TSR N: I-FD-7010.

00-6240-800-AEV-013

REV: C

AST N 3127-I-HD-013

REV: C

Sh..: 1
Of: 5

CLIENT: TRANSIERRA S.A


JOB: PRESSURE
GASYRGGAUGES
ESTACION
LIST
DE COMPRESION VILLAMONTES
JOB N: 3127

DATA SHEET

PRESSURE GAUGES

C
B
A
0
REV.

14-7-2003
3-6-2003
27-2-2003
4-2-2003
DATE

ISSUE FOR CONSTRUCTION


ISSUE FOR CONSTRUCTION
APPROVED
ISSUE FOR APPROVAL
DESCRIPTION

DP
DP
DP
DP
BY

OS
OS
OS
OS
CHKD.

GN
GN
GN
GN
APPROVAL

Rev.: C Sh.: 2

TSR N: I-FD-7010.00-6240-800-AEV-013

Of: 5

AST N: 3127-I-HD-013

CLIENT: TRANSIERRA S.A.


JOB: GASYRG ESTACION DE COMPRESION VILLAMONTES

PRESSURE GAUGES LIST


ITEM

N TAG

SERVICE

LOCATION

P&ID

MANUFACTURER
/ MODEL

RANGE
kg/cm2g

SHEET

PI - 199A PCV-189A outlet

Skid 0204

3127-F-PI-020

WEISZ / 4100

0 - 1,6

3-5

PI - 199B PCV-189B outlet

Skid 0204

3127-F-PI-020

WEISZ / 4100

0 - 1,6

3-5

PI - 305

V-0101

Field

3127-F-PI-017

WEISZ / 4100

0 - 1,6

3-5

PI - 285

B-0207 outlet

Field

3127-F-PI-018

WEISZ / 4100

0-6

3-5

PI - 292

Water to TK-0201

Field

3127-F-PI-018

WEISZ / 4100

0-6

3-5

PI - 293

B-0203 A discharge

Field

3127-F-PI-018

WEISZ / 4100

0-6

3-5

PI - 294

B-0203 B discharge

Field

3127-F-PI-018

WEISZ / 4100

0-6

3-5

PI - 303

B-0204 outlet

Field

3127-F-PI-017

WEISZ / 4100

0-6

3-5

PI - 313

B-0205 OUTLET

Field

3127-F-PI-017

WEISZ / 4100

0-6

3-5

PI - 314

B-0206 OUTLET

Field

3127-F-PI-017

WEISZ / 4100

0-6

3-5

PI - 149

V-0206

Skid 0204

3127-F-PI-014

WEISZ / 4100

0 - 16

3-5

PI - 198A PCV-188A outlet

Skid 0204

3127-F-PI-020

WEISZ / 4100

0 - 16

3-5

PI - 198B PCV-188B outlet

Skid 0204

3127-F-PI-020

WEISZ / 4100

0 - 16

3-5

PI - 263

V-0204

Field

3127-F-PI-016

WEISZ / 4100

0 - 16

3-5

PI - 274

S-0201 A outlet

Field

3127-F-PI-016

WEISZ / 4100

0 - 16

3-5

PI - 280

C-0202 A outlet

Field

3127-F-PI-015

WEISZ / 4100

0 - 16

3-5

PI - 282

C-0202 B

Field

3127-F-PI-015

WEISZ / 4100

0 - 16

3-5

PI - 244

Turbine start up inlet

Field

3127-F-PI-012

WEISZ / 4100

0 - 40

3-5

PI - 245

Fuel gas turbine inlet

Field

3127-F-PI-012

WEISZ / 4100

0 - 40

3-5

PI - 247

Turbine start up gas inlet

Field

3127-F-PI-021

WEISZ / 4100

0 - 40

3-5

PI - 248

Turbine fuel gas inlet

Field

3127-F-PI-021

WEISZ / 4100

0 - 40

3-5

PI - 009

FT-0201

Skid 0201

3127-F-PI-009

WEISZ / 4100

0 - 140

3-5

PI - 012

FT-0202

Skid 0202

3127-F-PI-009

WEISZ / 4100

0 - 140

3-5

PI - 014

San Antonio Inlet Gas

Field

3127-F-PI-009

WEISZ / 4100

0 - 140

3-5

PI - 015

San Alberto Inlet Gas

Field

3127-F-PI-009

WEISZ / 4100

0 - 140

3-5

PI - 051

TC "A" / "B" discharge manifold

Field

3127-F-PI-010

WEISZ / 4100

0 - 140

3-5

PI - 055A TC "A" suction

Field

3127-F-PI-010

WEISZ / 4100

0 - 140

3-5

PI - 055B TC "B" suction

Field

3127-F-PI-011

WEISZ / 4100

0 - 140

3-5

PI - 056A TC "A" discharge

Field

3127-F-PI-010

WEISZ / 4100

0 - 140

3-5

PI - 056B TC "B" discharge

Field

3127-F-PI-011

WEISZ / 4100

0 - 140

3-5

PI - 060A TC "A" discharge

Skid 0203A 3127-F-PI-010

WEISZ / 4100

0 - 140

3-5

PI - 060B TC "B" aircooler outlet

Skid 0203B 3127-F-PI-011

WEISZ / 4100

0 - 140

3-5

PI - 132A FT-0203 A

Skid 0205

3127-F-PI-013

WEISZ / 4100

0 - 140

3-5

PI - 132B FT-0203 B

Skid 0205

3127-F-PI-013

WEISZ / 4100

0 - 140

3-5

PI - 178A FT-0204 A

Skid 0204

3127-F-PI-019

WEISZ / 4100

0 - 140

3-5

PI - 178B FT-0204 B

Skid 0204

3127-F-PI-019

WEISZ / 4100

0 - 140

3-5

PI - 192

Skid 0204

3127-F-PI-019

WEISZ / 4100

0 - 140

3-5

FT-0204 A/B inlet

References:
1. P&Ids: 3127-F-PI-009 a 022 Rev B
Notes
1) Pressure gauges shall be provided with TAG identification and calibrated.
2) Pressure gauges shall be weatherproof, IP65.
3) The scales of the pressure gauges must be in kg/cm2
4) All pressure gauges must be filled with glycerin

3127-I-HD-013-C

NOTES

GENERAL

PROCESS
CONDITIONS

GAUGE

DIAPHRAGM
SEAL

OPTIONS

PURCHASE

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

Tag Number
Service
Location
P&ID No.

SEE LIST
SEE LIST
SEE LIST
SEE LIST

Fluid
Max. Design Pressure Max. Temperature
Max. Oper. Pressure Oper. Temperature
Pulsation
Vibration

SEE LIST
SEE LIST
SEE LIST

Type
Calibration Range
Figure Interval
Minor Graduation
Mounting
Dial Size
Dial Color
Case Material
Ring Construction
Ring Material
Blow-Out Protection
Lens Material
Pressure Element Type
Pressure Element Material
Socket Material
Connection Type
Connection Location
Movement Material
Nominal Accuracy
Overpressure

Direct Rdg
SEE LIST

kgf/cm-g
kgf/cm-g

60

C
C

Local
4"
in
White with black characters
AISI 304
Bayonete
AISI 304
Yes
Glass, 75% transparence
Bourdon
316 SS
316 SS
1/2" NPT
Bottom
SST, balanced pointer with micrometric adjusment
1 % FS
25 % FS

Type
Process Connection
Diaphragm Material
Bottom Housing Material
Fill Fluid
Capillary Length
Capillary Material
Flushing Connection
Top Housing Material
Connection to Instrument

Syphon: Type
Snubber: Type
Movement Damping

Material
Material

Manufacturer
Model
Purchase Order Number
Price
Item Number
Serial Number

WEISZ
4100

Notes: See notes on page 2

C
B
A
0
No.

DP
DP
DP
DP
By

14/07/2003
03/06/2003
27/02/2003
13/01/2003
Date

Issue for construction


Issue for construction
Approved
Issue for approval
Revision

INSTRUMENT SPECIFICATION
Pressure Instrument

Code: 10

Dwg. No.:

Sheet 3
3127-I-HD-013

of 5
Rev.: C

Tag Number

Service

Location

P&ID No.

Fluid

Max. Oper. P

Design P

Calibration Range

PI -009

FT-0201

Skid 0201

3127-F-PI-009

Natural Gas

71,7

100

0-140

PI -012

FT-0202

Skid 0202

3127-F-PI-009

Natural Gas

71,7

100

0-140

PI -014

San Antonio Inlet Gas

Field

3127-F-PI-009

Natural Gas

71,7

100

0-140

PI -015

San Alberto Inlet Gas

Field

3127-F-PI-009

Natural Gas

71,7

100

0-140

PI -051

TC "A" / "B" discharge manifoldField

3127-F-PI-010

Natural Gas

99,6

110

0-140

PI -055A

TC "A" suction

Field

3127-F-PI-010

Natural Gas

70,4

100

0-140

PI -055B

TC "B" suction

Field

3127-F-PI-011

Natural Gas

70,4

100

0-140

PI -056A

TC "A" discharge

Field

3127-F-PI-010

Natural Gas

99,85

110

0-140

PI -056B

TC "B" discharge

Field

3127-F-PI-011

Natural Gas

99,85

110

0-140

PI -060A

TC "A" discharge

Skid 0203A

3127-F-PI-010

Natural Gas

99,6

110

0-140

PI -060B

TC "B" aircooler outlet

Skid 0203B

3127-F-PI-011

Natural Gas

99,6

110

0-140

PI -132A

FT-0203 A

Skid 0205

3127-F-PI-013

Natural Gas

71,7

100

0-140

PI -132B

FT-0203 B

Skid 0205

3127-F-PI-013

Natural Gas

71,7

100

0-140

PI -149

V-0206

Skid 0204

3127-F-PI-020

Air

10

14

0-16

PI -178A

FT-0204 A

Skid 0204

3127-F-PI-019

Natural Gas

72

100

0-140

PI -178B

FT-0204 B

Skid 0204

3127-F-PI-019

Natural Gas

72

100

0-140

PI -192

FT-0204 A/B inlet

Skid 0204

3127-F-PI-019

Natural Gas

72

100

0-140

PI -198A

PCV-188A outlet

Skid 0204

3127-F-PI-020

Natural Gas

0-16

PI -198B

PCV-188B outlet

Skid 0204

3127-F-PI-020

Natural Gas

0-16

PI -199A

PCV-189A outlet

Skid 0204

3127-F-PI-020

Natural Gas

0,6

0,7

0-1.6

PI -199B

PCV-189B outlet

Skid 0204

3127-F-PI-020

Natural Gas

0,6

0,7

0-1.6

PI -244

Turbine start up inlet

Field

3127-F-PI-012

Natural Gas

28

31

0-40

PI -245

Fuel gas turbine inlet

Field

3127-F-PI-012

Natural Gas

28

31

0-40

PI -247

Turbine start up gas inlet

Field

3127-F-PI-021

Natural Gas

28

31

0-40

PI -248

Turbine fuel gas inlet

Field

3127-F-PI-021

Natural Gas

28

31

0-40

PI -263

V-0204

Field

3127-F-PI-016

Air

10

14

0-16

PI -274

S-0201 A outlet

Field

3127-F-PI-016

Air

10

14

0-16

PI -280

C-0202 A outlet

Field

3127-F-PI-015

Air

10

14

0-16

PI -282

C-0202 B

Field

3127-F-PI-015

Air

10

14

0-16

PI -285

B-0207 outlet

Field

3127-F-PI-018

Water

0-6

PI -292

Water to TK-0201

Field

3127-F-PI-018

Water

0-6

PI -293

B-0203 A discharge

Field

3127-F-PI-018

Water

0-6

PI -294

B-0203 B discharge

Field

3127-F-PI-018

Water

0-6

C
B
A
0
No.

DP
DP
DP
DP
By

14/07/2003
03/06/2003
27/02/2003
13/01/2003
Date

Issue for construction


Issue for construction
Approved
Issue for approval
Description

INSTRUMENT SPECIFICATION
Multiple Items List
Pressure Instrument
LIST
Code: 10

Sheet 4
Dwg. No.: 3127-I-HD-013

of 5
Rev: C

Tag Number

Service

Location

P&ID No.

Fluid

Max. Oper. P

Design P

Calibration Range

PI -303

B-0204 outlet

Field

3127-F-PI-017

Hydrocarbon

0-6

PI -305

V-0101

Field

3127-F-PI-017

Hydrocarbon

0-1.6

PI -313

B-0205 OUTLET

Field

3127-F-PI-017

Hydrocarbon

0-6

PI -314

B-0206 OUTLET

Field

3127-F-PI-017

Hydrocarbon

0-6

C
B
A
0
No.

DP
DP
DP
DP
By

14/07/2003
03/06/2003
27/02/2003
13/01/2003
Date

Issue for construction


Issue for construction
Approved
Issue for approval
Description

INSTRUMENT SPECIFICATION
Multiple Items List
Pressure Instrument
LIST
Code: 10

Sheet 5
Dwg. No.: 3127-I-HD-013

of 5
Rev: C