ASE Irrigation Design

Ashlee Acosta

Steven Major

Edward Smith

December 6, 2013

Dr. Raymond Lyrene, M.D.


C/O Jim McCullers, P.L.S.
5533 Bankhead Highway
Birmingham, AL 35210

Dr. Lyrene,
We are pleased to inform you and your team that we have completed and enclosed
our design proposal for the irrigation project in Akot, South Sudan as requested. In our
proposal, you will find that we recommend a drip irrigation system for the site. The system
we recommend will irrigate 2 acres of fruit orchard, 1 acre of grain crops, and 1 acre of
vegetables. We understand that this is less than the quantity of irrigated land than you had
originally requested, but it is our belief that this will be better suited for the resources that
are available.
In our design proposal, you will find a system in which in-line drip emitters are
incorporated producing 0.18 gallons per hour of water, each. These are supplied by a 2 acre
reservoir being depleted by a pump producing 68 gallons per minute of water. The reservoir
is supplied by the existing well water at 25 gallons per minute.
It is our wish that you will be satisfied with our design parameters and continue to
choose us for your irrigation design needs. Should you have any questions, please feel free
to reach out to us.

Sincerely,
ASE Irrigation Design Team

Akot, South Sudan Irrigation


Project
Irrigation System Proposal

Ashlee Acosta
aza0019@auburn.edu

Steven Major
sdm0010@auburn.edu

Edward Smith
eas0017@auburn.edu

Table of Contents
I.

Executive Summary..3

II.

Design Recommendations5
a. Mapping..5
b. Design Specifications5
c. System Pump Curves..8
d. Sample Irrigation System.10

III. Capital and Operating Costs11


IV.

Appendix...12

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

Executive Summary
A 12 acre plot in Akot, South Sudan is presently seeking to be developed. 8 acres of
grain, vegetable and fruit crops within the field boundary are desired to be cultivated. The
largest issue to overcome is the relative unavailability of irrigation water in the project area.
After much consideration, our team decided that a drip irrigation system should be designed
using a 2 acre reservoir for water supply.
The reservoir negates the limitations of the small productivity of the well. In our
design, 25 gallons per minute (GPM) will be pumped out of the well for twelve hours a day
into the reservoir. The water in the reservoir will in turn be pumped out at a rate of 68 GPM,
which is more feasible to irrigate with. The reservoir water will supply a drip irrigation
system designed to emit water at 0.18 gallons per hour (GPH) at each emitter. The system
will irrigate a 2 acre fruit orchard, a 1 acre plot of grains, and a 1 acre plot of vegetables.
The system should warrant ease of use and is designed to be added on to in the future.

Introduction
A proposal was brought to our attention for the development of an irrigation system
on a 12 acre farm in a very rural area Akot, South Sudan. The initial plans were to allocate
8 of the 12 acres for crops: 3 acres for an Orchard containing mango and papaya trees, 3
acres for grains such as sorghum, millet, and maize, and 2 acres for vegetables such as
beans, sweet potatoes, and squash. The primary issue in the design of the irrigation system
is the difficulty in obtaining irrigation water. Our only source of water is a lone well that
produces only 25 gallons per minute. There is a substantial amount of precipitation water
during six months of the year, with virtually no precipitation in remaining six months.
During the dry months irrigation is desired, yet only the 25 GPM well is accessible. The lack
of energy for pumping, high price of fuel for power production, and limited financial
resources could also be considered limiting factors.

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

Figure 1- Proposed project location

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

Design Recommendations
Mapping
As can be seen in the figure below, we incorporated a relatively simple layout for the
design of the irrigation system. Simplicity and symmetry were of great importance. The well
is in the center of the property with piping to the reservoir in the southwest corner. The
reservoir then supplies water to the orchard plot due north, and the grain and vegetable
plots to the east. Each plot, including the reservoir, has room for expansion or for nonirrigated crops to be used for demonstration.

Figure 2- AutoCAD layout of project site (see appendix for to-scale drawing)

Design Summary
The final design we recommend includes the implementation of a drip irrigation
system. Some assumptions made before the design process were commenced include the
drawdown of the well, the application efficiency of our design, the elevation difference in the
field and worst case emitter based on the total dynamic head (TDH). The design capacity of
AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

our reservoir hinges upon the precipitation values that were accessed from world
meteorological organization (WMO) for the nearby city of Malakal, South Sudan. These
values differ from the estimates that were provided. Several

different iterations and

calculations were performed to yield our final design.


The design is based on the crop water requirements which retrieved
from Food and Agricultural Organization (FAO) in mm/day displayed in table
1. The values were converted from acre-inches of depth required by the
grains and vegetables to gallons to coincide with the orchard. Once the
water needed to supply on a daily basis was calculated, in gallons per day,
the amount of water produced from the well assuming 12 hours of pumping
per day was determined. Once the data was analyzed it was determined that
22,548 gallons per day has to be supplied. We quickly realized that the well
productivity is only enough to supplyacres per day. 22,548 gallons per
day

Table 1. Crop water Requirements


Crop

Water

Water

Area (acres)

Gallons

Requirement

Requirement

(mm/day)

(in/day)

Sorghum

9.9

0.39

0.33

3495

Millet

9.9

0.39

0.33

3495

Maize

9.9

0.39

0.33

3495

Squash

9.9

0.39

0.33

3495

Beans

9.9

0.39

0.33

3495

Sweet Potatoes

9.9

0.39

0.33

3495

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

The system is designed to be operated using solar power which entails six solar
panels producing 180 volts of power. The panels will be located in the center of the property
near the well and facing south. They will be directly wired to each pump controller and, in
turn, each pump. We have specified Netafim Typhoon Series 875 0.18 GPH drip tube with
24 emitter spacing for irrigation. The flushing flow of the system is calculated at 26.50 GPM.
The lateral spacing is 6 feet for the Orchard and 4 feet for the grain and vegetable crops.
The water will be supplied from a well using a submersible turbine pump producing 25 GPM
and overcoming 105 feet of Total Dynamic Head (TDH) to a reservoir measuring 2 acres in
size by 58 inches deep.
Table 1. TDH

Pump

Submersible
Centrifugal

Elevation

Operating

Friction

TDH

(ft.)

(ft.)

(ft.)

(ft.)

105

--

--

105.0

23.10

21.61

49.71

Surface

From the reservoir, water will be pumped out at 68 GPM using a brushless DC
centrifugal surface pump overcoming 49.71 feet of TDH. Water will travel in a 2.5 inch main
and split into 2, 2 inch sub-mains, before splitting again into more sub-mains sized at 1.25
inches. Along the first sub-main, a back-flow prevention valve will be placed on the pipe;
followed by a 120 mesh disk filter and then a pressure regulation valve. Air/vacuum relief
valves will be placed at the end of the 1.25 inch lateral headers for each crop plot. Water
from the headers will be divided amongst 91 laterals for each of the grain and vegetable
plots and between 39 laterals for the orchard plot. The system was originally designed with
100% efficiency.

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

The crops specified in the design have a maximum evapotranspiration (ET) of 9.9
millimeters daily or 0.39 inches daily for grains and vegetables, along with a 4 gallon per
day ET for Mango trees and 2 for papayas. The system was designed to irrigate to these
depths according to a run time of 2.03 hours for the orchard plot and 10.7 hours for both
the grain and vegetable plots. The water flow for any of the three plots and for the well
water can be shut off using ball valves incorporated into the system design. The irrigation
system is designed to be run daily from November 1 st to April 30th, after beginning to fill the
reservoir with well water on April 15th.

System Pump Curves

Figure 3- Pump curve of submersible turbine pump

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

Figure 4- Pump curve of centrifugal surface pump.

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

Sample Irrigation System

Figure 5- Layout of sample drip irrigation system

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

10

Capital and Operating Costs


Bill of Materials
Cost

Item
Sun Pump SCP 75-40-105
Centrifugal Surface Pump w/
Controller
Sun Pump SCS 12-127-60
Submersible Pump
Controller for Submersible Pump
2 1/2" Schedule 40 PVCPipe
2" Schedule 40 PVC Pipe
1 1/4" Schedule 40 PVC Pipe
Series of Grape Solar 250-Watt
Monocrystalline Solar Panels w/
Mounting Brackets and Wiring
Netafim 2" Dual HP Filter
Netafim Typhoon Dripline 10 Mil
Wall Thickness
Miscellaneous (fittings and
valves)
Subtotal
Contingency at 10%
Total Cost

Energy Costs
Equipment and Peripherals (BOM)
Subtotal
Contingency at 10%
Total

Unit of
Measurement

Per Item

each

$1,725.00

$1,725.00

1
1
13
12
507

each
each
feet
feet
feet

$1,656.00
$425.00
$2.99
$1.73
$1.17

$3,312.00
$850.00
$38.87
$20.76
$593.19

6
1

each
each

$374.99
$433.00

$2,249.94
$433.00

$0.06

$2,042.94

$125.00

$125.00
$11,265.70
$1,126.57
$12,392.27

QTY.

35,841
1

feet
each

Project Costs
Solar Power
$0
$10,103.17
$10,103.17
$1,010.32
$11,113.49

Total

Diesel Generator
$5,584.50
$9,352.23
$14,936.73
$1,493.67
$16,430.40

Table 1- Financial comparison of solar and diesel power over a 10 year span

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

11

Appendix
Calculations

Where Q=flow, cfs


V=Velocity, fps
A=Cross-sectional area, ft2

Where Q=flow, GPM


A=Area, Acres
d=depth, in/day
t=time, hrs/day

Where PR=Precipitation rate, in/hr


Q=Flow, GPM
A=Area, ft2

Where RT=Run time, hrs/day

GWR=Gross water requirement, in/day

PR=Precipitation rate, in/hr

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

12

Conversions

Table 1. Conversions

Acres

Acre-

CFS

inches

Ft.2

43,560

Gallons

27,154

GPM

448.83

Water Balance
Table 1. Daily water balance, * denoting start of reservoir filling and
irrigation
Daily Water Balance (gallons)
* Precipitatin and Evaporation values found online for nearby city
15Apr
16Apr
17Apr
18Apr
19Apr
20Apr
21Apr
22Apr
23Apr
24Apr
25Apr
26Apr
27Apr
28Apr
29-

Into

Out

Precip

Evap

Net

18000*

1917.17

10690.55

9226.62

18000

1917.17

10690.55

18453.24

18000

1917.17

10690.55

27679.86

18000

1917.17

10690.55

36906.48

18000

1917.17

10690.55

46133.1

18000

1917.17

10690.55

55359.72

18000

1917.17

10690.55

64586.34

18000

1917.17

10690.55

73812.96

18000

1917.17

10690.55

83039.58

18000

1917.17

10690.55

92266.19882

18000

1917.17

10690.55

101492.8176

18000

1917.17

10690.55

110719.4365

18000

1917.17

10690.55

119946.0553

18000

1917.17

10690.55

129172.6741

18000

1917.17

10690.55

138399.2929

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

13

Apr
30Apr
1-May

18000

1917.17

10690.55

147625.9117

18000

6717.8

9655.982

162687.73

2-May

18000

6717.8

9655.982

177749.5483

3-May

18000

6717.8

9655.982

192811.3666

4-May

18000

6717.8

9655.982

207873.1849

5-May

18000

6717.8

9655.982

222935.0032

6-May

18000

6717.8

9655.982

237996.8215

7-May

18000

6717.8

9655.982

253058.6397

8-May

18000

6717.8

9655.982

268120.458

9-May

18000

6717.8

9655.982

283182.2763

10May
11May
12May
13May
14May
15May
16May
17May
18May
19May
20May
21May
22May
23May
24May
25May
26May
27May
28May
29May

18000

6717.8

9655.982

298244.0946

18000

6717.8

9655.982

313305.9129

18000

6717.8

9655.982

328367.7312

18000

6717.8

9655.982

343429.5495

18000

6717.8

9655.982

358491.3678

18000

6717.8

9655.982

373553.1861

18000

6717.8

9655.982

388615.0043

18000

6717.8

9655.982

403676.8226

18000

6717.8

9655.982

418738.6409

18000

6717.8

9655.982

433800.4592

18000

6717.8

9655.982

448862.2775

18000

6717.8

9655.982

463924.0958

18000

6717.8

9655.982

478985.9141

18000

6717.8

9655.982

494047.7324

18000

6717.8

9655.982

509109.5506

18000

6717.8

9655.982

524171.3689

18000

6717.8

9655.982

539233.1872

18000

6717.8

9655.982

554295.0055

18000

6717.8

9655.982

569356.8238

18000

6717.8

9655.982

584418.6421

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

14

30May
31May
1-Jun

18000

6717.8

9655.982

599480.4604

18000

6717.8

9655.982

614542.2787

18000

7682.94

9977.848

630247.3709

2-Jun

18000

7682.94

9977.848

645952.4631

3-Jun

18000

7682.94

9977.848

661657.5554

4-Jun

18000

7682.94

9977.848

677362.6476

5-Jun

18000

7682.94

9977.848

693067.7398

6-Jun

18000

7682.94

9977.848

708772.832

7-Jun

18000

7682.94

9977.848

724477.9243

8-Jun

18000

7682.94

9977.848

740183.0165

9-Jun

18000

7682.94

9977.848

755888.1087

10Jun
11Jun
12Jun
13Jun
14Jun
15Jun
16Jun
17Jun
18Jun
19Jun
20Jun
21Jun
22Jun
23Jun
24Jun
25Jun
26Jun
27Jun
28Jun
29-

18000

7682.94

9977.848

771593.201

18000

7682.94

9977.848

787298.2932

18000

7682.94

9977.848

803003.3854

18000

7682.94

9977.848

818708.4777

18000

7682.94

9977.848

834413.5699

18000

7682.94

9977.848

850118.6621

18000

7682.94

9977.848

865823.7544

18000

7682.94

9977.848

881528.8466

18000

7682.94

9977.848

897233.9388

18000

7682.94

9977.848

912939.031

18000

7682.94

9977.848

928644.1233

18000

7682.94

9977.848

944349.2155

18000

7682.94

9977.848

960054.3077

18000

7682.94

9977.848

975759.4

18000

7682.94

9977.848

991464.4922

18000

7682.94

9977.848

1007169.584

18000

7682.94

9977.848

1022874.677

18000

7682.94

9977.848

1038579.769

18000

7682.94

9977.848

1054284.861

18000

7682.94

9977.848

1069989.953

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

15

Jun
30Jun
1-Jul

18000

7682.94

9977.848

1085695.046

18000

11307.62

8966.269

1106036.397

2-Jul

18000

11307.62

8966.269

1126377.748

3-Jul

18000

11307.62

8966.269

1146719.099

4-Jul

18000

11307.62

8966.269

1167060.451

5-Jul

18000

11307.62

8966.269

1187401.802

6-Jul

18000

11307.62

8966.269

1207743.153

7-Jul

18000

11307.62

8966.269

1228084.504

8-Jul

18000

11307.62

8966.269

1248425.856

9-Jul

18000

11307.62

8966.269

1268767.207

10-Jul

18000

11307.62

8966.269

1289108.558

11-Jul

18000

11307.62

8966.269

1309449.91

12-Jul

18000

11307.62

8966.269

1329791.261

13-Jul

18000

11307.62

8966.269

1350132.612

14-Jul

18000

11307.62

8966.269

1370473.963

15-Jul

18000

11307.62

8966.269

1390815.315

16-Jul

18000

11307.62

8966.269

1411156.666

17-Jul

18000

11307.62

8966.269

1431498.017

18-Jul

18000

11307.62

8966.269

1451839.368

19-Jul

18000

11307.62

8966.269

1472180.72

20-Jul

18000

11307.62

8966.269

1492522.071

21-Jul

18000

11307.62

8966.269

1512863.422

22-Jul

18000

11307.62

8966.269

1533204.773

23-Jul

18000

11307.62

8966.269

1553546.125

24-Jul

18000

11307.62

8966.269

1573887.476

25-Jul

18000

11307.62

8966.269

1594228.827

26-Jul

18000

11307.62

8966.269

1614570.179

27-Jul

18000

11307.62

8966.269

1634911.53

28-Jul

18000

11307.62

8966.269

1655252.881

29-Jul

18000

11307.62

8966.269

1675594.232

30-Jul

18000

11307.62

8966.269

1695935.584

31-Jul

18000

11307.62

8966.269

1716276.935

1-Aug

18000

11738.91

8966.269

1737049.576

2-Aug

18000

11738.91

8966.269

1757822.217

3-Aug

18000

11738.91

8966.269

1778594.859

4-Aug

18000

11738.91

8966.269

1799367.5

5-Aug

18000

11738.91

8966.269

1820140.141

6-Aug

18000

11738.91

8966.269

1840912.782

7-Aug

18000

11738.91

8966.269

1861685.424

8-Aug

18000

11738.91

8966.269

1882458.065

9-Aug

18000

11738.91

8966.269

1903230.706

10-

18000

11738.91

8966.269

1924003.348

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

16

Aug
11Aug
12Aug
13Aug
14Aug
15Aug
16Aug
17Aug
18Aug
19Aug
20Aug
21Aug
22Aug
23Aug
24Aug
25Aug
26Aug
27Aug
28Aug
29Aug
30Aug
31Aug
1-Sep

18000

11738.91

8966.269

1944775.989

18000

11738.91

8966.269

1965548.63

18000

11738.91

8966.269

1986321.271

18000

11738.91

8966.269

2007093.913

18000

11738.91

8966.269

2027866.554

18000

11738.91

8966.269

2048639.195

18000

11738.91

8966.269

2069411.836

18000

11738.91

8966.269

2090184.478

18000

11738.91

8966.269

2110957.119

18000

11738.91

8966.269

2131729.76

18000

11738.91

8966.269

2152502.401

18000

11738.91

8966.269

2173275.043

18000

11738.91

8966.269

2194047.684

18000

11738.91

8966.269

2214820.325

18000

11738.91

8966.269

2235592.967

18000

11738.91

8966.269

2256365.608

18000

11738.91

8966.269

2277138.249

18000

11738.91

8966.269

2297910.89

18000

11738.91

8966.269

2318683.532

18000

11738.91

8966.269

2339456.173

18000

11738.91

8966.269

2360228.814

18000

8395.65

9977.848

2376646.616

2-Sep

18000

8395.65

9977.848

2393064.419

3-Sep

18000

8395.65

9977.848

2409482.221

4-Sep

18000

8395.65

9977.848

2425900.023

5-Sep

18000

8395.65

9977.848

2442317.825

6-Sep

18000

8395.65

9977.848

2458735.628

7-Sep

18000

8395.65

9977.848

2475153.43

8-Sep

18000

8395.65

9977.848

2491571.232

9-Sep

18000

8395.65

9977.848

2507989.034

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

17

10Sep
11Sep
12Sep
13Sep
14Sep
15Sep
16Sep
17Sep
18Sep
19Sep
20Sep
21Sep
22Sep
23Sep
24Sep
25Sep
26Sep
27Sep
28Sep
29Sep
30Sep
1-Oct

18000

8395.65

9977.848

2524406.836

18000

8395.65

9977.848

2540824.639

18000

8395.65

9977.848

2557242.441

18000

8395.65

9977.848

2573660.243

18000

8395.65

9977.848

2590078.045

18000

8395.65

9977.848

2606495.848

18000

8395.65

9977.848

2622913.65

18000

8395.65

9977.848

2639331.452

18000

8395.65

9977.848

2655749.254

18000

8395.65

9977.848

2672167.057

18000

8395.65

9977.848

2688584.859

18000

8395.65

9977.848

2705002.661

18000

8395.65

9977.848

2721420.463

18000

8395.65

9977.848

2737838.265

18000

8395.65

9977.848

2754256.068

18000

8395.65

9977.848

2770673.87

18000

8395.65

9977.848

2787091.672

18000

8395.65

9977.848

2803509.474

18000

8395.65

9977.848

2819927.277

18000

8395.65

9977.848

2836345.079

18000

8395.65

9977.848

2852762.881

18000

1988.42

11035.41

2861715.893

2-Oct

18000

1988.42

11035.41

2870668.906

3-Oct

18000

1988.42

11035.41

2879621.918

4-Oct

18000

1988.42

11035.41

2888574.93

5-Oct

18000

1988.42

11035.41

2897527.943

6-Oct

18000

1988.42

11035.41

2906480.955

7-Oct

18000

1988.42

11035.41

2915433.967

8-Oct

18000

1988.42

11035.41

2924386.98

9-Oct

18000

1988.42

11035.41

2933339.992

10-

18000

1988.42

11035.41

2942293.004

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

18

Oct
11Oct
12Oct
13Oct
14Oct
15Oct
16Oct
17Oct
18Oct
19Oct
20Oct
21Oct
22Oct
23Oct
24Oct
25Oct
26Oct
27Oct
28Oct
29Oct
30Oct
31Oct
1-Nov

18000

1988.42

11035.41

2951246.017

18000

1988.42

11035.41

2960199.029

18000

1988.42

11035.41

2969152.041

18000

1988.42

11035.41

2978105.054

18000

1988.42

11035.41

2987058.066

18000

1988.42

11035.41

2996011.078

18000

1988.42

11035.41

3004964.091

18000

1988.42

11035.41

3013917.103

18000

1988.42

11035.41

3022870.115

18000

1988.42

11035.41

3031823.128

18000

1988.42

11035.41

3040776.14

18000

1988.42

11035.41

3049729.152

18000

1988.42

11035.41

3058682.165

18000

1988.42

11035.41

3067635.177

18000

1988.42

11035.41

3076588.189

18000

1988.42

11035.41

3085541.202

18000

1988.42

11035.41

3094494.214

18000

1988.42

11035.41

3103447.226

18000

1988.42

11035.41

3112400.239

18000

1988.42

11035.41

3121353.251

18000

1988.42

11035.41

3130306.263

18000

23747.34

2054.7

12115.96

3114497.665

2-Nov

18000

23747.34

2054.7

12115.96

3098689.067

3-Nov

18000

23747.34

2054.7

12115.96

3082880.469

4-Nov

18000

23747.34

2054.7

12115.96

3067071.871

5-Nov

18000

23747.34

2054.7

12115.96

3051263.273

6-Nov

18000

23747.34

2054.7

12115.96

3035454.675

7-Nov

18000

23747.34

2054.7

12115.96

3019646.077

8-Nov

18000

23747.34

2054.7

12115.96

3003837.479

9-Nov

18000

23747.34

2054.7

12115.96

2988028.881

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

19

10Nov
11Nov
12Nov
13Nov
14Nov
15Nov
16Nov
17Nov
18Nov
19Nov
20Nov
21Nov
22Nov
23Nov
24Nov
25Nov
26Nov
27Nov
28Nov
29Nov
30Nov
1-Dec

18000

23747.34

2054.7

12115.96

2972220.283

18000

23747.34

2054.7

12115.96

2956411.685

18000

23747.34

2054.7

12115.96

2940603.087

18000

23747.34

2054.7

12115.96

2924794.489

18000

23747.34

2054.7

12115.96

2908985.891

18000

23747.34

2054.7

12115.96

2893177.293

18000

23747.34

2054.7

12115.96

2877368.695

18000

23747.34

2054.7

12115.96

2861560.097

18000

23747.34

2054.7

12115.96

2845751.499

18000

23747.34

2054.7

12115.96

2829942.901

18000

23747.34

2054.7

12115.96

2814134.303

18000

23747.34

2054.7

12115.96

2798325.705

18000

23747.34

2054.7

12115.96

2782517.107

18000

23747.34

2054.7

12115.96

2766708.509

18000

23747.34

2054.7

12115.96

2750899.911

18000

23747.34

2054.7

12115.96

2735091.313

18000

23747.34

2054.7

12115.96

2719282.715

18000

23747.34

2054.7

12115.96

2703474.117

18000

23747.34

2054.7

12115.96

2687665.519

18000

23747.34

2054.7

12115.96

2671856.921

18000

23747.34

2054.7

12115.96

2656048.323

18000

23747.34

11725.12

2638575.862

2-Dec

18000

23747.34

11725.12

2621103.402

3-Dec

18000

23747.34

11725.12

2603630.941

4-Dec

18000

23747.34

11725.12

2586158.481

5-Dec

18000

23747.34

11725.12

2568686.02

6-Dec

18000

23747.34

11725.12

2551213.559

7-Dec

18000

23747.34

11725.12

2533741.099

8-Dec

18000

23747.34

11725.12

2516268.638

9-Dec

18000

23747.34

11725.12

2498796.177

10-

18000

23747.34

11725.12

2481323.717

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

20

Dec
11Dec
12Dec
13Dec
14Dec
15Dec
16Dec
17Dec
18Dec
19Dec
20Dec
21Dec
22Dec
23Dec
24Dec
25Dec
26Dec
27Dec
28Dec
29Dec
30Dec
31Dec
1-Jan

18000

23747.34

11725.12

2463851.256

18000

23747.34

11725.12

2446378.795

18000

23747.34

11725.12

2428906.335

18000

23747.34

11725.12

2411433.874

18000

23747.34

11725.12

2393961.413

18000

23747.34

11725.12

2376488.953

18000

23747.34

11725.12

2359016.492

18000

23747.34

11725.12

2341544.031

18000

23747.34

11725.12

2324071.571

18000

23747.34

11725.12

2306599.11

18000

23747.34

11725.12

2289126.649

18000

23747.34

11725.12

2271654.189

18000

23747.34

11725.12

2254181.728

18000

23747.34

11725.12

2236709.268

18000

23747.34

11725.12

2219236.807

18000

23747.34

11725.12

2201764.346

18000

23747.34

11725.12

2184291.886

18000

23747.34

11725.12

2166819.425

18000

23747.34

11725.12

2149346.964

18000

23747.34

11725.12

2131874.504

18000

23747.34

11725.12

2114402.043

18000

23747.34

11725.12

2096929.582

2-Jan

18000

23747.34

11725.12

2079457.122

3-Jan

18000

23747.34

11725.12

2061984.661

4-Jan

18000

23747.34

11725.12

2044512.2

5-Jan

18000

23747.34

11725.12

2027039.74

6-Jan

18000

23747.34

11725.12

2009567.279

7-Jan

18000

23747.34

11725.12

1992094.818

8-Jan

18000

23747.34

11725.12

1974622.358

9-Jan

18000

23747.34

11725.12

1957149.897

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

21

10Jan
11Jan
12Jan
13Jan
14Jan
15Jan
16Jan
17Jan
18Jan
19Jan
20Jan
21Jan
22Jan
23Jan
24Jan
25Jan
26Jan
27Jan
28Jan
29Jan
30Jan
31Jan
1-Feb

18000

23747.34

11725.12

1939677.436

18000

23747.34

11725.12

1922204.976

18000

23747.34

11725.12

1904732.515

18000

23747.34

11725.12

1887260.055

18000

23747.34

11725.12

1869787.594

18000

23747.34

11725.12

1852315.133

18000

23747.34

11725.12

1834842.673

18000

23747.34

11725.12

1817370.212

18000

23747.34

11725.12

1799897.751

18000

23747.34

11725.12

1782425.291

18000

23747.34

11725.12

1764952.83

18000

23747.34

11725.12

1747480.369

18000

23747.34

11725.12

1730007.909

18000

23747.34

11725.12

1712535.448

18000

23747.34

11725.12

1695062.987

18000

23747.34

11725.12

1677590.527

18000

23747.34

11725.12

1660118.066

18000

23747.34

11725.12

1642645.605

18000

23747.34

11725.12

1625173.145

18000

23747.34

11725.12

1607700.684

18000

23747.34

11725.12

1590228.223

18000

23747.34

11725.12

1572755.763

18000

23747.34

30.56

14508.61

1552530.378

2-Feb

18000

23747.34

30.56

14508.61

1532304.992

3-Feb

18000

23747.34

30.56

14508.61

1512079.607

4-Feb

18000

23747.34

30.56

14508.61

1491854.222

5-Feb

18000

23747.34

30.56

14508.61

1471628.837

6-Feb

18000

23747.34

30.56

14508.61

1451403.452

7-Feb

18000

23747.34

30.56

14508.61

1431178.067

8-Feb

18000

23747.34

30.56

14508.61

1410952.681

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

22

9-Feb

18000

23747.34

30.56

14508.61

1390727.296

10Feb
11Feb
12Feb
13Feb
14Feb
15Feb
16Feb
17Feb
18Feb
19Feb
20Feb
21Feb
22Feb
23Feb
24Feb
25Feb
26Feb
27Feb
28Feb
1-Mar

18000

23747.34

30.56

14508.61

1370501.911

18000

23747.34

30.56

14508.61

1350276.526

18000

23747.34

30.56

14508.61

1330051.141

18000

23747.34

30.56

14508.61

1309825.756

18000

23747.34

30.56

14508.61

1289600.37

18000

23747.34

30.56

14508.61

1269374.985

18000

23747.34

30.56

14508.61

1249149.6

18000

23747.34

30.56

14508.61

1228924.215

18000

23747.34

30.56

14508.61

1208698.83

18000

23747.34

30.56

14508.61

1188473.445

18000

23747.34

30.56

14508.61

1168248.059

18000

23747.34

30.56

14508.61

1148022.674

18000

23747.34

30.56

14508.61

1127797.289

18000

23747.34

30.56

14508.61

1107571.904

18000

23747.34

30.56

14508.61

1087346.519

18000

23747.34

30.56

14508.61

1067121.133

18000

23747.34

30.56

14508.61

1046895.748

18000

23747.34

30.56

14508.61

1026670.363

18000

23747.34

30.56

14508.61

1006444.978

18000

23747.34

462.11

11035.41

990124.3403

2-Mar

18000

23747.34

462.11

11035.41

973803.7026

3-Mar

18000

23747.34

462.11

11035.41

957483.0649

4-Mar

18000

23747.34

462.11

11035.41

941162.4273

5-Mar

18000

23747.34

462.11

11035.41

924841.7896

6-Mar

18000

23747.34

462.11

11035.41

908521.1519

7-Mar

18000

23747.34

462.11

11035.41

892200.5143

8-Mar

18000

23747.34

462.11

11035.41

875879.8766

9-Mar

18000

23747.34

462.11

11035.41

859559.2389

10Mar
11Mar

18000

23747.34

462.11

11035.41

843238.6012

18000

23747.34

462.11

11035.41

826917.9636

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

23

12Mar
13Mar
14Mar
15Mar
16Mar
17Mar
18Mar
19Mar
20Mar
21Mar
22Mar
23Mar
24Mar
25Mar
26Mar
27Mar
28Mar
29Mar
30Mar
31Mar
1-Apr

18000

23747.34

462.11

11035.41

810597.3259

18000

23747.34

462.11

11035.41

794276.6882

18000

23747.34

462.11

11035.41

777956.0506

18000

23747.34

462.11

11035.41

761635.4129

18000

23747.34

462.11

11035.41

745314.7752

18000

23747.34

462.11

11035.41

728994.1375

18000

23747.34

462.11

11035.41

712673.4999

18000

23747.34

462.11

11035.41

696352.8622

18000

23747.34

462.11

11035.41

680032.2245

18000

23747.34

462.11

11035.41

663711.5869

18000

23747.34

462.11

11035.41

647390.9492

18000

23747.34

462.11

11035.41

631070.3115

18000

23747.34

462.11

11035.41

614749.6739

18000

23747.34

462.11

11035.41

598429.0362

18000

23747.34

462.11

11035.41

582108.3985

18000

23747.34

462.11

11035.41

565787.7608

18000

23747.34

462.11

11035.41

549467.1232

18000

23747.34

462.11

11035.41

533146.4855

18000

23747.34

462.11

11035.41

516825.8478

18000

23747.34

462.11

11035.41

500505.2102

18000

23747.34

1917.18

12828.66

483846.3887

2-Apr

18000

23747.34

1917.18

12828.66

467187.5673

3-Apr

18000

23747.34

1917.18

12828.66

450528.7459

4-Apr

18000

23747.34

1917.18

12828.66

433869.9245

5-Apr

18000

23747.34

1917.18

12828.66

417211.1031

6-Apr

18000

23747.34

1917.18

12828.66

400552.2817

7-Apr

18000

23747.34

1917.18

12828.66

383893.4602

8-Apr

18000

23747.34

1917.18

12828.66

367234.6388

9-Apr

18000

23747.34

1917.18

12828.66

350575.8174

10Apr
11-

18000

23747.34

1917.18

12828.66

333916.996

18000

23747.34

1917.18

12828.66

317258.1746

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

24

Apr
12Apr
13Apr
14Apr
15Apr
16Apr
17Apr
18Apr
19Apr
20Apr
21Apr
22Apr
23Apr
24Apr
25Apr
26Apr
27Apr
28Apr
29Apr
30Apr

18000

23747.34

1917.18

12828.66

300599.3531

18000

23747.34

1917.18

12828.66

283940.5317

18000

23747.34

1917.18

12828.66

267281.7103

18000

23747.34

1917.18

12828.66

250622.8889

18000

23747.34

1917.18

12828.66

233964.0675

18000

23747.34

1917.18

12828.66

217305.2461

18000

23747.34

1917.18

12828.66

200646.4246

18000

23747.34

1917.18

12828.66

183987.6032

18000

23747.34

1917.18

12828.66

167328.7818

18000

23747.34

1917.18

12828.66

150669.9604

18000

23747.34

1917.18

12828.66

134011.139

18000

23747.34

1917.18

12828.66

117352.3176

18000

23747.34

1917.18

12828.66

100693.4961

18000

23747.34

1917.18

12828.66

84034.67472

18000

23747.34

1917.18

12828.66

67375.85331

18000

23747.34

1917.18

12828.66

50717.03189

18000

23747.34

1917.18

12828.66

34058.21047

18000

23747.34

1917.18

12828.66

17399.38906

18000

23747.34

1917.18

12828.66

740.5676378

References
Brandhorst, Henry W., Ph.D.
Dougherty, Mark, Ph.D.
Lyrene, Raymond, M.D.
FAO
AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

25

www.ewing1.com
www.homedepot.com
www.netafilm.com/agriculture
www.sunpumps.com/products

AKOT, SOUTH SUDAN IRRIGATION PROJECT - DECEMBER 2013

26

Вам также может понравиться