Вы находитесь на странице: 1из 219

..

2548
ISBN 974 - 184 - 861 - 7

.. ()

.. 2548

.............................................................
(. )

.............................................................
(. )

.............................................................
(. )

.............................................................
(. )

..

12

.
.

2548


Chin Load - Settlement
Pile Load Test
10 Terzaghi, Davisson, Fuller and Hoy, Butler
and Hoy, De Beer, Modified Mazurkiewicz, Van der Veen, Chin, 80% Brich
Hansen 90% Brich Hansen Modified Mazurkiewicz
Davisson
De Beer
Chin 2 8 Pile
Load Test 2 20
Hiley Driven 0.9 1.05
Hiley 0.86 1.10
Pile Load Test
: / /

Thesis Title
Thesis Credits
Candidate
Thesis Advisors
Program
Field of Study
Department
Faculty
B.E.

Interpretation of Pile Load Test


12
Mr. Kittisak Tongmak
Dr. Yongyuth Taesiri
Assoc. Prof. Kasem Petchgate
Master of Engineering
Civil Engineering
Civil Engineering
School of Engineering
2548
Abstract

The research is carried out for the purpose of the pile load test interpretation. Comparison between
failed and unfailed piles was made in this study. The Chin method was used as a tool to generate the
Load-Settlement graph in order to acquire fundamental information for further analysis. Data from
pile load test were utilized to interpret ultimate bearing capacity by using 10 different methods,
which were Terzaghi method, Davisson method, Fuller and Hoy method, Butler and Hoy method,
De Beer method, Modified Mazurkiewicz method, Van der Veen method, Chin method, 80% Brich
Hansen method and 90% Brich Hansen method. The results illustrate that Modified Mazurkiewicz
is the best for the failed piles. In case of unfailed piles, Davisson method and De Beer method are
the most efficient method. The pile capacities predicted by Chin method are between 2 - 8 percent
higher comparing to those from pile load test results and between 2 20 percent lower than the
results from Hileys formula. However, the ultimate bearing capacity of pile computed by Driven
program is between 0.9 1.05 times of that calculated by Hileys formula, and between 0.86 1.10
times of the results obtained from pile load test.
Keywords : Pile capacity / Pile Load Test / Prediction

.
.

.
.




.

1.
1.1
1.2
1.3
1.4

1
1
1
2
2

2.
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9 Driven

4
4
12
30
37
41
44
49
60
63

3.
3.1

79
79

3.2
3.3
3.4 Driven
Hiley
3.5 Driven
4.
4.1

4.2

4.3
Predict Chin
4.4
Hiley
Load Settlement Predict Chin
4.5 Driven

79
81
87
93
103
103
122
126
146

149

5.
5.1
5.2

159
159
160

161


Predict Chin
( 2

169
169
181

200

2.1
2.2
2.3
2.4
3.1
3.2
3.3
3.4
4.1
4.2
4.3

4.4
4.5

4.6
4.7
4.8
4.9

4.10

adhesion factor
Humes
Factor of Safety range for equations used in the Michigan Pile Test Program

Pile Load Test

Predict Chin
( 3 )
Predict Chin
( 3 )

Predict Chin
( 2 )
Predict Chin
( 2 )

Hiley A
Hiley B
B
Predict Chin ( 2 )
Hiley
Predict Chin ( Terzaghi, Davisson
De beer)
Hiley

25
35
35
41
81
81
81
84
120
130
132

134
136

146
147
150
152

154

4.11
4.12
4.13
.1

Predict Chin ( Van der Veen,


Modified Mazurkiewicz, 80% Brinch Hansen, 90% Brinch Hansen,
Fuller and Hoy Butler and Hoy)
Driven
Hiley A
Driven
Hiley B
Driven
Pile Load Test
Predict Chin
( 2 )

156
156
157
182

2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28

Nq
Nq

Adhesion factor
Standard penetration test
SPT
adhesion factor

Davisson
Chin

5
8
8
9
10
11
12
13
16
17
18
18
20
21
22
23
24
27
28
29
39
39
40
45
47
48
50
52

2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56

De Beer
90% Brinch Hansen
80% Brinch Hansen
Mazurkiewicz
Modified Mazurkiewicz
Fuller and Hoy Butler and Hoy
Van der Veen
N ' q
N ' q Point Resistance Contribution
Point Resistance Contribution
Pile Toe ()
cohesionless
Pile Toe ()
cohesionless
adhesion cohesive
adhesion cohesive
adhesion factor ( )
adhesion factor ( )
adhesion factor ( )
adhesion factor
K = 250
K = 250
K = 300
K = 300
K = 350
K = 350
K = 400
K = 400
correction factor K
correction factor K

53
53
55
56
57
58
59
64
65
65
66
67
67
68
68
68
69
69
71
72
72
73
73
74
74
75
75
75

2.57 /

2.58 /

2.59 correction factor field SPT N-Values


effective overburden pressure
2.60 correction factor field SPT N-Values
effective overburden pressure
2.61 SPT
3.1
3.2 A
3.3 A
3.4 A
3.5 Bearing Unit A
3.6 B
3.7 B
3.8 Driven
3.9
3.10
3.11
3.12 cohesionless
3.13 SPT N internal friction angle
3.14 cohesive soil
3.15 Pipe Pile Closed End
3.16 Pipe Pile Open End
3.17 Precast Concrete Pile
3.18 H- Pile
3.19
3.20 Bearing Capacity
3.21 Bearing Capacity
3.22

76
76
77
77
78
80
87
88
89
90
91
92
93
94
95
95
96
96
97
98
98
99
99
100
101
101
102

4.1
President Internation
4.2 Terzaghi President
Internation
4.3 Terzaghi Crytal City
4.4 Terzaghi
1.20
4.5 Davisson
( T2- C2 )
4.6 Davisson initial
modulus elastic
4.7 Davisson initial modulus
elastic
4.8 Fuller&Hoy Building 9 Stories
4.9 load settlement 0.05 / Fuller&Hoy
4.10 Butler&Hoy Building 9 Stories
4.11 De beer Asoke Tower
4.12 elastic plastic
De beer
4.13 Modified Mazurkiewicz
4.14 End bearing Modified Mazurkiewicz
4.15 Van der Veen Fortune Complex
4.16 load - settlement Van der Veen
4.17 Van der Veen load 600 tons
4.18 Van der Veen load 675 tons
4.19 Van der Veen load 750 tons
4.20 Chin President Internation
4.21 Chin
4.22 80% Brinch Hansen
Lakmung Hospital
4.23 90% Brinch Hansen
President Internation

104
104
105
105
106
107
107
108
109
109
110
111
111
112
113
113
114
114
115
116
116
117
118

4.24 load movement 90% Brinch Hansen


50% UU 90% PU
4.25 load movement 90% Brinch Hansen
50% UU 90% PU
4.26 Predict 3 Design load Predict 2
4.27 Predict Chin
Mae Moh Unit 10.1
4.28 Predict Chin
Mae Moh Unit 10.1
4.29 Davisson load settlement
Predict Chin Mae Moh Unit 10.1
4.30 Predict Chin
Kanista Resident
4.31 Predict Chin
Kanista Resident
4.32 Terzaghi load settlement
Predict Chin Kanista Resident
4.33 Davisson load settlement
Predict Chin Kanista Resident
4.34 De beer load settlement
Predict Chin Kanista Resident
4.35 Fuller&Hoy load settlement
Predict Chin Kanista Resident
4.36 Butler&Hoy load settlement
Predict Chin Kanista Resident
4.37 Modified Mazurkiewicz
load settlement Predict Chin Kanista Resident
4.38 Van der Veen load settlement
Predict Chin Kanista Resident
4.39 80% Brinch Hansen
load settlement Predict Chin Kanista Resident

119
119
126
129
129
138
139
140
140
141
141
142
142
143
143
144

4.40 90% Brinch Hansen


load settlement Predict Chin Kanista Resident
4.41 Predict
Chin Kanista Resident
4.42 Predict
Chin Future Place Condominium
.1 Sakorn Place
.2 Ban Sing Land ( 1)
.3 Ban Sing Land ( 2)
.4 Toshiba Project
.5 Lakmung Hospital
.6 President Internation
.7 Building 9 Stories
.8 ( T3-C2)
.9 ( T2-C2)
.10 ( T2-C1)
.11 ( T1B-C1)
.12 ( T1-C3)
.13 ( T2-C3)
.14 Carre Four
.15 Technothani
.16 Asoke Tower
.17 Mae Moh Unit 10.1
.18 Crytal City
.19 Fortune Complex
.20 RS Tower
.21 Witayu Complex
.22 Grand Diamond

144
145
145
170
170
171
171
172
172
173
173
174
174
175
175
176
176
177
177
178
178
179
179
180
180

Ab
AF
a
B
b
c
C1
C2
C3

=
=
=
=
=
=
=
=
=

Cd

D
E
e

F.S
fs
h
L
NC
Nq
N
NCorrected
NMeasured
n
P
m
Qu
Qb
Qs
qu
r

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=


()

(Cohesion)
L2
L

effective pile perimeter

modulus of elasticity
Efficiency factor
Factor of safety
(unit skin friction)

Standard Penetration Number


Standard Penetration Number
Efficiency factor

(Ultimate Load)
(End Bearing)
(Friction Resistance)
Unconfined Compressive Strength
Coefficient of restitution

Su
S
W
Z
z

v
h

K
Pd

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

Undrained Shear Strength


( 10 )

Equipment Loss Factor


depth coordinate
normal stress
( Vertical Stress)
(Horizontal stress)
lateral stress z
effective overburden pressure
pile taper

adhesion factor
angle of internal friction
pile-soil friction angle

1
1.1
(Bearing Capacity)


2-3
5
1. (Empirical)
2. (Static)
3.
4. (Wave Equation)
5. Pile Load Test

Pile Load Test

Pile Load Test


Pile Load Test

1.2
load displacement
Pile Load Test


Terzaghi (1942), Fuller and Hoy
(1970), Chin (1970), Van de Veen (1953), Van de veen and Wallays (1972) Davisson (1972)

Pile
Load Test

1.3
1.
2.

3. Predicts Chin

4.

5. Driven HilayFormula
Blow Count
Predicts Chin
6.

1.4

Pile Load Test


1.

2. Predicts

3.
Pile Load Test
4.

5. Driven

6.

2
2.1

elastic

(linear) 2.1() linear elastic
2.1()
nonlinear elastic

2.1() plastic strain plastic settlement


2.1() rigid-plastic
elastic

elastic plastic elastoplastic 2.1()
elastoplastic (yield stress)
1 perfectly plastic
2 3

2.1
( [10])

strain
hardening strain softening

3
(viscous material)
viscoelastic , viscoplastic elastoviscoplastic
()


2.1()
2.1()
prestress

2.1.1



1

2.2()
2
(Distortion)

2.2()
1


(Normal Load)
2.3()
2





() 1 () 2

2.2
( Centre for Civil Engineering Research and Codes [23])

()

()

2.3
( Centre for Civil Engineering Research and Codes [23])

2.1.2






2.4

(Ultimate Pile Capacity)

2.4
( [7])

(Skin Friction) (End Bearing)

10

10 %
30 %

Skin Friction

End Bearing Skin Friction
End Bearing 2.5
2.6 Skin Friction
Stiff Clay
Skin Friction

(Shear Plane)
(Ultimate Pile
Capacity)

2.5
( Carroll , 1987 [22])

11

2.6
( Carroll , 1987 [22])
Tomlinson[61]
2.7
(Pile-Soil System)
A
A
Yielding Slippage B
Maximum Skin Friction C
OC Permanent Settlement Maximum Skin Friction
0.3-1 (Base
Resistance) 10 20
D 2.7

D Strain
Gauges
2.7 A Skin Friction
B

12

Maximum Skin Friction D


Skin Friction

2.7
( Tomlinson [61])

2.2

3

13

2.8 ( Coduto, 1994 [27])

14

1) Static Method

2) Dynamic Method

Newton




3)





3.1 Proof Load Test


2 - 2.5

3.2 Ultimate Load Test


15



2 3

2.2.1 Static Formula


shear strength parameters ( c , )
total (undrained) effective parameters effective parameters

triaxial test


cone penetration test standard penetration test

(Qu)(Qb) (Qs)
2.9 2 static
soil mechanics
QU = Qb + QS

[2.1]

Qu
Qb

=
=

(Ultimate Load)
(Point Bearing)

16

Qs

(Friction Resistance)

2.9

2.2.1.1 (Base Resistance, Qb)

(failure surface)
2.10
Qb = Ab . qult
Qb = Ab [cNC+ v Nq+0.5B N]

Qb
Ab
c
v

NC , Nq , N

=
=
=
=
=
=
=

(Cohesion)
(Effective Vertical Stress)
(Bearing Capacity Factor)

()

[2.2]

17

2.10 (Vesic, 1967 [65])

.
c = c = 0 = / N Nq
soil parameters effective long-term ultimate load capacity
(drained condition)
Qb = Ab v N q

[2.3]

Nq
2.11 2.12 Nq
Berezantsev (Tomlinson,1986 ; Poulos and Davis,1980)
2.12 triaxial tests penetration tests

carbonate sand silt
Kishida
( + 40 )0.5 (Poulos and Davis,1980 ; Tomlinson,1986)

() 1100 bearing stratum
5

18

(bearing stratum) D/B ( depth (length) to width radio )


2.12 bearing stratum

2.11 Nq
(Vesic, 1967 [65])

2.12 Nq
(Barezantsev, 1961[14])

19

.
0 Nq 1 N

Qb = Ab.cNC

[2.4]

NC 0
SKEMPTON (1951)
SKEMPTON (1959)
SOWERS (1961)
MOHAN&JAIN (1961)
LADANYI (1963)

6.14 < NC < 9 length to width radio (D/B) > 4


NC = 9 London clay
5 < NC < 8
5.7 < NC < 8.2 expansive clays
7.4 < NC < 9.3 inpansive clays

BISHOP (1961)

NC = 1 + 4 1 +ln
3

E
3CU

TOMLINSON (1986)
NC = length to width radio in bearing stratum > 5
BOWLES (1986)
NC = 5.74
9

2.2.1.2 (Skin Friction, Qs)



Shear strength of soil s = c + tan
(unit skin friction) fs = ca + h tan
c = soil cohesion cU
ca = soil adhesion .c
= adhesion factor
= normal stress
h = horizontal stress
= angle of internal friction
= angle of friction ( 2.13)

20

.
cohesion fricionless soil
drained
condition effective effective stress

fs = h tan
= K v tan
K = coefficient of lateral pressure
v = average effective vertical stress =
L
QS = 0 P . K v tan .dl

[2.5]

P = ( = 4B, = D)
L =

2.13
2.13 (V,
) /
K
K 0.5 1.5

21

)

undrained conditions

( = 0 analysis)
QS = fS.Ab = ca.P.L
QS = .c.P.L
fS = unit skin friction
Ab = = P.L
c = cohesion = average undisturbed shear strength
= cU undrained shear strength
= adhesion factor ( 2.14)

2.14 Adhesion factor


(a)
(b)
(c)

[2.6]

22

2.2.2 Standard Penetration Test (SPT)


Standard penetration test
standard split spoon sampler (Raymond sampler) 2
140 30 ( 2.15)
6 ( 6
)


(N, bolws/ft)

2.15 Standard penetration test (SPT)


fine sand silty sand N 15

Ncorrected = 15 + 1 (N - 15)
2

[2.7]

23

overburden pressure (po)


Peck and Bazaraa (1969)
corrected N =

4N
1 + 2 p0

p0

corrected N =

4N
3.25 +0.5 p 0

p0

1.5 ksf

[2.8]

> 1.5 ksf

[2.9]

( relative density ) 0.5 50%


Gibb and Holtz
(1957) 2.16
Peck, Hansen & Thornburn (1974)

2.16 SPT
Ncorrected = C Nmeasured

[2.10]

corrected factor C = 0.77 log 20


p0

p0

> 1.5 tons/ft2

24

2.2.3 Static Formula


(case-in-place pile)

(driven and case-in-place pile)
(bored and case-in-place pile) bored pile ()

0.60
75

(tube, casing)
Tomlinson(1986) ()
Rotary Drilling bentonite slurry
NC= 9 shear strength
= 0.45 shear strength c
10 heavily fissured clay 0.3
2.5 skin friction
boulder clay glacial tills adhesion factor 2.17
Weltman and Healy (1978)

2.17 adhesion factor

25

Bowles(1988) = 0.35 0.40 c 100 kPa NC= 9

Poulos and Davis (1980)


3 Skempton (1959), Meyerhof and Murdock
(1953) c 96 kPa 2.1
2.1 adhesion factor


injection bored pile injection
skin friction injection base resistance

2.2.4 Dynamic Formula






2.2.4.1

26


(soil
heave) (pile heave)

) (Cohesive Soil)

1. remold state
( 2.18 )
remold state

2. (total stress) ( h )
( v )
undisturbed
state remold state excess pore pressure(
)
Stress history ( Stress
) heavily overconsolidated
( 2.18) heavily over consolidated clay
(Overconsolidation ratio > 8)

(load)

remold state
heavily over
consolidated clay sensitive

27

2.18
load
1. Thixotrory (pore pressure)(effective stress)
release residual stress
(undrained condition)
2. Consolidation (swelling)
dynamic load
soil dynamic
consolidation process Thixotrory consolidation process
swelling process
(friction) (end
bearing)

mobilize mobilize displacement


excess pose pressure net
excess pose pressure

28

critical condition
long term condition fully drained

) (Cohesionless Soil)
( 2.19) state

(permeability)


critical condition effective confining stress

2.19
(fine silt) dense silty
fine sand
long term condition

friction pile (
)

29

(stiff clay) heavily over consolidated clay


stiff clay normally consolidated state

)
(
2.20) total horizontal stress ( h )
(skin friction)
(end bearing) total vertical stress ( v )

()
(stress)


relative density
remolding action

soil parameter site

2.20

30

2.3



End Bearing

(Load Test)




( 10 ) Blow
Count
(Factor of Safety)

2.3.1 (Pile Driving Formula)



()
(static formula, pile load test)
()

[, 2539]

48 - 60 /30 5.0 - 6.2 /10


72 - 96 /30 3.1 - 4.2 /10
144 - 180 /30 1.7 - 2.1 / 10
(Ultimate Bearing load)

31

2.3.1.1 Engineering News Formula ( F.S. = 4)


QU =

QU

W
h
S
C

Wh
S + 2.54C

=
=
=
=
=

Ultimate bearing capacity ()


()
()
10
0.9 (drop hammer)

2.3.1.2 Hiley ' s Formula ( F.S. = 4)


QU =

eWh
C
S+
2

QU

= Ultimate bearing capacity ()

= Efficiency factor

W
P

= ()
= ()

W + Pr 2
W +P

32

= Coefficient of restitution = 0.25

= ()
= Equipment Loss Factor
= 1 Falling hammer
= 0.80 Drop hammer with Friction winch
= 10
= Temporary Compression = C1 + C2 + C3
= L2 ()

h
Z

S
C
C1

=1.8

C2

QU L2
A

= L ()
= 0.72

QU L
A

QU
A

C3

= ()

= 3.60

2.3.1.3 Janbu's Formula ( F.S. = 4)


QU =

Wh
KU s

KU =Cd . 1+

Cd

C d = 0.75 +0.15
=

P
W

WhL
AES 2

2.3.1.4 Load Bearing Capacity (So's Formula), ( F.S. = 5)


a

QU =
S+

1
2ab
2

= ewh

33

= 1 Falling hammer
= 0.80 Drop hammer with friction winch

W
P
L
A
E
h

=
=
=
=
=
=
=
=

QU

L
AE

()
()
()
()
()
()
Ultimate bearing capacity ()
() 10

2.3.2
1994 183
(Ultimate Bearing load) Hiley ' s Formula
R=

nWhE
C
S+
2

= ()

= Efficiency factor

W
h
P
S
e

=
=
=
=
=
=
=
=

W + P.e 2
W +P

()
()
()
10
Coefficient of pile head and cushion ()
0.25 (Drop hammer)
0
Equipment Loss Factor = 0.75

34

C , , ()
C
= Temporary Compression = C1 + C2 + C3
10 5 R.L
=
A.EC

C1

= L ()

C2

C3
A
EC

= = 0.25
= ()
= Modulus of Elasticity of Concrete = 230,500 ton/cm2

= 9.0128

R
A

Blow count

" S "
10
Hiley

E C3 ( F.S.)

2.3.3 Factor of Safety


2.3.3.1



(S)
Ultimate Bearing Load


Ultimate Bearing
Load

35

. Milligan
.
Wmax =

0.0764 A. B
n

Wmax

A
B
n

=
=
=
=

()
()
()
()

2.2 Humes
()
15
15 - 18
18

Wmin

( P)
P
(3/4) P
(2/3) P

P
=

2.9.3.2 Factor of safety , F.S.


F.S. Bowles

2.3 Factor of Safety range for equations used in the Michigan Pile Test Program

Formula
Engineering News
Hiley

Upper and lower limits of SF = PU / Pd *


Range of Pu , kips
0 200
200 - 400
400 700
1.1 - 2.4
0.9 - 2.1
1.2 - 2.7
1.1 - 4.2
3.0 - 6.5
4.0 - 9.6

36

2.3 Factor of Safety range for equations used in the Michigan Pile Test Program ()

Formula
Pacific Coast Uniform Building Code
Redtenbacher
Eytelwein
Navy - McKay
Rankine
Canadian National Building Code
Modified Engineering News
Gates
Rabe

0 200
2.7 - 5.3
1.7 - 3.6
1.0 - 2.4
0.8 - 3.0
0.9 - 1.7
3.2 - 6.0
1.7 - 4.4
1.8 - 3.0
1.0 - 4.8

Upper and lower limits of SF = PU / Pd *


Range of Pu , kips
200 - 400
400 700
4.3 - 9.7
8.8 - 16.5
2.8 - 6.5
6.0 - 10.9
1.0 - 3.8
2.2 - 4.1
0.2 - 2.5
0.2 - 3.0
1.3 - 2.7
2.3 - 5.1
5.1 - 11.1
10.1 - 19.9
1.6 - 5.2
2.7 - 5.3
2.5 - 4.6
3.8 - 7.3
2.4 - 7.0
3.2 - 8.0

* PU = Ultimate test load.


Pd = Design capacity , using the safety factor recommended for the equation (values range
from 2 to 6 , depending on the formula)

() coarse-grained soil

thixotropic effect excess pore water
pressure
() submerged loose fine sand liquefaction
static formula
dense fine sand

37

()
()
Hiley

()
dynamic static formula

2.4

1. (load-settlement relation)

2. (Ultimate bearing capacity)

3.
dynamic static formula
4.

38

5.

2.4.1
2.21

3



2.4.2
2.22






39

2.21

2.22

40

2.4.3 2.23
)


2
)
)
)

2.23

2.4.4

41

1. Nation Building Code (1990)


250
2. Engel (1988) 5

2.4

( )

( )

0 - 6,000
0 - 1,800
6,000 - 10,000
1,800 - 3,000
10,000 - 20,000
3,000 - 6,000
20,000 - 30,000
6,000 - 9,000
30,000 - 40,000
9,000 - 12,000
: Engel (1988) Coduto (1994)

( )
0
1
2
3
4

2.5

30 90 3-30 (ASTM D 1143)

(Single Pile)
ASTM D-1143 7

2.5.1 Standard Loading Procedure Slow Maintain Load Test


(ASTM D 1143-88)
1) (Test Pile) (Anchor Pile) 1.5 2.0
3 5
2)

42

3) 5
25 200 2

4) 0.254 (0.01 )
2
5) 2, 5, 10, 30, 60
2
6) 2 200
24
0.254 (0.01 ) 12
2
7) 75, 50, 25, 10 0
30 24

2.5.2 Constant Rate of Penetration Test (CRP)


Whitaker (1957) CRP
Test
1) 0.5 3.5
0.25 1.25 (Friction Pile) 0.75 2.5
(End Bearing Pile)
2) 1 2
(Ultimate Load) 5
10 25 (Friction Pile)
(End Bearing Pile)
3) (Ultimate Load)

Whitaker (1970) 10

2.5.3 Cyclic Load Test


Cyclic Load Test Van Weele
(1957), Broms (1972) ASTM

43

1) 25 200
Slow Maintain Load Test
50, 100 150 1
20
Slow Maintain Load Test
2)
20 0.05
10 2 3
10 15
3

2.5.4 Quick Load Test

2
2.5 CRP Test Texas
Highway Department CRP Test
5 10

2.5.5 Loading in Excess of Standard Load Test


1.

2.5.6 Constant Time Interval Loading


1. 1

2.5.7 Constant Settlement Increment Loading Method



1%

44


Standard Loading Procedure Cyclic Load Test

2.6


Chun [26]
1.


2.

10% 25%

3. 2


2 Pseudo-elastic
Pseudo-plastic

4.



45





Vesic (1958) 3
1. General Shear Failure (Caquat, 1934)

I. General Shear Failure II. Local Shear Failure III.Punching Shear Failure
2.24
( : Winterkorn Fang, 1975 [66])
2. Local Shear Failure (Terzaghi, 1943)

46

3. Punching Shear Failure (De Beer Vesic, 1958)


3 2.24


(Punching Failure)

Winterkorn Fang[66]
2.25


1 ( , )

Bucking (Slender Column)
2.25(1)
2

General Shear Failure

2.25(2)
3
Punching Failure

2.25(3)

47

4


2.25(4)
5

4 Heave

2.25
( Winterkorn Fang [66])

Vesic
(End Bearing)

48

2.25
Tomlinson [61]
2.26

)
)
)
)
)
)
2.26
( Tomlinson [61])

49

2.7


10%

10
Pile Load Test :
1. Terzaghi (1943)
2. Davissson (1972)
3. Chin (1970, 1971)
4. De Beer (1967) De Beer and Walllays (1972)
5. Brich Hansen 90% (1963)
6. Brich Hansen 80 % (1963)
7. Modified Mazurkiewicz ( ,1998)
8. Fuller and Hoy (1970)
9. Butler and Hoy (1977)
10. Van der Veen (1953)
Terzaghi (1943)
10
(Ultimate Load)
Davisson (1972) (Ultimate Load)
(Free-Standing Column)
Elastic Shortening (Origin)

50

Offset 3.81 (0.15 ) 0.008


( Quake Factor
1 ) Offset
Elatic
Shortening
(Ultimate Load)
1
Elastic Shortening 20
Davisson
1) 2.27
2) Elastic = PL/AE P , L
, A E modulus of elasticity

3) OA 2 BC OA x
x = 3.81 + 0.008D x = 0.15 + D/120 , (D = )
4) BC
C

2.27 Davisson
( Johsi [40])

51

Davisson

Quick Method BC
Proof
Test
Chin (1970 1971) ( load movement curve)
hyperbola Chin
plot

(1/m) Chin

/P = m + C
=
P =
m =
C =

3
Chin Chin

Davisson limit Chin
Davisson limit 20 40 % Chin Quick test Slow
test Time increment
ASTM
Chin[24] Dr. Tan Swan Beng plot /P 300
load slope load
load slope load 1.2
correction factor 0.2 Prof. Chin

52

/P

( IN / TONS )

Chin
1) /P P

2) Pult 1/C1 C1
2.28

2.28 Chin ( Johsi [40])


De Beer (1967) De Beer Wallay (1972)
Elastic Plastic load
movement log log 2

Elastic
De Beer Slow test
De Beer
1)
2) 2

53

3) 2
Standard Loading Procedure

2.29 De Beer ( Johsi [40])

2.30 90% Brinch Hansen ( Johsi [40])

54

90% Brinch Hansen (1963)


2 90%
90%
90% Brinch Hansen
1) 2.30
2) Pu u
90% Pu Pu
80% Brinch Hansen (1963)
4 80%
80% extrapolation plot
80% Brinch Hansen plot

Chin

PU u 0.8PU 0.25 u

PU

PU =

C1

1
2 C1C 2

U =

C2
C1

C2

= Y

80% Brinch Hansen


1) / P 2.31
P

2)
PU =

1
2 C1C 2

= C1 +C 2
P

U =

C2
C1

55

/P

80% Brinch Hansen 0.8PU 0.25 u load


movement Quick Load Test Standard Loading Procedure
(Plunging Failure)

/ P = C1 +C2
P = / C1 +C 2

2.31 80% Brinch Hansen


( Johsi [40])
Mazurkiewicz (1972) (Ultimate Load)

(Parabola) (Ultimate Load)




45

45

(Ultimate Load) 2.32

56

2.32 Mazurkiewicz
( Johsi [40])
Mazurkiewicz
1) 2.32
2) X
(Y)
3) Y 45

4) (Y) Y

Mazurkiewicz

Modified Mazurkiewicz ( ,1998) Mazurkiewicz


Y X
(Delta load / Delta
settlement) Y

57

X Modified
Mazurkiewicz 2.33

2.33 Modified Mazurkiewicz


( [3])
Fuller and Hoy (1970) Quick
Load Test
(
)
0.05 /
Elastic
0.05 / Butler and Hoy

Fuller and Hoy
1) 2.34
2) Pu 0.05 /

58

Quick Load Test


elastic 0.05 /

2.34 Fuller and Hoy Butler and Hoy


( Johsi [40])
Butler and Hoy (1977)
0.05 /

Rebound elastic
Bilinear Stress Strain Quick Load Test
Butler and Hoy
Fuller and Hoy
Butler and Hoy
1) 2.34
2) 0.05 /
Rebound elastic

59

Van der Veen (1953) Pult


ln (1- P / Pult ) plot Pult
Van der Veen program

Van der Veen


1) Pult
2) ln (1-P/Pult) (Pult)
3) Pult
2.35

P U = P1

4.0

PU = P3
3.0

PULT = PU = P4
PU = P5
2.0

PU = P7

1 IN = 25.4 mm

1.0

0.6

0.7

0.8

0.9

1.0

1.1

1.2

1.3

1.4

MOVEMENT ( INCHES )

2.35 Van der Veen


( Johsi [40])

2.7.1 6 (.. 2527)

(Maintained
Load) ASTM D-1143

60



1) 0.60
1.1
24 25
1.2
24 25
2) 0.60
2.1

PL D
+
+4
AE 120

P ()
L ()
A ()
E ()
D ()
(2)
24 24

D
+4
120

2.8
Pile Load Test
J.H.Hwang, J.C.C.Li, N.Liang [39]
6

61

2.8.1 P - S
load displacement Pile Load Test PS 2 (1) stiffness
(2) Plastic Creep
3 1. (Maximum Curvature)
P-S ( P-S Curvature) 2. 2
( P-S intersection point) 3.
P-S ( P-S starting point)

2.8.2

Ultimate Bearing Capacity

Terzaghi (1942)
Ultimate Bearing Capacity
S = 0.1D ( D = ) Vesic(1977)
Ultimate Bearing Capacity
S = 0.1D 0.25D

2.8.3 Tangent Flexibility P-S


P-S
Tangent Flexibility
( S ) P-S Stiffness
P

Fuller and Hoy (1970) Ohio


California Fuller and Hoy Ultimate Bearing Capacity
(load) P-S . Tangent slope 1.27 ./

2.8.4 Plastic(Residual) Settlement, SP,


Pile Load Test
(multistage loading) unloading Plastic Settlement
Chellis(1961) Ultimate Bearing

62

Capacity (load) P - SP Canadian Building Coad


(1960) Davisson (1972) Ultimate Bearing Capacity
(load) Plastic Settlement SP = 1.0 (25.4 .) SP = 0.15 + 0.1D
( D = ) Boston Building Code Ultimate
Bearing Capacity Plastic Settlement SP = 0.5 DIN4026
Ultimate Bearing Capacity Plastic Settlement SP =
2.5%D

2.8.5 Creep
S-log t ( log )
S-log t
elastic Ultimate S-log t
Ultimate Bearing Capacity

2.8.6 P-S
P-S
P-S Ultimate
Chin (1970) Van der Veen (1953)

1. log P log S (De beer ,1972) P-S log P log S
Ultimate Bearing Capacity 2
log P log S
2. S - log P (Shen , 1980) P-S S - log P
Ultimate Bearing Capacity
S - log P
3. P - S/ log t P-S t P - S/ log t
yield Ultimate

63

2.9 Driven
(U.S. Department of Transportation Federal Highway Administration)

static formula Driven
Nordlund(1963, 1979), Thurman(1964), Meyerhof(1976), Cheney
and Chassie(1982), Tomlinson(1980, 1985) Hannigan, et.al.(1997)
Nordlund Tomlinson Semi empirical
(pile variables)

2.9.1 Driven
load-carrying capacility (frictional resistance)
(shaft)
[2.11]

Q = Q p +Qs

[2.12]

Q p = Ap * q p

Qs = f s C d dz
0

Ap
qp
s
Cd
L

=
=
=
= effective perimeter
=

[2.13]

64

= depth coordinate

s qp
(end bearing pile) Driven
(Thurman,1964)
[2.14]

Q pnet = Ap qN ' q

= bearing capacity factor 3.23


= dimensionless factor
N 'q

2.36

N 'q

( Bowles,1977)

65

2.37

N 'q

Point Resistance Contribution

2.38 Point Resistance Contribution


Driven pile point resistance limit Meyerhof (1976) ( 2.39)
limit
Shaft Resistance

f s = ca + h * tan()

[2.15]

66

ca
h

= pile soil adhesion


= normal component of stress
= pile-soil friction angle

h v h = K * v K lateral stress
[2.15]
f s = ca + K * v * tan()

[2.16]

2.39 Pile Toe ()


cohesionless
Total Stress Analysis
= 0 total stress analysis [2.16]
f s = ca

[2.17]

67

2.40 Pile Toe ()


cohesionless ( 2.39)
ca undrained shear strength su
[2.18]

ca = * S u

empirical adhesion :
2.41 2.46 ca
Tomlinson (1979, 1980)

2.41 adhesion cohesive

68

2.42 adhesion cohesive ( 3.28)

2.43 adhesion factor ()

2.44 adhesion factor ( )

69

2.45 adhesion factor ()

2.46 adhesion factor

70

Effective Stress Analysis


[5]
f s = c a + K * v * tan() K * v * tan()

[2.19]

c a K * v * tan()
effective stress normal effective stress
( h = K * v )
Nordlund (1963, 1979) skin friction
pile load test (cohesionless soil)
, H, monotube pile taper

Nordlund (1963, 1979)


f s = K C f P d

sin( +)
cos()

[2.20]

[2.13] [2.20]
L

Qs = K C f Pd
0

sin( + )
C d dz
cos( )

[2.21]

non-tapered pile ( = 0 )
L

Qs = K C f Pd sin( )C d dz
0

Qs
K
Pd

= total skin friction capacity


= lateral stress z
= effective overburden pressure

[2.22]

71

= pile taper
= pile-soil friction
= effective pile perimeter
= correction factor

Cd
Cf

effective unit
weight friction angle [2.22]
Qs = K C fi P di sin( i )C di Di
n

[2.23]

i =1

Di

=
=

2.47 , 2.49, 2.51 2.53 K 2.55 correction


factor K 2.57 /

2.47 K = 250

72

2.48 K = 250 ( 2.47)

2.49 K = 300

73

2.50 K = 300 ( 2.49)

2.51 K = 350

74

2.52 K = 350 ( 2.51)

2.53 K = 400

75

2.54 K = 400 ( 2.53)

2.55 correction factor K

2.56 correction factor K ( 2.55)

76

2.57 /

2.58 /
( 2.57)

77

2.59 correction factor field SPT N-Values


effective overburden pressure

2.60 correction factor field SPT N-Values


effective overburden pressure ( 2.59)

78

2.61 SPT
[2.13] [2.23] ultimate bearing capacity
Nordlund Hannigan (1997)

3
Pile Load Test

Pile Load
Test Pile Load Test
Pile Load
Test 214 164 50

3.1
1.
2.

3.2
1.
2.

3.
4.
()
5. Predicts
Chin
6. Predicts
Chin
7. Bearing Capacity Driven HilayFormula
Blow Count
8.

80

3.1

81

3.3


214
3.1

157
28
110
19
214



(
)
3.2

164
50

3.3

2
1
64

82

1
1
1
2
4
1
1
3
2
7
3
1
2
3
19
1
2
3
5
1
4
1
1
2
3
1
1
1
3
1
3

83

4
1
1
1
5
2
4
18
2
3
3
1
4
2
2
4
3
1
1

10
Pile Load Test
1.
2.
3.
4.
5.
6.
7.
8.

Terzaghi (1943)
Davisson (1972)
Chin (1970, 1971)
De Beer (1967) De Beer and Walllays (1972)
Brich Hansen 90% (1963)
Brich Hansen 80 % (1963)
Mazurkiewicz (1972)
Fuller and Hoy (1970)

84

9. Butler and Hoy (1977)


10. Vander Veer (1953)
3.4 Pile Load Test

1) Davisson

2) Chin

1)

2.27
2) elastic
= PL/AE
3) OA
2
4) BC x =
0.15 + D/120
5)

BC
C
1) /P
2.28
2) Pult
1/m
2.28
(

)

1)

2)
QM
3)

4) BC

1)
QM
SM

2)
Chin


Davisson
3)

ASTM

85

3) De Beer

4) 90% Brinch Hansen


(Swedish Pile Commission)

5) 80% Brinch Hansen

6) Mazurkiewicz

1)

2.29
2)

3)

1)
2.30
2) Pu
u

90% Pu Pu

1) / P
2.31
2)

1)

SM

1)
CRP

1)

SM QM
2)
c
1

PU =
,
U = 1
c2
2 c1c 2

2.31 3)
(
)
1) 1)

2.32
2)
80%
2)

86

7) Fuller and Hoy

8) Butler and Hoy

9) Van der Veen

3)
45

4)

1)
2.34
2) Pu

0.05
/

1)
QM
2)

elastic
0.05 /

1) 1)
QB
2.34
2)

0.05 /


Rebound
elastic
1)
1)
Pult
2) ln (1-P/Pult)
P

3) Pult

2.35

87

3.4
Driven Hiley
3.4.1 A

2.620 . 4 .
2

3.2 A

88

3.3 A

89

3.4 A

3.5 Bearing Unit A

91

3.4.2 B
5.200 .(Prestressed Concrete) 6
. 2

3.6 B

92

3.7 B

93

3.5 Driven
Driven
SPILE Windows
SPILE FHWA 1993 SPILE

Driven
Driven

3.8 Driven

3.5.1 Multiple Water Table


1) SPT blow count
2) restike/driving
effective stress
3)
effective stress (Ultimate condition)

94

3.9

3.5.2 Soft Compressible Soil / Negative Skin Friction



soft compressible soil negative skin
friction
Ultimate Skin negative skin friction

3.5.3 Scourable Soil


Driven 2 Short term Long term
Short term Effective Stress
Long term Effective Stress
Soft Compressible Soil Scourable Soil
dialog box

95

1. Soft Compressible Soil 3.10


( off
0 ) capacity
contribution effective stress

3.10
2. Scourable Soil 2
2.1 Local Scour
effective stress Ultimate skin friction End bearing
capacity
2.2 Long-term Degradation Contraction Scour

effective stress

3.11

96

3.12 cohesionless

3.13 SPT N Internal friction angle

97

3.5.3.3 Layer General Data


1. Depth to bottom of layer
( depth = 0 )
2. Total unit weight
3. Driving strength loss
capacity

3.5.3.4 Layer Soil Type


1. cohesionless soil SPT N internal friction angle
Skin friction End bearing
2. cohesive soil Undrained Shear Strength

3.14 cohesive soil

98

3.5.4 Pile Type Selection


Pile Type Selection Driven 7 Driven
Open End Pipe Pile
1)
2)
3)
4)
5)
6)
7)

Pipe Pile Closed End


Pipe Pile Open End
Timber Pile
Precast Concrete Pile
Raymond Unifrom Taper Pile
H - Pile
Monotube Pile

3.15 Pipe Pile Closed End

3.16 Pipe Pile Open End

99

3.17 Precast Concrete Pile

3.18 H- Pile

3.5.5 Capacity
Driven 3
1) Restike 2) Driving 3) Ultimate
1. Restike end bearing
Restike
2. Driving
Driving Driving Restike
Driving

100

3. Ultimate Ultimate

3.5.6 (Output)
Driven
( Restike, Driving, Ultimate )
, (end)

, ,
Windows Clip board

3.19

101

3.20 Bearing Capacity

3.21 Bearing Capacity

102

3.5.7 Unit System()


Driven English SI

Driven

3.22

4.1

load settlement Pile Load Test


22
load settlement
4.1
22
4.1

Terzaghi
10%

Terzaghi
50 . Terzaghi
60 . 4.1 4.2
60 . 4.3 4.4 Terzaghi
Terzaghi
F.S.(Factor of safety)
design load Terzaghi
50 .

Load (tons)

104

President Internation

185
180
175
170
165
160
155
150
145
140
135
130
125
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0

80% Hansen = 153


Van Der Veen = 150
Mazurkiewicz = 150

pile load

Chin = 161

Design load 2.5

De Beer = 133
Davisson = 135
Fuller = 135
Butler = 130
90% Hansen = 124

Terzaghi
Davisson
Fuller & Hoy

Design load 2

Butler & Hoy


De Beer
Mazurkiewicz

Terzaghi = 65

Van Der Veen

Design load

Chin
80% Hansen

Dimension = 0.40 m.
Length
= 25 m.

10

20

30

40

50

90% Hansen
60

70

Settlement (mm)

80

90

100

110

4.1 President
Internation

Load (tons)

President Internation

160
155
150
145
140
135
130
125
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0

Pu = 65

Dimension = 0.40 mm.


Length
= 25 m.

8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80
Settlement (mm)

4.2 Terzaghi President


Internation

Load (tons)

105

Crytal City

1200
1150
1100
1050
1000
950
900
850
800
750
700
650
600
550
500
450
400
350
300
250
200
150
100
50
0

Pu = 980

Dimension = 1.20 m.
Length
= 42.12 m.

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50
Se ttle me nt (mm)

Load (tons)

4.3 Terzaghi Crytal City


Crytal City

1400
1375
1350
1325
1300
1275
1250
1225
1200
1175
1150
1125
1100
1075
1050
1025
1000
975
950
925
900
875
850
825
800
775
750
725
700
675
650
625
600
575
550
525
500
475
450
425
400
375
350
325
300
275
250
225
200
175
150
125
100
75
50
25
0

Design load 2.5


Mazurkiewicz = 1110
Van Der Veen= 1101
Terzaghi = 980

Chin = 1205

80% Hansen = 1127

pile load
Terzaghi

Design load 2

Davisson

Davisson = 980

Fuller & Hoy

De Beer= 955

Butler & Hoy

90% Hansen = 891

De Beer
Mazurkiewicz

Design load

Van Der Veen


Chin
80% Hansen
Dimension = 1.20 m.
Length
= 42.12 m.
0

10

15

20

25

30

35

40

45

50

Settlement (mm)

55

60

65

70

90% Hansen
75

4.4 Terzaghi
1.20

106

Load(tons)

Davisson Davisson
elastic 0.15
120 initial modulus (S = PL/AE)
elastic
4.5 initial modulus elastic
offset
Modulus of Elasticity
initial modulus S =
PL/AE 4.6
initial modulus 4.7

elastic
(T2-C2)

400
390
380
370
360
350
340
330
320
310
300
290
280
270
260
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Dimension = 0.60 m.
Length
= 23.53 m.

Pu = 304

10

15

20

25

30

35

40

Settlement(mm)

4.5 Davisson
( T2- C2)

Load(tons)

107

Asoke Tower

800
780
760
740
720
700
680
660
640
620
600
580
560
540
520
500
480
460
440
420
400
380
360
340
320
300
280
260
240
220
200
180
160
140
120
100
80
60
40
20
0

Pu = 737

Elastic

Initial Modulus
S = PL/AE

Dimension = 0.80 m.
Length
= 51.42 m.

10

15

20

25

30

35

40

Settlement(mm)

Load(tons)

4.6 Davisson initial modulus


elastic
Asoke Tower

800
780
760
740
720
700
680
660
640
620
600
580
560
540
520
500
480
460
440
420
400
380
360
340
320
300
280
260
240
220
200
180
160
140
120
100
80
60
40
20
0

Pu = 660

Elastic

x = 0.15 + D/120 inches

Initial Modulus

10

15

20

Dimension = 0.80 m.
Length
= 51.42 m.

25

30

35

40

Settlement(mm)

4.7 Davisson initial modulus


elastic

108

Load (tons)

Fuller and Hoy


0.05 /
4.8 Elastic
0.05 /
0.05 /

4.9
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Building 9 Stories

Pu = 159

1 ton
0.05

1 ton
1.27 mm

Dimension = 0.60 m.
Length
= 21.5 m.

0 1 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829303132333435
Settlement (mm)

4.8 Fuller and Hoy Building 9 Stories


Butler and Hoy Fuller and Hoy Butler and Hoy
Butler and Hoy
0.05 /
Rebound elastic
4.10 Butler and Hoy elastic 0.05
/
elastic

Load (tons)

109

Carre Four

250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Pu =

1 ton
0.05

1 ton
1.27 mm

Dimension = 0.60 m.
Length
= 30 m.
0

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90
Settlement (mm)

Load (tons)

4.9 load settlement 0.05 / Fuller and Hoy


200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Building 9 Stories

Pu = 157

1 ton
0.05

1 ton
1.27 mm

Dimension = 0.60 m.
Length
= 21.5 m.

0 1 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829303132333435
Settlement (mm)

4.10 Butler and Hoy Building 9 Stories

110

Fuller and Hoy Butler and Hoy


0.05 /

De beer

4.11
elastic plastic De
beer
elastic plastic 4.12
elastic
Asoke Tower

1000

Load(tons)

Pu = 589

Dimension = 0.80 m.
Length
= 51.42 m.

100

1.0

10.0

100.0

Settlement(mm)

4.11 De beer Asoke Tower


Modified Mazurkiewicz
2.32
Y

111

Grand Diamond

10000

Load(tons)

Pu = 2692

1000

Dimension = 1.50 m.
Length
= 60.2 m.

100

1.0

10.0

100.0

Settlement(mm)

Load (tons)

4.12 elastic plastic


De beer
Carre Four

250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Pu = 226

Dimension = 0.60 m.
Length
= 30 m.

10

20

30

40

50

60

70

80

Delta load/Delta settlement (tons/mm)

4.13 Modified Mazurkiewicz

112

X Y X
(Delta load /
Delta settlement) 4.13
Delta load / Delta settlement
Modulus end bearing
4.14

Mae Moh Unit 10

1000
975
950
925
Pu 900
875
= 850
825
825 800
775
750
725
700
675
650
625
600
575
550
525
500
475
450
425
400
375
350
325
300
275
250
225
200
175
150
125
100
75
50
250

End Bearing

Load (tons)

Dimension = 0.90 m.
Length
= 22.29 m.

50

100

150

200

250

Delta load/Delta settlement (tons/mm)

300

350

4.14 End bearing Modified Mazurkiewicz


Van der Veen
ln (1-P/Pult)


4.15 4.16 load - settlement Van
der Veen 4.17, 4.18 4.19

load settlement

113

Fortune Complex

0
-1

10

15

20

25

30

35

40

45

50

ln(1-(p/pu))

-2
-3
-4
Pu = 2026

-5
-6
-7

Dimension = 1.50 m.
Length
= 50.02 m.

R2 = 0.9991

-8
settlement (mm)

4.15 Van der Veen Fortune Complex


Asoke Tower

800

33.46, 750

Pu = 767
700
600

11.99, 600

Pu = 957

33.17, 600

9.60, 525

500
Load (tons)

20.29, 675

Pu = 710

7.67, 450
400

32.48, 450

6.05, 375
4.69, 300

300

30.59, 300

3.02, 225

200

1.99, 150
100

27.94, 150

1.00, 75 Dimension = 0.80 m.


Length

0.00, 0

0
0

10

= 51.42 m.

23.47, 0

15

25

20

30

35

40

Settlement (mm)

4.16 load - settlement Van der Veen

114

Asoke Tower

ln(1-(p/pu))

10

11

12

Pu = 957

-1

13

14

R2 = 0.9993

Dimension = 0.80 m.
Length
= 51.42 m.

-2
settlement (mm)

4.17 Van der Veen load 600 tons


Asoke Tower

0
0

10

12

14

16

18

20

22

ln(1-(p/pu))

-1

-2

Pu = 710
R2 = 0.9946

-3

-4
Dimension = 0.80 m.
Length
= 51.42 m.

-5
settlement (mm)

4.18 Van der Veen load 675 tons

115

Asoke Tower

0
0

10 12 14 16 18 20 22 24 26 28 30 32 34 36

-1

ln(1-(p/pu))

-2

-3
Pu = 767
R2 = 0.9943

-4
Dimension = 0.80 mm.
Length
= 51.42 m.

-5
settlement (mm)

4.19 Van der Veen load 750 tons


4.1
Van der Veen Modified Mazurkiewicz
Van der Veen Modified Mazurkiewicz 10%
Chin

Chin load
settlement hyperbola U/P U
(P load U settlement) (1/slope)
load 4.20
Chin

hyperbola

116

President Internation

0.60

y = 0.00621x + 0.03080
Settlement/Load (mm/tons)

0.50

R = 0.99806
Pu = 1/0.00621
= 161

0.40

0.30

0.20

0.10
Dimension = 0.40 m.
Length
= 25 m.

0.00
0

10

20

30
40
50
Settlement (mm)

60

70

80

4.20 Chin President Internation


(T2-C1)

0.090

Pu = 1/0.00271
= 369

0.080

Settlement/Load (mm/tons)

0.070

y = 0.00271 + 0.01165

0.060

0.050
0.040

0.030
0.020

0.010

,
Dimension = 0.60 m.
Length
= 27.5 m.

0.000
0

10

15
20
Settlement (mm)

25

4.21 Chin

30

117


4.21
Chin load

80% Brinch Hansen load movement parabola Chin


hyperbola 2

4 80% 4.22 80%
Brinch Hansen Chin 10%
extrapolation
extrapolation
Lakmung Hospital

24

y = 0.2562x + 14.6
R2 = 0.9982

Sq rt settle/L o ad (to n s)

22

C1
1

Pu = 259
C1 = 0.256/1000 = 0.000256
C2 = 14.6/1000 = 0.0146

20

=C1 +C2
P

U = 57.031

18

PU =

C1 +C2

16
Dimension = 0.40 m.
Length
= 13 m.

14

10

15

20

25

30

35

40

Settlement (mm)

4.22 80% Brinch Hansen


Lakmung Hospital

118

Load (tons)

90% Brinch Hansen 2


90% 4.23

Terzaghi
load movement
90% Brinch Hansen 50% UU
90% PU
50% UU 90% PU 4.24

50% UU 90% PU
4.25 50% UU 90% PU
X

160
155
150
145
140
135
130
125
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0

President International

Pu = 138
90%Pu = 124

Dimension = 0.40 m.
Length
= 25 m.

50%

U = 13

U = 26

0 2 4 6 8101214161820222426283032343638404244464850525456586062646668707274767880
Settlement (mm)

4.23 90% Brinch Hansen


President Internation

Load (tons)

119

Lakmung Hospital

300
290
280
270
260
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Dimension = 0.40 m.
Length
= 13 m.
Pu = 250
90%Pu = 225
Pu 50%

U = 214

50%

U = 16.5

U = 33

8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
Settlement (mm)

4.24 load movement 90% Brinch Hansen 50% UU


90% PU

Load (tons)

Asoke Tower

800
780
760
740
720
700
680
660
640
620
600
580
560
540
520
500
480
460
440
420
400
380
360
340
320
300
280
260
240
220
200
180
160
140
120
100
80
60
40
20
0

Dimension = 0.80 m.
Length
= 51.42 m.

Pu = 748
90%Pu = 673
Pu 50%

50%

U = 640

U = 16.5

U = 33

8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
Settlement (mm)

4.25 load movement 90% Brinch Hansen


50% UU 90% PU

120

80% Hansen (tons)

90% Hansen (tons)

(tons)

(tons)

Pile Tip

25

24.2 25.6

28

18

40

50

17.3

20

CH

15

20.2

20

20.8

21

13.7

40

50

13.1

15

CH

72

74

83

82.6

90

84

69

80

100

69

75

CH

178

242

257

292

259

200

250

178

242

CL

135

135

130

133

150

150

161

153

124

120

150

124

135

SC

0.60 21.5 158

159

159

157

157

175

175

187

179

144

140

175

157

159

SC

Spun

0.60 26.3 215

266

251

283

279

339

274

247

275

343.75

247

283

SC

(T2-C2 )

Spun

0.60 27.3 190

304

302

366

351

417

358

304

350

437.5

302

351

SC

10

(T2-C1 )

Spun

0.60 27.5 202

307

300

331

326

369

333

281

330

412.5

281

333

SC

11

(T1B-C1)

Spun

0.60 27.5 205

285

269

303

301

345

305

261

300

375

261

305

SC

Sakorn Place

0.18

14

6.4

10.6 10.2

9.3

Ban Sing Land 1

0.22

18

13.9 20.1 18.6 17.3

20

Ban Sing Land 2

0.22

20

10.3 15.2 14.3 13.1

Toshiba Project

0.30

24

38

75

75

Lakmung Hospital

Square

0.40

13

128

179

President Internation

Spun

0.40

25

65

Building 9 Stories

Circular

(T3-C2 )

Design load 2
(tons)
Design load 2.5
(tons)

Chin (tons)

CH

Mazurkiewicz (tons)

10.6

De beer (tons)

9.3

Butler & Hoy (tons)

17.5

Fuller & Hoy (tons)

14

Davisson (tons)

9.5

Terzaghi (tons)

12.1

Shape

Length (m)

12

Location

Dimension (m)

10.5 11.2 11.1

number

Van der Veen (tons)

4.1

121

Location

Shape

Dimension (m)

Length (m)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

(tons)

(tons)

Pile Tip

12

(T1-C3)

Spun

0.60

28.5

155

276

266

305

303

407

306

268

300

375

266

306

SC

13

(T2-C3)

Spun

0.60

28

175

259

251

280

278

345

274

247

275

343.75

247

280

SC

14

Carre Four

Spun

0.60

30

151

201

202

193

195

226

226

238

235

184

200

250

184

202

SC

15

Technothani

Spun

0.60

30.4

155

272

285

271

266

291

291

333

304

256

240

300

256

272

SM

16

Asoke Tower

Circular

0.80

51.42

460

660

589

705

710

936

767

600

750

660

767

SP

17

Mae Moh Unit 10.1

Circular

0.90

22.29

575

635

631

825

999

1031

947

760

950

631

825

CL

18

Crytal City

Circular

1.20

42.12

980

980

966

1110 1101 1205 1127

1100 1375

891

980

SM

19

Fortune Complex

Circular

1.20

50.02

1840 1850

1778 2050 2026 2404 2110 1935 1800 2250 1779 2110 SM

20

RS Tower

Circular

1.50

38.37

965

930

891

21

Witayu Complex

Circular

1.50

56

1910 1980

1972 2050 2063 2381 2077 1827 1800 2250 1872 1980 SM

22

Grand Diamond

Circular

1.50

60.2

2225 2730

2692 3180 3480 3448 2992

1025 1109 1190 1158

891

925

Design load 2
(tons)
Design load 2.5
(tons)

number

4.1 ()

1700 2125

891

1025 SM

2100 2625 2646 2940 SM

122

4.2

2 2.5
Static Formula Pile Load Test
2 2.5 4.1

Terzaghi Terzaghi
2 2.5
1.20 1.50 2
2.5 Terzaghi
9 Terzaghi Conservative
Terzaghi

Terzaghi
Terzaghi
Conservative
Davisson Davisson
S = PL/AE

Lakmung Hospital
13 22 179 203
2 2.5
Modulus , Davisson

Fuller and Hoy Butler and Hoy


0.05 /

123

4.1
0.05 /

2 2.5
2
2.5 Fuller
and Hoy elastic
0.05 /
De beer
elastic
De beer

De beer
2 2.5
2 2.5
4.1 De beer Davisson
De beer 1 - 5%
Modified Mazurkiewicz

9
2 2.5 ,

Modified Mazurkiewicz

Van der Veen


Modified Mazurkiewicz Van der Veen
Modified Mazurkiewicz 10% Van der
Veen 2 2.5

124


2 2.5 Van der Veen

Van der Veen
Chin
9
2 2.5 Fellenius (1980)
Chin Davisson 20 40%
Fellenius (1980)
80% Brinch Hansen
Modified Mazurkiewicz Van der Veen Chin

2 2.5
Fellenius (1980) 80% Brinch Hansen
Chin 10%
80% Brinch Hansen Chin 5 - 15%
90% Brinch Hansen
2 2.5
2 2.5

Lakmung Hospital Mae Moh Unit 10.1 90%
Brinch Hansen load settlement
90% Brinch Hansen
4.24 4.25 2
90%
4.1
0.40 Pile Tip Hard Clay (CH, CL)
2 2.5

125

Pile Tip
Pile load 5 ( Lakmung Hospital)
6 ( President Internation)
Pile Tip 6 Clayey fine Sand (SC)
6
2 2.5
load settlement Pile Load Test
4.1 2 2.5
Modified Mazurkiewicz
Van der Veen
Terzaghi Chin
80% Brinch Hansen Chin,
Fuller and Hoy, Butler and Hoy, Davidson, De beer 90% Brich Hansen
.


0.40 Pile Tip Hard Clay (CH, CL)
Modified Mazurkiewicz, Van der Veen 80% Brinch Hansen
0.60 Pile Tip SC,
SM,SP Modified Mazurkiewicz, Van der Veen , 80% Brinch
Hansen Davisson
4.1
Modified Mazurkiewicz, Van der Veen , 80% Brinch Hansen
Davisson

22 .

126

4.3
Predict Chin
Pile Load Test 2
(Design load) 2
Pile Load Test

2 Chin
Predict Pile load Predict 2
Predict 3 (Design load)
Predict 2 50
Asoke Tower
Predict
2 50 .
Predict 3
Design load

Load(ton)

1200
1150
1100
1050
1000
950
900
850
800
750
700
650
600
550
500
450
400
350
300
250
200
150
100
50
0

Dimension = 0.80 m.
Length
= 51.42 m.

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52
Settlement(mm)

4.26 Predict 3 Design load Predict 2


Predict 2 Load Settlement Predict
Predict 3 Design load 2

127

Asoke Tower 4.26


Load Settlement 3 Design load
Load Settlement 2 Load Settlement
2 2 Load
Settlement Predict 2
4.2, 4.3, 4.4 4.5

4.3.1 Load Settlement


Predict Chin 3
2
4.2 4.4 3
2 Load
Settlement 7 President Internation, Building 9
Stories, (T2-C2 ), (T2-C1), Carre
Four, Technothani Asoke Tower 15
Load Settlement
Terzaghi Davisson Predict 3
Predict 2 50
Fuller and Hoy Butler and Hoy Predict 2
Predict 3
Load Settlement 3
0.05
/
Load Settlement 4.2 4.4
Predict 2
Predict 3
De beer, Modified Mazurkiewicz, Van der Veen, 80% Brinch Hansen 90%
Brinch Hansen Predict 3
Predict 2 load settlement 3

128

Predict 2 4.2
4.4
Predict Chin 3
2
4.2
( 0.50 0.90 ) 3
1 25
Load Settlement
Predict 2 Load
Settlement
Predict Chin
2 4.27
Predict 2

load settlement
4.27 4.28
Davisson 4.29

4.3.2
Predict Chin
4.3 4.5 3
0.50 0.50 0.90
0.90

Terzaghi
9 Davisson De beer
7
20 40%

Settlement/Load (mm/tons)

129

Mae Moh Unit 10.1

0.0660
0.0640
0.0620
0.0600
0.0580
0.0560
0.0540
0.0520
0.0500
0.0480
0.0460
0.0440
0.0420
0.0400
0.0380
0.0360
0.0340
0.0320
0.0300
0.0280
0.0260
0.0240
0.0220
0.0200
0.0180
0.0160
0.0140
0.0120
0.0100
0.0080
0.0060
0.0040

y = 0.00114x + 0.00496
2

R = 0.99713

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52
Settlement (mm)

4.27 Predict Chin


Mae Moh Unit 10.1
Mae Moh Unit 10.1

1000
900

y = 0.00114x + 0.00496

800

Pu = 1/0.00114
= 877

Load(ton)

700
600

Predict
Chin

500
400

load - settlement

300
200

Dimension = 0.90 m.
Length
= 22.29 m.

100
0
0

10

15

20

25
30
35
40
Settlement(mm)

45

50

55

60

4.28 Predict Chin


Mae Moh Unit 10.1

130

number

Location

Shape

Dimension
(m)

Length
(m)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

4.2 Predict Chin ( 3 )

R2

Sakorn Place

0.18

14

6.4

12.5

13

10.8

15.5

19.7

19.5

21

19

16.7

0.9976

Ban Sing Land 1

0.22

18

13.5

22.8

24

20.3

25.1

32

31.7

33.4

30.9

26.7

0.9999

Ban Sing Land 2

0.22

20

10.3

18.3

19.8

16.8

21.8

28.1

27.8

29.8

27.06

23.9

0.9999

Toshiba Project

0.30

24

38

79

100

87

81

117

114

127

112

99

0.9984

Lakmung Hospital

Square

0.40

13

120

180

253

231

193

270

266

291

259

231

0.9906

President Internation

Spun

0.40

25

64

124

175

153

122

195

188

218

192

0.9984

Building 9 Stories

Circular

0.60

21.5

164

192

136

232

224

266

238

0.9983

(T3-C2 )

Spun

0.60

26.3

208

270

325

302

254

345

338

364

329

0.9921

(T2-C2 )

Spun

0.60

27.3

190

327

257

570

521

714

0.9999

10

(T2-C1 )

Spun

0.60

27.5

205

405

224

601

548

781

0.9953

11

(T1B-C1)

Spun

0.60

27.5

219

275

314

292

263

330

325

345

318

0.9977

131

number

Location

Shape

Dimension
(m)

Length
(m)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

4.2 Predict Chin ( 3 ) ()

R2

12

(T1-C3)

Spun

0.60

28.5

169

251

243

372

358

407

357

0.9957

13

(T2-C3)

Spun

0.60

28

191

252

305

284

245

328

319

345

311

0.9922

14

Carre Four

Spun

0.60

30

151

220

191

330

316

375

329

0.9947

15

Technothani

Spun

0.60

30.4

164

268

219

417

389

488

0.9998

16

Asoke Tower

Circular

0.80

51.42

463

745

490

1170

1090

1515

0.9989

17

Mae Moh Unit 10.1

Circular

0.90

22.29

591

655

800

775

617

825

817

877

795

702

0.9971

18

Crytal City

Circular

1.20

42.12

935

1010

955

1150

1140

1205

1116

945

0.9981

19

Fortune Complex

Circular

1.20

50.02

1960

2125

1972

2800

2740

3030

2687

2399

0.9946

20

RS Tower

Circular

1.50

38.37

997

960

1115

1085

933

1140

1130

1190

1111

956

0.9989

21

Witayu Complex

Circular

1.50

56

1876

1920

1820

2600

2521

2841

2504

0.9959

22

Grand Diamond

Circular

1.50

60.2

2223

2460

2239

3300

3190

3704

3229

0.9926

132

number

Location

Shape

Terzaghi (%)

Davisson (%)

Fuller & Hoy


(%)

Butler & Hoy


(%)

De beer (%)

Mazurkiewicz
(%)

Van der Veen


(%)

Chin (%)

80% Hansen (%)

90% Hansen (%)

4.3 Predict Chin ( 3 )

Sakorn Place

0.18

14

0.0

17.9

27.5

16.1

47.6

75.9

75.7

75.0

57.0

75.8

Ban Sing Land 1

0.22

18

-2.9

13.4

29.0

17.3

25.5

28.0

31.0

30.5

10.4

48.3

Ban Sing Land 2

0.22

20

0.0

20.4

38.5

28.2

45.3

39.1

39.0

43.3

28.9

74.5

Toshiba Project

0.30

24

0.0

5.3

33.3

20.8

9.5

41.0

38.0

41.1

33.3

43.5

Lakmung Hospital

Square

0.40

13

-6.3

0.6

8.4

11.6

3.5

-0.3

0.0

President Internation

Spun

0.40

25

-1.5

-8.1

29.6

17.7

-8.3

30.0

25.3

35.4

25.5

Building 9 Stories

Circular

0.60

21.5

3.8

19.5

-13.4

32.6

28.0

42.2

33.0

(T3-C2 )

Spun

0.60

26.3

-3.3

1.5

1.2

21.9

21.1

0.0

20.1

(T2-C2 )

Spun

0.60

27.3

0.0

7.6

-14.9

55.7

48.4

71.2

10

(T2-C1 )

Spun

0.60

27.5

1.5

31.9

-25.3

81.6

68.1

111.7

11

(T1B-C1)

Spun

0.60

27.5

6.8

-3.5

-2.2

8.9

8.0

0.0

4.3

Dimension Length
(m)
(m)

133

number

Location

Shape

Terzaghi (%)

Davisson (%)

Fuller & Hoy


(%)

Butler & Hoy


(%)

De beer (%)

Mazurkiewicz
(%)

Van der Veen


(%)

Chin (%)

80% Hansen (%)

90% Hansen (%)

4.3 Predict Chin ( 3 )


()

12

(T1-C3)

Spun

0.60

28.5

9.0

-9.1

-8.6

22.0

18.2

0.0

16.7

13

(T2-C3)

Spun

0.60

28

9.1

-2.7

-2.4

17.1

14.7

0.0

13.5

14

Carre Four

Spun

0.60

30

0.0

9.5

-2.1

46.0

39.8

57.6

40.0

15

Technothani

Spun

0.60

30.4

5.8

-1.5

-17.7

43.3

33.7

46.5

16

Asoke Tower

Circular

0.80

51.42

0.7

12.9

-16.8

66.0

53.5

61.9

Mae Moh Unit 10.1 Circular

0.90

22.29

2.8

3.1

-2.2

0.0

-18.2

-14.9

-16.1

17

Dimension Length
(m)
(m)

18

Crytal City

Circular

1.20

42.12

-4.6

3.1

-1.1

3.6

3.5

0.0

-1.0

6.1

19

Fortune Complex

Circular

1.20

50.02

6.5

14.9

10.9

36.6

35.2

26.0

27.3

24.0

20

RS Tower

Circular

1.50

38.37

3.3

3.2

4.7

11.2

1.9

0.0

-4.1

3.4

21

Witayu Complex

Circular

1.50

56

-1.8

-3.0

-7.7

26.8

22.2

19.3

20.6

22

Grand Diamond

Circular

1.50

60.2

-0.1

-9.9

-16.8

3.8

-8.3

7.4

7.9

134

number

Location

Shape

Dimension
(m)

Length
(m)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

4.4 Predict Chin ( 2 )

R2

Sakorn Place

0.18

14

6.4

12.5

13

10.8

15.5

19.7

19.5

21

19

16.7

0.9976

Ban Sing Land 1

0.22

18

13.5

22.8

24

20.3

25.1

32

31.7

33.4

30.9

26.7

0.9999

Ban Sing Land 2

0.22

20

10.3

18.3

19.8

16.8

21.8

28.1

27.8

29.8

27.06

23.9

0.9999

Toshiba Project

0.30

24

38

79

100

87

81

117

114

127

112

99

0.9984

Lakmung Hospital

Square

0.40

13

120

180

253

231

193

270

266

291

259

231

0.9906

President Internation

Spun

0.40

25

64

124

175

153

122

195

188

218

192

0.9984

Building 9 Stories

Circular

0.60

21.5

164

190

235

218

188

255

250

266

243

212

0.9983

(T3-C2 )

Spun

0.60

26.3

208

270

325

302

254

345

338

364

329

0.9921

(T2-C2 )

Spun

0.60

27.3

190

327

305

618

577

714

645

0.9999

10

(T2-C1 )

Spun

0.60

27.5

205

405

327

670

628

781

710

0.9953

11

(T1B-C1)

Spun

0.60

27.5

219

275

314

292

263

330

325

345

318

0.9977

135

number

Location

Shape

Dimension
(m)

Length
(m)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

4.4 Predict Chin ( 2 ) ()

R2

12

(T1-C3)

Spun

0.60

28.5

169

251

243

372

358

407

357

0.9957

13

(T2-C3)

Spun

0.60

28

191

252

305

284

245

328

319

345

311

0.9922

14

Carre Four

Spun

0.60

30

151

220

316

290

214

340

328

375

329

0.9947

15

Technothani

Spun

0.60

30.4

164

268

237

436

412

488

433

0.9998

16

Asoke Tower

Circular

0.80

51.42

463

745

621

1310

1210

1515

1397

0.9989

17

Mae Moh Unit 10.1

Circular

0.90

22.29

591

655

800

775

617

825

817

877

795

702

0.9971

18

Crytal City

Circular

1.20

42.12

935

1010

955

1150

1140

1205

1116

945

0.9981

19

Fortune Complex

Circular

1.20

50.02

1960

2125

1972

2800

2740

3030

2687

2399

0.9946

20

RS Tower

Circular

1.50

38.37

997

960

1115

1085

933

1140

1130

1190

1111

956

0.9989

21

Witayu Complex

Circular

1.50

56

1876

1920

1820

2600

2521

2841

2504

0.9959

22

Grand Diamond

Circular

1.50

60.2

2223

2460

2239

3300

3190

3704

3229

0.9926

136

number

Location

Shape

Terzaghi (%)

Davisson (%)

Fuller & Hoy


(%)

Butler & Hoy


(%)

De beer (%)

Mazurkiewicz
(%)

Van der Veen


(%)

Chin (%)

80% Hansen (%)

90% Hansen (%)

4.5 Predict Chin ( 2 )

Sakorn Place

0.18

14

0.0

17.9

27.5

16.1

47.6

75.9

75.7

75.0

57.0

75.8

Ban Sing Land 1

0.22

18

-2.9

13.4

29.0

17.3

25.5

28.0

31.0

30.5

10.4

48.3

Ban Sing Land 2

0.22

20

0.0

20.4

38.5

28.2

45.3

39.1

39.0

43.3

28.9

74.5

Toshiba Project

0.30

24

0.0

5.3

33.3

20.8

9.5

41.0

38.0

41.1

33.3

43.5

Lakmung Hospital

Square

0.40

13

-6.3

0.6

8.4

11.6

3.5

-0.3

0.0

President Internation

Spun

0.40

25

-1.5

-8.1

29.6

18.5

-8.3

30.0

26.7

35.4

25.5

Building 9 Stories

Circular

0.60

21.5

3.8

19.5

47.8

38.9

19.7

45.7

42.9

42.2

35.8

47.2

(T3-C2 )

Spun

0.60

26.3

-3.3

1.5

1.2

21.9

21.1

0.0

20.1

(T2-C2 )

Spun

0.60

27.3

0.0

7.6

1.0

68.9

64.4

71.2

80.2

-100.0

10

(T2-C1 )

Spun

0.60

27.5

1.5

31.9

9.0

102.4

92.6

111.7

113.2

11

(T1B-C1)

Spun

0.60

27.5

6.8

-3.5

-2.2

8.9

8.0

0.0

4.3

Dimension Length
(m)
(m)

137

number

Location

Shape

Terzaghi (%)

Davisson (%)

Fuller & Hoy


(%)

Butler & Hoy


(%)

De beer (%)

Mazurkiewicz
(%)

Van der Veen


(%)

Chin (%)

80% Hansen (%)

90% Hansen (%)

4.5 Predict Chin ( 2 )


()

12

(T1-C3)

Spun

0.60

28.5

9.0

-9.1

-8.6

22.0

18.2

0.0

16.7

13

(T2-C3)

Spun

0.60

28

9.1

-2.7

-2.4

17.1

14.7

0.0

13.5

14

Carre Four

Spun

0.60

30

0.0

9.5

56.4

50.3

9.7

50.4

45.1

57.6

40.0

15

Technothani

Spun

0.60

30.4

5.8

-1.5

-10.9

49.8

41.6

46.5

42.4

16

Asoke Tower

Circular

0.80

51.42

0.7

12.9

5.4

85.8

70.4

61.9

82.1

Mae Moh Unit 10.1 Circular

0.90

22.29

2.8

3.1

-2.2

0.0

-18.2

-14.9

-16.1

17

Dimension Length
(m)
(m)

18

Crytal City

Circular

1.20

42.12

-4.6

3.1

-1.1

3.6

3.5

0.0

-1.0

6.1

19

Fortune Complex

Circular

1.20

50.02

6.5

14.9

10.9

36.6

35.2

26.0

27.3

24.0

20

RS Tower

Circular

1.50

38.37

3.3

3.2

4.7

11.2

1.9

0.0

-4.1

3.4

21

Witayu Complex

Circular

1.50

56

-1.8

-3.0

-7.7

26.8

22.2

19.3

20.6

22

Grand Diamond

Circular

1.50

60.2

-0.1

-9.9

-16.8

3.8

-8.3

7.4

7.9

Load(tons)

138

860
840
820
800
780
760
740
720
700
680
660
640
620
600
580
560
540
520
500
480
460
440
420
400
380
360
340
320
300
280
260
240
220
200
180
160
140
120
100
80
60
40
20
0

Mae Moh Unit 10.1

Pu = 655

Dimension = 0.90 m.
Length
= 22.29 m.

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52
Settlement(mm)

4.29 Davisson load settlement


Predict Chin Mae Moh Unit 10.1
Davisson
9 De beer Terzaghi
7
10 55%
De beer
9 Davisson Terzaghi
7
8 20%
2
Predict 4.30 4.31 load
settlement 4.31 9
4.32, 4.33, 4.34, 4.35, 4.36, 4.37, 4.38, 4.39, 4.40
Predict

139

Settlement/Load (mm/tons)

4.41 4.42 Future Place


Condominium 192
Predict Chin 2
Terzaghi, Davisson De beer

Terzaghi Conservative
4.41 4.42
0.4500
0.4400
0.4300
0.4200
0.4100
0.4000
0.3900
0.3800
0.3700
0.3600
0.3500
0.3400
0.3300
0.3200
0.3100
0.3000
0.2900
0.2800
0.2700
0.2600
0.2500
0.2400
0.2300
0.2200
0.2100
0.2000
0.1900
0.1800
0.1700
0.1600
0.1500
0.1400
0.1300
0.1200
0.1100
0.1000
0.0900
0.0800
0.0700
0.0600
0.0500
0.0400
0.0300
0.0200
0.0100

Kanista Resident

y = 0.00813x + 0.01564
2

R = 0.99772

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52
Settlement (mm)

4.30 Predict Chin


Kanista Resident

4.3.3
6 (.. 2527)
6
(.. 2527) 60 .

Davisson
Davisson

140

Kanista Resident

125
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0

Predict
Chin

Load(ton)

y = 0.00813x + 0.01564
Pu = 1/0.00813
= 123
load - settlement

Dimension = 0.50 m.
Length
= 18.5 m.

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52
Settlement(mm)

Load (tons)

4.31 Predict Chin


Kanista Resident
125
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0

Kanista Resident

Pu = 83

Dimension = 0.50 m.
Length
= 18.5 m.

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52
Settle me nt (mm)

4.32 Terzaghi load settlement


Predict Chin Kanista Resident

Load(tons)

141

Kanista Resident

125
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0

Pu = 98

Dimension = 0.50 m.
Length
= 18.5 m.

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52
Settlement(mm)

4.33 Davisson load settlement


Predict Chin Kanista Resident
Kanista Resident

Load(tons)

1000

Pu = 104

100

Dimension = 0.50 m.
Length
= 18.5 m.

10
1.0

10.0

100.0

Settlement(mm)

4.34 De beer load settlement


Predict Chin Kanista Resident

142

Kanista Resident

Load (tons)

125
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0

Pu = 109

1 ton
0.05

1 ton
1.27 mm.

Dimension = 0.50 m.
Length
= 18.5 m.

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48
Se ttle me nt (mm)

4.35 Fuller and Hoy load settlement


Predict Chin Kanista Resident
Kanista Resident

Load (tons)

125
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0

1 ton
0.05

1 ton
1.27 mm.

Dimension = 0.50 m.
Length
= 18.5 m.

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48
Se ttle me nt (mm)

4.36 Butler and Hoy load settlement


Predict Chin Kanista Resident

Load (tons)

143

Kanista Resident

125
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0

Pu = 120

Dimension = 0.50 m.
Length
= 18.5 m.

12

16

20

24

28

32

Delta load/Delta settlement (tons/mm)

36

40

44

4.37 Modified Mazurkiewicz


load settlement Predict Chin Kanista Resident

Kanista Resident

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52
-1

ln(1-(p/pu))

-2
-3
-4
Pu = 119

-5
-6
-7

R2 = 0.9875

Dimension = 0.50 m.
Length
= 18.5 m.
settlement (mm)

4.38 Van der Veen load settlement


Predict Chin Kanista Resident

144

Kanista Resident

Sqrt settle/Load (tons)

65
60

y = 0.7073x + 25.4674

55

R2 = 0.9939
Pu = 118
C1 = 0.7073/1000 = 0.0007073
C2 = 25.4674/1000 = 0.025467

50
45

C1

U = 36.007

40

= C1 +C2
P

35
30

PU =

Dimension = 0.50 m.
Length
= 18.5 m.

25

C1 +C2

20

10

15

20

25

30

35

Settlement (mm)

40

45

50

55

Load (tons)

4.39 80% Brinch Hansen


load settlement Predict Chin Kanista Resident
125
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0

Kanista Resident

Pu = 110
90%Pu = 99

50%

U = 8

U = 16

Dimension = 0.50 m.
Length
= 18.5 m.

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52
Se ttle me nt (mm)

4.40 90% Brinch Hansen


load settlement Predict Chin Kanista Resident

Load (tons)

145

130
125
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0

Kanista Resident

De Beer = 104

Van Der Veen = 119


Fuller = 109

Butler = 100

80% Hansen = 118

Chin = 123

Mazurkiewicz = 120

pile load
Terzaghi
Davisson

90% Hansen = 99

Fuller & Hoy

Davisson = 98

Butler & Hoy


Terzaghi = 83

De Beer
Mazurkiewicz
Van Der Veen
Chin
80% Hansen
Dimension = 0.50 m.
Length
= 18.5 m.

90% Hansen

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52
Settlement (mm)

Load (tons)

4.41 Predict Chin


Kanista Resident
300
290
280
270
260
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Future Place Condominium

Mazurkiwicz = 260

Chin = 291

pile load
Terzaghi

80% Hansen = 255

Davisson

Van der Veen = 244


Fuller = 231
Davisson = 149

Fuller & Hoy


Butler & Hoy

De Beer = 146

De Beer
Mazurkiewicz
Van Der Veen
Chin
80% Hansen

Terzaghi = 71

90% Hansen

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56
Settlement (mm)

4.42 Predict Chin


Future Place Condominium

146

4.4
Hiley Load
Settlement Predict Chin
B 19
Pile Load Test
Hiley 4.7
Pile Load Test 2
4.3 Predict 2 50 Load Settlement
4.8
A 50

Hiley 4.6
4.6 Hiley A

()

Hiley ()

10
(.)

()

0.4 x 0.4 x 22

107.77

1.25

6.010

0.4 x 0.4 x 22

105.51

1.45

6.010

0.4 x 0.4 x 22

106.21

1.45

6.010

0.4 x 0.4 x 22

93.91

0.725

4.490

10

0.4 x 0.4 x 22

93.33

0.75

4.490

B 0.4 x 0.4 .
50 0.65 x 0.65 .
150 F.S.=
2.5 Hiley F.S. 4.6

147

4.7 Hiley B

()

Hiley ()

10
(.)

()

TP 1

0.4 x 0.4 x 20

126.84

8.0

5.869

TP 2

0.4 x 0.4 x 20

143.23

1.5

4.810

TP 3

0.65 x 0.65 x 19

307.32

3.0

10.802

TP 4

0.65 x 0.65 x 20

302.43

2.0

10.245

TP 5

0.4 x 0.4 x 20

132.45

7.0

5.869

TP 6

0.4 x 0.4 x 20

132.45

7.0

5.869

TP 7

0.4 x 0.4 x 20

140.42

5.0

5.869

TP 8

0.65 x 0.65 x 20

275.12

1.9

9.244

TP 9

0.65 x 0.65 x 20

274.42

2.0

9.244

TP 10

0.65 x 0.65 x 20

274.42

2.0

9.244

TP 11

0.65 x 0.65 x 19

298.62

2.7

9.244

TP 12

0.4 x 0.4 x 20

132.51

7.1

5.897

TP 13

0.4 x 0.4 x 20

133.73

6.2

5.720

TP 14

0.4 x 0.4 x 20

138.41

6.0

5.869

TP 15

0.65 x 0.65 x 19

332.09

1.0

10.289

TP 16

0.65 x 0.65 x 19

325.95

1.3

10.289

TP 17

0.65 x 0.65 x 19

325.95

1.3

10.289

TP 18

0.4 x 0.4 x 20

138.41

6.0

5.869

TP 19

0.4 x 0.4 x 20

133.72

6.2

5.720

148

0.4 x 0.4 . Allowable Bearing Capacity


50 0.65 x 0.65
. Allowable Bearing Capacity
A 0.4 x 0.4 . 50
Allowable Bearing Capacity

Boring Pile Tip


"
S "
,


(S) Ultimate Bearing Load
TP 2


Ultimate Bearing Load

4.3.2 2
Terzaghi, Davisson De beer
Modified Mazurkiewicz, Van der Veen, 80% Brinch Hansen, 90% Brinch Hansen,
Fuller and Hoy Butler and Hoy 4.7 4.8
4.9 4.10

149

4.4.1 Hiley
Predict Chin (
2 ) B
4.9 Predict Chin Terzaghi,
Davisson De beer Hiley
0.8 1.03 F.S.(Factor of safety) F.S Hiley
2.5 F.S. Terzaghi, Davisson De
beer 2.0 2.65 4.10 Predict Chin
Modified Mazurkiewicz, Van der Veen, 80% Brinch Hansen, 90% Brinch Hansen,
Fuller and Hoy Butler and Hoy Hiley
1.2 1.4 F.S. 3 3.5
Terzaghi, Davisson De beer 5 %
Modified Mazurkiewicz, Van der Veen, 80% Brinch Hansen,
90% Brinch Hansen, Fuller and Hoy Butler and Hoy 20 50 %
4.3.2 Terzaghi, Davisson De
beer

4.5 Driven
Driven

Pile Tip

Driven
A B
Driven
Pile Load Test Predict Chin
Hiley

150

Shape

Length (m)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

(TP 1)

Square

0.40

20

99

127

141

130

129

152

152

158

150

127

100

150

SM

(TP 2)

Square

0.40

20

121

151

160

150

148

171

171

176

170

140

100

150

SM

(TP 3)

Square

0.65

19

231

316

420

392

304

446

433

483

427

300

450

SM

(TP 4)

Square

0.65

19

221

302

403

378

302

431

418

467

412

300

450

SM

(TP 5)

Square

0.40

20

108

138

152

140

136

165

162

169

161

135

100

150

SM

(TP 6)

Square

0.40

20

SM

(TP 7)

Square

0.40

20

SM

(TP 8)

Square

0.65

20

302

349

440

415

347

455

451

481

440

383

300

450

SM

(TP 9)

Square

0.65

20

270

320

445

418

331

465

455

495

444

397

300

450

SM

(TP 10)

Square

0.65

20

232

289

418

391

305

450

435

485

428

300

450

SM

Pile Tip

Location

Dimension (m)

Design load 2
(tons)
Design load 2.5
(tons)

4.8 B Predict Chin (


2 )

151

Shape

Length (m)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

(TP 11)

Square

0.65

19

238

291

427

400

309

454

441

493

435

300

450

SM

(TP 12)

Square

0.40

20

93

137

171

156

141

186

184

198

182

158

100

150

SM

(TP 13)

Square

0.40

20

84

132

155

141

132

170

169

182

166

149

100

150

SM

(TP 14)

Square

0.40

20

110

145

170

156

150

185

183

193

181

156

100

150

SM

(TP 15)

Square

0.65

19

328

392

513

490

398

533

530

575

523

460

300

450

SM

(TP 16)

Square

0.65

19

282

332

462

439

335

486

477

521

471

421

300

450

SM

(TP 17)

Square

0.65

19

266

311

442

418

331

463

457

500

442

395

300

450

SM

(TP 18)

Square

0.40

20

122

167

188

174

166

200

200

210

198

167

100

150

SM

(TP 19)

Square

0.40

20

102

130

144

133

126

157

156

162

154

131

100

150

SM

Pile Tip

Location

Dimension (m)

Design load 2
(tons)
Design load 2.5
(tons)

4.8 B Predict Chin (


2 ) ()

152

Location

Shape

Dimension (m)

Length (m)

Design load 2
(tons)

Design load 2.5


(tons)

Ultimate Bearing
Capacity Hiley

()

()

4.9 Hiley Predict Chin (


Terzaghi, Davisson De beer)

(TP 1)

Square

0.40

20

100

150

127

99

129

0.78

1.02

-22

(TP 2)

Square

0.40

20

100

150

143

121

151

0.85

1.06

-15

(TP 3)

Square

0.65

19

300

450

307

231

316

0.75

1.03

-25

(TP 4)

Square

0.65

19

300

450

302

221

302

0.73

1.00

-27

(TP 5)

Square

0.40

20

100

150

132

108

140

0.82

1.06

-18

(TP 6)

Square

0.40

20

100

150

132

(TP 7)

Square

0.40

20

100

150

140

(TP 8)

Square

0.65

20

300

450

275

302

349

1.10

1.27

10

27

(TP 9)

Square

0.65

20

300

450

274

270

331

0.99

1.21

-1

21

(TP 10)

Square

0.65

20

300

450

274

232

300

0.85

1.09

-15

153

Location

Shape

Dimension (m)

Length (m)

Design load 2
(tons)

Design load 2.5


(tons)

Ultimate Bearing
Capacity Hiley

()

()

4.9 Hiley Predict Chin (


Terzaghi, Davisson De beer) ()

(TP 11)

Square

0.65

19

300

450

298

238

309

0.80

1.04

-20

(TP 12)

Square

0.40

20

100

150

133

93

141

0.70

1.06

-30

(TP 13)

Square

0.40

20

100

150

133

84

132

0.63

0.99

-37

-1

(TP 14)

Square

0.40

20

100

150

138

110

150

0.80

1.09

-20

(TP 15)

Square

0.65

19

300

450

332

328

398

0.99

1.20

-1

20

(TP 16)

Square

0.65

19

300

450

326

282

335

0.87

1.03

-13

(TP 17)

Square

0.65

19

300

450

326

266

331

0.82

1.02

-18

(TP 18)

Square

0.40

20

100

150

138

122

174

0.88

1.26

-12

26

(TP 19)

Square

0.40

20

100

150

133

102

133

0.77

1.00

-23

154

Location

Shape

Dimension (m)

Length (m)

Design load 2
(tons)

Design load 2.5


(tons)

Ultimate Bearing
Capacity Hiley

()

()

4.10 Hiley Predict Chin (


Van der Veen, Modified Mazurkiewicz, 80% Brinch Hansen, 90% Brinch Hansen, Fuller and Hoy Butler and Hoy)

(TP 1)

Square

0.40

20

100

150

127

150

158

1.18

1.24

18

24

(TP 2)

Square

0.40

20

100

150

143

170

176

1.19

1.23

19

23

(TP 3)

Square

0.65

19

300

450

307

420

446

1.37

1.45

37

45

(TP 4)

Square

0.65

19

300

450

302

403

431

1.33

1.43

33

43

(TP 5)

Square

0.40

20

100

150

132

161

169

1.22

1.28

22

28

(TP 6)

Square

0.40

20

100

150

132

(TP 7)

Square

0.40

20

100

150

140

(TP 8)

Square

0.65

20

300

450

275

440

455

1.60

1.65

60

65

(TP 9)

Square

0.65

20

300

450

274

444

465

1.62

1.70

62

70

(TP 10)

Square

0.65

20

300

450

274

418

450

1.53

1.64

53

64

155

Location

Shape

Dimension (m)

Length (m)

Design load 2
(tons)

Design load 2.5


(tons)

Ultimate Bearing
Capacity Hiley

()

()

4.10 Hiley Predict Chin (


Van der Veen, Modified Mazurkiewicz, 80% Brinch Hansen, 90% Brinch Hansen, Fuller and Hoy Butler and Hoy) ()

(TP 11)

Square

0.65

19

300

450

298

427

454

1.43

1.52

43

52

(TP 12)

Square

0.40

20

100

150

133

182

186

1.37

1.40

37

40

(TP 13)

Square

0.40

20

100

150

133

166

182

1.25

1.37

25

37

(TP 14)

Square

0.40

20

100

150

138

181

193

1.31

1.40

31

40

(TP 15)

Square

0.65

19

300

450

332

513

533

1.55

1.61

55

61

(TP 16)

Square

0.65

19

300

450

326

462

486

1.42

1.49

42

49

(TP 17)

Square

0.65

19

300

450

326

442

463

1.36

1.42

36

42

(TP 18)

Square

0.40

20

100

150

138

188

210

1.36

1.52

36

52

(TP 19)

Square

0.40

20

100

150

133

154

162

1.16

1.22

16

22

156

4.11 Driven
Hiley A

()

()
Driven

()
Hiley ()

()

0+679

0.4 x 0.4 x 22

95.14

102.57

0.93

2+232

0.4 x 0.4 x 22

102.44

106.50

0.96

4.12 Driven
Hiley B

()

()
Driven

()
Hiley ()

()

0.4 x 0.4 x 20

132.97

135.22

0.98

0.65 x 0.65 x 19

282.79

317.92

0.89

0.65 x 0.65 x 20

302.71

283.99

1.06

4.5.1 Driven
Hiley
4.11 Driven A
Hiley 0.93 - 0.96
4.12 Driven B
Hiley 0.89 - 1.06 4.7
Hiley 0.65x0.65 19 .
20 .
19 .

157

number

Location

Shape

Dimension
(m)

Length
(m)


(tons)


(tons)

Driven
(tons)

()

()

4.13 Driven Pile Load Test

(T3-C2 )

Spun

0.60

26.3

247

283

267

0.94

1.08

(T2-C2 )

Spun

0.60

27.3

302

351

305

0.86

1.01

(T2-C1 )

Spun

0.60

27.5

281

333

310

0.93

1.10

(T1B-C1)

Spun

0.60

27.5

261

305

290

0.95

1.11

(T1-C3)

Spun

0.60

28.5

266

306

298

0.97

1.11

(T2-C3)

Spun

0.60

28

247

280

284

1.01

1.10

Asoke Tower

Circular

0.80

51.42

660

767

711

0.93

1.07

Crytal City

Circular

1.20

42.12

891

980

987

1.00

1.10

Witayu Complex

Circular

1.50

56

1872

1980

1964

0.99

1.04

10

Grand Diamond

Circular

1.50

60.2

2646

2940

2552

0.86

0.95

157

158

20 .

4.5.2 Driven
Pile Load Test

Driven
4.13
Driven
Pile Load Test 0.86 - 1.10
Driven Hiley 0.9 - 1.05
F.S.(Factor of safety)
Driven F.S. Hiley
2.5 Driven F.S.
2.15 2.75

5
5.1
10
Pile Load Test 22
214 Chin

1. 2 2.5
Modified Mazurkiewicz

2. Pile Load Test Chin


2 Load Settlement
3
3. Predict Chin Terzaghi, Davisson
De beer
Terzaghi
0.50 0.50 0.90
Davisson De beer

0.90
4. Modified Mazurkiewicz, Van der
Veen, 80% Brinch Hansen, 90% Brinch Hansen, Fuller & Hoy Butler & Hoy
20 40%
, 10 55% 8 20%

160

5. Hiley Load Settlement


Predict Chin Terzaghi, Davisson De beer
5 % Modified Mazurkiewicz, Van der Veen, 80% Brinch
Hansen, 90% Brinch Hansen, Fuller & Hoy Butler&Hoy
20 50 %
6. Driven 0.9 - 1.05
Hiley 0.86 - 1.10
Pile Load Test
F.S.= 2.5 Hiley Driven F.S.
2.15 2.75

5.2

5.2.1 10

P - S/ log t S - log
P, DIN4026, Boston Building Code, Canadian Building Coad (1960)
5.2.2 F.S.(Factor of safety)

F.S.

F.S.
5.2.3 (Finite Element
Analysis)


1. , 2532, Dynamic Load Test,
,
, , 1083 .
2. , 2535, Correllation of Dynamic Measurement and
Static Load Test, ,
, , 1083 .
3. , 2541,
,
, 161 .
4. , 2539, , ,
, 105116.
5. , 2539, Foundation Engineering and Tunnelling, 5,
, 443 .
6. , 2521, ,
, , 111
7. , 2539, , ,
, 161 .
8. , 2540,
, 40,
, 48-78.

162
9. , 2523,
,
,
10. , 2539,
,
, 30-35.
11. , 2524, ,
,
, 176 - 199
12. , 2531,
,
, 134-138.
13. ASTM Designation, 1986, D 1143-81 Standard Method of Testing Piles Under Static Axial
Compressive Load, Annual Book of ASTM Standards, Vol. 04.08, pp. 239-254.
14. Berezantzev, V.G., V. Khristoforov and V.Golubkov., 1961, Load Bearing Capacity and
Deformation of Piled Foundation, Proc., 5th Conf. S.M.&F.E., Vol. 02, pp. 11-15.
15. Bishop, A.W., 1945, The Theory of Indentation and Hardness Test, Proceedings of Physics
Society, No. 57, pp. 147-159.
16. Bowles, J.E., (1977, 1982, 1988), Foundation Analysis and Design, 2nd ,3rd and 4th ed.,
McGraw-Hill Book Company, New York
17. Brinch Hansen, H.J., 1963, Hyperbolic Stress-strain Response, Cohesive Soils, American
Society of Civil Engineers, ASCE, J.SMFD, Vol. 89, SM4, pp. 241-242.

163
18. Broms, B.B., 1966, Methods of Calculating the Ultimate Bearing Capacity of Piles, A
Summary Sols Soils, No. 18, pp. 21-32.
19. Broms, B.B., 1972, Stability of Flexible Structures (Piles and Pile Groups), 5th European
Conference on Soil Mechanics and Foundation Engineering, Madrid, Vol. 2, pp. 239-269.
20. Butler, H.D. and Hoy, H.E, 1977, Users manual for the Texas Quick-load Method for
Foundation Load Testing, Federal Highway Administration, Office of Development,
Washington, p. 59.
21. Canadian Geotechnical Society, 1992, Canadian Foundation Engineering Manual, 3rd ed.,
Technical Committee on Foundation, Richmond, British Columbia, p. 512.
22. Caquot, A. and Kerisel, J., 1948, Tables for Calculation of Passive Pressure, Active Pressure
and Bearing Capacity of Foundation( translated from French), Gauthier-Villars, Paris.
23. Carroll, J., 1994, Foundation Design : Principles and Practice, Prentice-Hall, New Jersey,
p. 796.
24. Centre for Civil Engineering Research and Codes, 1996, Building on Soft Soil, A.A. Balkema,
Rotterdam, Netherland, p. 396.
25. Chin, F.K., 1970, Estimation of the Ultimate Load of Pile not Carried to Failure, Proc., of 2nd
Southeast Asian Conf on Soil Eng, pp. 81-90.
26. Chin, F.K., 1971, Discussion, Pile tests, Arkansas River Project, American Society of Civil
Engineers, Vol. 97, pp. 930-932.
27. Chun, H.H., 1992, Performance of Driven and Bored Piles in Expressway Projects, Master
of Engineering Thesis, Geotechnical Engineering Program, Faculty of Engineering, Asian
Institute of Technology, p. 55.

164
28. Coduto, D.P., 1994, Foundation Design: Principles and Practices, Prentice Hall, Inc.,
New Jersey, p. 796.
29. Crowther, C.l., 1987, Load Test of Deep Foundation, John &Wiley Sons, Inc., Georgia,
p. 233.
30. Das, B.M., 1999, Principles of Foundation Engineering, 4thed., Brooks/Cole Publishing
Company, Pacific Grove, California, p. 862.
31. Davisson, M.T., 1972, High Capacity Piles, Proceedings of Soil Mechanics Lecture Series
on Innovations in Foundation Construction, American Society of Civil Engineers, Illinois
Section, Chicago, pp. 81-112.
32. De Beer, E.E. and Walays, M., 1972, Franki Piles with Overexpanded Bases, La Technique
des Travaux, Belgium, No. 333, p. 48.
33. Fellenius, B.H., 1975, Test Load of Piles and new Proof Testing Procedure, American
Society of Civil Engineers, ASCE, Jr. of Geotechnical Engineering Division, Vol. 101,
No. GT 9, pp. 855-869.
34. Fellenius, B.H., 1980, The Analysis of Results from Routine Pile Load Tests, Ground
Engineering, Vol. 13, No. 6, pp. 19-31.
35. Fellenius, B.H., 2001, From Strain Measurements to Load in an Instrumented Pile,
Geotechnical Instrumentation News, pp. 35-38.
36. Fleming, W.G.K., Randolph, M.F., Weltman, A.J. and Elson, W.K., 1992, Piling Engineering,
2nd ed., John Wiley & Sons, New York, p. 390.
37. Fuller, R.M. and Hoy, H.E., 1970, Pile Load Tests Including Quick-Load Test Method,
Conventional Methods and Interpretations, HRB 333, pp. 78-86.

165
38. Gibbs, H.J. And Holtz, W.G, 1957, Research on Determining the Density of Sands by Spoon
Penetration Testing, 5th IcSMFE., Vol. 2, pp. 35-39.
39. Housel, W.S., 1966, Pile Load Capacity: Estimation And Test Results, Proc. of the
American Society of Civil Engineering, Vol. 92(4), pp. 1-29.
40. Hwang, J.H., Li, J.C.C. and Liang, N., 2003, On Method for Interpretation Bearing Capacity
from a Pile Load Test, Journal of The Southeast Asian Geotechnical Society, April,
pp. 27-38.
41. Joshi, R.C. and Sharma, H.D., 1987, Prediction of Ultimate Pile Capacity from Load Test on
Bored and Belled, Expanded Base Compacted and Driven Piles, Prediction and Performance
in Geotechnical Engineering, University of Calgary, Canada, pp. 135-144.
42. Ladanyi, B., 1963, Evaluation of Pressuremeter Tests in Granular Soils, 2nd Panamerican
Conference on Soil Mechanics and Foundation Engineering., Sao Paulo, Brazil, Vol. 1,
pp. 3 - 20.
43. Lambe, T.W. and Whitman, R.V., 1979, Soil Mechanics, SI Version, John Wiley & Sons,
New York., p. 553.
44. Mazurkiewicz, B.K., 1972, Test Loading of Piles According to Polish Regulations, Royal
Swedish Academy of Engineering Sciences, Commission on Pile Research, Preliminary
Report No.35, Stockholm, Sweden, pp.20.
45. Meyerhof, G.G., 1951, The Ultimate Bearing Capacity of pile Foundation, Geotechnique,
Vol. 2, No. 4, pp. 301-331.
46. Meyerhof, G.G., 1953, The Bearing Capacity of Foundations under Eccentric and Inclined
Loads, 3rd ICSMFE, Vol. 1, pp. 440-445.

166
47. Meyerhof, G.G., 1976, The Bearing Capacity and Settlement of Pile Foundation, Geot. Eng.
Div. ASCE, Vol. 102, No. GT 3.
48. Mohan, D. And Jain, G.S., 1961, Bearing Capacity of Pile in Expansive Clays, Proc. 5th Int.
Conf. SM. And FE., Vol. 2
49. Mohan, D., 1967, Bearing Capacity of Multiple Under-Reamed Bored Pile, Proc. of 3rd Asian
Conference on Soil Mechanic and Foundation Engineering, Vol. 1, pp. 183-186.
50. Nordlund, R.L., 1963, Bearing Capacity of Pile in Cohesionless Soils, Journal. SMFD.,
ASCE, Vol. 89, SM 3.
51. Peck, R.B., 1954, Foundation Conditions in Cuyahoga River Valley, Journal of Geotechnical
Engineering Divison, ASCE, Vol. 80, p. 513.
52. Peck, R.B., 1958, Study of the Comparative Behaviour of Friction Piles, Washington D.C.,
Highway Research. Board, p. 72.
53. Peck, R.B., 1974, Foundation Engineering, 2nd ed., John Wiley, ASCE, New York.
54. Poulos, H.G. and Davis, E.H., 1980, Pile Foundation Analysis and Design, John Wiley and
Sons, Singapore, p. 397.
55. Skempton, A.W., 1951, Discussion : Pile and Piles in London Clay, Geotechnique, Vol. 9
56. Skempton, A.W. and Bjerrum, L, 1957, A Contribution to the Settlement Analysis of
Foundation on Clay, Geotechnique, Vol. 7, No. 4
57. Sower, G.F., 1961, The Bearing Capacity of Friction Pile Groups in a Homogeneous Clay from
Model Studies, 5rd ICSMFE, Vol. 2, pp. 367 - 374

167
58. Teng, W.C., 1962, Foundation Design, Prentice Hall, New Jersey
59. Terzaghi, K., 1943, Theoretical Soil Mechanics, John Wiley & Sons, New York
60. Terzaghi, K., (1978, 1967), Soil Mechanics in Engineering Practice, 1st and 2nd ed., John
Wiley & Sons, New York
61. Tomlinson, M.J., 1971, Some Effects of Pile Driving on Skin Friction, Proceeding
Behavious of Piles Institution of Civil Engineers, London, pp. 107-114.
62. Tomlinson, M.J., (1975, 1980, 1986), Foundation Design and Construction, 3rd, 4th and 5th
ed., Pitman Publishing Ltd., London
63. Van der Veen, C., 1953, The Bearing Capacity of a Pile,Proc, 3rd ed., ICSMFE, Vol. 2,
pp. 84-90.
64. Van Weele, A.F., 1957, A Method of Seperating the Bearing Capacity of a Test Pile into Skin
Friction and Point Resistance, 4rd ICSMFE, Vol. 2
65. Vesic, A.S., 1970, Load Transfer in Pile-Soil System, Design & Installation of Pile
Foundations and Cellular Structure, pp. 47-73.
66. Vesic, A.S., 1967, Ultimate Loads and Settlement of Deep Foundation in Sand,
Proceedings of Symposium on Bearing Capacity and Settlement of Foundations, Duke
University, Durham, N.C.
67. Winterkorn, H.F. and Fang, H., 1975, Foundation Engineering Handbook, Van Nostrand
Reinhold Co., New York, p. 751.
68. Whitaker, T., 1957, Experiments with Model Pile in Groups, Geotechnique, Vol. 7, No. 4,
December, pp. 147-167.

168
69. Whitaker, T., 1963, The Constant Rate of Penetration Test for Determination of the Ultimate
Bearing Capacity of a Pile, Proceeding of Institution of Civil Engineers, Vol. 26,
pp. 119-123.
70. Whitaker, T., 1970, The Design of Piled Foundation, Pergamon Press, London

Load (tons)

170

Sakorn Place

18.0
17.5
17.0
16.5
16.0
15.5
15.0
14.5
14.0
13.5
13.0
12.5
12.0
11.5
11.0
10.5
10.0
9.5
9.0
8.5
8.0
7.5
7.0
6.5
6.0
5.5
5.0
4.5
4.0
3.5
3.0
2.5
2.0
1.5
1.0
0.5
0.0

Design load 2.5

pile load
Terzaghi

Design load 2
De = 10.5

Davis = 10.6

Chin = 12

Van = 11.1

Fuller = 10.2
90% Han = 9.5
Butler = 9.3

Davisson
Fuller & Hoy
Butler & Hoy

80% Han = 11.8

Maz = 11.2

De Beer
Mazurkiewicz

Design load

Van Der Veen

Ter = 6.4

Chin
80% Hansen
Dimension = 0.18 m.
Length
= 14 m.
0

10

15

20

25

30

35

40

45

50

Settlement (mm)

55

60

65

70

90% Hansen
75

Load (tons)

.1 Sakorn Place
Ban Sing Land 1

52
50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0

Design load 2.5

pile load
Terzaghi

Design load 2

Davisson
Fuller & Hoy

80% Han = 27

Maz = 25
De = 20
Davis = 20.1

Butler & Hoy

Van = 24.2

De Beer

Chin = 25.6

Mazurkiewicz

Design load

Fuller = 18.6
90% Han = 18
Butler = 17.3
Ter = 13.9

Van Der Veen


Chin
80% Hansen

Dimension = 0.22 m.
Length
= 18 m.
0

10

20

30

40

50
60
70
80
Settlement (mm)

90% Hansen
90

100

110

120

.2 Ban Sing Land ( 1)

Load (tons)

171
Ban Sing Land 2

52
50
48
46
44
42
40
38
36
34
32
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0

Design load 2.5

pile load
Terzaghi

Design load 2

Davisson
Fuller & Hoy
Butler & Hoy

Maz = 20.2
De = 15

Design load

Davis = 15.2

80% Han = 21

Mazurkiewicz

Van = 20
Chin = 20.8

Fuller = 14.3
90% Han = 13.7
Butler = 13.1
Ter = 10.3

Van Der Veen


Chin
80% Hansen

Dimension = 0.22 m.
Length
= 20 m.

De Beer

90% Hansen

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80
Settlement (mm)

Load (tons)

.3 Ban Sing Land ( 2)


Toshiba Project

105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0

80% Han = 84
Van = 82.6
Fuller = 75 Davis = 75
De = 74

Design load 2.5


Chin = 90

Design load 2

Maz = 83

pile load
Terzaghi
Davisson
Fuller & Hoy
Butler & Hoy

Butler = 72
90% Han = 69

De Beer
Mazurkiewicz

Ter = 38

Design load

Van Der Veen


Chin
S - log

Dimension = 0.30 m.
Length
= 24 m.

80% Hansen
90% Hansen

5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85
Settlement (mm)

.4 Toshiba Project

Load (tons)

172
Lakmung Hospital

300
290
280
270
260
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Chin = 290
Van der Veen = 257

pile load

80% Han = 259

Terzaghi

Design load 2.5

Mazurkiewicz = 242

Davisson
Fuller & Hoy

Design load 2

Davisson = 179

Butler & Hoy

De Beer = 178

De Beer
Mazurkiewicz

Terzaghi = 128

Design load

Van Der Veen


Chin
80% Hansen

Dimension = 0.40 m.
Length
= 13 m.
0

10

15

20

25

30

35

40

Settlement (mm)

45

50

55

90% Hansen
60

Load (tons)

.5 Lakmung Hospital
President Internation

185
180
175
170
165
160
155
150
145
140
135
130
125
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0

80% Hansen = 153


Van Der Veen = 150
Mazurkiewicz = 150

pile load

Chin = 161

Design load 2.5

De Beer = 133
Davisson = 135
Fuller = 135
Butler = 130
90% Hansen = 124

Terzaghi
Davisson
Fuller & Hoy

Design load 2

Butler & Hoy


De Beer
Mazurkiewicz

Terzaghi = 65

Van Der Veen

Design load

Chin
80% Hansen

Dimension = 0.40 m.
Length
= 25 m.

10

20

30

40

50

90% Hansen
60

70

Settlement (mm)

80

90

100

110

.6 President Internation

Load (tons)

173
Highrise Building 9 Stories

210
205
200
195
190
185
180
175
170
165
160
155
150
145
140
135
130
125
120
115
110
105
100
95
90
85
80
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0

Van der veen = 175


Mazurkiewicz = 175
Ter = 158
Fuller = 159
Davisson = 159
De Beer = 157
Butler = 157

80% Han = 179 Chin = 187

pile load
Terzaghi

Design load 2.5

Davisson
Fuller & Hoy

Design load 2

90% Han = 144

Butler & Hoy


De Beer
Mazurkiewicz

Design load

Van Der Veen


Chin
80% Hansen

Dimension = 0.60 m.
Length
= 21.5 m.
0

10

15

20

25
30
35
40
Settlement (mm)

45

50

55

90% Hansen
60

Load (tons)

.7 Building 9 Stories
(T3-C2)

450
440
430
420
410
400
390
380
370
360
350
340
330
320
310
300
290
280
270
260
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Design load 2.5

pile load
Terzaghi

80% Han = 274


De = 251

Chin = 339Design load 2

Davisson

Mazurkiewicz = 283

Fuller & Hoy

Van der Veen = 279

Butler & Hoy

Davis = 266
90% Han = 247

De Beer

Terzaghi

Mazurkiewicz

Design load

Van Der Veen


Chin
80% Hansen

Dimension = 0.60 m.
Length
= 26.3 m.
0

10

15

20

25

30

35 40 45 50 55
Settlement (mm)

90% Hansen
60

65

70

75

80

.8 ( T3-C2)

Load (tons)

174
(T2-C2)

480
470
460
450
440
430
420
410
400
390
380
370
360
350
340
330
320
310
300
290
280
270
260
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

pile load

Chin = 417

80% Han = 358

Terzaghi

Mazurkiewicz = 366

Van der Veen = 351

Davisson

Design load 2.5

Davis = 304

Fuller & Hoy

90% Han = 304


De Beer = 302

Butler & Hoy

Design load 2

De Beer
Mazurkiewicz
Terzaghi = 190

Van Der Veen

Design load

Chin
80% Hansen
Dimension = 0.60 m.
Length
= 27.3 m.
0

10

20

30

40

50

60

Settlement (mm)

70

90% Hansen
80

Load (tons)

.9 ( T2-C2)
(T2-C1)

430
420
410
400
390
380
370
360
350
340
330
320
310
300
290
280
270
260
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Design load 2.5


Chin = 369

Mazurkiewicz = 331
80% Han = 333
Van der Veen = 326
Davisson = 307
De Beer = 300
90% Han = 281

Design load 2

pile load
Terzaghi
Davisson
Fuller & Hoy
Butler & Hoy
De Beer

Terzaghi = 202

Design load

Mazurkiewicz
Van Der Veen
Chin
80% Hansen

Dimension = 0.60 m.
Length
= 27.5 m.
0

90% Hansen

5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95
Settlement (mm)

.10 ( T2-C1)

Load (tons)

175
(T1B-C1)

390
380
370
360
350
340
330
320
310
300
290
280
270
260
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Design load 2.5


Mazurkiewicz = 303
Van der Veen = 301
80% Han = 305

pile load

Chin = 345

Terzaghi

Design load 2

Davisson

Davisson = 285
De Beer = 269
90% Han = 261

Fuller & Hoy


Butler & Hoy
De Beer

Terzaghi = 205

Mazurkiewicz

Design load

Van Der Veen


Chin
80% Hansen
Dimension = 0.60 m.
Length
= 27.5 m.
0

10 15

20

25

30 35

40

90% Hansen
45

50 55

Settlement (mm)

60

65

70 75

80

Load (tons)

.11 ( T1B-C1)
(T1-C3)

420
410
400
390
380
370
360
350
340
330
320
310
300
290
280
270
260
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Chin = 407

Design load 2.5


Mazurkiewicz = 305
Van der = 303
80% Han = 306

pile load
Terzaghi
Davisson

Design load 2
Davis = 276
90% Han = 268
De Beer = 266

Fuller & Hoy


Butler & Hoy
De Beer

Terzaghi = 155

Design load

Mazurkiewicz
Van Der Veen
Chin

Dimension = 0.60 m.
Length
= 28.5 m.
0

80% Hansen
90% Hansen

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
Settlement (mm)

.12 ( T1-C3)

Load (tons)

176
(T2-C3)

380
370
360
350
340
330
320
310
300
290
280
270
260
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Chin = 345

pile load

Design load 2.5

Terzaghi

Van der Veen = 278


80% Han = 274
Mazurkiewicz = 280

Davisson

Design load 2

Fuller & Hoy

Davisson = 259
De Beer = 251
90% Han = 247

Butler & Hoy


De Beer

Terzaghi = 175

Mazurkiewicz

Design load

Van Der Veen


Chin
80% Hansen

Dimension = 0.60 m.
Length
= 28 m.
0

10

15

20

25

30

90% Hansen

35 40 45 50 55 60
Settlement (mm)

65

70

75

80

85

Load (tons)

.13 ( T2-C3)
Carre Four

260
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Davis = 200 Fuller = 202

80% Han = 233 Design load 2.5


Van = 226
Chin = 238
Maz = 226

Design load 2

De Beer = 195
Butler = 193
90% Han = 184

pile load
Terzaghi
Davisson
Fuller & Hoy
Butler & Hoy

Terzaghi = 151

De Beer
Mazurkiewicz

Design load

Van Der Veen


Chin
80% Hansen
Dimension = 0.60 m.
Length
= 30 m.
0

10

20

30

40

50

90% Hansen
60

70

Settlement (mm)

80

90

100

110

.14 Carre Four

Load (tons)

177
Technothani Building

380
370
360
350
340
330
320
310
300
290
280
270
260
250
240
230
220
210
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0

Chin = 333
Fuller = 281 Van = 291
Davis = 272

pile load

80% Han = 305

Terzaghi

Design load 2.5

Maz = 291

Butler = 271
De Beer = 266
90% Han = 256

Davisson
Fuller & Hoy

Design load 2

Butler & Hoy


De Beer
Mazurkiewicz

Terzaghi = 155

Design load

Van Der Veen


Chin
80% Hansen

Dimension = 0.60 m.
Length
= 30.4 m.
0

10

20

30

40

50

60

70

80

Settlement (mm)

90

100

90% Hansen

110

Load (tons)

.15 Technothani
Asoke Tower

1000
975
950
925
900
875
850
825
800
775
750
725
700
675
650
625
600
575
550
525
500
475
450
425
400
375
350
325
300
275
250
225
200
175
150
125
100
75
50
25
0

pile load

Chin = 936

Terzaghi

80% Han = 767

Davisson

Design load 2.5

Van der Veen = 710

Mazurkiewicz = 705
Davis = 660

Fuller & Hoy

Design load 2

Butler & Hoy

De Beer = 589

De Beer
Mazurkiewicz

Terzaghi = 460

Van Der Veen

Design load

Chin
80% Hansen
Dimension = 0.80 m.
Length
= 51.42 m.
0

10

15

20

25

30

35

40

45

Settlement (mm)

50

55

60

65

90% Hansen
70

.16 Asoke Tower

Load (tons)

178
Mae Moh Unit 10.1

1100
1080
1060
1040
1020
1000
980
960
940
920
900
880
860
840
820
800
780
760
740
720
700
680
660
640
620
600
580
560
540
520
500
480
460
440
420
400
380
360
340
320
300
280
260
240
220
200
180
160
140
120
100
80
60
40
20
0

Chin = 1031
Van der Veen = 999

pile load

Design load 2.5

80% Han = 947

Terzaghi
Davisson

Mazurkie = 825

Design load 2

Davis = 635

Fuller & Hoy


Butler & Hoy

De Beer = 631

De Beer

Terzaghi = 575

Mazurkiewicz

Design load

Van Der Veen


Chin
80% Hansen

Dimension = 0.90 m.
Length
= 22.29 m.
0

10 15

20 25

30 35

90% Hansen
40 45 50

55 60

Settlement (mm)

65 70

75 80

Load (tons)

.17 Mae Moh Unit 10.1


Crytal City

1400
1375
1350
1325
1300
1275
1250
1225
1200
1175
1150
1125
1100
1075
1050
1025
1000
975
950
925
900
875
850
825
800
775
750
725
700
675
650
625
600
575
550
525
500
475
450
425
400
375
350
325
300
275
250
225
200
175
150
125
100
75
50
25
0

Design load 2.5


Mazurkiewicz = 1110
Van Der Veen= 1101
Terzaghi = 980

Chin = 1205

80% Hansen = 1127

pile load
Terzaghi

Design load 2

Davisson

Davisson = 980

Fuller & Hoy

De Beer= 955

Butler & Hoy

90% Hansen = 891

De Beer
Mazurkiewicz

Design load

Van Der Veen


Chin
80% Hansen
Dimension = 1.20 m.
Length
= 42.12 m.
0

10

15

20

25

30

35

40

45

50

Settlement (mm)

55

60

65

70

90% Hansen
75

.18 Crytal City

Load (tons)

179
Fortune Complex

2600
2550
2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
1450
1400
1350
1300
1250
1200
1150
1100
1050
1000
950
900
850
800
750
700
650
600
550
500
450
400
350
300
250
200
150
100
50
0

pile load

Chin = 2404

Design load 2.5

90% Han = 1935


Terzaghi = 1840
Davisson = 1850

80% Han = 2110


Mazurkiewicz = 2050
Van der Veen = 2026

Design load 2

De Beer = 1778

Terzaghi
Davisson
Fuller & Hoy
Butler & Hoy
De Beer
Mazurkiewicz

Design load

Van Der Veen


Chin
80% Hansen

Dimension = 1.20 m.
Length
= 50.02 m.
0

90% Hansen

5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95
Settlement (mm)

Load (tons)

.19 Fortune Complex

2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
1450
1400
1350
1300
1250
1200
1150
1100
1050
1000
950
900
850
800
750
700
650
600
550
500
450
400
350
300
250
200
150
100
50
0

Rs Tower

Design load 2.5

pile load
Terzaghi

Design load 2

Davisson
Fuller & Hoy

Terzaghi = 965

Maz = 1025

Van = 1109

Chin = 1190

Butler & Hoy


De Beer

Davis = 930

80% Han = 1158

90% Han = 925

Design load

Mazurkiewicz
Van Der Veen

De Beer = 891

Chin
80% Hansen
Dimension = 1.50 m.
Length
= 38.37 m.
0

90% Hansen

5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95
Settlement (mm)

.20 RS Tower

Load (tons)

180
Witayu Complex

2500
2450
2400
2350
2300
2250
2200
2150
2100
2050
2000
1950
1900
1850
1800
1750
1700
1650
1600
1550
1500
1450
1400
1350
1300
1250
1200
1150
1100
1050
1000
950
900
850
800
750
700
650
600
550
500
450
400
350
300
250
200
150
100
50
0

Chin = 2381
Maz = 2050 Design load 2.5

De Beer = 1972 Davis = 1980


Ter = 1910

80% Han = 2077


Van = 2063

90% Han = 1827

pile load
Terzaghi
Davisson

Design load 2

Fuller & Hoy


Butler & Hoy
De Beer
Mazurkiewicz

Design load

Van Der Veen


Chin
80% Hansen

Dimension = 1.50 m.
Length
= 56 m.

10

15

20

25

30

35

40

45

Settlement (mm)

50

55

60

65

90% Hansen
70

Load (tons)

.21 Witayu Complex


Grand Dimond

3700
3600
3500
3400
3300
3200
3100
3000
2900
2800
2700
2600
2500
2400
2300
2200
2100
2000
1900
1800
1700
1600
1500
1400
1300
1200
1100
1000
900
800
700
600
500
400
300
200
100
0

Van der Veen = 3480


Mazurkiewicz = 3180
80% Han = 2992
Davisson = 2730
Chin = 3448
90% Han = 2646
De Beer = 2692

Design load 2.5

Terzaghi = 2225

Design load 2

pile load
Terzaghi
Davisson
Fuller & Hoy
Butler & Hoy
De Beer
Mazurkiewicz

Design load

Van Der Veen


Chin
80% Hansen

Dimension = 1.50 m.
Length
= 60.2 m.
0

90% Hansen

10 15 20 25 30 35 40 45 50 55 60 65 70 75 80
Settlement (mm)

.22 Grand Diamond

number

Location

Dimension ( m.)

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

.1 Predict Chin ( 2 )

Pile Tip

Circular 0.20

15

25

62.5

46

85

82

75

79

93

92

95

91

75

CL

. ( 1)

Circular 0.23

18

7.5

18.75

8.3

21.3

44

35

33

66

62

78

70

CL-ML

. ( 1)

Circular 0.23

16

7.5

18.75

9.4

22.2

40

32

32

59

56

68

59

CL-ML

. ( 2)

Circular 0.23

16

7.5

18.75

14.5

25

27

23.8

28.2

36

35.2

37

34.8

30.1

CL-ML

. ( 3)

Circular 0.23

16

7.5

18.75

10.6

21

27

22

28.2

39

37.7

42

37

CL-ML

. ( 1)

Circular 0.23

21

7.5

18.75

13.7

47

70

56

45

93

87

108

94

CL-ML

Square

0.30

12

35

87.5

55

89

115

102

100

130

128

138

126

112

SM-SC

. 1

Square

0.30

14

30

75

75

95

97

92

91

106

106

108

105

89

International Airport P1

Square

0.30

28.8

45

112.5

71

217

235

211

155

260

250

287

252

SC

10

International Airport P3

Square

0.30

25

50

125

49

155

201

180

123

231

219

262

230

SC

11

Circular 0.35

21.5

45

112.5

37

56

68

60

59

81

80

86

79

70

SC

Shape

182

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

Pile Tip

0.35

21.5

17.5

6.6

13

12.2

11.8

14

14.2

14.1

14.3

14

12.4

SC

Chalerm Phra Kiat

Circular 0.35

19.3

30

75

40

79

141

119

95

165

156

187

163

14

. .

Circular 0.35

18

30

75

64

79

82

76

78

91

90

93

90

75

CL

15

Circular 0.35

21

25

62.5

85

132

140

128

123

156

154

162

152

130

OH-MH

16

Square

0.35

10

30

75

86

111

117

109

112

128

128

132

127

107

CL , CH

17

Thai Nippon Steel .

Square

0.35

24

60

150

51

140

197

178

129

230

217

264

232

ML-OL

18

. 2 .

Circular 0.35

6.5

50

125

144

182

205

194

184

219

217

225

215

180

19

. 3 .

Circular 0.35

6.5

50

125

144

180

201

190

181

213

211

217

209

174

20

. 4 .

Circular 0.35

6.5

50

125

136

185

225

210

195

240

237

248

234

200

21

. 5 .

Circular 0.35

6.5

50

125

140

172

189

178

176

201

200

206

199

166

22

International School .

30

75

62

109

125

114

105

142

139

150

137

120

SM

number

Dimension ( m.)

.1 Predict Chin ( 2 ) ()

Location

Shape

12

Square

13

Circular 0.35 21.75

183

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

Pile Tip

0.35

30

75

75

80

132

118

106

150

145

159

143

129

CL

Circular 0.35

21

35

87.5

76

106

111

102

104

124

121

126

120

103

SC

25

Square

0.35

10

30

75

105

129

142

133

129

152

152

156

151

127

SM

26

International Airport P4

Square

0.35

25

50

125

96

225

262

240

182

286

277

313

275

SC

27

Future Place .

Spun

0.40

21

80

200

71

149

231

205

146

260

244

291

255

SC

28

Square

0.40

12

50

125

101

125

149

138

132

164

162

169

160

136

SM

29

Circular 0.40

16

44

110

90

118

134

123

123

147

145

152

144

122

SM

30

Square

0.40

22

50

125

78

112

137

124

122

150

150

161

148

129

31

. .

Circular 0.40

24

40

100

60

105

147

130

110

170

163

185

162

32

. 2

Square

0.40

50

125

91

97

103

98

89

110

110

112

110

89

CL

33

(TP 1) .

Square

0.40

20

50

125

99

127

141

130

129

152

152

158

150

127

SM

number

Dimension ( m.)

.1 Predict Chin ( 2 ) ()

Location

Shape

23

Square

24

184

number

Location

Shape

Dimension ( m.)

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

.1 Predict Chin ( 2 ) ()

Pile Tip

34

(TP 2) .

Square

0.40

20

50

125

121

151

160

150

148

171

171

176

170

140

SM

35

(TP 5) .

Square

0.40

20

50

125

108

138

152

140

136

165

162

169

161

135

SM

36

(TP 12) .

Square

0.40

20

50

125

93

137

171

156

141

186

184

198

182

158

SM

37

(TP 13) .

Square

0.40

20

50

125

84

132

155

141

132

170

169

182

166

149

SM

38

(TP 14) .

Square

0.40

20

50

125

110

145

170

156

150

185

183

193

181

156

SM

39

(TP 18) .

Square

0.40

20

50

125

122

167

188

174

166

200

200

210

198

167

SM

40

(TP 19) .

Square

0.40

20

50

125

102

130

144

133

126

157

156

162

154

131

SM

41

. 1

Square

0.40

18

50

125

112

149

168

156

150

184

182

190

180

154

CH

42

. 2

Square

0.40

18

50

125

95

131

159

145

141

174

172

182

169

149

CH

43

Circular 0.43

11

40

100

116

130

138

131

132

150

149

153

148

122

CL , CH

44

.3 .15 .

Square

28

90

225

160

320

387

359

274

417

402

455

400

MH-OH

0.45

185

number

Location

Shape

Dimension ( m.)

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

.1 Predict Chin ( 2 ) ()

Pile Tip

45

.3 .6 .

Square

0.45

28

90

225

163

291

344

319

254

363

356

392

348

313

MH-OH

46

.3 .7 .

Square

0.45

28

90

225

161

298

353

327

257

372

365

405

358

MH-OH

47

.3 .8 .

Square

0.45

28

90

225

160

288

340

314

251

362

352

389

345

MH-OH

48

.3 .9 .

Square

0.45

28

90

225

169

293

342

316

253

361

353

386

347

309

MH-OH

49

.3 .10 .

Square

0.45

28

90

225

144

290

365

337

257

392

380

433

380

MH-OH

50

.3 .11 .

Square

0.45

28

90

225

144

278

348

320

251

373

361

408

359

MH-OH

51

.3 .12 .

Square

0.45

28

90

225

159

279

331

303

243

352

341

376

336

300

MHOH

52

.3 .13 .

Square

0.45

28

90

225

156

270

320

292

237

338

330

375

325

290

MH-OH

53

.3 .14 .

Square

0.45

28

90

225

164

272

315

290

240

332

326

355

321

284

MH-OH

54

.3 .1 .

Square

0.45

28

90

225

172

307

359

330

263

369

369

407

361

326

MH-OH

55

.3 .2 .

Square

0.45

28

90

225

130

262

305

286

219

339

325

368

324

284

MH-OH

186

number

Location

Shape

Dimension ( m.)

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

.1 Predict Chin ( 2 ) ()

Pile Tip

56

.3 .3 .

Square

0.45

28

90

225

159

280

330

307

254

352

344

380

339

301

MH-OH

57

.3 .4 .

Square

0.45

28

90

225

117

232

325

300

219

355

342

377

352

MH-OH

58

.3 .5 .

Square

0.45

28

90

225

203

331

362

340

295

381

376

405

371

327

MH-OH

59

Mae Moh Unit 10.2 .

Circular 0.50

10.5

120

300

218

259

310

290

260

325

321

336

317

269

CL

60

Kanista Resident

Circular 0.50

18.5

55

137.5

83

98

109

100

106

120

119

123

118

99

CH

61

Circular 0.50

10

60

150

142

160

201

187

182

219

215

226

213

181

CH

62

Circular 0.50

13

65

162.5

132

175

217

202

182

236

232

246

230

197

SC

63

Circular 0.50

22

50

125

159

210

241

224

197

255

254

268

251

215

CL

64

Circular 0.50

50

125

119

127

175

161

150

190

188

199

186

160

CL

65

. 1 .

Circular 0.50

14

40

100

90

96

107

100

102

118

117

120

116

97

SM

66

Circular 0.50

35

87.5

109

112

118

113

112

127

126

128

126

104

CL

187

number

Location

Dimension ( m.)

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

.1 Predict Chin ( 2 ) ()

Pile Tip

67

KR Precision .

Circular 0.50

23

60

150

166

213

234

219

202

252

248

260

245

210

SM

68

Circular 0.50

60

150

175

184

199

190

182

210

209

213

208

175

69

Circular 0.50

12.5

65

162.5

111

138

240

213

181

263

251

283

249

SM-SP

70

. 1 .

Circular 0.50

15.5

65

162.5

209

270

315

297

263

335

330

395

326

278

MH-OH

71

. 2 .

Circular 0.50

15.5

65

162.5

212

310

394

368

299

414

406

442

399

355

MH-OH

72

Circular 0.50

12

50

125

126

135

148

139

140

159

158

162

157

131

CH

73

Circular 0.50

15

50

125

199

209

212

205

202

223

221

224

220

183

CL-ML

74

. .

Circular 0.50

22

65

162.5

149

211

260

237

204

279

272

294

268

248

SP-SM

75

Circular 0.50

21

65

162.5

186

232

252

236

224

267

264

275

261

222

SM-SP

76

. .

Circular 0.50

10

65

162.5

203

226

252

240

234

268

266

272

263

219

CH

77

Circular 0.50

13

65

162.5

201

229

252

240

234

268

264

272

262

217

CL

Shape

188

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

Pile Tip

Circular 0.50

21

35

87.5

126

150

168

156

155

182

180

187

178

150

Square

55

137.5

128

133

150

142

141

160

160

163

159

133

SM

Circular 0.50

11.5

55

137.5

160

184

219

205

295

235

233

243

230

194

SM-SC

. .

Circular 0.50

12

65

162.5

114

136

211

190

168

230

223

244

219

194

SM

82

. .

Circular 0.50

19

65

162.5

188

232

256

239

224

268

268

279

265

244

SP-SM

83

. .

Circular 0.50

11

65

162.5

140

155

183

170

168

195

195

202

193

162

84

. .

Circular 0.50

16

65

162.5

76

95

201

176

127

214

214

253

221

SM

85

Circular 0.50

16

60

150

117

135

157

145

144

169

169

177

168

141

SC

86

. .

Circular 0.50

8.5

60

150

83

87

192

168

133

204

204

233

204

CL

87

Circular 0.50

50

125

136

141

154

146

145

163

163

166

162

133

88

. 1

Circular 0.50

6.5

60

150

136

138

145

139

141

153

153

155

152

123

number

Dimension ( m.)

.1 Predict Chin ( 2 ) ()

Location

78

79

80

. .

81

Shape

0.50

189

Location

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

Pile Tip

89

Circular 0.50

60

150

143

161

280

256

219

300

291

321

286

257

90

Circular 0.50

11

55

137.5

140

160

204

188

180

219

216

227

213

181

SC

91

Circular 0.50

22

60

150

143

197

239

220

195

260

254

274

250

220

SC

92

Circular 0.50

13

65

162.5

125

143

177

165

157

191

190

200

188

161

SM

93

Circular 0.50

55

137.5

147

155

181

170

168

193

192

198

191

161

CL

94

Circular 0.50

10

65

162.5

241

256

264

256

251

275

274

277

273

221

CL

95

. 1

Circular 0.50

50

125

106

110

141

130

129

155

153

159

151

127

CL

96

Circular 0.50

13

55

137.5

158

194

246

229

204

265

259

275

256

221

CH

97

Circular 0.50

11

65

162.5

92

102

150

135

124

166

163

176

161

140

SM

98

Circular 0.50

55

137.5

102

105

133

123

122

145

144

150

143

121

CL

99

Circular 0.50

60

150

99

103

148

136

126

165

162

172

160

140

CL

Shape

Dimension ( m.)

number

.1 Predict Chin ( 2 ) ()

190

number

Location

Dimension ( m.)

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

.1 Predict Chin ( 2 ) ()

Pile Tip

100

Circular 0.50

13.5

65

162.5

167

203

249

231

209

265

261

275

257

220

SM

101

Circular 0.50

15

60

150

107

119

136

126

129

147

147

152

145

122

CL-ML

102

. .

Circular 0.50

15

65

162.5

162

195

230

214

200

247

242

253

239

203

CL

103

Circular 0.50

10

55

137.5

77

83

136

120

112

153

150

164

148

131

CL-ML

104

Circular 0.50

10

65

162.5

145

162

204

189

177

219

216

226

213

180

SW-SM

105

..

Circular 0.50

10.5

60

150

190

198

203

196

197

211

211

213

210

171

CL

106

Circular 0.50

23

60

150

159

195

210

198

191

225

223

232

221

185

SM

107

. .1 .

Circular 0.50

10

60

150

146

156

174

164

162

185

184

188

182

151

SM-SC

108

Circular 0.50

19

50

125

185

220

238

224

211

252

249

258

247

208

SM

109

Circular 0.50

25

65

162.5

176

245

292

270

237

310

304

327

300

263

SC

110

Circular 0.50

23

55

137.5

164

189

203

191

182

214

213

219

212

176

SC

Shape

191

number

Location

Dimension ( m.)

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

.1 Predict Chin ( 2 ) ()

Pile Tip

111

Circular 0.50

18

50

125

99

110

128

119

120

141

140

146

139

118

CL

112

Hollow 0.525

30

100

250

238

580

398

710

673

800

701

SC

113

0.60

39

120

300

215

290

313

292

257

330

327

347

322

278

SP-SM

114

Circular 0.60

15

75

187.5

168

177

200

190

178

215

213

220

211

176

SM

115

Circular 0.60

15

65

162.5

178

182

185

180

178

194

194

196

193

158

ML-OL

116

. 2

Circular 0.60

14

65

162.5

161

170

206

193

184

221

219

228

217

186

SM

117

Circular 0.60

65

162.5

181

180

233

220

200

250

247

258

244

209

ML-OL

118

Circular 0.60

27.5

85

212.5

244

308

340

320

285

359

354

372

349

295

SC

119

. 1

Circular 0.60

15

60

150

172

185

226

212

200

244

241

252

238

203

CH

120

. 2

Circular 0.60

15

60

150

226

245

276

262

245

292

288

298

286

238

CH

121

Circular 0.60

12

80

200

224

235

265

254

245

282

279

287

276

229

SC

Shape

Spun

192

number

Location

Dimension ( m.)

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

.1 Predict Chin ( 2 ) ()

Pile Tip

122

2 .

Circular 0.60

12

80

200

167

175

230

212

200

246

242

255

239

204

SC

123

Circular 0.60

19

80

200

199

214

228

217

214

240

239

245

238

198

124

Circular 0.60

17

65

162.5

186

206

249

231

218

265

261

273

258

218

SM-SP

125

Circular 0.60

24

65

162.5

172

201

239

221

204

255

251

265

248

212

SW-SM

126

Circular 0.60

19.5

80

200

165

190

245

224

201

261

256

272

252

219

CL , CH

127

Circular 0.60

26

65

162.5

162

184

205

193

182

220

218

227

215

182

OH-MH

128

Circular 0.60

11

65

162.5

204

210

241

229

222

254

252

260

251

207

SM

129

Circular 0.60

16

25

62.5

54

51

71

66

64

77

77

80

75

63

SM-SP

130

Circular 0.60

23

80

200

167

200

252

232

204

272

265

283

261

228

SC

131

Circular 0.60

21

60

150

171

194

230

214

201

245

242

254

239

204

CH

132

Circular 0.60

15

65

162.5

187

203

244

227

211

259

255

267

253

212

CH

Shape

193

Location

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

Pile Tip

133

Circular 0.60

80

200

216

215

251

239

225

264

263

270

261

216

SC

134

. .

Circular 0.60

11

65

162.5

165

167

188

179

177

200

200

204

198

166

SC

135

. .

Circular 0.60

17

75

187.5

190

200

214

204

203

224

224

228

222

183

SC

136

Circular 0.60

10

65

162.5

161

163

202

188

178

212

212

220

210

177

137

Circular 0.60

60

150

152

152

200

181

176

212

212

222

209

180

SM-SP

138

. .

Circular 0.60

11

60

150

162

166

204

194

181

222

220

229

218

185

139

Circular 0.60

18

80

200

147

159

197

187

176

213

209

219

206

176

ML-OL

140

Circular 0.60

15

55

137.5

175

191

197

189

186

207

206

210

205

168

SM

141

Circular 0.60

12

55

137.5

190

196

217

206

204

228

227

233

226

189

CL

142

Circular 0.60

13

80

200

210

220

277

258

229

290

288

300

285

239

SM-SW

143

. .

Circular 0.60

65

162.5

188

189

208

199

195

219

217

221

216

178

Shape

Dimension ( m.)

number

.1 Predict Chin ( 2 ) ()

194

number

Location

Dimension ( m.)

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

.1 Predict Chin ( 2 ) ()

Pile Tip

144

Circular 0.60

15

60

150

192

201

217

207

204

230

228

233

227

186

GM

145

Circular 0.60

10

80

200

202

207

235

222

218

247

245

251

244

202

ML-OL

146

. .

Circular 0.60

13

65

162.5

129

131

156

146

140

169

168

174

166

140

SC

147

Circular 0.60

20

80

200

132

144

181

166

155

196

194

205

192

167

SP-SM

148

. .

Circular 0.60

65

162.5

131

127

216

195

164

235

228

248

224

199

CL-ML

149

Circular 0.60

10

60

150

131

131

195

176

166

210

207

224

204

176

SC

150

.1 .

Circular 0.60

70

175

235

239

255

246

243

266

265

269

264

220

SM-SP

151

. .

Circular 0.60

21

50

125

128

135

150

140

138

162

160

165

159

132

CH

152

.2 .

Circular 0.60

70

175

232

236

256

246

243

269

267

272

266

218

SM-SP

153

Circular 0.60

15

80

200

167

176

203

192

191

219

216

224

215

178

CL

154

Circular 0.60

24

80

200

237

308

397

372

299

418

410

446

404

356

SC

Shape

195

number

Location

Shape

Dimension ( m.)

Length ( m.)

Design load (tons)

load 2.5 (tons)

Terzaghi (tons)

Davisson (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

.1 Predict Chin ( 2 ) ()

Pile Tip

155

Bang Bor (J-3B4)(SC-17A)

Spun

0.60

31

135

337.5

150

234

345

320

224

366

366

429

376

SM

156

Bang Plee TP-1(BH-2)

Square

0.60

26

170

425

231

435

367

810

758

962

850

SC

157

(TP 3) .

Square

0.65

19

150

375

231

316

420

392

304

446

433

483

427

SM

158

(TP 4) .

Square

0.65

19

150

375

221

302

403

378

302

431

418

467

412

SM

159

(TP 8) .

Square

0.65

20

150

375

302

349

440

415

347

455

451

481

440

383

SM

160

(TP 9) .

Square

0.65

20

150

375

270

320

445

418

381

465

455

495

444

397

SM

161

(TP 10) .

Square

0.65

20

150

375

232

289

418

391

305

450

435

485

428

SM

162

(TP 11) .

Square

0.65

19

150

375

238

291

427

400

309

454

441

493

435

SM

163

(TP 15) .

Square

0.65

19

150

375

328

392

513

490

398

533

530

575

523

460

SM

164

(TP 16) .

Square

0.65

19

150

375

282

332

462

439

335

486

477

521

471

421

SM

165

(TP 17) .

Square

0.65

19

150

375

266

311

442

418

331

463

457

500

442

395

SM

196

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

Van der Veen (tons)

Chin (tons)

80% Hansen (tons)

90% Hansen (tons)

168

Davisson (tons)

Terzaghi (tons)

167

load 2.5 (tons)

Design load (tons)

166

Length ( m.)

Location

Dimension ( m.)

number

.1 Predict Chin ( 2 ) ()

Pile Tip

Circular 0.80

34

150

375

301

402

508

479

407

517

517

549

510

440

SP-SM

Shape

Circular 0.80 44.99

260

650

529

615

780

760

589

825

809

883

798

708

SM

( 2)

Circular 0.80

47.2

350

875

580

805

741

1270 1210 1433 1254

SM

169

Mae Moh Unit 6.7

Circular 0.90

21

250

625

828

1135

1000

1625 1560 1818 1593

CH

170

14

Circular 1.00 55.41

490

1225

898

1050

944

1640 1570 1876 1604

SM

171

Circular 1.00 47.04

450

1125

942

1020

955

1440 1390 1541 1372

1230

SM

172

Circular 1.00

520

1300

927

1155

1047

1805 1710 2037 1786

SM

173

Golden Gate Plaza

Circular 1.00 50.48

500

1250

1233 1440

1349

2280 2200 2564 2247

SM

174

Circular 1.20 34.47

403

1007.5 1027 1020

1310

1285

1023

1370 1338 1449 1319

1161

SP-SM

175

Circular 1.20

53.5

650

1625

1435 1640

1479

2795 2650 3226 2833

SM

176

Central Pinklao

Circular 1.20 45.22

700

1750

1127 1175

1122

1650 1610 1786 1587

SM

55

197

Terzaghi (tons)

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

90% Hansen (tons)

Circular 1.20 65.53

640

1600

1168 1330

1230

2140 2040 2433 2132

SM

178

Royal River Place

Circular 1.20

51.7

700

1750

1759 1800

1884

2550 2480 2762 2443

SM

179

Second Stage Expressway

Circular 1.20 35.18

410

1025

963

990

955

1275 1255 1355 1234

1080

SM

180

Water Clife( Phase I )

Circular 1.20 58.08

650

1625

1326 1470

1334

2730 2560 3185 2774

SM

181

Noble House Phayathai

Circular 1.20 55.32

635

1587.5 1068 1200

1072

1960 1860 2227 1946

SM

182

Circular 1.20

58.3

648

1620

1379 1550

1349

2460 2340 2778 2432

SM

183

Circular 1.20

50.5

450

1125

1308 1400

1259

2060 2010 2288 2008

SM

184

SV Riverside Garden

Circular 1.20

51.1

700

1750

1714 1960

1738

3025 2890 3413 2997

SM

185

Circular 1.20 63.07

725

1812.5 1339 1410

1318

1975 1910 2141 1892

SM

186

Circular 1.50 51.05

780

1950

2354 2510

2291

3450 3320 3802 3343

SM

187

SG Tower ll

Circular 1.50 60.13

1000

2500

2500 2840

2239

4910 4600 5882 5283

SM

80% Hansen (tons)

load 2.5 (tons)

Apartment (South)

Chin (tons)

Design load (tons)

177

Van der Veen (tons)

Length ( m.)

Pile Tip

Shape

Davisson (tons)

Location

Dimension ( m.)

number

.1 Predict Chin ( 2 ) ()

198

Fuller & Hoy (tons)

Butler & Hoy (tons)

De beer (tons)

Mazurkiewicz (tons)

90% Hansen (tons)

2375

2150 2210

2188

3350 3230 3788 3317

SM

Circular 1.50 55.01

850

2125

2404 2740

2455

5100 4750 6250 5743

SM

Makkasan Tower

Circular 1.50

900

2250

2291 2300

2089

3860 3650 4405 3863

SM

191

Dspa Tower Project

Circular 1.50 59.46

900

2250

2250 2370

1995

4020 3780 4651 1293

SM

192

THE 9th TOWER

Circular 1.50 58.25

853

2132.5 2242 2150

1972

3230 3110 3571 3136

SM

189

Bitec

190

57

80% Hansen (tons)

Terzaghi (tons)

950

Jasmine Internation

Chin (tons)

load 2.5 (tons)

63.7

188

Shape

Van der Veen (tons)

Design load (tons)

Circular 1.50

Location

Davisson (tons)

Length ( m.)

Pile Tip

number

Dimension ( m.)

.1 Predict Chin ( 2 ) ()

199

200

11 2518

.. 2536

.. 2540

.. 2545

.. 2549

Вам также может понравиться