Вы находитесь на странице: 1из 1

Project: IR No.

:
Owner: Building No.:
Level:
Date:
Main Contractor :
1
2
3
4
5
REMARKS
INSTALLATION OF CABLE TRAY, TRUNKING & LADDER
NO. DESCRIPTION
CHECKED BY
Shopdrawing is approved
Distances between supports are as per approved
drawing.
Approved Material used (MIR)
Installed hanger and supports are inspected and
approved
Consultant:
Project Manager:
Installed cable tray, trunking or ladder are levelled and
5
6
7
8
9
10
11
12
Expansion fitiings are used as required.
Approved and correct fittings are used.
Remarks/Comments (if any):
Tagging/labelling is provided
Installed containments are free of damages and
scratches.
Installed cable tray, trunking or ladder are levelled and
straight .
Bonding jumper is installed.
Painting is applied to cut ends
Spring knot is used to connect cable tray or trunking to
channel.
Name
Position
Signature
Date
COMPANY