AGENDA

09:30 RPD PMT Project Update & Fuel Oil Option

11:00 TR Project Update

13:00 Lunch

15:00 SC Internal Meeting

16:00 SC/RJV/TR Management Meeting

21:30 Team Dinner

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
REFINING PLANTS DIVISION
PROJECT UPDATE

SUMITOMO MANAGEMENT VISIT


July 20, 2006
MADRID

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
OUTLINE

• TEAM ORGANIZATION
• SCOPE OVERVIEW
• FINANCIAL UPDATE
• FEEDBACK ON TR
• EPC STATUS
• FUEL OIL OPTION

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
OUTLINE

• TEAM ORGANIZATION
• SCOPE OVERVIEW
• FINANCIAL UPDATE
• FEEDBACK ON TR
• EPC STATUS
• FUEL OIL OPTION

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
TEAM ORGANIZATION
PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara MM.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Abdulhadi Al-Mureeh
Project Manager

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Akira Hatada Mohammad Gamlo
Operations Operations

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Fadhil Tarooti
Commercial Manager

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Kim Stewart
Project Controls

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Ian MacFarlane
Procurement

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Nicolas Castellano
Planning

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Andrew Giordmaine
Cost Engineer

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Ziyad Rambo
Design Manager

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Khalil Al-Saeedi
Lead Project Engineer
VGO HT & Revamp

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Essa Al-Dossary
Lead Project Engineer
Interface Coordinator

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Rakkan Trabulsi
Project Engineer
VDU & HPU

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Saleh Al-Zaid
Project Engineer
SRU & SAR

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Steve Thomas
Project Engineer
C4 Alkylation

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Takanobu Mori
Project Engineer
C4 Isomerisation

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Mahdi Mousa
Project Engineer
ARU 2&3/SWS 2&3

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Akira Orihara
Technical Manager

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Koichi Ogino
Sr. Engineer

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Ahmad Naji
Electrical Engineer

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Jun Yano
Mechanical Engineer
Piping / 3D

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Takao Shimano
Mechanical Engineer
Vessels & Equipment

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Stephen Sim
Mechanical Engineer
Rotating Equipment

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Ted Omar
Metallurgy/Welds

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Mahmoud Chbib
Civil Engineer

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Ken Yau
Instrumentation & PCS

PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara M
M.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
TEAM ORGANIZATION
PROJECT MANAGER
Abdulhadi Mureeh

OPERATIONS
Gamlo / Hatada OOK IK

COMMERCIAL GROUP PROJECT GROUP TECHNICAL GROUP CONSTRUCTION


CONSTRUCTION GROUP
Fadhil Tarooti Ziyad Rambo Akira Orihara MM.Nadhrah
Schifrin

PROJECT CONTROLS LPE – VGOHT/REVAMP SR. ENGINEER CONSTRUCTION LOGISTICS


Kim Stewart Khalil Saeedi Koichi Ogino M. Nadhrah

PROCUREMENT LPE- INTERFACES ELECTRICAL CONSTRUCTION


Ian MacFarlane Essa Dossary Ahmad Naji S Menancio

PLANNING PE- VDU/H2 PIPING


Nicolas Castellano Rakkan Trabulsi Jun Yano

COST ENGINEERING PE – SRU/SAR STATIC EQUIPMENT


Andrew Giordmaine Saleh Zaid Takao Shimano

PE – ALKYLATION ROT EQUIPMENT


Steve Thomas Stephen Sim

PE – C4 ISOM METALLURGY/WELDS
Takanobu Mori Ted Omar

PE – SWS/ARU CIVIL/STRUCTURAL
Mahdi Mousa Mahmoud Chbib

INSTRUMENTS/PCS
Ken Yau

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
OUTLINE

• TEAM ORGANIZATION
• SCOPE OVERVIEW
• FINANCIAL UPDATE
• FEEDBACK ON TR
• EPC STATUS
• FUEL OIL OPTION

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
SCOPE OVERVIEW

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
SULFUR
VGOAMINE RECOVERY
VACUUM
SWS
REGEN
2/3
HYDROTREATER 2/3
H
C 4 PRODUCTION
2C ALKYLATION
SULFURIC ACID
4 ISOMERIZATION
DISTILLATION
UNIT
SCOPE OVERVIEW
552
178/140
450/56
120
160
7315.6
23 T/D
M
M33/HR
MBD
MMSCFD
MBD
MBD /HR
204 MBD
JACOBS
AXENS
MONSANTO
DuPONT
AXENS

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
OUTLINE

• TEAM ORGANIZATION
• SCOPE OVERVIEW
• FINANCIAL UPDATE
• FEEDBACK ON TR
• EPC STATUS
• FUEL OIL OPTION

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
CONTRACT PRICE

TOTAL
Euro GBP USD
USD

OOK CONTRACT 458,115 15,785 106,951 693,272

IK CONTRACT - - 541,791 541,791

TOTAL 458,115 15,785 648,742 1,235,063

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
EXPENDITURES TO DATE

BUDGET EXPENDITURE %

ENGINEERING $ 164,574,803 $ 69,539,122 42%

PROCUREMENT $ 596,967,581 $ 60,452,030 10%

CONSTRUCTION $ 502,921,731 $ 27,804,883 6%

TOTAL $1,264,463,116 $ 157,796,036 12.5%

INCLUDES 5% DOWNPAYMENT

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
CASH FLOW
Values in $ ‘000’s

1,400,000
1,200,000
1,000,000
800,000
600,000
400,000
200,000
0

2005 2006 2007


2008

Forecast (1,264,463) Actual (157,796) Commitment (218,900)

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
OUTLINE

• TEAM ORGANIZATION
• SCOPE OVERVIEW
• FINANCIAL UPDATE
• FEEDBACK ON TR
• EPC STATUS
• FUEL OIL OPTION

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
TR CAPABILITIES

10 - 10 - 10 - 10 - 10 -

9- 9- 9- 9- 9-

8- 8- 8- 8- 8-

7- 7- 7- 7- 7-

6- 6- 6- 6- 6-

5- 5- 5- 5- 5-

4- 4- 4- 4- 4-

3- 3- 3- 3- 3-

2- 2- 2- 2- 2-

1- 1- 1- 1- 1-

0- 0- 0- 0- 0-

ENGINEERING PROCUREMENT HO CONSTRUCTION PROJECT CONTROLS OVERALL

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
OUTLINE

• TEAM ORGANIZATION
• SCOPE OVERVIEW
• FINANCIAL UPDATE
• FEEDBACK ON TR
• EPC STATUS
• FUEL OIL OPTION

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
PROGRESS LEVEL
AS OF July 14

0% 50% 100%

50.45%
ENGINEERING -2.8%

53.24%

55.16%
PROCUREMENT -2.6%
57.79%

3.13%
CONSTRUCTION -0.8%

3.94%

33.41%

OVERALL -1.9%

35.32%

PLAN ACTUAL

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
ENGINEERING

2005 2006 2007 2008


DESCRIPTION Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
MONTH
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

ENGINEERING 60 90
ENGINEERING SUMMARY 100%

PROCESS
P&ID's for HAZOP HAZOP STARTS IFD AFC
LEGEND
PROCESS P&ID´s
PROCESS DATA SHEET AFD APPROVED FOR DESIGN

PIPING DESIGN IFD AFC Final AFC APPROVED FOR CONSTRUCTION

PLOT PLAN
30% 60% 90%
PIPING 3D MODEL
50%
ISOMETRICS 100%

1st MTO for purchase 2nd MTO 3rd MTO last MTO
PIPING M.T.O.´s
CIVIL & STRUCTURES DESIGN
MAIN PIPE RACKS DRWGS.
STRUCTURES

EQUIPMENT FOUNDATIONS
BUILDINGS
ELECTRICAL DESIGN 1st Iss. IFC
SINGLE LINE DIAGRAMS
POWER DISTRIBUTION
MTO´s 1st MTO FINAL

INSTRUMENTS DESIGN

PCS DESIGN

MTO´s INITIAL FINAL

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
ENGINEERING

(%) (Accum. % )
9.0 120.0

8.0

100.0

7.0

6.0 80.0

5.0

60.0

4.0

3.0 40.0

2.0

20.0

1.0

0.0 0.0
7-J ul-
J un-05 J ul-05 Aug-05 S ep-05 Oct -05 Nov-05 Dec-05 J an-06 Fe b-06 Ma r-06 Apr-06 Ma y-06 J un-06 J ul-06 Aug-06 S ep-06 Oct -06 Nov-06 De c-06 J a n-07 Fe b-07 Ma r-07 Apr-07 May-07
06

Enginee ring P lanned. 0.3 1.2 1.5 5.3 4.5 4.5 3.3 2.0 3.9 5.0 4.5 7.2 3.3 6.7 2.0 8.4 6.8 8.0 5.4 6.2 3.6 3.3 2.0 0.8 0.3

Enginee ring Ac t ual. 0.3 1.2 1.5 5.7 4.4 4.5 3.1 1.9 4.2 3.8 4.0 5.5 6.4 4.3

Ac c .Enginee ring P la nne d. 0.3 1.5 3.0 8.3 12.8 17.3 20.6 22.6 26.5 31.5 36.0 43.2 46.5 53.2 55.2 63.6 70.4 78.4 83.8 90.0 93.6 96.9 98.9 99.7 100.0

Ac c. Enginee ring Ac t ua l. 0.3 1.5 3.0 8.7 13.1 17.6 20.7 22.6 26.8 30.6 34.6 40.1 46.5 50.8

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Engineering Highlights

• 2nd HAZOP is completing


To be incorporated in design ASAP
• IFD, IFC Drawings being checked
To expedite not to delay for construction
• Vendor Document being checked
PMT Comments can be monitored now
• 30% 3D Model Review completed and 60% expected in Aug.
To monitor catching up progress closely
• Fire Fighting Review has completed
Comments need to be incorporated ASAP
• 60% Design Package will be issued on 21.Jul
Comments need to be incorporated ASAP
PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Project Review Follow-up

• Selective Control Schedule  Partially provided


• CRD   (Construction Required  Incorporated with schedule
Date)
 Status can be monitored
• Company Reviewed Comment
 Almost finish
• Remaining HAZOP
 Confirmed in line with PDS
• Spool drawing software
 Most of Eng’d Equip ordered
• Accelerate remaining order
 Under Preparation
• Lesson Learned (Yanbu)

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
PROCUREMENT

2005 2006 2007 2008

DESCRIPTION Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
MONTH
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

1st PO PLACED
PROCUREMENT
LONG LEAD ITEMS

-PLACED PLACED
FABRICATION
-FABRICATION
DELIVERY
-DELIVERY

ENGINEERING EQUIPMENT
-PLACED PLACED

-FABRICATION FABRICATION

-DELIVERY DELIVERY

PCS

-PLACED PLACED

-DESIGN

-FABRICATION DESIGN & FABRICATION

-DELIVERY DELIVERY

PIPING MATERIALS

CONTROL & RELIEF VALVES

NON ENGINEERING EQUIPMENT

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
PROCUREMENT

(%) (Accum. % )
14.0 120.0

12.0
100.0

10.0

80.0

8.0

60.0
P ROCUREMENT (Fa b. & De liv.) P la nned %

6.0

40.0

4.0
P ROCUREMENT ( Fa b. & De liv.) ACTUAL %

20.0
2.0

0.0 0.0
7-
J un- J ul- Aug- S e p- Oc t - Nov- De c - J a n- Fe b- Ma r- Apr- Ma y- J un- J ul- Aug- S e p- Oc t - Nov- De c - J a n- Fe b- Ma r- Apr- Ma y- J un- J ul- Aug- S e p- Oc t - Nov- De c - J a n- Fe b-
J ul-
05 05 05 05 05 05 05 06 06 06 06 06 06 06 06 06 06 06 06 07 07 07 07 07 07 07 07 07 07 07 07 08 08
06

P roc ure me nt (Fa b. & De liv.) P la nne d. 2.3 2.4 1.0 8.3 5.5 3.5 2.7 2.1 5.2 12.7 3.7 5.5 -0.6 0.0 1.4 2.9 2.3 0.4 0.4 2.7 6.8 3.0 1.5 5.4 5.3 2.3 4.7 3.9 0.5 1.5 0.0 0.1 0.0 0.6

P roc ure me nt (Fa b. & De liv.) Ac t ua l. 2.3 2.4 1.0 8.3 5.5 3.5 2.3 1.8 5.1 11.4 5.4 1.2 2.5 1.6

Ac c . P roc ure me nt (Fa b. & De liv.) P la nne d. 2.3 4.7 5.7 14.0 19.5 23.0 25.7 27.8 33.0 45.7 49.4 54.9 54.3 54.3 55.7 58.6 60.9 61.3 61.7 64.4 71.2 74.2 75.7 81.1 86.4 88.7 93.4 97.3 97.8 99.3 99.3 99.4 99.4 100.0

Ac c . P roc ure me nt (Fa b. & De liv.) Ac t ua l. 2.3 4.7 5.7 14.0 19.5 23.0 25.3 27.1 32.2 43.6 49.0 50.2 52.7 54.3

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
REQUISITIONS STATUS
AS OF July 7
(No. Req.)

160
140
120
100 Total Requisitions
80 Issued
60 Evaluated
Orders Placed
40
20
0 89 89 82 62 142 142 46 42

Engineered Non-Engineered
PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Procurement Highlights

• Most of engineered equipments on order


Shifted several items to other Vendors
Changed materials from clad to solid
Approved no-Regulated Vendor after Verification

• Major non engineered on order


( Progress of Instrument equipments is catching up )

• Negotiate with vendors to improve delivery date


(Wooyang, Stratco, etc.)

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Procurement Expediting

• TR:

• Expedite by reinforced internal / external Expeditor


( Per PMT’s Request )

• PMT:

•Monitor Weekly Procurement Control Sheet

•Monitor Expediting Report

•Feed back to TR (concerns & recommendations)

•Plan Expediting Visits (PMT, Core-Team 3rd Party)


especially on concerned Vendor such as
* Wooyang * Sungjin * ARA * Hautmont etc.

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
CONSTRUCTION

2005 2006 2007 2008


DESCRIPTION Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
MONTH
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

CONSTRUCTION
TEMPORARY FACILITIES, CAMP FAC. & MOBILISATION AT SITE MOBILIZATION - CIVIL WORK
CIVIL
FOUNDATIONS (EQUIPMENT & PIPE RACKS)
STRUCTURE
ERECTION (PIPE RACK)
BUILDINGS Substation ready for PIB ready for equipment

PIPE PREFABRICATION & ERECTION


PIPE PREFABRICATION
PIPE ERECTION
EQUIPMENT ERECTION
HDT REACTORS & VD COLUMN
VESSELS, COLUMNS, REACTORS
COMPRESSORS
HEATERS
HEAT EXCHANGERS
PUMPS

AIR COOLERS
PACKAGES
FIELD ELECTRICAL INSTALLATION
ELECTRICAL INSTALL. IN SUBESTATION
INSTRUMENTS INSTALLATION
LOOPS TESTING
PRECOMMISSIONING (incl. Flushing & Reinstat.)
COMMISSIONING
READY FOR START-UP

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
CONSTRUCTION

(%) (Accum. % )
10 120

100
8

7
80

5 60

40
3

2
20

0 0
J a n- Fe b- Ma r- Apr- Ma y- J un- 7-J ul- J ul- Aug- S e p- Oc t - Nov- De c - J a n- Fe b- Ma r- Apr- Ma y- J un- J ul- Aug- S e p- Oc t - Nov- De c - J a n- Fe b- Ma r- Apr- Ma y-
06 06 06 06 06 06 06 06 06 06 06 06 06 07 07 07 07 07 07 07 07 07 07 07 07 08 08 08 08 08

CONS T. MONTH EP C P LANNED 0.4 0.5 0.8 0.7 1.1 0.7 3.3 3.8 3.3 3.3 3.1 4.4 3.5 4.1 6.7 5.1 5.8 6.0 8.6 6.2 7.9 5.7 4.8 4.2 2.4 2.1 1.4 0.1

CONS T. MONTH EP C ACTUAL 0.4 0.2 0.4 1.4 0.5

ACC. CONS T. EP C P LANNED 0.4 0.9 1.7 2.4 3.5 4.2 7.5 11.3 14.6 17.9 21.0 25.4 28.9 33.0 39.7 44.8 50.6 56.6 65.2 71.4 79.3 85.0 89.8 94.0 96.4 98.5 99.9 100.0

ACC. CONS T. EP C ACTUAL 0.4 0.6 1.0 2.4 2.9

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
Construction Highlights

• Manning Level
•TR 20
•Sinopec 302
•Nesma 356
• Temporary Offices (July Start Partial Operation)
• Camp (July Start partial operation)
• Main Site Preparation 88% Completed
• Equipment & Pipe Racks Foundations Preparation:
• MS1 30%
• MS2 90%
• Sinopec Late Mobilization Corrective Measures:
•Foundation for pipe racks & Buildings A&W
•Major Equipments Foundation Nesma

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
RABIGH DEVELOPMENT PROJECT
PROPOSED PMT ORGANISATION FOR REFINING UNITS (Draft)

Directors

62
A.M Al-Mureeh
PM
1

Admin
Assistance
1

20 20 17 3
Package 1 Package 2
Business
Construction 1 Construction 1 1
Administrator Common Support
MGR MGR

Interface 1 Interface 1 Cost Engineer 2


RCM 1

Revamp 1 Alkylation 1 Planning 1


Superintendent 1

Isomerization 1
VDU 1 Document Control 34
Metrology/Welding 1

VGO 2 SAP 1 Procur & Material


Control
2

HPU 1 SWS 1 IT / LAN


1
Administration

CTS Support 13 ARU 1 Secret & clerks 7

SRU 1

CTS Support 12

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
OVERALL
(8.0% ) (Accum. % ) 120.0

7.0

100.0
OVERALL P LANNED %

6.0

80.0

5.0

4.0 60.0

3.0

40.0

2.0

20.0

1.0

0.0 0.0
7-
J un- J ul- Aug- S e p- Oc t - Nov- De c- J a n- Feb- Mar- Apr- Ma y- J un- J ul- Aug- S e p- Oc t - Nov- De c- J a n- Feb- Mar- Apr- May- J un- J ul- Aug- S ep- Oct - Nov- Dec - J an- Fe b- Ma r- Apr- Ma y- J un-
J ul-
05 05 05 05 05 05 05 06 06 06 06 06 06 06 06 06 06 06 06 07 07 07 07 07 07 07 07 07 07 07 07 08 08 08 08 08 08
06

OVERALL EP C MONTH-P LANNED 1.1 1.3 0.7 4.6 3.1 2.2 1.6 1.2 3.1 6.8 2.4 3.3 0.0 1.6 3.0 3.5 3.3 2.3 2.2 3.2 5.4 3.3 2.6 5.5 4.7 3.6 4.7 5.5 2.8 3.9 2.4 2.0 1.8 1.3 0.9 0.6 0.1

OVERALL EP C MONTH-ACTUAL 1.1 1.3 0.7 4.6 3.1 2.2 1.4 1.1 3.0 6.0 3.1 1.4 2.4 1.4

ACC. OVERALL EP C P LANNED 1.1 2.4 3.1 7.7 10.8 13.0 14.6 15.8 18.9 25.7 28.1 31.4 31.4 33.0 34.4 37.9 41.2 43.5 45.7 48.9 54.3 57.6 60.2 65.7 70.4 74.0 78.7 84.2 87.0 90.9 93.3 95.3 97.1 98.4 99.3 99.9 100.0

ACC. OVERALL EP C ACTUAL 1.1 2.4 3.1 7.7 10.8 13.0 14.4 15.5 18.5 24.5 27.6 29.0 31.4 32.8

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
OUTLINE

• TEAM ORGANIZATION
• SCOPE OVERVIEW
• FINANCIAL UPDATE
• FEEDBACK ON TR
• EPC STATUS
• FUEL OIL OPTION

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
FUEL OIL FIRING (ORIGINAL SCOPE)

VDU
VGO HDT

CDU
FGD

HDS FGD

Lean Solvent
Rich Solvent REGEN

SO2

SRU
Fired Heaters

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
FUEL GAS FIRING ( CURRENT SCOPE)

VDU
VGO HDT

CDU

HDS

Fired Heaters
Fuel Gas

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
NEW REFINERY REQUIRMENTS
5 PROCESS HEATERS
• TOTAL THERMAL DUTY : 195 MM Kcal/hr
• LPG : 4000 bbls/day
• FUEL OIL: 3200 bbls/day

• REQUIRMENTS :
• New FGD, capacity 285,500 Nm3/hr
• Change the heaters design to FO.
• New cooling Tower. 7,500 m3/hr
• Additional Power. 11.3 MW
• Fuel oil Tanks.
• Plot Space 3500 m2. (Not available)

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
EXISTING REFINERY REQUIRMENTS
6 PROCESS HEATERS

• TOTAL TERMAL DUTY : 206 MM Kcal/hr


• LPG : 4500 bbls/day
• FUEL OIL: 4000 bbls/day

REQUIRMENTS :
• New FGD, Capacity 408,506 Nm3/hr
• New cooling tower, capacity 5000 m3/r
• Additional Power load of 9 MW.
• Plot Space of 5500 m2 (Available)

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
SUMMARY

• Existing refinery FO firing is more feasible (4500 bbls/day ).


• Estimated Capital investment $150 MM.

• New refinery FO firing is less feasible (4000 bbls/day ).


• Estimated Capital investment $180 MM.

• FG from PETRORabigh Phase II Refinery Plants .

PETRORabigh ‫بترورابغ‬
Rabigh Refining & Petrochemical Co.L.L.C. ‫م‬.‫م‬.‫شركة رابغ للتكرير والبتروكيماويات ذ‬
THANK YOU