MAKING TEST CUBES FROM FRESH CONCRETE

1. Introduction
Concrete cubes are made on site to check that the strength of the concrete is above the minimum strength which
has been specified.

Making, curing and testing cubes should be carried out in the correct manner. Even small deviations from the
standard procedures will usually lead to compressive strength results which are lower than the true strength of the
concrete. For example, for each 1% air entrapped there will be a 4 to 5% loss of strength. The procedures for
concrete cube making are given in British Standard (BS) 1881:1983 Testing Concrete

Equipment

a. Sample tray;
b. Mould for making test cube;
c. Spanners;
d. Scoop;
e. Steel float or trowel;
f. Compacting bar;
g. Vibrating hammer or vibrating table;
h. Cleaning rags;
i. A bucket or barrow for transporting the samples;
j. Polythene sheeting;
k. Curing tank.

Some of the tools and equipment required for cube making.

2. Cube Moulds
The standard size of cube is 150 mm.

Cubes of 100 mm size are not suitable for concrete having a nominal maximum aggregate size exceeding 20 mm.
Cubes of 150 mm size are not suitable for concrete having a nominal maximum aggregate size exceeding 40 mm.

The moulds for the specimens must be made of cast iron or cast steel. The inside faces must be machined plane.
The cube mould is normally made in two halves to facilitate removal of the concrete cube without damage. Each
mould has a base, which is a separate metal plate, preferably fastened to the mould by clamps or springs. When
assembled, all the internal angles of the mould must be right angles.

To comply with CS 1:1990, moulds are required to be within specified tolerances for dimensions, squareness and
parallelism. These are covered in Section 7 of CS 1.

Preparing the Moulds

Before assembling the moulds, make sure that there is no hardened mortar or dirt on the faces of the flange that
prevent the sections from fitting together closely.
Cleaning the mould

These faces must be thinly coated with mould oil to prevent leakage during filling, and a similar oil film should be
provided between the contact surfaces of the bottom of the mould and the base. The inside of the mould must
also be oiled to prevent the concrete from sticking to it. The two sections must be bolted firmly together, and the
moulds held down firmly on the base plates.

Preparing the mould

3. Sampling Fresh Concrete


It is very important that the concrete put into the moulds should be a representative sample of the concrete that is
going into the works. A sample of the concrete should be taken either as the concrete is being discharged from a
mixer, or from a stationary lorry or heap; the latter method is less satisfactory.

The quantity of concrete required should be 10 kg for making each 150 mm cube, but in no case should the
quantity of concrete sampled be less than 20 kg. Each sample should consist of at least six increments when it is
taken from a heap or lorry, and at least four increments when taken from a chute or conveyor.

Sampling from Heaps or Lorries

The increments should wherever possible be distributed through the depth of the concrete as well as over the
exposed surface. Care should be taken not to take any from the edge of a pile where large particles of aggregate
may have gathered through segregation.

Sampling from Falling Streams, Chutes or Conveyors

When sampling from a falling stream, increments should be taken by passing a scoop through the whole width
and thickness of the stream in a single operation. Alternatively, the entire stream may be diverted so that it
discharges into the container.

Whichever way the samples are taken, the parts must be thoroughly mixed together so that the whole sample is
uniform. If the sample is in a barrow, the remixing can be done in the barrow with a shovel or a sampling scoop;
alternatively, and specially if the sample is in a bucket, it can be tipped over a non-absorbent base and then
thoroughly mixed together.

Remixing the sample.

4. Compaction: Filling the Cube Moulds and Compacting the Concrete


After the sample has been remixed, immediately fill the cube moulds and compact the concrete, either by hand or
by vibration. Any air trapped in the concrete will reduce the strength of the cube. Hence, the cubes must be fully
compacted. However, care must also be taken not to over compact the concrete as this may cause segregation
of the aggregates and cement paste in the mix. This may also reduce the final compressive strength.

Filling the mould (for 150 mm cube 3 equal layers)

Compacting with Compacting Bar

150 mm moulds should be filled in three approximately equal layers (50 mm deep). A compacting bar is provided
for compacting the concrete. It is a 380 mm long steel bar, weighs 1.8 kg and has a 25 mm square end for
ramming. During the compaction of each layer with the compacting bar, the strokes should be distributed in a
uniform manner over the surface of the concrete and each layer should be compacted to its full depth. During the
compaction of the first layer, the compacting bar should not forcibly strike the bottom of the mould. For
subsequent layers, the compacting bar should pass into the layer immediately below. The minimum number of
strokes per layer required to produce full compaction will depend upon the workability of the concrete, but at least
35 strokes will be necessary except in the case of very high workability concrete. After the top layer has been
compacted, a trowel should be used to finish off the surface level with the top of the mould, and the outside of the
mould should be wiped clean.

Compacting the concrete in the cube mould (For 150 mm cube at least 35 tamps per layer)

Finishing

Compacting with Vibrating Hammer or Table

During the compaction of each layer by means of a vibrating hammer, the mould should preferably be placed on a
level piece of timber. The concrete should be vibrated by holding the foot of the hammer against a piece of timber
placed over but not completely covering the top of the mould.

The applied vibration by either the vibrating hammer or table should be of the minimum duration necessary to
achieve full compaction of the concrete. Vibration should cease as soon as the surface of the concrete becomes
relatively smooth and air bubbles cease to appear.

Precautions to Take When Making Cubes

While finishing off the surface of the concrete, if the mould is too full, the excess concrete should not be removed
by scraping off the top surface as this takes off the cement paste that has come to the top and leaves the
concrete short of cement. The correct way is to use a corner of the trowel and dig out a fair sample of the
concrete as a whole, then finish the surface by trowelling.

Once a specimen has been compacted, it should not be left standing on the same bench as another specimen
that is being compacted. If this is done, some vibration will be passed on to the first specimen and it will be more
compacted than the other. In extreme cases some re-arranging of the particles may result and segregation will
occur.

Identification of Cubes

Immediately after making the cubes they should be marked clearly. This can be done by writing the details of the
cube in ink on a small piece of paper and placing on top of the concrete until it is demoulded.

5. Curing and Demoulding: Initial Curing of Concrete Cubes


Immediately after curing, the cubes should be covered with damp matting or other suitable damp material and
then with polythene or similar impervious sheeting and stored in a place where the temperature can be kept at 27
± 5°C for approximately 16 to 24 hrs.

Demoulding the Test Cubes

Test cubes should be demoulded between 16 and 24 hours after they have been made. If after this period of time
the concrete has not achieved sufficient strength to enable demoulding without damaging the cube then the
demoulding should be delayed for a further 24 hours. When removing the concrete cube from the mould, take the
mould apart completely. Take care not to damage the cube because, if any cracking is caused, the compressive
strength may be reduced.

Demoulding the cube

After demoulding, each cube should be marked with a legible identification on the top or bottom using a
waterproof crayon or ink. The mould must be thoroughly cleaned after demoulding the cube. Ensure that grease
or dirt does not collect between the faces of the flanges, otherwise the two halves will not fit together properly and
there will be leakage through the joint and an irregularly shaped cube may result.

Curing Test Cubes

Cubes must be cured before they are tested. Unless required for test at 24 hours, the cube should be placed
immediately after demoulding in the curing tank or mist room.

The curing temperature of the water in the curing tank should be maintained at 27-30°C. If curing is in a mist
room, the relative humidity should be maintained at no less than 95%. Curing should be continued as long as
possible up to the time of testing.

Marking and curing concrete cubes

In order to provide adequate circulation of water, adequate space should be provided between the cubes, and
between the cubes and the side of the curing tank. If curing is in a mist room, there should be sufficient space
between cubes to ensure that all surfaces of the cubes are moist at all times.