RipRap

Q 75 cfs
Z 3 3H:1V
b 10 ft
D50 0.5 ft
S 0.0015
Calculation:
n 0.03564
AR^(2/3) 46.3146
y 2.1499 46.3147 To calculate y, use goal seek, set cell C11 to value in B10 by changing cell B11
R 1.4987
Check stress
Side Slope Angle 18.4
Angle of Repose 42
K 0.88045
bed critical stress 2
wall critical stress 1.76089
bed stress 0.21042 O.K
wall stress 0.16833 O.K
To calculate y, use goal seek, set cell C11 to value in B10 by changing cell B11
Vegetated
Q 75 cfs
Z 3 3H:1V
b 10 ft
y 2.2 ft
s 0.0015
Calculation
R 1.52714
n 0.08395
AR^(2/3) 109.1
y0 3.30712 109.1 To calculate y0, use goal seek, set cell C11 to value in B10 by changing cell B11
to adjust y0 to makesure it equals to y, I think the easist way is simply change the y value in B5 then run goal seek again, repeat the step until you find a y value that can calculate out a y0 value that's close to it.
perm.stress 1 psf Class C
Check stress
stress in channel 0.2808 O.K
To calculate y0, use goal seek, set cell C11 to value in B10 by changing cell B11
to adjust y0 to makesure it equals to y, I think the easist way is simply change the y value in B5 then run goal seek again, repeat the step until you find a y value that can calculate out a y0 value that's close to it.
to adjust y0 to makesure it equals to y, I think the easist way is simply change the y value in B5 then run goal seek again, repeat the step until you find a y value that can calculate out a y0 value that's close to it.