This method statement outlines the planned construction activities, equipment, and safety precautions for a project taking place on a specific date. A mobile crane, forklift, welding machine, air compressor, and generator will be used. The necessary permits and work access permit have been obtained. The site supervisor and safety officer prepared the statement, which was received by the project managers.
Исходное описание:
Site Safety method
Оригинальное название
METHOD STATEMENT -Load, Unload, Moving, Shifting Material
This method statement outlines the planned construction activities, equipment, and safety precautions for a project taking place on a specific date. A mobile crane, forklift, welding machine, air compressor, and generator will be used. The necessary permits and work access permit have been obtained. The site supervisor and safety officer prepared the statement, which was received by the project managers.
This method statement outlines the planned construction activities, equipment, and safety precautions for a project taking place on a specific date. A mobile crane, forklift, welding machine, air compressor, and generator will be used. The necessary permits and work access permit have been obtained. The site supervisor and safety officer prepared the statement, which was received by the project managers.
Date: ____________ Permit To Work:________________ WAH Permit: __________________ Activities For The Day (Date: _______________) WAH Needed Task Location: _____________________________ No Needed Job Description:
EQUIPMENT / MACHINERIES No Items 1 Mobile crane 2 Forklift 3 Welding machine 4 Air Compressor 5 Generator 6 Manpower 7 Others (
Tick (/) if use
Quantity
(Insert drawing if needed)
Prepared By: __________________________
Site Supervisor / Safety Officer Received By:____________________ DR. VISWANATHAN / VIJAY KUMAR