Metal Industry Development Institute

Action Plan for Product Development Project on Portable Molding Injection Machine
Month 1
Week 1

S.No

Preparation of proposal

Proposal Approval

First design

12

First design review

First design approval

Identifying sub function

12

Preparation of conceptual design for selected sub functions

12

Design review for prepared conceptual design

Detail design for selected concepts

39

10 Preparing final design

12

11 Review prepared final design

Preparing manufacturing methods based on prepared detail


design of sub-functions

12

13 Review of prepared manufacturing methods

14 Preparing final design and manufacturing methods

39

15 Getting approval of the final document

16 Launching prototype development

17 Following activities of the prototype

156

18 Assembling of the produced prototype parts

12

19 Testing the machine on bare ground

12

20 Field test(Testing the machine on four soil type)

39

21

Week 3

Week 4

Week 5

Week 6

Month 3
Week 7

Week 8

Week 9

Week 10

Week 11

Week 12

Time
Allotted M Tu W Th Fr M Tu W Th Fr M Tu W Th Fr M Tu W Th Fr M Tu W Th Fr M Tu W Th Fr M Tu W Th Fr M Tu W Th Fr M Tu W Th Fr M Tu W Th Fr M Tu W Th Fr M Tu W Th Fr
(Hrs.)

Description

12

Week 2

Month 2

Base on the test result preparing the final design and


manufacturing document

12

Total

413