MONTO DE OBRA
FECHA DE INICIO:
FECHA FINAL:
FECHA DE INICIO:
15 DE DICIEMBRE DEL 2014
FECHA FINAL:
26 DE ENERO DEL 2015
425,678.95
ENTRE LAS FECHAS CORRESPONDE LA AMPLIACION DE PLAZO QUE INICIA DESDE LA FECHA
DESCRIPCION
UND
METRADO
FECHA DE INICIO:
15 DE DICIEMBRE DEL 2014
FECHA FINAL:
26 DE ENERO DEL 2015
P.U
TOTAL
OBRAS PROVISIONALES
1,272.27
CAMPAMENTO DE OBRA
mes
3.50
200.00
und
1.00
572.27
m2
488.80
0.43
210.18
TRAZO Y REPLANTEO
m2
488.80
0.95
464.36
977.60
0.97
OBRAS PRELIMINARES
700.00
572.27
4,041.06
und
1.00
918.24
glb
1.00
1,500.00
MOVIMIENTO DE TIERRAS
948.27
918.24
1,500.00
12,364.81
m3
124.80
4.60
574.08
m3
149.76
11.56
1,731.23
312.00
2.10
655.20
436.80
21.53
9,404.30
m2
MUROS DE CONCRETO
3,629.24
TRAZO Y REPLANTEO
m2
260.00
0.95
247.00
m3
465.59
6.22
2,895.97
m2
180.10
2.70
486.27
VALORIZACION HASTA
NOVIEMBRE
1272.27
700.00
572.27
2081.24
210.18
464.36
656.70
0.00
750.00
1613.69
401.86
1211.83
0.00
0.00
3142.97
247.00
2895.97
0.00
SALDO A
VAL0RIZAR
0.00
0.00
0.00
1959.81
0.00
0.00
291.57
918.24
750.00
10751.12
172.22
519.40
655.20
9404.30
486.27
0.00
0.00
486.27
38249.57
2508.39
1880.97
11035.61
22824.60
32285.93
12768.00
6710.00
12807.93
25465.40
1160.31
3667.47
20637.62
0.00
0.00
0.00
91.20
91.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
962.97
0.00
73.35
0.00
889.62
7266.99
2547.31
1622.81
3096.87
0.00
0.00
0.00
0.00
184.70
133.50
51.20
3.18
3.18
8840.00
8840.00
9874.80
9874.80
16599.95
4158.40
12441.55
4749.36
347.09
1695.86
2706.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
81.70
81.70
1438.81
385.14
208.98
844.69
1579.73
1579.73
35709.46
7352.00
4577.24
3254.93
6020.33
2641.66
5070.22
6763.68
29.41
7935.23
120.84
39,212.53
m2
122.90
20.41
m2
82.60
23.66
1,954.32
kg
2,420.09
4.56
11,035.61
2,508.39
381.81
23,714.22
m3
62.11
kg
3,358.62
4.56
15,315.31
m2
248.37
33.55
8,332.81
m3
15,904.80
39,552.92
37.26
426.86
m2
56.85
20.41
m2
116.28
31.54
3,667.47
m3
75.21
274.40
20,637.62
32.80
4.07
133.50
12.58
4.07
51.20
m2
248.37
0.38
25,465.40
JUNTAS
184.70
94.38
BARANDAS METALICAS
BARANDA METALICA D=2 1/2" EN MUROS
94.38
8,840.00
104.00
85.00
DRENAJE DE MUROS
DRENAJE DE MUROS
1,160.31
8,840.00
9,874.80
104.00
94.95
9,874.80
16,599.95
PREPARACION DE MATERIAL
m3
480.74
8.65
4,158.40
m3
480.74
25.88
12,441.55
PILOTES
EXCAVACION EN CONGLOMERADO
4,749.36
m3
20.25
17.14
347.09
kg
371.90
4.56
1,695.86
m3
5.46
495.68
2,706.41
866.673
6540.29
9874.80
4149.99
12449.96
ALCANTARILLADO PLUVIAL
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
81.70
m2
86.00
0.95
m3
61.92
6.22
385.14
m2
77.40
2.70
208.98
m3
73.07
11.56
m2
77.40
20.41
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
SOLADO DE CONCRETO 1:12, h=2"
81.70
1,438.81
844.69
1,579.73
1,579.73
35,709.47
kg
1,612.28
4.56
7,352.00
m3
11.61
394.25
4,577.24
m2
103.20
31.54
3,254.93
m3
15.48
388.91
6,020.33
m2
77.40
34.13
2,641.66
kg
1,111.89
4.56
5,070.22
m3
15.48
436.93
6,763.68
m2
77.40
0.38
m3
7.05
17.14
SUMIDEROS PLUVIALES
EXCAVACION EN CONGLOMERADO
29.41
7,935.24
120.84
81.70
1079.11
359.70
1579.73
17854.73
17854.73
m2
7.05
2.70
m3
8.46
11.56
97.80
m2
7.05
20.41
143.89
kg
146.33
4.56
667.26
m2
15.04
31.54
m3
2.04
394.25
m3
0.25
431.10
107.78
und
2.00
2,750.00
5,500.00
CUNETAS
19.04
474.36
804.27
1,455.42
EXCAVACION EN CONGLOMERADO
m3
2.79
m2
23.40
2.70
m3
3.29
17.14
11.56
47.82
38.03
m2
16.38
31.54
516.63
m3
2.05
382.18
783.47
63.18
m2
16.56
0.38
m2
96.19
31.55
3,034.79
m2
402.40
93.19
37,499.66
m2
402.40
0.38
480.96
4.07
86.32
4.07
m2
83.20
74.42
PAVIMENTO RIGIDO
JUNTAS
JUNTAS DE DILATACION CON ASFALTO RC-250, E=1"
JUNTAS DE CONTRACCION CON ASFALTO RC-250, E=1"
6.29
40,687.36
152.91
2,308.83
1,957.51
351.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
19.04
97.80
143.89
667.26
474.36
804.27
107.78
5500.00
1455.42
47.82
63.18
38.03
516.63
783.47
6.29
40687.36
3034.79
37499.66
152.91
2308.83
1957.51
351.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
32.05
32.05
0.00
0.00
0.00
0.00
0.00
60.16
60.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
500.00
0.00
393.60
106.40
15516.95
15516.95
6191.74
6191.74
7093.32
1264.12
1912.56
3649.15
235.87
31.62
539.40
423.28
116.12
4202.10
0.00
523.13
1078.90
2116.70
21.37
462.00
2310.56
0.00
31.59
1620.97
658.00
1908.00
300.00
600.00
558.00
250.00
200.00
592.96
416.00
97.61
79.34
3879.24
3879.24
VEREDAS DE CONCRETO
MOVIMIENTO DE TIERRAS
AFIRMADO DE 4" PARA VEREDAS
6,191.74
6,191.74
7,093.32
47.31
26.72
1,264.12
104.00
18.39
1,912.56
m2
83.20
43.86
3,649.15
187.20
1.26
235.87
m2
83.20
0.38
104.00
4.07
423.28
28.53
4.07
116.12
m2
JUNTAS
31.62
539.40
ESCALERA
4,234.15
EXCAVACION EN CONGLOMERADO
m3
1.87
17.14
m2
18.71
27.96
523.13
kg
236.60
4.56
1,078.90
431.10
2,116.70
m3
4.91
5.25
4.07
6.60
70.00
32.05
21.37
462.00
2,370.72
EXCAVACION EN CONGLOMERADO
m3
3.51
m2
11.70
2.70
31.59
m3
6.98
232.23
1,620.97
9.40
70.00
658.00
17.14
60.16
1,908.00
und
1.00
300.00
300.00
und
2.00
300.00
600.00
und
15.00
37.20
558.00
und
1.00
250.00
und
1.00
200.00
glb
1.00
416.00
ACONDICIONAMIENTO DE BOTADEROS
m3
149.76
3.28
RIEGO DE VIAS
m2
488.80
0.38
FLETE TERRESTRE
FLETE TERRESTRE
COSTO DIRECTO
GASTOS GENERALES (10.2886%)
UTILIDAD (10%)
SUBTOTAL
FACTOR RELACION (1.00)
SUB TOTAL (CON FACTOR RELACION)
IGV (18%)
TOTAL
PORCENTAJE DE AVANCE (%)
250.00
200.00
1,092.95
416.00
491.21
185.74
19,396.19
glb
1.00
19,396.19
19,396.19
299,904.46
30,849.97
29,990.45
360,744.88
360,744.88
360,744.88
64,934.08
425,678.96
100%
120,311.44
12,375.96
12,031.14
144,718.54
144,718.54
144,718.54
26,049.34
170,767.88
40.12%
18.98%
179,593.02
18,474.02
17,959.30
216,026.33
216,026.33
216,026.33
38,884.74
254,911.07
59.88%
1172.00
3879.24
21431.75
2204.60
2143.18
25779.53
25779.53
25779.53
4640.31
30419.84
18662.01
1919.69
1866.20
22447.90
22447.90
22447.90
4040.62
26488.52
56908.36
19794.17
17854.73
0.00
0.00