Вы находитесь на странице: 1из 1

KOILSAGAR LIFT IRRIGATION SCHEME STAGE - II

1.5m Drop @ Km.15.600 on Left Canal


S.No

Description

Foundation

Nos

Grade

Length

Breadth

Depth

Qty

Cut off wall

1 X 1 M - 15

3.700

0.300

0.215

0.239

Apron I

1 X 1 M - 15

3.700

6.460

0.455

10.875

Apron II

1 X 1 M - 15

3.700

5.685

0.450

9.466

Drop Portion

1 X 1 M - 15

3.700

1.945

0.450

3.238

U/S Return

1 X 2 M - 15

3.150

1.605

0.450

4.550

U/S Wing

1 X 2 M - 15

1.795

1.840

0.450

2.973

Slope Portion

1 X 2 M - 15

2.250

(1.84+1.095)/2

0.450

2.972

D/S Wing

1 X 2 M - 15

2.190

1.095

0.450

2.158

D/S Return

1 X 2 M - 15

3.000

1.095

0.450

2.957

Drop Wall

1 X 1 M - 15

3.700

(1.795+0.775)/2

1.650

7.845

U/S Return

1 X 2 M - 15

2.850

(1.305+0.45)/2

2.646

13.235

U/S Abutment

1 X 2 M - 15

2.045

(1.69+0.45)/2

3.425

11.872

Slope portion

1 X 2 M - 15

2.250

D/S Wing

1 X 2 M - 15

3.200

(0.945+0.45)/2

1.925

8.593

D/S Return

1 X 2 M - 15

2.850

(0.945+0.45)/2

1.925

7.653

Notch

1 X 1 M - 15

0.730

0.775

1.200

0.679

Total

20.580

18.848

Sub Structure

{[(3.425+0.45)/2)+[
(3.425+1.925)/2
(1.945+0.45)/2]}/2

TOTAL

18.869

68.746

108.173

Вам также может понравиться