9 5/8 in
10.0
10.0
20"
16.0
16.0
16"
19.0
19.0
13 3/8"
22.0
22.0
11 7/8"
25.0
25.0
9 5/8"
27.0
27.0
50
13 3/8"
52 m
100
7"
31.0
31.0
5"
34.0
34.0
4 1/8"
36.0
36.0
4 1/8"
44.0
44.0
5"
46.0
46.0
7"
49.0
49.0
9 5/8"
53.0
53.0
11 7/8"
55.0
55.0
13 3/8"
58.0
0
52
150
0
400
200
250
300
350
400
0
400
450
500
9 5/8"
400 m
58.0
16"
61.0
61.0
20"
64.0
64.0
30"
70.0
70.0
FIN DE GRAFICAS
52
500
Datos:
1a TR
Diametro del agujero (caliper)
Diametro del agujero (caliper)
2a TR
Cople flotador
Zapata guia
13 3/8
14 1/2
14 1/2
9 5/8
372.85
400
in, @
in, @
in, @
in, @
m
m
Datos de Propuesta:
Bache lavador
Bache Espaciador
Liberar tapn faltando
Cima Teorica de lechada de relleno
Cima Teorica de lechada de amarre
Fluido de despalzamiento
4.77
4.77
2
0
250
1.18
52
250
400
400
m,
m,
m,
m,
m^3,
m^3,
bls,
m,
m,
gr/cc
1.02
1.35
1,094.83 lts
40.33
lts/m
6.89
66.34
Cp EA1
10,547.90 lts
59.59
lts/m
87.57
Cp EA2
13,923.23 lts
59.59
lts/m
1,752.11 lts
33.69
lts/m
11.02
Cp EA3
15,035.30 lts
40.33
lts/m
94.56
1.60
1.90
Calculos de Lechada:
V1=
1.09 m^3
Cp TR 9 5/8
V2=
10.55 m^3
V3=
13.92 m^3
V4=
1.75 m^3
V5=
15.04 m^3
Cp TR 9 5/8
1.60 gr/cc
Ph EA=
Ph TR=
kg/cm^2
40
44.00
psi
568.80
625.63
1.90 gr/cc
kg/cm^2
psi
28.50
405.27
5.16
73.35
Procedimiento Operativo
4.77
4770
1.- Bombear
m^3
2.- Bombear
m^3
4.77
4770
2
3.- Liberar tapn de limpieza o diafragma con
15.68 m^3
4.- Mezclar y bombear
5.- Mezclar y bombear
11.64 m^3
6.- Liberar tapon de desplazamiento o solido
lts
lts
bls
p
kg/cm^2
psi
68.50
974.07
49.15
698.98
30
bls
bls
30
de bache espaciador. Observar paso
15,675.34 lts
98.59
11,642.74 lts
73.22
7.- Bombear
15.04 m^3
15,035.30 lts
94.56 bls
Di=
12.62
in
Di=
8.921
in
gr/cc,
gr/cc,
8
8
bpm
bpm
gr/cc,
gr/cc,
5
4
bpm,
bpm,
58.52
38.37
lts/sk,
lts/sk,
0.18
0.18
% exedente
% exedente
bls
V4
V4
bls
V3
bls
V5
V3
Cima de Lechada de
amarre
bls
V2
V2
bls
V1
p
kg/cm^2
psi
19.35
275.09
1.02
de bache lavador
de bache espaciador
1.35
spaciador. Observar paso de tapn (chismoso)
13.39 Ton,
bls
bls
15.17 Ton,
gr/cc, @
gr/cc, @
8
8
lechada de relleno de
lechada de amarre de
bpm
bpm
1.60
1.90
gr/cc, @
gr/cc, @
5
4
1.18
gr/cc
0
250
m
m
Cp
TR-Ag
0.12 BLS/FT
V1
70.65
Cp
TR-TR
0.17 BLS/FT
V2
7.70
Cp
TR
0.16 BLS/FT
Shoe track V3
V4
V cem.
6.75
94.9
85.10
BLS
BLS
BLS
BLS
TR 1
TR 2
AG.
ID
19.124
12.715
17 1/2
OD
20
13 5/8
PROF.
44
647
Cp
TR-Ag
0.12
BLS/FT
V1
70.65
BLS
Cp
TR-TR
0.17
BLS/FT
V2
7.70
BLS
Cp
TR
0.16
BLS/FT
6.75
94.86052
BLS
BLS
Shoe track V3
V4
V cem.
85.10
TR 1
TR 2
AG.
ID
19.124
12.715
17 1/2
Datos:
Volumen de cemento TR-TR:
Volumen de cemento TR-AG:
Shoe track:
Vol Cemento:
Desplazamiento:
OD
20
13 5/8
e cemento TR-TR:
e cemento TR-AG:
PROF.
44
647
8
71
7
85
95
Cp
TR-Ag
0.06
BLS/FT
125.29
BLS
Cp
TR-TR
0.07
BLS/FT
V2
43.39
BLS
Cp
TR
0.07
BLS/FT
V3
V4
3.20
212.213495
BLS
BLS
V1
V cem.
171.88
TR 1
TR 2
AG.
ID
12.715
8.755
12 1/4
Datos:
Volumen de cemento TR-TR:
Volumen de cemento TR-AG:
Shoe track:
Vol Cemento:
Desplazamiento:
OD
13 5/8
9 5/8
PROF.
647
2893
43
125
3
172
212
Cp
TR-Ag
0.02
BLS/FT
V1
79.12
BLS
Cp
TR-TR
0.03
BLS/FT
V2
77.71
BLS
Cp
TR
0.04
BLS/FT
V3
V4
1.55
229.19
BLS
BLS
V cem.
158.38
TR 1
TR 2
AG.
ID
8.755
6.094
8 1/2
Datos:
Volumen de cemento TR-TR:
Volumen de cemento TR-AG:
Shoe track:
Vol Cemento:
Desplazamiento:
OD
9 5/8
7
PROF.
2893
6396
78
79
2
158
229