Formulario No.

2
NOMBRE DEL OFERENTE: ING. CIV. JULIO CESAR ROJAS GIRON
COTO CEZ7 - 001 - 2012
"CONSTRUCCIN Y MEJORAMIENTO DE LA INFRAESTRUCCTURA FSICA EXISTENTE, Y BATERAS SANITARIAS EN EL
ESTABLECIMIENTO EDUCATIVO ADOLFO VALAREZO DEL CANTON LOJA.

TABLA DE DESCRIPCIN DE RUBROS, UNIDADES, CANTIDADES Y PRECIOS


CODIGO

DESCRIPCION

UNIDAD CANTIDAD P.UNITARIO

P.TOTAL

BLOQUE 4 AM - 2PH TIPO SIERRA


01 - PRELIMINARES
1
LIMPIEZA DE TERRENO
2
REPLANTEO Y NIVELACION
02 - MOVIMIENTOS DE TIERRA
72C:72D: 23: REPOSICION DE SUELO CON LASTRE
19
27
DESALOJO DE CIMIENTOS VOLQUETA
EXCAVACION A MANO DE CIMIENTOS Y PLINTOS
4
RELLENO EN CIMIENTO CON MATERIAL DE EXCAVACION
5
03 - CIMIENTOS
72C: HORMIGON SIMPLE PLINTOS FC=210 KG/CM2
3149
72C: HORMIGON SIMPLE REPLANTILLO FC=140 KG/CM2
46
04 - ESTRUCTURA
72C: HORMIGON ARMADO RIOSTRA DE 10 X 15 CM
472
72C: HORMIGON ARMADO RIOSTRA DE 10 X 15 CM
987
72C: HORMIGON SIMPLE EN COLUMNAS FC= 210 KG/CM2
INCLUYE ENCOFRADO
412
72C: HORMIGON SIMPLE EN LOSA DE CUBIERTA FC= 210
KG/CM2 INCLUYE ENCOFRADO
556
72C: HORMIGON SIMPLE EN LOSA DE ENTREPISO FC= 210
KG/CM2 INCLUYE ENCOFRADO
2663
72C; HORMIGON SIMPLE EN VIGAS FC= 210 KG/CM2
INCLUYE ENCOFRADO
442
72C:72D: BLOQUE ALIVIANADO LOSA 40X20X15 CM
98
72C: HORMIGON SIMPLE EN CADENAS FC= 210 KG/CM2
INCLUYE ENCOFRADO
789
ACERO DE REFUERZO, EN BARRAS FYy= 4200 KG/CM2
104
106
MALLA ELECTROSOLDADA R-64
05 - MAMPOSTERIA
72C: MAMPOSTERIA DE BLOQUE DE CEMENTO ARENA, E=
15 cm.
614
72C: MAMPOSTERIA DE BLOQUE DE CEMENTO ARENA,
E=10 cm.
584
06 - CONTRAPISOS
644
72C: CONTRAPISO(INCLUYE MALLA ELECTROSOLDADA)
07 - PISOS
72C: CERAMICA DE ALTO TRAFICO CLASE A CON
MORTERO MONOCOMPON (BONDEX)
672
08 - ENLUCIDOS
720
72C: MEDIAS CAAS
696
72C: ENLUCIDO PALETEADO MAS ESTUCADO
09 - IMPERMEABILIZACION Y PENDIENTES
768
72C: IMPERMEABILIZACION Y PENDIENTES
10 - REVESTIMIENTOS
2689
72C: BARREDERAS CERAMICA (INCLUYE INSTALACION)
3368
PIZARRON TIZA LIQUIDA 1.22X2.44 CM INCLUYE TIZERO 2.4
13 - HERRERIA
3189
72C: PUERTA TOL C/MARCO
118
REJAS TIPO
1166
VENTANA DE ALUMINIO Y VIDRIO 4 MM
18.1 -- CANALIZACION
352
72C: CAJA DE REVISION 60 X 60 (CON TAPA H.A.)
2736
72A: TUBERIA PVC 75MM DESAGUE (MAT/TRAN/INST)
121
72A: TUBERIA PVC 110MM DESAGUE (MAT/TRAN/INST)
126
SUMIDERO 50MM CON TRAMPA
FORMULARIO 2.xlsx - HOJA 1

M2
M2

237.54
108.00

0.80
1.00

190.03
108.00

M3
M3
M3
M3

1.00
19.07
38.72
19.65

25.01
15.08
6.73
6.54

25.01
287.58
260.59
128.51

M3
M3

7.10
3.57

144.43
115.78

1,025.45
413.33

ML
ML

50.16
30.40

33.35
35.04

1,672.84
1,065.22

M3

16.12

208.74

3,364.89

M3

15.44

237.35

3,664.68

M3

14.51

226.10

3,280.71

M3
UD

18.56
2,192.00

203.08
0.68

3,769.16
1,490.56

M3
KG
M2

4.21
8,818.42
135.02

210.55
2.01
15.76

886.42
17,725.02
2,127.92

M2

244.18

10.76

2,627.38

M2

17.51

10.13

177.38

M2

102.08

18.74

1,912.98

M2

281.36

23.73

6,676.67

ML
M2

44.60
998.13

7.69
7.58

342.97
7,565.83

M2

164.70

12.34

2,032.40

ML
U

167.70
4.00

6.00
129.49

1,006.20
517.96

M2
M2
M2

8.40
77.96
77.96

123.35
69.21
73.80

1,036.14
5,395.61
5,753.45

UD
ML
ML
UD

2.00
19.20
20.00
4.00

74.21
5.21
6.15
15.88

148.42
100.03
123.00
63.52

PRECIOS UNITARIOS

18.2 -- AGUAS LLUVIAS


131
72C: BAJANTE PVC DE 110MM
326
72C: REJILLA DE HIERRO 20 X 20 CM INCLUIDO SIFON
19 - INSTALACIONES ELECTRICAS
3187
72C:72D: TOMACORRIENTE DOBLE 110V - 30A
3186
72C:72D: PTOS DE ILUMINACION
72C:72D: ACOMETIDA ELECTRICA 2 No8 INCLUYE TUBO
CONDUIT 1"
2745
1197
CENTRO DE CARGA 4 BREAKER
156
FOCO AHORRADOR 20 W
3570
LAMPARA FLUORESCENTE 2X32W CAT T8 SOBREPUESTA
20 - PINTURA
162
PINTURA CIELO RASO
160
PINTURA DE CAUCHO
25 - VARIOS
181
72C: ACCESOS PAV.C/ CONTRAPISO
211
72C: BRODILLO HORM. SIMPLE 30X10
BATERIA 300P
01 - PRELIMINARES
1
LIMPIEZA DE TERRENO
2
REPLANTEO Y NIVELACION
02 - MOVIMIENTOS DE TIERRA
27
DESALOJO DE CIMIENTOS VOLQUETA
4
EXCAVACION A MANO DE CIMIENTOS Y PLINTOS
5
RELLENO EN CIMIENTO CON MATERIAL DE EXCAVACION
03 - CIMIENTOS
3149
72C: HORMIGON SIMPLE PLINTOS FC=210 KG/CM2
46
72C: HORMIGON SIMPLE REPLANTILLO FC=140 KG/CM2
04 - ESTRUCTURA
502
72C: HORMIGON ARMADO RIOSTRA DE 10 X 15 CM
472
72C: HORMIGON ARMADO RIOSTRA DE 10 X 15 CM
72C: HORMIGON SIMPLE EN COLUMNAS FC= 210 KG/CM2
INCLUYE ENCOFRADO
412
72C: HORMIGON SIMPLE EN LOSA DE CUBIERTA FC= 210
KG/CM2 INCLUYE ENCOFRADO
556
72C; HORMIGON SIMPLE EN VIGAS FC= 210 KG/CM2
INCLUYE ENCOFRADO
442
98
72C:72D: BLOQUE ALIVIANADO LOSA 40X20X15 CM
72C: HORMIGON SIMPLE EN CADENAS FC= 210 KG/CM2
INCLUYE ENCOFRADO
789
ACERO DE REFUERZO, EN BARRAS FYy= 4200 KG/CM2
104
MALLA ELECTROSOLDADA R-64
106
05 - MAMPOSTERIA
72C: MAMPOSTERIA DE BLOQUE DE CEMENTO ARENA, E=
15 cm.
614
72C: MAMPOSTERIA DE BLOQUE DE CEMENTO ARENA,
E=10 cm.
584
06 - CONTRAPISOS
72C: CONTRAPISO(INCLUYE MALLA ELECTROSOLDADA)
644
07 - PISOS
72C: CERAMICA DE ALTO TRAFICO CLASE A CON
MORTERO MONOCOMPON (BONDEX)
672
08 - ENLUCIDOS
72C: ENLUCIDO PALETEADO MAS ESTUCADO
744
72C: MEDIAS CAAS
720
09 - IMPERMEABILIZACION Y PENDIENTES
72C: IMPERMEABILIZACION Y PENDIENTES
768
10 - REVESTIMIENTOS
72C:
CERAMICA
DE
PARED
CON
MORTERO
MONOCOMPONTE (BONDEX)
530
12 - CERRAJERIA
CANDADOS VIRO 50MM
1034
PICAPORTE DE 2" NEGRO
110
TIRADERA NIQUELADA 5"
112

FORMULARIO 2.xlsx - HOJA 1

ML
UD

23.36
4.00

7.23
34.63

168.89
138.52

PTO
PT

16.00
1.00

22.81
24.58

364.96
24.58

ML
UD
UD
U

19.00
2.00
1.00
32.00

37.80
78.04
5.05
62.40

718.20
156.08
5.05
1,996.80

M2
M2

275.52
706.91

3.10
3.04

854.11
2,149.01

M2
ML

55.43
57.50

15.99
13.35
TOTAL:

886.33
767.63
85,196.02

M2
M2

80.75
27.00

0.80
1.00

64.60
27.00

M3
M3
M3

2.83
6.58
3.74

15.08
6.73
6.54

42.68
44.28
24.46

M3
M3

0.80
0.40

144.43
115.78

115.54
46.31

ML
ML

18.24
25.23

33.35
35.04

608.30
884.06

M3

1.24

208.74

258.84

M3

5.55

237.35

1,317.29

M3
UD

1.56
247.00

203.08
0.68

316.80
167.96

M3
KG
M2

0.69
1,016.75
48.75

210.55
2.01
15.76

145.28
2,043.67
768.30

M2

79.22

10.76

852.41

M2

27.10

10.13

274.52

M2

24.06

18.74

450.88

M2

24.06

23.73

570.94

M2
ML

305.68
55.92

7.58
7.69

2,317.05
430.02

M2

48.75

12.34

601.58

M2

64.66

19.98

1,291.91

U
U
U

2.00
6.00
6.00

20.34
19.61
20.86

40.68
117.66
125.16

PRECIOS UNITARIOS

13 - HERRERIA
72C:
PUERTA
METALICA-TOL
REJAS
(INCLUYE
CERRADURA CUADRADA)
3194
72C: PUERTA TOL C/MARCO
3189
REJAS TIPO
118
18.1 - CANALIZACION
72C: CAJA DE REVISION 60 X 60 (CON TAPA H.A.)
352
72A: TUBERIA PVC 110MM DESAGUE (MAT/TRAN/INST)
123
SUMIDERO 50MM CON TRAMPA
126
18.2 - AGUAS LLUVIAS
72C: BAJANTE PVC DE 110MM
131
72C: REJILLA DE HIERRO 20 X 20 CM INCLUIDO SIFON
326
18.3 - DESAGUES AGUAS NEGRAS
72C: DESAGUE DE AGUAS NEGRAS 50MM
143
72C: DESAGUE DE AGUAS NEGRAS 110MM
137
18.4 - MUEBLES SANITARIOS
72C: INODORO TANQUE BAJO
301
72C: LAVAMANOS COLECTIVO
271
72C: URINARIO COLECTIVO
241
LAVAMANOS
146
18.5 - AGUA POTABLE
LLAVE DE MANGUERA DE BRONCE TIPO FV D=1/2"
152
PUNTO DE AGUA POTABLE PVC ROSCABLE 1/2"
148
TUVERIA PVC ROSCABLE 1/2"
150
19 - INSTALACIONES ELECTRICAS
72C:72D: PTOS DE ILUMINACION
3186
72C:72D: ACOMETIDA ELECTRICA 2 No8 INCLUYE TUBO
CONDUIT 1"
2745
CENTRO DE CARGA 2 BREAKER
15839
FOCO AHORRADOR 20 W
156
20 - PINTURA
PINTURA CIELO RASO
162
PINTURA DE CAUCHO
160
25 - VARIOS
72C: ACCESOS PAV.C/ CONTRAPISO
181
72C: BRODILLO HORM. SIMPLE 30X10
211
RUBROS ADICIONALES
23 - REPARACIONES
DERROCAMIENTO DE LOSA (A MANO)
1067
DERROCAMIENTO DE LOSA DE ESTRUCTURA EXISTENTE
3819
DESARMADO DE PUERTAS
3860
GRADAS 2 PH
01 - PRELIMINARES
LIMPIEZA DE TERRENO
1
REPLANTEO Y NIVELACION
2
02 - MOVIMIENTOS DE TIERRA
72C:72D: 23: REPOSICION DE SUELO CON LASTRE
19
DESALOJO DE CIMIENTOS VOLQUETA
27
EXCAVACION A MANO DE CIMIENTOS Y PLINTOS
4
03 - CIMIENTOS
72C: HORMIGON CICLOPEO 40% PIEDRA FC=180 KG/CM2
1632
72C: HORMIGON SIMPLE PLINTOS FC=210 KG/CM2
3149
72C: HORMIGON SIMPLE REPLANTILLO FC=140 KG/CM2
46
04 - ESTRUCTURA
72C: HORMIGON ARMADO RIOSTRA DE 10 X 15 CM
472
72C: HORMIGON SIMPLE EN COLUMNAS FC= 210 KG/CM2
INCLUYE ENCOFRADO
412
72C: HORMIGON SIMPLE EN ESCALERAS FC= 210 KG/CM2
INCLUYE ENCOFRADO
1784
72C: HORMIGON SIMPLE EN LOSA DE CUBIERTA FC= 210
KG/CM2 INCLUYE ENCOFRADO
556
72C; HORMIGON SIMPLE EN VIGAS FC= 210 KG/CM2
INCLUYE ENCOFRADO
442
72C:72D: BLOQUE ALIVIANADO LOSA 40X20X15 CM
98
FORMULARIO 2.xlsx - HOJA 1

M2
M2
M2

4.20
9.03
9.53

148.73
123.35
69.21

624.67
1,113.85
659.57

UD
ML
UD

3.00
15.00
6.00

74.21
6.15
15.88

222.63
92.25
95.28

ML
UD

4.24
1.00

7.23
34.63

30.66
34.63

ML
ML

4.00
8.00

29.13
39.34

116.52
314.72

U
ML
ML
U

8.00
2.58
1.80
4.00

80.50
60.55
51.34
108.99

644.00
156.22
92.41
435.96

U
PT
ML

5.00
17.00
15.00

19.64
21.53
9.73

98.20
366.01
145.95

PT

8.00

24.58

196.64

ML
UD
UD

15.00
1.00
8.00

37.80
78.04
5.05

567.00
78.04
40.40

M2
M2

48.75
241.02

3.10
3.04

151.13
732.70

M2
ML

16.68
27.60

15.99
13.35
TOTAL:

266.71
368.46
21,592.79

M3
M3
U

19.00
34.00
6.00

13.44
13.44
13.44
TOTAL:

255.36
456.96
80.64
792.96

M2
M2

35.75
20.25

0.80
1.00

28.60
20.25

M3
M3
M3

1.00
4.46
12.49

25.01
15.08
6.73

25.01
67.26
84.06

M3
M3
M3

0.37
2.04
0.99

172.71
144.43
115.78

63.90
294.64
114.62

ML

26.30

33.35

877.11

M3

5.69

208.74

1,187.73

M3

7.51

226.10

1,698.01

M3

3.15

237.35

747.65

M3
UD

2.76
262.00

203.08
0.68

560.50
178.16

PRECIOS UNITARIOS

72C: HORMIGON SIMPLE EN CADENAS FC= 210 KG/CM2


INCLUYE ENCOFRADO
789
ACERO DE REFUERZO, EN BARRAS FYy= 4200 KG/CM2
104
05 - MAMPOSTERIA
72C: MAMPOSTERIA DE BLOQUE DE CEMENTO ARENA,
E=10 cm.
584
06 - CONTRAPISOS
72C: CONTRAPISO(INCLUYE MALLA ELECTROSOLDADA)
644
07 - PISOS
72C: CERAMICA DE ALTO TRAFICO CLASE A CON
MORTERO MONOCOMPON (BONDEX)
672
08 - ENLUCIDOS
72C: MEDIAS CAAS
720
72C: ENLUCIDO PALETEADO MAS ESTUCADO
21
09 - IMPERMEABILIZACION Y PENDIENTES
72C: IMPERMEABILIZACION Y PENDIENTES
768
10 - REVESTIMIENTOS
72C: BARREDERAS CERAMICA (INCLUYE INSTALACION)
23
72C: CAJA DE REVISION 60 X 60 (CON TAPA H.A.)
24
72A: TUBERIA PVC 110MM DESAGUE (MAT/TRAN/INST)
25
72C: BAJANTE PVC DE 110MM
26
72C: REJILLA DE HIERRO 20 X 20 CM INCLUIDO SIFON
27
72C:72D: PTOS DE ILUMINACION
28
72C:72D: ACOMETIDA ELECTRICA 2 No8 INCLUYE TUBO
CONDUIT 1"
29
CENTRO DE CARGA 2 BREAKER
30
FOCO AHORRADOR 20 W
31
RELLENO EN CIMIENTO
32
PINTURA CIELO RASO
33
PINTURA DE CAUCHO
34
72C: ACCESOS PAV.C/ CONTRAPISO
35
36

CODIGO
1
2
3
4

ROTULO DE LONA 1.22X2.44

NECESIDADES
BLOQUE 4 AM - 2PH TIPO SIERRA
BATERIA 300P
GRADAS 2 PH
ROTULO DE LONA 1.22X2.44

M3
KG

1.44
3,152.69

210.55
2.01

303.19
6,336.91

M2

22.41

10.13

227.01

M2

26.65

18.74

499.42

M2

67.27

23.73

1,596.32

ML
M2

34.80
196.05

7.69
7.58

267.61
1,486.06

M2

42.52

12.34

524.70

ML
UD
ML
ML
UD
PT

37.24
1.00
6.00
6.00
1.00
2.00

6.00
74.21
6.15
7.23
34.63
24.58

223.44
74.21
36.90
43.38
34.63
49.16

ML
UD
UD
M3
M2
M2
M2

10.00
1.00
2.00
8.92
79.78
116.27
10.08

37.80
78.04
5.05
6.54
3.10
3.04
15.99
TOTAL:
190.86
TOTAL:

378.00
78.04
10.10
58.34
247.32
353.46
161.18
18,936.88
190.86
190.86

CANTIDAD P.UNITARIO
2.00
85,196.02
1.00
22,385.75
1.00
18,936.88
1.00
190.86
TOTAL:

P.TOTAL
170,392.04
22,385.75
18,936.88
190.86
211,905.53

1.00

PRECIO TOTAL DE LA OFERTA (RUBROS OFERTADOS) : 211,905.53 USD (DOSCIENTOS ONCE MIL NOVECIENTOS CINCO
CON 53/100 DLARES AMERICANOS)
PLAZO TOTAL: 120 DIAS CALENDARIO
NOTA: ESTOS PRECIOS NO INCLUYEN IVA

Loja, 10 de Mayo del 2012

ING. CIV. JULIO CESAR ROJAS GIRON


RUC. 0704074335001
OFERENTE
FORMULARIO 2.xlsx - HOJA 1

PRECIOS UNITARIOS

FORMULARIO 2.xlsx - HOJA 1

PRECIOS UNITARIOS

FORMULARIO 2.xlsx - HOJA 1

PRECIOS UNITARIOS

FORMULARIO 2.xlsx - HOJA 1

PRECIOS UNITARIOS

FORMULARIO 2.xlsx - HOJA 1

PRECIOS UNITARIOS

FORMULARIO 2.xlsx - HOJA 1

PRECIOS UNITARIOS

FORMULARIO 2.xlsx - HOJA 1

PRECIOS UNITARIOS

FORMULARIO 2.xlsx - HOJA 1

PRECIOS UNITARIOS

FORMULARIO 2.xlsx - HOJA 1

PRECIOS UNITARIOS

FORMULARIO 2.xlsx - HOJA 1

PRECIOS UNITARIOS

FORMULARIO 2.xlsx - HOJA 1

PRECIOS UNITARIOS

FORMULARIO 2.xlsx - HOJA 1

PRECIOS UNITARIOS

FORMULARIO 2.xlsx - HOJA 1

PRECIOS UNITARIOS

FORMULARIO 2.xlsx - HOJA 1

PRECIOS UNITARIOS

Вам также может понравиться

  • Comparación Cilindros 100mm Vs 150mm
    Comparación Cilindros 100mm Vs 150mm
    Документ5 страниц
    Comparación Cilindros 100mm Vs 150mm
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Mapa de Actores Institucionales para El Apoyo en Los Casos de Vulnerabilidad Detectados
    Mapa de Actores Institucionales para El Apoyo en Los Casos de Vulnerabilidad Detectados
    Документ14 страниц
    Mapa de Actores Institucionales para El Apoyo en Los Casos de Vulnerabilidad Detectados
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Mop 001f Pro
    Mop 001f Pro
    Документ772 страницы
    Mop 001f Pro
    Glenda Angamarca
    100% (1)
  • Perfiles Estructurales
    Perfiles Estructurales
    Документ4 страницы
    Perfiles Estructurales
    Jaime Tacuri
    Оценок пока нет
  • Vigas de Amarre
    Vigas de Amarre
    Документ1 страница
    Vigas de Amarre
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Ficha Técnica Armaduro
    Ficha Técnica Armaduro
    Документ2 страницы
    Ficha Técnica Armaduro
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Ficha Técnica Armaduro
    Ficha Técnica Armaduro
    Документ2 страницы
    Ficha Técnica Armaduro
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Armex
    Armex
    Документ14 страниц
    Armex
    panap25
    Оценок пока нет
  • Aisla 4Pisos
    Aisla 4Pisos
    Документ34 страницы
    Aisla 4Pisos
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Informe Trafico
    Informe Trafico
    Документ29 страниц
    Informe Trafico
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Tuf Strand SF
    Tuf Strand SF
    Документ3 страницы
    Tuf Strand SF
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Escalas de Intensidad y Magnitud
    Escalas de Intensidad y Magnitud
    Документ2 страницы
    Escalas de Intensidad y Magnitud
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Propiedades Del Eucalipto
    Propiedades Del Eucalipto
    Документ4 страницы
    Propiedades Del Eucalipto
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Especificaci N EFNARC
    Especificaci N EFNARC
    Документ28 страниц
    Especificaci N EFNARC
    rudataco
    100% (1)
  • La Historia Del Concreto
    La Historia Del Concreto
    Документ16 страниц
    La Historia Del Concreto
    Jesus Luna
    Оценок пока нет
  • Interes de Prestamos o Ganacias
    Interes de Prestamos o Ganacias
    Документ1 страница
    Interes de Prestamos o Ganacias
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Duhamel
    Duhamel
    Документ2 страницы
    Duhamel
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Hacer APK
    Hacer APK
    Документ10 страниц
    Hacer APK
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • NOTACIONES
    NOTACIONES
    Документ4 страницы
    NOTACIONES
    pablete74
    Оценок пока нет
  • Diseño A Traccion
    Diseño A Traccion
    Документ1 страница
    Diseño A Traccion
    Luis Rivera
    Оценок пока нет
  • Glosario Cientifico
    Glosario Cientifico
    Документ32 страницы
    Glosario Cientifico
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Precios Referenciales
    Precios Referenciales
    Документ17 страниц
    Precios Referenciales
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Ejemplos de Anclajes y Longitudes de Desarrollo
    Ejemplos de Anclajes y Longitudes de Desarrollo
    Документ12 страниц
    Ejemplos de Anclajes y Longitudes de Desarrollo
    Eduardo Lozoya Cervantes
    75% (4)
  • Sap2000 Etabs Csi
    Sap2000 Etabs Csi
    Документ19 страниц
    Sap2000 Etabs Csi
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Calculos Mecanicos Estructuras
    Calculos Mecanicos Estructuras
    Документ6 страниц
    Calculos Mecanicos Estructuras
    ingenukuchnaj
    Оценок пока нет
  • Pliegos Ruta Viva Fase II - Puentes
    Pliegos Ruta Viva Fase II - Puentes
    Документ112 страниц
    Pliegos Ruta Viva Fase II - Puentes
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • El Enano - Par Lagerkvist
    El Enano - Par Lagerkvist
    Документ82 страницы
    El Enano - Par Lagerkvist
    Francisco Xavier Ramirez Tapia
    Оценок пока нет
  • Cálculo del coeficiente sísmico c con CEC-77 y CEC-2000
    Cálculo del coeficiente sísmico c con CEC-77 y CEC-2000
    Документ8 страниц
    Cálculo del coeficiente sísmico c con CEC-77 y CEC-2000
    Art-uro San
    Оценок пока нет
  • Precios Referenciales
    Precios Referenciales
    Документ17 страниц
    Precios Referenciales
    Francisco Xavier Ramirez Tapia
    Оценок пока нет