Making progress
Initial restriction on dam wall 10mm/s at 30m
Raised to 50mm/s at 8m
1.0
2.0
3.0
4.0
5.0
6.0
1.0
CONSTRUCTION LEVEL
2.0
WATER
3.0
8
4.0
A
B
C
D
E
F
G
H
I
799
715
631
547
463
379
295
211
127
782
698
614
530
446
362
278
194
110
765
681
597
513
429
345
261
177
93
748
664
580
496
412
328
244
160
76
731
647
563
479
395
311
227
143
59
714
630
546
462
378
294
210
126
42
672
588
504
420
336
252
168
84
689
605
521
437
353
269
185
101
17
706
622
538
454
370
286
202
118
34
DOWN STREAM
Col
Row
Holes
Time ms
Findings
Faster timing not observed
EDs had detonated sympathetically at 200
and 600ms
Det construction used Al shell
Changed over to Cu shell
No problems for rest of project
Only cosmetic damage to dam wall
Which started me thinking
ASIEX October 2012
10
11
Conclusion
Production drive in control of decisions
Initial blasting ideas abandoned
EDs expensive solution /m3, but
Flexibility needed
Testability critical
Known timing enabled problem to be solved
12