a) In the project proposal, we have very clearly given that they should Safety Path. Thus, we do
not need to reimburse the Zebra Marking. (Point 4)
b) I have not requested Garden as I am constrained with space. It is likely to hinder the
movement of trucks. Now I am destroying it, people will see me a company against
environment. (Point 5)
d) Cabling, Panel Board and related works fall well within electrical works and generator shed.
(Point 7)
f) We have used the crane for two days. First day, Mr. Nagababu paid the crane charges, which
is Rs. 1,500. Second day, the crane was only used for 2 hours. Thus, the charges are
rationalized.
a) My personnel have not used or requested for operation of generator as they have inverter. The
inverter was installed on 24th April 2009. Our occupying premise effectively was on 1st May
2009. I believe my staff.
The above has been prepared based on indepth discussion with our team. I have done my duty duly
without any unbias.
Reimbursement of Moshin
Bill AA
1 Air Conditioner 75,050
2 Power Invertor 31,000
3 D-Link Cable 12500
Cost of Providing Concrete Shelving & Construction of
8 35000
Toilet & Wash Room in Warehouse
10 Crane Hire Charges 2000
11 Window Blinds 35000
Total 190,550
Bill BB
1 Security Charges 36000
2 Electricity Charges
- May 8385
- June 15772
3 Water Charges
- May 1800
- June 1800
Total 63757
Total AA + BB 254,307