CONTRACT DESIGN
3. DETAIL DESIGN
BASIC DESIGN
CONCEPT DESIGN
CONTRACT DESIGN
DOKUMEN KONTRAK PEMBANGUNAN
HULL SECTION
LINES PLAN, STABILITAS, GENERAL ARRANGEMENT, DETAIL
KONSTRUKSI & KEKUATAN MEMANJANG, CAPACITY PLAN
MACHINERY SECTION
HEAT BALANCE, LAY OUT MACHINERY ROOM, MACHINERY SYSTEM
PLAN DIAGRAM, HULL PIPING SYSTEM, VENTILATION, AC, PROPELLER
ELECTRICAL SECTION
POWER & LIGHTING SYSTEM, GENERAL LOAD ANALYSIS, WIRING
DIAGRAM, DETAIL OF ELECTRICAL SPESIFICATION
DETAIL DESIGN
WORKING / YARD PLAN
PLATING MODEL
LAUNCHING CALCULATION
HIDROSTATIC TERPENUHI
DESIGN CONDITION
FRAME SYSTEM
PRINCIPAL DIEMSION (ESTIMATION)
LINES PLAN
KECEPATAN TERCAPAI ?
FREEBOARD CALCULATION
G/A
A
PERHITUNGAN TERPENUHI ?
WATER TIGHT BHD
C
PERHITUNGAN TERPENUHI
PERHITUNGAN SESUAI
KAPASITAS TERPENUHI
TONAGE CALCULATION
LAUNCHING CALCULATION
INCLINING TEST
STOP
GENERAL REQUIREMENT
1.
OWNER REQUIREMENT
# KECEPATAN
# DWT KAPAL
# RUTE PELAYARAN, DLL.
2.
CLASS REQUIREMENT
# SUB DIVISION
# CONSTRUCTION
# MATERIAL CONSTRUCTION
# SURVEY
3.
GOVERNMENT REQUIREMENT
# TAX
# WORKING
4.
CONTRACT DESIGN
STANDARD CONTRACT :
1.
2.
3.
AWES
DESCRIPTION OF AWES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
SUBJECT OF CONTRACT
INSPECTION & APPROVAL
MODIFICATIONS
TRIALS
GUARANTEE
DELIVERY
PRICE
PROPERTY
INSURANCE
DEFAULT BY THE CONTRACTOR
GUARANTEE AFTER DELIVERY
CONTRACT EXPENSES
PATENTS
REFERENCE TO EXPERT & ARBITRATION
CONDITION FOR CONTRACT
LEGAL DOMICILE ( OF PURCHASER )
ASSIGMNET
SHIP CONTRACT
JENIS PEMBAYARAN :
1.
2.
3.
4.
5.
10 %
10 %
10 %
20 %
50 %
: SIGNING CONTRACT
: ARRIVAL OF MATERIALS ON SITE
: KEEL LAYING
: LAUNCHING
: DELIVERY
PROSES PERENCANAAN
(SPIRAL DESIGN)
KEY PLAN
OWNER
YARD PLAN
CLASS
PRODUCTION DRAWING
ELECTRICAL OUTFITTING
MACHINERY OUTFITTING
BENGKEL
BENGKEL
ACCOMODATION DIVISION / QA
BENGKEL
1.
SHIP PERFORMANCE
2.
KEYPLAN
3.
YARDPLAN
4.
SHIP PERFORMANCE
1. LINESPLAN + DATA OFFSET
2. GENERAL ARRANGEMENT
3. INNER CONTOUR
4. TANK CONDITION
5. STABILITAS
6. FREEBOARD CALCULATION
7. LIGHT WEIGHT ESTIMATION
KEY PLAN
1.
2.
3.
4.
5.
6.
7.
8.
MIDSHIP SECTION
STEEL PLAN
TRANSVERSAL BULKHEAD
SHELL EXPANTION
BLOCK DIVISION
MATERIAL ESTIMATION
DOCKING PLAN
X-RAY PLAN / POSITION
YARD PLAN
1.
2.
FORE CONSTRUCTION
CARGO HOLD CONSTRUCTION
# CARGO HOLD FORE CONSTRUCTION
# CARGO HOLD MIDDLE CONSTRUCTION
# CARGO HOLD AFT CONSTRUCTION
3.
E/R CONSTRUCTION
# DOUBLE BOTTOM IN E/R CONSTRUCTION
# SIDE SHELL IN E/R CONSTRUCTION
4.
5.
6.
7.
AFT CONSTRUCTION
ACCOMODATION CONSTRUCTION
RUDDER CONSTRUCTION
LIGHT WEIGHT CALCULATION
PRODUCTION DRAWING
1.
2.
3.
4.
5.
6.
7.
8.
WORKING DRAWING
MATERIAL LIST
MARKING LIST
PIECE DRAWING
NESTING PLAN
STEEL LIST
JIG INFORMATION
BENDING TEMPLATE
# RAMBU BENDING
# INVERS BENDING