Вы находитесь на странице: 1из 1

10

Nort
h

20m

Do not scale from this drawing - Refer to figured dimensions only.


Contractor to notify originator of any discrepancies or variations immediately.

N 287300000
E 408000000

General Notes:

Change Guidance for Contractor:


(Summary of changes since Stage D issue - guidance only not
exhaustive)

2-

A B

AAR-A-P1-ZZ-EL-001

AAR-A-P1-ZZ-SE-003

AAR-A-P1-ZZ-EL-001

YY
Q

AAR-A-P1-ZZ-SE-003

Archive reading room arrangement modified


Access arrangements to MILO studio updated
Core design updated

Cardigan Street

AAR-A-P1-ZZ-SE-002

AAR-A-P1-ZZ-SE-002

Yb

AAR-A-P1-XX-CO-003

AAR-A-P1-XX-CO-004

1
Colour Grading
Suite
P027

Edit Suite
Large
P029

Photography
Studio 3
P032

CORE C
P0S3

Computer Suite
Radio
CORE D
P041
BT Intake P0S4
Room
P0D21

CTA
P026

Edit Suite
Large
P028

Fire Fighting
Lobby
P0S3A

Edit Suite
Large
P030
Avid Lobby
P028A

TV Studio
Lobby
P032A

Corridor
P099F

Changing
Room Male
P025

Archive Store
P039

3a
Break Out
P099E

Green Room
P023

Studio E VT
Machine Room
P031

Photography
Studio 4
P034

Scratch Radio
P033

Archive Office
P038

Archive
Reading Room
P037

Audio Post
Production
P040

Computer Suite
Radio
P047
Radio Studio
Lobby
P048A

Radio Studio
Lobby
P099K

Corridor
P0S4A Dis W.C.
P043A

Radio Studio
Lobby
Vocal Booth P040A
P042

Radio Studio A
P045

Break Out
P044

Archived
Student
Records Store
P043

Radio Studio B
P046

Radio Studio E
P050
Radio Studio F
Radio Studio D
P051
P049

2
3

Radio Studio C
P048

3a

Consultation /
Interview
P052

Faculty Office
P053

Changing
Room Female
P024

Entrance Lobby
P057B

wt
4a

Technicians
Office
P022

wt
4a

Faculty Office
P054

TV Studio
Lobby
P036A

TV Studio
Lobby
P035A

Equipment
Access

AAR-A-P1-ZZ-SE-001

3-

2
Reception
P056

-AAR-A-P1-ZZ-EL-001

Studio C Floor
P020

Corridor
P099C

Main Entrance
P057

Break Out
P058

5
1

Security Office
P055

SU Office
P021

5a

-AAR-A-P1-ZZ-EL-002

Studio A Floor
P036

Studio B Milo
P035

5a

3
4
AAR-A-P1-ZZ-DC-060

6
Studio C Audio
Gallery
P019

Studio C
Dimmer Room
P017

AAR-A-P1-ZZ-SE-001

Studio C VT
Machine Room
P018

Corridor
P099B

Edit Suite Small


P012
Studio C
Production
P016

6a

TV Studio
Lobby
P005A

Studio D
Dimmer Room
P004

Cleaners' St
P009
Stair Lobby
P0S2A

Resource Lab
Avid
P010

Edit Suite Small


P013

Dis W.C.
P008

Edit Suite Small


P014

CORE B
P0S2

BA BB

Corridor
P099L

BC

BD BE

Fire Fighting
Lobby
P0S1A

Studio D Floor
P005
Male W.C.
P002

Studio D VT
Machine Room
P007

CORE E
P0S5

The Shell
(Theatre
Studio)
P063

Core A Final
Exit
PMS1B

10

J K

Scene Dock
P062

B2

10

Lighting
Dimmer Rack
Room
P061

U
B4

Stage C Issue
BIAD comments incorporated. Cores updated.
Core C SER position to be reviewed.
INTERIM ISSUE FOR PROJECT EXEC. GA
Plan changes as shown. Core A design
ongoing. Core C SER position to be reviewed.
Details:

VC/DS
DS/DH

10.05.2013
05.12.2012

DS/AP

20.09.2012

DS/DH

08.02.2012

AP/DS
DS/JH
JH/JH
JS/DS
DS/JH

30.06.2011
06.06.2011
16.03.2011
11.02.2011
23.12.2010

DS/JH

16.12.2010

DS/JH
JH/JH

05.11.2010
23.10.2010

JH/JH

20.10.2010

By / Chk:

Date:

Willmott Dixon Construction Limited


Chantry House
High Street
Coleshill
Birmingham B46 3BP
T +44 (0)1675 467666 F +44 (0) 01675 467655
www.willmottdixon.co.uk

1 Severn Street Place The Mailbox Birmingham B1 1SE


T +44 (0)121 233 6600 F +44 (0)121 200 1564
mail@associated-architects.co.uk www.associated-architects.co.uk

Last Issue for Construction


General Revisions: Updated in line with latest
FFE layouts
General Revision: reissued to tally with
current GA-005 and 006 series drawings.
General Revision: Updated in line with 005
and 006 series setting out drawings. Client
room numbers added.
Revised in line with latest 1_100 plans
STAGE E TENDER ISSUE
Updated building position
STAGE D ISSUE
IT Suite on level 2 made open plan to bridge;
minor revisions to risers
Cores and Risers updated; Radio Studios
reconfigured; Accommodation Core
reconfigured; Reception amended; Platform
Lift omitted; Building management added;
Core E relocated; Side Entrance added;
Columns added

11

B3
P

B4

C
B
A

B3
E

B1

11

I
H
G
F
E

Rev:

B2

AAR-A-P1-XX-CO-005

Yb

6a 1

Theatre
Workshop
P060

AAR-A-P1-XX-CO-001

A B

M
L

CORE A
P0S1

Female W.C.
P001

AAR-A-P1-XX-CO-002

Core E Final
Exit
P0S5A

Acoustic Lobby
P063B

Cycle Store
-

B1

Corridor
P099N

Acoustic Lobby
P063A

SER
P003

Studio D
Production
P006

Edit Suite Small


P015

UP

Edit Suite
Medium
P011

7
Biomass Wood
Chip Store
PM09

TV Studio
Lobby
P020A

Coffee Pod
P059

ZZ

Birmingham City University


City Centre Campus Project Office
Millennium Point
Curzon Street
Birmingham
B4 7XG
Project:

N 287300000
E 407900000

-AAR-A-P1-ZZ-EL-002

B5

B5
TEE Loading Bay

B6

B7
00 - Ground Floor Plan GA
1

B6

B7

THE PARKSIDE BUILDING

Drawing Title:

Ground Floor GA Plan

Discipline:

ARCHITECTURAL
Status:

B8

B8

1 : 200

Last Issue for Construction


Drawn by:

Date:

PMB

08/27/10

Job number:

Client number:

3106

1435

Scale:

1 : 200

A1
Revision:

Millenium Point

AAR-A-P1-00-GA-002

Вам также может понравиться