The calibration process steps involve configuring an inspection type for preventative maintenance orders, creating a maintenance plan using existing equipment and task lists, scheduling the plan which generates a maintenance order, releasing the order to create an inspection lot, processing the inspection lot to update the equipment status, and closing the completed maintenance order.
The calibration process steps involve configuring an inspection type for preventative maintenance orders, creating a maintenance plan using existing equipment and task lists, scheduling the plan which generates a maintenance order, releasing the order to create an inspection lot, processing the inspection lot to update the equipment status, and closing the completed maintenance order.
The calibration process steps involve configuring an inspection type for preventative maintenance orders, creating a maintenance plan using existing equipment and task lists, scheduling the plan which generates a maintenance order, releasing the order to create an inspection lot, processing the inspection lot to update the equipment status, and closing the completed maintenance order.
Config: Assign Calibration inspection type-14 to respective PM Order type.
Master Data: 1. You first create Maintenance Plan (IP41). Considering you've already an Equipments (IE01), General Taks List for equipment (IA05) created/available in system in PM module. 2. Then you schedule Maintenance Plan using IP10. 3. After Scheduling, system generates a Maintenance Order automatically in background. 4. Then you release Maintenace Order (IW32). Once PM order releaseed, an inspection lot is generated (Based on Configuration done). 5. Then process the Insp Lot (UD)n depending on which a status will be updated for an equipment. 6. Subsequently, process the Maintenace Order & close it