Академический Документы
Профессиональный Документы
Культура Документы
Nature of Problem
Refurbishment of the existing cone fenders
cable trench were required to be carried out.
&
The Solution
18 sets of the cone fenders and 230m of the cable trench were replaced in 6
months.
Year 2006