301 Ballast Sub-base. Sub-base (to include ballast, crushed stone and possibly gravel
trap material for emergency escape lanes)
302 Cement Stabilised bases and sub-bases. To be drafted in outline only until we know
we have CTB or not.
303 Removal and processing of existing concrete pavement. Removal and processing of existing
pavement (to include cold milling) DELETED
304 Tack Coat. May not be required and only if CTB is used. MUST BE SPECIFIED IN SPECIFIC
CTB AND ASPHALT SECTION WITH MORE DETAILS
305 Prime Coat. Prime Coat (required between each bituminous layer) MUST BE SPECIFIED IN
SPECIFIC CTB AND ASPHALT SECTION WITH MORE DETAILS
306 Asphalt Base Course. Bituminous Base Course. INCLUDING BASE COURSE FOR
OTHER CLASS OF ROADS NOT ONLY MOTORWAY