THIS DOCUMENT CONTAINS THE FLIGHT MISSION RULES FOR APOLLO 11. THESE
RULES WILL RECEIVE AN EXTENSIVE EVALUATION DURING THE SIMULATIONS PRIOR
TO THE APOLLO 11 MISSION. SUBSEQUENT REVISIONS TO THIS DOCUMENT WILL
BE PRINTED ON COLORED PAGES FOR EASY RECOGNITION. INFORMATION CONTAINED WITHIN THIS DOCUMENT REPRESENTS THE FLIGHT MISSION RULES FOR
THE APOLLO 11 MISSION AS OF APRIL 16, 1969.
IT IS REQUESTED THAT ANY ORGANIZATION HAVING COMMENTS, QUESTIONS, OR
SUGGESTIONS CONCERNING THESE MISSION RULES CONTACT MR. LARRY W. KEYSER,
FLIGHT CONTROL OPERATIONS BRANCH, BUILDING hb, ROOM 638, PHONE 483-3838.
ANY REQUESTS FOR ADDITIONAL COPIES OR CHANGES TO THE DISTRIBUTION LIST
IN APPENDIX B OF THIS DOCUMENT MUST BE MADE IN WRITING TO MR. CHRISTOPHER
C. KRAFT, JR., DIRECTOR OF FLIGHT OPERATIONS, MANNED SPACECRAFT CENTER,
HOUSTON, TEXAS.
THIS IS A CONTROL DOCUMENT AND ANY CHANGES ARE SUBJECT TO THE CHANGE
CONTROL PROCEDURES DELINEATED IN APPENDIX C. THIS DOCUMENT IS NOT TO
BE REPRODUCED WITHOUT THE WRITTEN APPROVAL OF THE CHIEF, FLIGHT CONTROL
DIVISION, MANNED SPACECRAFT CENTER, HOUSTON, TEXAS.
APPROVED BY:
CHRISTOPHER C. KRAFT,
DIRECTOR OF FLIGHT OPERATIONS
ii
Center
MISSION RULES
RI V
TABLE OF CONTENTS
ITfM
ITEM
TABLE OF CONTENTS
PAGE
INTRODUCTION AND PURPOSE
PART I
GENERAL
GUIDELINES
O*SF GENERAL
RULES
PART II
FLIGHT MISSION
RuLES
1-1
SECTION
1
1-3
CRITERIA
1-7
PRELAUNCH RULES
1-8
1-9
CREW ABORT
1-13
LIMITS
M I S S I O N RULE
LAJNCH
SUVMARY
D~ASL
3-1
EARTH OREIT
3-2
TDkE
3-6
TRANSLUNAR CwAST
3-9
LUNAR ORBIT
3-13
UNCOCKED
3-16.
PHASE
RENDEZVOUS
3-15
UNMANNED
3-25
ALL
<*
2-1
PHASE
3-26
MANEUVERS
GROUND
INSTRUMENTATION
RECUL REGE
GENERAL
TRAjECTCR^ A N D GjIDASCE
LAL'NCM
5-1
5-3
MANEUVERS
5-7
TRANSLUNAn
LUNAR
COAST
5-9
ORBIT
MISSION
APOLLO 11
5-12
REV
DATE
SECTION
W16/69 TABLE OF
CONTENTS
GROUP
PAGE
Center
MISSION RULES
TABLE Or CONTENTS
TfM
ITEM
DESCENT
5-13
ASCENT
5-26
RENDEZVOUS
5-17
5-26
SLV -
SLV -
SLV -
TB6
SLV -
TB8
11
6-1
(COAST)
7-1
e-i
(RESTART)
ISAFING
PRELAUNCH
10
(LAUNCH)
AND
9-1
SLINGSHOT)
9-3
INSTRUMENTATION
CSM ENVIRONMENTAL
CONTROL
SYSTEM
GENERAL
10-1
MANAGEMENT
10-2
SUIT/CABIN
10-4
COOLANT
io-e
10-11
INSTRUMLNTATION REQUIREMENTS
10-13
CSM CRYOGENICS
GENERAL
il-i
MANAGEMENT
11-2
SPECIFIC
U-3
INSTRUMENTATION REQUIREMENTS
12
12-1
MANAGEMENT
12-2
FUEL CELLS
12-4
BATTERIES/CHARGER
12-6
DC DISTRIBUTION
12-7
12-10
AC
M
12-11
N REQUIRE ENTS
13
DOCKING AND
GENERAL
MANAGEMENT
SPECIFIC
CS
UMBILICAL
13-1
13-2
13-3
SEQUENTIAL
GENERAL
14-1
MANAGEMENT
14-2
SPECIF 1C
14-3
MISSION
APOLLO 11
REV
DATE
SECT ION
4/16/69 TABLE OF
CONTENTS
GROUP
PAGL
Center
MISSION RULES
TABLE OF CONTENTS
Rf V
ITf M
INSTRUMENTATION
15
GUIDANCE
AND
REQUIREMENTS
14-6
CONTROL
GENERAL
15-1
MANAGEMENT
15-3
scs
15-4
Gt-N
15-10
INSTRUMENTATION
16
CSM
SERVICE
REQUIREMENTS
PROPULSION
15-13
SYSTEM
GENERAL
16-1
MANAGEMENT
16-3
SPECIFIC
16-4
INSTRUMENTATION
17
CSM
REQUIREMENTS
16-8
SM-RCS
GENERAL
17-1
MANAGEMENT
17-2
SPECIFIC
17-3
INSTRUMENTATION
18
CSM
REQUIREMENTS
17-6
CM-RCS
GENERAL
ie-i
MANAGEMENT
16-2
SPECIFIC
ie-3
INSTRUMENTATION
19
REQUIREMENTS
ie-5
EMJ/EVA
GENERAL
19-1
SPECIFIC
PRELAUNCH
20
19-2
INST.
COMMUNICATIONS
19-6
A\D
INSTRUMENTATION
GENERAL
MANAGEMENT
20-3
SPECIFIC
20-*
CSM/LM
21
20-1
INSTR
LM SEQUENTIAL
REQ
6
20-6
PYROTECHNIC
GENERAL
21-2
SPECIFIC
21-3
PRELAJ\CM
27
21-1
MA\AGEWENT
LM
21-b
INSTRUMENTATION
ELECTRICAL
PO*ER
GENERAL
22-1
MANAGEMENT
22-4
REV
MISSION
APCLLO
11
DATE
SECTION
4/16/69
TABLE OF
CONTENTS
GROUP
PAGE
23
SPECIFIC
22-5
INSTRUMENTATION REQUIREMENTS
22-9
LM ENVIRONMENTAL CONTROL
GENERAL
23-1
MANAGEMENT
23-5
SPECIFIC
23-6
INSTRUMENTATION
24
25
26
27
28
REQUIREMENTS
23-12
LM COMM/INST
LM GUIDANCE AND CONTROL
GENERAL
25-1
MANAGEMENT
25-3
SPECIFIC - PGNS/CES/AGS
25-4
PRELAUNCH
25-9
INSTRUMENTATION
LM DPS
GENERAL
26-1
MANAGEMENT
26-2
SPECIFIC
26-4
PSELAUNCH INSTRUMENTATION
26-6
L* PCS
GENERAL
27-1
MANAGEMENT
27-2
SPECIFIC
27-3
PRELAUNCH INSTRUMENTATION
27-7
S ACE ENVIRONMENT
GENERAL
26-1
VANAGE^ENT
28-2
SPECIFIC
28-3
INSTRUMENTATION
29
REQUIREMENTS
26-5
RECOVERY
29-1
SPECIFIC
INSTRUMENTATION
30
31
REQUIREMENTS
29-5
AERCEDICAL
GENERAL
30-1
SPECIFIC - PHYSIOLOGICAL
31-1
30-2
SPECIFIC - EQUIPMENT
30-4
INSTRUMENTATION
30-5
REQUIREMENTS
EASEP
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 TABLE OF
CONTENTS
GROUP
PAGE
4
Center
MISSION RULES
TABLE OF CONTENTS
ITi M
TTEM"
GENERAL
31-1
ELECTRICAL
31-3
THERMAL
31-4
UPLINK.
31-5
DOWNLINK
31-6
PSE
31-8
A-l
B-l
C-l
MISSION
APOLLC
REV
DATE
SECTION
Wl6/fc9 TAELE OP
CONTENTS
GROUP
PAGE
: :
'
v^'^M^iBHB^^^^ii^
11 CSM CRYOGENIPS>
13
S4 CSH SEOUENTJA L
--
- -
17 .CSM'SM.T'RCS
I&.EMU/EVA
2C C OMMUNIC ATION.
-JNSTRUMENTATtOi
Center
MISSION RULES
iTI M
ITEM
* INTRODUCTION U PURPOSE
ISSION R u L t S C A N bE C A T t G O R l Z E D A S G E N E R A L A N D S P E C I F I C .
GENERAL
MISSION
R j .L c
~A.C T H L
r'->TA"
-->
T^-E ^AJLL'RE.
B.
THE RULING
COLUMN
DEFINES
FLIGHT
CONTROLLER
A C C O ^ P L I S H F D AS A PUSULT 0^ THE CONDITION.
.
IN WHICH T H E CCND J T I O N / V - A L F U N T I ON ^ L C w S .
ACTION
AND/OR
DATE
t/ifc/
INTRODUCTION
WJTH
GROUP
SECTION
PjnPCSE
PROCEDURES
^^^^
Li
A\D
1-1
AUDITJO'.AL
T - A T V,.CT
. ..A
IS.
i^^vi
*'
Center
MISSION RULES
RCV
ITEM
ITEM
1-1
MISSION RULES ARE EFFECTIVE DURING THE LAUNCH COUNTDOWN. FLIGHT AND RECOVERY OPERATIONS. AND
DURING PRELAuNCH TtSTS WHEN APPLICABLE, THEY ARE BASED ON PRIMARY OBJECTIVES AS STATED
IN THt
APOLLO FLIGHT MISSION ASSIGNMENTS DOCUMENT M-D MA 500-11. PROPOSED CHANGES
TO THE
P*I*ARv
OBJECTIVES STATED IN THE MISSION ASSlGMENTS DOCUMENT SHALL REQUIRE AA/MSF APPROVAL,
1-2
1-3
OPERATIONS
MISSION
OR
RULE
THEIR
CHANGES
UtSI&NATEl/
WITH
FOLLOWING THE CDDT OK FRT . WHICHEVER OCCURS FIRST, MISSION DIRECTOR APPROVAL
AND
CONCURRENCE
WILL BE REOUIRED ON ALL RULES CHANGES AFFECTING SAFETY, ACCOMPLISHMENT
OF TEST OBJECTIVES.
DEVIATIONS FROM THE NOMINAL MISSION AND PRELAUNCH
CONSTRAINTS. CONCURRENCE MAY BE OSTAINF.D
VERBALLY IF T]lE CONSIDERATIONS SO DICTATE.
DURING THE CONDUCT OF THE MISSION. THE MISSION DIRECTOR WILL BE ADVISED OF
THAT
INVOLVE CHANGES TO
MISSION OBJECTIVES* MISSION RULES* FLIGHT
LAUNCH/FLIGHT SAFETY.
ALL
PLAN
RECO*vtM>ATIUNb
CONTENT.
O
1-5
* : 7 M ] N THEIR RESPECTIVE AREAS OF RESPONSIBILITY. THE COMMAND PILOT. THE LAUNCH DIRECTOR,
DIRECTOR. DOS MANAGER FOR vsF SUPPORT OPERATIONS. AND 1M MISSION DIRECTOR MAY TAKL OH ^
A\Y ACTION REOUIRED FOR CP T lMu* CONDUCT O c TnE V.ISSION.
1-6
7-E COMMAND PILOT. SPACECRAFT TEST CONDUCTOR. L A J N C H VEHICLE TEST CONDUCTOR, SpACE V E - I C
SUPERVISOR. LAUNCH OPERATIONS MANAGER* LAUNCH DIRECTOR. FLIGHT DIRECTOR. DCD M A N A G E r uSPACE FLIGHT SUPPORT OPERATIONS. OR T H E MISSION DIRECTOR
*AY REQUEST A HOUJ
FJ- ^
WITHIN THEIR
1-7
THL
RESPECTIVE AREAS OF
FLIL--7
RESPONSIBILITY.
]\P-ORVD
AS
IT D E V E L O P S ,
OF E S T I M A T E D
"ISSIO.N
A P O L L O 11
TIvL
7C REPAIR
DATE
AND RECOWMF.NDED
PROCEED.
SECTION
GnOUP
GENERAL
GUIDELINES
OMSF GENERAL
RULES
H0LD
PAGE
1-2
^ECYCLE.
OR SC^wt:
AC*;i
Center
MISSION RULES
REV
1TTM
SECTION
I - GENERAL GUIDELINES
I TEW
1-9
IF A M A N D A T O R Y I T E M F A I L S D U R I N G T H E C O U N T D O W N . IT W I L L B E C O R R E C T E D P R I O R T O L A U N C H . H C L D I N L
R E C Y C L I N G THE C O U N T D O W N A S N E C E S S A R Y . IF A M A D A T O R Y ITEM C A N N O T B E C O R R E C T E D T O P E R M I T
LIFTOFF
W I T H I N THE L A U N C H W I N D O W . T H E M I S S I O N D I R E C T O R M A Y P R O C E E D W I T H
THE LAUNCH
AFTER
APPROPRIATE
SJSSSJSSVTy^^^^^
I -1 0
'
ELOSS 0F'
AS THE D E S I G N A T E D R E P R E S E N T A T I V E OF T H E PROGRAM D I R E C T O R , O N L Y T H E M I S S I O N
DIRECTOR
MAY S C R u b
THE M I S S I O N . F U R T H E R , THE * ISSI ON
DIRECTOR
RETAINS
T H E PRIMARY
AUTHORITY
TO DOWNGRADE
A
MANDATORY ITEM. T H I S A U T H O R I T Y SHALL BE EXERCISED AS C I R C U M S T A N C E S DICTATE AND AFTER APPROPRIATE
R E C O M M E N D A T I O N S ^ R U M THE P R O G R A M M A N A G E R S . L A U N C H D I R E C T O R . AND F L I G H T DIRECTOR
1-11
1-12
THE
1-13
COUNTDOWN
CONTINUE
wlLL
ON
NuT BE HELD
THE LAUNCM
SITE
RFADOWT.
SCRuBtfED FOR F A I L U R E
THIS
IS
(LISTED IN T H E F ^ I O H T M ] S b i c N R U L E S ) U - 0 \ * M I C H
HOLD **AY BE CALLED TC EVALUATE T H E ^ R O B L E V .
THE
1-15
COUNTDOWN
*ILL
CW\'J\L-E
AHERE
POSSIBLE
T-*U L x C L P T
MISSION
CWNCJ^ENTWY
FCk
RLLES
WITH
0^ D E S I R A B L E
-CTJCN
TrOSE
^A\DATCnv
IS T A ^ t N .
COKRECTiUN
CF
ITE
I't TrJs
AN A:S*:\L
* H E R E P O S S I B L E , A L L M A N j A L A B O R T E U ^ E T S F 3 G ^ T M E GkGu.'O J u n l N b ?Ll<>n^ ] t L BL
I N D E P E N D E N T I N D I C A T I O N S CF T H E F A I L W R E . C R E W A E J K T A C T I O N W I L L N O R V A L L V BE C A S E -
P I 0 R TC L I F T O F F .
.t DIRECTOR C^ L A U N C H OPERATIONS * I LL E : R E S P O N S I B L E
EVENT CF L A U N C H SI E
EMERGENCIES.
EXCEPT
FOR
RECOVERY
OPERATIONS
RESULTINo r R C ^ A P D ABORT.
S
IS A R M E D u\TIL TE
TC.'-ER. T~f CPITEcj
MANAGEK
^ACF
MISSION
APOLLO 1]
N*AY
VE^ICut
OP SENDING
REV
SEND AN AB^RT
RLACHES
AN AECPT
<EJbLST
SUFFICIENT
Rt^wEST
F*^* Tt T!^ T H E L A W \ C -
ALTITLOE
CLEAK
T H E T 0^ Of-
SECTION
GROUP
GENERAL
GUIDELINES
OVSF G
RuLtS
1-2
P A K A ^ U ^
C A ^ E , f.
^^W-L
RCV
Center
MISSION RULES
SECTION I - GENERAL GUIDELINES
JTFM
ITEM
I-1B
1-19
BY SAYING
'CLEAR T O ^ E R 1 1
VEHICLE CLEARS T H E U M B I L I C A L
1-20
1-21
1-22
IN T H E MCC THE. FLIGHT D I R E C T O R . FLIGHT DYNAMICS OFFICER Ai\D ECUSTER SYSTEMS t'.ul
THE C A P A B I L I T Y TO SE'^D AN ABORT REQUEST S I G N A L . T H E CRITERIA FOP sE-wING A'. AfcCST
BE
ESTABLISHED
IN
T*t. F L I G H T
RULES.
FLIGHT C R E *
1-25
SAFETY
INFLIG-T
TA<t PRECEDENCE
IN T - E E V E N T O F C O M M U N I C A T I O N S
T H E C O M M A N D PILOT
RULES.
ACTION
OF
OVEK T H E ACCO
L L S S B E T W E E N T H E M A N N E D s^ACt ^ L I
-ILL A S S U v t RtS^ONS IB I Li T Y F O K V I S S T Q N
T-E FLIG
SPACE r L l
DIRECTUK
TOWER.
T-IR(JUC-H TwE R E C O V E R Y C C O n D J N A T C R *
OPEHATICNS
*^E P ^ E W I C T E C L O C A T I O N
CJND.iCT
AS DtSCRJfctD
Tr- D C D MANAGER fO M A N N E D S P A C E F L I G H T
SUPPORT
OPfRATJo.NS
is RESP
C C ^ M A N D A ' O CCNT&Cw J r DUD RECOVERY F O R C E S . RfcCJMME NDA7 IUNS b . ! D U l ! c
C C R ' H BY NASA* ^ : L L bt CONSIDERED TC EFFEC^ SAFt AND E X P F C I T I C w S PrCt Rv
MISSION
A P O L L O 11
REV
DATE
SECTION
GROUP
GENERAL
GUIDELINES
OMSF GtNtFiAL
RULtS
* A v:.
Center
MISSION RULES
REV
SECTION I - GENERAL
ITEM
GUIDELINES
ITEM
DEFINITIONS
1-36
REDLINE
A REDLlNfc VALUE IS A MAXIMUM A N D / O R M I N I M U M LIMIT OF A CRITICAL PARAMETER N E C t S S A R Y TU
IDENTIFY vEHlCLEt SYSTEMt AND COMPONENT
PERFORMANCE
AND O P E R A T I O N .
REDLINE
VALUES
#'JLL t?L
E S T A B L I S H E D S U C M THAT FURTHER DEGRADATIONS OF THE SYSTEM OR COMPONENT COULD LEAD TO A F A I L U R F TO
ACCOMPLISH THE PRIMARY MISSION.
1-3 7
REDLINE F U N C T I O N
A REDLINE FUNCTION IS A PARAMETER THAT H A S BEEN
IDENTIFIED
TO MONITOR
F U N C T I O N I N G OF A UNIT TO INSURE THE OPERATIONAL P E R F O R M A N C E OF THAT UNIT IS ACCEPTABLE
TO
THE PRIMARY M I S S I O N . REDLINE FUNCTIONS ARE M A N D A T O R Y .
1-38
PRIMARY O B J E C T I V E
A STATEMENT OF THE PRIMARY PURPOSE OF F L I G H T . WHEN uSEu
IN CENTEK
CONTROu
D O C U M E N T A T I O N T H E PRIMARY OBJECTIVE MAY BE A M P L I F I E D BUT NOT M O D I F I E D . DETAILED TEST 0-3
WILL BE G E N E R A T E D A N D AMPLIFIED TO FULFILL EACH MISSION O B J E C T I V E ,
1-39
VANDATORY
DETAILED
TEST
OBJECTIVE
A PRINCIPAL
DETAILED
TEST
OBjECTlvt
*r-lC~
S A T I 3 C A C T O ^ I L Y C C v P L t T E D CN T H E ASSIGNED v i s s l C N . ^ A I L U R E
TU JC SO *C<uiD U \ J U . Y
C
SUBSEQUENT FLIG'-'T SCHEDULES AND/OR REQUIRE S U E S E J O E N T SPACE VEHICLE RLC\ p i G U R A T I' W N,
%*^'"
S^JtCTI V t - A
^L'AILLL
' - S ^ d - ^ C T I vL
*IICH
:TEV
tSi.\T;AL
TAI\v\7
:S A S D A C E
vEn;CwE
OR
C^E
V
CP T n P R I V A C Y
ISSIC\
*IC}-.
w'R^ Z*-:i SA r E" r y A \ D EF-'LCTIvE J P
D E T A I L E D T E S " 0s- -L'C* I v't S .
INCLUDED
^ t. *. Aw \ C n
N C . A:
.-.U*-
AS
{ - 3 ; A n I > i . Y DESIRABLE I T E V
is
A SACC
V E M I C L CK
^ ^ ' i AND . \ H A \ C S T H E AC CC-VPL I i,HV \ T OF Tn PwIVAR v - i S S U
>-VE -
C F TMF. P R I N C I P A L
D E T A I L E D
TEST
c t j C * i v r s
ELEVEST Jk UPERATlUNAt
,71\uE
IN ACCORDANCE * ; 7 H PRESCRIBED
CCNTDOAN
HtPAIR OF
DATE
APCLLC
II
SECTION
GROUP
GENERAL
GUIDELINES
OMSF GENERAL
RULES
PAGE
SuPf-wkT
LLfcv\T T - A T
Tut
MELT
Center
MISSION RULES
Rf.V
R
ITEM
ITEM
COUNTDOWN
^ ^ ^ ^ ' S S
1-48
HOLD-POINT
? ^ ^
! ^
WITH
LAUNCH
VEHICLE
POWER
THE L A J N C H
TO A D E S I G N A T E D
POINT OR
FOR
CUTOFF
THE AUTOMATIC OR MANUAL COMMAND TO STOP T H E L A U N C H S E U U E N C E
'AUTOMATIC LAUNCH SLUUENCE START.* 1
1-52
LIFTOFF
T H E POINT
1-52
V
AB'J^cT
I S S I C \ T K V I \ A T I O . N 6 * ^ S C H E D U L E S I \ T E \ T I C \ A L SEPARATION OF
LAJNC- VEHICLE PRIUR TO R E I T A L I - \ S E H T J C N .
iARLY visSI
INSERTION.
PERFCRVANCE
INTERRUPTED,
As
SPECIFIED
IN T H E
REvENT
2S A
^ D E C : F I C DATA C H A N N E L
1NSTR J W \ T AT ICN
EVALUATION
'1SSICN
PCcLO 11
REV
IS T M E E U U I P V ~ N T
THAT
ACULIRES.
DATE
SECTION
/ 16 / 1 9 GENERAL
GUIDELINES
iRCUP
OYSF GENERAL
RULES
AT
ITEMS.
PAGE
1-6
Tnf
vc\;TQRI\G
TRAf<S*ITi
SuPPCRT
OF
TME S^ACECKAFT
OF INSTRUMENTATION
IWTI
DISCONNECT
XI NAT I C \
2\STfiu v EN7ATl0N
LAUNCH
&
AFTER
EVENT
THE
I S POSTPONED.
1-51
FC^
UP
EIE
RECYCLE
THE COUNTDOWN
LAUNCH M I S S I O N R U L E S *
SCRUB
k\'j
"l^l'Ltt
5;.\it-
.:A7~
i-'l
'
^i&SBz^^
'^iri^^ffPr^^^^M^^^Vt'
iif^W^?'-5^
^^
Center
MISSION RULES
REV
ITEM
GENERAL
1-1
THE FLIGHT MISSION RULES OUTLINE PREPLANNED DECISIONS DESIGNED TO MINIMIZE THE AMOUNT OF
REAL-TIME RATIONALIZATION REuuIRED WHEN NON-NOMINAL SITUATIONS OCCUR DURING THE TERMINAL
COUNTDOWN. THE FLIGHT PHASE AND RECOVERY OPERATIONS.
1-2
EVER POSSIBLE. THE CREW AND GROUND WILL VERIFY ALL MALFUNCTIONS. WHENEVER THtkL IS A
CONFLICT BETWEEN SPACECRAFT AND GROUND TELEMETRY READOUTS. THE SPACECRAFT READOUTS ARE PRIME
(ASSUMING T H E S P A C E C K A F T HAS ADEQUATE INSTRUMENTATION AND THAT APPLICABLE SPACECRAFT
COCKPIT
READOUTS ARE O^'EHAT I UNAL )
1-3
SPACECRAFT W A U \ C H - I I I rwT Bt ATTEMPTED IF iCNCwN SPACECRAFT SYSTEMS MALFUNCTIONS WILL ..IV.IT THE
MISSION DURATION SUCH THAT ACCOMPLISHMENT OF THE PRINCIPAL OR MANDATORY DETAILED TEST OBJECTIVES
WILL BE COMPROMISED.
*HEN ! A CONFLICT CF
FLI6^
ACTIVITIES
OCCURS.
THE
FLIGMT
DIRtCTOR
WILL
DETERMINE
PRIORITY OF ACTIvITItS.
1-5
I\ SO" I N S T A N C E S . Ti S P E C I F I C
Is -ART 1 CR FRC-" Tf-rSE O E N E K A L
T H DEvlAT IDKS FRC>. * H [ GENERAL
Tt-. * \ A L V S : S C F Tf-it. F L I C . T .
C : v ^ L ] ] C \ Z? T-t
MISSION.
TE
A'O
T-E
1-9
TC
A\D
CTiEK.sISi
RCV
LO 11
ANY
NfcCtiSAtY
CONSIDERED TC lit
INTERIM OR u N C J \ f
SuiiSEi.Ut.ST
^rViSIwNS
u M I .
Ti
L'i.ESS STATED
TAKE
"Aj\tu
.
A\_
DATE
/ 16/69
DESInADuE
L I M I T S AS * E L C AS
r-EY
- R J \ S T R J ^ E N T A T I C\
I \ S T n U v \ T AT I CN
SECTION
GENERAL
RULES AND SOP'S
GENERAL
1-1
^i
An
MISSION RULES
SECTION 1 GENERAL RULES AND SOP'S
1TLM
1-11
A.
B.
C.
D.
> M r ? r c D ? r - r ! rv L , ^ - C 1 R A N S V I T 7 E D
.L.SS
1-13
Center
SEC.f-IC
liS.JN
rtwLtS
AnE
T0
THE
INVOKED
SYSTEMS
^ G N T ORLE
W^ICH
REQUIRE
CO^AND
ACTIVITY.
Tr-.E CCWA'.D
PILJT
VA>r
IN T H E EvtNT OF LwS
ASSUME
KESPCNSISILI
INITIATE
OF
SuCh
iNFLltnT
COw^NjCATlwNL
ACTION
BETWEEN
T^E
As
MSFN
T H E SPACE
ESSENTIAL
AND
C P V I I 5 : C \ r::C*ic% * ; ^ . I N T H E F R A M E
THE
S/C
REV
11
DATE
1 6 .
69
SECTION
GROUP
GENERAL
RULES AND SOP'S
GENLRAL
FOR
CRE*
COMMAND
...UR^ C F T H E M I S S I O N H U ^ E
MISSION
TMt
vf^iCuE
PAGE
1-2
r,A,
PHASL
NASA
- Manned
Spacecraft
Center
MISSION RULES
RF.V
SECTION
ITEM
1 GENERAL
RULES
AND S O P ' S
DEFINITIONS
ASAP-AS
SCON AS PRACTICABLE
PTP
A PREFERRED TARGET POINT IS A STRATEGICALLY LOCATED
SLT OF COORDINATES
FOk *HJCH T H E
SPACECRAFT S H O U L D E TARGETED IF IT HECOMFS NECESSARY TO LAND ON THAT REVOLUTION.
1-26
lll~otAl
1-27
NEXT BfST P T P
A PREFERRED TARGET POINT WHICH CAN B E REACHED
BY T H E SPACECRAFT
*ITHINT H E
C O N S T R A I N T S I M P O S E D c Y T H ES P A C E C R A F T P R O B L E * C A U S I N G A N E A R L Y V I S S I C N T E R M I N A T I O N A N D A L L O W I N G
X
T H E B E S T P O S S I B L E K t ^ N T ^ Y A \ D L A N D I N G A R E A C O N D I T I O N S * T > L V ^ C J Q N w l L L N U T P K L - V E E D T U T^L N t X T
=>HA5E U N L E S S S P E C I F I C A L L Y N O T E D .
1-28
PEENTER
1-29
TERMINATE ASAP
1-3C
i-32
ASAP
AS
RLE' rR
AS PRACTICABLE
JTH TH[
"""D
or
SET
COOKD^TES
c^stN
TO
I CRITICAL MANEUVERS
^ C R T M E PL'^P'-Sf OF V I S S I O N R U L E A C T I O N , C R I T I C A L ^ . A N t U V t ^ S A R J t F I \
T H C S E M A N E U V E R S E U U I = E D 1Z I N S U R E C R F w S A F E T Y . T H E V I O L A T I O N 0 ^ P R C ^ U L S I C N S V ^ T L V
LlvITs
BE A C C L P T c i ^ A S N L C L S ^ A S T F O R S U C H B U R N S . A L L M A N E U V E R S
A K - CUNSIDEKLD
CRITICAL
L^Ct^T
L 0 ! 2 t Pi-ANE Cii',Gi D ^ I , A ' D V C C ' S ::Z'
N^-N-CRHICAL
CRi:\
1-32
^ E C ^ T S I ^ T ^ ^ ^ O ^ : ^ ^ ^ :
FJRN
NOT HE
* B^
LU
T W MAINTAIN
L vtL
SAFETY.
EARLY STAGING
uNSCrEDuLED
MISSION
APCLLC I:
REV
SEPARATION
I;ATE
O F T H S - I V B
SECTION
/ 1 6 / 6 9 GENERAL
STAGE
FRwv
GROUP
STAGE.
PAGE
U- r
ITEM
1*33
1-3*
1-35
S-IVB SAFIN3
DEPLETED*
1-36
PSELAUNCH PHASE
CPRELN)THE
TI^E INTERVAL
FROM T H ECOMPLETION
PRESSURE
OF T H EFLIGHT
SPHERES ARt
READINESS
REVIE*
TC LIFTOFF.
1-37
FLIGHT ^HASE
FLIGHT
PHAE
A. LAUNCH PrALE
SUBDIVIDED
F*O* Ll^TOFT
FRO
C TDLE P^ASE
D.
3. L'.DJC<CC; -HAS:
ZC*L*ZD
1.
Dl
TC
FOR TLI T H R O J G H
LCII
CUTOFF.
--
T:*-*E
INTE^VA^.
T-
P^: *
'. l"i
-:' T - E D C I - - - A N E U V E ^
:\T^WVAL
FKCV
LC GATE TO T J J C H DO*,N
5CC F* A ^ T i T j D t J T O
">E Tivr
INTERVAL
CF
Tut PDI
DL^ING
A T /.-1
INTERVAL
T^E "I
LANCING.
T*-L T I v
5JCFT),
T C THE INITIATION
T H E INITIATION
2.
c-ASr
FRO1^ T-it C S W
P D l +b T O Lv L A T E
^ 0 ^ A T E IS T H E P O I N T
M A N U A L L Y r w I E S T-t D E S C E N T .
EVA
INJECTION' (Ttol:.
2.
STAv
PURPOSES T H L
_.. L U N A R
RULE
(TB1 T H R O U T H T B 4 ) .
"-E ll'-'z
D: S C t N T
p
INSERTION
MISSION
I.
THROUGH
FOR
BELLUV
f ^ v CS /S-IVB SEPARATION T H R C U G H
DOCKED PriASE
DOI p-ASt
THROUGH S P L A S H D O * ' N .
SMO*N
I-NStKTJON
^.
AS
j\'ERVAL
R C ^ TOoC-DO^N
F R O ^ L V D E R E S S u R I 2A T \ 0 \
V
UNTIL
UNTIL
MANEUVER.
TO T^uCf- JC*.\
THE PCWEKED
DLSCrNT
DESCENT
STAGE
AFTEK
CREA
TAKE6
TA^EOvtK
OF T H E PDI
VANEUVEK
OvER
MNJ
( A H P K O X l VAT t L Y
LIFTOFF.
LV R E P R E ^ S u R I Z A T I O N .
>
K* R E N D E Z V O U S
T h [ TIvc
JNT^RvA,. F R C
3^. SERT:0. I N T O L U N A R
ORDIT
AFTER
ASCENT
OR
ArTER
AN
A S O ^ ' E L ; D E S C E N T L - N T I L C b v ^ L v D O C K I N G . FOR A N A L T E R N A T E M I S S I O N * H I C H
DOES
NOT
INCLLDE
M
V
r
v
f>
V
LUNA-* ^ A N D J ' - C IT IS T-i ^ . " L R C "
T-E
CS
cfth-DJI
SEPARATION
MANEUVER
Tn^OcC:^
CS /LN>
DCC<:NG.
L.
TRANSEA-.-TH
ENTRv
CCA.^" - - A I
3HAS:-F^c/
Z'-'t S v
REV
-Rjv T E 1 CuTOFF
S r p A R A T ION
DATt
4/16/69
TC
TU C M / S V
SEPARATION.
SPLAS-^C'.-A.
SECT10N
GROUP
GENERAL
DEFINITIONS
PAGE
Center
MISSION RULES
REV
ITEM
1-33
1-35
S-IVB SAFING
DEPLETED.
1-36
P^ELAUNCH P H A S E
TO L I F T O F F ,
1-37
(PRELNJ
A, LAUNCH PHASE
s. E A ^ T H C R B : T
PKCV
LiPfOFT T H R O U C H
P~ASEFRO
r
C. TD6E P M A S E
INSERTION
E. DOCKED PHASE
K
F. L U . * R
ORSIT
OF THE F U G H T
FOR
MISSION
P.-ASc
-GA-RED
DCi
Cv
F O RTRANSLUNAR
INJECTION I T J ; .
; TO we L-A'E
STAV
E V A - - T^-E
<
P ^ A S T - ^ - T ^ L
TIV
LO wAT
TI*^E
INTERVAL
IN'E^VAL
F*0M
^ROM TOJC^DOAN
T-E
CRE
TA<Eb
TA^EOvtH
UNTIL
F R O ^ L V D E R E S S J R J 2 ATIO N U N T I L L M R E P R E ^ S U R I
FROV INSERTION I\TC LUNAR
DOCKING. FO^ AN ALTERNATE
r
C ^ ' T - E Cf-'
Pftr-DOI
A*,
ORDJT
AFTER
ASCENT
ZH Ar'TER
visSION * H I C H
COLS
N C T INCw^DE
SEPARATION
MANEUVER
> ^ L C "
/CL V S
CCA;^* --ASE
v
"1SSIJN
APOLLO 1;
REV
(AHPnOXI MATtLY
LIFTOFF*
DO:<:NG,
OvER
REN^EZv'OLS
T H E Tlvr j\T:RvAk
ABOP'EU DESCENT L;ST]L Civ/Lv
L L \ - ^ uANDI'-C i T I S T-> T I V L
^. -CANSEA-:'^
Tnt C S V
2. LC GATE TO T J J C H O C * \ - T ^ E T1 V E I N T K V A L
5uc F* A U T;TJ:>: TO LANCING.
LLAAR
FROV
l. P D I T ^ p - : - ^ i
A%Z. GET INTI Ol
I NSE^TICN.
PURPOSES
2. P
RJLE
REV1E
f^C-v L C U C U T L F F
D: SCE'.T
READINESS
ARt
3. L\DJC<iO P H A S :
T-E T I '-'r I'-.TE^vAw L-'uRJN^ ^ H I C H A v A N N E D L v Ib S E ^ A R A T E U
S T A T I O N <Et^I\C- ( V i M M U v S E P A R A T I O N DISTANCE OF A P P ^ J X
XI
E^
" H TIME
P^'A^E
PRESSURE
INSERT I U N (TB1 T M R O U T H T B O .
fiJ v CSV/S-Jv'8 S E P A R A T I O N
HIGH
TRANSMITTING
SFPARATICN-
DATt
TO spi-A*-jC:VN
SEC T 3ON
GROUP
GENERAL
RULES AND SOP'S
DEFINIT1ONS
PAGE
Center
MISSION RULES
RCV
ITEM
1-36
RECOVERY PHASE
T M TIME. INTERVAL FROM SPLASHDOWN
TO DESIGNATED LAND BASED INSTALLATIONS.
1-39
REENTRY DEFINITIONS
A.
AUTOMATIC
B.
CLOSED LOOP
REENTRY CONTROLLED BY THE CREW MANUALLY FLYING BAN*;
CMC ENTRY PROGRAM OUTPUTS.
C.
OPEN
REENTRY CONTROLLED
LOOP REENTRY
REENTRY CONTROLLED
TO THE R C S .
ANGLE
MODULATION
U
1 U N
1.
BANK. ANGLE
2.
3.
ROLLING REENTRY
<
EMS RANGING
CONSTANT BANK ANGLE IS HELD TO IGt THLN T M E RANGE 1U GO DISPLAY
AND THE KANGt POTENTIAL LINES ARE COMPARED TO MODULATE THE BANK
ANGLEI
AT
RETRE THE PKEStNT BANK ANGLE IS REVERSED.
CONSTANT
CREW AND S P A C
G ENTRY
(RL 0 - 9 0 ) .
MAINTAIN CONSTANT
CRE,* CONTROLS
BANK. ANGLE.
EXCEPT
WMEN
TO MAINTAIN A SPECIFIED G
E^S REtNTRv
CKF^. CO^.T^OLS T H BAN* ANGuE TO MAINTAIN A CONSTANT
G UNTIL
vLtCCiTY
LESS
THA\ 2b,5C'J F?$. THE ^S IS T H N USED TO CONTROL RANGE BY NULL ING T H E DIFFERtNCL
eE
THE RANGE TO GO COjNTtR AND T H E RANGE POTENTIAL GuIDtLINLS. ALL VANEuVEkS
Af<L
AS f.ECESSARY TC PREVENT AN CASET OR OFFSET VIOLATION.
ALTERNATE W ISSIQN
ANY DEVIATION FRCV
THE NOMINAL
MISSION
OBJECTIVES ARE CCNS.lJf.RED Hf FORE T H END OF T H *ISSION
WntKL
FuKTf-trc
J
CJNTINUE v l ^ s i ^ N - T n E CONTINUE ^ISSlJK fiJLlNo ^OR ^ A L ^ U N C T I (JNS INDICATES THAT Tr-L
BE CCN'INwED IN A C C C K J A S C E A I * *- -RESENT PL.ANS UNLESS OVERRIDING r A C T U R S ARt PRESENT
CAUSE SELECTION r,F AN ALTERNATE C M C I C E .
SLINGSHOT
NDN-LUNAR
MANEUVER
IVUACTINC
-SE 0? Hri.IL-jAL
T^A^ECT
lSSI ON
APOLLO 11
REV
DATE
S-IvB
SECTION
4/16/69 GENERAL
RULES AND SO^'S
TO P L A C E
GROUP
DEFINITIONS
TH SPLNT bTAbt
PAbt
buA
Center
MISSION RULES
RfV
ITEM
1-43
DPS
1.
MODE-1-
+ 104 SEC.
MODE-I I
l?0 SEC.
2 HRS
AND
SECOND
PERICYNTHION.
3.
"0DE-II1
TEI AT APPROXIMATELY L O U
NOTE
T M E CHUTOFF TIKES ARE BASED ON A NOMINAL TRAJECTORY
U? TO S H U T O F F , HANDOVER BETWEEN MODES J# II, AND
III IS A FUNCTION OF ACCUMULATED t-01 1 DELTA VELOCITY.
S?S
D)
LHUTCFF
OCCURS
AT Lvi: * 1^ M I N U T E S
FROV
LOU
SEC
TO
LOJ 1
17C SEC.
FOR A DIRECT
NUMBERS I-*.^
ARE RESERVED.
REV
APOLLC 11
DATE
SECT ION
*. /16/69 GENFRAL
RULES AND SOP'S
GROUP
DEF1NITI0NS
PAGE
BURN
AT
NEXT
Center
MISSION RULES
REV
ITEM
1
IST
ri
P !
CHOOSING BETWEEN TWO OR MORE TARGET
POINT*.
TY OF THE MISSION S I T U A T I O N WILL AFFtCT T M A P P L I C A T I O N OF THfcSE C R I T E R I A .
*
PRIORITY
1
OPERATIONS
2
FORCES
3
OPERATIONS
TRACKING
BURN#
(ASSUMES
120C - 1^00 \M
CC V-ANEuvER
TME R E L A T W E
ENTRY RANGE
IN
B.
v ILLATIONS
C.
*CATH9
&UL
NUMBERS
1-5C
I .\ P^JGnlTY
VIOLATIONS
A,)
IN PRIORITY A AND b)
THKOUGM
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 GENERAL
RULES AND
GROUP
TARGET POINT
SEL. CRITERIA
PAGE
1-7
Center
MISSION RULES
REV
ITEM
PRELAUNCH R U L E S
1-56
1-57
1-56
D E S I R A B L E - FLIGHT C C \ T R O L L E R S wlLL NOT CALL H O L D S FOR THE LOSS OF DESIRABLE ITEMS AS THEY
ARt
PLACED IN THIS CATEGORY BECAUSE T H E Y ARE ITEMS OF SUPPORT WHICH ARE OF MINOR
IMPORTANCE
TC
FLIGHT O P E R A T I O N S .
1-59
*A\UAL' CUTOFF wlLL NOT BE ATTEMPTED FROM T-1I S E C O N D S (ENGINE IbNlTlON) TO T-0.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
GENERAL
RULES AND SOP'S
PRELAUNCH
RULES
PAGE
1-B
NASA - Manned S p a c e c r a f t C e n t e r
MISSION RULES
REV
ITEM
LAUNCH ABORTS
1-66
ABORT REQUEST COMMANDS ARE COMMANDS TRANSMITTED FROM THE MCC OR LCC WHICH ILLUMINATE THE ABORT
REJUEST LIGHT ON THE COMMAND PILOT'S PANEL* THE " ABORT LIGHT 11 AND A VOICE REPORT
'ABORT'*
OVER A/G ARE CONSIDERED TWO CUES FOR THE CREW TO TAKE THE NECESSARY ACTION TO ABORT THE MISSION*
THE GROUND WILL USE TWO INDEPENDENT CUES PRIOR TO TRANSMITTING
AbORT REOUESTt" ADDITIONAL
CUES FOR THE CREW WILL" COME FROM ONBOARD INDICATIONS*
2-67
1-6E
WHENEVER POSSlBLEt ALL ABORTS AND EARLY MISSION TERMINATIONS WILL BE TIMED FOR A WATER LANDING*
1-69
THE FLIGHT DIRECTOR WILL INITIATE THE ABORT REQUEST FOR SPACECRAFT SYSTEM MALFUNCTIONS.
1-70
THE FLIGHT DYNAMICS OFFICER WILL INITIATE T H ABORT REQUEST COMMAND DURING THE FLIGHT
THE SPACE VEHICLE EXCEEDS THE FLIGHT DYNAMICS ENVELOPE.
1-71
THE BOOSTER SYSTEMS ENGINEER WILL INITIATE THE ABORT REQUEST COMMAND EASED UPON LAUNCH VEHICLE
TI^E-CRITICAL SYSTEMS MALFUNCTIONS THAT WOULD NOT ALLOW A SAFE INSERTION OK CONTINUATION TO A
PLIGHT DYNAMICS LIMIT LINE*
1-72
THE ONLY KSC POSITION THAT wlLL HAVE ABORT REQUEST CAPABILITY IS THE LAUNCH OPERATIONS MANAGER.
THE LAUNCH OPERATIONS MANAGER MAY SEND AN ABORT REQUEST FROM THE TIME THE LAUNCH ESCAPE SYSTEM
IS ARMEo U N T I L THE SPACE VEHICLE REACHES SUFFICIENT ALTITUDE TO CLEAR T H E TOP OF T H E UMBILICAL
TOWER. PRIOR TO TRANSFER OF CONTROL TO T H FLIGHT DIRECTOR* THE LAUNCH OPERATIONS MANAGER WILL
INITIATE THE ABORT RtQUEST COMMAND FROM KSC BASED ON THE CRITERIA DEFINED IN THE LMRD. THESE
INCLUDE
A.
5-
D.
PHASE
]F
1-73
THE RSO CAN SHUTDOWN THE SLV BY TRANSMITTING THE MFCO COMMAND WHICH ALSO LIGHTS THE ABORT
REQUEST LIGHT IN THE SPACECRAFT. THE MFCO WILL INITIATE AN AUTO-ABORT IF TRANSMITTED PRIOR TO
EDS DISABLE. THE MFCO COMMAND INITIATES A *1 SEC TIMER ON THE GROUND WHICH IN TURN ENABLES
DESTRuCT CAPABILITY IF TRANSMITTED. THE RSO DESTRuCT COMMAND CAN THEN DESTROY THE SLV. THE RSO
WILL ALWAYS SAFE THE 5-IVB AFTER TRANSMITTING MFCO UPON VERIFICATION OF CUTOFF IF THE DESTRUCT
COMMAND IS NCT TO BE TRANSMITTED.
1-7*
THE RSO WILL SAFE THE S-lVB DESTRuCT SYSTEM AFTER CONFIRMATION OF S-1VB C/O FROM THE FLIGHT
DYNAMICS OFFICER* IF COMMUNICATIONS ARE LOST WITH THE FlOOt THE S-IvB DESTRUCT SYSTEM WILL Bt
SAFED EASED ON THE RSO'S VERIFICATION OF S-lVB CUTOFF. ONCE SAFED* THE S-lVB DESTRUCT SYSTEM
CANNOT BE REINITIATED*
IF THE RSO INITIATES MFCO* THE RSO WILL INITIATE SAFING AFTER
VERIFICATION OF S-IVB CUTOFF.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
GENERAL
RULES AND SOP'S
LAUNCH ABORTS
RULES
PAGE
1-9
Center
MISSION RULES
RLV
ITEM
1-75
* INITIATOR
METHOD
STAGE
TIME FRAME
mmmmmm
CCW ON
THC
ASTRONAUT
i
t
S-ICt
T - 30 SEC.TO SECO
s-n
S-IVB
ASTRONAUT
s-n/
S-IVB
L/V
STAGE
SWITCH
i
i
i
S-II
S-IVB
T + 2-33 TO SECO
RF CMD
(MFCO)
S-ICi
s-ii
S-IVB
T-0 TO SECO
2 OF 3
VOTING
LOGIC
S-IC
T + 30 SC TO EDS
AUTO OFF AT T+ 2-00
KIN
RSO
i
i
EDS
i
i
i
NOTE
EDS WILL
f
' BE SHUTDOWN
i
i
i
i
1-76
THE AUTOMATIC EDS (TWO ENGINE OUT AND OVERRATE AUTO-ABORT CAPABILITIES) WILL BE FLOwN CLOSED
LOOP IATIL T C2-0C. DURING LAUNCHt MALFUNCTIONS AFFECTING EDS OPERATION WILL BE MANAGED AS
FOLLOWS
THE EOS AUTO SWITCH *ILL 5E TURNED OFF WHENEVER ANY TWO CSK ENTRY BATTERIES ARE TIED TO T M E SAME
MAIN BUS OR FOR CONFIRMED LOSS OF ANY CSM ENTRY BATTERY.
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 GENERAL
RULES AND SOP'S
GROUP
LAUNCH ABORTS
RULES
PAGE
1-10
Center
MISSION RULES
SECTION 1 GENERAL RULES AND SOP'S
ITEM
ABORT MODES-
BOUNDARY OF APPLICATION
MODE I
1A
IB
1C
1-7B
PROCEDURES
REFERENCE AOH TD
II
BOUNDARY OF APPLICATION
TOWER JETTISON (GET APPROX, 3 07)
UNTIL FULL LIFT SPLASHPOINT IS 3200
NV DOWNRANGE (GET APPROX.
)
PROCEDURES
A. REFERENCE AOH TBD
B. KCC PROVIDES
1. GET OF
2# PITCH AT .O5G
3. GET DROGUE
ENTRY IS FULL LIFT
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
A/16/69
GENERAL
RULES AND SOPS
LAUNCH ABORTS
RULES
PAGE
1-11
Center
MtSSION RULES
REV
ITEM
1-79
MODE III
BOUNDARY OF APPLICATION
BETWEEN FULL LIFT SPLASH POINT
3200 NM AND INSERTION.
PROCEDURES
A,
B.
MCC P R O V I D E S -
1. GETJ AT S-IVB CUTOFF PLUS 2-05
2. DELTA V FOR 3350 NM SPLASH POINT
3. BURN DURATION
4. GET Of 400IC
5. PITCH AT .05G
6. GET DROGUE
C. MANEUVER IS SCS AUTO.
D. ENTRY IS ROLL LEFT 55 DEGREES.
NOTE
lf
MODE III
NO BURN 11 WILL BE
CALLED IF THE ROLL LEFT 55 DEG.
ENTRY RANGE IS LESS THAN 3350 NM,
1-80
MODE IV
BOUNDARY OF APPLICATION
CONTINGENCY ORBIT INSERTION
CAPABILITY TO INSERTION (BASED
ON COI LINE ON GAMMA VS V PLOT
FOR NEAR NOMINAL ALTITUDE)
PROCEDURES
A. REFERENCE AOH TBD
B. MCC PROVIDES
1* GETI AT S-IVB CUTOFF PLUS 2-05
2. DFLTA V REQUIRED TO ACHIEVE PERIGEE
GREATER THAN CR tJUAL TO 75 NV
3. BURN DURATION
4. PITCH AT GETI
C. MANEUVER IS SCS AuTO
BOUNDARY OF APPLICATION
MODE
APOGEE KICK
PROCEDURES
A. REFERENCE AOH TBD
B. MCC PROVIDES
1. GETI FOR BURN AT APOGEE
2. DELTA V REQUIRED TO ACHIEVE PERIGEt
GREATER THAN UR EQUAL TO 75 NM
3. BURN DURATION
4. PITCH ATTITUDE
C. MANEUVER IS SCS AUTO
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 GENERAL
RULES AND SOP'S
GROUP
LAUNCH ABORTS
RULES
PAGE
1-12
Center
MISSION RULES
RLV
ITEM
1-6"!
MAX 0 REGION
PROCEDURES
A. (00-50 TO 02-00)
AOA GREATER THAN OR EUUAL TO 100 PCT AND ROLLt
PITCH* OR YAW
ERROR GREATER THAN OR EUUAL TO 5 DEGREES
1-BB
PROCEDURES
1-B9
ABORT MODE I
ABORT MODE It MODE
MODE IV
ROLL
1. L/O TO SECC - 20 DEG/SEC
Jit MODE
2 11* OR
I lit OR
BOUNDARY OF APPLICATION
A.
1-90
PATES PITCH
AND YAW
ROLL
4.Q */- .
20,0 +/-
8.
CM TO IU BREAKUP
DEG/SEC
DEG/SEC
= 36 PSID
1-91
PROCEDURES
ENGINE FAILURES
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 GENERAL
RULES AND SOP'S
GROUP
CREW ABORT
LIMITS
PAGE
1-13
LV
RATES
AT
Center
MISSION RULES
RCV
1TLM
' GENERAL
2-1
2-2
PRELAUNCH
A.
LAUNCH AZIMUTH LIMITATIONS RESTRICT LAUNCHES TO OCCUR BETWtEN 72 DEG. AND JL2
Bi
THE FLIGHT DIRECTOR WILL EVALUATE 'WIND SIMULATIONS ALONG THE MODE 1 (TOWER) ABORT TRACK
PRIOR TO THE START OF CRITICAL COUNTDOWN ACTIVITIES AND WILL ADVISE T H E LAUNCH DIRECTOR OF
ANY PREDICTED PERIODS OF LAND LANDING. IF THE FLIGHT DIRECTOR IS UNABLE T O PROVIDE THIS
EVALUATION* A LAND LANDING WILL BE ASSUMED AND THE SPACECRAFT WIND CONSTRAINTS FUR LAND
IP'S WILL BE APPLIED. THESE CONSTRAINTS (RtF LMRD) REQUIRE THAT THE SPACECRAFT NOT BE
LAUNCHED OR PEMAIN IN A TOWER ABORT MODE IF A TOWER ABORT WOULD RESULT IN A LAND LANDING
WITH A HORIZONTAL VELOCITY COMPONENT OF GREATER THAN $<. FEET PER SECOND AT IMPACT, IN ALL
CASES* Th LAUNCH DIRECTOR WILL BE PRIME FUR CALLING HOLDS FOR LAND LANDING LAUNCH WIND
VIOLATION'S*
C.
LAUNCH
IT IS PREFERABLE TO GO INTO ORBIT AND REENTER INTO THE WEST ATLANTIC RATHER THAN PERFORM A
LAUNCH ABORT. THEREFORE* THE LAUNCH WILL BE CONTINUED AS LONG AS THE
CREW CONDITION IS
SATISFACTORY* NO S/C OR SLV PROBLEMS EXIST WHICH JEOPARDIZE CREW SAFETY* AND SUFFICIENT
CONSUMABLESt COOLANTt AND ELECTRICAL ENERGY REMAIN FOR AT LEAST ONE REVOLUTION PLUS ENTRY.
2-3
EARLY STAGING
:F R E Q U I R E D * EARLY S-IVB S T A G I N G M A Y B E I N I T I A T E D
BY T H E F L I G H T
CREW
CAPABILITY JS OBTAINED OR AFTER TOWER JETTISON IF LOX OVER PRESS OCCURS.-
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
GENERAL
4/16/69 FLIGHT
OPERATIONS RULES
PAGE
AFTER
S-iVD-TO-ORBIT
Center
MISSION RULES
RCV
ITCM
EARTH ORBIT
A
ENTRY WILL BE MADE AT THE NEXT BEST PIP WHEN ONE MORE CSM FAILURE WILL RESULT
ENTRY OR UNCONTROLLABLE CONDITIONS*
e.
MAKING
IN
AN
ALLOWANCES
ASAH
FOR
PRECLUDE
DEORBIT
BY
EITHER
bE
METHOD
RESERVED
6.
2-5
UTILIZATION OF
PK1ORITIES
BACKUP
DEORBIT
METHODS
(A)
SM-RCS
(B)
(C)
SM-CM/RCS HYBRID
(D)
WILL
BE
BASED
ON
THt
FOLLOWING
A.
AN S-IVB FAILURE OR SYSTEMS TREND THAT WILL RESULT IN A HAZARDOUS SITUATION FOR TnE
FLIGHT
CREW IS CAUSE FOR A.N IMMEDIATE CSM/S-IVB
SEPARATION.
THE FLIGHT
CREw
MLL
PERFORM
A
SEPARATION MANEUVER ASAP. M I ^ M u M SAFE DISTANCE IS CONSIDERED TO BE 7CQQ-PT.
R.
THROUGH
MISSION
APOLLO 11
REV
DATE
SECT ION
GROUP
GENERAL
FLIGHT
OPERATIONS RULES
PAGE
2-2
Center
MISSION RULES
RCV
ITEM
2-11
TRANSLUNAR INJECTION
A.
ThE TLl WILL BE GO IF THE S/C AND L/V SATISFY THE FOLLOWING C R I T E R I A
2.
THE
S-IVB
THAT
WOULD
MAKE
IT
UNSAFE
A
TO
3.
EARLY
WOULD
<
THE CSM HAS TCTAL SYSTEMS CAPABILITY WITH REDUNDANCY. KEDUNDANCY VERIFICATION
IS SUBJECT TO THE NUMBER AND TYPE OF K E D J N D A N T COMPONENT CHECKS WHICH CAN Bfc
PERFORMED IN EARTH ORBIT.
THE TLl MANEUVER wlLL BE DELAYED UNTIL THE SECOND OPPORTUNITY FOR SUSPECTED FAILURE OF A
CRITICAL SYSTEM (PRIME OR BACKUP) (MANEUVER* LIFE SUPPORT* COOLING* POwER* SEUUENT2AL
COMMUNICATIONS) WHICH REQUIRES TIME FOR EVALUATION.
2-12
8.
THE NORMAL MINIMUM CABIN PRESSURE REDLINE OF 4.0 PSIA FOR TUNNEL/LM PRESSURIZAT I ON
SEQUENCES WILL BE WAIVED DURING TD6E. FOR TUNNEL OR LM LEAKS WHICH PREVENT NORMAL
PRESSUKI2ATION* THE CM WILL EE DEPRESSuRIZED AS REQUIRED FOR HATCH REMOVAL AND UMBILICAL
HOOKUP.
C.
THREE LATCHED LATCHES LOCATED 120 DEGREES APART ARE REUUlRED TO PERFOKM EJECTION.
D.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
GENERAL
4/16/69 FLIGHT
OPERATIONS RULES
PAGE
2*3
ANOMALIES*
AND
THE
FLIGHT
'STAGE1'
Center
MISSION RULES
RTV
ITEM
2-13
TRANSLUNAR COAST
* ?ROMP?HEU^IVLAPPROXIMATLY.20
rPS IS PLANNED
EU
C.
^ ^ 1
LUNAR ORBJT
FREE
IF
TO CSM SYSTEMS
IF
THE
CSM
DOES
NOT
SATISFY
ANY
OF
THE
A.
B.
ADEQUATE CONSUMABLES FOR MINIMUM LUNAR OR&IT OPERATIONS AND RETURN TO EARTH 12 HOURS.
C.
D.
RCS PROPELLANT RESERVE TO ACCOMPLISH TEI CONTROL. TRANSEARTH MCC CONTKOL. PTC. AND
LUNAR ORBIT OPERATIONS*
E.
LOSS OF ANY u DOC KING RING LATCHES WILL BE CAUSE FOR CSM ONLY L O U
LUNAR
A.
2*16
INSERTION
2-15
FOk
CAT IONS
2-14
DISTANCE
MINIMUK
ORBIT
LCI DISPERSIONS
1.
BEEN
ACHIEVED*
AN
&Ps
OK
DPS
ABOKT
2.
wlLL
BE
PERFORMED
AT
8.
c.
SUFFICIENT CONSUMABLES MUST REMAIN TO COMPLETE THE NEXT MISSION PHASE AND EARTH RETURN
12 HRS FOR CONTINUATION TO THE NEXT MISSION
P^
D.
THE C 5 " N'UST MAINTAIN AN SPS FUEL RESERVE CAPABILITY FOR THE TEI
E.
F.
IF NORMAL MISSION OPERATIONS ARE INHIBITED. THE DPS WILL BE USED FOR TEI
CHOICE BETWEEN THE DPS AND SPS.
MANEUVERS
TEI
CONTROL.
AND
TRANSEARTH
TRANSEARTH
WHEN
PLUS
THERE
MCC
IS
INTRAVEHICULAR TRANSFER
ONE HARDSuIT IVT FROM THE CSM TO THE LM WILL BE ACCOMPLISHED IF A REASONABLE CHANCE EXISTS
CORRECTIVE ACTION CAN BE TAKEN FOR A LM/TUNNEL PRESSURI2AT 1 ON PROBLEM.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
GENERAL
/16/69 FLIGHT
OPERATIONS RULES
PAGE
THAT
Center
MISSION RULES
RTV
ITEK
2-17
DOCKED LM
OPERATION
FOR AN IMPENDING HAZARDOUS SITUATION RESULTING FROM A DESCENT STAGE PROBLEM, THE STAGE
WIl
JETTISONED AND ASC STAGE OPERATIONS WILL CONTINUE AFTER THE VEHICLE HAS MOVED TO A SAFE DI
BE
:E
** r T ) .
2-21
B.
VHF VOICE COMMUNICATIONS BETWEEN THE LM AND CSM ARE MANDATORY FOR
C.
D.
2-22
CS^
A.
EV'T CAPABILITY
MANEUVER
CAPABILITY
OF
THE LM CAPABILITY
UNDOCKlNG.
LUNAR ORBIT
INDEPENDENT
CONFIGURATION
AND
UNTIL
CM
INTERbRlTY
UNDOCKED
UNDCCKlNG TO PDI
LOSS OF REDUNDANT CAPABILITY IN CRITICAL SYSTEMS WILL BE CAUSE TO TERMINATE THE MISSION ANL>
PERFORM TEI ASAP. BETWEEN UNLOCKING AND DOI* THE VEHICLES fclLL BE REDOCKED FOR LOSS OF
CSM
ACTIVE DOCKING OR LM RESCUE CAPABILITY,
B.
PDI TO LANDING
NO CSV FAlLURESt EXCEPT FOR TIME-CRITICAL SPS F A I L U R E S ! WILL
DOWERED DESCENT.
C>
BE
CAUSE
FOR
ABORT
DURING
LUNAR STAY
\
j
SUPPORT
WILL.
2-22
FOR DCI 'HZ LM MUST HAVE T H E CAPABILITY TO RENDEZVOUS AND DOCK WITHOUT
MISSION RULES OR REDLlNES.
VIOLATING
ANY
SPECIFIC
2-24
FOR PDI* T H E LM MUST HAVE T H CAPABILITY TO LAND* COMPLETE
WITHOUT VIOLATING ANY 5 p ECIFIC MISSION RULES OR REDLJNES*
MISSION
APOLLO
REV
U
DATE
SECTION
4/16/69 FLIGHT
OPERATIONS
GROUP
ONE
PAGE
GENERAL
RULES
2-5
DOCK
Center
MISSION RULES
RLV
ITEM
2-25>
LM-POwERED DESCENT
IF A SYSTEMS FAILURE OCCURS AND A CHOICE
A.
IS AVAILABLE
TO
IS
DURING THE REKAINDLR CF POwER DESCENT, IT IS PREFERABLE TO LAND AND LAUNCH FROM
THE
LUNAR
Sw'RFACt 7 "AN .0 ABORT. ONLY THOSE SYSTEMS ^AILuRES OR TRENDS THAT INDICATE
IMPENDING
LO^
0^ T M L CAPABILITY TO L A N D ASCEND AND A C H I E V E A SAFE ORbIT
FROM
T H E LUNAR
SUHPArF
rZ
IMPENDING LOSS UF LIFE SUPPORT CAPABILITY WILL BL CAUSE FOR ABORT DURING T ^ S
LS
2-7t
L V -LUNAR
A
5.
2-27
STAY
TO^ASCEND 1 AN^ A ^ " ^ " 5
CAPAeTm
L O S S OF R E D U N D A N T
0 P P 0 R i U N I i Yt
CAPABILITY
*A]LURES
JN C R I T I C A L
TRND
LM SYSTEMS
* A T INDICATE
IS C A U S E
IMPENDING
FOR ABORT
AT
LOSS
THE
OF
NEXT
THE
BEST
EVA
A.
NOMINAL EVA
"CRITICAL
IS
REQUIRED,
EVA
EVA
FAILURE CF ONL
PLSS*
ONE 0P
EVA
TO EVA DUPLEX
VOICE.
INSTRUMENTATIUN *ILL BE CAUSE FOR A ONE-MAN ALTERNATE EVA.
OR
THE
LOSS
OF
CRITICAL
2-2E
LM
WHICH
WILL
ALLOW
SAFE
ASCENT
IN THE EVENT OF PROCEDURAL ERRORS OR SYSTEMS PROBLEMS WHICH RESULT IN LOSS OF
SOME
USED FOR ASCENT FOR OR RENDEZVOUS AND WHICH CAN BE CORRECTED IN ONE REV. IT IS BETTER
ASCENT FOR ONI REV AND CORRECT THE SITUATION THAN IT IS TO LIFT OFF ON TIME.
2-29
CAPABILITY
TO DELAY
RENDEZVOUS
SELECTION OF THE ACTIVE VEHICLE FOR R E N D E 2 V 0 J S AND DOCKING WILL BE DETERMINED BY FLIGHT
CONTROL
AND THE FLIGHT CREW 6ASED UPON CONSUMABLES AND SYSTEMS PERFORMANCEt THE TOTAL LM CAPABILITY WILL
Hf DEDICATED TO ACCOMPLISHING ThE RENDEZVOUS*
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 FLIGHT
OPERATIONS RULES
GROUP
PAGE
GENERAL
2-6
Center
MISSION RULES
SECTION 2 FLIGHT OPERATIONS RULES
REV
2-30
TRANSEARTH COAST
A,
THE STEEP TARGET LINE WILL BE USED FOR MCC'S UNLESS THE VELOCITY AT ENTRY INTERFACE
THAN 3OOOO FPS AND THE G&N IS GO - THEN THE SHALLOW TAKGET LINE WILL BE USED*
15
'
SS
>
9.
MINUS
24 MOURS
IN ANY PART
OF
FOR
THE
c.
SOON
PRACTICAL.
D.
2-31
ALTERNATE MISSIONS
TO
BE DETERMINED.
REV
MISSION
APOLLO
DATE
SECTION
GROUP
GENERAL
4/16/69 FLIGHT
OPERATIONS RULES
PAGE
2-7
AS
^mmsm^m^g^
~tmmsM
Center
MISSION RULES
SECTION 3 MISSION RULE SUMMARY
REV
ITEM
* LAUNCH PHASE
3-1
THE
CONDITION
A.
SLV
CAPABILITY
ENGINE FAILURES
(TIME
DEPENDENT)
SEPARATION
FLUID
(PRIOR TO S-IVB
IGNITION)
(TI ME DEPENDENT)
S-IvB LCX TANK. PRESS GREATER THAN 50 PS I BEFORE TwR JETTt AFTER
EARLY STAGING
B.
TWR JETT
PERFORM
CSM
1.
ENVIRONMENTAL
LOSS OF CABIN AND SUIT
PRESSURE
CIRCULATION
IN CM
ELECTRICAL
LOSS OF 3 FUEL CELLS AND 1 BATTERY
UNCONTROLLABLE
PROPULSION
SUSTAINED LEAK OR LCSS OF ME PRESSURE
I ONLY)
C.
C.
H5
It
SUIT/CABIN
2#
MEDICAL
( S C U R C E OR M A N I F O L D )
LINES
CONTAMINATION
PROBLEMS
BE USED AFTER
S-IVB T O - C R B I T 1 1
CCNDITION
S-II
GIMg.AL ACTUATOR
S-II
ENGINE FAILURE
INBOARD
HARDOvER
<T1 ME D E P E N D E N T )
SWITCHOVER TO C S M GUIDANCE
y.ILL BE PERFORMED
FOR
Iu PLAT FAIL
REV
APOLLO 11
:ATE
SECTION
GROUP
'"M5SJCN RULE
LAUNCH PHASE
SUMMARY
PAGE
3-1
CMODfc
Center
MISSION RULES
SECTION 3 MISSION RULE SUMMARY
REV
ITEM
3-1:
EARTH ORBIT
CSM SEPARATION FROM THE S-IV'B (WITHOUT LM EXTRACTION) WILL BE PERFORMED EARLY FOR T H E FOLLQwINb
SLV CONDITIONS (CONSIDERATION WILL BE GIVEN TO EXTRACTING T H E LM LATER IF THE CONDITION
CAN
BE
CONDITION
Ju
LIMITS
3-12
CSV SEPARATION
CONDITION
3-13
A.
5.
ORBIT
MISSION
CONTROL
HARDOVER
FLUID
IS NO-GC
LIMITS
T ^ C f pT * 3 \
UNACCEPTABLE
MISSION
APOLLO 11
REV
IU ORBITAL DECISION
DATE
SECTION
W16/69
MISSION
SUMMARY
PARAMETERS
GROUP
RULE
PAGE
EARTH ORBI1
3-2
TOTAL
VELOCITY
AT
Center
MISSION RULES
SECTION 3 MISSION RULE
RV
SUMMARY
ITEM
3-14
9.
C.
RULES
3-15
THROUGH
3-20
ARE RESERVED,
RTV"
11
SECTJON
GROUP
PTGT
Mission
SUMMARY
3-3
Center
MISSION RULES
REV
ITEM
TD&E '
3-21
PILOTS EVALUATION OF RATES AND ATTITUDES, AND SLA CONFIGUKA T I ON NOT ACCEPTABLE.
B.
2.
3.
MISSION
APOLLO 1]
REV
DATE
SECTION
A/26/69
MISSION RULE
SUMMARY
GROUP
PAGE
NASA - - M a n n e d Spacecraft
Center
MISSION RULES
REV
ITEM
3-30
TRANSLUNAR COAST
TERMINATE LOI FOR THE FOLLOWING SPS PROBLEMS (PERFORM THE 15 "INUTE ABORT IF
TERMINATED IN THE MODE I OR MODE II REGION)
It
2.
3.
4.
C.
TME
5.
6*
8.
ACTION
IS
COMMANDED
ON
SPS-1.
PERFORM MTVC TAKEOVER AND COMPLETE THE BURN FOR THE FOLLOWING CONTROL PROBLEMS
!
G&N NO-GC
2.
3.
TRANSIENTS
RESTART THE BURN AND COMPLETE UNDER SCS CONTROL FOR AN SPS SHUTDOWN.
MISSION
APOLLO 11
REV
SECTION
4/16/69 MISSION RULE
SUMMARY
GROUP
TRANSLUNAR
COAST
PAGE
3-5
OR
BURN
IS
NASA - M a n n e d S p a c e c r a f t
Center
MISSION RULES
REV
ITEM,
3-37
3-38
LUNAR ORBIT
LOI
BuRNt
THE
FOLLOWING
tSPS OR DPS)
COURSES
ABORTS
OR
OF
DPS
ACTION
A*
TWO
B.
IF STABLE ORBIT HAS BEEN ACHIEVED, TEI (DPS OR SPS) WIL BE EXECUTED AT NEXT OPPORTUNITY
AN ALTERNATE MISSION WILL BE INITIATED.
ARE
IM^uLSt
OH
THE MISS DISTANCE OVER THE LLS IS LESS THAN Q5 DG. UuT OF PLANE AND + /-2 DEG. l<\ AZIMUTH
NOTE
ADDITIONAL MANEUVERS WILL BE SCHEDULED*
AS NEEDED* BETWEEN LCI2 AND UNDOCKJNG
TO CORRECT DISPERSIONS,
ONE SET OF 5 SATISFACTORY LANDMARK SITHTINGS ON THE LANDING SITE HAS BEEN OBTAINED,
NOTE
UNDOCK.ING WILL BE SLIPPED NO MORE THAN
ONE REV IF THE SIGHTINGS AkE NOT
SATISFACTORY.
THKOUGH
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
LUNAR ORBIT
3-6
Center
MISSION RULES
RCV
ITEM
DC I IGNITION
THE FLIGHT CREW WILL NOT ATTEMPT TO BACKUP THE DOI ULLAGE MANEUVER OR ThE
EITHER FAIL TO OCCUR AUTOMATICALLY,
3-^6
3-<* 7
DPS
IGNITION
SHOULD
DOI TERMINATION
THE
A.
B*
C.
D.
E.
F.
PGNS FAIL
DOI TO PDI
A.
9.
THE FLIGHT CREW WILL PERFORM THE DIRECT RETURN TO THE CSM FOR THE FOLLOWING REASONS
NOTE 1
NOTE 2
1.
LM CONDITIONS
(A3 ECS
(1) LOSS OF BOTH COOLANT LOOPS
(2) F I R E , S V Q K E * O R F R E E G L Y C C L IN C A B I N O R S U i T
(B) G & C
{i) P G N S F A I L OR A G S F A I L
(2)
PZ^S*
AGS POST-DOI
REDIG'JALS D I F F E R BY G R E A T E R
(3) AT D O I C U T O F F , P R I O R
ANY A X I S
(C)
PULE 3-^6
CREW TERMINATES
TO TRIMMING*
THAN J_ F P S
IS RESERVED
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 M I S S I O N RULE
SUMMARY
GROUP
PAGE
DOI PHASE
3-7
THAN
FPS
IN
Center
MISSION RULES
RCV
ITEM
PDI
IGNITION
THE FLIGHT CREW WILL NOT ATTEMPT TO BACK UP THE PDI ULLAGE MANEUVER. IF THE ULLAGE MANEUVER
OCCUR AUTOMATICALLYi THE FLIGHT CREW WlLL ATTEMPT TO MANUALLY IGNITE THE DPS ENGINE IF
IT
NOT IGNITE AUTOMATICALLY. THE MANUAL IGNITION MUST OCCUR BY LGC COMPUTED TIG 7.5 SEC.
3-50
DOEb
PDI TO LO GATE
POWERED DESCENT WILL BE ABORTED FOR THE FOLLOWING
A.
B.
LP FAILURE AFTER
C.
C.
PGNS NAVIGATION tRRORS WHICH RESULT IN AGS-PGNS VELOCITY DIFFERENCES THAT VIOLATE
FAILURE LIMITS.
THE
E.
THE
PGNS
NOTE
ITEMS E AND F ARE VALID ONLY PRIOR
TO LR INCORPORATION. FOR ITEM E
SWITCHOVER TO AGS WILL BE PERFORMED.
3-51
LO GATE TO TD
THERE ARE NO TRAJECTORY OR GUIDANCE CONSIDERATIONS WHICH AK CAUSE FUR ABORT AFTEK CREW
OF POWERED DESCENT
MISSION
APOLLO 11
REV
DATE
SECTION
PAGE
GROUP
POwERtD
DLSCEN
3-e
TAKEOvEK
Center
MISSION RULES
REV
ITEM
>
3-61
A5CENT
ASCFNT
A.
(SOFTWARE)).
RESULT
THE GROUND WILL NOT REQUEST SWITCHOVER AFTER TGO LESS THAN 0. SECONDS.
MISSION
APOLLO 12
REV
DATE
SECTION
GROUP
PAGE
ASCENT
3-9
Center
MISSION RULES
REV
ITEM
7. SPS
(A) LOSS OF BOTH GN2 BOTTLES (LESS THAN 400 PS I J
(?) FUEL OR OXIDI2ER FEEDLINE TEMP LESS THAN 27 DLG F.
(C) FLANGh TEMP GRtATER THAN 480 DEG. F. ON P K E V I O J S buRN
(D) CHAMBER PRESSURE LESS THAN 70 PSI ON PREVIOUS BURN
(E) FUEL/OXIDI2ER DELTA P GREATER THAN 20 PSI
(F) LOSS OF ULLAGE CAPABILITY FOR FIRST BURN SUBSEQUENT TO DOCKET DPS bURNt
STORAGE TANKS EMPTY
(G) FIRST BURN SUBSEQUENT TO DOCKED DPS WAS LESS THAN 40 SEC
OR
AFTE*
CONTINUOUS
(M> PRESSURE IN EITHER FuEL OR OXIDIZES TANK LESS THAN 14C PSI
(I) DELTA V REGAINING LESS THAN MANEUVER PLUS DEORBIT REQUIREMENT
THE NON-CRITICAL DOCKED SPS
EXISTS
BURNS
WILL
BE
NO-GC
IF
T H E FOLLOWING
1* DOCKING SYSTEM
(AJ LESS THAN (TED) GOOD DCCKING RING LATCHES
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
ALL PHASES
3-11
INTERFACE
CONDITION
NASA - Manned
REV
Center
MISSION RULES
SECTION 3 MISSION RULE SUMMARY
iTEM
3-70
Spacecraft
ECS
(A) LOSS OF CABIN INTEGRITY
(B) LOSS OF SUIT CIRCUIT
(C) LOSS OF 02 MANIFOLD
(DJ LOSS OF SURGE TANK AND REPRESS PACK
(E) LOSS OF CYCLIC ACCUMULATOR OPERATION
(F) LOSS OF SUIT INTEGRITY (FOR DOCKED SPS BURNS)
(G) LOSS OF ALL COOLING
(h) CONFIRMED LEAK OF GLYCOL IN EITHER COMMAND MODULE OR SUIT CIRCUIT
y
2. CR O
(A) INSUFFICIENT 02 AND H2 TO SUPPLY FuEL CELL AND CS DEMANDS TO
PT* PLUS
.
ThE
NEXT
GO/NO-GC
3. EPS
(Aj
LOSS OF
TWO
FUEL
CELLS
LOSS OF TWO-WAY
VOICE
NOT
POSSIBLE
TO
VERIFY
COMMUNICATION ICS
5. SEQUENTIAL
(A) LOSS OF SEQUENTIAL LOGIC BUS A OR S
IB 5 LOSS OF PYRO BUS A OR B
6. G&C
(A) LOSS OF TwO TVC SERVO LOOPS
(fi) LOSS OF THREE TVC CONTROL MODES (G&N SCS A O T O I AND MTVC - RATE C^D IF UNDOCKED)
(C) LOSS CF THREE TVC CONTROL MODES tG&.\ SCS AuTCf AND MTvC - ACCEL C^D IF J C C K E D )
MISSION
APOLLO 11
REV
DATE
SECTION
W 1 6 / 6 9 MISSION RULE
SUMMARY
GROUP
PAGE
ALL PHASES
3-10
Center
MISSION RULES
REV
ITEM
3-71
A CRITICAL SPS MANEUVER WILL BE INHIBITED FOR THE FOLLOWING CSM PROBLEMS
A,
G6C
1 LOSS OF TWO TVC SERVO LOOPS
2. LOSS OF THREE TVC CONTROL MODES (G6N SCS AUTO* AND MTVC - RATE CMD)
B.
SPS
1. PRESSURE IN EITHER FUEL OR OXIDIZER TANK LESS THAN 115 PSI
2. LOSS OF BOTH GN2 BOTTLES (LESS THAN 400 PSI)
3. FUEL OR OXIDIZER FEEDLINE TEMP LESS THAN 27 DEGt F.
4. FLANGE TEMP GREATER THAN 480 DEG. F. ON PREVIOUS BURN
5. CHAMBER PRESSURE LESS THAN 70 PSI ON PREVIOUS BURN
6. FUEL/OXIDIZE* DELTA P GREATER THAN 20 PSI
7. FIRST BURN SUBSEQUENT TO DOCKED DPS WAS LESS THAN 40 SEC* CONTINUOUS
3-72
G&C
TBD
B.
DPS
THROTTLE STUCK. ABOvE 60 PER. (DPS NC START CONDITION)
PROPELLANT TEMP NOT wlTnlN 40 TO 75 DEG* F LIMITS
DELTA PRESS BETWEEN FUEL AND CXIDIZER GREATER T H A N 5 PSI
FUEL INLET PRESS LESS THAN 120 PSI
LOSS OF SUPERCRITICAL HE AND DELTA V REQUIRED GREATER THAN 310 FPS
PROPELLANT LEAKS
C.
DOCKING SYSTEM
FOR DOCKED BURNS LESS THAN (TBD) GOOD DOCKING RING LATCHES
3-73
G&C
TBD
APS
DELTA
f^RESS B E T W E E N
DELTA
TEMP
PRC-ELLANT
INLET
PRESS
PRO^ELLANT
BETWEEN
TEMP
LESS
FUEL
FuEL
NOT
AND
OXIDIZER
AND OXIDIZER
wITHlNG
THAN
115
REV
DATE
TBD
GREATER
40 TO 65 D E G .
F.
ThAN
10 P E G . F
LIMITS
PSI
LEAKS
MISSION
/POLLO II
SECTION
4/16/69 MISSION
SUMMARY
GROUP
RULE
ALL
PAGE
PHASES
3-12
Center
MISSION RULES
REV
ITEM
3-?4
G&C
TBD
RCS
PROPELLANT TEMP NOT WITHIN 40 TO 2.00 DEG F. LIMITS
DELTA PRESS BETWEEN FUEL AND OXIDlZER GREATER THAN 80 PSID
MANIFOLD PRESSURE LESS THAN 100 PSI
PROPELLANT LEAKS
QUAD TEMPS LESS THAN 119 0EG. F.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
ALL PHASES
3-13
STAY
W/O EVA
2-MAN
EVA
CSI/CDH
TPI/TPF
ELECTRICAL/PYRO
1 . CDR AND I M P BUS
2.
DC FEEDER(S)
3.
BATTERY(S)
6.
2 I 2 OF 4
OR
2 I 2 OF 2
ZZ
3. 07 DEMAND REGULATORS(S)
SEPARATOR* S>
?
4.
AND
LCG COOLANT LOOP
BOTH H 2 0 SEPS OR
10F 2 H 2 0 SEPS + LCG
1 OF 2H 2 O SEPS
OR LCG
6. COOLANT LOOPS(S)
LM.CSM.EVA COMM/INST
1.
SIMPLEX OR DUPLEX
CRITICAL INSTRUMENTATION
HBR OR LBR
5. CSM OPERATIONAL TELEMETRY
NOTES:
(T)
(2)
HBR OR LBR
FOR ONE-MAN EVA, MSFN COMM WITH EITHER EVA OR
THE CREWMAN IN THE LM IS REQUIRED
ASSUMES CREWMAN IN LM OPERATING ON LM ECS
LEGEND:
*-**
MM
NO REQUIREMENT
LEGEND:
1NO REQUIREMENT
c
CSMEECOM GO/NO-GO CRITERIA
GO/NO-GO
ITEM
EARTH
ORBIT
CO NT
BOOST
CONT
E.O.
LUNAR ORBIT
TLC
TLI
TIH.E
CONT
TLC
LOI
CONT
L.O.
UNDOCKING
EVENT
NOMINAL
MISSION
DO I
EVENT
NOMINAL
MISSION
POWERED DESCENT
LUNAR STAY
PDI TO P D I - 5 T O LO GATE
STAY
PDI-5
LO GATE TO T / D W/O EVA
2-MAN
EVA
1-MAN
EVA
ECS
CABIN INTEGRITY
ABIN INTEGRITY-
FUEL CELLS
ENTRY BATTERIES
MAIN BUSES
BATTERY BUSES
AC BUSES
BATT RELAY BUS
INVERTERS
AC * A( 1 AND 2)
INSTRUMENTATION
SCE
CRITICAL INSTR
SEQ
SMJC NOT ACTIVATED
SEQUENTIAL SYSTEMS
DOCKING
DOCKING LATCHES
6.
LEGEND:
NO REQUIREMENT
LEGEND:
I NO REQUIREMENTS
mmmmssimm
("GROUND
..." ^ ;
.f$NS TRUMEN TATION
^REQUIREMENTS
NASA - Manned
Spacecraft
Center
MISSION RULES
RTV
ITEM
ITEM
GENERAL
A
B.
WHEN A SPECIFIC HARDWARE ITEM OR OPERATIONAL CAPABILITY IS DEFINED AS A MANDATORY ITEM, THE
HARDWARE AND/OR SOFTWARE INTERFACE REQUIRED TO PROVIDE THE MANDATORY FUNCTIONS OF THAT
HARDWARE ITEM OR OPERATIONAL CAPABILITY ARE TO ASSUME A MANDATORY STATUS ALSO.
WHERE REDUNDANCY EXISTS FOR MANDATORY ITEMS*
DESIRABLE.
BACKUP
CAPABILITY
NOTE
THE VARIOUS EQUIPMENT LISTINGS IN THIS
SECTION ARE TO BE UTILIZED AS A GUIDE
ONLY, IT IS MANDATORY, PRIOR TO C O M M U T I N G
THE MISSION TO LAUNCH* TO BE ABLE TO
MI SSI ON
APOLLO 11
A.
5.
REV
DATE
SECTION
GROUP
PAGE
GENERAL
4-1
WMICH
Is
MUST
CONSIDERED
BE
MET
HIGHLY
NASA
- Manned
Spacecraft
Center
MISSION RULES
REV
ITEM
R 'RULE ONDITION/MALFUNCTION1
PHASE
RULING
CUES/NOTES/COMMENTS
TELEMETRY
A. CONSOLE DISPLAY ID/TV*
EVENTS* ANALOGS)
PRELAUNCH
MANDATORY
S/V
PRELAUNCH
1 OF 4 MANDATORY*
1 HIGHLY
DESIRABLE
S/V
PRELAUNCH
BOTH DESIRABLE
PRELAUNCH
1 OF 2 MANDATORY
D, FM - GROUND STATION
4-3
D TO PROVIDE MANDATORY
DATA FOR THE MCC SURGEON,
DISPLAY
COMMAND
A. MOCR TOGGLE SWITCHES
(BOTH A AND 6)
PRELAUNCH
HIGHLY DESIRABLE
PRELAUNCH
HIGHLY DESIRABLE
3. FD ABORT REQUEST
PRELAUNCH
HIGHLY DESIRABLE
PRELAUNCH
HIGHLY DESIRABLE
PRELAUNCH
HIGHLY DESIRABLE
PRELAUNCH
HIGHLY DESIRABLE
B. COMMAND PANELS
EECCW G'JIDO* BSE.
TELCOM, CONTROL* CCATS
K
XZR CONSCLE/SITE
SELECT CAPABILITY
1. RTC CONSOLE
ICCATS)
2. CCATS CMD CONSOLE
W
ED
FQ/GO SWITCHING
CAPABILITY
i. FLIGHT DIRECTOR
2 CCATS CMD MED
MISSION
APOLLC 11
REV
DATE
SECTION
W 1 6 / 6 9 GROUND ISSTR
REQUIREMENTS
GROUP
PAGt
4-2
Center
MISSION RULES
REV
ITEM
RULE
:ONDITION/MALFUNCTION*
PHASE
RULING
CUES/NOTES/COMMENTS
TRAJECTORY
A. TRAJECTORY DATA
PROCESSING
B.
4-5
1. AVAILABILITY OF
ONE INDIPENDENT
TRACKING SOURCE
(IPR USB) FROM
LIFTOFF TO T + 10
"INUTES.
PRELAUNCH
2.
PRELAUNCH
BOTH MANDATORY
PRELAjNCH
MANDATORY
PRELAUNCH
1 OF 2 MANDATORY
PRELAUNCH
ALL HIGHLY
DESIRABLE
PKELAJNCM
1 OF 3 MANDATORY
PRELAUNCH
1 OF 3 MANDATORY
FOR TRAJECTORY
BOOSTER SAFING
PRELAJNCH
DESIRABLE
PRtLAUNCH
MANDATORY
IU AND CMC TM
VECTORS FROM
LIFTOFF TO INSERTION
PLUS 60 SECONDS.
1 MANDATORY
1* (A) INDEPENDENT
OF L/V NAVIGATION.
VERIFICATION
SOuRCEi
VIOLATION
B.
TO SELECT BEST AVAlLAbLE DATA
SOURCE.
COMMUNICATIONS
M.OCR
FD LOOP
\
AFD CONF LOOP S
MOCR SYS 1 & 2
KCCR DYN
A/G 1 LOOP
A/G 2 LOOP
e. MCC/LAUNCM
COMPLEX
121 CLTC
111 CVTS
212 MSTC
COCKDINAT I ON
C. MCC/RSO
FD LINE TO RSC
(
RSC PRIVATE LINt /
CAPE 111 RSO LC^P 1
VERIFICATION
AND
MISCELLANEOUS
BSE T" VONITCR LOOP I
C IF/USB LOOP
(
USED
FOR
MONITORING
VEHICLES SUBSYSTEM CHECKOUT
SPACE
^CC/REWOTED SITES
ONE A/G PATH VIA GSFC
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
"CC
4-3
CRK
Center
MISSION RULES
REV
ITEM
RULE ZONOITION/MALFUNCTION1
PHASE
RULING
CUES/NOTES/COMMENTS
COMPUTER
A MOC (IBM 360/75)
PRELAUNCH
MANDATORY
TO
PROCESS
MANDATORY
S
PARAMETERS AND TRAJECTORY DATA
PRELA'JNCH
HIGHLY DESIRABLE
A
N SSC (IBM 360/75) IS A
AS BACKUP TO THE MOC OR DSC*
PRELAUNCH
1 MANDATORY AND 1
HIGHLY DESIRABLE
PRELAJNCM
1 HIGHLY
DESIRABLE
PRELAUNCH
1 MANDATORY
A, 6US Al
PRELAUNCH
MANDATORY
UNINTERRUPTABLE
CONVERTERS
POWER
FOR
D/TV
5. BUS A2
PRELAJNCM
MANDATORY
UNINTERRUPTABLE
DATA DISTRIBUTOR
POWER
FOR
D/Tv
C. BUS El
PRELAUNCH
MANDATORY
20 SECONDS INTERRUPTAbLE
FOR MOCR AND SSR CONSOLES
PC*ER
MANDATORY
20 SECONDS
FOR VSM
POfcER
4-7
S/V
TIMING
MITE (2)
MCC POWER
PRELAUNCH
0. BUS B2
MISSION
APCLLO 11
REV
DATE
SECTION
GROUP
MCC
PAGE
INTERRUPTABLE
Center
MISSION RULES
REV
ITEM
RULE
PHASE
RULING
CUES/NOTES/COMMENTS
DISPLAY
A. MOCR D/TV
CHANNELS
PRELAUNCH
10 OF 36
MANDATORY
NO. OF
CHANNELS
POSITION
I
i
i
l
l
l
RETRO
FIDO
GUIDO
EECOM
GNC
fcTCC
BOOSTER
B. TRAJECTORY DISPLAY
'PRELAuNCH
' MANDATORY ON
D/TV
FOR CONTINGENCY
ORBIT
INSERTION
MANEUVER DATA AND TFF LIMITS.
2. GAV>*A VS V
PRELAUNCH
MANDATORY ON
1 OF 4
FROM
SOURCE.
SELECTED
TRACKING
DATA
1
(A) 10 X 20
scRibtR PLOTTER
1
(B) D/TV
(C) RTCC
1
PLCTBCARD
1
(D) SSR
1
PLCTBOARD
PRELAUNCH
i
t
4. GAMMA( El ) VS V I El )
1
1
MANDATORY ON
D/TV
MONITOR
FOR
MANEUVER DATA.
MODES
III
AND
Ifa
PRELAUNCH
MANDATORY ON
1 OF 2
(A) D/TV
(6) SSR
PLCTBCARD
1
5. PHI VS LAMBDA
'PRELAUNCH
HIGHLY DESIRABLE
CN 1 OF 2
(A) RTCC
PLCTBCARD
1
<5 ) SSR
PLOTEOARD
fc. T (FF ) VS RI IP)
'PRELAUNCH
1
1
HIGHLY DESIRABLE
C,\ 1 CF 2
IIIi
(A) D/TV
IB) SRR
PLCT8CARD
7. H VS 0
8. GA M MA(I) VS V(I)
(C'-'C DYNAMIC
STATUS)
9. wEDGE ANGLE MONITOR
PRELAUNCH
HIGHLY DESIRABLE
' ON 10 X 20
SCRIBER PLOTTER
'PRELAJNCH
'
HIGHLY DESIRABLE
' CN 1C X 1C
'PRELAUNCH
HIGHLY DESIRABLE
CN D/TV
missies
APCLLC 11
REV
SCRIBER
PLOTTER
MONITOR
FOR
L/V
AND
S/C
NAVIGATION
PERFORMANCE
(GUIDANCE
SYSTEM ANALYSIS - COMPARES CMC WITH
TRACKING)
MONITOR
NAVIGATION
HIGHLY DLSIRABLE
CN D''TV
DATE
SECTION
GROUP
MCC
PAGE
FOR
L/V
PERFORMANCE
AND
s/c
NASA
Manned
Spacecraft
Center
MISSION RULES
REV
ITEM
RULE
SECTION
CONDITION/MALFUNCTION1
4 GROUND
INSTRUMENTATION
PHASE
REQUIREMENTS
RULING
11. INSERTION/INJECTION
DIGITALS
C. ADEG CHANNELS 90-93
PRELAUNCh
D* VSV
PRELAUNCH
PRELAUNCH
MANDATORY ON
D/TV
CUES/NOTES/COMMENTS
HIGHLY DESIRABLE
FOR D/TV
MANDATORY
E. AUX VSM
F.
PRELAUNCH
EIDOPMORS
PRELAUNCH
(3)
HIGHLY DESIRABLE
2 HIGHLY
DESIRABLE
NOTE
INDIVIDUAL FLIGHT CONTROLLERS WILL BE
RESPONSIBLE FOR REPORTING LOSS OF DISPLAY
CAPABILITY CF MANDATORY PARAMETERS TO THE FLIGHT
DIRtCTCR.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
GROUND INSTR
REQUIREMENTS
MCC
PAGE-
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
ITEM
R 'RULE
4-10
CONDITION/MALFUNCTION1
PHASE
RULING
CUES/NOTES/COMMENTS
GSFC
A. GSFC U N I V A C - 494 (2)
COMMUNICATIONS
PROCESSOR
PRELAUNCH
1 MANDATORY
^RELAUNCH
1 MANDATORY
4-11
1 OF 32 CIRCUITS
HIGHLY DESIRABLE
PRELAUNCh
1 OF 32 CIRCUITS
MANDATORY
REDUNDANT
OF
LOWSPEED
KSC
TELEMETRY
A. VHF TM FROM THE
FOLLOWING FOR S'U
5-IV3t AND IU
PRELAuNCH
1. CIF ANTENNA
1 MANDATORY
B. USB IS TH CSM'S
OF DATA.
PRELAUNCH
1 MANDATORY
2. CIF USB
COMMAND
THIS CAPABILITY IS DEFINED UNDER GSFC/KSC/KSFN
COMMAND RULE 4-12 FOR LAUNCH COVERAGE.
TRACKING
THAT CAPABILITY REQUIRED TO SATISFY RULE
(TRAJECTORY) IS MANDATORY.
4-4
VOICE COMMUNICATIONS
THIS <SC CAPABILITY IS DEFINED UNDER MCC RULE 4-5
(COMMUNICATIONS),
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
GSFC/K.SC/MSFN
4-7
ONLY
SOURCt
Center
MISSION RULES
REV
ITEM
PULE
4-12
lONDlTlON/MALF'JNCTION1
PHASE
RULING
CUES/NOTES/COMMENTS
LAUNCH COVERAGE
KSC/MSFN SITES (SITES NOT LISTED DuE TO VARIABLE
LAUNCH AZIMUTH) ML-ST PROVIDE THE FOLLOWING
CAPABILITIES FROM LIFTOFF THROUGH S-IVB CUTOFF
PLUS 60 SECONDS.
REFER TO DECISION MATRIX (RULE 4-16 AND FIGURES
4-1 THROUGH 4-5) TO DETERMINE. CAPABILITY.
CKD
USB CCS
PRELAUNCH
HIGHLY DESIRABLE
S-IC (Vt-F)
PRELAUNCH
HIGHLY DESIRABLE
S-II IVHF)
PRELAUNCh
HIGHLY DESIRABLE
FROM
LIFTOFF TO S-II
CUTOFF (APPROX.
8 t 36 SEC)
PRELAUNCH
HIGHLY DESIRABLE
IU CCS (DP-IB)
iu y^.F icp-i)
PKELAUNCH
MANDATORY
HIGHLY DESIRABLE
CSM (USB)
PRELAUNCH
TELEMETRY
MANDATORY FROM
LIFTOFF THROUGH
S-IVB CUTOFF
PLUS 6C SEC.
S-IC
DATA
IS
ONLY
HIGHLY
DESIRABLE SINCE THE MCC IS NCT PRIME
FOR REQUESTING AN ABORT FOR S-IC
MALFUNCTIONS.
FOR ABORT CUtS FROM MCC
TRACKING
T H A T CAPABILITY REQUIRED TO SATISFY RULE 4-4
(TRAJECTORY) IS MANDATORY
D. A/G COMMUNICATIONS
1. "ILA
VMF
4-13
PRELAUNCh
HIGHLY DESIRABLE
USB
PRELAUNCh
MANDATORY
VHF
USB
PRELAUNCH
1 OF 2 MANDATORY
CCS
CS"
USB
MISSION
APOLLO 11
REV
PRELAUNCH
HIGHLY DESIRABLE
PRELAUNCH
HIGHLY DESIRABLE
DATE
SECTION
SEP
GROUP
PAGE
GSFC/KSC/MSFN
4-6
AFTER
S/C
Center
MISSION RULES
RLV
ITEM
RULE
PHASE
RETIREMENTS
RULING
CUES/NOTES/COMMENTS
B. TELEMETRY
S-IVB VHF
ICP-U
'PRELAUNCH
HIGHLY DESIRABLE
1U CCS (DP-16)
IU VhF
'
'PRELAUNCH
(DP-1)
1 OF 2 MANDATORY
DOWNLINKS
S-IVB DATA.
KEUUIRED
TO
RECOVEK
CSM USB
PRELAUNCH
MANDATORY
C-EAND
PRELAUNCH
HIGHLY DESIRABLE
USB
PRELAUNCH
MANDATORY
C. TRACK
D. A/G
COMMUNICATIONS
PRELAUNCH
VMF
HIGHLY DESIRABLE
i
USB
PRELAUNCH
MANDATORY
i
i
A. T.s
USB
PRELAUNCH
MANDATORY
9. TRACK
USE
PRELAUNCH
.VANDATORY
C, VOICE
USE:
PPELAUNCH
MANDATORY
USB
PRELAuNCH
HIGHLY DESIRABLE
D C D
4-15
PRELAUNCH
fi. LIMA
HIGHLY DESIRABLE
fi. CRO
CYI
1 OF 2 HIGHLY
DESIRABLE
MISSION
APOLLO 11
REV
DATE
PAGE
SECTION
GSFC/KSC/MSFN
ANU
Center
MISSION RULES
REV
ITEM
REQUIREMENTS
ITV
4-16
TO THE
CAUSE
POSSIBLE
LOSS
OF
FAILURES
CONTINUOUS
D. MORE THAN ONE X IN A ROW SPECIFIES A FAILURE OF THE SAME CAPABILITY AT MORE THAN ONE SITE.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
GSFC/KSC/MSFN
4-10
NASA
- Manned
Spacecraft
Center
MISSION RULES
RfV
ITEM
ITEM
SITES
FAILED
MANDATORY
AIDS TM MIL/CAPE ' GBM ' BDA f VAN ' COVERAGE
0 0 - 0 0 00-00 0 1 - 0 7 0 4 - 1 1 09-30 LOST
C8-49
08-49
0 9 - 1 3 1 2 - 4 2 15-32
1
1
NONE
SEE NOTE 4
I
N
G
0 0 - 0 0 TO
01-02
CAPABILITY LOST
TELEMETRY'
USB
OR
VhF
CMD
'
GO
GO
A/G
BOTH
S AND C '
'
BAND
'
N/A
TKAOC
N/A
'
'
N/A
GO
GO
'
N^-GO
NO-GO
t
E
S-IC/S-II
SEP
SEE NOTE 1
F
A
I
L
U
R
E
'
'
GO
GO
GO
GO
GO
GO
'
GO
GO
NO-GU
00-00
GO
03-56
NO-GO
GO
GO
' NO-GU
'
NU-GO
'
GO
'
NO-GO
' NO-GU
NO-GO
GO
'
NO-GC
NO-GO
GO
NU-GC
* NO-GO
00-00 TO
01-02
GO
i
I
'
i
*
t
I
GO
NO-GO
X
'
NONE
GO
i
t
NONE
00-CO TO
01-02
0 0 - 0 0 TO
01-02
X
i
I
P
L
E
>
M
U
L
T
GO
GO
'
NU-GO
'
NO-GU
GO
'
ND-GC
'
NO-GO
'
'
GO
'
NO-GC
'
NO-GC
'
GO
GO
I '
L
U
R
E
S
'
'
08-51 TO
08-58
GO
S-IC/S-II
SEP
GO
9-14
'
TO
INSR 60
GO
t
i
*
i
' NO-GO
'
GO
GU
GO
3.
LOSS OF COVERAGE
4.
GO FOR USB
GO
NO-GO
'
GO
SEPARATION.
12-21.
SECTION
DATE
APOLLO 11
GROUP
PAGE
GSFC/HSC/KSFN
4-11
MISSION
2.
NOTES
1.
'
I
Center
M I S S I O N RULE:S
REV
ITEM
ITEM
SITES
FAJLED
CAPABILITY LOST
ALDS TM MIL/CAPE
00-00 0 0 - 0 0
' C8-A9
08-4*
GBM
BDA 1 VAN
' 0 1 - 0 7 04-12 0 9 - 1 1 1
1
TELEMETRY
MANDATORY
COVERAGE
LOST
I
1
N
G
L
E
NONE
SEE NOTE 4
X
I
F
A
' I
1
L
1
U
R
1
E
1
'
'
M
U
L
T
I
P
L
E
GO
5-IC/S-II
SEP
GO
'
SEE NOTE 2
NONE
'
0 0 - 0 0 TO
'
03-57
00-OC TO
00-00 TO
01-02
NO-GO
'
N/A
'
GO
'
NO-GO
* NO-GO
GO
GU
'
GO
'
i
GO
GO
GO
GO
'
GO
GO
'
i
GO
N/A
'
NO-GO
GO
GO
'
BOTH
' S AND C
BAND
NO-GO
A/G
N/A
GO
01-02
TRACK
*
i
NONE
CMD
GO
X
f
1
USB
CR
VHF
00-00 TO
01-02
GO
* NO-GO
'
NO-GO
'
GO
* NO-GC
NO-GO
GO
NO-GC
NO-GO
'
GO
'
NO-GC
'
NO-CJU
'
GO
* NO-GC
NO-GC
'
GO
NO-GO
NO-GU
GO
'
NO-GO
GO
GU
t
t
F
A
I
L
U
R
1
E
S
X
X
00-00 TO
C1-C2
X
X
S-IC/S-II
SEP
X
1
S-IC/S-I I
SEP
GO
NO-GO
GO
GO
GO
'
* NO-GO
GO
GO
GO
>
t
t
1
1
0 9 - 2 1 TC
INSR 60
NO-GC
GO
I I
NO-GC
GO
I
*
I
NOTES
1.
ANG HAS ACCUISIT20N FROM C7-48 TO 11-20 HOwEVERf tfAXlMU* ELEVATJON IS 1.6 DEGREES,
2,
FLAME ATTENUATION WILL CAUSE LCSS OF USB LOCK AT MIL DURING S-IC/S-II SEPARATION.
At
GO FOR USB
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
GSFC/K.5C/M5FN
4-12
Center
MISSION RULES
REV
ITEM
1TFM
SITES
CAPABILITY LOST
FAJLED
MANDATORY
COVERAGE
LOST
X
i
I
N
G
L
E
F
A
CMD
TRACK.
A/6
N/A
USB
OR
VMF
NONE
SEE NOTE 4
GO
N/A
N/A
GO
GO
NO-GO
00-00 TO
01-02
TELEMETRY
'
'
'
SIC/SI I SEP
SEE NOTE 2
BOTH
S AND C
' BAND
GO
GO
GO
NO-GO '
GO
L
U
R
E
X
i
NONE
GO
GO
GO
GO
NONE
GO
GO
GO
GC
'
NONE
GO
GC
GC
CaO
X
X
00-00 TO
01-02
U
L
T
NO-GO
CO-OC TO
GO
GO
NO-GO
NO-GO
GO
NO-GO
NO-GO '
I
P
L
E
X
F
A
03-59
00-00 TO
'
X
'
'
X
X
'
'
'
NO-GO
NO-GC
GO
NO-GO
NO-GC
GO
NO-GO
NO-GO '
GO
NO-GO
NO-GO '
NO-GO
GO
NO-GO
C'O
GO
GO
GO
'
bO
GO
GO
OC
GO
GO
GC
'
GC
NO GO '
GO
'
NO-GO
00-00 TO
01-02
GO
S-IC/S-II
SEP
GO
GO
01-02
L
U
R
E
S
NO-GC
s-ic/s-n
SEP
NONE
'
12-11 TO
INSR + 60
.NO-GO
' GO
NOTES
1.
2t
FLAME ATTENUATION WILL CAUSE LOSS C c USS LOCK AT MIL DURING S-IC/S-I I SEPARATION.
3.
4.
12-21.
GO FOR USB
HOWEVER*
MISSION
APCLLO 11
REV
DATE
SECTION
DECISION
GROUP
PAGE
GSFC/KSC/MSFN
4-13
'
Center
MISSION RULES
RCV
ITEM
ITEM*
SITES FAILED
CAPABILITY LOST
TELEMETRY 1
MANDATORY
ALDS TM MIL/CAPE GBM * BDA ANG, VAN
COVERAGE
00-00 '01-06 '04-21 07-00 09-16
00-00
LOST
08-48 09-31 11-43 13-40 15-57
08-48
I
N
G
L
E
NONE
SEE NOTE 3
GO
00-00 TO
01-02
GO
S-IC/S-II
SEP
SEE NOTE 1
GO
F
A
I
U
R
E
TRACK
A/G
BOTH
1
S AND C
BAND
N/A
N/A
'
N/A
NO-GC
GO
' NO-GC
i
GO
GO
NONE
GO
GO
GO
NONE
GO
GU
GO
00-00 TO
01-02
X
X
_ ., _
V
F
A
I
L
U
R
E
S
GO
GO
NO-GO
GO
GO
S-IC/S-II
SEP
'
s-ic/s-n
'
GC
'
GO
GO
NO-GC
11-41 TO
INSR + 60
X
1
'
00-00 TO
01-02
GO
NO-GO
NO-GC *
GO
NO-GO
' NO-GO *
GO
NO-GC
NO-GC
NO-GO
GO
NO-GO
NO-GO *
GO
GO
NO-GO
' NO-GO
NO-GO
GO
NO-GO
GO
GO
GO
GO
NO-GO
NO-GO
GO
GO
GO
'
GO
GO
GO
GO
GO
GO
GO
NO-GO
GC
GO
NO-GO
GO FOR USB
'
GO
GO
DECISION
GROUP
PAGE
GSFC/K.SC/MSFN
4-14
GC
APOLLO 11
'
NO-GO
12-21*
SECTION
GO
GO
3.
DATE
INSR + 60 SECONDS IS A P P O X I K A T E L Y
'
NO-GO
2*
REV
GO
GC
FLAME ATTENUATION WILL CAu'SE LOSS OF U.<iB LOCK AT MIL DuRING S-IC/S-II SEPARATION.
1.
MISSION
GO
\CTES
HOEVER
NONE
GC
NONE
NO-GC '
SEP
X
GO
01-02
X
X
04-04
00-00 TO
X
X
'
01-02
00-00 TO
00-00 TO
'
NONE
M
U
L
T
I
P
L
E
USB
OR
VHF
CMD
'
Center
MISSION RULES
REV
ITEM
SITES
1
FARED
'
MANDATORY
TELEMETRY'
G '
L
'
I
1
X
__
'
'
,_
x
X
'
_ _ 1
'
'
'
'
'
'
'
'
'
'
N/A
N/A
GO
'
GO
'
NO-GO
GO
'
GO
'
GO
'
'
GO
GO
'
GO
GO
GO
'
NONE
'
GO
'
GO
'
GO
GO
NO-GO
GO
'
'
NO-GO
'
0 0 - 0 0 TO
01-02
'
'
'
00-00
'
GO
'
GO
'
NO-GO
'
NO-GO
'
'
NC-GO
'
GO
NO-GO
'
NO-GO
'
'
GO
'
GO
'
NO-GO
'
NO-GO
'
'
NO-GO
'
GO
'
NO-GU
'
NO-GO
'
GO
'
-GO
'
NO-GO
'
NO-GO
TO
04-11
00-00
TO
01-02
00-00
TO
'
'
S-IC/S-II
'
'
Sp
*
'
GO
GO
NONE
GO
NO-GO
'
GO
'
GO
'
'
GO
GO
'
GO
GO
'
I
'
NO-GO
_ _ i
1 1 - 0 1 TO
INSR 60
NO-GO
,__i__
S-IC/S-II
SEP
'
'
'
'
NO-GO
'
GO
'
GO
GO
'
'
GC
'
GO
GO
FLAME ATTENUATION WILL CAUSE LOSS OF USB LOCK AT MIL DURING S-IC/S-II SEPARATION.
INSR 60 SECONDS IS APPOXiMATELY 12-21.
3.
LOSS OF ALOS RESULTS IN LOSS OF S-IC TV. HOWEVER* IT IS NOT MANDATORY FOR LAUNCH.
APOLLO 11
'
GO
1.
DATE
NO-GO
GO
2.
REV
N/A
'
NOTES
MISSION
'
01-02
'
'
GO
GO
GO
'
USB
'
BOTH
i S AND C '
'
BAND
'
'
A/G
NONE
'
NONE
'
LOST
TRACK
'
'
'
CMD
'
0 0 - 0 0 TO
01-02
S-IC/S-II
'
SEP
_ I
'
'
USB
' O R
*
VhF
NOTE
'
SEE NOTE 3 '
'
'
I
i
i
LOST
CAPABILITY
SECT ION
GROUP
GROUND INSTR.
REQUIREMENTS
GSFC/KSC/MSFN
PAGE
4-15
GO
TRAJECTORY AND
GUIDANCE
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 5 TRAJECTORY ANO GUIDANCE
5-L
7 it LAUNCH M H A S E
CONDITIONS
tigti
TOWER
JETTISON.
LIMIT.
VS INCREASING.
5-2
THAN
KICK.
III MANh'JVER
COMPUTATION.
CD
IF T H CURRENT A L T I T U D E
IS T5 NMt D E C R E A S I N G AND nP
. M A X I M U M
MISSION
APOLLO 11
REV
OATE
SECTION
GROUP
/16/69
TRAJECTORY ANO
GUIDANCE
LAUNCH
PAGE
5-1
RCS
ASAP
NASA - Manned
Spacecraft
Center
MISSION RULES
SECTION 5 TRAJECTORY AND GUIDANCE
ITE*
*L 90 DEG.
TO
MAINTAIN
TFF
MANEUVER
DETERMINATION
ANO
MONITORING
FOR
ANY
OF T H E
5-6
GO"
OR
NO-GO l f
INCONSISTENT
APOLLO 11
RCV
0AT6
SCCT10N
GROUP
/16/69
TRAJECTORY ANO
GUIDANCE
LAUNCH
BEST
TRAJcCTwS^
MISSION
WITH
1JC
PAGE
3-2
NASA
- Manned
Spacecraft
Center
MISSION RULES
=>EV
ITEM
ITEM'
5-20
HP
IS
5-21
F P S
RCS
IN
ASAP.
* " ASAP.
5-22
REQUIRED
MlNuTES
PRIOR
TU
5-23
5-24
I
TIME BETWEEN EPO RtTROFIRE GETI ANO 400* MUST BE GREATER THAN 9 MIN. IF NOT. RETARGET
IF SPS RETROFIRE OELTA T8 IS LESS THAN 7 SEC. USE SCS AUTO TVC.
MISSION
APOLLO 11
REV
OATC
SECTION
4/16/69 TRAJECTORY
ANO GUIDANCE
GROUP
EARTH ORBIT
ANO TLl
PAGE
5-3
FvR
NEXT \
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 5 TRAJECTORY ANC GUIDANCE
J
i-25
*I \
POSITION C H A N G E S 3Y GREATER
T^AN 0.5 O E G L O N G I T U D E
RIOR
TO GcTI
-3-W i
3. THE CC^uTED RE^OFTRE 3CSI ICN CHANGES 3Y GREATER THAN 2 Z>G LONGITUDE AFTER GETI -2C I .\.
I
i
-2 6
5-27
IF A Gfr.N F A I L U R E
SEP
RCS.
rtORUONTAL
M T T I T U O E AND
RCS
1. BURN ^P TO -AC V A L U E
2. BURN ^AXI^UM
SM RCS
DELTA
V AVAILABLE
IN RETRO
ATTITUOE
ANO
BURN
SM
RCS
NOTE
THE S-Iva -OX DUMP CAPABILITY
MAY 3E USED TO SHAPE ThE ORBIT
FOR RET-.OFIRE MANEUVER OR TO
DEDUCE THE S-IVB WEIGHT TO
OBTAIN MORE SM RCS DELTA V.
MISSION
APOLLO 11
REV
OATE
SECTION
4/16/69 TRAJECTORY
ANO GUIDANCE
GROUP
EARTH ORttlT
ANO TLI
PAGE
5-4
USING
THE
FULLO*I.N<J
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION
5-29
THE G&N
IS NO-GO FOR
ENTRY
5 TRAJECTORY
AMC
GUIDANCE
I F
5-2=3
5-30
BOOSTER
NAVIGATION
A.
T*ERE
2.
AN
wIk
-L
ANO
- NO
WILL 8 UPDATED
A PROPERLY
5-32
5-34
TLI
ILL
THE S/C
OPERATING
SPACECRAFT
L/C RESFMMAT
DISPERSED
TLI C/O
G&N
EITHER
MISALIGNMENT
WILL
BE USED
TLI
O R BOTH TLI
THE
8EST
THE
IU ANO
PREDICTED
1.
SFN
VECTOR.
IS MANDATORY
FCR
TLI.
DEG/HR
(IU)
.
AND
1.- 1
"1
OPPORTUNiTlES.
PROFILE,
OPPORTUNITY
RATES BETWEEN
ENTRY
TLI O P P O R T U N I T Y ,
(CHCt
PRCVIDE
5-31
5-33
EOMFR
LESS
SCO * PS 1NCL-
CONTINUE
A N D
( O P S ) . LOl2t
THAN
5500 FPS
ANO
APOLLO 11
REV
OATE
SECTION
4/16/69 TRAJECTORY
AND GUIOANCE
GROUP
EARTH ORBIT
ANO TLI
PAGE
5-5
(NO
(3) EOMFR AFTER LUNAR FLYBY LESS THAN _5J^00, FPS E X E C U T E ALTERNATE
WITH FINAL MISSION PLANNING*
MISSION
TEI
MISSION
MCC
CONSISTENT
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 5 TRAJECTORY AND GUIDANCE
:S N O - G O U N T I L
P A R T S C ANO
5-36
ARE
5-36
DIFFERENCE IN MSFN ANO IU OOWNRANGE POSITION (OtLTA RV) IS GREATER THAN iDStQCC FT AT jT
^IN vANS TLI IS NC-GO.
5-*5
MISSION
APOLLO 11
REV
3ATE
SECTION
GROUP
TRAJECTORY
ANO GUIDANCE
EARTH 0R8IT
ANO TLI
PAGE
5-6
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 5 TRAJECTORY AND GUIOANCE
ITv
TH
CMC OR LGC WILL dE TEMPORARILY NO-GO FOR MANEUVER CONTROL FOR ANY OF THE FOLLOWING
IN
LGC/IMU ALlGNMtNT
COORDINATES.
DISCREPANCY
INDICATE
BY
GREATER
THAN
DEG
FROM
0. DIFFERENCE SETWEtN CMC/LGC GROUNO NAV CHEC< AFTER A NAV UPDATE FROM GROUND
PREDICTEO
COAS
IS
3E
COMPLETED
AGS
3Y
TAKEOVER
MISSION
REV
APOLLO 10 FNL
OATE
SECTION
4/14/69 TRAJECTORY
ANO GUIDANCE
GROUP
MANUAL
PAGE
MANEUVtRS
5-7
FOR
'A<CvS
ANY
T'-E I
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 5 TRAJECTORY AND GUIDANCE
ITE*
NON-CRITICAL MANEUVERS WILL 3E TERMINATED AFTER MANUAL TAKEOVER FORA. ATTITUDE EXCURSIONS IS GREATER THAN CR EUUAL TO ^10. QEG.
3* ATTITuOE RATES IS GREATER THAN OR EOuAL f0 ^10^ OEG/SEC.
C. ATTITUDE ERRORS IS GREATER THAN OR EQUAL 10 PEG.
5-50
T*E POLLOwiNG
MANEUVERS
wILL
BE
MANUALLY
TERMINATED
AFTER
VIOLATION
IN
A-AXIS.
OF
/
MISSION
REV
APCLLO 10 FNL
DATE
SECTION
4/14/69 TRAJECTORY
ANO GUIOANCE
GROUP
MANEUVERS
PAGE
NASA
- Manned Spacecraft
Center
MISSION RULES
?EV
R
SECTION
ITEM
5 TRAJECTORY
AND GUIDANCE
' ITEM
5-56
IDCOURSE
CORRECTION
NOMINAL
EXECUTION
PLANNED
POINTS
WILL
SE AT Trit F O L L O W I N G -
TRANSLUNAR
A. vcci
*CC EXECUTION
AND *CC2
NOTE
MCC3
*ILL
CRITERIA
NOT BE EXECUTED
DELTA
V IS GREATER
9. *cc3 W I L L B E E X E C U T E D
ONLY
AS LONG
THAN
IF L O I #
AS MCC3
3 EPS ENABLES
REMAINS
LESS
THAN ^25.
UTILIZATION
CANNOT BE TARGETED
(WITHIN
Ps
OF S P S .
ALTITUDE
AND
APSUAL
5-59
5-60
MQDE
WILL BE THE
5-5 8
0F
3E
(WITMJN
ALTITUOE
TAHGETED
T*i
X-AXIS
CONSTRAINTS
OF T-t NODE
(BETWEEN T H E
APORQACH
HYPERBULA
ANO
50 AND 7THE
DtSMED
-POJ
5-61
COMMITMENT TO LtAST < HRS IN LPO - (PROVIDES ONE REv OF TRACK AFTER L'Jll FOR CALCwtAT ICN CF
TEIJ .
B*
ADEQUATE FUEL REMAINING FOR SUBSEQUENT LUNAR ORBIT OPERATIONS (MINIMUM WOULD
TED .
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 TRAJECTORY
ANO GUIDANCE
GROUP
TRANSLUNAR
COAST
PAGE
5-9
BE
LCI 2 ANO
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION
R ' ITEM
5-62
5-63
PREMATURE
LCI
SHUTDOWN
A.
3.
735 LESS THAN OELTA VM LESS T*AN 1280 <100 TC 170 S E C ) - EXECUTt AN SPS -a *I,\ oinzrCR A DPS TWO-IMPULSE CIRCUMLUNAR ABORT.
-*
C.
DELTA VM GREATER THAN 1280 F P S (GREATER THAN 170 SEC TC END OF 3uRN) - c X E C u T ^ T- ' ISPs
DPS) AT NEXT P E R I C Y N T H I A N CR INITIATE AN ALTERNATE M I S S I O N .
"
EXECUTION.
5-75
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 TRAJECTORY
ANO GUlOANCE
GROUP
TRANSLUNAR
COAST
PAGE
5-10
J &3
S
- -*
-- a .
"
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 5 TRAJECTORY ANQ GUIDANCE
ITE
5-76
5-77
'GO1'
(NOTE-
5-7a
FOR
THIS
LO12
REuuIRES
PSOVIDfcS
THROUGH
ONE
COMMITMENT
?ULL
REV
OF
TO AT LEAST
< H R S IN LUNAR
TRACK
LOI2
AFTER
FOR
ORBIT.
CALCULATION
5-ao
ARE RESERVED.
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 TRAJECTORY
GUIDANCE
GROUP
LUNAR ORBIT
PAGE
OF
TEI.)
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION
5-81
PRIOR
5 TRAJECTORY
A\O GUIDANCE
*'" JLD^
UNOOCKlNG TO CORRE
5-92
5-93
RE5IDUALS
J D
A
^<ING
WILL 3c N'JLLcO
W l L l
;f3?
S L I P P
5-9 5
^DJ_WV
STJS
A.
3.
DELTA
LATITWCE
C.
DELTA
LCNGITMS
TM
FCP F A I L U R E
A,
AT
AF'ER
DC!
.-.ILL
TO A C n l E V t
u.Nt
SET OF
A :
^tAS7
Li-i) s x T
'-A', 6 000 ~T
WSS
T - A N 12002
* ; L U . d [ ' . . - I r . I ' E D
4*
AXiS.
IN T L G C WILL BE
=D:
X 800Y
CW*OF?.
FT
C
CONSTANTS
U L BE
I \ * SE**f-!'A '>
T3D
ANC A a c ^ ' A C T I O N
=^:cw
-0
T^IMVISC,
TA*\
p^Nc
- C ^ r- c;
^ESID^ALS
DIFFER
;*I*.G
A ^ C OAT-
3Y j R t A T - S
Tr-AN Z
NOTE
IN CASES OF DISAGREEMENT* Tn
JSD TC O E T E R * i N THt VALIU
5-87
THE
>-8S
LGC W I U L
BE NO-GC
MISSION
APOLLO li
C R OOI IF T N 0N80AR0 S T A T C
REV
VECTOR
DIFFERS Fqgv. T M L A T E - T
OATE
SECTION
GROUP
/16/69
TRAJECTORY AND
GUIOANCE
DESCENT
PAGE
5-L2
^SFN vtCTw,5 =-
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION
ERED DESCENT
FAILURE
wlLL
5 TRAJECTORY
2E TERMINATED
Q INCORPORATE
LANDING
ANO GUIDANCE
FOR VIOLATION
RADAR
ALTITUDE
OF TH FOLLOWING
DATA BEFORE
L R CONSTRAINTS
L * ALTITUDE
EQUALS 1 3 ,
NOTE
L* rflLL NOT 3 INCORPORATED I c T- -G.\S/
ALTITUDE DIFFERENCE ;S GREATER T^AN T H
3REVISSIC.N SPECIFIED LI^IT J L I ^ I T IS A
p
U N C " I 0 N OF A L T I T J O E CARRIfQ AS cREw C^A
LR
AlLwRE
C w E R E 0 DESCENT
A.
5.
C.
VIOLATION
f
Al.uR
AFTE^
INCOROCRATIGN
IuL
8E TERMINATED
OF APS A3CRT
TO ENTiR
AND PRIOR
PCR-
PCjNDARv,
GNS
TO C O N V E R G E N C E .
NAVIGATION
iC-
IN A G S 3 C \ S
RES-jLr IN
VELCCI"V
DIFFERENCES
VELOCITV DIFFERENCES
T-AT vI-LAT?
>AT
.1CLAT:. T-i
NOTE
=?ULS C A N D D A R E V A L I D O N L Y P R I Q * T O
-ANOING RADAR VELOCITY INCORPORATIONS.
-CR S U L E C. S^ITCrtCvE-^ TO AGS W I L L 3t
PERFORMED.
JR
^ . > !
MISSION
APOLLO 11
REV
OATE
SECTION
/16/69
TRAJECTORY
GUiOANCE
GROUP
ANO
CESCENT
PAGE
,,j
-i\i j
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION
A.
5 TRAJECTORY
AND GUIDANCE
DCI F A I L U R E S
DIRECT RETURN ABORTS *ILL *E PERFGRMtO r-tNVER POSSIBLE
FOR
.ILL CAuSE PO.ERED DESCENT TO 9E I N C I T E D . (DIRECT ABORTS CAN 2 pcRFGr"ED
* I N u T E S . T- RR IS MANOATCRY FCR r - E S ABORTS.)
NOTE
FOLLOWING DQit T H OG,\S AND AGS a I LL 3E
C O M P A R E D . IN CASE OF DI SAGREEvt- NT , T M E RR
ILL 3c uScD - O K SvSTEv VALIDATION*
=>NGS -AIL - DIRECT
ACS -AIL
- DIRECT
RR FAIL - FIVE
RETURN.
RETURN.
IMPULSE
RENDEZVOUS.
T 3-i/fc M O U R S .
INSERT
lt,7Q
UINAK
^alT
-S
^ ^ j
VARIABLE T A P G c ^ j . RbNCECvCuS W I L L 5E ACCw^^LlSrEJ by A L.V
COCKING *ILL 3E IN ABOUT 5-1/4 H O U R S FRC.V INSERTION.
E.
ES 5 - 9 \ THROUGH 5 - 1 0 0
WILL
EXECUTE
ACTIVE
FivE
ARE RESERVEO.
MISSION
APOLLO 11
iCTION
'16/69
FivE
)ESCENT
5-U
ivo.
IMO.JLvt.
-. -
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 5 TRAJECTORY ANO GUIDANCE
5-101
LM LIFTOFF WILL 3E DELAYED ONE REVOLUTION R A T M R THAN ACCEPTING A SLIP IN NOMINAL LlFrjFF T ; M P ,
5-102
DURING ASCENT OR FALLOWING A DESCENT ABORT. GUIDANCE SWITCHOVER TO AGS * ILL 3 PERFORMED FZR
A.
3.
IN
5-1C3
J^L7
DEG.
^w GROUNO WILL NOT REQUEST SWITCHOVER AFTER TGO LESS THAN 3 SECONOS.
ES 5-1)4 THROUGH
5- 10 APE RESERVED.
1ISSION
APOLLO 11
*ev
>ATE
16/69
iECTION
1ROUP
TRAJECTORY ANO
iUIOANCE
kSCENT
'AGE
5-13
NASA
- Manned Spacecraft
Center
MISSION RULES
?S:Y
I TEM
ITc"
5-111
ACCEPTED S O L U T I O N * 1
HM A N u V
5-112
5-113
5-114
0H
^
E TPI
ON WILL NOT BE U S O
FROM
SOL-T:CN
SO
A.
3.
C.
FROI* >O0
3E 15 /- N M ,
5-115
MISSION
APOLLO 11
IEV
>ATE
bACKuP
SECTION
/16/69 rRAJECTORY
iUI DANCE
ROUP
>AG
IENDE2VOUS
5-16
NASA
- Manned
Spacecraft
Center
MISSION RULES
SEC T IQN 5 TRA-ECTORv
AND GUIDANCE
ITEM
5-121
TRANSEARTH
A.
IF VEI GREATER
3.
I? vEl LESS T H A N
5-122
5-123
TRANSEARTH
LlNt.
TAROET
ulNE.
*IL0SCPMY.
IF GAIV!MA EI is O U T S I D E T H E E N T R Y C O R R I D O R , E X E C U T E * C C A S A P
C.
D.
E.
^CC GREATER
THE
TEC
NO LATER
THAN
yGOE OF EXECUTION
TMg LANuING
POINT
IS UNACCEPTABLE
(EXCEPTION
vccs O N L Y :
EJ-3 MQURS.
F^R ALL TC * C C
RESIOUALS
FOR
C C COR WANOINCJ
^CCS
AREA
WILL
BE
TRIMMED
TO
WITHIN
0.2
-OS
IN
EACM
AAIS.
CCNTSGL
PRIOR TO E I - 2 * -RS
-ILL 3E EXECUTED FgR RECOVERY ACCESS V I O L A T I O N S . uNACCEOTABLc
AT I P , OR IP ANr PART OF r n OPERATIONAL FOOTPRINT IS UN L A N D .
AFTER
ENTSv
5-126
30GC0 rOS
A,
i.
5-125
MCC
THAN
9.
A.
V C C I U d TARGETED
Ei-2< H R S W I L L
CONDITIONS
3AC<U ENTRY
NOT SE EXECUTED.
l'-L BE CONTROLLED
is CONSTRAINED
A.
THE CONSTANT G E N T R Y
9.
EMS RANGING
0 AVOID H A T
SHIELO L
AS F O L L O W S
vyST F A L L
THAN
2550C e P S .
ISSI ON
DATE
APOLLO 11
W16/69
GROUP
SECTION
ANO
GUIDANCE
UNLESS T H E Gfr.N IS C P ^ K A T I N A L .
FKANSEARTH
ENTRY
5-1?
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 5 TRAJECTORY AND GUIDANCE
R
ITEM
5-127
PREDICTED
ENTRY
COKSIOQR
VIOLATION
A.
B#
CONSTANT^NTRYE
5-128
EMS
X C
E D
G R O u N O
AOVlSE CREw
LRUSS
LIFT u N T U
TO FLY N E G A T I V E
LIFT S H Q U L J
uIFT
CONOlnON
ENTRY
EMSTS>
Is
TO 2 G'S FQLLO*ti
36 ACHIEVED
FULL L I F T
TnE GROUNO B
CAUSES
TRAJECTORY
TQ VIOLATE
CAUSES
GREATER
TRAJECTORY
TO VIOLATE
PRIOR
TO V E R I F Y I N G
SMOUL0
THAN
THAN
*/- _aO F P S .
/ - C.6 GS
(SKIP) ON EMS S C R u L L .
13) ON MS S C R O L L .
FROM
THf HORIZON M O N I T o f t
VALUES
BY GREATER T - A
MISSION
APOLLO 11
ATT IT DE
W
T H A N J5_ D E G .
T H E C
I F
TC
PEA*
CHcCfCS.
5-129
5-13C
AFTER
W16/69
SECTION
GROUP
TRAJECTORY AND
GUIDANCE
TRAMSEARTH
ENTRY
PAGE
5-18
T^E
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 6 - SLV - T3I THROUGH ^Q^/TQUA
TEM
s-ic
LOSS OF THRUST
6-2
6-3
6-4
6-7
S-II LOSS OF T H R U S T
6-8
6-9
6-10
6-11
S-IV3 LOSS UF T H R U S T
O THIS
SECTION
NONE
MISSION
APOLLO 11
REV
OATE
SECTION
GROUP
PAGE
6-1
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION
. 3SE GENERALISED S W I T C H
!
SLV
TQI
THROUGH
TB</T8<*A
'
IN ITEM 0)
PHASCS.
/-['-
HAZARD
GUIDANCE
CUTOFF,
PHASE
s-ic
L C S S OF T H R U S T
6-7
S-II
-CSS QF
6-8
6-9
THRUST
ff
AUwRE
(INBOARD)
6-10
6-11
7-8
S-II/S-IV8
6-7
S-II
^A ILurtE-ATTITuDt K&FERENCE
N
MISSION
APOLLO 11
REV
OATE
SECTION
GROUP
PAGE
6-2
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 6 - SLV -
T3I THROUGH
TB</T3<*A
INSUFFICIENT
7 8
PROPELLANTS
LOSS OF ATTITUDE
7 H
CuTCFF
7 22 S-IV8
FLUID
8 1
INERTIAL PLATFORM
9 5
S-IV9
8 6
S-IV3 ACTuATCR
ERGE\CY
^. iPA SCSAFT
R
7-^.
'
FAILURE - ACCELEROMETER
SEPARATION
SEPARATION
CONFIRMED
L G W PRIOR
HAROOvER
BURN
RE-^IRED
UR TLI INHIBIT
* I LL BE
U UNLfcSS CwMMANO
ACTi-'N I b
- "WW.CA I N G -
w-2
CW.NT:\JOL=
7-i* S-Iva
PSIO
VNT S Y S T E V
STAG C O ^ M C N
3U-<HA0
7-13
LOw COLD H C U I L M
wO*
^-2J
8-7
uOx
SPHERE
OELTA
TA\< JWLAG:
SE=ARATIW\
CuTCFF
TO CLOSE
< C V S ) REGULATOR
7-1?
EMERGENCY
TO SECCNO
CUTOFF
CONTROL
7 16 S-IVB
OF TLI GUIDANCE
INSERTION
FAILS TO OPEN
PRESSURE ^ E A C H E S
l\ T35
OR
EXCEEDS
-36
OR -2b
PRESSURE
PRESSURE
3
RSSuR C U ' S U E
RESTART
uIvITS
C^OSc
KEUUIRED
MISSION
APOLLO 11
5ATE
SECTION
SLV - TBl
THROUGH TB*/TB*A
GROUP
Tn a
S-PAKA:7ON
ANO
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 6 - SLV - T3I THROUGH TB4/TB4A
R 'RULE
6-1
CCNOITICN MALFUNCTION 1
PHASE
'LAUNCH
RULING
'
CUES/NCTES/CCMMENTS
A. CONTINUE MISSION
CUES
A. A.NY
ENG;\E
B. CONTINUE MISSION
PRIOR TO
'
'
: ABORT
9SE INFORM FLIGHT
CF TWO ENGINES'
AuTC ABORT
'
A8ORT
3.
LONGITUDINAL
2* CONTINUE MISSION
BSE INFORM FLIGHT
ANO FIDO* CAPCCM
AOVISE CREW
CF POTENTIAL
OVERRATE CONDITION.
'
LAUNCH
C. CONTINUE MISSION
ENGINE 3 OR (.
{THIS 3UL
APPLIES ONLY FOR
7*E UNIUUE CASE
OF ENGINE 3 OR 4
THRUST LOSS
BETwEEN 0 TC *5
SEC)
1. VOICE COMM
vITH RSO
-'
4.
FINAL THRUST CK Cjr-FF
<<52-lI5 THROUGH <56-ii5).
ABOHT
c. LOSS OF THRUST -
ACCEL=<A7 I c.\
ZERO (A2-6C3).
AFTER
'
uEACTIVATICN '
OF TWO ENuINtS'
AUTO
ZK
2.
THRUST CHAMBER P ^ E S S W K S -_i
THAN 5OC
PSiA
!J8-1J1
T.-RCjGrr
THRUST
(K33-U5 THRCuGn ^4
TO TS3
1. THRUST C H A M B E R PRESiu
THAN 500 SIA (08-103. 03-iG
2. ENGINE 3 OR ENGINE *
QIC SWITCHES OFF CJC39-lls.
.JA)
FLIGHT CONFIRM
NUTES
1.
RSO . wQCP
BACKUP TO PL.
REV
OATE
SECTION
GROUP
\|
Hi
CR
FQ
-ZQP
I
2.
CONFIRMATION CF ',c --t^ ^
*NC*N ANOMALIES WILL 3E 5ASEC C.\ J
ENGINE CHAMBER PRESSU^t ABOVE
52*:
PSIA ANO HCLCING
. PLIGHT CONFIRM
ENGINE 3 OR 4 CUT
ANO NO OTHER KNOWN
ANOMALIES 3Y LITE
ACTIVATION.
2. NO VOICE CO**
WITH RSO
APOLLO 11
-3;
CUES
MISSION
PAGE
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 6 RULE
ONOITICN/*ALFUNCTIGN
6-2
LOSS OF ATTITUOE
CONTROL
SLV -
TBl THROUGH
T8<*/TB<*A
RULING
PHASE
CUES/.NOTES/COMMENTS
LAUNCH
A,
CUES
ANGULAR
1.
A. S-IC 3URN
3ATES
-IT
2
3.
AwERT
wCSS
JF
ATTITUDE
(Set NOTc A . 2 ; ,
A.
NCTE5-
CRE ABORT
(AJ
PITCH ANC. Y A W ' A T ;
I N U S ** DEG/StC
IB)
DcG/SEC
ROLL RATE
=>uUS Zn
?LwS
Zn
"lx^$
I*
(C)
P I T C H . Y A w . OR
i-Lh
P L U S OR >*INUS b DEG ANC J - S A L L
a
P PLUS OR MINUS 32 S I D
ERRL
WLTA
2.
wOSS
OF
ATTIT^ji
ZZ\:**~
ALRT
# IL*.
6E
uivE/FCK
7rc
FOLwOwING CONDITIONS
LVuC'LViiA
(A)
FAILURE
18)
GREATER
ATTITL-CE
THAN
:C)
FAILURE TO
GUIDANCE SEQUENCE
(0)
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
ERKOR
LuS OR VIN^S
SIGNALS
5 DG.
INITIATE
^ROPt^
S-IC
ENGINE
ACTwATQR
EH GREATER T'-AN - u i wS v I Nci
PAGE-
6-5
NASA
- Manned
Spacecraft
Center
MISSION RULES
3EV
R
I TE.V
RULE
CNOITIC,N/MALFUNCTICNI
6-2
(CON T)
8. S-II BURN
PHASE
RULING
'LAUNCH
CuES/NOTES/COMMENTS
*8-o02)t OR -iOLw
GREATER
THAN
a
DECREASING.
2.
<~6-oi<:. -.12-bw2;
:c/SC
-Nw
NC "
PLATFORM
G;M8AL
ANCUEG
PITCH.
YAW
OR
RCL' -6C-6C2J
CHANGING AT THt RATES GiVtN
l\ C J 5.1.
3.
-OSS OF ATTITUuE
ALERT tScE NCTfe 5 . 2 ) .
3.
NUTtS
i.
'. A :
'. TC.-i ANC
viNwS 10 DG/SiC
C3.NTRC-
A - -< A 7
- -w i
,t
-EG/SEC
2.
LOSS
OF
AT*IT^WE
LVDC/LVDA
.3?
GMEATER
ATTITUDE
RRCf<
SISN^.Ti-tAN PLUS OR M l N u S ? JE'G
I N I " I A Tl
C. S-IVB 3U*N
'LAUNCH
C. LAUNCH V E H I C U E A80RT
3SE
INFORM FLIGHT
'
Gv-iJANCE
ScuuENCi
i o j
MARDOVER
5 CcG
s-ivs
GRSATi.R
c.
* *N
iw!-
^0*
=rr:?:
CUES
AND FIDO.
'
CAPCOM INFORM C3EW
OF LOSS OF ATTITUOE 1
CONTROL.
i.
ANGULAR
R 8 - 6 O 2 1 OR R O L L
GWEATER
THAN
5
DECREASING.
' A
( R6-6C2.
y cG. SEC
au-6C
AND
'
2.
PLATFORM GIM8AL A
PITCHt
YAto.
OH
3CLJi
CHANGING AT T H RATES G I V E N
C.I.
3o
ALERT
C.
1*
L^SS OF ATTITuOi
EE NOTE C.2;.
NOTES
CREW ABORT
LIMITS-
A
PITCH ANO Y A * RATE
MINUS 10 O&G/S&C
PLwS
OR
*I.NuS
20
2.
LOSS OF ATTITUDE
CONTROL
ALERT *ILL
3
GIVEN
FOR
'nt
FOLLOWING CONDITIONS
J
MISSION
3ATE
SECTION
APOLLO 11
fc/16/69
5LV - T81
THROUGH TB^/TEUA
GROUP
PAGE
b-6
Center
MISSION RULES
SECTION 6 q
PHASE
SLV -
RULING
CwES/NGTES/ COMMENTS
'
IA)
'
1
1
LVDC/LVOA
COMPUTATIONAL
FAILURE
THAN
LUS OR M I N U S
9UU.j
3.2
0E_
: >
!
i
i
'
'
:o
FAILURE
TO
INITIATE
S R C P E ^ '
GUIDANCE SEQUENCE
6-3
INERTIAL PLATFORM
FAILURE ACCELEROMETER
'LAUNCH
'
CONTINUE MISSION
3SE INFORM FLIGHT ANO
eIOO
CAPCOM AOVISE CREW OF
PROBA8LE OEGRAOED ORBI T .
'
'
1
1
CuES
: GUIDANCE STAT-jS
CCDc 2<O (H60-503*
BITS 026 ANO 02 5
TO 'ONE1
> MCCI-
JC* '
j
JT '
1
1
NOTES
LVDC
1
1
1
1
SwITCnEC
TO
3ACXL.-
0R
'
'
'
i
!
NO
EFFcCT
ON
vnIC-TRAJECTORY DURING 5-IC STA^t fj*\.
PROFILE
;
C3 Z Av.CE;. iT
TC 'ONE'
CONTINUE MISSION
9SE INFORM FLIGHT AND
REC0MMND SPACECRAFT
GUIDANCE TAKEOVER*
'LAUNCH
'
v--.;
LAUNCH VEHICLE
INERTIAL PLATFORM
FAILURE - ATTITuOE
REFERENCE
-^o
-A;.-
AXIS
.wiiNw
r. "
*-c
C2
'
:
*. GuIDANCt REFhStNCE A : . ^ ;- j
* 0^ 0 6) 'CDE CCO 26 zl~ ~2 iT '- iCNE (H6G-603)
S
G I M C A L i&T *_
i
i
NOTES
i
i
MISSION
APOLLO 11
*EV
)ATE
'
'
SECTION
k/16/69 LV - TBI
THROUGH TB4/TB*A
iKOuP
Ac
-Aue
,-7
NASA
TEM
RULE
- Manned
Spacecraft
Center
MISSION RULES
SECTION 6 - SLV - TBI THROUGH TB*/TB4A
!
CONDITION/MALFUNCTION
HASE
'
RULING
CUcS/NOTES/COMMENTS
R U L E \ U * B E R S 6-5
r
-ROUGn 6-6 ARE
RESERVED.
t
6-T
LAUNCH
'
A. CONTINUE MISSION
1
8SE INFORM FLIGHT
'
ANO FIDO.
A.
CUES
1.
THRUST
OH
SWiTCrttS- CF(X235-201 THROUGH
2C5,
KZSb""* *
T H R C U G H 2C5).
2.
THRUST CHAMBER PRESiuHt- Z - % C
1013-201 THROUGH 205).
3.
LCNGITuOlNAL
A2-603J
B. CONTINUE MISSION/ABORT1
'
1
1
1
1
1
C. ThQEE CR MORE
ENGINES CUT
2. A80RT
3SE INFORM FLIGHT
ANO FIOO ANO
TRANSMIT ABORT
REQUEST
'
C. ABORT/EARLY STAGE/
CONTINUE MISSION
'
1, ABORT
3SE
'
1
1
*LlGhiT
T*Q ENGlNcS
OUT
;C-C3 A
A.3)
.* 1
\
i
2.
COMMANDED
ANGLES
A.\J
Zl"
ANGutS (n60603J
i
INFORM
1.
A.2f
'
'
1. CONTINUE MISSION
3SE INFORM F L I G H T
ANO FIDC.
>
1. PRIOR TC 3-ivS
T
C CR8IT
CAPABILITY
CUES
'
2. IF THE
DIFFERENCE
IN CCMMANOEO
ANGLES ANO
JIVAL ANGLES
EXCEEOS >O DEG
IN =ITCH CR vAw
a.
A C C E L E R A T 1 -N }
.
C.
CwtS-
1. *i-RE CR M CRE
(CwES A,l A . 2 A.3)
\%ii\^S
w-.n
'
. 2* EARLY STAGE
j
I
I
1
3, AFTER LOW
^EVEL SENSE
(A) 3 CS *
ENGINES
CUT
j
1
(3) ALL .
ENGINES
CUT
BSE INFORM
FLIGHT ANO
ricCOMMgiso E A R L Y *
STAGE.
'
BSE INFORM
FLIGHT
MISSION
APOLLO lil
REV
'
)ATE
SECTION
GROUP
PAGE
6-8
NASA
- Manned
Spacecraft
Center
MISSION RULES
SC T ION 6 - SLV - T3I THROUGH ~3<W73*A
RULE
6-9
CCNDITION/MALFUNCriC.V
OMAE
'LAUNCH
'
'
RULING
CwES /NOTES/COMMENTS
'ABORT
CUES
1*
'AW -iC7uATOR
POiiT,
CEEDS - 6 OEG iGa-2Si ^nriZ^tjr
Z
I TCM
AC7;jA FC^
2.
AOJACL.NT
CONTROL
ACTUATOR IN SA^E L A N
vicvcb
3EG iNBOAftO
(iAM MEAiuKc^
CUEi I ANO 2)
NOTE
CRE* SHQuLU AdQRT AS S
PCSiI8L AFTER MAWFW.NCT: ON ^sl
PRECLUDE s-XCESSIvE * - R V A L P
IN T M AFT INTERSTAGE.
' LAUNCH
'ABORT
AT T83 31
SEC
CUES
1.
SECOND
PL.HNE
INDICATION
SHOWS
NO
IM86-206* M87-2O6)
!
GUIDANCE
CODE
25 9IT
'.H6Q-60 3) .
MODE
D15
*UAO
RE*Al
2.
IGNITION
BUi: V - u 1
MAP.S
AT APPHCXI.MATELY
ic
(M125-2Q7J.
NUTES-
THfc C A E *
iHCLLw
6-10
SPACECRAFT SEPARATION
BSE INFORM FLIGHT ANO
FIDO ANO RECQMMENO \0
S-IVB START.
1* HYORAULiC RESERVOIK
APPKQX ZE^O PERCENT (L7-<.oi
2.
HYORAULIC
SYSTEM
PRESSURE
-ESS "AN 17QQ PS I A C I *C2 ) .
CUES
3
MYORACwIC
RtjC.^V-Irt
JR
SURE APPROX ZERU PSiA lD*2-<03).
NOTE1.
L7-<03 PLUS ONE OF T-e OT"Er<
CUES ARE REUUlKtD FOR IMPLEMENTATION
OF
MISSION
APOLLO il
REV
DATE
SECTION
GROUP
THIS RULE.
PAGE
6-9
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 6 - SLV - TBI THROUGH TB4/TB4A
! TEM
CONOI TIC\/vALFyNCTlC,V
PHASE
RULING
CuES/NOTES/CG
6-11
CUES
i.
A. p AlLS TO ATTAIN
THRUST OR PREMATUR
SHUTDOWN PRIOR TO1
OBTAINING PARKING1
S.
ORBIT
P A I L S TO A T T A I N
T H R U S T OR
PREMATURE
MISSION
DATE
APOLLO 11
SECTION
GHOUP
THRUST
ZERO (Dl-<*01 ) .
THRUST
OK
)
3 L'JNGITUOINAL
ZERO (A2-6G3W
*
25*
BIT
ACCELERATION
TB5 IS INITIATED,
02
SET
TO
0N
MOUfc
(H6W-603J.
PAGE
6-10
-:LV
- Ta5 A N r
T3 7 (COAST)
>
iNASA - M a n n e d
Spacecraft
Center
MISSION RULES
i TEM
SECTION 7 -
SLV -
ITEM
7-1
INSUFFICIENT PROPELLANT
7-2
RESERVED
7-3
7-4
7-3
7-6
7-7
7-8
7-9
7-10
7-11
7-12
RESERVED
7-13
7-14
7-15
7-16
7-17
7-18
7-lt
7-20
7-21
PU VALVE FAILURE
7-22
7-23
RESERVED
7-2*
RC5ERVED
7-23
7-26
7-27
7-28
7-29
RESERVED
7-30
RESERVED
MISSION
APOLLO 11
REV
DATE
SECTION
NONE
GROUP
Center
MISSION RULES
3EV
ITEM
'RULE
7-1
PRIOR TO RESTART*
INSUFFICIENT
PROPELLANT REMAINS
FOR ACHIEVEMENT OF
TLI SUIOANCS
CUTOFF
PHASE
EARTH
ORBIT
CUES/NOTES/COMMENTS
NO 3-IVB RESTART
CUE
PROPELLANT
REMAINING
AS
ASCERTAINED
DURING
REAL-TIME
MONITORING EVALUATIONS*
CUES
1*
MAIN
I 04-401>
EARTH
0R81T
FUEL
VALVE
POSITION
A* CONTINUE MISSION
BSE INFORM FLIGHT ANO
CCMMANO (ASAP)-
2*
MAIN
(KU8-401W
FUEL
VALVE
OPEN
1* PHEVALVES ANO
3.
FUEL
IF2-401).
REC:RC SHUTOFF
VALVES CLOSEO
(SEE NOTED
2. ATTEMPT TO CLOSE
MFV
4*
(F5-401)
FUEL
FLQWM6TER
RECIRC
FLOWRATE
FLOWRATE
NOTES
IF SUCCESSFUL BSE
COMWANO
3* PREVALvE ANO RSCIRC
SHUTOFF VALVES
OPEN
SECOND 5-IVB
CUTOFF
TLC
B* CONTINUE MISSION
BSE INFORM FLIGHT ANO
COMHANO
1* PREVALVES ANO
RECXRC SHUTOFF
VALVES CLOSE
2* ATTEMPT TO CLOSE
MFV
WHEN S-rvB IS AT
PROPER OUMP ATTl[TUQE.
BSC C O M M A N O
3* PH(VALVES ANO
RECXRC SHUTOFF
VALVES OPEN
MISSION
APOLLO 11
REV
0AT6
SECTION
SLV - TBS
ANO TB7
GROUP
PAGE
7-2
Center
MISSION RULESREV.
ITEM'
R 'RULE CONDITION/MALFUNCTION*
PHASE
RULING
CUES/NOTES/COMMENTS
7-4
EARTH
'ORBIT
A. CONTINUE MISSION/NO
S-IVB RESTART
1
1
'
1
'
1
CUES
J
!
'
BSE INFORM FLIGHT ANO
COMMAND (ASAP)
'
1
1* PREVALVES AND
RECIRC SHUTOFF
VALVES CLOSED
2.
MAIN
(K120-401U
*
(F1-4O1).
LOX
OXIDIZER
FLOWMETER
POSITION
VALVE
OPEN
FLOWRATE
NOTES
2. ATTEMPT TO CLOSE
MOV
IF SUCCESSFUL* BSE
COMMANO
3. PRSVALVE ANO
RECIRC SHUTOFF
VALVES OPEN
<
IF MOV CANNOT 3E
CLOSCO* RECOMMEND NO
S-lVi RESTART
'
2.
THIS FAILURE WILL 9ECUIRE
T
EVALUATION OF LOX
RESIDUALS
O
DETERMINE ADEQUACY FOR TLI VELOCITY
CUTOFF (REF FMR 7-1)
B*
SECOND BURN
CUTOFF
> TLC
'
MISSIOM
APOLLO 11
B. CONTINUE MISSION
REV
DATE
l PREVALVES ANO
RECIRC SHUTOFF
VALVES CLOSEO
*
'
Z ATTIMPT TO CLOSE
MOV
AT INITIATION
OF LOX DUMP*
BSC C O M M A N O
'
'
It PRfVALVES ANO
RECIRC SHUTOFF
VALVES OPEN
*
*
SECTION
OftQUP
PAGE
7-3
Center
MISSION RULES3EV
ITEM
'RULE
7-3
lONOITION/MALFUNCTION*
PHASE
'
RULING
CUES/NOTES/COMMENTS
CUES
1*
THAN
A. PROPELLANT
DISPERSION
SYSTEM NOT ARMED
A* CONTINUE MISSION
8SE INFORM FLIGHT ANO
RECOMMEND RSO SENO
SAFE COMMANO
PROPELLANT
OISPERSION
SYSTEM ARMED ANO
RSO HAS NOT SENT
MFCO
3. SPACECRAFT SEPARATION
1. RECOMMENO
SPACECRAFT
SEPARATION TO A
SAFE DISTANCE
(7000 FT).
2* WHEN SPACECRAFT HAS
REACHED A SAFE
01 STANCE.
RECOMMENO RSO SENO
SAFE COMMANO*
5* . RSO DISPLAY
SYSTEM STATUS.
NOTES-
ANO
COHMANO
EARTH
S-lVB STAGE COLO
ORBIT
HELIUM SHUTQFF
VALVES FAIL TO CLOSE
AT
A. TB9 1*4 SEC
IS
THIS
CUES
1
COLD
HELIUM
REGULATOR
01SCHAROS PRC&SUAi GAEATSA THAN 200
PSIA (00103-403)
A. CONTINUE MISSION
NO S-lVB RESTART
2
LOX
(00179-404
TANK
ULLAGE
PRESSURES
REV
DATE
SECTION
GROUP
2*
ACTION REQUIRED TO AVOID
EXCEEDING LOX TANK OVERPRESSURE Oft
BULJCHEAO POSITIVE DELTA
PRESSURE
LIMITS (FMR 7-14). 3 SEE FMR 7-18
FOR RESTART CRITERIA FOR OFF-NOMINAL
COLO HELIUM PRESSURE*
Center
CONOITION/MALFUNCTION*
7-7
S-IVB AUXILIARY
HYDRAULIC PUMP FAILS
A TO TURN OFF AS
SEQUENCEO
PHASE
RULING
CUES/NOTES/COMMENTS
CUES
EARTH
ORBIT
A. CONTINUE MISSION
SSE INFORM
FLIGHT ANO
2.
RESERVOIR
PERCENT (L7-403U
A80VE
LEVEL
BELOW
CURRENT
50
'
ABOVE
4.
HYDRAULIC
RESERVOIR
PRESSURE GREATER THAN
137
(042-4031.
OIL
8 CONTINUE MISSION
AS SEQUENCEO
ANO THE
HYORAULIC
FLU 10 TEMP IS
BELOW OR
PREOICTED
TO DROP BELOW
10 DEG F
BEFORE NEXT
STATION AOS
AT TB4 3
MIN 39 SEC
CUES
50
AT
CURRENT
SECTION
GROUP
THAN
OATE
1700
TLC
Mission REV
APOLLO 11
BELOW
PAGE
7-*
NASA - M a n n e d S p a c e c r a f t
Center
TEM!
R RULE
CONDITION/MALFUNCTION*
PHASE
RULING
CUES/NOTES/COMMENTS
LOSS OF ATTITUOE
CONTROL DURING
CUES-
A. I. ANGULAR HATES
PITCH
<R*-602. R13-602J OR YAW
(RS- 602
RI-*02). GREATER THAN 0.3 QEG/3EC
ANO
NOT
DECREASING.
ANO
3CLw
<R6-*02 fU2-602> GREATER THAN C.5
DEG/SEC ANO NOT DECREASING
EARTH
ORBIT/
TLC
A, SPACECRAFT GUIDANCE
TAKEOVER
BSE INFORM FLIGHT AND
RECOMMEND SPACECRAFT
GUIDANCE TAKEOVER
IF UNSUCCESSFUL* BSE
RECOMMNO SPACECRAFT
SEPARATION
2. PLATFORM GIM3AL
ANGLES
PITCH. YAW.
OR
ROLL
(H60-603J
CHANGING AT RATES CORRESPONDING TO
THOSE IN CUE i
3. LOSS OF ATTITUOE CONTROL ALERT
(SEE NOTE 2)
B* TB* TO TB6
MIN 20 SEC
TLI
B. TLI INHIBIT
BSE INFORM FLIGHT ANO
RECOMMEND TLI INHIBIT
AFTER TB7 13
TLC
C CREW DISCRETION
BSE INFORM FLIGHT ANO
FIDO
1.
ANGULAR
RATES
PITCH
R12-*C2>
ANO NOT
TLC
0* AFTER TBt
INITIATE
O# CONTINUE MISSION
LVDC/LVOA
(8}
SIGNALS
ABNORMAL
(C) FAILURt TO
GUIDANCE SEQUENCE
COMPUTATIONAL
ATTITUOE
ERROR
INITIATE
PROPER
MISSION
APOLLO 1 1
ICV
)ATC
SECTION
ILV
- ret
MO TBT
7-4
Center
TEM
'RULE 'CONDITION/MALFUNCTION1
7-9
PHASE
CONTINUOUS VENT
EARTH
SYSTEM (CVS)
0R8IT
REGULATOR FAILS TO
OPEN IN T85 (TB5
59 SEC)
RULING
CUES/NOTES/COMMENTS
'CONTINUE MISSION/NO
'S-IV8 RESTART
BSE INFORM FLIGHT ANO
1 ATTEMPT TO OPEN CVS
'RELIEP OVERRIDE SHUTOFF
VALVE
1
i
J IF UNSUCCESSFUL B S E
2.
VENT THE LM2 TANK
1
PRIOR TO TB6 TO A
'
VALUE BELOW THE
1
PRESSURE REQUIRED FOR
1
TB4 INITIATE
i
'3*
ULLAGE ENGINES ON
i
'AFTER 90 SEC OF ULLAGE
iSEND
CUES
1
CVS NOZZLE
(Olfl-409* 0182-409).
2
13
3
17
CVS
LM2
REGULATOR
ULLAGE
PRESSURE
CLOSED
PRESSURE
EARTH
ORBIT
7-10
'CONTINUE MISSION
CUES
! ULLAGE ENGINE THRUST CHAMBER
PRESSURE GREATER
THAN
90
PS IA
(D22O-*14* D221-41S).
7-X1
EARTH
ORBIT
TLC
'SPACECRAFT SEPARATION
CUES
LVOC FAILURE
NOTE
THIS CONDITION WILL RESULT IN
LOSS Of SEQUENCING ANO PITCH ANO YAM
ATTITUDE CONTROL*
MISSION
APOLLO 11
ICV
DATE
SECTION
ILV - TBS
M O TB7
GROUP
AGt
7-7
Center
MISSION RULESREV
ITEM
7-13
PHASE
RULING
CUES/NOTES/COMMENTS
A CONTINUE MISSION
CUES-
ALL
1
WATER
VALVE
<G3-601 G6-60D*
A* MATER VALVE
CLOSED ANO
COOLANT INLET
CONTROL
TEMPERATURE IS
64 OEG. F OR
MIGHERt ANO
THE INERTIAL
GIMBAL
TEMPERATURE IS
PREDICTED TO 8E
EQUAL TO OR
GREATER THAN
115 DEG.F BEFORE
THE NEXT SITE AOS
Oftt
5*
SUBLIMATOR
(C11-601U
6,
SET
TEMP
7.
REV
PATE
SECTION
GROUP
TEHP
8*
INLET CONTROL
TSMP IIS 59 DEG.F
OH LESS* ANO
INLET
B* CONTINUE MISSION
6* MATER
VALVE OPEN
ANO COOLANT
APOLLO 1
08
MlSSXOH
J
CLOSED/OP?N j
PAGE
7-
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 7 - SLV - T93 AND TB7
5
RULE
7-14
'CONDITION/MALFUNCTION'
PHASE
'
RULING
EARTH
ORBIT
TLC
CUES/NOTES/COMMENTS
CUES
1
LH2 TANK ULLAGE
U 1 7 7 - 4 0 8 t 0178-408) .
A* CONTINUE MISSION
2.
LJX TAN*;
(0130-406.
LH2
ULLAGE
PUMP
INLET
<>
LOX PUMP
(03-403J.
INLET
P9ESSOR
(02-403
LH2 AND/OR LOX VENT
VALVES OPEN OR CLOSED
TO PRECLUOE REACHING
SEPARATION LIMITS
8* MINUS 26 PSIO
OR
PLUS 36 PSIO
8. SPACECRAFT SEPARATION
NOTES
BSE INFORM FLIGHT ANO
FIDO ANO RECOMMENO
SPACECRAFT SEPARATION
TO A SAFE DISTANCE
!
MINUS DELTA PRESSURE
IS
DEFINED AS A FUEL
TANK
jLwAGc
PRESSURE GREATER THAN THE wGx :AN
ULLAGE PRESSURE.
2.
PLUS
uELTA
DEFINED
AS
A
PRESSURE GREATER
PPESSL.^c
I?
LQX
'ANK.
ULLAG
THAN T H E ?UL
TA,N<
ULLAGE PRESSURE.
3
THE
MINIMUM
R E C O M M g.N OES
APOLLO 1
4/16/6
SLV - TBS
AND T87
ANO
OR
PLUS)
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION ? - SLV - T95 AND TB7
R 'RULE
7-15
CONDITION/MALFUNCTION1
LOSS OR IMPENDING
LOSS OF S-IV3 STAGE
PNEUMATICS PRESSURE
PHASE
RULING
CUES/NOTES/COMMENTS
EARTH
ORBIT
CUES
Al.
ENGINE ?U
PRESSURE (O3O-*O3> - M Li TO iECREA
FROM ABOUT 100 ?SIA "0 AbCUT
? SI A
A* CONTINUE MISSION
BSE INFORM FLIGHT ANO
1. ATTEMPT TO
TERMINATE PURGE
2*
AMBlEr^T - E L UM
SPHERE PRESSURE (0236 <C3
DECREASING AT 3 PSI/M
IF JNSUCCESSFULt
COMMANO
2 AMBIENT HELIUM
SUPPLY SHUTOFF VALVE
CLOSED
3 REOPEN AMBIENT
HELIUM SUPPLY SHUTOFF
VALVE AS REQUIRED
EARTH
STAGE PNEUMATIC
PRESSURE LEAKING ORBIT/
AT GREATER THAN 6 TLC
PSI/MIN IN T35 OR
EXCESSIVE LEAKAGE
DURING TB7
3. CONTINUE MISSION
3SE INFORM FLIGHT ANO
CCMMANO-
1* AMBIENT HELIuH
SHUTOFF VALVE
CLOSED
31
STAGE
PRESSURE 10226-^
2*
2
LOX
'. 088-^03 t 025^-^03)
REOPEN AMBIENT
HELIUM SHUTOF"?
VALVE AS REQUIRED
>
MISSION
APOLLO 11
REV
DATS
SECTION
SLV - TBS
ANO TB7
GROUP
PAGE
7-10
NASA
- Manned
Spacecraft
Center
MISSION RULES
! Tf '
RULE I C Q N O I T I O N / M A L F U N C T I Q N 1
7-16
PHASE
RULING
CuES/NOTES/COMMENTS
NO S-IVB RESTART
(TB5J/TLI
INHIBIT (TB6)
CUES
7-17
CONTINUE MISSION
1.
ENGINE
PRESSURE (019-^01
CONTROL
30TTL
2.
REPRESSURIZATICN
BOTTLE
PRESSURE
(D20-4G3t
D88-<.Q3
03. 0234-403).
CUES
1*
LH2 ULLAGE
(0177-408* 0178-408).
2*
LH2 PUMP
(02-403)
INLET
3.
LH2VENT CLOSED
(Kl-4lOt 0210-410).
PRESSURE
PRESSURE
OlSCRTS
NOTES
MISSION
APOLLO 11
HEV DATE
fc/16/49
SECTION
ILV - TBS
TB7
GROUP
PAGE
7-11
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 7 - SLV - TBS AND T87
'RULE
7-18
CQNOITION/^ALFUNCTIQN1
PHASE
RULING
CUES/NOTES/COMMENTS
EARTH
0*8IT
A. CONTINUE MISSION
BSE INFORM FLIGHT ANO
COMMANO FROM LAST
STATION PRIOR TO T B 6 ~
SURNER LOX SHUTDOWN
VALVE CLOSE ON
CUECOLO
HELIUM
SPHERE
PRESSURE
(D261-*03, D263-403),
LESS THAN 50.
PSIA DURING
BURNER
REPRESSURIZATICN
TLI
8. CONTINUE MISSION
BSE
COMMANO
i. BURNER LOX SHUTDOWN
VALVE CLOSE ON
2 BURNER LOX SHUTDOWN
VALVE CLOSE OFF
LESS THAN _
PSIA PRIOR TO
RESTART
EARTH
ORBIT/
T
LI
NO S-IVB RESTART
(TB3J/TLI
INHIBIT (TB6)
BSE INFORM FLIGHT ANO
RECOMMENO NO S-IVB
RESTART.
7-19
EARTH
ORBIT
A. CONTINUE MISSION
BSE INFORM FLIGHT ANO
COMMANO
A LOX ULLAGE
PRESSURE uESS
THAN J X PSIA IN
TB5
CUES
1*
LOX
ULLAGE
0l80~*06)
2.
LOX
(03-003U
B. TLI INHIBIT
BSE INFORM FLIGHT ANO
RECOMMEND TLI INHIBIT
REV
APOLLO IX
DATE
SECTION
GROUP
PAGE
7*12
PUMP
PRESSURES
INLET
PRESSURE
Center
MISSION RULES
SECTION 7 - SLV - TBS AND TB7
ULE
7-20
ONOITION/MALFUNCTION1
PHASE
RULING
CUES/NOTES/COMMENTS
EARTH
ORBIT
CUS
STAfcT
BOTTLE
PRESSURE
(D17-*01t
A* CONTINUE MISSION
BSE INFORM FLIGHT AND
SENO
1. START BOTTLE VENT
OPEN FOR 3 SEC
2. REPEAT COMMAND AS
NECESSARY TO INSURE
A PRESSURE OF LESS
THAN 1400 PSIA FOR
FIRST OPPORTUNITY
RESTART OR 1500
PSIA FOR SECOND
OPPORTUNITY
RESTART
8. SPACECRAFT SEPARATION
BSE INFORM FLIGHT ANO
FIDO ANO RECOMMENO
SPACECRAFT SEPARATION
-21
PU VALVE FAILS TO
A MIXTURE RATIO
GREATER
THAN 5.0 TO 1 ANY
TIME PRIOR TO
RESTART
EARTH
ORBIT/
TLI
CONTINUE MISSION
cues
1*
2*
1. PU VALVE HARDOVER
POSITION ON (LOW EMR
4.3 TO 1) (SEE NOTE i>
IF 1 IS UNSUCCESSFUL* BSE
INFORM FLIGHT AND
2. VENT START BOTTLE TO
ACCEPTABLE LIMITS
MISSION
APOLLO 11
tev DAT!
SECTION
GROUP
NOTES
1.
THIS FAILURE MILL REQUIRE
EVALUATION OF RESIOUALS TO DETERMINE
AOEQUACY FOR TLI VELOCITY CUTOFF
(REF FMR 7-1).
2*
PU FEEDBACK VOLTAGE M*l*
ONLY VALIO *HEN PU SYSTEM POttER
ON
PAGC
7-13
IS
IS
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 7 - SUV - TBS AND T87
RULE
?-22
CONOITION/MALFUNCTION1
PHASE
RULING
CUES/NOTES/COMMENTS
NO S-IVB RESTART
(T35J/TLI
INHIBIT ITB6)
HYDRAULIC FLUIO
CUES-
1. HYORAULIC RESERVOIR OIL LEvEu
APPROX ZERO PERCENT <L7-*O3).
2,
HYOHAULIC SYSTEM
LESS THAN 1700 PSIA <D*
PRESSURE
3. HYORAULIC RESERVOIR
PRESSURE
APPROXIMATELY ZERO PSIA (D42-M33).
NOTES
L7-403 PLUS ONE OF TH U T H CUES
ARE REQUIRED FOR
IMPLEMENTATION
OF
THIS RULE.
MISSION
IPOLLO 11
>ATE
SECTION
ILV - TBS
INO TB7
KOUP
NASA
- Manned Spacecraft
Center
MISSION RULES
:
-:s v
R
1 TTM
PHASE
RULING
CUES/NOTES/COMMENTS
7-23
' TLC
CUES
1
LOX NPV NOZZLE
( D2O-404* Q2h*-+Q<+ )
A. CONTINUE MISSION
'
2.
LOX TANK ULLAGE
(0179-406* 0180-406).
PRESSURES
PRESSURE
3.
LOX
HPy
OPEN
(K19S-424* K199-424)*
OISCRETE
'
'
IF UNSUCCESSFUL* BSE
COMMA N O
'
SEC
""" |
8. CONTINUE MISSION
IF UNSUCCESSFUL* BSE
C0MMAN0
2.
'
*
'
IF B2 UNSUCCESSFUL*
3SE COMMANO-
'
-
7-26
CONTINUE MISSION
TLC
CUES
1*
LH2 HPW NOZZLE
(D1&3-409* 0184-409).
2*
LH2
ULLAGE
(0177-408* 0178-408).
IF UNSUCCESSFUL* BSE
'COMMANO
'2.
3*
MISSION
APOLLO 11
REV
pATE
SECTION
GROUP
PRESSURE
3.
LH2 LATCHING VENT
VALV&
DISCRETES (K210-410* IC2H-410U
PRESSURE
PAGE
7-13
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 7 - SLV - TB3 ANO T87
RULE
CONOIT1ON/MALFUNCTION1
7-27
PHASE
TLC
RULING
CUES/NOTES/COMMENTS
CONTINUE MISSION
CUES
GH2
START
BOTTLE
7-28
CONTINUE MISSION
CUES
! COLO HELIUM BOTTLE
<D26l-<*03 0263-403)
MISSION
APOLLO 11
IEV
)ATE
SECTION
SLV - T85
TB7
GROUP
AGC
PRESSURE
SLV - T36
(RESTART)
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 8 - SLV - TB6
1
8-1
ACCELEROMt-TSH* FAILURE
8-2
9-3
3-4
8-5
9-6
9-7
8-9
TH
TO THIS
SECTION-
6-11
-.7
7-3
wCSS CF ATTITuOE CONTROL OuRING TB5 AND TB7 TO SPACECRAFT SEPARATIONt TS6 TO TB6 * 9
MI.N 20 SEC
^-9
7-13
CUES/NOTES/COMMENTS
16
-17
PRESSURE
-19
-21
U VALVE FAILS TO A V T X T O R
-22
MISSION
APOLLO 11
REV DATE
SECTION
GROUP
PAGE
8-1
NASA
- /Wanned Spacecraft
Center
MISSION RULES
SECTION 8 - SLv - T86
RULING
TIAL PLATFORM
CUES/NOTES/COMMENTS
TLl
CUES
1. GUIDANCE STAT'jS
COOt 2<) (H60-6U3)
A, AFTER '36
INITIATED BUT
TO T3o
10 SEC
A,
TLI
INHIBIT
BSE
INFORM
FLIGHT
ANO
*-!
8 AFTER TB6 - 9
10 SEC
WUKQ
AS.
3. CONTINUE MISSION
bITS u
TC ONE'
iL7
bc.T
Y C;C
uES-
dUHNtrt
CHA
INDICATES
1. su^NE' SI-WT:G*\
2. .CGNTI'.UOUS vE\T SVSTE
ORIFICE CPtN
3. =?ERESSURUATION OFF
NOTE
Ml SSIUN
APOLLO 11
REV
OATE
SECTION
GROUP
PAGE
SLV - TB6
8-2
Center
MISSION RULES
=M.V
SECTION 8 -
I Tf "1
RULE
ONOITION/MALFUNCTIUN1
8-3
LH2 CHILLOO^N
SYSTEM F A I L S DURING
RESTART
PREPARATIONS
TLI
SLV - TB6
RULING
PHASE
CUES/NOTES/COMMENTS
CONTINUE MISSION
cues
A. 8S INFORM FLIGHT
ANO
1. ATTEMPT TO CORRECT
SITUATION SPECIFIED
IN NCTE lAt l,8i
1.0
LH2 RECIRC F L O W
4.
IF UNSUCCESSFUL.
BSE INFORM FLIGHT
ANO AT TB 6 J_ MIN
Jt5_SEC C O M M A N D
2 FuEL LEAD
5*
LH2
LH2
(F5-<U4)
BLtEU
VALVU
CLwS:
KECIRC
VALVE
CLCSC
L.-I2 ULLAGE
PRtSi
(D177-uo8
NOTES
I. LH2 CMlLLOOwN
SATISFACTORY IF
(A)
(B)
CLOSED
wlLL
NOT St
SRbVALVE IS jpt.s
RECIRCULATICN
(C)
(0)
CHILLU0VI\ P U M P
I S *uT O N
MISSION
APOLLO IX
REV
DATE
SECTION
GROUP
PAGE
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 8 - SLV - TB6
RULt
CNDI TIQN/MALFU.NCTIoN'
PHASE
TLI
RULING
CONTINUE
MISSION
CUES-
INLET
(03-<03)
ANO
L U X :*',.<,
(D179-4O6# ^i8G-^w6
(Klw9-<C3 <IiU-<C3)
5.
LUX
6.
LUX
3LCCJ
RECIRCULAT iU.\
CLWSEC
NOTES
1. L O A
SATISFACTORY
(A)
IF
^HtVALVt
IS uHt*.
8-5
LOW
L H 2 TANK
T96 *
E AT
1C SEC
IC)
3LtE0 VALVE
(0)
CHILLDUWN
TLI
CUES
1.
LM2
2.
w.-2
NOTE
TANK
IS CLw^t-
t^u'^P IS Nu7
ULLAGC
INLCT
*ICjHfcH
THAN
WLLAGC
8-6
S-lvB ACTUATOR
TLI
CONFIRMED HAROCVER
(3HEATER THAN OR
EQUAL TO /- b D E C . ) '
PRIOR TO T86 9 MIM
10 SEC
TLI
INHIBIT
as
INFORM F L I G H T A N D
RECOMMEND
TLI INHIBIT
CUE
NOTE
BOTH
INDIVIDUAL
POSITIONS '-'UST CO.sFlR
PRIUR TO
MISSION
APOLLO 11
REV
OATE
SECTION
GROUP
PAGE
yAL-u.\CTIC-!<
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 8 -
ITFM
RULE
9-7
:ONOITION/MALFUNCTION'
S - I V B STAGE
CONTINUOUS VENT
SYSTEM (CVS)
REGULATOR FAILS TC
CLOSE DURING
RESTART SEQUENCE
PHASE
TLI
SLV - TB6
RULING
C'JES/NOTES/COMMENTb
CONTINUE MISSION/TLI
INHIBIT
CUES
1.
CVS NOZZLE
GREATER
THAN
^RESSUKc
PSIA
(U
0182-4C9).
2.
CVS
REGULATOR
tQ177-<C8t
IF NEITHER 1 NOR 2 IS
SUCCESSFUL* BSE
INFORM FLIGHT AND
RECOMMENO TLI INHIBIT.
9-8
LOSS OF ATTITUDE
CONTROL DURING
S-IVfl SECONO PURN
TLl
SPACECRAFT SEPARATION
CUES
I.
ANGULAR
(R4-602
ftl3-60
itS-602) t OR RuLw
RATES
t
YAW
GREATER
THAN ^
DECREASING.
DG/ScC A\Q
(:<6-602
a I7C-^i
C-M',ci,\ij
LOSS QF M T T I ' U W / C
( S t E NCTE2)
4*
Cw\TLL
NOTES
i.
Tn SLV YAW GIMilAL
IS CRITICAL BEYOND / - u^ ,
(Z-AXiS)
2.
LObS
OF ATTITuOt
CALERT
WILL
tt
GIVEN
F<J*
FOLLOWING CONOiTIo.NS
(A )
FAILURE*
LVDC/LVOA
(B)
ATTITUDE tHRCt
ROLL GREATER THAN /- 3.5 - u
AND Y A W GRE*TgR T H A N
tCJ FAILURE TC
GUIDANCE SEUUENCt.
10)
FAILUR&
HYORAULICS.
(t)
MISSION
APOLLO 11
REV
OATE
SECTION
GROUP
ATTITUUt
PAGE
/- o Sfc
INITIATE
OF
as
S"i vn E
r<cFtRtNCc
PAlLu
9 S L V - T/"8 ( S A F I N ; .
AND SLINGSHOT)
NASA
- Manned Spacecraft
Center
MISSION RULES
SECTION 9 -
SLV TB8
9-2
LOX OU^P
AiLS
9-3
9-4
9-5
Tw
7
-3
F C L L O ' A I N G REFERENCED
J-2 ENGlNt M
CUTOFF
FUEL VALVE
7-4
j-2
OXIOIZER
7-9
LCSS OF A T T I T U O E
M I \ 20 SEC AFTER
7-13
7-U
7-25
7-26
7-28
E\GI,\
FAILS
T6 TC
MISSION
APOLLO 11
Rev
DATE
INHV) FAILS
Tu
AT T B 7
TO LATCH OPI\ AS
DUMP FAILS TC
SECTION
INITIATE
GROUP
PAGE
20
PSID
jC
r-j
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 9 -
1 TEN
'RULE
9-1
CCNOITICN/MALrUNCTION
S-IVB STAGE
PNEUMATIC DUMP
FAILS TO INITIATE
PHASE
SLV
B8
CueS/NOTES/COMMENTS
TLC
CONTINUE
BSE
I SSI ON
INFORM
CUES
FLIGHT AND
E.\Gi,N
9-2
CONTINUE
9SE
FLIGHT AND
1*
1. ATTEMPT TC INITIATE
LOX DUMP 9Y OPENING T H
CXIDIZER VALVE
CJ-3
ENGINE CONTROL
BOTTLE OUMP FAILS TC
INITIATE
CONTINUE
3SE
MISSION
INFORM
TLC
9-5
MAIN OXiCIZER
2.
DISCRETE
A T T E M P T rc I N I T I A T E
LH2 DUMP BY O P E N I N G
T.i MAIN FUEL VALVE
APOLLO 11
SECTION
MAIN
FUiL
VALVt
vALVt
jPi*.
CUES
OATE
T:Z?> J
CJES-
CONTINUE MISSION
REV
OS
2
ENGINE CONTROL rL-v
PRESSURE (019-^01. 02*2-*0i:
1.
MANIF0L3 PRESSURE "*G0 1 uSS j
T H A N 160 H S I A (Qxio Futu) ; c.'73-<.;- J
2.
MA.MFOui;
T H A N 160 PSIA (
O7315 :
MISSION
VALVE
CONTROL
JfeU
LOSS OF !TfP OR
BOTH APS MOOULaS
OR I OR TO OR DURING
ROPELLANT OUMP
VALVfc
MAIN
OXIOIZE^
(ici 20-^01 J.
1.
ENGINE
(OiB-Oi).
CONTINUE MISSION
SSE INFORM FLIGHT ANO
:.
C3 5 <
CUE-
FLIGHT ANO
1. ATTEMPT TO OPEN T H
ENGINE HELIUM CONTROL
VALVE
uH2 DUM F A I L S TO
INITIATE AT TS8
MIN 9 * SEC
BIE
'. 0236--03t
CUES
MISSION
INFORM
PRESSURE
GROUP
PRESSURE
3.
HELIUM
APPROXIMATELY
O 2 5 O 1 )
iuPPLr
11QQ
PRiSiwRt
PSIA
lO3
<
HfeLlUM
APPROXIMATELY
0231-<>15U
SUPPLY
1100
PRESSURfe - O D E 2
PSIA
i 036 15 t
PAGE
NASA
- Manned
Spacecraft
Center
PRELAUNCH
INSTRUMENTATION
MA5
MEASUREMENT DESCRIPTION
NUMBER 0N80AR0
TRANSDUCERS
CATEGORY
SICN RULE
RE.F
INSTRUMENT UNIT
LINK OPlb
EMERGENCY DETECTION SYSTEM tEDS)
COMMAND COMMUNICATIONS SYSTEM (CCS) UPLINK
FLIGHT CONTROL MEASUREMENTS
S-II STAGE
G8-201
G3-202
G8-2G3
G3-204
G9-2C1
G9-2C2
G9-2C3
G9-204
G3O-2O1
G30-202
G30-203
G30-204
G31-2OI
G31-202
G31-203
331-204
*125-2Q7
HO
HO
HO
HO
HO
HO
HO
MO
HO
HO
HO
HO
fe-s.a-o
6-6
6-8
a-9
6-68-s
b-9
o-d
6-*
6-e
o-e
6-d
6-8
6-9
6-3
6-3
6-9
6-v
rtO
HO
HO
HO
HO
S-tVB STAGE
PRESS* FUEL PUMP INLET
PRESS* FUEL TAN* ULLAGE EDS 1
PRESS. FUEL TANK ULLAGE EDS 2
PRESSt Ox ID PUMP INLET
PRESS* OXID TANK ULLAGE EDS 1
PRESS* QXIO TANK ULLAGE EDS 2
PRESS* COLD HELIUM SPHERE
PRESS. GH2 START BOTTLE
PRESSt ENG CONTROL HE SPHERE
PRESS* HYORAULIC SYSTEM
PRESS* RESERVOIR OIL
PRESS. AMBIENT HE PNEu SPHERE
P^ESS* GH2 START BOTTLE BKUP M S
PRESS. ENG CONT H SPHERE BKUP *AS
EAS
PRESS. AM9 Hg PNEU SPHERE
PRESS. COLO HE SPHERE
FLOWMETER. OXIOIZER
POSITION. PITCH-ACTUATOR
POSITION* YAW ACTUATOR
POSITION* MAIN OXIOUER VALVE
POSITION* PU SYSTEM RATIO VALvE
VOLT. F/U I EBW RANGE SAFETY
VOLT. F/u 2 EBW RANGE SAFETY
VOLT. PU VALVE POSITION FEEDBACK
NETWORK
02-403
0177-413
D178-410
03-403
0179-406
oiao-406
016-425
017-401
019-401
041-403
042-4C3
0236-403
0241-401
0242-401
0256-403
0263-403
F1-401
G1-4Q3
G2-403
G3-401
G10-401
M30-411
M31-4H
M61-41X
METER
METER
COMMON
COMMON
( 2 OF 3
M
\
METER
METER
COMMON
COMMON
[
\
2 OF 3
M
HO
HO
MO
HO
HO
HO
HD
HO
HO
HO
HO
HO
HO
HO
HO
HO
HO
HO
MISSION
APOLLO
RCV
DATS
SECTION
4/16/69 SLV - T3
GROUP
PRELAUNCH
INSTR
PAGE
9-3
7-i*
7-1*
7-14
7-1*.19
7-14/;*,3-3
7-14/19.3-5
7-13
7-2C
7-16
6-10*7-22
6-1C.7-22
7-15
7-2C
7-16
7-15
7-ia
7-4
9-6
8-6
7-4
7-21
7-5
7-5
7-21
Center
MISSION RULES
SECTION 9 - SLV - T38 - CONTINUED
ITEV
"EAS
NUMBER
MEASUREMENT DESCRIPTION
MISC. SEC R/S RCVR 1 L/L SIG STR
*ISC. SEC R/S RCVR 2 L/L SIG STR
LiVEL. RESERVOIR OIL
INSTRUMENT UNIT
GUIDANCE COMPUTER OPERATION
ONBOARO TRANSDUC&RS
SFFECCATEGOKY TIVITY
.-
N57-<11
HO
HO
7-5
7-5
6-U.7-22
M60-6C3
t*
6-1/^/7/9,
7-6/11d-i/d
J71-603
J72-6O3
R4-602
HO
R5-6C2
HO
6-1/7*7-3,8-8
R6-602
HO
6-1/7,7-e,a-a
R8-6C2
-0
5-1/", :--,5-?
R12-602
HO
6-1/7,7-9.3-3
R13-6C2
HO
6-l/7,7-^,a-a
1 OF 2
MISSION
APOLLO 11
REV
OATE
SECTION
GROUP
PRELAUNCH
INSTR
PAGE
\ RE-UI^ED TC
COMPUTE
MULTIPLE *OrC
\ GRUUNU
) CCMMANOb
6-1/7,7-98-e
| I O CSM ENVIRONMENTS
CONTROL
.NASA - M a n n e d
Spacecraft
Center
MISSION RULES
SECTION 10 - CSM ENVIRONMENTAL CONTROL SYSTEM
ITEM
<3Nc*AL
XO-l
LAUNCH
LAUNCH WILL 3E CONTINUED AS LONG AS 7H SUIT CIRCUIT AKO 02 SUPPLY WILL 3UPP03T FLlZnT
OEMANOS FOR AT LEAST ONE REV AND ENTRY INTO 2-1* 'HERE ARE HQ COOLANT FAILurtSS rCR
LAUNCH/INSERTION PHASE WILL 3E TERMINATED.
C3
Wi
TLC fr TEC
WATER EVAPORATION WILL 3 LJMITEO TO COMPONENT TESTING.
ALL PHASES
A, flACKUP SYSTEMS ANO BACKUP COMPONENTS WILL NORMALLY SE
RETURN TO SARTrt* NOT FOR MISSION CONTINUATION.
USED
FOR
THE
MOST
SAPID
3RACTICAL
8. LM SYSTEMS WILL 9 USED AS REQUIRED FOR CSM SYSTEMS BACKUP. IF CSM SYSTEMS REQUIRE LM
THE DESCENT STAGE WILL 3E RETAINED WHERE POSSISLE.
C TO CONTINUE* WATER QUANTITY PREDICTIONS MUST
MISSION REQUIREMENTS.
0-2
REFLECT
AOEQUATE
QUANTITIES
TO
MEET
DEFINITIONS
LOSS OF CABIN I N T E G R I T Y CM PRESSURE VESSEL LEAKAGE SUCH THAT CABIN PRESSURE CANNOT BE MAINTAINED
THANt OR QUAL TO 4,5 PS2A BY CAdlN PRESSURE REGULATORS (1.2 ufl/HR TOTAL;
LOSS OF SUIT INTEGRITY-
TOTAL PGA ANO SUIT LOOP LEAKAGE IS GREATER THAN 0.5 PS1/MIN
PGA SUIT LOOP PRESSURE CHECT.
(1.5
CURING
CREW
COMFORT
A*O/CR
CCMFCRT
<
LOSS OF 02 MANIFOLDAN 02 MANIFOLD OR REGULATOR FAILURE WtTH WHICH THE SUIT CIRCUIT 02 5SMANOS
3E SUPPLIEO ^OR ENTRY.
LOSS OF PRIMARY LOOP COOLINGLOSS OF ALL FLOW* A LEAK WHICH CANNOT 3E ISOLATEDt OR COMBINED FAILURES SUCH Th
RADIATORS ANO EVAPORATOR PROVIDE NO COOLING.
LOSS OF SECCNOARY LOOP C O O L I N G OF ALL FLOW* A LEAK WHICH CANNOT BE ISOLATED* OR COMBINED "AlLU/US SUCH THAT !
RAOIATOftS ANO EVAPORATOR PROVIDE NO COOLING.
:
LOSS OF COOLANT LOOP R A O I A T O R S
RAOUTOR LEAK* BLOCKAGE OF ALL FLOW THROUGH RADIATOMS* Off RAOIATQA DEGRADATION I
SUCH THAT TOTAL LONG TERM USAGE OF WATER IS MORE THAN IS 3EING PROOUCEO.
LOSS OF ALL C O C L I N G LOSS OF PRIMARY ANO SECONOAftY LOOP COOLING.
LOSS OF SURGE TANK ANO/OR REPRESS P A C K
SURGE TANK* REPRESS PACK* OR ASSOCIATED IS0LATA1LE PLUMBING
REQUIRE ISOLATION OF THE SURGE TANK ANO/OR REPRESS PACK.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
GENERAL
10-1
FAILURES
WHICH i
i
!
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 10 - CSM ENVIRONMENTAL CONTROL SYSTEM
SYSTEMS
10-10
02 SYSTEM
A.
SUIT FLOW RELIEF VALVE WILL REMAIN CLOiEO FOR DURATION OF FLIGHT.
9.
C.
SURGE TANK WILL BE ON LINE EXCEPT DURING LM PRESSUIZATION OR CM ^REiAURIZATION *iTrt Trig
MANNED. WHEN IT WILL BE ISOLATED TO MAINTAIN QUANTITY GAEATE* THAN 300 P
C.
E.
F.
G.
CM
CA8IN
PRESSURE
WILL
NOT
BE
PRESSURIZATION EXCEPT DURING TD&E.
I.
L10H CANISTER
J.
1.
K.
INABILITY
WILL
ALL UNOOCKcO
T
TO
DROP
EXCEPT
6 HOURS FOR
ANO
ONE
TUNNE'
MINUTE
SIMULTANEOUSLY,
BELOW
ANO
LAUNCH
4.0
PSIA
DURING
Ivf
NORMAL
^MASES.
COMES <=l?ST
THE FOLLOWING
4.5
PSIA.
OPERATIONS.
DfcE.
GLYCQL LEAKS
3.
F I R E . S M O K E . CONTAMINATION
IN COMMANO
MODULE.
2.
PHASES
BE RECHARGED
4t
COOLANT
ALLOWED
ALL
TO MAINTAIN
3.
FOR
WILL NORMALLY
2.
1.
POSITION
LOSS OF SUIT
CONFIRMED
IN
CABIN.
T H E FOLLOWING-
CIRCUIT.
LEAK OF GLYC3L
IN SUIT
CIRCUIT.
MANAGEMENT
A.
OPERATION.
9.
GLYCOL RESERVOIR WILL 36 ON LINE AND RADIATORS WILL 3E BYPASSED FOR LAUNCH.
C.
NORMALLY
EITHER
THE
PRIMARY
3A
D.
AOOXTIQNAL POWER LOAOS WILL BE AOOEO AS REQUIRED IN AN ATTEMPT TO MAINTAIN PRIMARY RAOIATOR
CUTLET TEMPERATURE GREATER THAN -20 OEG.
MISSION
APOLLO
REV
li
DATE
SECTION
GROUP
CSM ENVIRONMENT
CONTHOU
MANAGEMENT
PAGfi
10-2
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 10 - CSM ENVIRONMENTAL CONTROL SYSTEM
ITEM
WATER SYSTEM
A
WASTE WATER WILL 8E OUMPED OVERBOARD AS REQUIRED TO MAINTAIN INOICATEO UUANTITY LESS THAN
85-90 PERCENT. WASTE WATER WILL NORMALLY BE DUMPED TO 25 PERCENT. HOWEVER* IF WASTE WATER
QUANTITY INSTRUMENTATION (CF0009) Is LOST* WASTE WATER WILL BE DUMPED UNTIL POTABLE WATER
QUANTITY (CF0013) BEGINS TO DECREASE.
9.
1.
2.
AT CM-SM SEPARATION. THE POTABLE TANK WILL BE FULL ANO THE WASTE TANK
C
ULL.
C.
1*
OUMPS WILL BE PERFORMED <IF REQUIRED) WITHIN 2 HOURS PRECEOING MCC MANEUVERS.
2.
WILL
IMMEDIATELY
BE
90
PRECEOING
PERCENT
SLEEP
SYSTEM BACKUP
L,M SYSTEMS WILL BE USED AS REOUlRED FOR CSM SYSTEMS SAC*UP DESCENT STAGE WILL
POSSIBLE*
r
RULE NUMBERS 10-11 THROUGH
10-19 ARE RESERVED.
MISSION
APOLLO II
RCV
0ATI
SECTION
GftOUP
PAGE
MANAGEMENT
10-1
BE
RETAINED
IF
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 10 - CSM ENVIRONMENTAL CONTROL SYSTEM
RULE
CONOITION/MALFUNCTION1
PHASE
RULING
CUES/NOTES/COMMENTS
10-21
ANO ?-30
ARE RESERVEO*
CABIN PRESSURE
'LAUNCH
CANNOT 8E RELIEVED
CABIN PRESSURE
DECREASING ANO/OR
LESS THAN 4.5 PSIA
ANO
RELIEF
STARTS
AT
A. SUIT PRESSURE
GREATER THAN
LAUNCH
ALL
9. SUIT PRESSURE
LESS THAN 3.5 PSIA
LAUNCH
ALL
C LOSS OP SUIT
CIRCULATION
LAUNCH
2* ENTER ASAP
O 1 . ABORT ASAP
OPEN DIRECT 02 45
DEG FROM LAUNCH
SETTING.
ALL
10-22
NORMAL
SECONOS
'CONTINUE MISSION
C . U CORRESPONDS T3
(APPROX 3 CFM/Cie*MAN)
.6
-,3/HR j
2. ENTER ASAP
LOSS OF SUIT
CIRCULATION CABIN
STASLEt ANO GREATER
THAN 4.3 PSIA
LAUNCH
A. CONTINUE MISSION
OPEN DIRECT C2 VALVE
45 OEG FROM LAUNCH
SETTING*
EC
A*
CORRESPONDS TO
(APPROX 3 CFM/C3w*AN>
12.6
1* DOFF SUITS*
2* OPEN HASTE
OVERBOARD DRAIN
VALVE TO OBTAIN
CABIN BLEED FLOW.
3. OON FACE MASKS
AFTER 1 HOUR
ALL
.O7
3 CREWMAN*-* 80 *IH*
MISSION
APOLLO 11
REV
DATE
PAGE
SECTION
CSM ENVIRONMENT
CONTROL SYSTEM
SUIT/CABIN
NASA
- Manned
Spacecraft
Center
MISSION RULES-
10-23
10-24
10-25
CONOITION/MALFUNCTION1
PHASE *
RULING
CUES/NOTES/COMMENTS
A. CONTINUE MISSION
ALL
3. CONTINUE MISSION
LAUNCH
A CONTINUE MISSION
ALL
8. CONTINUE MISSION
PLAN TO RESTORE ENTRY
02 BY STORING OPS IN
CM AT FINAL LM EGRESS*
TEC
C. CONTINUE MISSION
DOFF SUITS FOR ENTRY.
LAUNCH
A ABORT
1* DECOMPRESS CASIN
LOSS OF SURGE
TANK ANO REPRESS
PACK
3.
2. TR0U8LESH00T
ELECTRICAL
SYSTEM PER FLIGHT
CHEW CHECKLIST
800ST FIRE
PROCEDURES.
c
ALL
al TROUtLESHOOT/COMSAT
FIRE PER FLIGHT CREW
CHECKLIST EMERGENCY
PROCEDURES*
2* ASSESS DAMAGE ANO
REMOVE POtfER FROM
AFFECTEO SYSTEMS
3. ENTER NEXT BEST PTP
MISSION
APOLLO XI
DATS
SECTION
GROUP
CSM ENVIRONMENT
CONTROL SYSTEM
SUIT/CASIN
PAGE
10-5
NASA
- Manned
Spacecraft
Center
MISSION RULES
*V
ITEV
'RULE
PHASE
10-26
CONTAMINATION IN
CABIN
ALL
'
10-27
LOSS OF SUIT
INTEGRITY
'
LAUNCH
0
TLC
TD4E
ALL
10-28
ALL
RULING
CUES/NOTES/COMMENTS
A.
8.
C
D.
CONTINUE MISSION
CONTINUE MISSION
INHIBIT TOtE
TERMINATE PHASE
CONTINUE LM EJECTION
IF LM IS PRESSURIZED
ANO TUNNEL WORK IS
COMPLETE.
a CONTINUE MISSION
NO-GO FOR UNOOCK
A.I.
'
'
'
'
CONTINUE MISSION
A.2.
APPROXIMATELY
5 HOURS ARE I
REQUIRED TO DEPLETE CABIN 02 FROM i
USAGE RATE (CREW CABIN LcAK. * TAd*
PRESS BLEED)
|
EO
AFTER RNOZ
'ALL
MISSION
APOLLO I
2. ENTER ASAP
USE OPS IN SUITED
MOOE FOR ENTRY
'LAUNCH
TLC
ItfV
A.2*(8)
CREW
gNVXA0J4MMT FOR
OF MANUAL CABIN
OPTION
Tw
gsg '-.M
IAAT* HfTuAN Hi LlZU
PRESSURE R E G U L A T I O N .
10-29
OATE
SfCTION
GROUP
UZEZ
PAGE
SUIT/CABIN
10-*
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 10 - CSM ENVIRONMENTAL CONTROL SYSTEM
R
RULE KONOITION/MALFUNCTION1
10-30
PHASE
'
RULING
CUES/NOTES/COMMENTS
A. CONTINUE MISSION
8. ENTER NEXT BEST PTP
10-31
LAUNCH
A, CONTINUE MISSION
EO
ALL
MISSION
APOLLO 11
REV
OATE
SECTION
GROUP
PAGE
SUIT/CABIN
10-T
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 10 - C3M ENVIRONMENTAL CONTROL SYSTEM
R 'RULE
10-40
CONDITION/MALFUNCTION1
PHASE
RULING
/'i
CUES/NOTES/COMMSNTS
PRIMARY COOLANT
LOOP MALFUNCTIONS
A* LOSS OF
EVAPORATOR
LAUNCH
A.I,
ALL
B.
CONTINUE MISSION
A.I.
2e CONTINUE MISSION
ACTIVATE SECONOARY
COOLANT LOOP WITH
RAOIATORS IN BYPASS
AS REQUIRED TO
MAINTAIN PRIMARY
EVAPORATOR OUT TEMP
LESS THAN 80 OEG F
OR AS REQUIRED
FOR CREW COMFORT
8.1.
CONTINUE
MISSION
OuT
7r
3.1.
REF MALF P R C C ~
I
j
2*
EO
2
ALTERNATE
PERFORMED
MISSION
MAY
3 !
:
.
(A) ACTIVATE
SECONDARY LOOP
(8) USE PRIMARY
LOOP IN AOOITION
TO SECONOARY
LOOP FOR GtN
OPERATIONSt
TLC
LUNA*
ORBIT/
LUNAR
STAY
C. TOTAL LOSS OF
LOOP
LAUNCH
CO
ALL
MISSION
APOLLO 12
REV
DATE
SECTION
GROUP
COOtANT
C.2
ALTERNATE
PERFORMED*
PAGE
ife
NASA
- Manned
Spacecraft
Center
MISSION RULESREV
ITEM)
RULE
CONOITION/MALFUNCTION
PHASE
RULING
CUES/NOTES/COMMENTS
10-41
SECONOARY LOOP
MALFUNCTIONS
A. LOSS OF
EVAPORATOR
ALL
A. CONTINUE MISSION
8. LOSS OF
RAOIATORS
EO
B.I,
TLC
2.
LUNAR
ORBIT
3. CONTINUE MISSION
LUNAR
STAY
4.
EO
C TOTAL LOSS OF
LOOP
A . MALF
Bl
ECS
MALF
CS
1
CONTINUE MISSION
'
PERFORM ASCENT AT '
NEXT BEST
OPPORTUNITY AFTER '
EVA
Cl
MALF
ECS
TLC
2.
LUNAR
ORBIT
3 CONTINUE MISSION
LUNAR
STAY
4 CONTINUE MISSION
PERFORM ASCENT AT
NCXT BEST
OPPORTUNITY AFTER
EVA
'
'
<
1
i
10-42
EO
A CONTINUE MISSION
KO-C FOR TLI
'
TLC
3 CONTINUE MISSION
NO-GO FOR LOI
>
'
ALL
i
i
10-4S
EO
A CONTINUE MISSION
B.
1
1
ALL
APOLLO IX
C. ENTE1 ASAP
<
i
i
MISSION
REV
DATE
SECTION
GROUP
PAGE
COOLANT
10-9
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 10 - CSM ENVIRONMENTAL CONTROL SYSTEM
! T-IM
RULE
10-44
C0N0ITI0N/MALFUNCTI0N1
PHASE
RULING
CUES/NOTES/COMMENTS
CONFIRMED LEAK OF
GYLCOL COOLANT
A* IN COMMAND
MODULE
8. IN SUIT CIRCUIT
EO
ALL
LAUNCH
EO
ALL
MISSION
APOLLO 11
REV DATE
SECTION
GROUP
PAGE
COOLANT
10-10
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 10 - CSM ENVIRONMENTAL CONTROL SYSTEM
ITEM
RULE
10-50
CONOITION/MALFUNCTION1
PHASE
3UL1NG
CUES/NOTES/COMMENTS
LOSS OF OVERBOARO
OUMPS
A. NORMAL OVERBOARO
OUMPS FROZEN OR
SLOCKED
A. CONTINUE MISSION
A.l
UTILIZE AUXILIARY ObMP
URINE ANO WASTE WATER DISPOSAL.
2.
3LEED 02 FROM
WATR
THROUGH WASTE
MANAGEMENT
DRAIN VALVE INTO CABIN.
LOSS OF ALL
OVERBOARO OUMP
CAPABILITY
EO
TLC
LUNAR
ORBIT
LUNAR
STAY
10-61
10-52
CONTINUE MI SSI OH
PERFORM ASCENT AT
NEXT BEST OPPORTuNlT
AFTER EVA
FAILURE OF 9OTH
WATER ACCUMULATORS
CR UNCONTROLLABLE
HIGH HUMIDITY
3.1.
IF POTABLE ANO MASTl TANKS
(OR WASTE TANKS ALONE) SECOMt ?UULi
FORCED
*ATER
SOILING * ILL
55
NECESSARY TO ALLOW rUEL CELL ANQ/Oft
CYCLIC ACCUMULATOR OPERATION.
2. LM URINE STORAGE
AVAILABLE) WILL 3E
LM SYSTEMS MAY
HUMIDITY CONTROL.
LAUNCH
A. CONTINUE MISSION
ALL
SAGS
'. IF
3E
3 |
!
A, CONTINUE MISSION
EO
B CONTINUE MISSION
NO-GO FO TLI
ALL
MISSION
APOLLO 11
RfV
OATC
SECTION
GROUP
PAGE
WATER fr WASTE
MANAGEMENT
10-11
NASA
- Manned
Spacecraft
Center
10-53
CONDITION/MALFUNCTION'
PHASE
RULING
CUES/NOTES/CCMMENTS
CONFIRMED LEAK IN
POTABLE WATER TANK
OR UNABLE TO
TRANSFER FUEL CELL
WATER TO POTABLE
TANK*
LAUNCH
A. CONTINUE MISSION
EO
B. CONTINUE MISSION
NO-GO FOR TLI
ENTER NEXT BEST PTP
AFTER TANK DEPLETED.
TLC
LUNAR
ORBIT
LUNAR
STAY
MISSION
APOLLO 11
REV
DATE
SECTION
GAOUP
PAGI
WATEH fc MASTS
MANAGEMENT
10-12
A
SE
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 10 - CSM ENVIRONMENTAL CONTROL SYSTEM - CONCLUDED
ITEM'
INSTRUMENTATION REQUIREMENTS
10-60
MEAS DESCRIPTION
CABIN PRES
SUIT PRES
TANK 3LAODER PRES
PCM
0N80AR0
CF0001P
CF0012P
CF0120P
METER
METER
TRANSDUCER
CATEGORY
COMMON
COMMON
1 OF
3 M
SUIT PRESS
(CUFF GAGES)
10-20
CF0006P
METER
METER
COMMON
1 OF
2 M
10-28
CF00190
CF0016P
METER
METER
COMMON
COMMON
1 OF
2 M
10-40*
CF0010G
CF0009Q
METER
METER
COMMON
COMMON
1 OF
2 M
10-53*
10-52
CF0073P
CF0071T
METER
METER
COMMON
COMMON
1 OF
10-4;
CF0072P
METER
COMMON
CF0070P
METER
COMMON
CFOOIST
METER
COMMON
CF0Q34
METER
COMMON
ECS 02 FLOW
CF0035R
METER
COMMON
02 MANIFOLD PRESS
CF0036P
CF0015P
METER
COMMON
CF0020T
METER
COMMON
CFQ181T
HO
HO
HO
HO
HO
HO
HO
HO
HO
STEAM OUCT TEMP
CF0017T
SF0236T
HO
MANDATORY
10-21
(EACH CREWMAN)
2 M
REFERENCE
MISSION
REV
APOLLO 10 FNL
OATE
METER
SECTION
HO
GROUP
PAGE
INSTR
REQUIREMENTS
10-13
I I CSM CRYOGENICS
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 11 - CSM CRYOGENICS
ITEM
11-1
GENERAL
LAUNCH
THERE ARE NO CRYO FAILURES FOR WHICH THE LAUNCH/INSERT ION P H A S E WILL 8 TERMINATED. FOR
LOSS OF THE SYSTEM RESULTING IN THREE FUEL CELL FAILURES* ENTRY WILL 9 PLANNED
INTO PTP 2-l
THREE ENTRY BATTERIES ARE CAPABLE OF SUPPORTING THE LAUNCH* ONE REV OF POWER DOWN AND SCS ENTRY.
11-2
ALL PHASES
THE CRYOGENICS SYSTEM is REQUIREO UNTIL CM/S* SEP SO THAT T H E ENTRY AND LANOING PHASES WILL 3
ENTERED INTO WITH FuLL CONSUMABLES POTENTIAL* THAT IS* FULLY CHARGED ENTRY BATTERIES ANO ENTRY
02 TANKS. IF THIS CAPABILITY
is POTENTIALLY JEOPARDIZED BY CRYO SYSTEMS DEPLETION OR
MALFUNCTION. MISSION TERMINATION PROCEDURES WILL BE ENACTEO
IN WHATEVER TIME fRAME
APPROPRIATE OR AVAILABLE. ANY ENTRY BATTERY OR ENTRY 02 USAGE AFTER LOSS uF RfcCHARGE CAPABILITY
FROM THE CRYO SYSTEM WILL REDUCE SUPPLY AVAILABLE FOR ENTRY, i.ANOING AND PQSTLANOlNG*
11-3
MISSION
APOLLO 11
REV
DATE
SECTION
GftOUP
PAGE
GENERAL
11-1
ANO HYDROGEN
MISSION PLUS
TO
12
Center
MISSION RULES.
SECTION 11 - CIM CRYOGENICS
ITEM
ITEM*
SYSTEMS MANAGEMENT *
11-10
CRYO MANAGEMENT
A.
TANK PRESSURES GREATER THAN 750 PSIA 02 AND 200 PSIA FOR H2.
2*
8.
CRYO TANKS WILL BE ALLOWED TO VENT NORMALLY THROUGH TANK RELIEF VALVES.
C.
02 TANK FANS ANO M2 TANK FANS WILL NOT 8 OPERATED IN THE AUTO MOOE.
CRYO GAGING
A.
PERCENT
3.
L8
02.
MISSION
APOLLO 11
REV DATE
SECTION
GROUP
PAGE
MANAGEMENT
11-2
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION il - CSM CRYOGENICS
PULE
RULING
PHASE
CUES/NOTES/COMMENTS
LOSS OF ONE 02
AND/OR M2 CRYO TANK
I TAN*, PRESSURE
LESS THAN 150 0 2 .
LSS THAN IOC h2*
RESPECTIVELY)
A. CONTINUE MISSION
EO
TO&E
LAUNCH
ALL
11-21
LOSS OF aoTH 02
ANO/OR H2 CRYO TANK
(TANK PRESSURE
LESS THAN 15C 02.
LESS rHAN 100 N2t
RESPECTIVELY)
LAUNCH
CONTINUE MISSION
A. CONTINUE MISSION
ISOLATE SURGE TANK
PRIOR TO 800 PSIA.
EO
MISSION
APOLLO 11
REV
OATE
SECTION
GROUP
PAGE
SPECIFIC
11-3
NASA
- Manned Spacecraft
Center
MISSION RULES
SECTION 11 - CSM CRYOGENICS - CONCLuOEO
ITEM
INSTRUMENTATION REQUIREMENTS
11-50
MEAS DESCRIPTION
PCM
ONBOARD
MISSION
TRANSDUCERS
CATEGORY
REFERENCE
02 TANK 1 QTY
02 TANK 2 QTY
SC0032Q
SC0033Q
02 TANK 1 TEMP
02 TANK 2 TEMP
SC00MT
SC0042T
M2 TANK 1 QTY
H2 TANK 2 QTY
SCC030Q
SC0031Q
H2 TANK 1 TEMP
H2 TANK 2 TEMP
SC00O3T
02 TANK 1 PRESS
02 TANK 2 PRESS
SC0037P
SC0038P
METER
METER
H2 TANK 1 PRESS
H2 TANK 2 PRESS
SC0039P
SCOOtOP
METER
METER
METER
METER
METER
METER
MISSION
DATE
APOLLO 11
SECTION
COMMON
COMMON
|
(
1 OF 2
MANDATORY
11-20
HIGHLY
DESIRABLE
11-20
1 OF 2
MANOATORY
11-20
HIGHLY
DESIRABLE
11-20
COMMON
COMMON
1 OF 2
MANOATORY
11-20
COMMON
COMMON
1 OF 2
MANOATORY
11-20
COMMON
COMMON
GROUP
INSTR REU
PAGE
2 CSM ELECTRICAL
POWER SYSTEM
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 12 - C5M ELECTRICAL POWER SYSTEM
ITEM'
GENERAL
12-1
LAUNCH
LAUNCH WILL 8E CONTINUED AS LONG AS SUFFICIENT ENERGY IS AVAILABLE TO PERFORM AN ENTRY INTO
LEAST PTP 2-1. THERE MUST BE AT LEAST ONE MAIN BUS ANO ONE AC BUS OPERATIONAL TO CONTINUE,
12-2
THERE ARE NC FuEL CELL FAILURES FOR WHICH THE LAUNCH P^ASE WILL BE TERMINATED AS LONG
ENTRY 9ATTEWIES ARE REMAINING TO SUPPLY MAIN BUS LOAOS*
12-3
ALL PHASES
AS
AT
THflEE
THE MISSION WILL BE CONTINUED AS LONG AS THE REQUIRED NUMBER OF FuEL CELLS ARE AVAILABLE ANO ARE
CAPABLE OF SUPPORTING MISSION RETIREMENTS OF 75 TO 90 AMPS (WITHOUT BATTERY SUPPLEMENT EXCEPT
DURING SPS OELTA v'S> ANO THREE GOOO ENTRY BATTERIES REMAIN.
12-5
12-6
12-7
12-S
IF
A.
OUTPUT IS LESS THAN 3 AMPS WHEN CONNECTED TO A MAIN BUS DURING SPS MANEUVERS (NOMINAL TOTAL
BATTERY CURRENT FOR SPS NAMEUVERS IS 20 / 2 AMPS)
3.
SUSTAINED BATTERY CHARGER OUTPUT IS GREATER THAN 2*0 AMPS AND ALL LOAOS REMOVED*
AN AC BUS IS CONSIDERED FAILEO IF ANY TWO PHASES CANNOT S MAINTAINED GREATER THAN 95 VOLTS.
IF
A.
3.
IF
A.
OWN
PARASITIC
LOADS
(5
AMPS
PLUS
8.
C.
REGULATED H2 PRESSURE IS LESS THAN 36.7 PSIA (CORRESPONDS TO N2 PRESSURE SHIFT DOWN TO 28.2
PS!A FOR CRITICAL OPERATION- LOWER N2 PRESSURE CAN BE MANAGED BY TURNING OFF M 2 0 TANK.
PRESSURE).
TLI MINIMUM PURGE CAPABILITY IS BOTH OXYGEN ANO HYDROGEN ON ONE FUEL CELL ANO AT LEAST OXYGEN ON
ONE OTHER FUEL CELL.
MISSION
APOLLO 11
REV
OATE
SECTION
GROUP
PAGE
GENERAL
12-1
Center
MISSION RULES
SECTION 12 - CSM ELECTRICAL POWER SYSTEM
ITEM*
SYSTEMS MANAGEMENT
12-20
BUS MANAGEMENT
A*
ONE ANO ONLY ONE FUEL CELL MILL BE TIED TO BOTH MAIN BUSES*
INVERTERS WILL BE CONFIGURED SUCH THAT MAIN BUS A WILL SUPPLY AC 8US 1 ANO MAIN BUS
SUPPLY AC BUS 2.
MAIN BUS VOLTAGE WILL BE MAINTAINED GREATER THAN 26.5 VDC ANO LESS THAN 31
CELL MAY BE OPEN CIRCUITED FOR OPTIMUM VOLTAGE ANO POWER MANAGEMENT.
THE BATTERY CHARGE WILL BE USED TO CHECK OUT A SUSPECTED SHORTED BUS
AFTER ALL EQUIPMENT ANO POWER SOURCES NAVE BEEN REMOVEO FROM BUS*
MINIMUM MAIN BUS VOLTAGE
EQUIPMENT.
1.
SPS
2.
PGNS
3*
AUTO SM-RCS
4.
AUTO CM-RCS
21.0
5.
OIRECT SM-RCS
2JLO.
6.
DIRECT CM-RCS
17 + 0
7.
INVERTERS
19.0
WILL
BE
MAINTAINED
TO
3E
COMPATABLE
VOC.
(EXCEPT
WITH
WILL
ONE
FuEL
MAIN
ONLINE
BuSESi
OPERATION
23.0
22*0
12-21
BATTERY MANAGEMENT
A.
BATTERIES A ANO B WILL BE USED TO SUPPLEMENT MAIN BUS LOADS FROM T-75 SECONOS TO INSERTION.
8*
BATTERIES A ANO 9 WILL BE USED TO SUPPLEMENT MAIN SUS LOAOS FOR SPS MANEUVERS* BATTERY
WILL BE ROTATED IN THE EVENT THE BATTERY CHARGER FAILS TO MAINTAIN BATTERY BALANCE*
BATTERY CHARGING WILL BE TERMINATED FOR ONE OF THE FOLLOWING* WHICHEVER OCCURS FIRST
1*
2.
THREE BATTERIES WILL BE TIED TO THE MAIN BUSES FOR OEORSIT MANEUVER ANO ENTRY.
BATTERIES ARE CONSIDERED TO HAVE *O AMP-tiR CAPABILITY INFLIGHT ANO *5 A M P - H R CAPABILITY FOR
POSTLANOING.
A SINGLE BATTERY THAT CANNOT BE RECHARGED WILL NOT BE USED EXCEPT DURING OEORBIT* ENTRY ANO
POSTLANOING.
BATTERY VENT VALVE WILL REMAIN CLOSED UNLESS MANIFOLO PRESSURE IS GREATER
VENTING OPERATION WILL BE ALLOWED TO T R O U B L E S H O O T A SUSPECTEO FROZEN DUMP.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
MANAGEMENT
12-2
THAN
PSIA*
NASA
- Manned Spacecraft
Center
MISSION RULES
SECTION 12 - CSM ELECTRICAL POWER SYSTEM
ITEM
12-22
3*
2*
3.
GREATER
THAN
PREDICTED
FUEL
FUEL CELL 02 PURGES WILL BE DONE AT 12 HOUR INTERVALS* FUEL CELL H2 PURGES WILL SE OONE
48 HOUR INTERVALS*
AT
12-23
THAN
DEG
FUEL CELLS MAY BE PURGED TO PRECLUOE VENTING OF CRYO TANKS OR FOR CRYO PRESSURE MANAGEMENT.
INVERTER MANAGEMENT
INVERTERS MAY 86 REMOV60 FROM LINE FOR ANY OF THE FOLLOWING REASONSA*
B*
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
MANAGEMENT
12-3
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 12 - CSM ELECTRICAL POWER SYSTEM
'RULE
CONQITlON/MALrUNCTION1
PHASE
RULING
CUES/NOTES/COMMENTS
LAUNCH
A. CONTINUE MISSION
EO
8* NO-GO F0 TLI
1* OPEN CIRCUIT
CELL.
UEL
Bl.
2* RECONFIGURE
REMAINING TWO FUEL
CELLS TO ONE FUEL CELL
PER MAIN BUS ONLY*
3. IF FUEL CELL CANNOT
BE RESTOREOt PERFORM
SHUTOOWN*
12-31
TLC
LUNAR
ORBIT
LUNAR
STAY
ALL
0* CONTINUE MISSION
LM SYSTEMS MAY
SUPPLEMENT CSM POwER.
LAUNCH
BE
USED
A. CONTINUE MISSION
AFTER 2 00 GET
PERFORM
1. EDS AUTO/OFF TO
OFF.
2. IF LOSS OF FC 1 ANO
2* TIE BAT C TO MAIN
A
3. IF LOSS OF FC 2 ANO
3* TIE BAT C TO MAIN
8.
< IF LOSS OF FC 1 ANO
3t TIE BAT C TO BOTH
MAIN BUSES*
ALL
B*
ONE ENTRY BATTERY MAY &E
TO SUPPLEMENT REMAINING FC FOR
ALIGNMENT PRIOR TO DEORBITT
2. PERFORM uOSS OF
TWO FC POWER DOWN*
MISSION
APOLLO IX
REV
OATE
SECTION
GROUP
FUEL CELLS
PAGE
TO
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 12 - CSM ELECTRICAL POWER SYSTEM
RULE ' lONOITION/MALFUNCTlQN*
12-32
PHASE
'
RULING
CUES/NOTES/COMMENTS
A.l.lA)
IF
TOTAL
OUTPUT
CAPABILITY LESS THAH 8 AMPS AT 22
VOC. SMJC WILL 3E INOPERATIVE FGk
CM/SM SEP.
ALL
LAUNCH
TOTAL OUTPUT
ALL
CAPABILITY
LESS THAN 36 AMPS
AT MAIN BUS
VOLTAGE OF 26.3
VOC
2* NOT APPLICABLE
C.I.
LAUNCH
12-33
C 1 * J 6 _ A M P S REPRESENTS MINIMUM
POWER TO SUPPORT 5/C SYSTEMS IN
ORBIT.
2* NOT APPLICABLE
LAUNCH
A* ABORT
EO
ALL
MISSION
APOLLO 11
REV
OATE
SECTION
GROUP
PAGE
FUEL CELLS
12-5
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 12 - CSM ELECTRICAL POWER SYSTEM
R
12-*O
PHASE
'
LAUNCH
RULING
CUES/NQTES/COMMENTS
A* CONTINUE MISSION
1. EOS AUTO/OFF TO
OFF.
2*
IF LOSS OF BAT At
TIE BAT C TO MAIN
A.
3. IF LOSS OF BAT 3*
TIE BAT C TO MAIN 3.
'
EO
ALL
NOMINAL MISSION*
B.
IF LOST DURING SPS MANEUVER*
CONTINUE ON REMAINING BATTERY.
i
i
12-41
A* CONTINUE MISSION
ALL
B.
1. EDS AUTO/OFF TO
OFF.
a*
ATTEMPT
MAINS.
BATTERY
i
i
i
i
12-42
LOSS OF BATTERY
CHARGER
EO
A. CONTINUE MISSION
TLC
'
'
REF MALF
PROC
LO
LUNAR
STAY
0.
1
1
MISSION
APOLLO 11
REV
OATE
SECTION
GROUP
ATTERIES/
CHARGER
PAGE
12*4
EPS-*
MANEUVER.
C
TO
BUT*
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 12 - CSM ELECTRICAL POWER SYSTEM
i TE."
RULE
12-30
CONOITION/MALFUNCTION 1
PHASE
'
RULING
CUES/NOTES/COMMENTS
LAUNCH
A.I.
CONTINUE MISSION
(A) IF MOTOR SW
A/C TIE BAT
C TO MAIN
8US A,
(B) IF MOTOR SW B/C
TIE BAT C TO
MAIN BUS 8*
2. CONTINUE MISSION
CLOSE ALTERNATE
MOTOR SW ANO USE
MAIN BUS TIE CS'S
AS MOTOR SWITCHES.
3. ONE OR BOTH
MOTOR SW FAILED
CLOSED
ALL
CONTINUE MISSION
USE CB'S AS MOTOR
SWITCHES*
A.2.
BATTERIES MUST 36 CHARGED
THROUGH OPEN MOTOR SW
LEAVE BAT
RLY CB CLOSED FOR CHARGING.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
CSM ELECTRICAL
POWER SYSTEM
DC
DISTRIBUTION
12-7
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 12 - CSM ELECTRICAL POWER SYSTEM
RULE
12-31
CONDITION/MALFUNCTION1
PHASE
PULING
CUES/NOTES/COMMENTS
LAUNCH
A.2.
a*
FUEL CELL 2
DISCONNECTS FROM
MAIN B
LAUNCH
(D) INVERTER 3 TO AC
BUS 1. MAIN B.
(E) POWER DOWN MAIN
BUS A*
(F) rvc GIMBAL DRIVE
(PY)-2.
(G) GIMSAL MOTOR
CONTROL (YAW 2.
PITCH 2) BAT B OPEN
FOLLOWING GIMBAL
MOTOR TURN ON,
ALL
C.I. ABORT
ALL
MISSION
APOLLO 11
REV
C.i.
FAILURE OF MOTOR SWITCH TO
DISCONNECT
FROM
SHORTEO
BUS
INOICATED BY FC SHORTED BUS T/ft
GRAY*
DATE
SECTION
GROUP
PAGE
oc
12-9
DISTRIBUTION
Center
MISSION RULES
SECTION 12 - CSM ELECTRICAL POWER SYSTEM
i TLM
RULE 'CONDITION/MALFUNCTION1
12-52
A. BATTERY BUS
SHORTED IS GREATER
THAN 5 AMPS
PHASE
RULING
'
LAUNCH
A.I.
CUES/NOTES/COMMENTS
CONTINUE MISSION
1.2-33
ALL
BATTERY BUS
ALL
SHORTED LESS THAN
3 AMPS
CONTINUE MISSION
REMOVE POWER FROM BUS
EXCEPT FOR MANEUVERS
AND ENTRY
LAUNCH
A.I.
ALL
12-3*
CONTINUE MISSION
LUNAR
ORBIT
LUNAR
STAY
3. CONTINUE MISSION
PERFORM ASCENT AT
NEXT BEST OPPORTUNITY
AFTER EVA.
ALL
CONTINUE MISSION
A* LOSS OP ONE
LAUNCH
BATTERY BUS* AIN
ALL
BUS* (UNABLE TO
POWER BUS)
A.I.
LAUNCH
8. LOSS OF BATTERY
RELAY BUS (UNABLE
EO
TO POWER BUS!
TLC
B.I.
A.2.
REMOVE POWER FROM auS. IF j
SHORTED LESS THAN OR EQUAL TO 10 \
AMPS. POWER BUS JUST PRIOH TO ENTRY i
TO MAINTAIN SECS REDUNDANCY.
j
A.2.
CONTINUE MISSION
LUNAR
ORBIT
LUNAR
STAY
3. CONTINUE MISSION
PERFORM ASCENT AT
NEXT BEST OPPORTUNITY
AFTER EVA
J
MISSION
APOLLO 11
REV
OATE
SECTION
GROUP
PAGE
OC
OISTIIIBUTION
12-9
Center
MISSION RULES
ONOITION/MALFUNCTION'
12-60
LOSS OF TWO
INVERTERS
PHASE
LAUNCH
RULING
CUES/NOTES/COMMENTS
A. CONTINUE MISSION
A*
12-61
12-62
B*
LOSS OF BOTH AC
BUSES
LAUNCH
SOTh
B*
CONSIDERATION WILL 9 GIVEN
TO RETAINING LM FOR SYSTEM BACKUP.
A. CONTINUE MISSION
B*
A*
REF MR-
ALL
A.2*
INITIATE CONTINUOUS
PURGE FOR COOLING.
B.I.
USE
LM
SYSTEMS
( IF
AVAILABLE) FOR AC POWERED FUNCTIONS
TO ENTRY*
2*
FOR CSM ONLYt ENTER WITH 11^
1-1/2 HOURS* INITIATE
E CONTINUOUS F
H2 PURGE FOR CO
COOLING*
MISSION
APOLLO 11
RtV
OATE
FQ
SECTION
GROUP
PAGE
CSM ELECTRICAL
POWER SYSTEM
AC
DISTRIBUTION
12-10
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 12 -
CONCLUOED
ITEM
INSTRUMENTATION REQUIREMENTS
12-70
MEAS DESCRIPTION
ONBOARD
TRANSDUCERS
CATEGORY
MISSION RULE
REFERENCE
SEPARATE
HIGHLY DESIRABLE
HIGHLY 0ESIRA8LE
HIGHLY DESIRABLE
HIGHLY OSIRA8L
HIGHLY 0ESIRA8LE
12-5t6.61
HIGHLY 0ESIRA8LE >
COMMON
METER
AC BUS 2 PHASE A VAC
AC BUS 2 PHASE B VAC
AC BUS 2 PHASE C VAC
CC0203V
METER
METER
METER
SEPARATE
CC0206V
CC0207V
CC0210V
CC0211V
CC0232V
METER
METER
METER
METER
METER
SEPARATE
SEPARATE
SEPARATE
SEPARATE
SEPARATE
BAT A CURRENT
BAT 8 CURRENT
BAT C CURRENT
CC0222C
CC0223C
CC0224C
METER
METER
METER
COMMON
COMMON
COMMON
2 OF 3 MANOATORY
12-4#33
FC 1 CURRENT
FC 1 02 FLO
FC 1 H2 FLO
SC2113C
SC2141R
SC2139R
METER
METER
METER
COMMON
COMMON
COMMON
1 OF 3 MANOATORY
12-7,31.32t33.
22 A
FC 2 CURRENT
FC 2 02 FLO
FC 2 M2 FLO
SC21I4C
SC2142R
SC2140R
METER
METER
METER
COMMON
COMMON
COMMON
1 OF 3 MANOATORY
12-7t313233
22A
FC 3 CURRENT
FC 3 02 FLO
FC 3 H2 FLO
SC2113C
SC2144R
SC2141R
METER
METER
METER
COMMON
COMMON
COMMON
1 OF 3 MANOATORY
12-7t31t32t33
22A
SC0215C
METER
COMMON
HIGHLY DESIRABLE
FC 1 SKIN TEMP
FC 2 SKIN TEMP
FC 3 SKIN TEMP
SC2084T
SC2083T
SC2086T
METER
METER
METER
COMMON
COMMON
COMMON
HIGHLY 0E*IRA8L
HIGHLY DESIRABLE
12-223
HIGHLY DESIRABLE *
FC 1 CONO TEMP
FC 2 CONO TEMP
FC 3 CONO TEMP
SC2081T
SC2082T
SC2083T
"ETER
METER
METER
COMMON
COMMON
COMMON
HIGHLY 0ESIRA8L6,
HIGHLY DESIRABLE; 12-22B
HIGHLY DESIRABLE ^
SC2087T
SC2088T
SC2081T
METER
METER
METER
COMMON
COMMON
COMMON
HIGHLY DESIRABLE i
HIGHLY DESIRABLE
12-221
HIGHLY DESIRABLE*
NO
MCWS
MCWS
MCWS
TALKBACK
TALKBACK
TALK8ACK
MANOATORY
DESIRABLE
DESIRABLE
DESIRABLE
HIGHLY DESIRABLE
METER
CC0175T
CC0176T
CC0177T
SC2160X
SC2161X
SC2162X
INV 1 TEMP
INV 2 TEMP
INV 3 TEMP
FC 1 PM
FC 2 PM
FC 3 PM
1 OF 2
HIGHLY
HIGHLY
HIGHLY
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
HIGHLY
HIGHLY
HIGHLY
HIGHLY
HIGHLY
HIGHLY
APOLLO 11
REV
DATE
SECTION
GROUP
0E5IRA8LE
DESIRABLE
DESIRABLE
DESIRABLE,
0ESIRA8LE
12-22E
0ESIRA8LE ]
MISSION
12-32,52,20C
12-22
PAGE
INSTR REQ
12-11
13 DOCKING AND
UMBILICAL
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
SECTION 13 - DOCKING AND UMBILICAL
RLV
R * ITEM
GENERAL
13-1
THREE GOOD DOCKING RING LATCHES 120 DEG* APART ARE REQUIRED FOR AN IVT
13-2
THREE GOOD DOCKING RING LATCHES 120 DEG. APART ARE REQUIRED FOR A DOCKED RCS MANEUVER.
13-3
DOCKED SPS OR DPS BURNS REQUIRE AT LEAST NINE DOCKING RING LATCHES.
DOCKING
RING
LATCrt
13-3
WITH FAILURE OF THE CSM FOWARO HATCH PRIMARY LOCK/UNLOCKED MECHANISM* THE NOMINAL
BE PERFORMED USING THE SECONDARY LOCK/UNLOCK MECHANISM.
13-6
LOSS OF VISUAL DOCKING AIDS (COA5 AND TARGETS) WILL NOT INHIBIT DOCKING AND UNDOCKING.
13-7
BACK
INDICATORS*
MISSION
ARE
TO
WILL
BARBER
N O T E T H E ONLY DOCKING PROBE INSTRUMENTATION CONSISTS OF TWO TALK BACK INDICATORS IN THE CSM.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
GENERAL
13-1
Center
MISSION RULES
REV
ITEM
ITEM
MANAGEMENT '
13-11
TWO NITROGEN BOTTLES ARE REQUIRED FOR UNDOCKING. FOR SYSTEM RETRACT FAILURE.
BOTTLE IN THE SAME SYSTEM BEFORE UTILIZING BOTTLES IN THE REDUNDANT SYSTEM
USE
13-12
OF
BE
INSTALLED
FOR
ANY
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
DOCKING ANO
UMBILICAL
MANAGEMENT
PAGE
13-2
TYPE
TM6
SECOND
S^ONO
MANEUVER
Center
MISSION RULES
RlV
ITfM
RULE
CONDITION/MALFUNCTION'
PHASE
RULING
CUES/NOTES/COMMENTS
CONTINUE MISSION
RETURN LM TO DESCENT
BATTERY POWER
13-21
FAILURE TO ACHIEVE
5-IVB/LM SEPARATION
OR FAILURE TO MATE
LM UMBILICALS (P23
AND P24)
13-22
FAILURE TO ACHIEVE
CSM/LM FINAL
SEPARATION
BE ACHIEVED
LEAST
ONE
POWER
CAN
BE
SWITCHED
MAINTAINED WITH EITHER
DOCKED
BE
AND
MODIFIED
13-23
13-24
FAILURE TO INDICATE
DOCKING PROBE EXTEND
OR BOTH TALK BACK
INDICATORS ARE
BARBER POLE*
UNOCCKED
CONTINUE MISSION
ATTEMPT TDfrE
TUNNEL
CANNOT REMOVE
DOCKING
PROBE LM DROGUEt
ANO/OR LM UPPER
HATCH*
TDfrE
DOCKED
B*
MISSION
APOLLO 11
DATE
NOT
8E
PERFORM
REV
CAN
CONTINUE MISSION
DOCKED
PRESSURE
MAINTAINED*
8. CONTINUE MISSION
ATTEMPT DOCKlNw
IF LM MANNEDt
EVT TO CSM*
13-25
SECTION
GROUP
DOCKING ANO
UMBILICAL
SPECIFIC
PAGE
13-3
MAY
BE
Center
MISSION RULES
SECTION 13 - DOCKING ANO UMBILICAL
1
RULE
ONDITION/MALFUNCTION
13-26
FAILURE TO RELEASE
CAPTURE LATCHES
PHASE
RULING
DOCKED
CUES/NOTES/COMMENTS
REDOCK
PERFORM RETRACTION
13-27
PRIMARY FORWARD
HATCH LOCK/UNLOCK
MECHANISM
INOPERATIVE
13-28
ALL
CONTINUE MISSION
CONTINUE MISSION
1* ATTEMPT TO SEAL
HATCH WITH
4 PSID*
2 JUST PRIOR TO
ENTRYt P^ESS
CABIN TO 15
PSI. AT DROGUE
DEPLOY OPEN
RAPID REPRESS*
3. ENTER IN SUITS
13-29
NO DOCKING
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
SPECIFIC
13-4
Center
MISSION RULES
SECTION 14 - CSM SEQUENTIAL
R
ITEM
GENERAL
LAUNCH
THERE ARE NO SEQUENTIAL MALFUNCTIONS FOR WHICH LAUNCH WILL BE TERMINATED.
14-2
14-3
14-4
14-5
IF
A.
VOLTAGE IS LESS THAN 22 VDC AND UNABLE TO ACTIVATE RCS ENABLE AND/OR
(CD0170X AND/OR CDO123X SYSTEM A, CD0171X ANQ/OR C00124X SYSTEM 8 ) .
B*
SLA
IF
A*
B*
FAILURE TO PERFORM ANY SEQUENTIAL FUNCTION WITH SUSPECTED FAILED PYRO SYSTEM*
MISSION
APOLLO il
REV
DATE
SECTION
GROUP
GENERAL
PAGE
RELAYS
NASA
- Manned
Spacecraft
Center
MISSION RULES
9V
ITEM
ITEM
14-10
MANAGEMENT *
SITH"ARMINGLTHHTPYREW
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
MANAGEMENT
14-2
"
GROUND
T0
TELEMFTRY
PROCEED
Center
MISSION RULES
R RULE CONOITION/MALFuNCTI ON
i
t
PHASE
'
RULING
i
i
CUES/NOTES/COMMENTS
t
i
14-21
LAUNCH
A, CONTINUE MISSION
ENTER 1-1 IF BUS NOT
RESTORED
EO
TLC
B.
LUNAR
ORBIT/
LUNAR
STAY
C. CONTINUE MISSION
At
TERMINATE OPERATIONS
ENTER NEXT BEST PTP IF
BUS NOT RESTORED
VDC
A. SHORTED GREATER
THAN 10 AMPS
LAUNCH
A.I*
EO
CONTINUE MISSION
2. TERMINATE OPERATIONS
ENTER NEXT BEST PTP
TLC
LUNAR
ORBIT/
LUNAR
STAY
3. CONTINUE MISSION
B CONTINUE MISSION
C.I,
2*
1
'
1
1
'
MISSION
APOLLO 11
REV
DATE
A.2.
USE BATTERY TIE
POWER TO AFFECTED BUS
FOR
PYRO
B.
USE BATTERY TIE
POWER TO AFFECTED BUS
FOR
PYRO
CONTINUE MISSION
1
ATTEMPT FUNCTION
1
USING
SUSPECTED FAILED BUS 1
1
ONLY
C.2. ASSUME
GREATER THAN
IF ENTRY BAT
BAT* VOLTAGE
TO BAT BUS
(A) IF FUNCTION
NORMAL* CONTINUE
MISSION
(B) IF' FUNCTION DOES
NOT WORK,
NORMALLY* ENTER
NEXT BEST PTP
SECTION
GROUP
PAGE
SPECIFIC
14-3
PYRO
BAT
VERIFIED
35 VDC PRIOR TO ARMING.
USED IN LIEU OF PYRO
SHOULD 8E APPROXIMATELY
VOLTAGE.
Center
MISSION RULES
oI
ITEM
RULE
PHASE
RULING
CUES/NOTES/COMMENTS
CD0133X.
A, BAT C VOLTAGE
MONITORED ONBOARD
ONLY
14-22
2. OR 3
'CONTINUE MISSION
'
A, IF ANY ENTRY BATTERY
LESS THAN 22 VCCt EDS
AUTO/OFF SWITCH TO OFF
CAN
BE
14-23
14-24
LAUNCH
SMJC ACTIVATES
PREMATURELY
ALL
CONTINUE MISSION
ATTEMPT JETTISON PER CREW
CHECKLIST EMERGENCY
PROCEDURE
B.
IF UNOOCKEDt RETURN TO
CSM AND PERFORM CSM/LM1
FINAL SEP
8.
14-25
ALL
ACTIVATED CM RCS
PRESS LOGIC RELAYS.
CONTINUE MISSION
A* PRIOR TO CM RCS
P R E S S 0 0 NOT ARM
RESPECTIVE PYRO BUS
(FOR BOTH INDICATIONS
PERFORM SLA SEP WITH
SECS ARM CB'S OPEN*)
B AT CM RCS P R E S S A R M
RESPECTIVE PYRO BUS
CD0123X AND/OR CD0124X
14*26
ACTIVATED SLA DEPLOY ALL
LOGIC RELAYS
CONTINUE MISSION
A. PRIOR TO SLA S E P 0 0
NOT ARM RESPECTIVE
PYRO BUS
S. FOR SLA S E P A R M
RESPECTIVE PYRO BUS
FIRST
MISSION
APOLLO 11
REV
DATS
SECTION
GROUP
PAGE
SPECIFIC
14-4
Center
MISSION RULES
SECTION 14 - CSM SEQUENTIAL
REV
RULE
CONOITION/MALFUNCTION'
PHASE
'
RULING
CUES/NOTES/COMMENTS
14-27
UNABLE TO PERFORM
SLA SEPARATION
TLC
14-28
LOST GROUND TO
REGISTER NETWORK
FOR LOGIC OR PYRO
ALL
CONTINUE MISSION
DO NOT ARM AFFECTED
SYSTEM UNTIL SEQ GO/NO-GO
B. ENTER NEXT BEST PTP
PRIOR TO ENTkY UNLESS
OTHER PYRO SYSTEM FAILS*
ALL
BUS VOLTS
MEASUREMENTS
REF MR
ARMING
SYSTEM
WITH
VOLTAGE
GREATER THAN 18 VDC MAY RESULT IN
PERMANENT LOSS OF THAT PAH TRAIN*
14-40
ACTIVATED APEX
JETTISON LOGIC
RELAYS
LUNAR
ORBIT
LUNAR
STAY
A* CONTINUE MISSION
DO NOT ARM PYRO BUSSES
'UNTIL MALFUNCTION HAS
'BEEN ISOLATED
DETECTED
AT
SECS
(CDU230X AND CD023X)
POWER
MAY BE DETECTED AT
(CEOOOlX AND/OR CE0002X)
ANY
14-41
ACTIVATED DROGUE
CHUTE DEPLOY LOGIC
RELAYS
ALL
LUNAR
ORBIT/
LUNAR
STAY
A, CONTINUE MISSION
DO NOT ARM PYRO BUSES
UNTIL MALFUNCTION HAS
BEEN ISOLATED
TIME
14-42
ACTIVATED PILOT
CHUTE DEPLOY LOGIC
RELAYS
LUNAR
ORBIT/
LUNAR
STAY
ALL
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
SPECIFIC
PAGE
Center
MISSION RULES
SECTION 14 ft
CSM SEQUENTIAL
CONCLUDED
ITEM
INSTRUMENTATION
REQUIREMENTS
MISSION RUL
REFERENCE
MEAS DESCRIPTION
PCM
CDOOOSV
CD0006V
1 OF
2 M
14-21
14-21
CD0200V
CD0201V
HD
HD
14-20
14-20
APEX JET A
APEX JET B
CDO23OX
CD0231X
HO
HD
14-40
14-4 0
DROGUE DEPLOY A
DROGUE DEPLOY B
CE0001X
CE0002X
HD
HD
14-41
14-41
CE0003X
CE0004X
HD
HD
14-42
14-42
C00123X
CD0170X
HD
HD
14-26
CD0124X
CD0171X
HD
HD
14-26
CD0173X
CD0174X
HD
HD
14-2 3
14-2 3
CD0023X
CD0024X
HD
HD
CREW ABORT A
CREW ABORT 3
CD0130X
C00131X
HD
HD
CD0132X
CD0133X
CD0134X
HO
HD
HD
EDS ABORT A
EDS ABORT B
CD0133X
C0Q136X
HD
HO
CEO321X
CD0322X
HD
BS0080X
BSOO81X
HD
HD
CSO22OT
HD
C S M - L V LOCK, RING
SEP' RELAY A
SEP RELAY B
CSM-LM LOCK. RING
LM CURRENT
CD1154X
HD
19-23
HD
19-23
MISSION
APOLLO 11
ONBOARD
CD113X
SC2962C
REV
DATE
METER
SECTION
TRANSDUCERS
CATEGORY
COMMON
GROUP
HO
PAGE
INSTft REQ
14-4
14-22
14-22
14-22
c
I t 5 CSM GUIDANCE
I
AND CONTROL
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 13 - GUIDANCE ANO CONTROL
R
ITEM
' GENERAL
15-1
LAUNCH
THERE ARE NO FAILURES OF THE CSM GUIDANCE AND CONTROL SYSTEM WHICH ARE CAUSE FOR ABORT,
15-2
IN ORDER TO CONTINUE THE MISSION PAST THE NEXT BEST PTP. THE GUIDANCE AND CONTROL SYSTEMS
MUST PROVIDE SPS CRITICAL BURN CAPABILITY AND ONE BACKUP DEORB1T METHOD (SM OR HYaRID). THE
FOLLOWING MINIMUM CAPABILITIES MUST BE A V A I L A B L E
1.
2.
TVC (CRITICAL B U R N S ) ONE TVC SERVO LOOP IN EACH AXIS AND ONE TvC
MODE (ACCEL CMD EXCLUDED).
3.
CONTROL
B.
IN ORDER TO PERFORM A NON-CRITICAL BURN AFTER THE STORAGE TANKS ARE EMPTY. THE GtC SYSTEMS
MUST PROVIDE THE TMt CAPABILITY.TO EXECUTE AN ULLAGE MANEUVER BY fclTHER CMC AUTO (RCS DAP)
SCS AUTO* OR DIRECT ULLAGE.
C#
IN ORDER TO COMMIT TO THE TRANSLUNAR COAST PHASEi THE GUIDANCE AND CONTROL SYSTEMS MUST
PROVIOE SPS NON-CRITICAL GUIDANCE AND CONTROL SYSTEMS BURN CAPABILITY. THE FOLLOWING
MINIMUM CAPABILITIES MuST ALSO BE AVAILABLE TO BE GO FOR TLl
ATTITUDE CONTROLDIRECT RCS AND RATE DAMPING IN EACH AXIS*
7 V C T W O SERVO LOOPS AND BOTH GfrN AND ONE SCS TVC CONTROL MODES I ACCEL
EXCLUDED).
3frN-CMCt IMU AND
ALIGNING PLATFORM.
15-3
MDC
DSKY
FULLY
OPERATIONAL
AND
OPTICS
CAPABLE
<
5.
CMO
OF
TRANSLUNAR COAST
IN ORDER TO CONTINUE THE MISSION PAST THE NEXT BEST PTP* THE GUIDANCE ANO CONTROL
PROVIDE THE FOLLOWING MINIMUM CAPABILITIES
A.
8.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
GENERAL
15-1
SYSTEMS
MUST
Center
MISSION RULES
REV
ITEM
R ITEM
13-4
5.
15-5
LOX WILL BE INHIBITED OR LUNAR ORBIT TERMINATED EARLY IF EITHER REDUNDANT ATTITUDE CONTROL.
REDUNDANT SPS CONTROL OR NON-CRITICAL S*>S CAPABILITY Is LOST, IN ADDITION. THE FOLLOW INC
MINIMUM CAPABILITIES MUST BE AVAILABLE BEFORE COMMITTING TO OR CONTINUING LUNAR ORBIT.
1.
2.
TVCBOTH
3.
G & N T H E G6N MUST BE FULLY OPERATIONAL WITH THE EXCEPTION OF OPTICS ANO NAV
DSlCY, OPTICS MUST BE CAPABLE OF ALIGNING PLATFORM*
4.
RCS TRANSLATIONX-AXIS
SERVO LOOPS AND TWO TVC CONTROL MODES (ACCEL CMD EXCLUDED 1.
IN,ORDER TO PERFORM A NON-CRITICAL BURN THE G*C SYSTEMS MuST PROVIDE THE CAPABILITY
EXECUTE AN ULLAGE MANEUVER BY EITHER CMC A'jTO (RCS DAP), SCS AyTO OR DIRECT ULLAGE-
TO
UNDCCKEO
THE UNOOCKSD PHASE WILL BE O E L E T E D OR TERMINATED IF THE G*C SYSTEMS CANNOT PROVIDE REDQCKIN5 OR i
LM RESCUE CAPABILITY. THE GfrC SYSTEMS MUST PROVIDE DIRECT RCS RATE DAMPING AND TRANSLAT ON j
CAPABILITY IN EACft AXIS FOR DOCKING/UNDOCKING
CONTROL. IN ADDITION* THE FOLLOWING
TNI
CAPABILITIES *OR LM RESCUE MUST BE AVAILABLE-
ONE DSKY
DIRECT RCS
15-6
ASCENTt DESCENT- -THERE ARE NO GUIDANCE AND CONTROL SYSTEM FAILURES THAT AFFECT
DESCENT PHASES.
RULES 15-7
THROUGH
MISSION
APOLLO 11
REV
DATE
isECTION
CROUP
PAGE
GENERAL
15-2
THE
ASCENT
OR
Center
MISSION RULES
REV
ITEM;
ITEM
SYSTEMS MANAGEMENT
15-10
ATTITUDE CONTROL-CSM. IN ACTIVE RCS CONTROL- LM WILL NOT BE IN ACTIVE ATTITUOE HOLD. LM IN
ACTIVE RCS CONTROL- CSM WILL NOT BE IN ACTIVE ATTITUOE HOLD. FOR DOCKIN ACTIVITIES AFTER OPENING
THE APS INTERCONNECT (BOTH VEHICLES IN ACTIVE RCS CONTROL>t THE CSM MUST BE IN A TIGHTER
DEADBANO THAN THE LM.
13-11
PIPA ANO IRIG BIAS WILL BE UPDATED WHEN ACTUAL BIASES DIFFER FROM
C.007 FT/SEC2 AND 0.075 DEG/HR RESPECTIVELY.
15-12
VALUES
IN
CMC
ERASABLE
SHOULD THE DELTA V COUNTER DRIFT BE GREATER THAN 0.01 FT/SEC2 FOR AN RCS MANEUVERt Th- VC
SETTING WILL BE APPROPRIATELY 3IASED. SHOULD THE DRIFT BE GREATER THAN 0.1 FT/SEC2. THE EMS~ILL
BE CONSIDERED FAILED.
CSM* LM W E I G H T WILL BE UPDATED WHEN GROUND COMPUTED VALUES DIFFER FROM CMC STORED VALUES BY
1.0 PERCENT. ^EIGHTS MUST BE UPDATED WHEN GROUND VALUES DIFFER FROM CMC VALUES BY 10.0 PERCENT.
1
[
1
1
ii
j
i
1
!
J
i !
i
1
!
(MISSION
|APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
SYSTEMS
MANAGEMENT
15-3
Center
MISSION RULES
REV
ITEM
RULE
CONDITION/MALFUNCTION*
PHASE
RULING
CUES/NOTES/COMMENTS
LOSS OF EITHER
SHAG 1 OR 2
IN EITHER PITCH
OR YAM CHANNEL
CONTINUE MISSION
ALL
A*
GfrC-1 >
B.
C
IF IN YAH CHANNELt AFTER
*03G RSI IS USABLE IF REMAINING
GYRO IS SELECTED FOR RATE, RSI MUST
BE REALIGNED IN AODITION TO THE
ABOVE* FOR YAW FAILURE AFTER *OSG*
15-21
A* CONTINUE MISSION
TLC
DESCENT
C. CONTINUE MISSION
ALL
OTHERS
D.I,
2* IF STAGED*
STAGE FOR TEI.
RETAIN
LM
ASCENT
[15-22
. CONTINUE MISSION
.
RSI AND SCS
FDA I
ROLL
UNUSABLE WITH YAM CHANNEL FAILURES*
A* CONTINUE MISSION
2*
B* NUMBER TWO
ALL
CONTROL
RSI VALID*
B*l.
USE OF ATT I/RATE 2 AND LIM
CYCLE MAY
PROVIDE
RATE
DAMPED
ATTITUDE HOLD WHEN RCS DAP IS NOT
USED.
GYRO PACKAGE 2 MUST
B
POWERED DOWN TO EFFfcCT ATTITUOE HCL&
IF FAILURE IS HARDOVER*
B. CONTINUE MISSION
2*
SELECTION OF RATE 1 ILL
PROVIDE BOTH RSI AND SCS FDAI ROLL
FOR ENTRY* RSI MUST BE REALIGNED FOR
ROLL FAILURE AFTER *05G*
{(MISSION
APOLLO 11
EV
DATE
SECTION
GROUP
SCS
PAGE
REV
SECTION 13 -
iTEM
RULE
13-23
CONOITION/MALFUNCTION
PHASE
'
LAUNCH
At CONTINUE MISSION
EO
B.
13-25
CUES/NOTES/COMMENTS
2.
13-24
RULING
B.I,
Center
MISSION RULES
TLC
ALL
OTHERS
D. CONTINUE MISSION
C.
NO SCS FDAI ROLL
AVAILABLE FOR ENTRY
OR
RSI
A. CONTINUE ALTERNATE EO
MISSION
SELECT 1 OR 2 ON TVC
GIMBAL DRIVE SWITCH
IN APPROPRIATE AXIS
TLC
B.
DESCENT
C CONTINUE MISSION
ALL
OTHERS
D.
LAUNCH
A* CONTINUE MISSION
D.
A.;.
SCS-A1
2*
NO MODE III OR IV CAPABILITY*
LIMITED
LANDING
POINT
CONTROL IN MODE III OR IV WIT*
SM-RCS.
B.
EO
TLC
DESCENT
D.
ALL
OTHERS
13-26
E.
LOSS OF PROPORTIONAL
CONTROL FROMA* CONTINUE MISSION
USE REMAINING RHC
A. EITHER RHC
B.
CONTINUE MISSION
BOTH RHC'S
B CONTINUE MISSION
USE DIRECT RCS OR
ACCEL CMD FOR MANUAL
MANEUVERS
ALL
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
B*
NO MTVC RATE OR MTVC
CAPABILITY
PAGE
SCS
15-5
ACCEL
CMD
NASA
- Manned
Spacecraft
Center
MISSION RULES
REV-
ITEM
R *RULE
<
CONDITION/MALFUNCTION
15-27
PHASE
'
B.
15-28
BOTH RHC'S
COMPLETE LOSS OF
AUTO ATTITUDE
CONTROL IN PITCH
AND YAW CHANNELS.
A. CONTROL IS
REGAINED BY
OPENING EMS CB'S
ALL
A. CONTINUE MISSION
LAUNCH
B.I*
2. CONTINUE MISSION
ALL
OTHERS
VIOLATES
DIRECT
RCS
ALL
A. CONTINUE MISSION
AFTER SM JETTISON EMS
MAY BE REENABLED
WITHOUT LOSS OF AUTC
RCS
'
b, CONTROL IS
ALL
REGAINED BY
PLACING S/C
CONTROL SWITCH TO
CMC.
B.
C# CONTROL IS NOT
REGAINED
DESCENT
CONTINUE MISSION
B*
C.2*
FAILURE VIOLATES RATE
REQUIREMENTS*
DAMPING
A. ONE
ALL
A* CONTINUE MISSION
B.
LAUNCH
B.I.
BC^H
B.3*
FAILURE
REQUIREMENT.
LOSS 0* FLIGHT
DIRECTOR ATTITUOE
INDICATORS
ij
CONTINUE MISSION
DESCENT
ALL
OTHERS
CUES/NOTES/COMMENTS
LOSS OF DIRECT
RCS CONTROL F R O M
A. EITHER RHC
RULING
2.
CONTINUE MISSION
NO-GO FOR LOI
3t CONTINUE MISSION
OESCNT
!
[
ALL
OTHERS
C.
IF STAGED*
'
{MISSION
JAPOLLO 11
REV
DATE
SECTION
CONTROL
GROUP
PAGE
5CS
15*6
Center
MISSION RULES
SECTION 15 - GUIOANCE AND CONTROL
R RULE 'CONDITION/MALFUNCTION1
15-30
PHASE
RULING
CUES/NOTES/COMMENTS
IN
F.
G.
H.
SCS
CAPABILITY
1.
SCS
DAMPING
J.
MINIMUM
ATTITUDE
IMPULSE
CONTROL
RATE
A. CONTINUE MISSION
TLC
B.
DESCENT
C. CONTINUE MISSION
ALL
OTHERS
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
SCS
15-7
Center
MISSION RULES
REV
ITEM
RULE
15-31
CONDITION/MALFUNCTION1
PHASE
'
RULING
CUES/NOTES/COMMENTS
IN
B.
C.
FDAI NO* 2
D*
E*
ATTITUDE
SCS
PITCH
AND
YAW
TOTAL
RSI
H.
A. CONTINUE MISSION
TLC
DESCENT
C. CONTINUE MISSION
ALL
OTHERS
D.
13-32
ALL
CONTINUE MISSION
15-33
LOSS OF ENTRY
MONITOR SYSTEM
ALL
CONTINUE MISSION
ji
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
SCS
! 6
Center
ITEM|
R RULE
CONDITION/MALFUNCTION
PHASE
RULING
CUES/NOTES/COMMENTS
t
i
13-3*
i
GROUND AT EITHER
EITHER SPS SOL
i
DRIVER OUTPUT
AND UNABLE TO REMOVE
LAUNCH
A. CONTINUE MISSION
B.
EARTH
ORBIT
i
c.
TLC
CONTINUE ALTERNATE EO
MISSION. USE OTHER SPS
BANK FOR ENGINE
OPERATION
NO-GO FOR LO!
19-35
LOSS OF TRANSLATION
HAND CONTROLLER
ALL
OTHERS
D.
A* CONTINUE MISSION
LAUNCH
EARTH
ORBIT
TLC
CONTINUE MISSION
I
i
LO
UNDOCKED
E. DOCK
i
1
B.
VIOLATES BOTH SM AND HYBRID
DEORBIT MINIMUM'. REQUIREMENTS.
D
VIOLATES
REQUIREMENTS*
F. CONTINUE MISSION
ALL
OTHERS
xi
RULE NUMBERS 15-36
THROUGH 15-*9 ARE
RESERVED.
i
|
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
scs
PAGE
15-9
LM
RESCUE
MINIMUM
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 13 - GUIDANCE AND CONTROL
R (RULE
15-50
CONDITION/MALFUNCTION*
PHASE
'
RULING
LOSS OF COMMAND
MODULE COMPUTER
LAUNCH
A. CONTINUE MISSION
EO
B.
CONTINUE ALTERNATE EO
MISSION
IF BOTH SP5 AND SM
OEORBIT CAPABILITY
AVAILABLE
TLC
LO
D.
CUES/NOTES/COMMENTS
B,
MINIMUM
VIOLATES
HYBRID
REQUIREMENTS
DEOftBIT
UNOOCKED
E.
DESCENT
F. CONTINUE MISSION
DOCK
E.
VIOLATES
REQUIREMENTS
ENTRY
ALL
OTHERS
LOSS OF
LM
RESCUE
A* CONTINUE MISSION
EO
TLC
2.
LO
UNDOCKED
4 DOCK
DESCENT
5. CONTINUE MISSION
ENTRY
ALL
OTHERS
7.
Bl
VIOwATES HYBRID
MINIMUM REQUIREMENTS
DEORBIT
*>
VIOLATES
REQUIREMENTS
MINIMUM
TERMINATE PHASE
AND ENTER NEXT BEST
PTP
LM
RESCUc
J
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
GfcN
15-10
NASA
- Manned
Spacecraft
Center
MISSION RULES
PHASE
15-52
RULING
CUES/NOTES/COMMENTS
LAUNCH
A* CONTINUE MISSION
EO
B. CONTINUE ALTERNATE EO
MISSION
IF BOTH SPS AND SM
DEORBIT CAPABILITY
AVAILABLE
TLC
LO
B. VIOLATES HYBRID
REQUIREMENTS
DEORBIT
MINIMUM
E.
E. DOCK
DESCENT
F. CONTINUE MISSION
ENTRY
G. PERFORM BACKUP ENTRY
H. TERMINATE PHASE ANO
ENTER NEXT BEST PTP
ALL
OTHERS
hUl. VIOLATES
REQUIREMENTS
LM
RESCUE
MINIMUM
15-53
LOSS OF OPTICS
I SUBSYSTEM
LAUNCH
A. CONTINUE MISSION
EO
B. CONTINUE ALTERNATE
EO MISSION
D VIOLATES
REQUIREMENTS
LUNAR
ORBIT
UNDOCKED
E. DOCK
ALL
OTHERS
F. CONTINUE MISSION
MISSION
APOLLO 11
REV
OATE
SECTION
GROUP
GfrN
PAGE
LM
RESCUE
MINIMUM
Center
MISSION RULES
SECTION 13 - GUIDANCE AND CONTROL
RULE
15-54
CONDITION/MALFUNCTION1
PHASE
'
RULING
CUES/NOTES/COMMENTS
LOSS OF OPTICS
SYBSYSTEM COUPLING
DATA UNIT DIGITAL
TO ANALOG
CONVERTER
LAUNCH
A. CONTINUE MISSION
EO
B* CONTINUE ALTERNATE
EO MISSION
IF BOTH SPS AND SM
DEORBIT
CAPABILITY AVAILABLE
TLC
LO
UNDOCKED
DESCENT
ALL
OTHERS
E. DOCK
F CONTINUE MISSION
G. TERMINATE PHASE AND
NEXT dEST PTP
D. 00 DPS TEI
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
GfrN
15-12
NASA - Manned
Spacecraft
Center
MISSION RULES
INSTRUMENTATION REQUIREMENTS
15-60
MEAS DESCRIPTION
PCM
ONBOARD
CG0001V
CH3604X
CH3605X
CH3517H
GPI
COMMON
1*2
CH3510H
GPI
COMMON
CG1110V
CG2300T
CH1513X
CG1523X
CG1533X
IG
IG
MG
MG
OG
OG
CG2112V
CG2113V
CG2142V
CG2143V
CG2172V
CG2173V
IX
IX
IX
ix
IX
IX
RSVR
RSVR
RSVR
RSVR
RSVR
RSVR
OUT
OUT
OUT
OUT
OUT
OUT
SIN
COS
SIN
COS
SIN
COS
TRANSDUCERS
-
EMS-SPS-ON SEPARATE
EMS-SPS-ON SEPARATE
FDAI
FDAI
FDAI
FDAI
FDAI
FDAI
CG3721V
CG3722V
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
CATEGORY
MANDATORY
MISSION RULE
REFERENCE
15-50
HIGHLY DESIRABLE
HIGHLY DESIRABLE
15-34
15-34
1 OF 2 MANDATORY
-OB/HD-PCM
1 OF 2 MANDATORY
-OB/HD-PCM
15-24/25
HIGHLY
HIGHLY
HIGHLY
HIGHLY
HIGHLY
DESIRABLE
DESIRABLE
DESIRABLE
DESIRABLE
DESIRABLE
15-52/53/54
15-52
15-52
15-50
15-54
HIGHLY
HIGHLY
HIGHLY
HIGHLY
HIGHLY
HIGHLY
DESIRABLE
DESIRABLE
DESIRABLE
DESIRABLE
DESIRABLE
DESIRABLE
15-52
15-52
15-52
15-52
15-52
15-52
HIGHLY DESIRABLE.
HIGHLY DESIRABLE
15-54
15-5*4
15-24/25
CMC WARNING
CG5040X
C*w
COMMON
HIGHLY DESIRABLE
CH35OOH
CH3501H
C.H3502H
FDAI
FDAI
FDAI
COMMON
COMMON
COMMON
HIGHLY DESIRABLE
HIGHLY DESIRABLE
HIGHLY OESIRABLE
15-20/21/22/23
15-20/21/22/23
15-20/21/22/23
CH3503R
CH3504R
CH3505R
CH35S2V
CH55OV
CH3565H
CH3586M
FDAI
FDAI
FDAI
COMMON
COMMON
COMMON
--
HIGHLY
HIGHLY
HIGHLY
HIGHLY
HIGHLY
HIGHLY
HIGHLY
DESIRABLE
DESIRABLE
DESIRABLE
DESIRABLE
OESIRABLE
DESIRABLE
OESIRABLE
15-20/21/22/23
15-20/21/22/23
15-20/21/22/23
15-24/25
15-24/25
15-24/25
15-24/25
CH3592X
CH3593X
HIGHLY DESIRABLE
HIGHLY OESIRABLE
15-20/21/22/23
15-20/21/22/23
CH3666C
CH3667C
HIGHLY OESIRABLE
HIGHLY DESIRABLE
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
INSTR REU
REQ
15-13
15-50
15-24/25
15-24/25
V|j|v|||r
16 CSM SERVICE
PROPULSION
SYSTEM
Center
MISSION RULES
SECTION
R
'
16 -
CSM SPS
ITEM
I6-1
LAUNCH
ThERh
16-2
PHASE
REMAINING
A.
GENERAL
MISSION
PHASES
FAILURES AFFECTING
1.
INTO ONE OF T H R E E
CATEGORIES
BY
OR UNSAFE TO OPERATE.
OR ALTERt- SuC-
OF T H E SPS TO A DEGREE
BURNS BE INHIBITED.
F A I L U R E S I.\ T H I S
CATEGORY
CAuSE
THE VISSIJN
TO
3E
SUBSEQUENT SPS MANEUVERS ARE NOT NECESSARY, IF pcssi
A I T H STORAGE TAN<S EMPTY, EITHER A TWO-JET
ALL NON-CRITICAL B U R N S . LACK OF CAPABILITY
="OR INHIBITING A CRITICAL BuRN.
ENTRY
THAT
AwTERE-
SwC-
EARTH
ORBIT
BuRN.
OR
PHASE
A.
C R I T I C A L B U R N S IN T H I S P H A S E A R E M O D E IV A P O G E E < I C < A N D D E C R B I T . IF T H S P S IS . - I N C A P A B L E
OF P E R F O ^ ^ I N G C R I T I C A L 8 u R N S T H E M I S S I O N W I L L B E T E R " M N A T f c D B y E:,TR^ I \ T J > : ;.:AT. B E S T
PT U S I N G S^RCS OR H Y B R I D T E C H M J U E J .
3.
TRANSLUNAR
COAST
FKCV
*IL L
PS
A N Y PCI\*
=>E
V.AV
IN:3I*^
Q-L ^$CZ,
SQ-K
IN TH-T^
PfiASE
A.
CRITICAL BURNS IN THIS PASE A R E TIME CRITICAL ABORTS* BURNS T O ASSURE FREE RETURN W ^ BURN*
TC AVOID LUNAR QR LAND I M PACT HOv.EvER* ONCE
INITIATED
wITn
T H E S?S* T H S E
3U\S
ARi
CONSIDERED NON-CRITICAL BECAUSE SUFFICIENT TI"E IS AVAILABLE
FOR A N A L V S I S
AND
PCSSIBwE
CORRECTIVE ACTION.
C.
MISSION
APOLLO 11
REV
DATE
NUN-CRITICAL MANEUVERS*
g
SECTION
FU*TH*
GROUP
PAGE
GENERAL
16-1
NON-CMTICAL
OR LAND
Buft-NS
IMPACT A Y
Center
MISSION RULES
Rt V
R
SECTION 16 -
ITEM
C$M
SPS
ITEM
16-5
16-6
LUNAR ORBIT P H A S E
A.
B.
C.
DESCENT PHASE
THC L,M POwEKEO DESCENT WILL BE ABORTED FOR
PERFORM TEI IS DECREASING WITH TIME.
16- 7
16-8
bURNS
SPS
PROPELLANT
LEAKS
BECAuSt
THE
CAPAdlLlTY
THE LUNAR ORBIT PuANE CHANGE IS A CRITICAL BURN IF OuTSIDE TOTAL L-V CAPABILITY.
B.
TESE PHASES W I L L
LUNAR STAY P H A S E
IN
ADDITION.
ASCENT PHASE
L* RESCUE IS THE ONLY BURN REQUIRED IN THIS PHASE AND ARE CRITICAL.
J
16-9
T R A N S E A R T H COAST
PHASE
CRITICAL BURNS IN T H I S P H A S E ARE MIDCOuRSE CORRECTIONS TO ATTAIN THE PROPER ENTRY CORRIDOR *HlCr
ARE O U T S I D E S M - R C S C A P A B I L I T Y , HOWEVER* ONCE INITIATED* Tnest BU&NS A * & C O N S I ^ E ^ E D
NON-CRITICAL
BECAUSE SUFFICIENT TIME IS T H N AVAILABLE FOR ANALYSIS AND POSSIBLE CORRECTIVE ACTION,
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
GENERAL
16-2
Center
MISSION RULES
SECTION 16 - CSM SPS
ITEM
ITEM
16-10
16-U
PROPELLANT
GAGING
A,
PRIME M E T H O D O N B O A R D
B.
BACKUP M E T H O D - F L O W
PROPELLANT UTILIZATION
T H E P U VALVE W I L L
- 100 POUNDS.
16-12
DUAL BANK
SYSTEMS MANAGEMENT
GAGING S Y S T E M Q
PERCENT).
VALVE
VS SINGLE BANK
TO MAINTAIN OXIDI2ER
IMBALANCE wiTHi;<
OPERATION
T H E SPS WILL ALWAYS BE STARTED USING A SINGLE BANK. HOWEVER. T H E OTHER BANK WILL BE CLOSED 2
5 SECONDS AFTER IGMTIC-N FOR LOI AND TEI. BANK A WILL BE USED FOR T H E FIRST ENGINE IGNITION.
16-13
OROPELLANT
MANAGEMENT
A.
THE SPS PROPELLANT REDLINE PRE LOI TO PROVIDE CAPABILITY FOR LOI. ClRCULARIZATiON.
TEI AND TEMC FOR T H E NOMINAL MISSION IS
PERCENT INDICATED PROPELLANT REMAINING.
LOPC
B.
TEMC
OROPELLANT
FEEDLINE
TEMPERATURE
ULLAGE
ANO
MANAGEMENT
16-15
TO
TEMPERATURES
BETWEEN
hb DEG.
MANAGEMENT
IN GENERAL* DOCKED SPS BURNS REQUIRING ULLAGE wiLL BE PRECEDED BY A FOUR-JtT ULLAGE
UNDOCKED
SPS BUNS BY A TWO-JET ULLAGE. TWO-JET ULLAGE WILL BE USED WHENEVER NECESSARY TO IMPROVE S*
RCS
PROPELLANT CAPABILITY.
RULE NUMBERS
16-16
THROUGH
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
MANAGEMENT
16-3
Center
MISSION RULES
SECTION 16 - CSM SPS
I TF"M
RULE
CONDITION/MALFUNCTION
PHASE
SUSTAINED PRESSURE
DECAY IN EITHER THE
FUEL OR 0XIDI2ER
TANK <COULD BE
HELIUM OR FUEL OR
OXIDUER)
'LAUNCH
CUES/NOTES/COMMENTS
16-20
RULING
CONTINUE MISSION
PLAN
RCS 0EOR8IT AT
1
NEXT BEST PTP
IF LAND IMPACT IS
1
IMMINENT AFTER ABORTING
1
REPRESS MANUALLY AND
1
PERFORM BURN TO AVOID
' LAND*
EO
TLC
LO
16-21
OESCENT
LUNAR
STAY
TEC
CONTINUE MISSION
INHIBIT NON-CRITICAL
BURNS
A. DURING
NON-CRITICAL BURN
ALL
A. TERMINATE BURN
B. DURING CRITICAL
BURN
ALL
B. CONTINUE BURN
MISSION
APOLLO 11
REV
00 NOT STAGE LM
A.I. ftEDOCK
2. PERFORM MANEUVER ON '
SUSPECTED SYSTEM*
OATE
CONTINUE MISSION
SECTION
MALF P R O C SPS 9
TRANSDUCER
INDICATION CANNOT
BE
VERIFIED
WITHOUT
ENGINE
OPERATION*
GROUP
PAGE
SPECIFIC
16*4
NASA
- Manned
Spacecraft
Center
MISSION RULES
REV
I TEN
PHASE
RULING
CUES/NOTES/COMMENTS
i
i
16-22
T LC
B.
LO
i
t
i
UNDOCJCED/ D.
DESCENT
1
LUNAR
E.
STAY
N/A
ENTER NEXT BEST PTP
i
i
i
i
16-23
EO
A CONTINUE MISSION
B*
TRANSDUCER
INDICATION CANNOT
BE
VERIFIED
WITHOUT
ENGINE
OPERATION*
i
t
i
RCS OEORBIT
TLC
MALF P R O C SPS 9
LO
DPS
UNDOCKED
E.
DOCK ASAP
DESCENT
F. CONTINUE MISSION
* LUNAR
'STAY
TEC
H. CONTINUE MISSION
DO NOT STAGE LM
i
i
i
i
U-24
MALF P B O C &P6 11
LAUNCH
A* CONTINUE MISSION
EO
B.
i
t
i
; TLC
LO
t
t
'UNOOCKED
E.
DOCK ASAP
DO NOT STAGE LM
MISSION
APOLLO 11
REV DATE
SECTION
GROUP
PAGE
SPECIFIC
16-5
NASA
- Manned
Spacecraft
Center
MISSION RULES
16-25
PHASE
DESCENT
LUNAR
STAY
'
RULING
'
F, CONTINUE MISSION
G# RETURN TO CSM ASAP
TEC
H. CONTINUE MISSION
LAUNCH
NOT APPLICABLE
EO
CUES/NOTES/COMMENTS
MALF P R O w
RCS DEORBIT
16-26
16-27
LO
A. DURING
NON-CRITICAL BURN
ALL
A. TERMINATE BURN
INHIBIT FURTHER
NON-CRITICAL BURNS
B# DURING CRITICAL
BURN
ALL
B. CONTINUE BURN
INHIBIT FURTHER
NCN-CRITICAL BURNS
THRUST CHAMBER
PRESSURE LESS THAN
70 PSI CONFIRMED BY
OTHER
INSTRUMENTATION
SPS 6
LAUNCH
NOT APPLICABLE
EO
LC
A, OURING
NON-CRITICAL BURN
'
A. TERMINATE BURN
INHIBIT FURTHER
NON-CRITICAL BURNS
B. DURING CRITICAL
BURN
B CONTINUE BuRN
INHIBIT FURTHER
NON-CRITICAL BURNS
LACK OF ULLAGE
CAPABILITY
'
* LAUNCH
EO
CONFIRMING
INSTRUMENTATION
I N C L U O E S ONgOAftO PC MfcTEftt CREtf*
DEGRAOED THRuSTt Fu AND Ox INTERFACE
PRESSURES* F/C VALVE POSITIONS* Fu
ANC Or TAN* PRtSSuftES*
'
MALF P R O C
TLC
LO
MISSION
APOLLO 11
REV
SM RCS
OAT!
SECTION
GROUP
PAGE
SPECIFIC
16-6
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 16 - CSM SPS
R RULE
CONOITION/MALFUNCTION
PHASE
ALL
'OTHERS
16-28
DELTA P BETWEEN
PLJFL
UbL
AMQ
AriU
F,
LAUNCH
RULING
CONTINUE MISSION
INHIBIT NON-CRITICAL
BURNS IF POSSIBLE
CONTINUE MISSION
Ti AAHlfc*
NK
CUES/NOTES/COMMENTS
MALF P R O C
SPS ic
PRESSURES GREATER
THAN 20 PSI AND
UNABLE TO DECREASE
EO
TLC
LO
A* DURING
NON-CRITICAL BURN
UNDOCKED
DO NOT STAGE LM
DOCK ASAP
ALL
OTHERS
A. TERMINATE BURN
INHIBIT FURTHER
NON-CRITICAL BURNS
B DURING CRITICAL
BURN
16-29
8* CONTINUE BURN
INHIBIT FURTHER
NON-CRITICAL BURNS
LEAK OR COMPLETE
LOSS OF HELIUM
SUPPLY PfttSSURE OR
BOTH HELIUM VALVES
FAIL CLOSED*
'
LAUNCH
A CONTINUE MISSION
'
EO
i
i
i
TLC
'
LO
' D.
'
UNDOCJCED E.
ALL
OTHERS
DOCK ASAP
F. CONTINUE MISSION
'
E.
NORMAL
RESCUE
MISSION
APOLLO i;I
REV
DATEI
SECTION
GROUP
PAGE
SPECIFIC
16-7
MISSION
PRECLUDES
LM
NASA
- Manned
Spacecraft
Center
MISSION) RULES
SECTION i6 - CSM SPS - CONCLUDED
R ' ITEM
INSTRUMENTATION REQUIREMENTS
16-50
DESCRIPTION
PCM
OX T< PRESS
OX SM/ENG INTERFACE P
SPO003P
SP0931P
COMMON
M C/B
16-20* 28
16-20*29
F'j TC PRESS
FU SM/ENG INTERFACE P
SP00Q6P
SPG93QD
COMMON
M 0/B
HD
16-20t 2d
16-20. 28
SP0600P
SP0601P
METER
METER
COMMON
COMMON
-1 OF 2 M C/B
SPOO^ST
SP0049T
MFTER
SYS TEST
COMMON
COMMON
-1 OF 2 M
SP0061T
SP0062T
SP066iP
METER
COMMON
M 0/B
16-26
ME TIC RESS
SP0001P
METER
SEPARATE
HD
16-29
SPC022H
SP0023H
DISPLAY
DISPLAY
DISPLAY
DISPLAY
DI5PLAY
DISPLAY
DISPLAY
DISPLAY
SEPARATE M !
SEPARATE M (' 1 OF 2 0/B
SEPARATE
1 OF 2 0/S
SEPARATE
COMMON
MD
COMMON
HD
COMMON
HD
COMMON
HD
FU/OX
PU/OX
FJ/OX
FU/OX
VLV
Vuv
VLV
VLV
1
2
3
h
POS
POS
POS
PCS
TOTAL AUX
T
OTAL AUX
FU TIC 2 QTY
MISSION
APOLLO li
REV
SP0C25H
SP0655C
SP0655C
SP065TC
SP06582
OATE
ONBOARD
TRANSDUCERS
COMMON
COMMON
CATEGORY
MISSION UL
REFERENCE
16-21. 22
16-21. 22
16-2*
SECTION
GROUP
CSM SPS
INSTA REG
16-25
-1 OF 2 M 0/B
PAGE
16-8
16-21
16-21
16-21
16-21
16-10
16-10
16-10
14-lQi
26
26
26
26
lit
lit
13
13
U . 13
lit
13
Center
MISSION RULES
=>EV
ITEM
ITEM
GENERAL
17-1
LAUNCH
THE LOSS OF ONE QUAD IS NOT CAUSE FOR ABORT AND THERE ARE NO SINGLE FAILURES NOR ANY REASONABLE
REALISTIC COMBINATION OF FAILURES WHICH LEAD ONLY TO LOSS OF MULTIPLE QUAOS. THERE ARE*
THEREFOREt NO SM-RCS FAILURES WHICH ARE CONSIDERED CAUSE FOR ABORT*
17-2
EARTH ORBIT
A.
LOSS OF ONE QUAD* IN ITSELF* IS NOT NECESSARILY CAUSE FOR EARLY TERMINATION OF THE MISSION.
THE GUIDELINE IS THAT AS LONG AS THE SPACECRAFT ATTITUDE CAN BE CONTROLLED AND THE $?i CAN
BE BURNED THE MISSION NEED NOT BE TERMINATED EARLY. HOWEVER* LOSS OF ONE QUAD WILL REQUIRE
TLI BE INHIBITED AND MAY LEAD TO EARLY MISSION TERMINATION SINCE THE CAPABILITY TO PERFORM
SM OR HYBRID DEORBIT WILL 8E AFFECTED.
B.
LOSS OF TWO OR MORE QUADS 15 CAUSE FOR ENTRY INTO THE NEXT BEST PTP.
1.
LOSS OF TWO AOJACENT QUADS WILL DESTROY THE CAPABILITY TO PERFORM ULLAGE
MANEUVERS AND WILL REQUIRE DELETION OF NON-CRITICAL SPS MANEUVERS. LOSS OF
TWO AOJACENT QUADS PRECLUDES SM OR HYBRID DEORBIT.
LOSS OF TWO OPPOSITE QUADS WILL DESTROY THE CAPABILITY TC PERFORM
3-AXIS ATTITUDE CONTROL AND PRECLUDES SM OR HYBRID DEO3BI7.
117-3
PRECISE
TRANSuUNAR COAST
LOSS OF ONE QUAD IS NOT. IN ITSELF. CAUSE FOR TERMINATION OF THE MISSION. HOWEVER*
CONSIDERING
THE EFFECTS OF POSSIBLE SUBSEQUENT QUAD OR JET FAILURES AND LM RCS CAPABILITYt THE
TRANSLUNAR
COAST PHASE MAY BE TERMINATED BY ENTRY INTO THE NEXT BEST PTP. LOSS OF ONE QuAO IS CAuSE FOR
INHIBITING LOI* BECAUSE SUBSEQUENT FAILURE OF QUADS OR JTS IMPAIR ATTITUDE CONTROL OR ULLAGE.
r
17-4
LUNAR ORBIT
LOSS OF ONE QUAD IS CAUSE FOR EARLY TERMINATION OF LUNAR ORBIT AND LUNAR STAY PHASES* AND FOR
INHIBITING LOI2 AND UNDOCICING. BECAUSE SUBSEQUENT FAILURE OF QUADS OR JETS IMPAIR ATTITUDE
CONTROL OR ULLAGE. UNDOCMNG WILL BE NO-GO BECAUSE LOSS OF ONE QUAD PRECLUDES CSM ACTIVE
DOCKING. LOSS OF TWO QUADS IS CAuSE FOR RETAINING THE LM ASCENT STAGE THROUGH TEl FO TE*C AND
PTC.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
GENERAL
17-1
Center
MISSION RULES
REV
ITEM
R ITEM
17-15
17-16
SYSTEMS MANAGEMENT
PROPELLANT GAGING
A,
B.
17-17
BE
OPENED
WHEN
THE
MISSION
APOLLO IX
RIV
DATE
SECTION
GROUP
CSM SM-RCS
MANAGEMENT
PAGE
17-2
PRIMARY
FUEL.
MANIFOLD
Center
MISSION RULES
5 r_ y
1TEM|
R 'RULE
i
i
PHASE
17-20
RULING
CUES/NOTES/COMMENTS
SUSTAINED LEAK IN
HELIUM TANK
A.
B.I.
CONTINUE MISSION
'
2. (A)
MALF P R O C -
RCS
i
i
LO
UNDOCKED
4. DOCK ASAP
DESCENT
5. CONTINUE MISSION
LUNAR
STAY
I
|
b. CONTINUE MISSION
WITHIN BLQWDOWN
CAPABILITY
EO
C.I.
CONTINUE MtSSlON
ENTER PRIOR TO LOSS
OF HYBRID DEORBIT
CAPABILITY
i
j
2. REF RULING B
ALL
OTHER
STAGE
APS/
FOR
RCS
17-21
f
r
SUSTAINED LEAK
BELOW HE ISOLATION
VALVE (COULD BE
HELIUM OR FUEL OR
OXIDIZER)
MALF P R O C RCS
A. ONE OR MORE
QUAOS
LAUNCH
EO
A* CONTINUE MISSION
i
B.I.
TLC
LO
UNDOCKED '
4*
DOCK ASAP
5* CONTINUE MISSION
DESCENT
'
LUNAR
STAY
EO
C.I.
ALL
OTHER
'
REF RULING B
C 2 . RETAIN LM ASCENT
TEI DEPENDING UPON LM
PROPELLANT REMAINING.
!
!
MISSION
APOLLO 11
REV
DAT!
SECTION
GROUP
PAGE
SPECIFIC
17-3
STAGE
APS/
FOR
RCS
Center
MISSION RULES
SECTION 17 - CSM SM-RCS
I TEM
R 'RULE 'CONDITION/MALFUNCTION'
17-22
PHASE
RULING
LAUNCH
NOT APPLICABLE
EO
A.I.
'
CUES/NOTES/COHMENTS
TLC
2.
LO
UNDOCKED
4.
DOCK ASAP
DESCENT
5* CONTINUE MISSION
LUNAR
STAY
EO
B.I.
ALL
OTHER
MISSION
APOLLO 11
REV
2. RE* RULING A
OATE
MALF PftOC-
SECTION
{GROUP
PAGE
SPECIFIC
17-4
STAGE
APS/
FOR
RCS
ITEM;
R RULE 'CONDITION/MALFUNCTION
PHASE
'
RULING
'
CUES/NOTES/COMMENTS
17-23
LOSS OF INDIVIDUAL
THRUSTERS
OR THRUSTER
COMBINATIONS AS A
RESULT OF CLOGGING*
FREEZING* BURNOUT*
OR CONTROL SYSTEM
MALFUNCTION
LAUNCH
LO
'NOT APPLICABLE
'
1
'
t
i
UNDOCKED
2* DOCK ASAP
ALL
OTHERS
3. CONTINUE MISSION
B* LOSS OF FOLLOWING
THRUSTER
COMBINATIONS-
EO
'
'TLC
'
i
THREE ROLL IN
SAME DIRECTION
UNDOCKEO
OPPORTUNITY
4. DOCK ASAP
'DESCENT
'
LUNAR
STAY
C# LOSS OF +X
THRUSTERS ON
AOJACENT QUADS*
'ALL
C
INHIBIT NON-CRITICAL
1
SPS BURNS
i
APOLLO 11
i
i
MISSION
REV
DATE
SECTION
GROUP
PAGE
SPECIFIC
XT-,
14-27*
LACK OF
18 CSM CMRCS
NASA
- Manned
Spacecraft
Center
MISSION RULES
I TEM
R
ITEM
GENERAL
li-l
18-2
LAUNCH
A.
A SUSTAINED LEA* IN OR THE LOSS OF HELIUM SUPPLY PRESSURE OR HELIUM MANIFOLD PRESSURE IN
ONE CM RCS RING IS NOT CAUSE FOR ABORT SINCE THE REMAINING RING IS CAPABLE OF ABORT OR
ENTRY ATTITUDE CONTROL. THIS FAILURE WILL REQUIRE ENTRY INTO PTP *-4 SINCE SYSTEMS ARE N C
LONGER REDUNDANT.
* & *
c
B.
A SUSTAINED LEAR IN OR THE LOSS OF HELIUM SUPPLY PRESSURE OR HELIUM MANIFOLD PRESSURE 1%
BOTH CM RCS RINGS PRIOR TO TOWER JETTISON IS JUSTIFICATION FOR A MODE I ABORT. AFTER TGn
JETTISON. IT IS NOT CAUSE FOR ABORT SINCE THE ABILITY TO PERFORM A SAFE ENTRY ' M O Tr
ATLANTIC AT THE END OF THE FIRST REV STILL EXISTS BY USING TH CONTINGENCY S* RCS SPIN
^
PRIOR TO CM/SM SEP. THIS METHOD OF ENTRY j;S CONSIDERED OPERAT IONALU* P R E ^ C R * ^
PERFORMING AN ABORT AND PRESENTS LESS POTENTIAL HAZARD TO CREw RECOVERY. F U R T H R * C R S <*'
RCS CONTROL IS REQUIRED FOR ABORTS IN THE MODE II AND MODE III REGIONS. AND TO A6ORT T'
LAUNCH IN THESE REGIONS FOR LOSS OF CM RCS CAPABILITY WOULD PUT THE SPACECRAFT A N D ' C * E I
INTO AN UNSAFE ENVIRONMENT.
ia-3
LUNAR ORBIT ACTIVITIES WILL BE CONTINUEO FOR LOSS OR IMPENOING LOSS OF ONE CM RCS
B.
LOSS OF ONE SYSTEM AND ANY DEGRADATION IN THE REMAINING SYSTEM IS CAUSE FOR ENTRY
NEXT BEST PTP.
INTO
THE
LM DESCENT PHASE
THERE ARE NO CSM RCS FAILURES THAT ARE CAUSE FOR TERMINATING THE DESCENT
18-4
SUSTAINED LEAK IN OR LOSS OF HELIUM SUPPLY PRESSURE OR HELIUM MANIFOLD PRESSURE (COULD BE
EITHER FUEL OR O X I D U E R ) IN ONE CM RCS RING DELETES THE REDUNDANCY OF T H E ENTRY ATTITuDE
CONTROL SYSTEM AND REDUCES THE DELTA V AVAILABLE FOR HYBRID DEORBIT. LOSS OF H E L VI U " SjPPLr
PRESSURE OR HfcLIUM MANIFOLO PRESSURE IN BOTH CM RCS RINGS DELETES A L L E N T R
ATTITUDE
CONTROL CAPABILITY REQUIRING CONTINGENCY SM RCS SPIN UP PRIOR TO CM/SM SEP. T M E LOSS OF ONE
OR BOTH CM RCS RINGS IS CAUSE FOR TERMINATING THE PHASE AND MISSION BY ENTRY INTO T* NEXT
BEST PTP.
ARMING OF THE CM RCS RINGS* WHETHER THE PROPELLANT ISOLATION VALVES ARE OPENED
IS CAUSE FOA TERMINATING THE PHASE AND MISSION INTO THE NEXT BEST PTP.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
CSM CM-RCS
GENERAL
PAGE
1B-1
OR
CLOSED*
Center
MISSION RULES
SECTION 18 - CSM CM-RCS
R ITEM
18-10
SYSTEMS MANAGEMENT
18-11
HELIUM INTERCONNECT
AS A LAST RESORT* IF THE HELIUM IN ONE RING IS DEPLETED DUE TO A LEAK AND THE PROPELLANT
DEPLETED IN THE OTHER RINGt Ti-E SYSTEMS MAY BE INTERCONNECTED IF THE REMAINING
PROPELLANT
REQUIRED FOR CONTROL. ONCE INTERCONNECTED* THE RINGS CANNOT BE ISOLATED* MALF PROC RCS
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
MANAGEMENT
18-2
Center
MISSION RULES
REV
ITEM
RULE C0N0ITION/MALFUNCTION *
t
i
PHASE
RULING
i
i
i
t
i
i
18-20
CUES/NOTES/COMMENTS
SUSTAINED LEAK IN
OR COMPLETE LOSS OF
OF HELIUM SUPPLY
PRESSURE
A* ONE RING
LAUNCH
A.I.
LO/
DESCENT/
LUNAR
STAY
ALL
OTHERS
B. BOTH RINGS
2. CONTINUE MISSION
LAUNCH
B.I,
A.3.
NORMAL ENTRY
DESCENT
2. CONTINUE MISSION
ALL
OTHERS
li-21
SUSTAINED LEAK IN OR
COMPLETE LOSS OF
HELIUM MANIFOLD
PRESSURE (COULD
BE EITHER FUEL OR
OXIDIZER)
'A.I,
LAUNCH
A, ONE RING
LO/
'
'DESCENT/
LUNAR
STAY
1
ALL
OTHERS
B. BOTH RINGS
2 . CONTINUE MISSION
'LAUNCH
MISSION
APOLLO 11
REV
2. CONTINUE MISSION
1
OATE
SECTION
GROUP
PAGE
SPECIFIC
18-3
Center
MISSION RULES
REV
ITEM
RULE
18-22
CONDITION/MALFUNCTION1
PHASE
RULING
CUES/NOTES/COMMENTS
CONTINUE MISSION
ALL
'OTHERS
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
SPECIFIC
lt-4
Center
MISSION RULES
REV
ITEM
SECTION I S -
CSM CM-ftCS -
CONCLUDED
ITEM
18-30
MEAS DESCRIPTION
CM
CM
CM
CM
HE
ME
TK
TIC
PCM
TIC A PRESS
TK B PRESS
A TEMP
fi TEMP
CR0001P
CR0002P
CR0003P
CROOO4P
CR0033P
CR0036P
CM HE MNFLD A PRESS
CM HE MNFLD B PRESS
MISSION
APOLLO 11
REV
DATE
ONBOARD
METER
METER
METER
METER
METER/Cfrw
METER/CfrW
SECTION
TRANSDUCERS CATEGORY
COMMON
COMMON
COMMON
COMMON
SEPARATE
SEPARATE
GROUP
M
M
HO
HD
M
M
PACE
INSTR REQ
18-5
MISSION RULE
REFERENCE
18-20
18-20
18-20
18-20
18-21
18-21
119 EMU/EVA
NASA
- Manned
Spacecraft
Center
MISSION RULES
P.EV
SECTION if - EMU/EVA -
\TFK-
ITEM
GENERAL
19-1
MOBILITY
UNIT
I EMUi
INSTALLED)/UNDOCKED/RNOZ
OPS)
PROVIDING
SUFFICIENT
CONSUMABLES
TS
EVA
1.
WITH
SUFFICIENT
CONSUMABLES
TO
ALTERNATE
AN EXTRAVEHICULAR MOBILITY UNIT (EMU) WITH SUFFICIENT CONSUMABLES TO SUPPORT
CHECKOUT AND THE ALTERNATE EVA.
MANAGEMENT
19-2
THE PLSS BATTERY IS CONSIDERED TO HAVE A MINIMUM OF 1*3 A M P - H R CAPABILITY. This CONSwMABLE
GAGED BY MONITORING GT814QC/GT8240C AND PROCESSING IN T*E RTCC T O OBTAIN A M P - H R S .
19-3
THE PLSS PRIMARY OXYGEN SUBSYSTEM (POSJ iS CONSIDERED TO HAVE A MINIMUM SOURCE PRESSURE GF 1060
PSIA TO SATISFY THE PLANNED EVA. THIS CONSUMABLE IS GAGED BY MONITORING GT6182P/GTa282P ANO
PROCESSING IN THE RTCC TO OBTAIN LBS MASS.
19-4
19-5
TOTAL
RU ES 19-i THROUGH
19 19 ARE RESERVED*
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 EMU/EVA
GROUP
PAGE
GENERAL/
MANAGEMENT
19-1
METABOLIC
CAPABILITY.
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 19 - EMU/EVA 'RULE
CONDITION/MALFUNCTION1
PHASE
RULING
CUES/NOTES/COMMENTS
SPECIFIC
19-20
LOSS OF PRESSURE
INTEGRITY
EVA
3.75
A. TERMINATE EVA
PSIA
(TM) AND
ANO DECREASING OR
p
GA PRESS GAGE OF
LESS THAN 3.7
PSIA AND
DECREASING
2* INGRESS LM
PGA PRESS GREATER
THAN 4.05 PSIA
(TM) AND
INCREASING OR
PGA PRESS GAGE OF
GREATER THAN 4.0
PSIA ANO
INCREASING
B. TERMINATE EVA
1. ACTIVATE OPS
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 CEVT
GROUP
PAGE
SPECIFIC
19-2
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION
RULE
19-21
CONDITION/MALFUNCTION'
PHASE
19
EMU/E'VA
RULING
CUES/NOTES/COMMENTS
LOSS OF OXYGEN
VENTILATION
A* FAN FAILURE
EVA
A. TERMINATE EVA
1. ACTIVATE OPS
3. INGRESS LM ASAP
a. NOXIOUS ODOR
EVA
B. TERMINATE EVA
1. ACTIVATE OPS
3* INGRESS LM ASAP
19-22
HUMIDITY CONTROL
MALFUNCTION
REF
A. DEGRADED
OPERATION OF
WATER SEPARATOR
TOTAL LOSS OF
WATER SEPARATOR
EVA
B. TERMINATE EvA
DETECTION
2 INGRESS ^ M ASAP
19-23
THRU
MISSION
APOLLO 11
EMU
A, CONTINUE MISSION
REDUCE WORK. PROFILE
TO COMPENSATE
FOR INCREASES
HUMIDITY
1. IF DEHUMIDIFICATION
IS REJuIRED*
ACTIVATE OPS IN
PURGE *GDE
RULES
MALF
REV
DATE
SECTION
4/16/69 CEVT
GROUP
PAGE
SPECIFIC
19-3
^20
PRESS
FWAO
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
ITEM
ftRULE
19-30
PHASE
RULING
LOSS OF LIQUID
TRANSPORT LOOP
THERMAL CONTROL
A DEGRADED
CIRCULATION
(LESS THAN 3*5
LBS/MIN>
'
JSVA
CUES/NOTES/COMMENTS
EVA
B LOSS OF
CIRCULATION
>B*
TERMINATE EVA
1. IF ADDITIONAL
COOL IMG I*
WVwUiHU 4 9
1
1
1
1
'
GT8110P/GT8210P FEED H20 PRESS
CREW SENSIBLE DETECTION
REF MALF EMU
EVA
C. DEGRADED
SUBLlMATOft
wvDb4nA1Wn
1
(LIQUID TRANSPORT
LOOP HEAT
REJECTION LESS
THAN 1250 STU/HR
IN MAX H20
DIVERTER VALVE
POSITION
2* IF COOLING IS
'
INADEQUATE* CREWMAN'
MAY ATTEMPT A WET
SUBLIMATOR KESTAfcT
LOW
FEED
ANNUNCIATOR
H20
PRESS
FLAG
EVA
SUBLIMATOR
FAILURE
~ * * tWRt
D. TERMINATE EVA
1
'
lf-fl
'
'
'EVA
1 IF ADDITIONAL
COOLING IS
<
REQUIRED* ACTIVATE '
OPS IN PURGE MODE '
2* INGRESS LM ASAP
'
'
'
1. IF ADDITIONAL
'
COOLING IS
REQUIRED* ACTIVATE <
OPS IN PURGE MODE '
H20
PRESS
MISSION
APOLLO 11
REV
DATE
SECTION
4/14/69 CEVT
GROUP
PAGE
SPECIFIC
Xf-4
FLAG
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 19 - EMU/EVA CONDITION/MALFUNCTION*
19-32
PHASE
RULING
DEPLETION OF POS
D
OS PRESS LESS
THAN 152 P S U
CuES/NOTES/COMMNTS
TERMINATE EVA
1 ACTIVATE OPS
2. INGRESS LM
! 19-33
A, TERMINATE EVA
ACTIVATE OPS IN A
PURGE MODE
2. INGRESS LM ASAP
5.
TOTAL
A.MP-
EVA
B. TERMINATE EVA
EVA
CONTINUE MISSION
REF
R E ^ A I N ING
9-J- ! DEGRADED
CC PP GREATER THAN
1 C t 0 MM MG AND
INCREASING
EMg
EVA
TERMINATE EVA
ACTIVATE OPS IN A PURGE
MODE INGRESS LM ASAP
*-;& { LCiS OP --
!19-37
MAL*
CONTINUE MISSION
EVA
uOSS 0* CRITICAL
INSTRUMENTATION
NOTE
TERMINATE EVA
REF MR 20-<2
:
i
MISSION
APOLLO 11
EV
DATE
SECTION
4/16/69 CEVT
GROUP
PAGE
SPECIFIC
19-5
Center
MISSION RULES
REV
ITEM
ITEM
INSTRUMENTATION REQUIREMENTS
PAM
19-41
MEAS DESCRIPTION
ONBOARD
TRANSDUCERS
GT8110P/GT8210P
COMMON
FLAG ANNUNCIATOR
GT8124J/GT8224J
GT8i40C/GTi240C
GTB141V/GTI241V
GT8154T/GT8254T
GT8140P/GT8240P
METER
FLAG ANNUNCIATOR
GT8170T/GT8270T
GT8173P/GT8275P
FLAG ANNUNCIATOR
GT8182P/GT8282P
COMMON
METER
FLAG ANNUNCIATOR
FLAG ANNUNCIATOR
GT8196T/GT8296T
CATAGORY
MISSION RULE
REFERENCE
HO
M
HO
HD
HO
HD
M
M
HO
HD
M
HD
M
H
M
HO
METER
METER
GREEN LIGHTS
1 OF
2M
9**2 j CRITICAL
i
INSTRUMENTATION
PAM
FM/FM
MEAS DESCRIPTION
TRANSDUCER
METER
COMMON
METER/TONEFLAG
METER/TONE-
GT8173P/
GT8275P
ONBOARD
COMMON
FLAG
TONE-FLAG
)
MISSION
APOLLO 11
*EV
DATE
SECTION
4/14/49 EMU/EVA
GROUP
PAQg
PRELAUNCH
INSTR
19-4
20 COMMUNICATIONS/
INSTRUMENTATION
NASA
- Manned
Spacecraft
Center
MISSION RULES
AND
INSTRUMENTATION
ITEM
20-1
TO
INITIATE
INSTRUMENTATION
THE FOLLOWING
MISSION
PHASES*
SYSTEMS M - J S ^ PROVIDE THE FOLLOWING
NCTc
RENDEZVOUS/CONTINGENCY
wM-ACTIvE
EVA
COMMUNICATIONS
Afw
RETURN ASSUMED.
LAUNCH
THERE ARE NO COMMUNICATIONS/INSTRUMENTATION
WILL BE T E R M I N A T E D .
ALL
PHASES
EXCEPT
LAUNCH
BASELINE
FAILURES
?0R WHICH
THE
2.
T*c-wA*
COMM
BETWEEN
PHASE
REQUIREMENTS
1*
vCICE
LAUNCH/INSERT ION
INSTRUMENTATION.
LOS REQUIRED
TC
SPACECRAFT,
NOTE
T H I S MAY BE SATISFIED
5Y UMBILICAL INTERCO W
DURING DOCkEC P H A S E S .
3.
TwO-wAY N/CICE COMM bETwEEN CSM OR LM AND MSFN DURING ALL. DOC<ED
ANC dETwcEN 3 0 T H SPACECRAFT ANO *SFN DURING UNOOClCED A C T I V I T I E S .
I,
aCwERED
DESCENT
ADDITIONAL
LUNAR
1.
2.
STAY
"OR
F
C R ONE-MAN
2.
DUPLEX
4.
LM-L33 TM.
i
ii
REQUIREMENTS
TELEMETRY.
NOTE
NO REQUIREMENT
AFTER P O I .
C0MM
SETWEEN
EvAvOICE
COMM
BETWEEN
vOlCE
COMM
ADDITIONAL
BETWEEN
BCTH
EVA
MSFN
A N C CN E V A .
ANO LM OR EVA.
CRCWMEN.
OF-
A.
9.
EITHER
C.
LINUS
D.
THE C S V HIGH
E.
EVA
F.
G.
EITHER
-.
V-F RANGING
GAIN
SFN
REQUIREMENTS
OR S O T H
COMM
REQUIREMENTS
EVA-VOICE
TC-f<AN
RENDEZVOUS
20-2
ADDITIONAL
ACTIVITIES
AND WARNING
SYSTEMS
ANTENNA
TELEMETRY
i
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 COMMUNICATIONS
AND INSTR
GROUP
PAGE
i
1
GENERAL
20-1
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 20 - COMMUNICATIONS AND
R
INSTRUMENTATION
ITEM
20-3
VHP V A
A.
120
VOICE
COMMUNICATIONS
PR IOR I T I . A R E
T W O - M A N EVA
1.
PRIMEtVA-1
296.8 Z)
AR/CVA-2
2.
BACKUP
EVA-1 A/EVA-2 e OR EVA-1 S/EVA-2
296.8 MHZ. RECEIVE e RC* u * ON 296.B M2J
1.
2.
BACKUPEVA-;
;MEEVA-1
M 2 J
OR EVA-2
OR
AR
(TRANSMIT
A (TRANSMIT
TO LM ON
259.7
MH2 t
A (TRANSMIT
TO LM 259.7 M M Z #
EvA-2 B (TRANSMIT
RECEIVE
LM
RECEIVE
TO LM 296*8 M M Z
PROM
FROM
LM
296.8
RECEIVE FROM
CM
259.7
CONFIGURATION
VHP
DJPLEX
6 A N D J S B - I I I 8E
SIMULTANEOUSLY
ITN
POR - A U N C H
e E S " JuALlT*
TRANSMITTED/RECEU:
AND E A R T H
DOWNLINE
ORBIT.
* ILL BE REMCTD
TO
M0uS*0NU
oSfc IS P^IM
wiB-v^ff
S / C.
6*
7.
VOICE
*ELAr
TO j-z A S I ^ P
BETWEEN M S F N
i v'CICE COM**-BACKUP
296.8 M M Z
EXCEPT
BUT
DURING
* I LL
A N O C S M OR
TC wSB
BETWEEN
MAUFLNCT I ONEW
"OANS^IT
SIMULTANEOUSLY
8.
PJMC
Q.
:s * - : :.*.T 2* * C : W - W E T E
^
MLUC
0R vrICLE- O-VHlCL
A I W - =E CCN IuU-E2
COMM
CN y^
DURING
L O S S O^ C L M S-SAND
FOR LM T-O-.vAY
3E
3 W AY
ANO
ANO u S B .
LUNAR
STAY
IS VIA MbFN
CC^^L-NILA-'IC'.S : * -
A N D RETAINED
RELAY.
C
N.
T*E
A-.5
6.
L< T W O - * A T ^toAY ^ITp. T*O-MAN EVA t-AC*wO MODE IS BACKUP ^OR EVA
OPERATIONS.
C S * 1 u S S TRANiVl'/RECEIVE ONLY* L M - T R A N S M I T \J^^ Af RECcIvE vrF A AND B
Mi s *. CONFIGURES ffD* USB RELAY.
L-*T * C - * A V RE^AY .VITH ONE-MAN E V A PRiv. OR
BACKUP
MODE
.NLCiS"* Y w " 3 v " U S B TRANSMIT/RECEIVE ONLY# L M T R A N S M I T
AN3 3 M J F % C O N r : G L R E D "OR uSB RELAY.
^wt
NUMBERS 23-i
VI SSI ON
APOLLO 11
THROUGH
REV
DATE
SECTION
GROUP
COMMUNICATIONS
AND INSTR
GENERAL
PAGE
20-2
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 20 - C O M M U N I C A T I O N S
R
AND
INSTRUMENTATION
ITEM*
2 0-10
20-11
CSM VHF/uSB
MANAGEMENT
f%
e.
DS
COMMANDS.
COMMUNICATIONS
SwITCr-
MANAGEMENT
A,
LM AND CSM L O * BIT RATE TELEMETRY WILL BE RECORDED C O N T I N U O U S L Y WHEN NOT IN CONTACT *I~.~
G R O U N D TELEMETRY SITES AND WILL BE PLAYED SACIC AT LEAST ONCE PER R E V O L U T I O N IN LuNAR O R B I T .
3.
C" H I G V
C.
1.
UAU-NCM
2.
S-Iv/6/CSM
CM/LM
6.
w*
SEPAKA T I O N
SEPARATION AND
INAL
OPERATIONS-
ENTRY
Si"
A III. O
IN
:)RDR
ANAG0
USING
OMNI'St b * AND CS LOW SIT RA
C O N T I N U O U S L Y *iN NOT I\ C O N T A C T I T H G K C W N
BE DUMPED U N L E S S A M A L F U N C T I O N SO D I C T A T E S .
A C T I V A T E D FOR T^E D U V P .
120-12
CTE AND M I S S I O N
A.
TIVER
MANAGEMENT
CTE A N D T H E MISSION
C C C j R S A F T E " T-2C
TIM^
20-13
LM USB/TM
A.
3.
C.
20-U
HI^L BE C O N F I G U R E D T3 C L O C < is G i *
FLIG-T -O*EVR
CTE ILL NOT BE CORRECTED NTIL C O M P L E T I O N OF
A ! L L BE ALLOWED TO
SEC
BEFORE
BEING
!c A
w-OA'EO
MANAGEMENT
*.--
MONITORING
TO
MONITOR
MISSION
A P O L L O 11
REV
DATE
SECTION
GROUP
COMMUNICATIONS
ANO INSTR
MANAGEMENT
PAGE
20-3
OR
MCir^
DC
RANG INu
SYSTEM
A-TER
AND/OR
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 20 - COMMUNICATIONS ANO INSTRUMENTATION
RULE CONOITION/MAkFuNCTIQN 1
PHASE
RULING
CuES/NOTES/CO^ENTS
CONTINUE MISSION
DOCKED
COMM
CONTINUE MISSION
POwERED
DESCENT
CONTINUE MISSION
LUNAR
STAY
CONTINUE MISSION
N O GO F O R rVA
W I T H CS'-'
IF D U P L E X
A, L ONLY
DOCKED
A. CONTINUE MISSiCN
5 S-BAND RECOVER
AiE LOCK.
LAUNCH
CANNCT
0R9IT
TLC
3. CONTINUE MISSION
EARTH
B.3.
ENTER
LM C A R L Y
TO USE
DESCENT
0R6IT
C. LM OR
20-22
POWERED
DESCENT
2. CONTINUE MISSION
LUNAR
STAY
3. LM LIFTOFF ASAP
LOSS OF CSM TM
A. HSR OR LBR
ALL
A. CONTINUE MISSION
B. ALL TM
LAUNCH
ORBIT
POWERED
DESCENT
3. CONTINUE MISSION
LUNAR
ST. AY
* LM LIFTOFF ASAP
MISSION
APOLLO II
REV
DATE
SECTION
4/16/69 COMMUNICATIONS
ANO INSTR
GROUP
SPECIFIC
20-4
S-BANO
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 20 - COMMUNICATIONS AND INSTRUMENTATION
PULE
CONDITION/MALFUNCTION'
MA5E
'
RULING
CUES/NOTES/COMMENTS
SPECIFIC
20-23
LOSS OF LM TM
A* LOSS OF LBR
ONLY
B. LOSS OF NBR
ONLY
A, CONTINUE MISSION
ALL
DESCENT
ORBIT
2. RETURN TO VICINITY
OF CSM ASAP
NO GO FOR PDl
C. LOSS OF ALL TM
DOCKED
UNDOCKED
DESCENT
0R9IT
3. RETURN TO VICINITY
OF CSM A5AP
NO GO FOR POI
POWERED
DESCENT
*. CONTINUE MISSION
NO GO S OR LUNAR STA>
LJNAR
5. LM LIFTOFF ASAP
LAUNCH
CONTINUE MISSION
EO
NO GO FCR T-1
TLC
CONTINUE MISSION
LUNAR
OR8IT
NC GO FOR UNCOCKED
AC- 'IVITIES
DOCKED
DO NOT UNDCCK
UNDOCKED
COCK ASAP
ALL
CONTINUE MISSION
EPO
NO GO FOR TLI
ALL
CONTINUE MISSION
NO GO LCI
20-25
MISSION
REV
OATE
SECTION
GROUP
PAGE
APOLLO 11
#/16/69 COMMUNICATIONS
AND INSTR
SPECIFIC
20-5
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 20 - COMMUNICATIONS AND INSTRUMENTATION
PHAS E
'
RULING
CUES/NOTES/COMMENTS
20-27
20-28
20-29
EPO
NO GO FOR TLI
TLC
CONTINUE MISSION
NO GO FOR LOI
LUNAR
ORBIT
CONTINUE MISSION
LUNAR
STAY
CONTINUE MISSION
EPO
NO GO FOR TLI
ALL
CONTINUE MISSION
DUAL
CONTINU MISSION
EVA-2
EVA
TO
EVA-1
20-30
DUAL
EVA
CONTINUE MISSION
1 EVA-2 GO TO
POSITION A*
2. EVA-i GO TO
POSITION '9 1
LOSS OF DUPLEX
VOICE BETWEEN
EVA-1 AND EVA-2
20-31
DUAL
EVA
TERMINATE EVA
i
LOSS OF TWO-WAY
VOICE BETWEEN
MSFN AND EVA
20-32
DUAL
EVA
CONTINUE MISSION
i EVA-2 GO TO
POSITION 'A 11
EVA-2 GO TO
POSITION Bl
2* IF UNABLE TO
RE-ESTABLISH COM*
EVA-2 MAY ELECT
TO RETURN TO LM ktiO
RECONFIGURE COMM
3 IF UNABLE TO
RE-ESTABLISH COMM*
TERMINATE EVA.
i
i
1
1
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 COMMUNICATIONS
ANO INSTM
GROUP
PAGE
SPECIFIC
20-6
NASA
- Manned Spacecraft
Center
MISSION RULES
ITF.v
RULE
ONOITION/MALFUNCTION1
20-33
LOSS OF TWO-WAY
VOICE BETWEEN MSFN
ANO BOTH LM AND EVA
PHASE
RULING
ALT
CONTINUE MISSION
EVA
(ONt-MAN) 1. RECONFIGURE LM TO
RE-ESTABLISH COMM
2.
20-34
CUES/NOTES/COMMENTS
LOSS OF DUPLEX
VOICE BETWEEN LM
ANO EVA
IF UNABLE TO
RE-ESTABLISH COMM*
TERMINATE EVA.
ALT EVA
CONTINUE MISSION
(ONE-MAN)
1. RECONFIGURE LM ANO EVA
TO 'JHF BACKUP MODE
2.
IF UNABLE TO
RE-ESTABLISH COMMt
TERMINATE EVA
MISSION
APOLLO 11
DATE
SECTION
GROUP
OMMUNICATIONS
ANO INSTR
SPECIFIC
PAGE
20-7
NASA
- Manned
Spacecraft
Center
MISSION R U L E S
SECTION 20 - COMMUNICATIONS
It
AND
INSTRUMENTATION
CONCLUDED
I "" iM i
DESCRIPTION
PCM
L'DL VALIDITY
SIGNAL
CT0262V
USB RECEIVER
AGC
CT3620E
JS3 RECEIVER
AGC
METER
US5 RECEIVER
ERROR
DSE
TAPE
C^z
TIMP
ONBOARD
TRA\iO
METE*
COMMON
nC
MD
CT0604F
CTQ012X
v-TJCN
CTQ145F
SCE 10 VDC
CT0018V
SCE 5 VDC
CT0C17V
CT0015V
CTOOlov
| = C" I R E " 85
1 =:- -I RE?
PERCENT
CT0125V
15 PERCENT
CTC126V
M- INSTS'JMMAT:C\ R : . - ; ^ ^ 1 . ! ; '
PCM
ONBOARD
TRANSDUCERS
I- 2
c*
:5C FA I- 3
CAL
CT
CA^ 15 P c
j S-SN5 ST O H ERR
I
! S-9NT RCvR SIG
GTQV92B
!
1
REV
MISSION
APOLLO
11
DATE*
SECTION
fc/16/69 COMMUNICATIONS
AND INSTR
GRCcP
PAGE
RtJ
20-8
TS
21 LM SEQUENTIAL
AND PYROTECHNIC
NASA
- Manned
Spacecraft
Center
MISSION RULES
I Tf M
ITEM
GENERAL
21-1
MUST
PROVIOE
THE
CLLJwl'-
B.
21-2
21-3
A.
B*
IF
A.
B.
A PYRO SYSTEM IS DISABLED BY OPENING THE APPROPRIATE uOGlC PC*ER #I ClftCuiT fctftAKEfc
21-*
THE ASCENT AND DESCENT STAGES ARE CONSIDERED NON-RIGIDLY ATTACHED IF T H E GUILLOTINE FAILS
SEVER THE INTERSTAGE UMBILICALS ANO ALL OTHER INTERSTAGE ATTACHMENT POINTS HAvE -^EuEAS
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 LM SEQUENTIAL
ANO PYROTECHNIC
GROUP
PAGE
GENERAL
MANAGEMENT
21-1
Center
MISSION RULES
RlV
ITEM
ITEM*
MANAGEMENT
21-10
21-11
IF UNABLE TO DEPLOY ONE OR MORE LANDING GEAR. A LANOING WILL NOT BE ATTEMPTED.
BURNS WILL BE CONTINUED SINCE CONTROL PROBLEMS ARE NOT EXPECTEO TO EXIST ANO
LANDING GEAR FROM TH BURN WILL NOT AFFECT ALTERNATE MISSIONS*
21-12
UNDOCKED STAGING WITH ONE PYRO SYSTEM WILL BE PERFORMED ONLY IF ABSOLUTELY NECcSSAftY TO
CRE'W SAFETY.
21-13
FOR A Kl THROUGH Kb FAILURE^ THE GOOD SYSTEM WILL BE DISABLED ANO A PYRQ FUNCTION* OTHER
THAN
STAGINGt ATTEMPTED TO DETERMINE IF Kl HAS FAILED CLOSED. IF B O T H SYSTtMS Aft FAILED IN THIS
MODE* THEY MUST BOTH BE TESTED FUR A Kl FAILURE INDEPENDENTLY. A PYRO SYSTEM CANNOT ; yiSA8u*
FOR A Kl FAILURE.
21-14
CONSIDERED
UNSAFE
FOR
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 LM SEQUENTIAL
ANO PYROTECHNIC
GROUP
PAGE
GENERAL
MANAGEMENT
21-2
THE
BE
DESCENT ENGlNt
OAMAGc TC TH
vlBRATIQN/$MOC*
Center
MISSION RULES
RtV
ITFM
RULE
ONOITION/MALFUNCTION1
PHASE
RULING
CUES/NOTES/COMMENTS
SPECIFIC
21-20
LOSS
OF
ALL
A* 1. DELAY STAGING AS
LONG AS POSSIBLE
DOCKED/
UNDOCKED
2. CONTINUE MISSION
NO-GO DOI
DESCENT
ORBIT
3. DOCK ASAP
NO-00 PDI
POWERED
DESCENT
LUNAR
STAY
ED RELAY
BEST OPPORTUNITY
ALL
B.
1. DOCK ASAP
2* ABORT
POWERED
DESCENT
21*21
UNABLE TO OtSARM
PYRO SYSTEM(S)
CONTINUE MISSION
NO-GO PDI
ALL
RCS
'
POWERED
DESCENT
ABORT
LUNAR
STAY
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 LM SEQUENTIAL
AND PYROTECHNIC
E D
ED RELAY
GROUP
PAGE
SPECIFIC
MANAGEMENT
21-3
-feu
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
ITEM
'RULE
21-22
A RELAY K7 THROUGH
K19 INAOVERTENTLY
CLOSES
PHASE
RULING
CUES/NOTES/COMMENTS
ALL
RELAYS
K7 EQUALS RCS PRESS
K8 EQUALS LANO GEAR DEPLOY
JCftA EQUALS LANO GEAR DEPLOY
K9 EQUALS OPS CRYO HE PRESS
K1O EQUALS ASC HE TANK 1
Kll EQUALS ASC HE TANK 2
K12 EQUALS ASC FUEL ANO
VALVE
OX
COMP
COMP
A CONTINUE MISSION
B CONTINUE MISSION
C ! CONTINUE MISSION
2. PRIOR TO
POSITIONING MASTER
ARM SW TO O N
CLOSE OES HE REG 1
ANO 2
3* OPEN OES HE REG 1 AT
TIG OF DPS 1 BURN
MISSION
APOLLO 11
REV
OATE
SECTION
4/14/69 LM SEQUENTIAL
ANO PYROTECHNIC
COMP
OX
GROUP
SPECIFIC
MANAGEMENT
PAGE
Center
MISSION RULES
SECTION 21 - LM SEQUENTIAL AND PYROTECHNIC
'CONDITION/MALFUNCTION 1
PHASE
RULING
CUE5/NOTES/COMMENTS
i
21-23
UNABLE TO STAGE
* ASCENT AND
DESCENT STAGES
STILL
THIS
RULE
ONLY
ALTERNATE MISSIONS
RNOZ
A. l. CONTINUE
MISSION
APPLIES
Tw
INITIATED
Dui
RIGIDLY
TIf.D TOGETHER
S. INCOMPLETE
STAGING. VEHICLE
NOT RIGID
GO
TO
DRIFTING
FWIJ^-T
RULE NUMBERS 2 1 - 2 *
THROUGH 2i-*9
ii I
t
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 LM SEQUENTIAL
ANO OYROTECMNIC
GROUP
PAGE
SPECIFIC
MANAGEMENT
1-5
oECAySE OF
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTIUN 2 1 -
LM SEOUE.NTIAL
PRELAUNCM
21-5C
DESCRIPTION
P.CM
D StoY A K1-K5
GY0201X
AND PYROTECHNIC
CONCLUDED
INSTRUMENTATION
ONBOARD
^
COMMON
CAUTION
21-i 2i 3 13 t ^ 3 . 2.
MD
LIGMT
i
i
I
I
i
j
ED RLY B <l-<6
GY0202X
ED RLY A K7-K.15
GYO231X
SELECTED ED BAT
VOLT
SYS B STAGING L I G H T J
METER
2 1 - 1 . 2 . 3t 1 3 . 2 0 . <.:
.M
21 -1 3 2 2
2 1 - 1 3 22
2 1 - 1 2 . 20
j
$
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 LM SEQUENTIAL
ANO PYROTECHNIC
GROUP
PAGE
PRELAUNCH
INSTR
21-6
122 LM ELECTRICAL
I
POWER
RFV
Center
MISSION RULES
SECTION 22 - LM ELECTRICAL POWER
ITEM
R ITEM'
22-1
GENERAL
TO INITIATE THE FOLLOWING MISSION PHASES* THE ELECTRICAL OQwER SYSTEM *UST PKOVIDE THE F
MINIMUM CAPABILITIESNOTE
LM ACTIVE RENDEZVOUS/CONTINGENCY RETURN ASSUMED
A.
B.
ENERGY
TO
WITH
COMPLETE T H E
C.
BATTERY
2.
TWO DESCENT BATTERIES PLUS ONE ASCENT BATTERY ON BOTH ASCENT 3ATTERUS.
3.
4.
ENERGY
TO
COMPLETE
THE
UNDOCKED/SEPARATION
1.
2.
FOUR
3.
SMORTEO
4.
DESCENT
THE
BATTERIES
DESCENT
PLANNED
FEtDE*
(A)
ACTIVITY
(8)
PLuS
PLUS
NOTE
TO CONTINUE LANDING MISSION* SEE POWERED
DESCENT CONSUMABLE REQUIREMENTS.
D
DESCENT ORBIT
1.
2.
3.
4.
3.
DESCENT
THE
PLANNED
BATTERIES
(A)
(B)
MISSION
APOLLO 11
REV
OATE
SECTION
4/14/69 LM ELECTRICAL
POWER
GROUP
PAGE
GENERAL
22-1
ACTIVITY
Center
MISSION RULES
RI:V
ITEM
ITEM'
POWERED DESCENT
1.
2.
3.
4.
5.
LUNAR
LANDING.
<*-HOUR
(B)
(C)
LUNAR
TRANSFER.
LIFTOFF),
LUNAR STAY
1.
2.
3.
4.
LUNAR
STAY
PLUS
(B>
(C)
LUNAR
TRANSFER.
LM ACTIVE RENDEZVOUS
1.
2.
3.
MISSION
APOLLO 11
REV
DATE
SECTION
4/14/69 LM ELECTRICAL
POWER
TO
COMPLETE
GROUP
RENOEZVOUS/DOCKING/CREW
PAGE
GENERAL
22-2
STAY
LIFTOFF)
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 22 - LM ELECTRICAL POWER
ITEM
22-2
B.
C.
D.
B.
DEFINITE LOSS IT
11)
BOTH CIRCUIT BREAKERS POWERING THE ECA'S FAIL OPfcN <ALL DESCENT
bATTERIES* DEPENDENT ON WHICH PAIR OF CIRCUIT BREAKERS * A I L C C >
{2)
R C B A B L E LOSS IF
Oft A w ^
il)
(2)
AC duS VOLTAGE LtSS THAN OR EQUAL TO 110.5 CR GRcATER THAN Oft EJUAu
VAC
TO
12'-
B.
TC
*1Q
MISSION
APOLLO 11
REV
DATE
SECTION
4/14/69 LM ELECTRICAL
POWER
GROUP
PAG
GENERAL
22-3
ASCE>
Center
MISSION RULES
SECTION 22 - LM ELECTRICAL POWER
: TEM
MANAGEMENT
22-10
THIS
A.
B.
C.
IP ONE OR SCTr- ASCENT BATTERY NORMAL -EED CONTACTORS -Alt OPEN, THE SPACECRAFT
CONFIGURED W H N ASCENT STAGE ONLY OPERATIONS ARE REQUIRED. USING TH BACKUP F-DS
ASCENT BATTERIES wITh THE CROSSTIES LEFT OPEN.
BATTERIES
THE
PROTECTION
BATTERY
WILL
BE
*IL
li
af
^A*ALLLL
u l u =r
CN B'TH
22-11
cOR MMINAL STAGING. T H ASCENT BATTERIES *ILL BE PRECONDITIONED FOR ONE ASCENT
OPERATION BY REMOVING 20 A * D - M R S FRQV ACM BATTERY IMMEDIATELY PRIOR TO T H EVENT.
22-12
-OR CONTINGENCY STAGING. T H E ASCENT BATTERIES WILL BE PRECONDITIONED FOR T*O ASCENT BATTERY
CBrRATION SY REMOVING 5 A M P - H R S **OM EACH BATTERY IMMEDIATELY PRIOR TO Tnt tVENT.
T H I S IS
PRESENTLY PLANNED TO BE ACCOMPLISHED ONLY FO* PEERED DESCENT OR IMMEOIATE wi^TOFF ArwMA w I e S.
IN THE VNT THAT A BATTERY is wOST AT. OR SUBSEQUENT To. bTAGING. SINGLE BUS 2PhATIZU *lLw "
CONTINJD UNTIL 20 A M O - H O U R S HAVE BEEN R E M Q V E D ^ ^ O M THE fta.MAIMNQ ASCENT BATTERY,
22-13
THE
BAL
LOAD
CROSSTICS
(30A)
BATTERY
MhcNEvgrt
AGS
22-15
THE INVERTERS wILL BE SWITCHED FOR A VOLTAGE LESS THAN OR EQuAL TO 112 VAC OR
LESS THAN OR EQUAL T J F LESS THAN OR EQUAL TO 398 H 2 .
22-16
AVAILABLE
MISSION
APOLLO
REV
DATE
SECTION
4/14/69 LM ELECTRICAL
POWER
GROUP
PAGE
MANAGEMENT
22-4
OF
FREwuENCY
402
ENERGY
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 22 - LM ELECTRICAL POWER
'RULE CONDITION/MALFUNCTION1
(A)
PHASE
RULING
22-20
CUEb/NOTES/COMMENTS
LOSS OF EITHER DC
BUS
DOCKED
ALL
SPECIFIC
A. TERMINATE LM
ACTIVITIES
B. DOCK ASAP
UNSTAGED DC BUS
STAGED DC BUS
STAGED C AND W PR
BATTERY
22-21
SHORTED DC BUS
FEEDER
r
A, DESCENT
ALL
A. RETURN TO VICINITY
OF CSM
CONFIGURE * I T H
BGTH ASCENT BATTERIES
ON NORMAL FEED * I T H
THE SHORT ISOLATED VIA
THE D E A O F A C E RELAY
8. ASCENT
UCCKED
B. 1* TERMINATE LM
ACTIVITIES
2* DOCK ASAP
ALL
MISSION
APOLLO 11
REV
DATE
SECTION
4/14/69 LM ELECTRICAL
POWER
GROUP
PAGE
SPECIFIC
22-5
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 22 - LM ELECTRICAL POWER
R
PULE CONDITION/MALFUNCTION
PHASE
'
PULING
CUES/NOTES/COMMENTS
22-22
LOSS OF ASCENT
BATTERY(S)
A. LOSS OF ONE
ASCENT BATTERY
DOC<ED
UNOQCKEO
DESCENT
ORBIT
1. CONTINUE
2.
RETURN
OF CSM
NO GO
POWERED
DESCENT
3(A)
DELAY
STAGED DC BUS
MISSION
TO VICINITY
ASAP.
BATTERY
PDI
PDI TO LO
- ABORT
STAGING
GATE
ALAP
IB) LO GATE TO
TD - CONTINUE
MISSION
wUNAR
STAY
3. uCSS OF TwC
ASCENT BATTERIES
4, LIFTOFF AT NEXT
8EST OPPORTUNITY
ALL
B.
DOCKED
OwERED
DESCENT
22-23
i. DO NOT
ASAP
2. DO NOT
3.
STAGE
DOCK
UNOQCK
ABORT
LOSS OF OESCENT
"ATTERIES
A. LOSS OF ONE OR
TWO DESCENT
BATTERIES
ALL
B. LOSS OF THREE
0* MORE DESCENT
BATTERIES
DOCKED
A. CONTINUE
UNDOCKED
DESCENT
ORBIT
POWERED
DESCENT
RETURN
OF C S M
3.1A)
UNSTAGED DC b'JS
BATTERY
MISSION
1. DO NOT
2.
JNOOC<
TC VICINITY
ASAP
LUNAR
MISSION
APOLLO 11
REV
4 . LIFT
BEST
DATE
OFF AT NEXT
OPPORTUNITY
SECTION
4/14/69 LM ELECTRICAL
POWER
GROUP
PAGE
SPECIFIC
22-6
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 22 - LM ELECTRICAL POWER
p ULE
CONDITION/MALFUNCT ION 1
PHASE
RULING
'
CUES/NOTES/COMMENTS
22-24
LOSS OF ONE
INVERTER
A. LOSS OF ONE
INVERTER
ALL
A. l CONTINUE MISSION
DESCENT
ORBIT
'
3 LOSS OF dCTM
DCC<ED/
INVERTERS
UNDOCKEu
B.
10
INVERTER
DESCENT
ORBIT
POWERED
DESCENT
-UNA*
STAY
22-25
woss OF AC BUSES
A. LOSS OF BUS A
A. 1 CONTINUE MISSION
NC GO DOI
DOCKED
UNDOCKED
I.
POwcRED
DESCENT
3 (A DQI T; LZ GATE -
ABORT
'
LUNA*
STAY
ALL
B. 1 CONTINUE MISSION
DESCENT
URBIT
C. LCSS OF EOT* AC
BUSES
CCNTINwc. MISSION
DOCKED
C. 1 CONTINUE MISSION
'
A50KT
(B) LC GATE TO TD CONTINUE MISSION
LUNAR
STAY
UNOQCKED
5 CONTINUE MISSION
'
*
MISSION
APOLLO 11
9EV
DATE
wCSi
DESCENT
URBIT
POWERED
DESCENT
INVERTER
DESCENT
ORBIT
B LOSS OF BUS S
10
SECTION
GROUP
LM ELECTRICAL
POWER
SPECIFIC
PAGE
22-7
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 22 -
LM ELECTRICAL POWER -
CONCLUDED
ITEM
INSTRUMENTATION
22-50
MA S CDESCRIPTION
PCM
REQUIREMENTS
CATEGORY
ONBOARD
AC BUS FREQ
AC BUS VOLTS
BAT 1 VOLTS
BAT 2 VOLTS
BAT 3 VOLTS
BAT 4 VOLTS
BAT 5 VOLTS
BAT 6 VOLTS
CDR BUS VOLTS
LMP BUS VOLTS
GC0155F
GC0071V
GCO201V
GC0202V
GC0203V
GCO2O4V
GCQ2O5V
GC0206V
GCO3O1V
GC0302V
CAUTION
^COMMON
METER/CAUTIO ^)LIGHT
METER
METER
METER
VCOMMON
/METER
METER
METER
METER
METER/WARNIN 3JICOMMON
METER/WARNING*) LIGHT
M
M
M
BAT
BAT
BAT
BAT
BAT
BAT
1 CUR
2 CUR
3 CUR
4 CUR
5 CUR
6 CUR
GC1201C
GC12O2C
GC1203C
GC12O4C
GC12O5C
GC1206C
METER
METER
METER
METER
METER
METER
M
M
M
M
M
M
BAT
BAT
BAT
BAT
BAT
BAT
; *AL
2 MAL
3 MAL
CAUTION/COMO
CAUTION/CCVB
CAuTION/COMP
CAUTION/COMP
CAUTION/COMP
CAUTICN/COMP
BATTEPtv MAL
GC9961U
GC9962U
GC9963U
GC9964U
GC9965U
GC9966U
GC4O47X
GC4362X
GC^36**X
GCO66X
GC4363X
PLAG
FLAG
FLAG
FLAG
HD
HD
HD
HC
BAT
BAT
BAT
BAT
GCO69X
GC4370X
GC4371X
GC^3 72X
HD
HD
HD
HD
MAL
5 MAL
6 *AL
5
6
5
6
B/J CDR
NORM CDR
NORM LMP
B/U LMP
MISSION
APOLLO
REV
U
COMMON
' METER
1
CC M MCN
LIGHTS
LAG
FLAG
FLAG
FLAG
DATE
SECTION
4/14/69 LM ELECTRICAL
POWER
M
M
HD
MD
hD
HD
M
MISSION RuLt
REFERENCE
I 22-2t5.24.25
i
J22-2#1O14
(20*21.22
,22-2.10.14
PCM
PCM
PCM
PCM
PCM
PCM
ONBOARD
ONBOARD
ONBOARD
ON3CARD
v
ONBOARD
ONBOARD
22-2.10.14
20.21.22.23
/22-2.10.14
M
M
M
M
(22-2.10.14.20.21 .23
HD
122-2.10.20.21.22
GROUP
i
22-2.10.20.21.22*23
;2-2.10*20.21.23
(22-2.10.17,20
121.22
PAGE
INSTR REU
22-8
C
1
23 LM ENVIRONMENTAL
CONTROL
Center
MISSION RULES
SECTION 23 - LM ENVIRONMENTAL CONTROL
ITEM
GENERAL
23-1
ENVIRONMENTAL
CONTROL
SYSTEM
MUST
PROVIDE
LM ACTIVE RENDEZVOUS/CONTINGENCY
RETURN IS ASSUMED
COMBINED VEHICLE
2*
ONE LM COOLANT
CABIN
PRESSURE
CLEAR
INTEGRITY
LOOP
CLOSEC
PRESSURE
SUIT C I R C u I T
INTEGRITY
INTEGRITY
REGULATOR
ONE COOLANT
LOOP
TO COMPLETE
T H E PLANNED
ACTIVITY
UNDOCKED/SEPARATION
1*
CABIN
2.
SUIT CIRCUIT
PRESSURE
*.
ONE DEMAND
3*
ONE COOLANT
6.
7,
INTEGRITY
INTEGRITY
REGULATOR
LOOP
BOTH H 2 0 SEPARATORS
OR 1 OF 2 H 2 0 SEPARATORS
PLUS T H E L C G LOOP
TO COMPLETE
TH PLANNED ACTIVITY
PLUS A RESERVE
OF 2 HOURS
TO PROVIDE A 2-HOUR
CONTINGENCY
SETuRN
CAPABILITY
CONTINGENCY
*ETU*N
CAPABILITY
NOTE
TO CONTINUE LANDING MISSION*
SEE POWERED DESCENT CONSUMABLES
REQUIREMENTS*
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
23-1
TME
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 23 - LM ENVIRONMENTAL CONTROL
R ITEM
DESCENT ORBIT
CABIN
PRESSURE
SUIT LOOP
INTEGRITY
INTEGRITY
REGULATOR
9CTM COOLANT
LOOP
6*
PRIMARY
SR 1 OF 2 "<2O SEPARATORS
SUFFICIENT 02 H20
A.\'O LI O H
<A)
H2O FEEDPATH
TO COMPLETE
CAPABILITY
PLUS
Th L C G LOOP
PLUS A RESERVE
OF 2 h O U P S .
TO ORSvIDE A 5-HQuR
CONTINGENCY
RETuRN
CAPABlLlTv
TO PROVIDE
CONTINGENCY
^ETuRN
CAPABiuItv
02 TANKS
A 5-nGUR
NOTE
TO CONTINUE MlSSlONt SEE
POwEREO DESCENT CONSUMABLE
REQUIREMENTS.
POWERED
DESCENT
1.
CABIN
2.
SUIT LOCP
INTEGRITY
3.
SOTH SUIT
FANS
4*
ONE DEMAND
BOTH COOLANT
6.
PRIMARY
7,
BOTM H 2 0 SEPARATORS
S.
SUFFICIENT
<A)
PRESSURE
INTEGRITY
REGULATOR
LOOPS
H20 FE5DPATM
CAPABILITY
OR I OF 2 20 SEPARATORS
0 2 , H 2 C . A.\D LI O H
LUNAR
STAr, P L J S
A LUNAR
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
23-2
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 23 - LM ENVIRONMENTAL CONTROL
ITEM*
LUNAR STAY
1*
2.
3.
<>
BOTH COOLANT
5.
6.
7.
uCGPS
(A) IN THE DESCENT TANK TO ACCOMPLISH A NOMINAL 22-HCUR LUNAR STAY PLUS A
RESERVE OF 2 HOU*S
LUNAR
STAY
LM-ACTIVE RENDEZVOUS/DOCKING
1.
2*
3.
*.
5.
Vl
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
23-3
0OC<ING/CftE*
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 23 - LM ENVIRONMENTAL CONTROL
ITEM
23-2
DEFINITIONSLOSS OF CABIN
INTEGRITY
TO
TEAR
0.3
PSI/MlN
IN THE PGA.
LOOP
A.
B.
GLYCOL COOLANT
(0.6
DEGREE
LOST)
(CIRCULATION
AND
RISING
LOST) OS KNOwr,
LOSS
LEAK
02
OR
PRESENCE
TO
INADEQUATE
DESCENT
TRANSFER
TANK
02
FROM
DESCENT
TANK
OR
GLYCOL
LO
MSFN
CONFIRMATION
OF
PRESSURE-
TANK
A.
MSFN CONFIRMATION
B.
C.
IF STAGED OR
OF LOSS OF ASCENT
TANK
IF DESCENT 02 LESS T N A N
PRESSURE
35
H20
WITH
02 MANIFOLD
PERCENTt
PRfcSSjRc
CREw
CONFJRv
AND $F\
L 0
SS
0*
5'
RAOC*T.
TANK
OF
TANK
INABILITY
LOSS OF ASCENT 02
TASTE
DROP.
GWYCCL
AND
(MSFN O N L Y ) .
SUIT
LOOP
TANK
A.
LOSS OF MEASUREMENT
ONE TANK
AND REMAINING
RATE
TANK FEEDING
23-3
IF A SUBLIMATOR
23-4
23-3
AT TwICE NORMAL
AND NO CHANGE
NO RESTART
ATTEMPT
WILL BE RESERVED
FOR
IN MEASUREMENT
WILL
FOR
*HEN
VT
APOLLO 11
REV
OATE
SECTION
GROUP
PAGE
23-4
AND
WILL
USE
IN
DISCUSSING
MISSION
ON OTR
TANK.
BE M A D E .
POSSIBLE
UNAVAILABLE
CONSIDERED.
RATE
NOT
BE
CALCULATING
FUNCTIONAL
Center
MISSION RULES
SECTION 23 - LM ENVIRONMENTAL CONTROL
I T r ,'
ITEM1
SYSTEMS MANAGEMENT
23-10
23-11
IF EITHER ASCENT 02 TANK IS LESS THAN OR EQUAL TO 95 PERCENT* IT WILL BE REPLENISHED FROM T H E
DESCENT 02 WHEN THE DESCENT TANK QUANTITY IS GREATER THAN OR EQUAL TO 35 PERCENT ANO AS CLOSE TO
STAGING AS POSSIBLE*
23-12
THE PLSS FILL VALVE WILL BE CLOSED* EXCEPT FOR REPRESSURIZING THE PLSS ANO
READOUTS OF 02 MANIFOLD PRESSURE.
23-13
CREW WILL GO TO EGRESS MODE IF INSUFFICIENT 02 IS AVAILABLE TO MAINTAIN CABIN PRESSURE FOR THE
REQUIRED TIME. ADDITIONALLY, A MISSION PHASE WILL NOT BE INITIATED IF THIS CONDITION CAN 5
ANTICIPATED.
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
LM ENVIRONMENTAL MANAGEMENT
CONTROL
PAGE
23-5
SECONDARY
FOR
M5FN
LOOP
BUT
REQUESTED
NASA
- Manned
Spacecraft
Center
MISSION RULES
I T[ M
RULE
PHASE
'
RULING
CUES/NOTES/COMMENTS
LOSS OF CABIN
PRESSURE INTEGRITY
CONTINUE MISSION
1* PERFORM SYSTEMS
EVALUATION
WITHIN CONSUMABLES
LIFETIME CONSTRAINTS
WITH ONE CREWMAN
ON BOTH THE CSM ANO LM
UMBILICALS
2* NO-GO FOR UNDOCKING
UNDOCKED
DOCK ASAP
DO NOT STAGE WHILE
UNOCC<ED
OESCENT
ORBIT
DOCK. ASAP
NO-GC FOR DO I
MISSION
APOLLO 11
LUNAR
STAY
RN02
CONTINUE MISSION
DOCK ASAP
REV
DATE
SECTION
GROUP
PAGE
23-6
MISSION RULES
Rf.V
ITEM
RULE 'CONDITION/MALFUNCTION1
23-21
Center
PHASE
DOCKED
RULING
CUES/NOTES/COMMENTS
CONTINUE MISSION
1* PERFORM SYSTEMS
EVALUATION WITHIN
CONSUMABLES LIFETIME
CONSTRAINTS WITH ONE
CREWMAN ON BOTH THE
CSM AND LM UMBILICALS
3A SUIT FAN
DOCK ASAP
DO NOT STAGE WHILE
UNOOCKED
NO-GO FOR DOI
DESCENT
ORBIT
DOCK ASAP
DO NOT STAGE WHILE
UNOOCKED
POWERED
DESCENT
LUNAR
STAf
RNDZ
CONTINUE MISSION
DOCK ASAP
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
PAGE
23-7
NASA
- Manned
Spacecraft
Center
MISSION RULES
RLV
ITEM
RULE
23-22
CONDITION/MALFUNCTION1
PHASE
RULING
CUES/NOTES/COMMENTS
A.I,
POWERED
DESCENT
CONTINUE MISSION
7A ECS
2. RETURN TO VICINITY
OF C5M
DELAY STAGING ALAP
(B) PDI *5 TO TD
CONTINUE MISSION
LUNAR
STAY
RNDZ
5. CONTINUE MISSION
DOCK ASAP
DOCKED
B.I,
CONTINUE MISSION ON
CSM TRANSFER
UMBILICAL
*ETuRN
2. DOCK ASAP
3 SUIT FAN
NO-GO FOR DO I
DO NOT STAGE WHILE
UNDOCKED
DESCENT
ORBIT
3. DOCK ASAP
DO
NOT
STAGE W H I L E
UNDOCKED
POWERED
DESCENT
MISSION
APOLLO XX
LUNAR
STAY
RND2
6* OOCK ASAP
REV
DATE
SECTION
4/16/69 LM ENVIRONMENTAL
CONTROL
GROUP
PAGE
SPECIFIC
23-a
ECS
TO
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
RtV
ITEM
RULE
23-23
PHASE
RULING
LOSS OF H2O
SEPARATOR(S)
AND/OR LCG LOOP
CuES/NOTES/COMMENTS
A. ONE M2O
SEPARATOR
(LCG LOOP
OPERABLE)
A* CONTINUE MISSION
B. TWO H2O
SEPARATORS
(LCG LOOP
OPERABLE) OR ONE
H2O SEPARATOR
AND LCG LOOP
DOCKED
B.I.
CONTINUE MISSION
UNDOCKED
DESCENT
ORBIT
2. DOCK ASAP
POWERED
DESCENT
DELAY STAGING
ALAP
<B) PDI +i TO TD
CONTINUE MISSION
C. TWO H2O
SEPARATORS
ANO LCG LOOP
LUNAR
STAY
RNDZ
DOCKED
C.I.
CONTINUE MISSION
UNDOCKED
DESCENT
ORBIT
2. DOCK ASAP
POWERED
DESCENT
DELAY STAGING
ALAP
(B) POI *3 TO TD
CONTINUE MISSION
LUNAR
STAY
RNDZ
MISSION
APOLLO IX
REV
DATE
SECTION
GROUP
PAGE
23-9
NASA
- /Via,; i n e v
' p a c e c r e ! t
Center
^ i i S S K ' N K:. L C i
SECTI ON 23 - L" ENVIRONMENTAL CONTROL
R 'RULE CONDITION/MALFUNCTION1
<ULiNo
:
23-2<*
PMAS"
oh CLOSED
A. ONE REGULATOR
B. TWO REGULATORS
'
CuES/NOTES/COVMENTS
A. CON.NL, ,:.;,,
ALL
'
2. DOCK ii;r
DE.SCc>,7
:ORBIT
ALA^
3. co,\-:Nw-i -';: C N
DESCENT
ST.-
S 1; I: '
ON
ND.
23-25 "
t
:
..CSS 0^ C C C - A N T
L00r 'S ?
A, =>RI^ASty C5
SECONDARY' w X -
TE
i
i
;
j
B. S O T M LOOPS > A N Y
'
COMB 1 NATION OP
LOSS OF C I R C U L A T I O N . '
SUBLIMATION
'=-
i*
.ir"Cr=
NEXT
ECS
BEST
INGRESS CSV
',,,-jJ
FOR JiN
i
FF
ASAP
J
!
MISSION
1
APOLi.0 11
IREV
s
i
JOATE
SECTION
GROUP
PAGE
23-lC '
69 L* ENVIRONMENTAL SPECIF.C
j
COMRCL
Center
MISSION RULES
Rl.V
ITEM
RULE 'CONDITION/MALFUNCTION
23-26
PHASE
RULING
CUES/NOTES/COMMENTS
CONTINUE MISSION
8
GLYCOL
23-27
FIRE OR SMOKE IN
CABIN OR SUIT
RETURN TO VICINITY OF
CSM
POWERED
DESCENT
LUNAR
STAY
RNDZ
CONTINUE MISSION
ALL
TROuBLESHOOT/COMBAT FIRE
23-28
CONTAMINATION
CABIN
ALL
23-29
ALL
TRANSFER TO CSM
A, CABIN
ALL
a* SUIT
ALL
IF UNABLE TO "CLEAR
CONTAMINATION*
MISSION MAY BE TERMINATED EARLY.
GLYCOL
23-49 ARE
RESERVCD.
MISSION
APOLLO IX
REV
DATE
SECTION
GROUP
PAGE
23-11
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 23 - LM ENVIRONMENTAL CONTROL - CONCLUDED
INSTRUMENTATION
23-60
CABIN PRESS
RfPR ELEC 0E\
CCJ D A R T PRESS
H20
DES
ASC
AS,:
02
SEP RATE
02 PRESS
1 02 PRESS
2 02 PRESS
*ANlrCL
PRESS
SEVGLY OUM
SE-.
GLY
DELTA P
SW/C
PRESS
LV
REQUIREMENTS
PCM
ONBOARD
CATEGORY
GF1301P
METER
MANDATORY
GF3572X
GF1521P
GF9999U
GF3584P
GF3582P
oF3583P
GF3589P
WARNING
METER
WARNING
METER. CAUTION
COMP
MANDATORY
MANDATORY
HIGHLY DESIRABLE
HIGHLY DESIRABLE.
CAuTIQNt COMP
MTER CAUTION
M
ETER CAUTION \
METER* CAUTION I
MIGHLY
GF2936X
GF2921P
GF9997J
GF9966U
GF9998U
1 -F 2
MANDATORY
MANDATORY
COMP
MANJATORv
*ETER
CAuTlON
CAUTION
M
Asc
DESIRABLE
ETER
u*ICN
^T ION
:
GF45830
MANDATORY
MANDATORY =Cy
MANJATORr
CM UN TANIC ANU V T E R 0"H-r
OF 2
PC.V AND CAUTION - J i
MISSION
APOLLO 11
G^:221X
GF1231T
GF1651T
REV
DATE
METER
*ETR
SECTION
GROUP
INSTR
4/16/69 LM
ENVIRONMENTAL CT REU
IGHLY
PAGE
23-12
TAN<i
24
LM GUIDANCE
AND CONTROL
25
LM DPS
26
LM APS
2 7 LM REAC TION
CONTROL SYSTEM
2 8 SPACE
ENVIRONMENT
2 9 RECOVERY
3 0 AEROMEDICA L
31
EASEP
APPENDICES
ACRONYMS AND
SYMBOLS
DISTRIBUTION
LIST
CHANGE CONTROL
24 LM OUIOANCC
AND CONTflOL
Center
MISSION RULES
SECTION 24 - LM GUIDANCE AND CONTROL
ITEM
24-1
GENERAL '
PROVIDE
THE
DOCKD/UNDOC<ED
DESCENT ORBIT
1.
OPERATIONAL
2.
3.
REDUNDANT
4.
5.
3-AXIS TRANSLATION
FOLLOWING
MINIMUM
REQUIRES
3-AXlS CONTROL.
(ACA).
CAPABlLlTYt
WHICH
REQUIRES
7.
ONE FDAI
REFERENCE
NEEDLES
(C) ERROR
8.
(TTCA)
INCLUDING
(A) ATTlTuOE
(B) RATE
CAPABILITY
CONTROLLER ASSEMBLY
NEEDLES
AN OPERATIONAL
AOT
ITS USE
IN REALIGNING THE LM
PLATFORM.
NOTE
AFTER SUCCESSFUL PLATFORM FINE
ALIGNMENT TE AOT IS NOT REQUIRED*
OPERATIONAL
RENDEZVOUS RADAR
(RR) ANO RR
TRANSPONDER
IDENTIFIED BY ABILITY
TO
ACTIVATE*
AND
LANDING RADAR
INTERFACE*
TO ACTIVATE
ANO
THE
CAPABILITY
12
LGC
TEMPERATURE
(LR)
U.
ANTENNA
CAPABILITY,
REQUIRES
FAILURE
FAILURE
14.
MISSION
APOLLO II
REV
DATE
SECTION
4/16/69 LM GUIDANCE
AND CONTROL
WHICH
REQUIRES
INHIBIT T H R O T T L E
GROUP
GENERAL
ONE
TTCA
CONTROL.
CES/DESCENT
PAGE
AND
NO
ENGINE
AND
NASA
- Manned
Spacecraft
Center
MISSION RULES
SECTION 2 - LM GUIDANCE AND CONTROL
I TLM
ITEM'
POWERED DESCENT
REQUIREMENTS TO INITATE POI ARE IDENTICAL TO DESCENT ORBIT EXCEPT DELETE AOT
AND RR WHICH ARE NOT REQUIRED*
2.
3*
CPERATIQNAL MANUAL
THROTTLE
LUNAR STAY
1.
THE ASCtNT "ANEuVER TO LIFTOFF THE LUNAR SURFACE AT THE NEXT BEST
OPPORTUNITY WILL BE PERFORMED IF ANY OF THE FOLLOWING G6C SYSTEM CAPA6ILITES
ARE LOST
(A) OPERATIONAL AG5
<B) REDUNDANT 3-AXlS AUTO ATTITUDE CONTROL AND HOLD CAPABILITY
(C) REDUNDANT 3- AXIS CONTROL
CD) REDUNDANT ASC ENGINE ON/OFF CAPABILITY
MISSION
APOLLO XI
REV
DATE
SECTION
4/16/69 LM GUIDANCE
AND CONTROL
GROUP
PAGE
GENERAL
24-2
Center
MISSION RULES
SECTION 24 -
ITEM
RENDEZVOUS
1*
CSI AND
CDH
IN ORDER FOP
THE
LM
TO
BE
ACTIVE
VEHICLE
IN
RENDEZVOUS MANEUVERS* THE G&C SYSTEMS MUST
PROVIDE
CAPABILITIES-
(A) OPERATIONAL
PQNS OR
(C) 3-AXIS
CONTROL
(D) 1-AXIS
TRANSLATION
TPI AND
INITIAL
MINIMUM
AGS
IB) 3-AXIS
(E) AN OPERATIONAL
2.
PERFORMING
THE
THE
FOLLOWING
AND HOLD
CAPABILITY
CAPABILITY
RR AND RR
TRANSPONDER
TPF
THE
THE
TERMINAL
RENDEZVOUS
FOLLOWING
MINIMUM
CAPABILITIES
(A) OPERATIONAL
PGNS OR
(9) 3-AXIS
(C) 3-AXIS
CONTROL
ID) 3-AXIS
TRANSLATION
(E) AN OPERATIONAL
'
3.
AGS
(F) ONE
CAPABILITY
CAPABILITY
RR AND RR
TRANSPONDER
TTCA
OOCKING
IN ORDER FOR THE L M TO BE THE ACTIVE VEHICLE FOR
DOCKING
MUST PROVIDE T M FOLLOWING MINIMUM C A P A B I L I T I E S
(A) 3-AXIS
<S> ONE
CONTROL
ACA
(C) 3-AXIS
(D> ONE
THE
TRANSLATION
CAPABILITY
TTCA
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 LM GUIDANCE
AND CONTROL
GROUP
GENERAL
PAGE
G&C
SYSTEMS
Center
MISSION RULES
"IV
SECTION 24 -
I T!"M
ITEM
DE C INITIONS
3-AXIS AUTO ATTITUDE CONTROL AND HOLD CAPABILITY
3-AXIS AUTO ATTITUDE CONTROL AND MOLD CAPABILITY
IS DEFINED AS TwE LMS
ABILITY TO AUTOMATICALLY HOLD AND CONTROL ATTITUDE. IN ORDER TO HAVE T M I S
CAPABILITY THE LM REMUIRES EITHcK AN OPERATIONAL PGNS OR AN OPERATIONAL AGS*
3-AXIS CONTROL
3-AXIS CONTROL IS DEFINE AS THE ABILITY TO CHANGE T H E EXISTING VEHICLE
ATTITUOE. TO HAVE THIS CAPABILITY THE LM RuuIfcS AN OPERATIONAL
M A N U A L CK
AUTOMATIC CONTROL SYSTEM.
OPERATIONAL PGNS
AN OPERATIONAL PGNS IS DEFINED AS NO LGC FAILURE. NO
DSKY FAILURES.
ISS
FAILURE.
AND
NO
A. ANY FAILURE OF THE LGC HARDWARE AND/CR THE ASSOCIATED INPUT/OUTPUT INTERFACES w*ICCANNOT SI REMEDIED SY CREW PROCEDURES IS CONSIDERED AN LGC FAlLURfc.
B. ANY FAILURE WITHIN THE IMu* CDU PTAi OR THE PSA WHICH WOULD CAUSE A PERMANENT
OF THE INERTIAL ATTITUDE AND VELOCITY MEASUREMENT. IS CONSIDERtD AN ISS
ANY FAILURE OF THE DSKY HARDWARE AND/OR T H ASSOCIATED
INPJT/CUTPLT
WHICH CANNOT BE REMEDIED BY CREW PROCEDURES IS CONSIDERED A 0$<r
LOSi
INTERFACES
OPERATIONAL AGS
AN OPERATIONAL AGS IS DEFINED AS NO AEA FAILURE. NO ASA
FAILURE. AND NO CES FAILURE PREVENTING ATTITUOE CONTROL.
FAILURE*
NO
OEDA
A. ANY FAILURE OF THE AEA HARDWARE A.N/CR THE ASSOCIATED INPUT/OUTPUT INTERFACES
CANNOT BE REMEDIED BY CREW PROCEDURES IS CONSIDERED AN AEA FAILURE.
w*-IC-
B* ANY FAILURE OF THE ASA HARDWARE ANC/CR THE ASSOCIATED INPuT/OuTPuT INTERFACES w*-ICr
CAUSE LOSS OF THfe VEHICLE ATTITUOE AND VELOCITY "EASUREMtNTS IS CONSlOEkfetf A * ASFAILURE*
C. ANY FAILURE OF T H E DEDA HARDWARE AND/OR TriE ASSOCIATED -I N?UT /OUTPUT
i-NTE^FACEs
WHICH CANNOT BE REMEDIED BY cREw PROCEDURES IS CUNSIOEPED A uJEDA FAlLuRr.
D. ANY FAILURE OF THE CES HARDWARE THAT PRtVENTS ATTITUDE
CONSIDERED A CES FAILURE.
CQNTSCL
WHILE
I<\
3-AXIS TRANSLATION
3-AXIS TRANSLATION IS DEFINED AS THE ABILITY TO CHANGE THE VEHlCuE VELOCITY,
PLUS OP MINUS. ALONG EACH BODY AXIS. TO HAVE THIS CAPABILITY T H E L.M REQUIRES
ONE TTCA AND AN OPERATIONAL PGNS OR OPERATIONAL CES CIRCUITRY.
MISSION
APOLLO 11
REV
OATE
SECTION
4/16/69 LM GUIOANCE
AND CONTROL
GROUP
PAGE
GENERAL
24-4
AGS
Center
MISSION RULES
SECTION 24 - LM GUIDANCE AND CONTROL
ITEM
MANAGEMENT
24-3
24-4
IMU
A.
B.
T H E PGNS WILL BE CONSIDERED NO-GC WITH A GYRO DRIFT GREATER THAN OR EUUAL TO +/-1.5
(100 MERU THE MAXIMUM ALLOWABLE VALUE WITHIN THE LGC IS +/-1.93 DEG/HR (128 M R u ) .
C.
THE PIPA BIAS WILL BE UPDATED WHENEVER THE DELTA BIAS (LGC VALUE OF BIAS - MEASuftt ilASJ
GREATER T H A N CR EQUAL TO /-200 C*/SC2 C.C066 F T / s C 2 ) *
D*
IS GREATER
THAN OR EQUAL
+/-3*125
CM/SEC2*
TO
THc
IS
MAX I
LGC
A MASS UPDATE IS REQUIRED IF A MASS DELTA
OF 4-/-1Q PERCENT
(DIFF&KENCE
BTN
CALCULATION ANO LGC VALUE) EXISTS WHEN IN THE DPS CONFIGURATION* OR
-/-b
Pf.RCENT IN
CONFIGURATION*
ALL DESCENT ENGINE STARTS MUST NOMINALLY BE PRECEDED
USING TWO SYSTEM a JETS IN CASE OF A CONTINGENCY*
BY
PROPELLANT
AP5
SETTLING
24-5
RENDEZVOUS RADAR
A
8.
THE RR SHOULD NOT BE OPERATED AT AN ANTENNA TEMPERATURE GREATER THAN OR EQUAL TO 145 DEG
AND/OR A GYRO PACKAGE TEMP (ESTIMATED) OF GREATER THAN OR 6.UUAL TO 203 OLG F.
IF IT IS ESTIMATED THAT THE RR GYRO PACKAGE WILL EXCEED
PRIOR TO COMPLETION OF T H E BRAKING PHASE* T H E RR S H O U L O
TPI AND BRAKING*
200 DEG F {W
BE TURNED OFF
IF THE E5TIMAT GYRO PACKAGE TEMP S H O U L O EXCEED 200 DEG F ( H P M APPROX* 125 PEG
DURING THE RENDEZVOUS PHASE* THE AC POWER TO THE RR SHOULD NOT BE TURNED -FF*
IF THE RR ANTENNA TEMP (HPM) EXCEEDS T H E NOMINAL TEMP PROFILE BY
BE TURNED OFF IF IT IS NOT NEEDED.
APOLLO 11
REV
DATE
SECTION
4/16/69 LM GUIDANCE
ANO CONTROL
GROUP
PAGE
MANAGEMENT
24-5
F)
DEG ht T H RR
IF THE RR HEATERS ARE TURNED OFF (BOTH T H E P G N S RNDZ RDR AND OPR OPEN) FDR
DATA MUST NOT BE USED UNTIL H MJN AFTER RE-ENERGIZING*
MISSION
ANYTIME
irCuL-
<I-\*
Center
MISSION RULES
"IV
I Tf M
ITEM
LANDING RADAR
A.
THE LR SHOULD NOT BE OPERATED AT AN ANTENNA TEMP LESS THAN +50 PEG F.
B.
AGS
A.
THE AGS IS DECLARED NO-GO WITH AN ASA TEMPERATURE OF LESS THAN 90 DEG F OR GREATEK THAN *
150 DEG F.
B.
C.
0.
E.
THE AGS USING ONLY TTCA CONTROL CAN BE USED TO PERFORM A DOCKED DPS BURN.
Ru
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 LM GUIDANCE
AND CONTROL
GROUP
PAGE
MANAGEMENT
24-6
Center
MISSION RULES
SECTION 24 - LM GUIDANCE ANO CONTROL
R RULE
CONDITION/MALFUNCTION
PHASE
RULING
CUES/NOTES/COMMENTS
i
i
SPECIFIC
i
24-20
LOSS OF OPERATIONAL
PGNS
D.0OCED/
UNDOCKPB
UliMwWK Cv
DESCENT
ORB IT
POWERED
OESCENT
PGNS
ISS WARN
2*
TEMP CAUTION
15
16
17
ABNORMAL
RESPONSE
(B) ABORT
2*
OSKY
PUSH8UTT0N
RNDZ
1. SWITCH TO AGS
2.
2^-21
CONTINUE MISSION
LOSS OF FDAI
A. ONE
ALL
B.
DOCKED/
UNDdCKED
BOTH
A* CONTINUE MISSION
B1(A) RETURN TO CSM
1
ASAP
DESCENT
ORBIT
'
3(A) PRIOR TO
LOW G A T E
POWERED
DESCENT
'
(2} ABORT
(B> AFTER LOW G A T E
CONTINUE MISSION
LUNAR
4 CONTINUE MISSION
STAY/RN02
i
i
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 LM GUIDANCE
AND CONTROL
GROUP
SPECIFIC PGNS/CES/AGS
PAGE
24-7
Center
MISSION RULES
RI:V
ITEM
RULE
24-22
LOSS OF AOT
PHASE
DOCKED/
UNDQCKED
RULING
CUES/NOTES/COMMENTS
24-23
LOSS OF RENDEZVOUS
RADAR AND/OR
TRANSPONDER
DOCKED/
UNDOCKED
LOSS OF LANDING
RADAR
HEATER CAUTION
DESCENT
ORBIT/
LUNAR
STAY
RNDZ
DOCKED/
UNDOCKED
1. CONTINUE MISSION
9
NO TRACK
DESCENT
ORBIT
10 TRACKER CAUTION
POWERED
DESCENT
2* NO-GC
1. PRIOR
ALTITUDE
LM STATE
FOR PDI
TO AOEUUATE
UPDATING OF
VECTORS
24-25
TBD
24-26
LOSS OF TRACKING
LIGHT
TBD
MISSION
APOLLO 11
RfV
DATE
SECTION
4/16/69 LM GUIDANCE
AND CONTROL
GROUP
SPECIFIC PGNS/CES/AGS
PAGE
24-8
Center
MISSION RULES
REV
ITEM
24-27
RULING
PHASE
CUES/NOTES/COMMENTS
LOSS OF REDUNDANT
AUTOMATIC 3-AXIS
ATTITUDE CONTROL AND
HOLD C A P A B I L I T Y
11 LM DRIFTS
A. LOSS OF AGS
ALL
CONTINUE MISSION
B. LOSS OF PGNS
DOCKED/
CAPABILITY
UNDOCKED
DESCENT
ORBIT
BURNING
(B) NO-GO FOR PDI
<C) RETURN TO CSM
ASAP
POWERED
DESCENT
'
ABORT
(B) AFTER LOW GATE
(1) LAND MANUALLY
(2) NO-GC FOR
EXTENDED
LUNAR STAY
1
LUNAR
STAY
24-28
LOSS OF 3-AXIS
CONTROL
A* REDUNOANT
BEST OPPORTUNITY
DOCKED/
UNDOCKED
B. ANY AXIS
3, CONTINUE MISSION
POWERED
DESCENT
LUNAR
STAY
RNDZ
5, CONTINUE MISSION
POWERED
DESCENT
RNDZ
MISSION
APOLLO 11
REV
OAT! ;
SECTION
4/16/69 LM GUIDANCE
AND CONTROL
GROUP
SPECIFIC PGNS/CES/AGS
CES
PAGE
24-9
Center
MISSION RULES
REV
ITEM
R RULE
PHASE
RULING
CUES/NOTES/COMMENTS
i
i
24-29
LOSS OF TRANSLATION
CAPABILITY
A. AUTOMATIC
ULLAGE (+X)
1
1
1
1
1
POWERED
DESCENT
CES
'
'
'
i
CONTINUE MISSION
8* EITHER
/-Y /-2t + /-X
TRANSLATION
'
DOCKED/
UNDOOCED
'
DESCENT
ORBIT
<f
'
i
'
'
i
i
*
i
(1) CONTINUE
MISSION
'
*
POWERED
DESCENT
'
'
4e(A> CSI-CDH
RN02
(1) CONTINUE
MISSION
'
(B) TPI-TPF
U ) CSM ACTIVE
RNDZ ANO
DOCKING
MISSION
APOLLO 13L
REV
DATE
SECTION
4/16/49 LM GUIDANCE
AND CONTROL
'
GROUP
SPECIFIC PGNS/CES/AGS
PAGE
24-10
Center
MISSION RULES
REV
ITEM
R RULE
24-30
CONDITION/MALFUNCTION1
LOSS OF PITCH OR
ROLL GOA
PHASE
RULING
'
CUES/NOTES/COMMENTS
POWERED
DESCENT
24-31
DOCKED/
UNOOCKED
2* 1MO-GO
DESCENT
ORBIT
FOR DO I
EVENT
POWERED
DESCENT
START PS
2 . <CONTINUE MISSION
3 . \YO-GO FOR EXTENDED
.UNAR STAY IF FAILURE
EFFECTS ASCENT ENGINE.
24-32
LUNAR
STAY
POWERED
DESCENT
1. INHIBIT POt
24-33
LOSS OF OPERATIONAL
ALL
CONTINUE MISSION
AGS
1
'
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 LM GUIDANCE
AND CONTROL
GROUP
SPECIFIC PGNS/CSS/AGS
PAGE
24-11
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
RtV
ITfM
24-34
LOSS OF AUTO
THRUST CONTROL
PHASE
RULING
DOCKED/
UNCOCKED
'
CUES/NOTES/COMMENTS
CES
NOT
AGREE
DfSCENT
ORBIT
2. IF BURNING* CONTINUE
BURN
TO
'
24-35
NO LONGER THAN
100
NON-THROTTLEABLE
RANGE
ACCUMULATED*
IN
BE
DO
NOT
POWERED
SEC
CAN
CES
THR
1. DO NOT SWITCH TO
OESCENT
MANUAL
THROTTLE
TO
LOSS OF ACA
REF M A L F PROC
A* ONE
ALL
A* CONTINUE MISSION
8. BOTH
DOCKED/
UNDOCKED
CES
'DESCENT
ORBIT
!
|
I
'POWERED
DESCENT
'LUNAR
STAY
(
RNDZ
'
MISSION
APOLLO 11
REV
DATE
SECTION
4/l/69 LM GUIDANCE
AND CONTROL
GROUP
SPfCIFIC
PGNS/CES/AGS
PAGE
2*-12
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
RUV
ITEM
R 'RULE 'CONDITION/MALFUNCTION1
24-37
PHASE
RULING
'
CUES/NOTES/COMMENTS
LOSS OF TTCA
A ONE
ALL
A* CONTINUE MISSION
S. BOTH
OOCKED/
UNDOCKED
(B)
NO-GO FOR
DOI
DESCENT
ORBIT
POWERED
DESCENT
LUNAR
STAY
RNDZ
24-38
LOSS OF LUNAR
CONTACT LIGHTS
POWERED
DESCENT
CONTINUE MISSION
MISSION
APOLLO XI
REV
DATE
SECTION
4/16/69 LM GUIDANCE
AND CONTROL
CES
GROUP
SPECIFIC PGNS/CES/AGS
PAGE
24-13
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
RtV
ITEM
SECTION 24 -
CONTINUED
ITEM
24-*O
PRELAWJNCH INSTRUMENTATION
PCM
ONBOARD
LGC DOWNLINK
PLS TORO REF
2.5 VOC TM BIAS
I"U 28 VAC 800
IRIG SUSP 3.2 KC
IMU STBY
LGC OPR
X PIPA OUT IN PHASE
Y PIPA OUT IN PHASE
2 PIPA OUT IN PHASE
IG SVO ERR IN P^ASE
IG IX RSVR OUT SIN
IG IX RXVR OUT COS
MG SVO ERR IN PHASE
MG IX RSVR OUT SIN
MG IX RSVR OUT COS
OG SVO ERR IN PHASE
OG RSVR OUT SIN
OG RSVR OUT COS
PITCH ATT ERR
YAW ATT ERR
ROLL ATT ERR
PIPA TEMP
RR SHFT SIN
RR SHFT COS
RR TRUN SIN
RR TRUN COS
LGC WARNING
ISS WARNING
LR ANT TEMP
RR NO TRACK
RR ANT TEMP
GG0001U
GG104OV
GG1110V
GG1201V
GG1331V
GG1313X
GG1523X
GG2001V
GG2021V
GG2041V
GG2107V
GG2112V
GG2113V
GG2137V
GG2142V
SG2143V
GG2167V
GG2172V
GG2173V
GG2219V
GG2249V
GG2279V
GG2300T
GG3304V
GG3305V
GG3324V
GG3325V
GG9001X
GG9002X
GN7563T
GN7621X
GN7723T
GH1247V
GH1248V
GH1249V
GH1419V
GRS032X
GH1423V
GR5036X
GH1427V
GR5040X
GH1431V
GRS044X
GH1418V
GH1420V
GH1421V
GH1422V
GH1424V
GH1423V
GH1426V
GH1428V
GH1429V
GH1430V
GH1432V
GH1433V
GRS031X
GR5033X
GR5034X
6RS039X
GR3037X
GR5038X
GR9039X
GR5041X
GR5042X
GR5043X
GR3045X
GR5046X
GH1455V
GH14S6V
MEAS DESCRIPTION
MISSION
APOLLO 11
REV
DATE
TRANSDUCERS
FDA I
FDA I
COMMON
COMMON
FDA I
FDA I
COMMON
COMMON
FDA I
FDA!
FDA I
FDA!
FOAI
Cfrw
FDA I
FDA I
FDA!
FDA I
CfrW
CfrW
TEMP MONITOR
CfrW
TEMP MONITOR
COMMON
COMMON
COMMON
COMMON
COMMON
SEPARATE
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMUN
HD
HO
MO
HO
HO
HO
HO
HO
HO
HO
HO"
HO
MO
M
M
M
HO
HO
HO
HO
HO
HO
HO
HO
HO
HO
HO
HO
HO
HO
HO
HO
HO
SECTION
H0>
0\
HO)
HO
HO
HO
HO
HO
HO
HD
M-PCM
M-PCM
MO
M-PCM
M-PCM
HO
M-PCM
M-PCM
MD - PC*
HD - P O
MD - PC*
M-PCM
HO - P C
MO - PCP
MD - PCI"
MO - PC*
HO - PC*
HD - P O
HO - PC*
MD - PO*
M-PCM
HO
HO
FDA I
FDAl
CATEGORYf
COMMON
COMMON
MO
HO
GROUP
PAGE
PRELAUNCM
1NSTR
24-14
MISSION RULE
REFERENCE
24-20
24-20
24-20
24-20
24-20
24-20
2420
24-20
24-20
2420
24-20
24-20
24-20
24-20
24-20
24-20
24-20
24-20
24-20
24-20
24-20
24-20
24-20
24-23
24-23
24-23
24-23
24-20
24-20
24-23
24-23
24-33
24-33
24-33
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-27
24-33
24-33
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
SECTION 24 - M
ITEM
ITEM
24-40
NEAS DESCRIPTION
ROLL ATT ERR
R6A YAM RATE
RGA PITCH RATE
RGA ROLL RATE
ACS SEL
ROLL PLSD/DIR
=>ITCH PLSD/OIR
YAW PLSD/DIR
AUTO ON
APS ARM
ENG FIRE OVRO
MAN THRUST CMO
PITCH GOA POS
ROLL GOA POS
P TRM FAIL
R TRM FAIL
AUTO THRUST CMO
OPS ARM
VAR INJ ACT POS
CES AC PWR FAIL
CES DC PWR FAIL
AGS DOWNLINK DATA
ASA TEMP
ASA PWR/AEA FAIL
AUTO OFF
AGS AUTO
AGS ATT HOLD
PGNS AUTO
PGNS ATT HOLD
LR RNG DATA NO GOOD
LR VEL DATA NO GOOD
MISSION
APOLLO 11
PCM
ONBOARD
FDAI
FDA I
FOAZ
FDAI
GH1457V
. GH1461V
GH1462V
GH1463V
GHX62XX
GH162IX
GH1629X
GH1630X
GH1214X
GH1230X
GH12S6X
GHX3X1V
GH1313V
GH13X4V
GH1323X
GHX330X
GHX331V
GHX346X
GO6806H
GL4026X
GL4027X
GIOOOXX
GI330XT
GL4028X
GHX2X7X
GHX64XX
GHX642X
GHX643X
GHX644X
GN752XX
GN7557X
REV
DATE
METER
ctw
Cfrw
METER
TRANSDUCERS
COMMON
COMMON
COMMON
COMMON
SEPARATE
COMMON
COMMON
SEPARATE
CfrW
Cfrw
COMMON
COMMON
COMMON
ctw
CfrW
CfrW
SECTION
COMMON
COMMON
CATEGORY
HD
M ON BOAR
M PCM/HD
M
HO
HD
HD
HO
M
M
M
M
M
M
M
M
HO
M
M
M
M
M
HO
HD
HO
HO
HO
HO
HD
HD
HO
GROUP
PAGE
PRELAUNCH
INSTR
24-X5
MISSION RULE
REFERENCE
24-28
24-33
24-33
24-33
24-33
24-33
24-33
24-33
24-3 X
24-31
24-3X
24-34*24-35
24-30
24-30
24-30
24-30
24-34
24-32*24-31
24-34*24-35
24-30
24-30
24-33
24-33
24-33
24-32*24-31
24-27
24-27
24-27
24-27
I 23 LM DPS
ITEM
ITEM
23-1
GENERAL '
IN ORDER TO INITIATE AND CONTINUE THE FOLLOWING MISSION PHASES THE DPS
THE FOLLOWING MINIMUM CAPABILITIES*
A*
DOCKED/UNDOCKED
B.
SUBSYSTEM
MUST
PROVIDE
23-2
1*
2.
AN OPERATIONAL DPS
3*
4.
WARNING
ABOVE
DEFINITIONS
A.
2.
FUEL AND/OR OXID ENGINE INLET PRESSURES GREATER THAN 120 PSIA DURING A BURN
WITH THROTTLE LESSER THAN 63 PERCENT OR GREATER THAN 130 PSIA WITH THROTTLE
GREATER THAN 63 PERCENT*
3.
4.
THAN
100
PSIA
ONLY
TO
AT
DOI
ONLY
TO
INITIATE
BURN*
3<A)DELTA PRESSURE BETWEEN FUEL ANO 0X10 ENGINE INLET PRESSURES AT FTP LESS
THAN 12.pSID (OXID HIGH) AND LESS
THAN 23.PSID (FUEL HIGH) DURING DESCENT
PRIOR TO LOW GATE.
(B)
6.
THE LOW THROTTLE POINT IS DEFINED AS THE MINIMUM POSITION THAT THE THROTTLE
ASSUME WITH MINIMUM MANUAL THROTTLE COMMAND VOLTAGE (10.9 FOR LM-3)
MISSION
APOLLO 11
REV
0AT6
SECTION
4/l6/6t LM PROPULSION
-OPS
GROUP
PAGE
GENERAL - DPS
23-1
ACTUATOR
WILL
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
ITEM
ITEM
SYSTEMS MANAGEMENT
25-U
18*192.7
-256*6
-233.0
17.701.1
LBS
LBS
LBfr
LBS
25-12
THE TOTAL CONTINUOUS BURN TINE OF THE DESCENT ENGINE SHALL NOT EXCEED 910 SECONDS
25-13
THE DPS ENGINE WILL NOT NORMALLY BE OPERATED FOR LESS THAN 3.5 SEC ANO WILL PROVIOE A 10
COAST BETWEEN NON-CRITICAL BURNS AND A j . SEC COAST BETWEEN CRITICAL BURNS.
25-14
ALL OPS STARTS WILL BE NOMINALLY PLANNED AT THE LOW THROTTLE POINT.
25-15
THE DPS ENGINE WILL NOT BE OPERATED IN THE NON-THROTTLING RANGE (65 PERCENT TO FTP) FOR MORE
THAN TBO SEC DURING THE NORMAL LUNAR MISSION PROFILE OR FOR MORE THAN 100 SEC OURING A ALTERNATE
MISSIONS*
25-16
FROM A SAFETY STANDPOINT SUPERCRITICAL HELIUM BURST DISC RUPTURE DURING MANNED OPERATION
ALLOWABLE EVENT* EXCEPT DURING EVA*
25-17
FOR ALTERNATE MISSIONS THE MINIMUM SHE PRESSURE FOR START OF A BURN WHICH
PROPELLANTS IS 50^ PSIA. ASSUMING NOMINAL PRESSURE RISES TO THIS POINT.
MISSION
APOLLO IX
REV
DATE
SECTION
4/16/69 LM PROPULSION
-OPS
GROUP
PAGE
MANAGEMENT
25-2
wlLL
OF
OPERATION
MINUTE
IS
DEPLETE
AN
OPS
MISSION RULES
REV
ITEM
ITEM
23-19
DPS ENGINE RESTART CAN BE MAOE WITH THE FOLLOWING CONSTRAINTSINITIAL BURN
MAXIMUM RESTART
BURN TIME
A.
B
C.
D.
2 SECONDS
2 SECONDS
REFERENCE(SEE FIGURE BELOW)
NO RESTART
NO CONSTRAINT
9. *ECS
1 SECS
UP TO TBD SEC
TBD TO 190 SEC
190 SECS TO 600 5ECS
GREATER THAN 600 SECS
LIMITS.
14,000
~:
I:;;
':,
=HT
;:..
12,000
nnr:::
: i
r; j |
:
r:"
M -
k'
'
10,000
::/
I^T;
z-M
::::
''
8,000
!
"3
r
t
i r !;
:;.:
iil-i
6,000
..':.
4,000
j_
2,000
WF ;frf
a**
iiit
:;:?
r:n
iiii
=x
mi
tffifa
m s
200
300
400
500
600
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/49 LM PROPULSION
DPS
GROUP
PAGE
MANAGEMENT
23-3
700
TERMINATE
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
ITEM
ITEM
25-20
ONLY PREMISSION APPROVED ALTERNATE OPS/MULTIBURN PROFILES WILL BE EXECUTEDt SINCE NO DATA
25-21
S ? f t S % i S - K 3 5 r S i : S "AMININ0
0PS FRE 1N
" "
PROPELLANT GAGING
A.
9.
MISSION
APOLLO XI
REV
DATE
SECTION
4/16/69 LM PROPULSION
-DPS
GROUP
PAGE
MANAGEMENT
25-4
Center
MISSION RULES
Rt V
I TFM
PULING
PHASE
'
CUES/NOTES/COMMENTS
25-30
1* INHIBIT PDI
2* RNDZ WITH APS
POWEREO
DESCENT
C* ABORT STAGE
25-31
B* FUEL AND/OR
OXID ENGINE
INLET P
LESS
THAN
100 PSIA.
B*
CONTINUE MISSION
'
1* FIRE SGUIB TO
START TANK
2*
i
'
25-32
NOTE
PRESSURIZATION SYSTEM
MAY
BE
OPENED TO STAKT TANK LEAK*
CLOSE
PRIMARY hE REG SOV AFTER C A C M
BURN
AND REOPEN AT
INITIATION OF EACH
BURN*
DPS FAILS TO
PRESSURIZE
A* 1* CONTINUE MISSION
ALL
i
i
2* INLET PRESS
LESS THAN
100 PSIA*
B* VIA SUPERCRITICAL DESCENT
HELIUM
ORBIT
MISSION
APOLLO 11
REV
DATE
SECTION
4/14/69 LM PROPULSION
-OPS
GROUP
PAGE
SPECIFIC-DPS
23-5
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
RfcV
ITEM
25-33
PHASE
'
RULING
LOSS OF
SUPERCRITICAL
PRESSURE (OPS IN
BLOWDOWN MODE)
A. PRIOR TO
THROTTLE DOWN
FROM FTP
POWERED
REF
RULE 25-1*
REF
REF
A* ABORT
DESCENT
5. AFTER THROTTLE
25-34
CUES/NOTES/COMMENTS
DO NOT THROTTLE UP
GREATER THAN
65 PERCENT*
ALL
B*
ALL
DESCENT
ORBIT
C. AFTER DOI
C*
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 LM PROPULSION
-OPS
GROUP
PAGE
SPECHFIC-DPS
25-6
MISSION RULES
REV
ITEM
R RULE
25-35
CONDITION/MALFUNCTION
PHASE
DOCKED/ 'A.
UNDOOCED
CUES/NOTES/COMMENTS
'
i
i
'
DESCENT
ORBIT
25-36
RULING
'APS RND2
A. POI TO LOW GATE
POWERED
DESCENT
ABORT STAGE
i
B LOW GATE TO TD
1
CONTINUE MISSION
25-37
POWERED
DESCENT
'A*
ABORT
B*
'
i
i
t
25-38
PQQS READING
1 PERCENT iEITHER
FUEL OR OX 10) AND
NO VALID TIME
ESTIMATE FROM LOW
LEVEL
POWERED
DESCENT
ABORT
i
i
25-39
A* PRIOR TO
THROTTLE DOWN CONTINUE MISSION
2*
MISSION
APOLLO 11
REV
DATE
ABORT STAGE 2C
SECONOS AFTER
LOW LEVEL*
SECTION
4/16/69 LM PROPULSION
-OPS
GROUP
PAGE
SPECIFIC-OPS
25-7
ITEM
ITEM
25-40
MEAS DESCRIPTION
PCM
GQ301SP
GU3018P
GU3025P
GQ3435P
GQ3436P
GQ3603O
GQ3604Q
GU4103Q
GU4104Q
GU3718T
GU3719T
GJ4218T
GO4219T
GQ3611P
OX PRESS
GQ4H1P
TCP
LOW LEVEL
GQ6510P
GU4455X
ONBOARD
TRANSDUCER
HE MON
Cfc
COMMON
COMMON
PRESS
QTY
QTY
QTY
QTY
TEMP MON
TEMP MON
TEMP MON
TEMP MON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
MISSION RULE
REFERENCE
CATEGORY
M
HO
HO
HD
HD
HD
HD
HO
HD
HD
HD
HO
HD
M
I OF 2
M-PCM
1 OF 2
M
1 OF 2
M
1 OF 2
M
1 OF 2
M
1 OF 2
M
THRUST
DPS LOW
COMMON
COMMON
M-PCM
25-31.32.35
29-3**30*35
25-34*30*35
23-33*30*32
25-33*30*32
25-373S*39
25-37*38*39
25-37*31*39
25-37*38*39
25-30
25-30
25-30
25-30
25-30*313233
25-30.31.32.33.
m g.
33
25-30
25-36
MISSION
APOLLO IX
REV
OATS
SECTION
4/16/49 LM DPS
GROUP
PAGE
PRELAUNCH
INSTR
25-1
126 LM APS
ITEM
SECTION 26 - LM PROPULSION - AS
ITEM
GENERAL '
26-1
IN OROER TO INITIATE AND CONTINUE THE FOLLOWING MISSION PHASES THE APS
THE FOLLOWlN MINIMUM CAPABILITIES
A.
SUBSYSTEM
MU T
DOCKED/UNDOCKED
NO PROPELLANT LEAK
B*
C.
26-2
2.
AN OPERATIONAL APS
RENDEZVOUS
1*
NO PROPELLANT LEAKS
2.
DEFINITIONS
A*
DELTA PRESS BETWEEN APS FUEL AND OXID ENGINE INLET PRESSURES
PSID.
2.
DELTA TEMP BETWEEN APS FUEL AND OxlD LESS THAN 10 DEG F*
LESS
THAN
3*
APS FUEL ANO/OR OXID TEMP GREATER THAN 30 DEG F AND LESS THAN 90 DEG F*
4*
APS FUEL AND/OR OXID INLET PRESSURE GREATER THAN 62 PSIA AND LESS
PSIA.
5.
THAN
90
205
THAN
APS FUEL ANO/OR OXID TEMP GREATER THAN TBJ3 DEG F AND LESS THAN Ififi DEG F FOR
BURNS LESS 100 SECONDS AND GREATER THAN 50 DEG F AND LESS THAN 90 DEG F FOR
BURNS GREATER THAN 100 SECONDS*
4*
APS FUEL ANO/OR OXID INLET PRESSURES GREATER THAN 115 PSIA*
5*
DELTA PRESSURE BETWEEN FUEL ANO OXID INLET PRESSURES LESS THAN OR EQUAL TO
20 PSID FOR BURNS LESS THAN 100 SECONDS ANO LESS THAN OR EQUAL TO 12 PSIA
FOR BURNS GREATER THAN 100 SECONDS
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 LM PROPULSION
- APS
GROUP
PAGE
GENERAL
26-1
PROVIDE
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
ITEM
ITEM
SYSTEMS MANAGEMENT
26-10
APS MANNED ENGINE STARTS WILL NOMINALLY BE PRECEDED BY A PROPELLANT SETTLING MANEUVER USING Twu
JET ULLAGE WITH THE EXCEPTION THAT NO ULLAGE IS REQUIRED FOR AN ABORT STAGE OR FROM INITIATION
OF ASCENT FROM THE LUNAR SURFACE.
26-11
THE APS CANNOT REMAIN ACTIVATED (COMPATIBILITY SuUXB VALVES FIRED) LUNGER TMAN 24 HOURS BEFORE
ITS USAGE IS COMPLETED NOMINALLY. IN CASE OF A CONTINGENCY* THE TIME CAN BE EXTENDED TO 3-1/2
DAYS.
26-12
5*227.1 LBS
-
46.4 LBS
5*180.7 LBS
26-13
THE MINIMUM IMPULSE OF THE APS ENGINE IS 1235 PLUS OR MINUS -NC 89 L8S - SEC* WHICH
TO A BURN TIME OF 0.5 SEC.
26-14
ONLY PREMISSION APPROVED APS MULTIBURN PROFILES WILL BE EXECUTED* SINCE NO DATA EXISTS TO ALLQw
REALTIME SUPPORT FOR EXAMINING APS FREEZING* CHARRING* BACKWALL TEMPERATURE CONSTRAINTS FOR
MULTIBURN PROFILES.
26-15
A.
B.
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 LM PROPULSION
- APS
GROUP
PAGE
MANAGEMENT
26-2
CORRESPOND
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
ITEM
RULE :ONDITION/MALFUNCTION
t
i
PHASE
RULING
i
i
CuES/NOTES/COMMENTS
i
SPECIFIC
i
26-20
LOSS OF AN
OPERATIONAL APS
'DOCKED/
i
'UNDOCKED
DESCENT
ORBIT
POWERED
DESCENT
C. ABORT
USE DPS AS LONG AS
POSSIBLE
LUNAR
STAY
26-21
D. ASCEND ASAP
APS HE SOURCE
PRESSURE
A* LEAK PRIOR TO
PRESSURIZATION
A* ! RETURN TO CSM
NO-GO FOR DOI
DOCKED/
UNDOCKED
DESCENT
ORBIT
2. RETURN TO CSM
NO-GO FOR DI
POWERED
DESCENT
3* ABORT
(A) USE DPS AS LONG
AS POSSIBLE
(8) SELECT ALTERNATE
APS HELIUM TANK
(C) AFTER APS GOES
IN SLOWDOWN*
SELECT LEAKING
TANK IF PRESS
GREATER THAN
200 PSIA
LUNAR
STAY
6* LEAK AFTER
PRESSURIZATION
LUNAR
STAY
RNDZ
MISSION
APOLLO 11
REV
B* 1* ASCEND IMMEDIATELY
OATS
2. CONTINUE MISSION
SECTION
4/16/69 LM PROPULSION
- APS
GROUP
PAGE
SPECIFIC
26-3
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
R I; V
I TEM
R RULE ONDITION/MALFUNCTION
PHASE
RULING
CUES/NOTES/COMMENTS
26-22
A* RETURN TO CSM
B. RETURN TO CSM
APS
BURNS
wf\O 1 I
POWERED
DESCENT
LUNAR
STAY
26-23
APS HELIUM/
PRCPELLANT VAPOR
LEAK DOWNSTREAM OF
QUAO CHECK VALVES
E CONTINUE MISSION
CLOSE HE SOV'S
DOCKED
JETTISON LM
UNDOCKED
B. DOCK ASAP
1. CSM ACTIVE DOCKING
2. JETTISON LM ASAP
DESCENT
ORBIT/
RN02
C, DOCK ASAP
1* CSM RESCUE
2* CSM ACTIVE DOCKING
3. JETTISON LM ASAP
D. ABORT
POWERED
DESCENT
'
'
LUNAR
STAY
E. ASCEND IMMEDIATELY
1
1. CSM RESCUE
3. JETTISON LM ASAP
MISSION
APOLLO 11
MIGHT
REV DATE
SECTION
4/16/69 LM PROPULSION
- APS
GROUP
PAGE
SPECIFIC
26-4
BE
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
ITEM
'RULE
26-24
26-25
CONOITION/MALFUNCTION1
PHASE
ASCENT
RULING
CUES/NOTES/COMMENTS
THIS INDICATION
A. CONTINUE MISSION
RULES 26-26
THROUGH 26-29
ARE RESERVED.
MISSION
APOLLO 11
REV
DATE
PRIOR
CONTINUE MISSION
IF BURNING OR HAVE HAD AT
LEAST ONE APS BURN.
INHIBIT SUBSEQUENT
APS BURNS
SECTION
4/16/69 LM PROPULSION
- APS
GROUP
PAGE
SPECIFIC
26-5
TO F I R S T
CONSIDERED
APS
MAL
PCC
Center
MISSION RULES
REV
ITEM
ITEM
26-5
INSTff
26-30
MEAS DESCRIPTION
PCM
ONBOARD TRANSDUCER
GP0001P
GP0002P
GP00I8P
GP0025P
GP0201T
GP0202T
GP0718T
GP0908X
GP1218T
GP1408X
GP1501P
TEMP
C&W
C&W
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
GP1503P
C&W
COMMON
GP2997U
GP2998U
GP2010P
APS
APS
APS
APS
APS
APS
APS
APS
APS
APS
APS
ME 1 PRESS
HE 2 PRESS
HE REG PRESS
HE REG PRESS
HE 1 TEMP
HE 2 TEMP
FUEL TEMP
FUEL LOW
OXID TEMP
OXID LOW
FUEL PRESS
MISSION
APOLLO 11
REV
C&W
HEL MON
HEL MON
TEMP
c&w
DATE
SECTION
4/16/69 LM APS
- APS
MISSION RULE
REFERENCE
CATEGORY
M - PCM
M - PCM
HD 1 I OF 2
HO fM - PCM
HD - PCM
HD - PCM
M - PCM
M - PCM
26-20.21.22
26-20*21*22
26-20*22
26-20*22
26-21
26-21
26-20
26-25
26-20
26-25
26-20*21*22*23
M - PCM
26-20*21*22*23
HO
HO
HD
26-24
26-25
HD
M - PCM
HD
GROUP
PAGE
PRELAUNCH
26-6
27 LM REACTION
CONTROL SYSTEM
ITEM
ITEM
GENERAL
27-1
IN ORDER TO INITIATE AND CONTINUE THE FOLLOWING MISSION PHASES* THE RCS SUBSYSTEM
THE FOLLOWING MINIMUM C A P A B I L I T I E S
A.
MUST
PROVIDE
DOCKED
NO PROPELLANT LEAKS
B.
C.
2.
NO PROPELLANT LEAKS
POWERED DESCENT
1.
2.
27-2
TO INITIATE PDI
(A)
(B)
NO PROPELLANT LEAKS
IB)
NO PROPELLANT LEAKS
WHICH
LUNAR STAY
1.
NO PROPELLANT LEAKS
RENDEZVOUS
!
2.
NO PROPELLANT LEAKS*
DEFINITIONS
A,
RCS SYSTEM
AN RCS SYSTEM CONTAINS EIGHT OPERATIONAL THRUSTERS SUPPLIED BY ITS OWN
PROPELLANT FEED SYSTEM INDEPENDENT OF ASCENT FEED ANO CROSSFEED**
PRESSURUATION
INDIVIDUAL THRUSTERS REQUIRED FOR DIFFERENT MISSION PHASES WILL BE COVERED SEPARATELY.
OPERATIONAL RCS SYSTEM
1.
FUEL AND/OR OXID MANIFOLD PRESSURES GREATER THAN OR EQUAL TO 100 PSI*
2*
DELTA PRESSURE BETWEEN FUEL ANO OXlD MANIFOLD LESS THAN OR EUUAL TO 80 PSID*
3.
THROUGH 27-9
MISSION
APOLLO 11
REV
DATE
ARE RESERVED*
SECTION
4/16/69 LM REACTION
CONTROL SYSTEM
GROUP
GENERAL - RCS
PAGE
27-1
EQUAL
TO 100
AND
Center
MISSION RULES
REV
ITEM
ITEM
SYSTEMS MANAGEMENT
27-10
THRUSTER TEMP
THE RCS QUAO TEMP MUST BE BROUGHT UP TO OPERATING TEMPERATURE VIA T H RCS hEATERS PRIOR TO AN'
RCS FIRINGS* THRUSTER QUAD TEMPERATURES MUST BE ABOVE 119 OEG F ANO LESS THAN 190 DEG Ft EXCEPT
DURING PERIODS OF HEAVY DUTY CYCLE WITH EXPECTED TEMP RISES SUCH AS DOCKING.
27-11
633*0 LBS
100.0 PERCENT
-40.5 LBS
-36.0 LBS
- 6.4 PERCENT
- 6.0 PERCENT
USABLE
552.5 LBS
87.6 PERCENT
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 LM REACTION
CONTROL SYSTEM
GROUP
PAGE
MANAGEMENT
27-2
I TEM
RULE
ONDITION/MALFUNCTION'
PHASE
27-20
ALL
RULING
CUES/NOTES/COMMENTS
DO NOT UNDOCK
UNOOCKED
DOCK ASAP
NO-GO FOR DOI
OESCENT
MISSION
APOLLO 11
ORBIT
POWERED
DESCENT/
RNOZ
CONTINUE MISSION
LUNAR
STAY
ASCENT ASAP
REV
DATE
SECTION
4/16/69 LM REACTION
CONTROL SYSTEM
GROUP
PAGE
SPECIFIC - RCS
27-3
Center
MISSION RULES
REV
R
ITEM
RULE I O N D I T I O N / M A L F U N C T I U N '
i
i
27-21
PHASE
RULING
CUES/NOTES/COMMENTS
A, ONE PAIR
ISOLATED
A* 1* DO NOT UNDOCK
DOCKED
UNDOCKED
2* DOCK ASAP
ORBIT
'POWERED
DESCENT/
RNDZ
LUNAR
STAY
4. CONTINUE MISSION
5. ASCENT ASAP
B. COMBINATION
ISOLATED
DOCKED
RESULTING IN LOSS OF
ATTITUDE CONTROL
UNDOCKED
B 1 DO NOT UNOOCK
2. CSM ACTIVE DOCKING
NO-GO FOR DOI
DESCENT
3* CSM RESCUE
ORBIT
CSM
4. OPEN WHATEVER
ISOLATION PAIRS
REQUIRED TO MAINTAIN
ATTITUDE CONTROL*
POWERED
DESCENT
-
LUNAR
STAY/
RNOZ
3. OPEN WHATEVER
ISOLATION PAIRS
REQUIRED TO ACHIEVE
SAFE ASCENT.
MISSION
APOLLO 11
REV
OATE
SECTION
4/14/69 LM REACTION
CONTROL SYSTEM
GROUP
PAGE
SPECIFIC RCS
27-4
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
ITEM
R RULE
CONDI1ION/MALFUNCTION1
PHASE
PULING
CUES/NOTES/COMMENTS
27-22
DECREASING OR LOSS
OF RCS HE PRESSURE
'ALL
LESSER T H A N
'
1
1
DOCKED
100
Psi
UNDOCKED
DESCENT
ORBIT
<
E. CONTINUE MISSION
LUNAR
STAY
F. CONTINUE MISSION IF
SUFFICIENT SLOWDOWN
CAPABILITY EXISTS
IN FAILED
SYSTEM FOR 6 HOURS OF
LINE OF SIGHT AND 5
MINUTES OF ATT HOLD
- RNOZ
27-23
DOCKED
JETTISON LM
UNDOCKED
NOTE
B* CSM RESCUE
OESCENT
ORBIT/
RND2
POWERED
DESCENT/
LUNAR
STAY
1. CSM RESCUE
3* JETTISON LM ASAP
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 LM REACTION
CONTROL SYSTEM
GROUP
PAGE
SPECIFIC - RCS
27-5
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
ITEM
RULE 'CONDITION/MALFUNCTION'
27-2*
27-23
PHASE
RULING
CUES/NOTES/COMMENTS
ALL
IMPINGEMENT
CONSTRAINTS VIOLATED DOCKED/
UNDOCKED
DESCENT
ORBIT
B CSM RESCUE
CSM ACTIVE DOCKING
POWERED
DESCENT
ABORT STAGE
2. LOW GATE TO TD
CONTINUE MISSION
LUNAR
STAY/
RND2
D. CONTINUE MISSION
J
RULES 27-26
THROUGH 27-29
ARE RESERVED*
MISSION
APOLLO 11
RCV
OATE
SECTION
4/16/69 LM REACTION
CONTROL SYSTEM
GROUP
PAGE
SPECIFIC - RCS
27-6
ITEM
ITEM
PRELAUNCM INSTRUMENTATION
27-30
PCM
MEAS DESCRIPTION
ONBOARD
GR1085Q
GR1095Q
GR1201P
GR1202P
GR1101P
GR1102P
GR2121T
GR2122T
GR9609U
GR9610U
GR2201P
GR2202P
GR3201P
GR3202P
GR9613U
GR9667U
GR9665U
GR9663U
GR9661U
GR9660U
GR9666U
GR9664U
GR9662U
GR6004T
GR6003T
GR6002T
GR6001T ,
GR9641U
GR9631U
(l
OPEN
GR9632U
GR9642U
MISSION
APOLLO 11
REV
DATE
TRANSDUCER
QUANTITY
QUANTITY
PRESS MON CfrW
PRESS MON CfrW
PRESS MON Cfrw
PRESS MON CfrM
TEMP MON
TEMP MON
MAIN SOV
MAIN SOV
PRESS MON
PRESS MON
PRESS MON
PRESS MON
CRSFD
SYS A QUAD 1
SYS A QUAO 2
SYS A QUAD 3
SYS A UUAD 4
SYS B QUAO 1
SYS B QUAO 2
SYS B QUAD 3
SYS B QUAD 4
TEMP MON CfrW
TEMP MON CfrW
TEMP MON CfrW
TEMP MON C6W
SYS A ASC OXIO
ASC FUEL
SYS A ASC OXIO
ASC FUEL
SYS B ASC OXID
ASC FUEL
SYS B ASC OXID
ASC FUEL
SECTION
4/16/69 LM REACTION
CONTROL SYSTEM
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
COMMON
CATEGORY
M
M
M-PCM
M-PCM
M-PCM
M-PCM
M-PCM
M-PCM
HO
ND
M
M
M
M
HD
HD
HD
HO
HD
HO
HO
HD
HD
M
M
M
M
HO
MO
COMMON
HD
COMMON
hO
GROUP
PAGE
PRELAUNCH
INSTR
27-7
MISSION RULE
REFERENCE
27-23.2220
27-23t2220
27-20*22*23
27-20*22*23
27-23*20
27-23*20
27-20
27-20
27-20*23
27-20*23
27-20*23
27-20*23
27-21
27-21
27-21
27-21
27-21
27-21
27-21
27-21
27-24
27-24
27-24
27-24
ENVIRONMENT
1 28 SPACE
NASA - M a n n e d S p a c e c r a f t
Center
MISSION RULES
RLV
ITEM
ITEM1
GENERAL
28-1
28-2
DEFINITIONS
ANO
PROJECTIONS
BASED
ON
A.
THE MAXIMUM OPERATIONAL DOSE (MOO) IS THE MAXIMUM RAOUTION DOSE TO WHICH TH CREW WOULO "
SUBJECTED BASED ON A SKIN DOSE OF 400 RAD ANO/OR A DEPTH (GASTROINTESTINAL) DOSE OF 50 RAD.
9.
THE PLANNING OPERATIONAL DOSE (POD) IS THE MAXIMUM RADIATION DOSE TO THE CREW WHICH ANY
MISSION WOULD BE DESIGNED DURING THE PLANNING PERIOD BASED ON A SKIN DOSE OF 250 RAD AND/Q*
A DEPTH DOSE OF 25 RADS.
THESE DOSES REPRESENT THE CUTOFF POINT WHERE A DECISION MUST BE MADE WHETHER TO CONTINUE Ok
TERMINATE THE MISSION.
THE RADIATION ABSORBED DOSE (RAD) IS A UNIT OF ABSORBED DOSE WHICH IS EQUAL
DEPOSITION OF 100 ERGS/GRAM.
TO
AN
ENERGY
THE RELATIVE BIOLOGICAL EFFECTIVENESS (RBE* EXPRESSES THE EFFECTIVENESS OF PARTICULAR TYPES
OF RADIATION IN PRODUCING THE SAME BIOLOGICAL RESPONSE.
THE AVERAGE RBE THAT WILL BE USED FOR SOLAR PARTICLE EVENT RAOIATION FROM PROTONS IS 12*
THE ROENTGEN EQUIVALENT MAN (RM) IS THE PRODUCT OF THE RAD AND THE RB (REM RAD X 3E>
A CONFIRMED EVENT IS DEFINED AS AN EVENT THAT HAS BEEN MhASURED BY
SOURCES.
TWO
OR
MORE
RELIABLE
A SIGNIFICANT INCREASE OF THE MOD IS DEFINED AS A PARTICLE EVENT THAT WILL PRODUCE A
OF 10 TO THE 10TH POWER AND A SKIN DOSE OF 575 RADS AND/OR A DEPTH DOSE OF 140 RADS.
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 SPACE
ENVIRONMENT
GROUP
PAGE
GENERAL
28-1
FLUX
Center
MISSION RULES
RtZV
ITEM
ITEM
MANAGEMENT
28-3
28-*
PRIORITY OF DATA
*
WILL
BE
PART
OF
(SPAN)
(VABD)
(SPAN)
(SPMS)
ARTIFICIAL
1.
2.
EPO
(A) JAEIC
(B) RIOMETERS
(C) PRO
3.
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 SPACE
ENVIRONMENT
GROUP
PAGE
MANAGEMENT
28-2
THE
GO/NQ-GU
DECISION
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
ITEM
RULE CONDITION/MALFUNCTION
PHASE
RULING
t
i
28-10
CUES/NOTES/COMMENTS
i
PROCEED UNTIL
VERIFICATION FROM ALL
OTHER SOURCES*
28-11
DEFINITE ARTIFICIAL
EVENT CONFIRMED BY
REPORTING SOURCES
PRELAUNCH
A. MOLD IF INFORMATION
FROM REPORTING SOURCES
INDICATES A SEVERE
INCREASE IN RADIATION
ALONG THE S/C
TRAJECTORY.
EPO
B.I.
CREW SHOULD BEGIN PERSONAL
DOSIMETER REAOOUTS PER SOP 2-6
2. FOR DOSES
APPROACHING THE MOD
CONTINUE MISSION
WITH CONTINUOUS PRD
MONITORING AND
CREW ASSESSMENT.
CONSIDERATIONS WILL
BE GIVEN TO CHANGING
THE TRAJECTORY TO A
LOW EARTH ORBIT OR
REENTERING ASAP
BASED ON ACTUAL
CONDITIONS.
ALL OTHER C. CONTINUE MISSION
28-12
28-13
RADIATION CONFIRMED
BY PRO READOUTS OR
ONBOARD TM AND
PROJECTED TO EXCEEO
Trt M OD
PRELAUNCH
AND
LAUNCH
NOT APPLICABLE
ALL
OTHERS
ALL
CONTINUE MISSION
i
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
fc/16/69
SPACE
ENVIRONMENT
SPECIFIC
PAGE
2S-3
Center
MISSION RULES
REV
ITEM
RULE
28-14
SECTION 28 -
CONDITION/MALFUNCTION1
PHASE
SPACE ENVIRONMENT
RULING
CUES/NOTES/COMMENTS
A. CONTINUE MISSION
ALL
CONFIRMED
PRE- .
PARTICLE EVENT
LAUNCH
AND SOLAR
PARTICLE ALERT
NETWORK/RTACF
ANALYSIS INDICATE
THE MOD WILL 8E
EXCEEDED DURING
THE MISSION
EPO
B.l.
HOLD IF DATA
ANALYSIS INDICATES
THAT THE MOD WILL BE
SIGNIFICANTLY
EXCEEDED PRIOR TO
MISSION COMPLETION.
B.2.
CONTINUE MISSION
IF DATA ANALYSIS
INDICATES THAT THE
MOD WILL BE EXCEEDED
BY A SIGNIFICANT
AMOUNT PRIOR TO
MISSION COMPLETION.
TLI IS NG-GC.
ALL
OTHERS
3. CONTINUE MISSION
CONSIDERATION WILL
BE GIVEN T Q A R L Y
C.I.
LO
2.
CONTINUE MISSION
CONSIDERATIONS
SHOULD BE GIVEN TO
ENTER IN NEXT BEST
PTP IF T H E TOTAL DOSE
CANNOT BE REDuCiO
SIGNIFICANTLY
WITHOUT INCREASING
THE TOTAL RISK TC
THE CREW.
C.I.
CREW SHOULD BEGIN
DOSIMETER READOUTS PER SOP
CONTINUE MISSION
CONSIDER tXTENCING
LUNAR ORBIT STAY
TIME IF THE TOTAL
2.(A)
DOSE TO T H E C R E W
WOULD BE REDUCED
SIGNIFICANTLY BY
LUNAR SHIELDING*
LUNAR
STAY
HATCH-DOWN
FROM THE LM TO T H E C $ M A S A K .
THE T O T A L
ALL
OTHER
PHASES
MISSION
APOLLO 11
REV
DATE
CONTINUE MISSION
SECTION
4/16/69 SPACE
ENVIRONMENT
GROUP
MAY
(B)
IF A PARTICLt EVEN*
CONFIRMED TwE CRE* a ILL TRANS
3* CONSIDER REDUCING T H E
LUNAR STAY TIME
AND/OR EVA IF T H E
TOTAL DOSE TO THE
CREW CAN BE EDUCED
SIGNIFCANTLY *ITHOuT
INCREASING
ATTITUOE
PAGE
SPECIFIC
28-4
Center
MISSION RULES
REV
SECTION 28 -
ITEM
SPACE ENVIRONMENT -
CONCLUDED
ITEM
INSTRUMENTATION REQUIREMENTS
MEAS DESCRIPTION
28-15
PCM
RADIATION DOSIMETER 1
(CM DEPTH DOSE RATE)
ONBOARD
TRANSDUCERS
CATEGORY
CK1Q51K
HD
28-12
RADIATION DOSIMETER 2
(CM S<IN DOSE RATE) 2
CK1052K
HD
28-12
CK1Q53R
HD
28-12
ST082QK
HD
28-14
ST0821K
HD
20-14
STO822*
HD
28-14
ST0823K
HD
28-14
STO83OK
HD
28-14
ST0831K
HO
HO
28-14
2o-l4
ST0832K
ST0838K
HD
2Q-14
STO84OT
HD
2tt-l4
ST0841T
HD
2b-l4
VABD
>NPDS
(PRO) -
(RSM)
MISSION
APOLLO 11
REV
DATE
3 - ONBOARD
MANDATORY TO
BE ONBOARD
28-14
3 - ONBOARD
MANDATORY TO
BE ONBOARD
20-14
SECTION
4/16/69 SPACE
ENVIRONMENT
GROUP
PAGE
INSTR REQ
28-9
Center
MISSION RULES
REV
SECTION 29 - RECOVERY
ITEM
RULE CONDITION/MALFUNCTION1
PHASE
RULING
CUES/NOTES/COMMNTS
SPECIFIC
29-1
ACCEPTABLE WEATHE
CONDITIONS
AND RECOVERY
CAPABILITY*
IN THE LAUNCH
SITE AREA,
PRELAUNCH MANDATORY
29-2
ACCEPTABLE WEATHER
CONDITIONS
AND RECOVERY
CAPABILITY*
IN THE LAUNCH ABORT
AREA TO 1OOO NM
DOWNRANGE AND IN
THE MIDPACIFIC
RECOVERY ZONE
29-3
MINIMUM OF 5 AMP
HOURS OF CM
POSTLANDING POWER
AVAILABLE AT
LANDING.
HIGHLY DESIRABLE
TO
PROVIDE
POSTLANDING
UPRIGHTING.
29-4
MINIMUM OF 15 AMP
HOURS OF CM
POSTLANDING POWER
AVAILABLE
AT LANDING.
MANDATORY
TO PROVIDE 18
POSTLANDING
PQwER
UPRIGHTING.
29-5
UNTIL ENTRY - 2U
HOURS. RETAIN DELTA
V CAPABILITY TO
MOVE ENTRY POINT
/-500 NM
HIGHLY DESIRABLE
TO PROVIDE
CAPABILITY.
MISSION
APOLLO 11
REV
25 KNOTS
1500 FT
3 NM
8 FT
OATE
SECTION
4/16/69 RECOVERY
GROUP
PAGE
SPECIFIC
29-1
40
HQukS
POWER
PLUS
HOURS
PLUS
OF
CM
ONE
OF
ONE
AVClOAMCt
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
RLV
SECTION 29 - RECOVERY
ITEM
RULE
CONDITION/MALFUNCTION*
29-6
AN ELLIPSE 1&2 NM
UP3ANGE* Ijul NM
DOWNRANGE ANO 10 NM
TO EITHER SIDE OF
55 DEG/550EG
TARGET POINT AND
AN ELLIPSE 105 NM
UPRANGE AND
DOWNRANGE AND k& NM
TO EITHER SIDE OF
THE ROLL RIGHT 90
DEG (DELAYED)
TARGET POINT WILL
BE CLEAR OF ALL
LAND*
EARTH
ORBITAL
MANDATORY
29-7
REMAINDER OF
MANEUVER FOOTPRINT
AND AN ELLIPSE 123
NM UPRANGE AND
DOWNRANGE AND 40 NM
TO EITHER SIDE
OF 90 DEG/90DEG
TARGET POINT
EARTH
ORBITAL
HIGHLY DESIRABLE
PHASE
RULING
CUES/NOTES/COMMENTS
29-8
AN ELLIPSE Hfi NM
UPSANGEt 1D NM
DOWNRANGE AND IflD
NM TO EITER SIDE
OF THE GNCS TARGET
POINTAND AN
ELLIPSE ISO NM
UPRANGE 1BJ2 NM
DOWNRANGE AND T_BD.
NM TO EITHER SIDE
OF THE EMS TARGET
POINT WILL BE CLEAR
OF ALL LAND
POST-TLI
MANDATORY
29-9
REMAINER OF
OPERATIONAL
FOOTPRINT AND AN
ELLIPSE IflP NM
UPRANGE* Iflfi NM
DOWNRANGE* AND T&D.
NM TO EITHER SIDE
OF THE CONSTANT
G TARGET POINT
MILL BE CLEAR OF
LARGE LAND MASSES
POST-TLI
HIGHLY DESIRABLE
MISSION
APOLLO 11
REV
OATE
SECTION
t/16/69 RECOVERY
GROUP
PAGE
SPECIFIC
29-2
Center
MISSION RULES
REV
ITEM
SECTION 30 - AEROMEDICAL
ITEM
GENERAL
30-1
PRELAUNCM
PRIOR TO COMMITING TO LAUNCH* THE FOLLOWING CONDITIONS MuST BE MET
A.
B.
C.
30-2
THE SUIT CIRCUIT MUST BE MAINTAINED AT LEAST 2 IN. WATER PRESSURE ABOVE THE CABIN PRESSURE.
SUIT LOOP PURGE IS REQUIRED IF THE SUIT-TC-CA8IN DELTA PRESSURE REMAINS AT ZERO FOR A PEKIOS OF
5 MINUTES.
30-3
THE POTABLE WATER PH MUST BE WITHIN 6.0 TO 8.0 AT SERVICING AND FINAL SAMPLING.
30-*
30-5
LAUNCH
THERE ARE NO MEDICAL REASONS FOR ABORTING DURING THE LAUNCH PHASE OTHER
INTOLERABLE TO THE CREW.
30-6
THAN
THQSE
CONDITIONS
ORBIT
EARLY MISSION TERMINATION FOR MEDICAL FALL INTO TWO CATEGORIES'
30-7
A.
ONSET OF CONDITIONS
PERFORMANCE.
B.
WHICH
ADVERSELY
AFFECT
CREW
SAFETYt
HEALTH*
OR
FUNCTION
AND
WATER PALATABILITY
CREW EVALUATION OF THE DRINKING WATER
PALATABILITY* EWEH FOR KOH CONTAMINATION.
TASTE
WILL
BE
THE
BASIS
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
AEROMEDICAL
GENERAL
PAGE
30-1
FOR
DETERMINING
WATER
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
RHV
SECTION SO - AEROMEOICAL
ITEM
RULE ONOITION/MALFUNCTION1
PHASE
RULING
CUES/NOTES/COMMENTS
LOiS OR
UNREADABLE EKG
ALL
PHASES
CONTINUE MISSION
ARTIFACTS
LAUNCH
ANTICIPATED
DURING
30-16
30-17
30-18
ABNORMAL HEART
RATE* RHYTHM OR EKG
LAUNCH
A. CONTINUE MISSION
EPO
TLC
LO
TEC
ONSET OP SERIOUS
MEDICAL PROBLEM
A* CONTINUE MISSION
THE ABNORMAL
RATES
MILL
BE
EVALUATED BY THE MCC SURGEON AHO
EARLY MISSION TERMINATION MAY BE
RECOMMENOED IF CORRECTIVE ACTION IS
NOT EFFECTIVE.
TLC
LO
TEC
LAUNCH
A* CONTINUE MISSION
CREW MAY ELECT TO
ABORT IF INTOLERABLE
EPO
TLC
LO
TEC
Mission
APOLLO 11
R6V
PATE
SECTION
4/16/69 AEROMEOICAL
GROUP
PAGE
SPECIFIC
PHYSIOLOGICAL
10-2
Center
MISSION RULES
REV
SECTION 30 - AEROMEOICAL
ITEM
1
RULE rONDITION/MALFUNCTION
30-19
OYSBARISM IN ANY
CREWMAN
PHASE
LAUNCH
RULING
CUES/NOTES/COMMENTS
A* CONTINUE MISSION
A.I.
2.
IF CONDITIONS PERMIT CREw M
ELECT TO OVER- PRESSURIZE.
(A) ALL THREE SUITS CONNECTED
SUIT CIRCUIT.
(B) SUIT
POSITION
DEMAND
REG
<C)
MONITOR SUIT PRESS
REACH 9 PSIA IN 75 SEC)
TO
PRESS
(D)
SELECT SUIT DEMAND REG INLET
SEL VALVE TO OFF HEN SUIT PRESS
REACHES 9.0 PSIA.
(E)
MAINTAIN SUIT OVtRPRESSUHt
BY OPENING INLET SELECTOR VALVE Ai
NECESSARY.
NOTE
RELIEF
FUNCTION
DEMAND REGULATOR
IS ISOLATED
USING THIS PROCEDURE.
ALL
B TERMINATE PHASE
ENTER NEXT BEST PTP
30-20
OF
B.
MCC SURGEON WILL EVALUATE AN2
MAY
RECOMMEND
EARLY
MISSION
TERMINATION IF CORRCTIVE ACTION IS
NOT EFFECTIVE.
A.I*
2*
ALL
NOT APPLICABLE
TERMINATE PHASE
ENTER NEXT BEST PTP
B.I.
2.
NOT APPLICABLE
TERMINATE PHASE
ENTER NEXT BEST PTP
MISSION
APOLLO XI
REV
DATE
SECTION
4/16/69 AEROMEDICAL
GROUP
PAGE
SPECIFIC
PHYSIOLOGICAL
30-3
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
ITEM
SECTION 30 - AEHOMEDICAL
CONDITION/MALFUNCTION1
30-25
INCREASE IN PC02
A* IS GREATER THAN
OR EQUAL TO
7*6 MM H6
PHASE
RULING
LAUNCH
A,i,
ALL
CUES/NOTES/COMMENTS
CONTINUE MISSION
MM
2* CONTINUE MISSION
CHANGE LIOH CANISTER
GREATER THAN OR
EQUAL TO
7*6 MM MG
ANO UNABLE TO
DECREASE
B.I.
LAUNCH
CONTINUE MISSION
2* CONTINUE MISSION
ALL
B.2.
LIOH CANISTERS WILL NOT BE
CHANGED IN AN UNPRESSURI ZED CABIN.
B.2.(C)
PC02 SENSOR T E S T
ISOLATE SUIT
CIRCUIT
DISCONNECTING SUIT HOSES FROM
SPACECRAFT
BY
THE
02
METERING
VALVE
TO
OPEN
PURGE FOR 30 SECONDS
CLOSED 02 METERING VALVE
IF ABOVE PROCEDURE RESULTS IN
A PCO READING NEAR ZERO* THE PC02
SENSOR IS OPERATING PROPERLY
C. GREATER THAN OR
EQUAL TO 10 MMHG
LAUNCH
ALL
30-26
PC02
INSTRUMENTATION
FAILURE
CONTINUE MISSION
ALL
MISSION
APOLLO 11
REV
DATE
SCCTION
4/16/69 AEROMEOICAL
GROUP
PAGE
SPECIFIC
EQUIPMENT
30-4
Center
MISSION RULES
REV
ITEM
ITEM
INSTRUMENTATION REQUIREMENTS
CSM
30-35
MEAS DESCRIPTION
PCM
ONBOARD
TRANSDUCERS
CATEGORY
MISSION RULE
REFERENCE
ELECTROCARDIOGRAM
CJ0060J
NOT DISPLAYED
ELECTROCARDIOGRAM
CJ0061J
NOT DISPLAYED
M*
M*
30-15/16
ELECTROCARDIOGRAM
CJ0062J
NOT DISPLAYED
30-13/16
CF0009P
METER
CF0003P
ORAL TEMPERATURE
30-15/16
HD
30-2/27/28
NOT DISPLAYED
HD
30-3/19
CLINICAL
THERMOMETER
M*
30-20
COMMON
PNEUMOGRAM
CJ0200R
NOT DISPLAYED
HD
30-17
PNEUMOGRAM
CJ0201R
NOT DISPLAYED
HO
30-17
PNEUMOGRAM
CJ0202R
NOT DISPLAYED
HD
30-17
LM
C02 PARTIAL PRESSURE
GF1521P
METER
HD
ELECTROCARDIOGRAM
GT9999
NOT DISPLAYED
HD
30-15/16
NOT DISPLAYED
HD
30-17
PNEUMOGRAM
PLSS
PLSS ELECTROCARDIOGRAM
GTtl24J
30-15/16
MISSION
APOLLO IX
REV
DATE
SECTION
4/16/69 AEROMEDICAL
GROUP
PAGE
INSTR REQ
30-5
'''&?$&*
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
RlV
SECTION 31 - EASEP
!TEM
ITEM
GENERAL
31-1
GENERAL
1.
OR
PURPOSES*
5*
BASED
ON
AN
APPARENT
ARE NC PROBLEMS W I T " THE
THE TIMER INHIBIT COMMAND WILL NOT BE SENT PRIOR TO ALL EXPERIMENTS
AND PROPERLY ADJUSTED FOR OPTIMUM SCIENTIFIC DATA R E T U R N .
THE TIMER WILL NEVER BE INHIBITED WHILE THE PSEP TRANSMITTER
PSEP TRANSMITTER WILL NEVER BE COMMANDED OFF WHILE THfc TIMER
EITHER PSEP COMMAND
OPERATIONS*
DECODER
MAY
BE ADDRESSED
DURING
NORMAL
PSEP
VSFN
BEING
CM
IS OFF* A N D T H E
IS" INHIBITED.
GROUND
COMMANDING
fl
OR
OPERATE
TIMER*
UNLESS
10*
11*
PDR NO* 1 (SW) WILL BE COMMANDED ON APPROXIMATELY ONE (1) HOUR BEFORE LUNAR
SUNSET*
12*
13*
NO SEQUENCE OF COMMAN0S
LINE* UNLOADING THE 29v
BUILDUP OF SPIKES ON THE
VOLTS WHICH WOULO DAMAGE
14*
15*
16.
IMMEDIATE
BEFORE
LUNAR
ASSURE
FIELD
PSE
1*
THE PSE WILL BE UNCAGED AS SOON AS POSSIBLE AFTER THE PSE IS COMMANDED ON.
THE PSE LEVELING MOTORS WILL NOT BE ACTIVATED PRIOR TO UNCAGING OF THE PSE.
3*
MISSION
APOLLO IX
REV
DATE
SECTION
4/16/69 EASEP
GROUP
PAGE
GENERAL
31-1
HAS BEEN
(VIA CMD
Center
MISSION RULES
SECTION 31 - EASE?
ITEM
ITEM
C*
BEFORE
OPERATION
OF
BY
THE
APOLLO 11
OATC
SECTION
4/14/69 EASCP
GROUP
PSE
GROUND
KEV
Z-AXIS
MISSION
THE
PAGE
GENERAL
31-2
LEVELING
COMMAND*
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
Rt:V
SECTION 31 - EASEP
ITEM
RULE 'CONDITION/MALFUNCTION*
31-10
PHASE
FAILURE OF PCU
'
RULING
CUES/NOTES/COMMENTS
A, IF PCU 1 IS ACTIVE.
SELECT PCU 2*
IF PCU 2 IS A C T I V E
1* VERIFY THAT
SCIENTIFIC DATA IS
BEING LOST.
MISSION
APOLLO 11
REV
DATE
SECTION
4/14/69 EASEP
GROUP
PAGC
ELECTRICAL
31-3
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
ITEM
RULE
31-20
SECTION 31 - EASEP
lONDITION/MALFUNCTION1
PHASE
'
RULING
CUES/NOTES/COMMENTS
SELECT
THE
ADJUSTMENT
WHICH
REDUCES HEAT GENERATION
(E.G.T QY
REDUCING INTERNAL PQWER DISSIPATION)
ANO MINIMIZES THE RISK OF EXCEEDING
PCU HIGH AND LOW LOAD LIMITS
(ALS&T
SHUNT CURRENT HIGH AND LG* LIMITS),
GRAPH OF INTERNAL POWER
DISSIPATION
VS. PCU LOA0 COULD BE USED
IF
AVAILABLE.
THERMAL
PLATE
TE*.
MEASUREMENTS ARE AT-3i
AT-fct
AT-5t
AT-6t AND A T - 7 . PDR NO. 1 DISSIPATES
5 WATTS. PDR N O . 2 DISSIPATES It
WATTS.
MISSION
DATE
APOLLO 11
4/16/69 EASEP
SECTION
GROUP
THERMAL
PAGE
Center
MISSION RULES
SECTION 31 - EASEP
lULE
ONDITION/MALFUNCTIQN1
31-30
EASEP FAILS TO
RESPOND TO A CMD,
PHASE
RULING
C'JES/NQTES/COMWENTS
CUE
NO FUNCTIONAL
VERIFICATION
AND NO CMD VERIFICATION ORD (Cvw)
9. IF UNSECCESSFULf SELECT
OTHER DECODER IALSEP 2A
OR 28) AND REINITIATE
THE CMD.
C. IF UNSECCESSFUL. SEND
A 'SPARE* CMD.
NO F U N C T I O N ,
C M D I S O . 153
155 A R E S P A R E C M O S *
D. IF UNSECCESSFUL* SWITCH
TO OTHER DATA PROCESSOR.
CB
^AS
boT
CMD
0 3 4 PROCESSOR
SELECT.
CMD
033 PROCESSOR
ST^ECT.
MISSION
APOLLO 11
REV
OATE
SECTION
4/16/69 EASEP
GROUP
15*. A.**
PAGE
UPLINK
Sl-5
NASA - Manned S p a c e c r a f t
Center
MISSION RULES
Rt.V
SECTION 31 - EASE?
ITEM
PHASE
RULING
CUES/NOTES/COMMENTS
i
i
31-40
LOSS OF DOWNLINK
CARRIER.
1
1
1
B. IF NO E F F E C T SEND
TRANSMITTER ON CMD.
1
'B' SEuECT.
31-41
LOSS OF DOWNLINK
MODULATION.
B IF NO E F F E C T SELECT
OTHER TLM TRANSMITTER.
LOSS
OF
'A1 SELECT.
31-42
UNABLE TO RETAIN
NORMAL BIT RATE*
LSM DATA IS
BIT RATE.
B. IF UNSUCCESSFUL* SEND
NORMAL BIT RATE RESET
CMD.
>
IN
LOW
C. IF UNSUCCESSFUL* SELECT
OTHER DATA PROCESSOR.
MEANINGLESS
0. IF UNSUCCESSFUL* REPEAT
STEP A AND/OR STEP 8.
31-43
A. SWITCH TO REDUNDANT
TRANSMITTER*
B. IF U N S U C C E S S F U L SWITCH TO REDUNDANT
DATA PROCESSOR.
NO
GROUNO
B SELECT
'
MISSION
APOLLO 11
REV
OATE
SECTION
4/l6/*f EASEP
GROUP
PAGE
DOWNLINK
31-*
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
SECTION 31 - EASEP
ITEM
R PRULE
:ONDITION/MALFUNCTION
PHASE
MULING
CUES/NOTES/COMMENTS
SWITCH TO REDUNDANT
PROCESSOR* USING THE
OTHER DECODER*
MISSION
APOLLO 11
EV
OATE
SECTION
4/16/69 EASEP
GROUP
PAGE
DOWNLINK
11-7
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
SECTION 31 - EASEP
ITEM
CONDITION/MALFUNCTION'
PHASE
RULING
CUES/NOTES/COMMENTS
31-50
FAILURE OF AUTOMATIC
PSE LEVELING MODE
REFERENCE PROCEDURE
FOR
MANUAL LEVELING OF THE PSE
BY GROUND COMMANDS*
31-51
UNABLE TO
MOTOR OFF.
COMMANO
PSE
LEVELING
DRA*
CMD 017*
SELECT*
IXP
(PSE)
STANDBY
CMD 01*
SELECT*
EXP
(PSE)
OPERATE
31-52
FAILURE OF PSE
LEVELING MOTOR - OFF
31-53
FAILURE OF
MECHANICAL LEVEL
DRIVE
31-54
MISALIGNED COARSE
SENSOR
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
EASEP
PSE
PAGE
Jl-i
Center
MISSION RULES
Rt:v
SECTION 31 - EASEP
ITEM
R 'RULE 'CONDITION/MALFUNCTION'
31-55
PHASE
FAILURE OF COARSE
LEVEL SENSOR
RULING
CUES/NOTES/COMMENTS
CUES
NO
HIGH
SPEED
MOTOR
OPERATION IS MOTICED DURING INITIAL
LEVELING PHASE AND COMPONENT DOES
NOT CENTER WITHIN EXPECTED TIME. (40
MINUTES MAXIMUM IN AUTO MODE.)
LEVELING
CMD
103*
AUTO/MA/SiUAL.
PSE
LEVELING
MODE
31-56
LONG PERIOD
COMPONENTS STICK
PULLS MASS
AWAY
FROM STOP.
B. IF UNSUCCESSFUL* SELECT
LOW SPEED AND HIGH SPEED
AND DIRECTION REVERSALS
ALTERNATELY.
C U E FAILURE TO CENTER
*ITHIN
EXPECTED TIME (40 MINUTES MAXIMUM IN
AUTO MODE).
IF STEPS A AND B
COMPONENT IS DEFECTIVE.
NOTELIMITS.
DO
NOT
FAIL*
EXCEED
LP
LEVELING
G
31-57
ELECTRICAL FAILURE
OF LONG PERIOD
COMPONENT
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 EASEP
GROUP
PSE
CUE
TIDAL OUTPUT
IS WITMIN
RANGE* BUT IS NOT
AFFECTED
BY
LEVELING OR CENTERING DRIVE.
PAGE
31-9
SECTION 31 - EASEP
ITEM
RULE
31-58
CONDITION/MALFUNCTION1
PHASE
RULING
FAILURE TO UNCAGE
CuES/NOTES/COMMENTS
A* TO UNCAGE ARM-
1. SEND UNCAGE ARM/FIRE*
2. IF UNSUCCESSFUL*
FIRST 12-HOUR TIMER
PULSE MILL ARM
ACTUATOR.
3. IF UNSUCCESSFUL* 9*
HOURS *2 MINUTES
PULSE FROM DELAYED
CMD SEQUENCER WILL
ARM ACTUATOR*
AT05
THERMAL
PLATE
31-59
3. IF UNSUCCESSFUL* SENO
CMD 037 EXPER 1 (PSE)
STANDBY SELECT.
IF PSE HAS NOT BEEN RIPPLED
OFF* COMMANO EXPER. 1 (PSE)
TO OPERATE SELECT.
AUTOMATIC SWITCHOVER
OF PSE TO STANDBY
31-60
C U E EXP. 1 STDBY
OISCRETE
EXTINGUISHES* AND
RESERVE
POWER
INCREASES SINCE POWER I* REMOVED
FROM THE HEATERS. FuSE IF-03) HAS
PROBABLY BEEN BLOWN BY OVERCURRENT
(500 M A ) . CAPABILITY TO SELECT PSE
STANDBY MODE IS LOST.
CMD 036* EXPER. 1 OPERATE SELECT*
MISSION
APOLLO 11
REV
DATE
SECTION
GROUP
CASEP
PSE
PAGE
31-10
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
REV
SECTION 31 - EASEP
ITEM
31-61
PHASE
RULING
CUES/NOTES/COMMENTS
THERMOSTAT
31-62
CONTROL
TEMP*
THERMOSTAT
CONTROL
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 EASEP
GROUP
PAGE
PSE
31-11
NASA - M a n n e d S p a c e c r a f t C e n t e r
MISSION RULES
1 TEM
ITEM
AC
ACA
ACCEL
ACCUM
ACS
ACT
ACEG
AEA
AELD
AFD
AFETR
A/G
AGS
ALDS
ALT
AM
AMP
ANT
AOA
AOH
AOT
APS
APS
ARIA
ASA
ASAP
ASC
ATCA
ATP
ATT
AUX
AZUSA
ALTERNATING CURRENT
ATTITUDE CONTROLLER ASSEMBLY
ACCELEROMETER
ACCUMULATOR
ATTITUDE CONTROL AND STABILIZATION SYSTEM
ACTUATOR
AUXILIARY DISPLAY EQUIPMENT GROP
ABORT ELECTRONICS ASSEMBLY
ASCENT ENGINE LATCHING DEVICE
ASSISTENT FLIGHT DIRECTOR
AIR FORCE EASTERN TEST RANGE
AlR-TO-GRQUND
ABORT GUIDANCE SYSTEM
APOLLO LAUNCH DATA SYSTEM
ALTERNATE
AMPLITUDE MODULATION
AMPERE(S)
ANTENNA
ANGLE OF ATTACK
APOLLO OPERATIONS HANDBOOK
ALIGNMENT OPTICAL TELESCOPE
ASCENT PROPULSION SYSTEM
AUXILIARY PROPULSION SYSTEM
APOLLO RANGc INSTRUMENTATION AIRCRAFT
ABORT SENSO* ASSEMBLY
AS SOON AS PRACTICAL
ASCENT
ATTITUDE TRANSLATION CONTROLLER ASSEMBLY
ALTERNATE TARGET POINT
ATTITUDE
AUXILIARY
ELECTRONIC TRACKING ANO VECTORING
SYSTEM ETR
BA
BAP
BAT
BDA
B/H
BMAG
3RS0
BSE
9TU
BANK ANGLE
BEST ADOPTIVE PATH
BATTERY
BERMUDA MSFN REMOTED SITE
BLOCK HOUSE
3ODY MOUNTED ATTITUDE GYRO
BERMUDA RANGE SAFETY OFFICER
BOOSTER SYSTEMS ENGINEER
BRITISH THERMAL UNIT
CONF
CONTROL
CP
CRO
CRYO
CSI
CSM
CTE
CVS
CVTS
cw
ctw
CYI
DAP
DB
DC
DCA
DCS
ODD
DECA
DEDA
DEG
DESC
DFI
DK
DKD
DOD
DPS
DRA
DRS
DSC
DSE
DSKY
DTO
D/TV
ECS
EDS
EECOM
EKG
EMR
EMS
CAL
CASTS
CB
CCATS
CCw
CDH
COP
CDR
CDU
CES
CEVT
CF*
CIF
CIM
CKT
CLTC
CM
CMC
CMD
CMP
C/O
CO2
COAS
COI
COMM
CALIBRATE
COUNTDOWN ANO STATUS TRANSMISSION
SYSTEM
CIRCUIT-BREAKER
COMMAND* COMMUNICATIONS* AND TELEMETRY
SYSTEM
COUNTERCLOCKWISE
CONSTANT DELTA HEIGHT
COMMAND DATA PROCESSOR
COMMANDER
COUPLING DATA UNIT
CONTROL ELECTRONICS SYSTEM
CONTINGENCY EXTRA VEHICULAR TRANSFER
CUBIC FEET PER MINUTE
CENTRAL INSTRUMENTATION FACILITY
COMPUTER INPUT MATRIX
CIRCUIT
CHIEF LAUNCH VEHICLE TEST CONDUCTOR
COMMAND MODULE
COMMAND MODULE COMPUTER
COMMAND
COMMANO MODULE PILOT
CUTOFF
CARBON DIOXIDE
CREW OPTICAL ALIGNMENT SIGHT
CONTINGENCY ORBIT INSERTION
COMMUNICATION
MISSION
APOLLO 11
REV
DATE
SECTION
EMU
ENG
EPS
ERR
ESE
ETDM
ETR
EVA
EVAP
EVT
EVVA
F/A
FC
FCSM
FD
FDAI
FDO
FIDO
FIG
FITH
GROUP
CONFERENCE
LM GNC SYSTEMS ENGINEER
COMMUNICATIONS PROCESSOR
CARNARVON
MSFN REMOTED SITE
CRYOGENICS
CONCENTRIC SEQUENCE INITIATE
FORWARO/AFT
FUEL CELL OR FLIGHT CONTROL
FLIGHT COMBUSTION STABILITY
MONITOR
FLIGHT DIRECTOR
FLIGHT DIRECTOR ATTITUDE
INDICATOR
FLIGHT DYNAMICS OFFICER
FLIGHT DYNAMICS OFFICER
FIGURE
FIRE IN THE HOLE
PAGE
A-l
NASA - Manned S p a c e c r a f t
Center
MISSION RULES
RtV
ITEM
ITEM
FL
FM
FPS
FOR
FTP
FULL LIFT
FREQUENCY MODULATION
FEET PER SECOND
FLIGHT QUALIFICATION RECORDER
FIXED THROTTLE POINT
G
G&C
GASTA
GRAVITY
GUIDANCE AND CONTROL
GIMBAL ANGLE SEQUENCE TRANSLATION
ASSEMBLY
GRAND BAHAMA ISLAND
GIMBAL DRIVE ASSEMBLY
GYRO DISPLAY COUPLER
GROUND ELAPSED TIME
GROUND ELAPSED TIME OF IGNITION
GREENWICH MEAN TIME
GREENWICH MEAN TIME OF LIFTOFF
GUIDANCE AND NAVIGATION
GASEOUS NITROGEN
GUIDANCE NAVIGATION CONTROL
GJIDANCE. NAVIGATION* AND CONTROL SYSTEM
GROUND
GUIDANCE REFERENCE RELEASE
GODDARD SPACE FLIGHT CENTER
GIMBAL TRIM SYSTEM
GUIDANCE OFFICER
GBI
GDA
GDC
GET
GETI
GMT
GMTLO
G&N
GN2
GNC
GNCS
GNO
GRR
GSFC
GTS
GUIDO
H2
H2O
HA
HAW
H8R
HF
HP
HS
HZ
HYDROGEN
WATER
HEIGHT OF APOGEE
HAWAII
HIGH-BIT-RATE
HIGH FREQUENCY
HEIGHT OF PERIGEE
HIGH-SPEED
HERTZ
IC
IGA
IMU
INJ
INST
INV
IP
IRIG
ISOL
ISS
IU
IVT
INTERCOMMUNICATIONS EQUIPMENT
INNER GIMBAL AXIS
INERTIAL MEASUREMENT UNIT
INJECTOR
INSTRUMENTATION
INVERTER
IMPACT POINT OR IMPACT PREDICTION
INERTIAL RATE INTEGRATING GYRO
ISOLATION
INERTIAL SUBSYSTEM
INSTRUMENTATION UNIT
INTRAVEHICULAR TRANSFER
JD
JET DRIVER
KOH
KSC
POTASSIUM HYDROXIDE
KENNEDY SPACE CENTER
LB
LBR
LCG
LES
LET
LGC
LM2
LIOH
LM
POUNO
LOW-BIT-RATE
LIQUID COOLING GARMENT
LAUNCH ESCAPE SYSTEM
LAUNCH ESCAPE TOWER
LM GUIDANCE COMPUTER
LIQUID HYDROGEN
LITHIUM HYDROXIDE
LUNAR MODULE
MISSION
APOLLO 11
REV
DATE
LMDE
LMP
L/O
LOI
LOS
LOX
L/R
LV
L/V
LVDA
LVOC
LM DESCENT ENGINE
LM MODULE PILQT
LIFTOFF
LUNAR ORBIT INSERTION
LINE-OF-SIGHT
LIQUID OXYGEN
LEFT/RIGHT
LOW-VOLTAGE
LAUNCH VEHlCLt
LAUNCH VEHICLE DATA ADAPTER
LAUNCH VEHICLE DIGITAL COMPUTER
MALF
MCC
MCC
MCFRW
MDAS
MED
MESC
MFCO
MFV
MGA
MIL
MITE
MNFLD
M60
MOC
MALFUNCTION
MISSION CONTROL CENTER
MIDCOURSE CORRECTION
MASTER CAUTION AND WARNING
MEDICAL OATA ACQUISITION SYSTEM
MANUAL ENTRY DEVICE
MASTER EVENTS SEQUENCE CONTROLLER
MANUAL FUEL CUTOFF
MAIN FUEL VALVE
MIDDLE GIMBAL AXIS
MERRITT ISLAND
MASTER INSTRUMENTATION TIMING
EQUIPMENT
MANIFOLD
MAINTENANCE ANO OPERATION
MISSION OPERATIONS COMPUTTR
MSFN
MSK
MSTC
MTVC
MUX
NASA
NCC
NM
NPV
NSR
02 '
0/B
ODOP
OGA
OMSF
OPS
ORDEAL
OXYGEN
ONBOARD
OFFSeT D Q P P L E * AND POSITION
OUTER GIMBAL AXIS
OFFICE OF MANNEO SPACE FLIGHT
OXYGEN PURGE SYSTEM
ORBITAL RATE ORIVE ELECTRONICS
APOLLO LM
OXID
OXIDIZER
PAFB
PAM
PB
PC
PCM
PCMGS
PC02
PDS/DD
PGA
PGNCS
PGNS
SECTION
GROUP
PAGE
A-2
ITEM
ITEM
PLSS
PO
PO2
POS
POS
PPM
PQGS
PRELN
PRESS
PRI
PROC
PROP
PSA
PS I
PS ID
PSS
PTA
PTP
0IPA
SODB
SOL
SOP
SOV
SPAN
SPS
SRO
SSC
STBY
SW
SXT
TB
TBD
TC
T/C
TCE
TCP
TDfrE
PTV
PU
PUGS
PVT
PYRO
TOP
TELCOM
TEMP
QTY
QUANTITY
TFF
THC
TIG
TLI
TM
TMG
TNK
TO PC
TPF
TPI
TRNS
TRUN
TTC
TTY
TVC
TANK
THRUST OKAY
TERMINAL PHASE FINALIZATIQN
TERMINAL PHASE INITIATE
TRANSFER
TRUNNION
TRANSLATION THRUST CONTROLLER
TELETYPE
THRUST VECTOR CONTROL
U/D
UDL
UHF
UNDKD
USB
UP/DOWN
UPDATA LINK
ULTRA HIGH FREQUENCY
UNDOCKED
UNIFIED S-BAND
VC
VEI
VGX
VGY
VGY
VHF
VLV
VSM
VELOCITY COUNTER
INERTIAL VELOCITY AT ENTRY
VELOCITY TO BE GAINED X-AXIS
VELOCITY TO BE GAINED Y-AXIS
VELOCITY TO BE GAINED Z-AXIS
VERY HIGH FREQUENCY
VALUE
VIDEO SWITCHING MATRIX
W6D
WMS
wT
WIDE-BANO DATA
WASTE MANAGEMENT SYSTEM
WEIGHT
XFEED
XMIT
XMTR
CROSSFEED
TRANSMIT
TRANSMITTER
RAD
RET
RCS
RCU
RCVR
REF
REFSMMAT
REQD
RETRB
RETRO
RCV
RF
RFO
RGA
RHC
RIP
RL
RNDZ
RP-RT
RR
RR
RSI
RSO
RSVR
RTACF
RTC
ftTCC
RADIATOR
RETRACT
REACTION CONTROL SYSTEM
REMOTE CONTROL UNIT
RECEIVER
REFERENCE
REFERENCE STABLE MEMBER MATRIX
REQUIRED
RETRO ELAPSED TIME TO REVERSE 8
RETROFIRE OFFICER
REVOLUTION
RADIO FREQUENCY
RETROFIRE OFFICER
RATE GYRO ASSEMBLY
ROTATION HAND CONTROLLER
RANGE OF IMPACT POINT
ROLL LEFT
RENDEZVOUS
DOWNRANGE ERROR
RENDEZVOUS RADAR
ROLL RIGHT
ROLL STABILITY INDICATOR
RANGE SAFETY OFFICER
RESOLVE*
REAL-TIME AUXILIARY COMPUTING FACILITY
REAL-TIME COMMAND
REAL-TIME COMPUTER COMPLEX
S/C
SCS
SCS
SEC
SEC
SECO
SECS
S^
SIG
SLA
SLV
SM
SMJC
SPACECRAFT
SIGNAL CONDITIONING EQUIPMENT
STABILIZATION AND CONTROL SYSTEM
SECONDARY
SECONO
SUSTAINED ENGINE CUTOFF S-IVBCUTOFF
SEQUENTAL EVENTS CONTROL SYSTEM
SUPER-CRITICAL HELIUM
SIGNAL
SPACECRAFT LM ADAPTER
SATURN LAUNCH VEHICLE
SERVICE MODULE
SERVICE MODULE JETTISON CONTROLER
MISSION
APOLLO 11
REV
DATE
SECTION
YTV
GROUP
PAGE
A-S
MISSION RULES
RLV
ITEM
ITEM
SYMBOLS
M
ALTITUDE
DELTA VIN DELTA VELOCITY IN INSERTION
DELTA TB DELTA BURN TIME
DELTA H
DELTA ALTITUDE
MISSION
APOLLO 11
REV
DATE
SECTION
4/16/69 ACRONYMS
SYMBOLS
GROUP
PAGE
DISTRIBUTION LIST
DIRECTOR OF FLIGHT OPERATIONS
FSVFRERE, J.A.
SANBORN, S.D. (15)
MONKVIC, J.A. (2)
KSC
FM2/BENNETT, F,,V.
BOLT, W.M.
GRAVES, C.A.
HARPOLD, J.C.
ALPHIN, J.
DUPNICK, E.
HANS SEN, V,.
AP/HANEY, P.
AP8/GREEN, D.J. (5)
LM SYSTEMS BRANCH
FC5/BOSTICK, J.C.
SHAFFER, P.C.
LLEWELYN, J.S. C O
PARKER, C.B. 0 0
PAVELKA, E.L. 0 0
FM13/PARTEN, R,,
COLLINS, M.
BENNET, W . J .
ASTRONAUT OFFICE
APOLLO 11
<*/16/69
B-l
EC3/GILLEN, R.J.
TUCKER, E.M.
EC9/STUTESMAN, H.L.
EDm/U\UTEN, W.
EE/SAWYER, R.S.
EE<*/R1EGERT, D.
JOHNSON, G.
MUFORD, R.E.
ROTRAMEL, F.
COMPOS, A.B.
DIETZ, R.H.
FEWER, R.G.
WALTER, R.T,
GIESECKE, R.L.
EE12/LUSE, M.B.
EE13/TREMONT, R.
EDMISTON, C.R.
EG/KAYTON, M.
EG23/COX, K.J., DR.
EG25/HANAWAY, J.
WASSON, C.
EG<*2/RICE, G. (2)
EG*43/LEWIS, R.E.
KURTEN, P.M.
SHELTON, D.H.
EP/MCSHEEHY, R.
EP2/TOWNSEND, N.A.
HUMPHRIES, C.E.
HAMMOCK, W.R.
LAMBERT, C.H.
EPVKARAKULKO, W.
EP5/BELL, D.
OWENS, S.
TROUT, B.
ES/CHAUVEN, L.
ES3/STROUHAL, G.
ES127/SMITH, J.
ES12/GLYNN, P.C.
WEISS, S.P.
PAVLOSKY, J.E.
EX/SILVER I A, M.
EX2/REDD, B.
APOLLO 11
V16/69
MICC,]-/.
APOLLO 11
j-'mt^ims^^mm^m
-^SS^^^^^^^S^