Вы находитесь на странице: 1из 1
lis, A BRANCH OF AL-HOTY LTD. CO. 4 cr. zo5t016901 tanta P.O. Box31729, altnabar 31952 Kingdom of Sau arcbin Tel (03) 544130 eB4a020 945452 Fax: (03) 8643060 E-Nal :e0s@ataty com es ‘Website: was hay com nm abhotycom: Le 42N\ 1417 TEST CERTIFICATE Certificate No: Al-167413 Customer Name: Al Khodari Heavy Industries Address: P.O. Box 832 Dammam 31421, Kingdom of Saudi Arabia Air Receiver Tank Page No: toft Biastline Received Date: 25 June 2014 1600 cfm Date Tested: 26 June 2014 4102 NA K-2011NGCI072 || Test Procedure: Based on ASTM E 1003-05 _ Summary of Test: The Unit Under Test (UT), ar receiver tank is completely filed with water and all air is expelled ‘from the manifold. Pressure is to be applied gradually to the manifold an increment of 25% of rated pressure, unti the maximum required pressure was attained. «| Environmental Condition: 19.40°C / 52.47%RH | Test Results: {| Test Description Working Pressure Applied Pressure Holding Time Duration (@ 125% of rating) Hydrostatic Pressure 150 psi 188 psi 15 minutes for maximum reauired oressure resting i 5) Notes: Passed - The Unit Under Test (UUT) an air receiver tank was satisfactory withstand the given pressure, no leakage or deformation was observed during and after the testing. | Standard Used to Test the Instrument: Description b Cal Due Date Traceability ) Test Gauge 15 July 2014 160913 (NPL, UK) + Digital Stop Watch H ILS/E/0114(09/02 (NIST, USA)| a ‘Approved By: Regional Offices sa Riyadh : P.O, Box 760 -Tel.:01 2066491 Cyeestinn sawn eee a Jeddah POBox 8129 Tal : 026613703 eutanrsoge arts git ‘huball":P.0:8ox 487 To : 032407953 Cnriversage tino: kot

Вам также может понравиться