Вы находитесь на странице: 1из 1

METHOD STATEMENT

IBAU HAMBURG THAT SENG CONSTRUCTION SDN. BHD.


Date: ____________
Permit To Work:________________
WAH Permit: __________________
Activities For The Day (Date: _______________)
WAH Needed
Task Location: _____________________________
No Needed
Job Description:

EQUIPMENT / MACHINERIES
No Items
1
Mobile crane
2
Forklift
3
Welding machine
4
Air Compressor
5
Generator
6
Manpower
7
Others (

Tick (/) if use

Quantity

(Insert drawing if needed)

Prepared By: __________________________


Site Supervisor / Safety Officer
Received By:____________________
DR. VISWANATHAN / VIJAY KUMAR

Remarks:-

Remarks

Вам также может понравиться