Вы находитесь на странице: 1из 3

Discrete Vs REM

This Blog will bring out some basics of Discrete Vs Repetitive manufacturing
as a Snap Shot.
Discrete Manufacturing:
1. hen pro!uction is !one Base! on "r!ers.
#. $ost is collecte! at "r!er %evel.
&. $ollection of cost
'. $omple( Routing)Bom* %i+e Variant $on,guration-
Repetitive Manufacturing:
1. hen .ro!uction is !one .erio!icall/* Same pro!uct .ro!uce! for over
perio! of time-
#. Simple Bac+ 0ushing is .lanne!.
The below are few other points that are !i1erentiate them.
Master Data
1. Material Master
or+ Sche!uling View:
Discrete: 2ou nee! to have the or+ Sche!uling View activate! for this.
REM: or+ Sche!uling is not Re3uire!.
REM .ro,le:
Discrete: 4o Rem .ro,le is re3uire!.
REM: REM .ro,le is Man!ator/.
#. .ro!uction Version
Discrete: 5t is "ptional
REM: 5t is Man!ator/
&. .ro!uct $ost $ollector:
Discrete: 5t is 4ot Re3uire!
REM: 5t is Man!ator/ 6 it is the one which collects all the cost.
'. Settlement
Discrete: Settlement is !one at the .ro!uction or!er level.
REM: 5t is at material %evel.
7. or+ "r!er.
Discrete: .ro!uction or!er are man!ator/.
REM: 4o "r!er6
8. $on,rmation
Discrete: con,rmation is !one at .ro!uction or!er "peration level or at "r!er
level.
REM: $on,rmation are !one at pro!uction version ).lanne! or!er level.
9. $apacit/ .lanning
Discrete: Done with $M:16:# etc6
REM: 4ee! to be !one with M;7: .lanning table.
<. Shop ;loor .aper.
Discrete: $an $reate shop 0oor .rint.
REM : 4o Stan!ar! Shop 0oor .aper6 nee! to !o $ustom Development if
Re3uire!.
=."r!er 5nformation S/stem
Discrete: >as Detaile! or!er information
REM: 4o !etaile! list.

Вам также может понравиться