-05T6E1

TECCHNICAL BID ANALYSIS

MDPP-FPSC-P-05C7O1

COMMMERCIAL BID ANALYSIS

MDPP-FPSC-P-05IS81

ISSUE LOI

MDPP-FPSC-P-05M91A

MANUFACTURING & DELIVERY AT SITE

MDPP-FPSC-P-06IS01

ISSUE PO / PR TO VENDOR

MDPP-FPSC-P-06R1E1

RECEIPT OF VENDOR DRAWINGS

MDPP-FPSC-P-06A2P1

APPROVAL OF VENDOR DRAWINGS


VALVES 03-Aug-1... 27-Jun-13 203

MDPP-FPSC-P-06IS31

ISSUE ENQUIRY

MDPP-FPSC-P-06R4E1

RECEIPT BIDS

MDPP-FPSC-P-06T5E1

TECCHNICAL BID ANALYSIS

MDPP-FPSC-P-06C6O1

COMMMERCIAL BID ANALYSIS

MDPP-FPSC-P-06IS71

ISSUE LOI

MDPP-FPSC-P-06M81A

MANUFACTURING & DELIVERY AT SITE

MDPP-FPSC-P-06IS91

ISSUE PO / PR TO VENDOR

MDPP-FPSC-P-07R0E1

RECEIPT OF VENDOR DRAWINGS

MDPP-FPSC-P-07A1P1

APPROVAL OF VENDOR DRAWINGS


OMAGNETIC FLOW METER 03-Jan-1... 22-May-13 239

MDPP-FPSC-P-07IS21

ISSUE ENQUIRY

MDPP-FPSC-P-07R3E1

RECEIPT BIDS

MDPP-FPSC-P-07T4E1

TECCHNICAL BID ANALYSIS

MDPP-FPSC-P-07C5O1

COMMMERCIAL BID ANALYSIS

MDPP-FPSC-P-07IS61

ISSUE LOI

MDPP-FPSC-P-07M71A

MANUFACTURING & DELIVERY AT SITE

MDPP-FPSC-P-07IS81

ISSUE PO / PR TO VENDOR

MDPP-FPSC-P-07R9E1

RECEIPT OF VENDOR DRAWINGS

MDPP-FPSC-P-08A0P1

APPROVAL OF VENDOR DRAWINGS


R PUMPS 11-Jan-1... 17-Aug-11 A 482

MDPP-FPSC-P-08IS11

ISSUE ENQUIRY

MDPP-FPSC-P-08R2E1

RECEIPT BIDS

MDPP-FPSC-P-08T3E1

TECCHNICAL BID ANALYSIS

MDPP-FPSC-P-08C4O1

COMMMERCIAL BID ANALYSIS

MDPP-FPSC-P-08IS51

ISSUE LOI

MDPP-FPSC-P-08M61A

MANUFACTURING & DELIVERY AT SITE

MDPP-FPSC-P-08IS71

ISSUE PO / PR TO VENDOR

MDPP-FPSC-P-08R8E1

RECEIPT OF VENDOR DRAWINGS

MDPP-FPSC-P-08A9P1

APPROVAL OF VENDOR DRAWINGS


EXPANSION BELLOW 09-Mar-1... 13-Oct-12 A 114

MDPP-FPSC-P-09IS01

ISSUE ENQUIRY

MDPP-FPSC-P-09R1E1

RECEIPT BIDS

MDPP-FPSC-P-09T2E1

TECCHNICAL BID ANALYSIS

MDPP-FPSC-P-09C3O1

COMMMERCIAL BID ANALYSIS

MDPP-FPSC-P-09IS41

ISSUE LOI

MDPP-FPSC-P-09M51A

MANUFACTURING & DELIVERY AT SITE

MDPP-FPSC-P-09IS61

ISSUE PO / PR TO VENDOR

MDPP-FPSC-P-09R7E1

RECEIPT OF VENDOR DRAWINGS

MDPP-FPSC-P-09A8P1

APPROVAL OF VENDOR DRAWINGS


TEM 10-Mar-1... 20-Jul-11 A 157

MDPP-FPSC-P-09IS91

ISSUE ENQUIRY

MDPP-FPSC-P-10R0E1

RECEIPT BIDS

MDPP-FPSC-P-10T1E1

TECCHNICAL BID ANALYSIS

MDPP-FPSC-P-10C2O1

COMMMERCIAL BID ANALYSIS

MDPP-FPSC-P-10IS31

ISSUE LOI

MDPP-FPSC-P-10M41A

MANUFACTURING & DELIVERY AT SITE

MDPP-FPSC-P-10IS51

ISSUE PO / PR TO VENDOR

MDPP-FPSC-P-10R6E1

RECEIPT OF VENDOR DRAWINGS

MDPP-FPSC-P-10A7P1

APPROVAL OF VENDOR DRAWINGS

PRFI001

Delivery at Site of GT

PRFI011

Delivery at Site of Export Booster Pumps

PRFI021

Delivery at Site of Custody Transfer Metering system

PRFI031

Delivery at Site of Butterfly/Ball Valves above

CNCM001

Site Mobilization

CNCM011

Camp Establishment

CNM100

Mobilise Civil Contractor - For Roads, Dyke Wal

CNM105

Mobilise Civil Contractor - For Packages (foundations etc.)

CNM110

CNM140

Mobilise Building Contractor


Mobilise Mechanical / Piping Contractor 07-Apr-1... 30Apr-11 A 15
Mobilization of Batching Plant-II 28-Oct-1... 03-Dec-10 A
45

CNM150

Mobilise Contractor- Instrumentation Contractor 24-May1... 13-Jun-11 A 20

CNM130

CNM160
CNM180
CNM190

CNCV550
CNCV592
CNCV610
CNCV651

CNCV270
CNCV331
CNCV332

Mobilise Electrical Contractor 03-May-1... 25-May-11 A 12


Mobilise Insulation & C.P. Contractor 02-Nov-1... 22-Nov11 A 15
Mobilise Plant and Machinery at site 31-Dec-1... 02-Mar11 A 90
1 23-Nov-1... 06-Jan-14 846
OIL TANKS (TAG NO.-2,3,4) 11-Feb-1... 04-May-13 A 357
uction of Vertical Dyke Wall V-2 11-Feb-1... 07-Jun-11 A
183
0 Release of Front 11-Feb-11 A 0
2 RCC 17-Mar-1... 07-Jun-11 A 72
0 Excavation 22-Feb-1... 28-Feb-11 A 15
1 PCC 02-Mar-1... 09-Mar-11 A 15
uction of Horizontal Dyke Wall H-1 18-Apr-1... 06-Nov-12 A
273
0 Release of Front 15-Feb-12 A 0
1 PCC 11-Mar-1... 03-Sep-12 A 101
2 RCC 18-Apr-1... 06-Nov-12 A 150

CNCV390

CNCV612
CNCV640
CNCV650
CNCV671

CNCV602
CNCV620
CNCV630
CNCV661

CNCV622
CNCV660
CNCV670
CNCV681
Constru
CNCV280
CNCV352
CNCV400
CNCV401

CNCV310
CNCV362
CNCV410
CNCV411

CNCV382
CNCV431
CNCV440
CNCV450

CNCV372

0 Excavation 22-Feb-1... 18-Jul-12 A 97


uction of Vertical Dyke Wall V-4 15-Jul-12 A 03-Nov-12 A
68
2 RCC 10-Sep-1... 03-Nov-12 A 79
0 Release of Front 15-Jul-12 A 0
0 Excavation 30-Jul-12 A 08-Aug-12 A 15
1 PCC 13-Aug-1... 29-Aug-12 A 15
uction of Vertical Dyke Wall V-3 15-Feb-1... 11-Jun-12 A
317
2 RCC 23-Mar-1... 11-Jun-12 A 79
0 Release of Front 15-Feb-12 A 0
0 Excavation 22-Feb-1... 28-Feb-12 A 15
1 PCC 02-Mar-1... 15-Mar-12 A 15
uction of Vertical Dyke Wall V-5 17-Feb-1... 25-Jun-12 A
320
2 RCC 21-Mar-1... 25-Jun-12 A 80
0 Release of Front 17-Feb-12 A 0
0 Excavation 20-Feb-1... 29-Feb-12 A 15
1 PCC 06-Mar-1... 16-Mar-12 A 15
uction of Horizontal Dyke Wall H-2 15-Feb-1... 18-Aug-12 A
274
0 Release of Front 15-Feb-12 A 0
2 RCC 06-Mar-1... 18-Aug-12 A 152
0 Excavation 21-Feb-1... 27-Mar-12 A 97
1 PCC 01-Mar-1... 03-Jul-12 A 101
uction of Horizontal Dyke Wall H-3 15-Feb-1... 04-Dec-12 A
200
0 Release of Front 15-Feb-12 A 0
2 RCC 31-Jul-12 A 04-Dec-12 A 84
0 Excavation 15-Feb-1... 11-Apr-12 A 35
1 PCC 31-May-1... 20-Jun-12 A 65
uction of Vertical Dyke Wall V-8 07-Feb-1... 04-Aug-12 A
247
2 RCC 30-May-1... 04-Aug-12 A 90
1 PCC 30-Mar-1... 05-Jun-12 A 75
0 Release of Front 07-Feb-12 A 0
0 Excavation 10-Feb-1... 22-Mar-12 A 45
uction of Vertical Dyke Wall V-7 09-Feb-1... 03-Apr-13 A
103
2 RCC 02-May-1... 21-Aug-12 A 90

CNCV420
CNCV421

0 Release of Front 09-Feb-12 A 0


1 PCC 11-Apr-1... 11-Jul-12 A 75

CNCV430

0 Excavation 15-Feb-1... 03-Apr-13 A 45


uction of Vertical Dyke Wall V-6 16-Feb-1... 04-Sep-12 A
355
2 RCC 12-Apr-1... 04-Sep-12 A 90
1 PCC 30-Mar-1... 10-Jul-12 A 75
0 Release of Front 16-Feb-12 A 0

CNCV402
CNCV451
CNCV480
CNCV490

CNCV392
CNCV441
CNCV460

0 Excavation 22-Feb-1... 22-Mar-12 A 35


uction of Vertical Dyke Wall V-1 26-Dec-1... 13-Jun-12 A
266
2 RCC 14-Mar-1... 13-Jun-12 A 60
1 PCC 24-Jan-1... 17-Apr-12 A 45
0 Release of Front 26-Dec-11 A 0

CNCV412
CNCV461
CNCV500

0 Excavation 02-Jan-1... 31-Jan-12 A 35


uction of Vertical Dyke Wall V-9 18-Jan-1... 04-May-13 A
98
2 RCC 02-Mar-1... 04-May-13 A 58
1 PCC 29-Feb-1... 20-Mar-13 A 47
0 Release of Front 18-Jan-12 A 0

CNCV510

0 Excavation 08-Feb-1... 04-Mar-12 A 35

CNCV470

MANIFOLD,BOOSTER AND EXPORT PUMPS ETC (TAG22,25 & 70) 15-Jun-1... 25-Jun-13 482
Export

Booster Pumps 14-Nov-1... 31-May-12 A 182

CNCV380

0 Excavation 14-Nov-1... 16-Nov-11 A 6

CNCV385

5 Foundation 15-Nov-1... 07-Dec-11 A 21


Installation of Export and Booster Pump 21-Apr-1... 31May-12 A 31

INT150

& Booster Pump House (SHED) 03-Oct-1... 25-Jun-13 334


CNCV224

4 Brick works -deleted 31-May-1... 31-May-12 A 45

CNCV232

2 Superstructure -deleted 31-May-1... 31-May-12 A 75


3 Structural Fab.,Shot Blasting & primer Painting 29-May1... 25-Jun-13 60
4 Structural Erection & Final painting 12-Sep-1... 26-Oct-12
A 45

CNCV233
CNCV234

CNCV251

1 Substructure 03-Oct-1... 10-Jan-12 A 60

CNCV324

4 Sheet Fixing 08-Aug-1... 20-Sep-12 A 45

CNCV445

5 Finishing (Paving,Elect. Inst.,Doors & Window


fixing,Painting) 12-Jun-1... 15-Oct-12 A 8
y Transfer Metering (CTM) 16-Nov-1... 15-Mar-12 A 68

CNCV370

0 Excavation 16-Nov-1... 22-Nov-11 A 15

CNCV375

5 Foundation 26-Dec-1... 17-Jan-12 A 31


Installation of Custody Transfer Metering 15-Feb-1... 15Mar-12 A 21

INT140

Room for CTM 19-Dec-1... 14-Nov-12 A 270

CNCV253

2 Superstructure 01-Mar-1... 26-Mar-12 A 65


3 Structural Fab.,Shot Blasting & primer Painting 01-May1... 25-Jul-12 A 60

CNCV474

4 Brick works 10-Apr-1... 13-Jun-12 A 45

CNCV242

CNCV484

5 Finishing (Paving,Elect. Inst.,Doors & Window


fixing,Painting) 25-Jun-1... 08-Aug-12 A 7
4 Structural Erection & Final painting 12-Sep-1... 14-Nov12 A 60

CNCV494

4 Sheet Fixing 23-Oct-1... 07-Nov-12 A 30

CNCV761

1 Substructure 19-Dec-1... 25-Feb-12 A 45

CTM Pac

ckage Shed 15-Jun-1... 29-Nov-12 A 482

CNCV181

1 Substructure 15-Jun-1... 25-Jan-12 A 60

CNCV184

4 Sheet Fixing 01-Jun-1... 04-Aug-12 A 45

CNCV192

2 Superstructure 26-Jan-1... 02-May-12 A 75

CNCV193

3 Masonary 17-May-1... 19-Jun-12 A 45

CNCV475

CNCV255
CNCV691

5 Finishing ( Elect. Inst.,Doors & Window fixing,Painting)


02-Jul-12 A 29-Nov-12 A 110
1 Structural Fab.,Shot Blasting & primer Painting 26-Jan1... 10-May-12 A 75

CNCV701

1 Structural Erection. & final Painting 07-Aug-1... 23-Aug12 A 110


NKS (TAG NO-44,45 & 46) 0
NIFOLD,EXPORT PUMP (TAG NO-65,66 & 67) 03-Oct-1... 19Dec-12 A 357
ace Storage tanks 03-Oct-1... 31-May-12 A 80

CNCV132

2 Excavation 03-Oct-1... 25-Nov-11 A 15

CNCV134

4 Barbending 28-Oct-1... 22-Nov-11 A 25

CNCV136
CNCV138

6 Form Work 28-Oct-1... 22-Nov-11 A 25


8 RCC 29-Dec-1... 05-Feb-12 A 35

CNCV140

0 Backfilling & Compaction 02-Apr-1... 31-May-12 A 8

CNCV158

ace Transfer Pump Bay 06-Jul-12 A 30-Aug-12 A 222


8 RCC 14-Jul-12 A 14-Jul-12 A 35

CNCV210
CNCV244

0 Backfilling & Compaction 19-Jul-12 A 28-Jul-12 A 10


4 Barbending 09-Jul-12 A 11-Jul-12 A 3

CNCV246

6 Form Work 11-Jul-12 A 13-Jul-12 A 25

CNCV262

2 Excavation 06-Jul-12 A 11-Jul-12 A 15


0 Installation of Interface Transfer pump 08-Aug-1... 30Aug-12 A 15

CNEQ180

ACE HOLDUP TANK 01-Mar-1... 19-Dec-12 A 204


CNME460

0 Fabtication of Tank 01-Mar-1... 02-Jul-12 A 90

CNME470

0 Erection of Tank 15-Jun-1... 05-Nov-12 A 65

CNME480

0 Hydrotesting of Tank 20-Nov-1... 30-Nov-12 A 10

CNME490

0 Painting of Tank 01-Dec-1... 19-Dec-12 A 21


ACE STORAGE TANK-DYKE WALL 10-Jul-12 A 29-Aug-12 A
53

CNCV520

0 Excavation 10-Jul-12 A 14-Jul-12 A 11

CNCV632
CNCV711

2 RCC & RELATED FACILITIES 02-Aug-1... 29-Aug-12 A 75


1 PCC 13-Jul-12 A 31-Jul-12 A 21
ACE HOLD UP TANK-DYKE WALL 08-Aug-1... 22-Nov-12 A
111

CNCV530

0 Excavation 08-Aug-1... 15-Aug-12 A 90

CNCV642
CNCV721

2 RCC & RELATED FACILITIES 25-Oct-1... 14-Nov-12 A 120


1 PCC 06-Sep-1... 22-Nov-12 A 90
ALL AROUND TANK -9,10,11 25-May-1... 07-Nov-12 A 131

CNCV662

2 RCC & RELATED FACILITIES 16-Aug-1... 07-Nov-12 A 120

CNCV680
CNCV741

0 Excavation 25-May-1... 14-Jul-12 A 90


1 PCC 28-May-1... 28-Aug-12 A 90
MPRESSOR & PSA NITROGEN SYSTEM (TAG NO-12) 22-Jan1... 20-Dec-12 A 380
mpressor 22-Jan-1... 23-Aug-12 A 119

CNCV273
CNCV283

3 Earth Work 22-Jan-1... 24-Mar-12 A 26


3 PCC 26-Mar-1... 26-Mar-12 A 36

CNCV313

3 Barbending 26-Mar-1... 30-Mar-12 A 31

CNCV323
CNCV333

3 Form Work 26-Mar-1... 30-Mar-12 A 31


3 RCC 31-Mar-1... 31-Mar-12 A 46

CNCV442

2 Back filling & Compaction 16-Apr-1... 23-Apr-12 A 11


0 Installation of Air Compressor 15-May-1... 23-Aug-12 A
61
en Package 20-Mar-1... 17-Sep-12 A 295

CNEQ120

CNCV276
CNCV286

6 Earth Work 20-Mar-1... 24-Mar-12 A 26


6 PCC 26-Mar-1... 26-Mar-12 A 31

CNCV296

6 Barbending 26-Mar-1... 30-Mar-12 A 31

CNCV306
CNCV316

6 Form Work 26-Mar-1... 30-Mar-12 A 31


6 RCC 31-Mar-1... 16-May-12 A 46

CNCV472

2 Back filling & Compaction 30-May-1... 05-Jun-12 A 11


0 Installation of Nitrogen Generation Package 21-Aug-1...
17-Sep-12 A 46

CNEQ130

mpressor Shed 22-Jan-1... 20-Dec-12 A 380


CNCV343
CNCV353

3 Earth Work 22-Jan-1... 25-Mar-12 A 15


3 PCC 26-Mar-1... 26-Mar-12 A 1

CNCV363

3 Barbending 28-Mar-1... 02-Jul-12 A 30

CNCV413

3 Form Work 30-Mar-1... 13-Jul-12 A 30


3 RCC 20-Feb-1... 19-Apr-12 A 40
3 Structural Fab. Shot Blasting & Primer painting 15-Jun1... 04-Sep-12 A 60
3 Structural Erection & Final painting 26-Jul-12 A 04-Sep12 A 40
3 Metal Sheet Fixing & Side Cladding 17-Sep-1... 10-Oct-12
A 60

CNCV423

3 Internal & External Painting 15-Nov-1... 20-Dec-12 A 50

CNCV373
CNCV383
CNCV393
CNCV403

AS HANDLING (TAG NO-38) 15-May-1... 02-Oct-12 A 298


as system foundation (KO Drum,Cartridge Filter, Electric
Heater) 15-May-1... 02-Oct-12 A 2
CNCV349
CNCV359

9 Earth Work 15-May-1... 30-May-12 A 26


9 PCC 04-Jun-1... 14-Jun-12 A 6

CNCV369
CNCV379

9 Form Work 20-Jun-1... 04-Jul-12 A 15


9 RCC 10-Jul-12 A 18-Jul-12 A 16

CNCV512

2 Back filling & Compaction 24-Jul-12 A 09-Aug-12 A 10


0 Installation of Fuel & Gas system 03-Sep-1... 02-Oct-12 A
45

CNEQ250

TER SYSTEM (TAG NO-34) 14-Jun-1... 02-Oct-13 307


CNCV414
CNCV424

4 Earth Work 15-Jun-1... 09-Jul-12 A 25


4 PCC 25-Jun-1... 18-Jul-12 A 60

CNCV434

4 Barbending 20-Jul-12 A 22-Aug-12 A 60

CNCV444
CNCV454
CNCV464

4 Form Work 08-Aug-1... 04-Sep-12 A 60


4 RCC 23-Aug-1... 16-Oct-12 A 90
4 Handover of Area 14-Jun-12 A 0

CNCV502

2 Back filling & Compaction 14-Nov-1... 23-Nov-12 A 11

CNEQ185

5 Installation of Raw Water Package(Water Treatment


Package 22-Nov-1... 02-Oct-13 55
TREATMENT SYSTEM (TAG NO-35,36,37,51,56 & 72) 10May-1... 29-Oct-13 369
Treatment Package (WTP) 10-May-1... 29-Oct-13 363

CNCV274
CNCV284

4 Earth Work 10-May-1... 25-May-12 A 26


4 PCC 25-May-1... 30-May-12 A 31

CNCV294

4 Barbending 01-Jun-1... 02-Jul-12 A 31

CNCV304
CNCV314

4 Form Work 06-Jun-1... 03-Jul-12 A 21


4 RCC 06-Jun-1... 18-Jul-12 A 46

CNCV452

2 Back filling & Compaction 01-Aug-1... 13-Aug-12 A 11

CNEQ195

5 Installation Testing & Commissioning of Water


Treatment Package 16-Oct-1... 29-Oct-13 60
d Water Storage Tank (1263-TK-21) 15-Jun-1... 14-Nov-12
A 273

CNME660

0 Pre-Fabtication of Plates 15-Jun-1... 26-Jun-12 A 90

CNME710

0 Hydrotesting of Tank 04-Sep-1... 14-Nov-12 A 10

CNME720

0 Erection & Painting of Tank 11-Jul-12 A 04-Oct-12 A 90


d Water Overhead Storage Tank-(1263-TK-22) 15-Jun-1...
11-Sep-13 107
0 FDN & Fabrication & Erection of SMC Panel Tank 15-Jun1... 11-Sep-13 150
er Tank 15-May-1... 09-Nov-12 A 114

CNEQ200

CNME730

0 Pre-Fabtication of Plates 17-May-1... 18-Jul-12 A 90

CNME740

0 Erection & Painting of Tank 15-May-1... 10-Sep-12 A 90

CNME750

0 Hydrotesting of Tank 10-Oct-1... 09-Nov-12 A 10


Water Storage Tank 11-May-1... 12-Nov-12 A 223

CNME760

0 Pre-Fabtication of Plates 11-May-1... 25-May-12 A 90

CNME770

0 Erection & Painting of Tank 25-May-1... 12-Sep-12 A 90

CNME780
CNCV334

0 Hydrotesting of Tank 04-Nov-1... 12-Nov-12 A 10


REWELL 18-May-1... 29-Oct-13 369
4 DRILLING 18-May-1... 01-Jun-13 45

CNCV354

4 INSTALLATION OF PIPES 18-May-1... 16-Jul-13 60

CNCV364

4 FDN / FIXING OF PUMPS 17-Jul-13 14-Sep-13 60

CNCV374

4 CONNECTION OF PUMPS 31-Aug-13 29-Oct-13 60


GENERATION PLANT (TAG NO-21) 02-Jan-1... 17-Aug-13
404
Generation System / Boiler Foundation 25-Jan-1... 17-Aug13 169

CNCV277
CNCV287

7 Earth Work 25-Jan-1... 15-Feb-12 A 31


7 PCC 31-Jan-1... 09-Mar-12 A 46

CNCV297

7 Barbending 31-Jan-1... 12-Mar-12 A 36

CNCV307
CNCV317

7 Form Work 02-Feb-1... 15-Mar-12 A 36


7 RCC 15-Feb-1... 24-Mar-12 A 76

CNCV482

2 Back filling & Compaction 29-Mar-1... 04-Apr-12 A 11

CNEQ260

0 Installation Testing & Commissioning of Steam


Generation system 04-Sep-1... 17-Aug-13 95
House Shed (32MX24MX9H) 02-Jan-1... 26-Dec-12 A 355

CNCV523
CNCV533

3 Earth Work 02-Jan-1... 06-Jan-12 A 15


3 PCC 09-Jan-1... 20-Jan-12 A 30

CNCV543

3 Barbending 02-Apr-1... 04-Jun-12 A 30

CNCV553

CNCV583

3 Form Work 05-Apr-1... 12-Jun-12 A 30


3 Structural Fab. Shot Blasting & Primer painting 17-May1... 24-Aug-12 A 60
3 RCC 04-Jun-1... 27-Jun-12 A 40
3 Structural Erection & Final painting 20-Jul-12 A 23-Oct12 A 40

CNCV593

3 Sheet Fixing 05-Sep-1... 03-Dec-12 A 80

CNCV603

3 Final Painting 14-Nov-1... 26-Dec-12 A 40


DRAIN SYSTEM (TAG NO-10 & 59) 06-Jun-1... 14-Dec-12 A
380
0 Installation of Closed drain Pump 14-Nov-1... 14-Dec-12
A 30

CNCV563
CNCV573

CNEQ100

DRAIN TANK PIT (CRUDE & LIGHT FLUSING OIL -1 NOS) 22Dec-1... 31-May-12 A 380
CNCV090

0 Excavation 22-Dec-1... 22-Feb-12 A 20

CNCV100

0 Barbending 27-Feb-1... 08-May-12 A 40

CNCV110
CNCV120

0 Form Work 28-Feb-1... 10-May-12 A 10


0 RCC 10-Mar-1... 16-May-12 A 60

CNCV125

5 Backfilling & Compaction 23-May-1... 31-May-12 A 16


DRAIN TANK-FABRICATION (CRUDE & LIGHT FLUSING OIL 1 NOS) 15-May-1... 13-Dec-12 A 237

CNME630

0 Pre-Fabtication & Transportation of Dish End &


Fabrication 15-May-1... 04-Sep-12 A 120

CNME640

0 Erection & Painting of Tank 18-Jul-12 A 22-Nov-12 A 60

CNME650

CNCV540

0 Hydrotesting of Tank 04-Dec-1... 13-Dec-12 A 20


DRAIN TANK-DYKE WALL ( LIGHT & FLUSHING OIL) 06-Jun1... 08-Aug-12 A 122
0 Excavation 06-Jun-1... 09-Jul-12 A 90

CNCV652
CNCV731

2 RCC & RELATED FACILITIES 26-Jun-1... 08-Aug-12 A 120


1 PCC 06-Jun-1... 16-Jul-12 A 90

CNEL190
CNCV561

( TAG NO-52 & 23) 02-Aug-1... 05-Dec-12 A 552


0 Installation of DG set outside of substation bldg 23-Apr1... 12-Sep-12 A 31
Foundation 13-Jan-1... 28-Feb-12 A 64
1 Earth Work 13-Jan-1... 14-Jan-12 A 9

CNCV562
CNCV571
CNCV581

2 Back filling & Compaction 17-Feb-1... 28-Feb-12 A 11


1 PCC 16-Jan-1... 30-Jan-12 A 11
1 RCC 24-Jan-1... 15-Feb-12 A 21
Storage tanks-Foundation 02-Aug-1... 13-Apr-12 A 167

CNCV122

2 Excavation 08-Aug-1... 12-Aug-11 A 20

CNCV124

4 Barbending 13-Aug-1... 18-Feb-12 A 30

CNCV126
CNCV128

6 Form Work 02-Aug-1... 23-Feb-12 A 45


8 RCC 19-Aug-1... 24-Feb-12 A 60

CNCV130

0 Backfilling & Compaction 02-Apr-1... 13-Apr-12 A 20


STORAGE TANK-Fabrication 15-Nov-1... 05-Dec-12 A 356

CNEQ170

0 Installation of Diesel Unloading pump 26-May-1... 09Aug-12 A 15

CNME670

0 Fabtication of Tank 15-Nov-1... 15-Feb-12 A 45

CNME680

0 Erection of Tank 22-May-1... 30-May-12 A 40

CNME690

0 Hydrotesting of Tank 13-Nov-1... 20-Nov-12 A 14

CNME700

0 Painting of Tank 22-Nov-1... 05-Dec-12 A 23


STORAGE TANK-DYKE WALL 21-Mar-1... 06-Jul-12 A 129

CNCV672

2 RCC & RELATED FACILITIES 21-May-1... 06-Jul-12 A 120

CNCV690
CNCV751

0 Excavation 21-Mar-1... 02-Apr-12 A 45


1 PCC 08-Apr-1... 22-May-12 A 90
ROTECTION SYSTEM (TAG NO-18,19,47 & 53) 24-Jan-1...
25-Aug-13 715
P HOUSE 09-Feb-1... 09-Aug-12 A 603

CNCV215

5 Substructure 09-Feb-1... 20-Mar-12 A 45

CNCV216
CNCV218

6 Superstructure 26-Mar-1... 14-Jun-12 A 75


8 Flooring 03-Jul-12 A 09-Aug-12 A 35

FIRE ST
CNCV204

TATION BUILDING ( Drill Yard) 02-Jan-1... 23-Aug-13 A 567


4 Flooring 10-Jul-12 A 28-Jul-12 A 30

CNCV212
CNCV213

2 Superstructure 07-Feb-1... 03-Apr-12 A 95


3 Masonary 21-Mar-1... 13-Jun-12 A 60

CNCV221

1 Substructure 02-Jan-1... 04-Feb-12 A 60


0 Installation of Split Air Conditioner 29-Aug-1... 04-Sep-12
A 10

CNCV350

CNCV050

5 Finishing ( Elect. Inst.,Doors & Window fixing,Painting)


08-Aug-1... 23-Aug-13 A 90
ATER TANK FOUNDATION - 2 NOS 24-Jan-1... 05-Jul-11 A
304
0 Excavation 24-Jan-1... 04-Feb-11 A 8

CNCV060

0 Barbending 31-Jan-1... 31-Mar-11 A 12

CNCV070
CNCV080

0 Form Work 16-Mar-1... 13-Apr-11 A 15


0 RCC 19-Apr-1... 30-May-11 A 90

CNCV425

CNCV085

5 Backfilling & Compaction 15-Jun-1... 05-Jul-11 A 30


ATER TANK FABRICATION - 2 NOS 28-Oct-1... 28-Dec-12 A
423

CNME590

0 Fabtication of Tank 28-Oct-1... 06-Jan-12 A 105

CNME600

0 Erection of Tank 04-Dec-1... 05-Mar-12 A 120

CNME610

0 Hydrotesting of Tank 20-Nov-1... 04-Dec-12 A 90

CNME620

0 Painting of Tank 11-Dec-1... 28-Dec-12 A 90


ATER PUMP HOUSE -SHED 15-Nov-1... 22-Jan-13 A 403

CNCV433
CNCV443

3 Earth Work 15-Nov-1... 09-Jan-12 A 15


3 PCC 09-Feb-1... 20-Mar-12 A 30

CNCV453

3 Barbending 09-Feb-1... 20-Mar-12 A 30

CNCV463

CNCV503

3 Form Work 09-Feb-1... 20-Mar-12 A 30


3 Structural Fab. Shot Blasting & Primer painting 15-Aug1... 29-Nov-12 A 60
3 RCC 26-Mar-1... 16-May-12 A 40
3 Structural Erection & Final painting 27-Sep-1... 13-Nov12 A 40
3 Metal Sheet Fixing & Side Cladding 05-Nov-1... 14-Jan-13
A 80

CNCV513

3 Internal & External Painting 18-Dec-1... 22-Jan-13 A 60

CNCV613

3 Installation of Monorail 16-Nov-1... 13-Dec-12 A 78


Fire Fighting Changes- Construction 15-Feb-1... 25-Aug-13
390
15-Feb-1... 13-Jul-12 A 108
PSCF-DCNC.- 0F0O0R1 FIRE WATER PUMP 24-Feb-1... 30Apr-12 A 45
PSCF-DCNC.- 0F0O1R1 JOCKEY PUMP 07-Mar-1... 30-Apr12 A 45

CNCV473
CNCV483
CNCV493

MDPP-FP
MDPP-FP

MDPP-FP
MDPP-FP

PSCF-DCNC.- 0F0O2R1 FOAM CONCENTRATE TANK 15-Jun1... 13-Jul-12 A 60


PSCF-DCNC.- 0F0O3R1 FIRE WATER TANK (NEW TANK) 15Feb-1... 16-Mar-12 A 60
ICAL & PIPING 05-Mar-1... 09-Aug-13 348

ATER TANK FABRICATION 05-Mar-1... 12-Dec-12 A 312

MDPP-FP

PCSACT-CHCO-D0I0C5 1PROTECTION FOR FIRE WATER


TANK (NEW TANK) 08-May-1... 28-May-12 A 60
PFSACB-CRMICPA-T0I0O5N1 OF PLATES 05-Mar-1... 15May-12 A 50

MDPP-FP

PASLCIG-CNMMPE-0N1T2 &1 ERECTION OF ROLLED


SEGMENTS 16-Apr-1... 03-Oct-12 A 120

MDPP-FP

MDPP-FP
MDPP-FP

MDPP-FP
MDPP-FP
MDPP-FP

MDPP-FP
MDPP-FP
FOAM CO
MDPP-FP
MDPP-FP

MDPP-FP

MDPP-FP

PNSDCT-CMP-0131 27-Nov-1... 12-Dec-12 A 30


PPSICP-INCGM PC-O01N4N1ECTION 05-Jun-1... 10-Oct-12
A 30
ATER PUMP 07-Aug-1... 28-May-13 31
PASSCS-CEMPB-L0Y0,2IN1STALLATION OF FIRE WATER
PUMP 07-Aug-1... 09-Oct-12 A 30
PPSICP-INCGM PC-O00N6N1ECTION 17-Oct-1... 24-May-13
10
PNSDCT-C &M HPY-0D0R7O1TESTING 12-Mar-1... 28-May13 10
PUMP 03-Oct-1... 08-Jun-13 63
PISNCS-TCAMLLPA-0T0IO31N OF JOCKEY PUMP 03-Oct-1...
23-Oct-12 A 12
PPSICP-INCGM PC-O00N8N1ECTION 04-Dec-1... 08-Jun-13
25
ONCENTRATE TANK 12-Sep-1... 09-Aug-13 35
PESRCE-CCMTIPO-N00 A4N1D ALLIGNMENT 12-Sep-1... 04Oct-12 A 12
PPSICP-INCGM PC-O01N0N1ECTION 12-Nov-1... 09-Aug-13
20
ICAL 21-Aug-1... 13-Jun-13 21
PSCIN-CSET-A0L0L0A1TION & TERMINATION OF CABLES 21Aug-1... 13-Jun-13 30
MENTATION 04-Oct-1... 25-Aug-13 65
PSCIN-CSI-T0A0L0L1ATION OF INSTRUMENTATION ITEMS
04-Oct-1... 25-Aug-13 90

DURIATION
25-Oct-10 A

0.00

16-Mar-11 A

0.00

28-Oct-10 A

0.00

16-Mar-11 A

0.00

11-Feb-11 A

0.00

11-Feb-11

0.00

01-Dec-10 A

0.00

01-Dec-10 A

0.00

31-Dec-10 A
09-Jun-11 A
14-Jan-11 A

0.00
0.00
0.00

16-May-12 A

0.00

10-May-12 A

0.00

20-Nov-13 A

0.00

24-Jul-13 A

0.00

05-Aug-13 A

0.00

16-Jul-13 A

0.00

04-Jun-12 A

0.00

11-Oct-12 A

0.00

15-Jul-12 A

0.00

16-Jul-13 A
21-Apr-12 A

0.00
0.00

22-Oct-13 A

0.00

08-Jan-14 A

0.00

15-Jul-13 A

0.00

12-Feb-13 A

0.00

11-Mar-14 A

0.00
18-Nov-13
13-Jan-14

06-Apr-12 A

30.00
40.00
0.00

11-Apr-12 A

0.00

21-Oct-13 A

0.00

27-Mar-12 A

0.00

15-May-13 A

0.00

04-Jun-13 A

0.00

07-Nov-11 A

0.00

10-Apr-12 A

0.00

10-Apr-12 A

0.00

13-Apr-12 A

0.00

05-Jun-12 A

0.00

14-Dec-13 A

0.00

22-Nov-12 A
15-Jul-13 A

0.00
0.00

18-Sep-13 A

0.00

31-May-12 A
16-Aug-12 A

0.00
.11

15-Mar-12 A

0.00

12-Dec-11 A

0.00

29-Dec-11 A

0.00

15-Mar-12 A

0.00

24-Feb-12 A

0.00

15-May-12 A

0.00

24-Feb-12 A

0.00

13-Sep-12 A

0.00

13-Sep-12 A

0.00

20-Nov-13 A

0.00

07-Dec-11 A

0.00

15-Jan-12 A

0.00

17-Jan-12 A

0.00

28-Apr-12 A

0.00

26-Mar-12 A

0.00

14-Nov-12 A

0.00

16-Oct-12 A

0.00

13-Nov-12 A

0.00

18-Sep-13 A

0.00

18-Jul-13 A

0.00

21-Apr-12 A

0.00

15-Nov-12 A

0.00

24-Oct-12 A

0.00

20-Nov-13 A

0.00

21-Oct-13 A

0.00

20-Dec-12 A

0.00

21-Nov-13 A

0.00

23-Jan-13 A

0.00

15-Nov-12 A

0.00

18-Sep-13 A

0.00

22-Jul-13 A

0.00
15-May-13

30.00

31-May-12 A

0.00

25-Jan-12 A

0.00
15-May-13

30.00

20-Mar-12 A

0.00

16-Nov-12 A 0

0.00

17-Jan-13 A 0

0.00

20-Nov-13 A 0

0.00

30-Apr-12 A 0

0.00

19-Mar-14 A 0

0.00

KAGES 13-Jun-

0.00

MERS 23-Jul-1

30.00

G 30-Dec-13 0

30.00

NG 01-Nov-12

0.00

G 15-May-13 0

30.00

LDINGS 15-May

30.00

Y 15-May-13 0

30.00

G 15-May-13 0

30.00

S 15-May-13 0

30.00

E 15-May-13 0

30.00

N 15-May-13 0

30.00

N 15-May-13 0

30.00

N 15-May-13 0

30.00

M 15-May-13 0

30.00

S 03-Jul-13 0

30.00

TES, CABINS,

30.00

CTRICAL & INS

40.00

E 17-Aug-13 0

30.00
15-May-13

30.00

2-Oct-13

30.00

29-Oct-13

30.00

15-May-13

30.00

3-Jul-13

30.00

29-Oct-13

30.00
23-Jul-13

30.00

.15-May-13

9-Sep-13

30.00

30-Dec-13

30.00

15-May-13

30.00

9-Aug-13

30.00

6-Jan-14

40.00

9-Aug-13

30.00

15-May-13

30.00

1-Jun-13

30.00

14-Dec-13

30.00

30-Nov-13

30.00

15-May-13

30.00

30.00

1.00

25.00
30.00

15.00

7.00

10.00

5.00

2.00

2.00

2.00

2.00

2.00

5.00

5.00

2.00

10.00

10.00
1.00

3.00

2.00

2.00

2.00

15.00
25.00
25.00
25.00
15.00
25.00
25.00
25.00

25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00

30.00

2.00
2.00

1.00
1.00
10.00
10.00
60.00
15.00
46.00

2.00
2.00
2.00
1.00
2.00
5.00
20.00
2.00
2.00
2.00
2.00

40.00
2.00
6.00

25.00

91.00
1.00

10.00
1.00
2.00
2.00
2.00

5.00
10.00
2.00
2.00
2.00
15.00
82.00

5.00
5.00

5.00

7.00

30.00
15.00
74.00

0.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00

1.00
1.00
1.00
1.00
1.00
601
10.00

10.00

10.00

10.00
10.00
39.00
60.00
777
129
40.00

25.00

60.00
25.00
22.00
20.00
5.00
16.00
22.00
25.00
29.00
22.00
5.00
9.00
15.00
7.00
22.00
15.00

5.00
587
127
1.00
10.00
20.00
8.00
160
163
1.00
10.00
15.00
8.00
200
133
1.00
10.00
12.00
8.00
160
207
1.00
8.00
14.00
7.00
150
172

1.00
8.00
15.00
8.00
150
172
8.00
15.00
8.00
1.00
150
80.00
1.00
10.00
15.00

25.00
80.00
e0
292
1.00
10.00
15.00
8.00

160
240
1.00

12.00
20.00
10.00

230
256
1.00
10.00
25.00
7.00

200
233
1.00
8.00
15.00
8.00
160
238
1.00
10.00
15.00
8.00
200
232
1.00
10.00
22.00

8.00
240
135
8.00
180
587
1.00
8.00
20.00
20.00
140
301
131
1.00
10.00
5.00
60.00
150
79.00
1.00
1.00
5.00
30.00
70.00
193
1.00
10.00
5.00

25.00
90.00
301
1.00
8.00
8.00
14.00
180
438
177
1.00
7.00
15.00
12.00
220
184
1.00
10.00
12.00
22.00
220
192

30.00
1.00
8.00
20.00
8.00

240
177
1.00
7.00
18.00
8.00
220
201
1.00
10.00
20.00
8.00
210
248
1.00
8.00
20.00
10.00
180
152
1.00
7.00
12.00
25.00
150
227
1.00

7.00
20.00
8.00
175
433
1.00
8.00
18.00
10.00
145
196
1.00
8.00
20.00
10.00
150
187
2.00
8.00
15.00

20.00
120
149
1.00
8.00
20.00

10.00
130
452
145
1.00
10.00
10.00
15.00
150
249
1.00
8.00
8.00
20.00

230
186
1.00
10.00
8.00
25.00
150
237
1.00
10.00
8.00
25.00

150
156
10.00
8.00
25.00
1.00
180
236
10.00
8.00
25.00
1.00
155
157
10.00
8.00
25.00
1.00
180
93.00
10.00
8.00
25.00
1.00
69.00

170
30.00
8.00
25.00
1.00
180
599
216
1.00
1.00
1.00
1.00
1.00
250
1.00
15.00
15.00
217
1.00
1.00
1.00
1.00
1.00
230

1.00
15.00
15.00
260
1.00
26.00
1.00
1.00
1.00
75.00
1.00
18.00
15.00
140
1.00
18.00
1.00
1.00
1.00
90.00
156
1.00
18.00

1.00
1.00
1.00
120
187
1.00
18.00
1.00
1.00
1.00
30.00
214
1.00
18.00
1.00
1.00
1.00
40.00
195
1.00
26.00
1.00
1.00

1.00
90.00
1.00
379
1.00
20.00
1.00
1.00
1.00
105
1.00
18.00
15.00
433
1.00
26.00
1.00
1.00
1.00
120
1.00
18.00
12.00
358

1.00
15.00
1.00
1.00
1.00
90.00
1.00
18.00
15.00
222
1.00
20.00
1.00
1.00
1.00
220
1.00
18.00
15.00
203
1.00
26.00
1.00
1.00

1.00
72.00
1.00
18.00
15.00
239
1.00
26.00
1.00
1.00
1.00
150
1.00
18.00
15.00
482
1.00
26.00
1.00
1.00
1.00
137
1.00
18.00

12.00
114
1.00
26.00
1.00
1.00
1.00
120
1.00
18.00
15.00
157
1.00
1.00
1.00
1.00
1.00
100
1.00
18.00
13.00
679
20.00
20.00

20.00

20.00
891
20.00
30.00
407
22.00

22.00
12.00
15.00
45.00

20.00
12.00
15.00
90.00
846
357
183
0.00
72.00
15.00
15.00
273
0.00
101
150

97.00
68.00
79.00
0.00
15.00
15.00
317
79.00
0.00
15.00
15.00
320
80.00
0.00
15.00
15.00
274
0.00
152
97.00
101
200
0.00
84.00
35.00
65.00
247
90.00
75.00
0.00
45.00
103
90.00

0.00
75.00
45.00
355
90.00
75.00
0.00
35.00
266
60.00
45.00
0.00
35.00
98.00
58.00
47.00
0.00
35.00

482
182
6.00
21.00
31.00
334
45.00
75.00
60.00
45.00

60.00
45.00

80.00
68.00
15.00
31.00
21.00
270
65.00
60.00
45.00

70.00
60.00
30.00
45.00
482
60.00
45.00
75.00
45.00

110
75.00

110
)0
357
80.00
15.00
25.00
25.00
35.00
8.00
222
35.00
10.00
3.00
25.00
15.00
15.00
204
90.00
65.00
10.00
21.00
53.00
11.00
75.00
21.00
111

90.00
120
90.00
131
120
90.00
90.00
380
119
26.00
36.00
31.00
31.00
46.00
11.00
61.00
295
26.00
31.00
31.00
31.00
46.00
11.00
46.00
380
15.00
1.00
30.00

30.00
40.00
60.00
40.00
60.00
50.00
298

298
26.00
6.00
15.00
16.00
10.00
45.00
307
25.00
60.00
60.00
60.00
90.00
0.00
11.00

55.00
369
363

26.00
31.00
31.00
21.00
46.00
11.00

60.00
273
90.00
10.00
90.00
107
150
114
90.00
90.00
10.00
223
90.00
90.00
10.00
369
45.00
60.00
60.00

60.00
404
169
31.00
46.00
36.00
36.00
76.00
11.00

95.00
355
15.00
30.00
30.00
30.00
60.00
40.00
40.00
80.00
40.00
380
30.00

380
20.00

40.00
10.00
60.00
16.00

237

120
60.00
20.00
122
90.00
120
90.00
552
31.00
64.00
9.00
11.00
11.00
21.00
167
20.00
30.00
45.00
60.00
20.00
356

15.00
45.00
40.00
14.00
23.00
129
120
45.00
90.00
715
603
45.00
75.00
35.00
567
30.00
95.00
60.00
60.00
10.00

90.00
304
8.00
12.00
15.00
90.00

30.00
423
105
120
90.00
90.00
403
15.00
30.00
30.00
30.00
60.00
40.00
40.00
80.00
60.00
78.00
390
108
45.00
45.00

60.00
60.00
348

312

60.00
50.00

120
30.00
30.00
31.00

30.00
10.00
10.00
63.00
12.00
25.00
35.00
12.00
20.00
21.00

30.00
65.00

90.00