P

PREPARATION
1. SURVEY
Survey- flat and cleared area
Survey- rough and non-cleared area
Survey levelling
2 DEMOLISHING WORKS
Steel existing Fence 3"
Demolish Mason
3 TREE CUTTING
Tree Cutting 0 - 10 cm dia.
Tree Cutting 0 - 10 cm dia.
Tree Cutting 11 - 40 cm dia.
Tree Cutting 41 - 80 cm dia.
Tree Cutting > 80 cm dia.
4 LAND CLEARING
Land clearing after trees cutting
5 CUT AND FILL / Excavation
1 Section 1
2 Section 2
3 Section 3AL
Section 3A
4 Section 4AL
Section 4A
5 Section 5
6 Borepile Exacavation
6.1 Type P1
Borepile Exacavation
Pile Cap Excavation
6.2 Type P2
Borepile Exacavation
NO DESCRIPTION
CHEVRON GEOTHERMAL SALAK
PT. REKAYASA INDUSTRI
Pile Cap Excavation
6.3 Type P3
Borepile Exacavation
Pile Cap Excavation
7 Backfill
4 Strainer
4.1 Supply and install tarpaulin for ground/material covering
4.2 Installl geotextile terram
4.3 Bamboo pile
5 Parkir Area
5.1 RETAINING WALL
5.1.1 Borepile Exacavation
0 Survey levelling
1 Type P1
Borepile Exacavation
Pile Cap Excavation
2 Type F1P
Borepile Exacavation
Pile Cap Excavation
3 Cupping Beam
250 x 400 mm
4 Backfill
5.1.2 Concrete
5.1.1 Borepile
1 Type P1
Borepile
Pile Cap
2 Type F1P
Borepile
Pile Cap
3 Cupping Beam
250 x 400 mm
4 Concrete Retaining Wall
150 x 3500 mm
5 Colomn
P1 -- 300x300 mm
F1P -- 300x300 mm
F2P -- 300x300 mm
F3P -- 300x300 mm
6 Sand Bedding
Beam
Pile Cap P1
Pile Cap F1P
7 Lean Concrete
Beam
Pile Cap P1
Pile Cap F1P
8 Grouting
5.2 PAVEMENT PARKIR
0 Survey levelling
1 Pavement
Backfill & Compaction - RED Clay 250 mm
Red Clay
Rock Platting
Base coarse 150 mm
Sand Bedding 50 mm
Paving Block 80 mm
2 Concrete Access
0 Survey levelling
Backfill & Compaction - RED Clay 250 mm
Red Clay
Rock Platting
Base coarse 150 mm
Sand Bedding 50 mm
Concrete Access 120 mm
3 Cellar Area
Survey levelling
Backfill & Compaction - RED Clay 250 mm
Red Clay
Rock Platting
Base coarse 150 mm
Sand Bedding 50 mm
Concrete Access 120 mm
4 Cellar Statue
Celar Excavation
Backfill & Compaction - RED Clay 250 mm
Red Clay
Rock Platting
Base coarse 150 mm
Base coarse 150 mm
Lean Concrete
Pile Cup 800x800
Cupping Beam 300x200
Colomn 300x300
Wall concrete 200 mm
Floor concrete 200 mm
5 Drainage
5.1 Drainage type A
Survey levelling
Backfill & Compaction - RED Clay 250 mm
Red Clay
Rock Platting
Base coarse 150 mm
Base coarse 150 mm
Concrete U ditch
Concrete Cover U ditch
5.2 Drainage type B
Survey levelling
Backfill & Compaction - RED Clay 250 mm
Red Clay
Rock Platting
Base coarse 150 mm
Sand Bedding 50 mm
Concrete U ditch
Concrete Cover U ditch
6 Bollard / Guarf post
Survey levelling
Excavation
Concrete 18.75 fy
Pipe 4"
Reflective contact type 2"
Sand Bedding 50 mm
Lean Concrete
7 Ground Reservoir
Survey levelling
Excavation , Grountank
Exacavation Borepile
Concrete K225, Ground tank
Concrete K225 Borepile
Concrete K225, kolom
Concrete K225 beam
Concrete K225, roof
Sand Bedding 50 mm
Lean Concrete
Pas Bata merah
Plaster
8 Septic Tank Type 1 Cap 1 M3
Survey levelling
Excavation , Grountank
Concrete K225, infiltrate
Sand Bedding 50 mm
Lean Concrete
Gravel
Palm wool
9 Septic Tank Type 2 Cap 2 M3
Survey levelling
Excavation , Grountank
Concrete K225, infiltrate
Sand Bedding 50 mm
Lean Concrete
Gravel
Palm wool
10 Septic Tank Type 3 Cap 3 M3
Survey levelling
Excavation , Grountank
Concrete K225, infiltrate
Sand Bedding 50 mm
Lean Concrete
Gravel
Palm wool
6 MAIN BUILDING
6.1 Borepiled Excavation
6.1.1 Excavation
1.1 Borepile Exacavation
1.1.1 Type P1
Borepile Exacavation
Pile Cap Excavation
1.1.2 Type P2
Borepile Exacavation
Pile Cap Excavation
1.1.3 Type P3
Borepile Exacavation
Pile Cap Excavation
1.2 Cupping Beam 250x400
6.1.2 Sand Bedding
6.1.3 Lean Concrete
6.2 Concrete
1.1 Borepile
1.1.1 Type F1P
Borepile
Pile Cap
1.1.2 Type F2P
Borepile
Pile Cap
1.1.3 Type F3P
Borepile
Pile Cap
1.2 Cupping Beam 250x400
1.3 Pedestal F1P
1.4 Pedestal F3P
1.5 Pedestal F3P Axis A2 & A4
1.6 Pedestal F3P Axis H2 & H4
1.7 Pedestal F3P Axis H3'
1.8 Cupping Beam 250x400
1.9 Grouting
8 STEEL STRUCTURE
Structural Steel Structure
Stairs steel structure
Purlin, sagrod and braching
Bolts & Nuts & gussetts
10 HANDLING and TRANSPORT
Handling Rock, Stones, and Equiv -demolished mason
Handling Structural steel -demolished existing hand rail
Handling Structural steel -new hand rail
Supply, fabricate, and install structural steel - light , Capping beam
Handling soil
Handling Mud/ equivalent -muck from existing septic tank
Transport Rock, Stones, and Equiv -demolished mason
Transport Structural Steel
Transport soil
Transport Mud/ equivalet
SCAFFOLDING
For borepile hard barricade
Install Scaffolding
Rental Scaffolding
For support construction during wall concrete construction
Install Scaffolding
Rental Scaffolding
For support construction during erection steel structure
Install Scaffolding
Rental Scaffolding

Spec
Survey- flat and cleared area
Survey- rough and non-cleared area
DEMOLISHING WORKS
Steel existing Fence 3"
Tree Cutting 0 - 10 cm dia.
Tree Cutting 0 - 10 cm dia.
Tree Cutting 11 - 40 cm dia.
Tree Cutting 41 - 80 cm dia.
Tree Cutting > 80 cm dia.
Land clearing after trees cutting
CUT AND FILL / Excavation
Section 3AL
Section 4AL
Borepile Exacavation
Borepile Exacavation
Pile Cap Excavation
Borepile Exacavation
DESCRIPTION
BASIS VOLUME
CHEVRON GEOTHERMAL SALAK GENERAL PROCURMENT & CONSTRUCTION SERVICE
PT. REKAYASA INDUSTRI
SALAK VISITOR CENTRE STRUCTURAL WORKS
GATE #1 AREA
Pile Cap Excavation
Borepile Exacavation
Pile Cap Excavation
Supply and install tarpaulin for ground/material covering
Installl geotextile terram Maccafery, Polyvelt TC 50, or equivalent
Maccafery, Polyvelt TC 50, or equivalent
Borepile Exacavation
Survey levelling
Borepile Exacavation
Pile Cap Excavation
Borepile Exacavation
Pile Cap Excavation
Cupping Beam
250 x 400 mm
Cupping Beam
250 x 400 mm
Concrete Retaining Wall
150 x 3500 mm
P1 -- 300x300 mm
F1P -- 300x300 mm
F2P -- 300x300 mm
F3P -- 300x300 mm
Sand Bedding
Pile Cap F1P
Lean Concrete
Pile Cap F1P
PAVEMENT PARKIR
Survey levelling
Backfill & Compaction - RED Clay 250 mm
Rock Platting
Base coarse 150 mm
Sand Bedding 50 mm
Paving Block 80 mm
Concrete Access
Survey levelling
Backfill & Compaction - RED Clay 250 mm
Rock Platting
Base coarse 150 mm
Sand Bedding 50 mm
Concrete Access 120 mm
Cellar Area
Survey levelling
Backfill & Compaction - RED Clay 250 mm
Rock Platting
Base coarse 150 mm
Sand Bedding 50 mm
Concrete Access 120 mm
Cellar Statue
Celar Excavation
Backfill & Compaction - RED Clay 250 mm
Rock Platting
Base coarse 150 mm
Base coarse 150 mm
Lean Concrete
Pile Cup 800x800
Cupping Beam 300x200
Colomn 300x300
Wall concrete 200 mm
Floor concrete 200 mm
Drainage type A
Survey levelling
Backfill & Compaction - RED Clay 250 mm
Rock Platting
Base coarse 150 mm
Base coarse 150 mm
Concrete U ditch
Concrete Cover U ditch
Drainage type B
Survey levelling
Backfill & Compaction - RED Clay 250 mm
Rock Platting
Base coarse 150 mm
Sand Bedding 50 mm
Concrete U ditch
Concrete Cover U ditch
Bollard / Guarf post
Survey levelling
Concrete 18.75 fy
Reflective contact type 2"
Sand Bedding 50 mm
Lean Concrete
Ground Reservoir
Survey levelling
Excavation , Grountank
Exacavation Borepile
Concrete K225, Ground tank
- Wall
- Wall control box
- Slab
- Cover top
- Foundation
Concrete K225 Borepile
Concrete K225, kolom
Concrete K225 beam
Concrete K225, roof
Sand Bedding 50 mm
Lean Concrete
Pas Bata merah
Septic Tank Type 1 Cap 1 M3
Survey levelling
Excavation , Grountank
Concrete K225, infiltrate
- Wall
- Wall
- Slab for Bio fill
Sand Bedding 50 mm
Lean Concrete
Septic Tank Type 2 Cap 2 M3
Survey levelling
Excavation , Grountank
Concrete K225, infiltrate
- Wall
- Wall
- Slab for Bio fill
Sand Bedding 50 mm
Lean Concrete
Septic Tank Type 3 Cap 3 M3
Survey levelling
Excavation , Grountank
Concrete K225, infiltrate
- Wall
- Wall
- Slab for Bio fill
Sand Bedding 50 mm
Lean Concrete
Borepiled Excavation
Borepile Exacavation
Borepile Exacavation
Pile Cap Excavation
Borepile Exacavation
Pile Cap Excavation
Borepile Exacavation
Pile Cap Excavation
Cupping Beam 250x400
Sand Bedding
Lean Concrete
Cupping Beam 250x400
Pedestal F1P
Pedestal F3P
Pedestal F3P Axis A2 & A4
Pedestal F3P Axis H2 & H4
Pedestal F3P Axis H3'
Cupping Beam 250x400
As per Spec. 05120,
paintig excluded,
include all type achor
bolts
Tulangan Utama 14D25 A36
Sengakang D19-200 A36
Pengurangan / m3
Structural Steel Structure
Stairs steel structure
Purlin, sagrod and braching
Bolts & Nuts & gussetts
HANDLING and TRANSPORT
Handling Rock, Stones, and Equiv -demolished mason
Handling Structural steel -demolished existing hand rail
Handling Structural steel -new hand rail
Supply, fabricate, and install structural steel - light , Capping beam
Handling Mud/ equivalent -muck from existing septic tank
Transport Rock, Stones, and Equiv -demolished mason
Transport Structural Steel
Transport Mud/ equivalet
For borepile hard barricade
Install Scaffolding
Rental Scaffolding
For support construction during wall concrete construction
Install Scaffolding
Rental Scaffolding
For support construction during erection steel structure
Install Scaffolding
Rental Scaffolding
NO L (M) W1 (M) W2 (M) H (M)
1.00 98.00 17.00
1.00
1.00
1.00 96.00 38.40
1.00 23.30 0.30 1.50
- 1.00 1.00
- 1.00 1.00
- 1.00 1.00
- 1.00 1.00
- 1.00 1.00
1.00 98.00 17.00
1.00 54.50 1.00 0.50
1.00 54.50 6.40 0.50 1.50
1.00 30.30 4.25 0.50 2.00
1.00 24.19 4.25 0.50 2.00
1.00 30.30 4.25 0.50 3.00
1.00 24.19 4.25 0.50 3.00
1.00 54.50 4.00 0.50 1.00
35.00
35.00 20.00 0.50 1.30 1.00
35.00 0.90 0.90 1.00 0.80
1.00
3.00 20.00 0.50 1.30 1.00
BASIS VOLUME
GENERAL PROCURMENT & CONSTRUCTION SERVICE
SALAK VISITOR CENTRE STRUCTURAL WORKS
GATE #1 AREA
1.00 2.15 0.90 1.00 0.80
17.00
51.00 20.00 0.50 1.30 1.00
17.00 1.00 1.00 1.00 0.80
1.00 1.00 1.00 1.00 1.00
1.00 98.00 4.00 1.00
1.00 98.00 1.50 1.00
2.00 98.00 2.00 1.00
1.00 3.00
12.00
12.00 20.00 0.50 1.30 1.00
12.00 1.00 1.00 1.00 0.30
22.00
22.00 20.00 0.50 1.30 1.00
22.00 2.15 0.90 1.00 0.80
81.08
81.08 0.25 0.40 1.30 1.00
1.00 1.00 1.00 1.00 1.00
12.00
- 20.00 0.50 1.30 1.00
12.00 1.00 1.00 1.00 0.30
22.00
22.00 20.00 0.50 1.30 1.00
22.00 2.15 0.90 1.00 0.80
81.08
81.08 0.25 0.40 2.00 1.00
81.08
81.08 0.15 1.00 1.30 3.50
12.00 1.00 0.40 0.28 1.20
22.00 1.00 0.30 0.30 3.50
-
-
81.08 0.25 1.00 0.10
12.00 1.00 1.00 1.00 0.10
22.00 0.90 0.90 1.00 0.10
81.08 0.25 0.05
12.00 1.00 1.00 1.00 0.05
22.00 0.90 0.90 1.00 0.05
- 1.00 3.30 1.10 0.05
1,030.71 59.93 17.20
1.00 1.00
550.16 191.76 358.40
550.16 1.30 0.25
550.16 1.30 0.25
550.16 1.30 0.10
550.16 1.30 0.15
550.16 1.30 0.10
550.16 1.30 1.00
230.56 56.00 70.40 48.00 56.16
1.00 1.00
230.56 1.30 0.25
230.56 1.30 0.25
230.56 1.30 0.10
230.56 1.30 0.15
230.56 1.30 0.10
230.56 1.30 0.12
221.64
1.00 1.00
221.64 1.30 0.25
221.64 1.30 0.25
221.64 1.30 0.10
221.64 1.30 0.10
221.64 1.30 0.15
28.35 1.30
7.84
7.84 2.80 2.80 1.80 1.30
7.84 1.30 0.25
7.84 1.30 0.25
7.84 1.30 0.10
7.84 1.00 0.15
7.84 1.30 0.15
7.84 1.00 0.05
8.00 0.80 0.80 1.00 0.40
1.00 8.00 0.20 0.30 1.50
8.00 0.30 0.30 1.00 1.50
1.00 8.00 0.20 1.00 1.50
1.00 2.00 2.00 1.00 0.20
53.50
23.30 1.30 0.25
1.00 2.00
23.30 1.30 0.25
23.30 1.30 0.25
23.30 1.30 0.10
23.30 1.30 0.15
23.30 1.30 0.15
23.30 1.60 0.08 1.00 1.00
23.30 0.42 0.40 1.00 0.80
30.20 1.30 0.25
1.00 2.00
30.20 1.30 0.25
30.20 1.30 0.25
30.20 1.30 0.10
30.20 1.30 0.15
30.20 1.30 0.15
30.20 1.60 0.08 1.00 1.00
- 0.42 0.40 1.00 0.80
56.00
1.00 2.00
56.00 0.45 0.45 1.00 1.00
56.00 0.40 0.40 1.00 1.00
56.00 1.73 - -
56.00 0.36 2.00 - -
56.00 0.45 0.45 1.00 0.10
56.00 0.45 0.45 1.00 1.00
25.00
1.00 2.00
1.00 4.00 4.00 1.00 3.00
1.00 3.65 1.00 1.30 1.00
4.00 2.00 2.00 0.20 1.75
2.00 0.50 0.70 0.20 0.50
1.00 2.00 2.00 0.20 1.75
1.00 2.00 2.00 1.00 0.60
1.00 2.90 2.90 1.00 0.60
1.00 3.65 1.00 1.30 1.00
4.00 0.50 0.15 1.00 2.65
4.00 2.90 0.20 1.00 0.20
1.00 2.90 2.90 1.00 0.10
4.00 0.45 0.45 1.00 0.10
4.00 0.45 0.45 1.00 1.00
1.00
1.00
1.00 4.00 6.00 1.00 1.00
1.00 4.00 6.00 1.00 2.00
2.00 2.65 1.00 0.15 1.00
2.00 1.65 1.00 0.15 1.00
1.00 1.20 1.20 0.15 1.00
1.00 4.40 3.40 1.00 0.30
1.00 4.40 3.40 1.00 0.05
1.00 2.50 1.50 1.00 0.90
1.00 9.20 0.90 1.00 1.00
1.00 4.00 6.00 1.00 1.00
1.00 4.00 6.00 1.00 2.00
2.00 2.65 1.00 0.15 1.00
2.00 1.65 1.00 0.15 1.00
1.00 1.60 1.60 0.15 1.00
1.00 4.40 3.40 1.00 0.30
1.00 4.40 3.40 1.00 0.05
1.00 2.50 1.50 1.00 0.90
1.00 9.20 0.90 1.00 1.00
1.00 4.00 8.00 1.00 1.00
1.00 4.00 6.00 1.00 2.00
2.00 2.65 1.00 0.15 1.00
2.00 1.65 1.00 0.15 1.00
1.00 1.60 3.60 0.15 1.00
1.00 4.40 3.40 1.00 0.30
1.00 4.40 3.40 1.00 0.05
1.00 2.50 1.50 1.00 0.90
1.00 9.20 0.90 1.00 1.00
2.00 57.50 5.00 1.00 1.88
1.00
3.00 20.00 0.50 1.30 1.00
1.00 0.90 0.90 1.00 0.80
-
- 20.00 0.50 1.30 1.00
- 2.15 0.90 1.00 0.80
17.00
51.00 20.00 0.50 1.30 1.00
17.00 1.00 1.00 1.00 0.80
1.00 115.40 0.35 1.00 0.50
1.00 0.10
1.00 0.05
1.00
3.00 20.00 0.50 1.30 1.00
1.00 0.90 0.90 1.00 0.80
-
- 20.00 0.50 1.30 1.00
- 2.15 0.90 1.00 0.80
17.00
51.00 20.00 0.50 1.30 1.00
17.00 1.00 1.00 1.00 0.80
1.00 115.40 0.35 1.00 0.50
1.00 - 0.40 0.40 0.95
12.00 - 0.50 1.15 1.50
2.00 - 0.25 0.58 1.88
2.00 - 0.13 0.56 1.88
1.00 - 0.50 2.80 0.80
1.00 115.40 0.25 1.00 0.40
1.00 1.00 10.49 1.10 0.05
1.00 14.00
3.84 7.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
1.00 1.00 1.00
2.00
2.00
-
2.00
2.00
1.00
1.00
1.00
1.00
20.00 1.50 1.50 - 1.00 -
1.00 - - - - -
1.00 81.08 3.00 - 3.00 -
1.00 - - - - -
1.00 115.40 3.00 - 3.00 -
1.00 - - - - -
Area (M2)
W/Unit
(Kg/M')
Vol (M3)
/unit
Distance
(M)
DURATION
1,666.00 1,666.00
- -
1,666.00 1,666.00
11.00 1,478.40
10.49 10.49
- 390.00 0.01
- 390.00 0.01
7.00 390.00 0.50
-
-
1,666.00 1,666.00
- -
261.58 261.58
128.78 128.78
102.82 102.82
193.18 193.18
154.23 154.23
108.99 108.99
0.20 178.59
0.65 22.68
0.20 15.31
BASIS VOLUME
TOTAL QTY
GENERAL PROCURMENT & CONSTRUCTION SERVICE
SALAK VISITOR CENTRE STRUCTURAL WORKS
GATE #1 AREA
1.55 1.55
0.20 260.23
2.67 36.29
949.58 949.58
392.00 392.00 392.00
147.00 147.00 147.00
196.00 392.00 m1 392.00
81.08 243.23
0.20 61.23
0.30 3.60
0.20 112.26
1.55 34.06
0.13 3.31
- 214.45
0.20 -
0.30 3.60
0.20 112.26
1.55 34.06
0.13 5.09
0.79 43.44
0.11 1.58
0.09 6.93
-
-
0.03 2.03
0.10 1.20
0.08 1.78
0.01 1.01
0.05 0.60
0.04 0.89
0.18 -
550.16 550.16
178.80
178.80
71.52
- 107.28
71.52
715.21
230.56 230.56
74.93
74.93
29.97
44.96
29.97
35.97
221.64 221.64
72.03
72.03
28.81
- 28.81
43.22
1.30 0.25 -
143.83
2.55
2.55
1.02
- 1.18
1.53
1.30 0.05 0.39
0.26 2.05
0.72 0.72
0.14 1.08
2.40 2.40
0.80 0.80
7.57
23.30 46.60
7.57
7.57
3.03
- 4.54
4.54
0.13 2.98
0.13 3.13
9.82
30.20 60.40
9.82
9.82
3.93
- 5.89
5.89
0.13 3.87
0.13 -
56.00 112.00
0.20 11.34
0.16 8.96
16.00 1,545.60
- 40.09
0.10 5.60
0.05 2.80
1.00 2.00
48.00 48.00
0.79 3.72
1.40 5.60
0.04 0.07
1.40 1.40
2.40 2.40
5.05 5.05
0.79 3.72
0.20 0.80
0.12 0.46
0.84 0.84
0.10 0.40
0.05 0.20
28.35 28.35
7.35 7.35
24.00 24.00
48.00 48.00
0.40 0.80
0.25 0.50
0.22 0.22
4.49 4.49
0.75 0.75
3.38 3.38
8.28 8.28
24.00 24.00
48.00 48.00
0.40 0.80
0.25 0.50
0.38 0.38
4.49 4.49
0.75 0.75
3.38 3.38
8.28 8.28
32.00 32.00
48.00 48.00
0.40 0.80
0.25 0.50
0.86 0.86
4.49 4.49
0.75 0.75
3.38 3.38
8.28 8.28
539.06 1,078.13
0.20 15.31
0.65 0.65
0.20 -
1.55 -
0.20 260.23
2.67 36.29
20.20 20.20
61.82 6.18
61.82 3.09
0.20 15.31
0.65 0.65
0.20 -
1.55 -
0.20 260.23
2.67 36.29
20.20 20.20
0.15 0.15
0.86 10.35
3.09 6.19
2.58 5.16
1.12 1.12
11.54 11.54
0.58 0.58
-
53.90 -
17.03 -
(125.00) -
73,462.00 1.00 73,462.00
3,722.00 1.00 3,722.00
3,150.00 1.00 3,150.00
80,334.00 0.20 16,066.80
10.49 20.97
1,478.40
3,127.58 6,255.17
3,400.00 712.98
3,400.00 50,265.60
6,255.17 3,400.00 212,675.62
- - - - - 45.0
- - 45.00 - 30.00 1,350.0
- - - - - 729.7
- - 364.84 - 30.00 10,945.1
- - - - - 1,038.6
- - 519.30 - 30.00 15,579.0
QTY UNIT
m2
m2
m2
kg
m3
- ea -
- ea -
- ea -
- ea
- ea
m2
M3
M3
M3
M3
M3
M3
M3 949.58 m3
M3
M3
M3
UNIT
WEIGHT
Unit Rate (IDR) Amount (IDR)
GENERAL PROCURMENT & CONSTRUCTION SERVICE
SALAK VISITOR CENTRE STRUCTURAL WORKS
GATE #1 AREA
M3
M3
M3
M3 949.58 m3
m2
m2
m1
m2
M3 449.02 M3
M3
M3
M3
M3
M3 85.78 m3
87.63 m3
574.12 M3
M3 206.95 M3
M3 8.43 m3
159.37 m3
M3
M3
M3
M3
M3
M3
M3
M3
M3 -
M3
M3
-
M3 -
M3
M3
M3
m2
M3
M3
M3
M3
M3
M2
m2
M3
M3
M3
M3
M3
M3
m2
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
m2
M3
M3
M3
M3
M3
M3
M3
M3
m2
M3
M3
M3
M3
M3
M3 -
M3
m2
M3
M3
kg
m1
M3
M3 -
m2
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3 -
M3
M2
m2
M3
M3
M3
M3
M3
M3 -
M3 -
M3 -
m2
M3
M3
M3
M3
M3
M3 -
M3 -
M3 -
m2
M3
M3
M3
M3
M3
M3 -
M3 -
M3 -
M3
M3
M3
M3
M3
M3
M3
M3 133.07 m3
M3 -
M3 -
M3 367.17 m3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
kg
kg
kg
kg
kg
kg
kg
kg 96,400.80 kg
m3
kg
kg
m3
m3.100m
ton.100m 1,478.40 kg
m3.100m
M3 2,025.00 Kg
M3. Days
M3 32,835.38 Kg
M3. Days
M3 46,737.00 Kg
M3. Days
TOTAL -
MASIH ESTIMASI
WORK PACKAGE :
FIC REFERENCE :
kg
Tea Plant along pipe guard
rail area
kg Tea Plant at SVC building area
kg
Endemic plantation at SVC
building area
Endemic plantation at SVC
building area
Endemic plantation at SVC
building area
#DIV/0!
#DIV/0!
Backfill using crashrock
SALAK VISITOR CENTRE
: SLK-FE-FIP-025-REV00-FE-GS13000026
Backfill using crashrock
soil cover, ex. Excavation for borepile,
pilecap
Stainer
Stainer
Borepile
Backfill using crashrock
Total K225
Total K300
K300
Lean Concrete
Sand Bedding
-
-
for access auger
Backfill using crashrock
K300
conversion weight of steel rebar
>125kg
deduction per m3
WPS to AWI 21 --> to backfill area
WPS to Awi 4
WPS to AWI 21