F01
F02
F03
F04
MATERIAL TRANSMITTAL
F05A
F05B
F06
REPLY TO COMMENTS
F07
F08
F09
F10A
F10B
F10C
F11
F12
F13
F14
F15
NON-CONFORMANCE NOTICE
F16
01/21/2015
Content
PROJECT
DAILY REPORT
PROJECT No. :
SUB CONTR:
DATE
TO
: M/s
SCOPE
DAY
STAFF:
SYSTEM
PO
NO.
SUBMITTALS:
NO SYSTEM
TOTAL
EQUIPMENT (Available at site today):
TYPE
NO.
HOURS
NAME
:
S
T W Th F
REF
QYT
TOTAL
MATERIAL (Delivered to site today):
TYPE
SUB REF.
UNIT
QTY.
Sheet 1 of 2
THIS REPORT MUST BE SUBMITTED NO LATER THAN 9:00AM THE NEXT DAY
Confidential
01/21/2015
Page 2
PROJECT
DAILY REPORT
REPORT NO.
SUB CONTRACTO:
TO
ccs
ACT. NO.
:
DATE
: M/s
ACUAL
ACTIVITY DESCRIPTION
START END
ITEMS
UINT
QYT
AREA
LEVEL
REF.NO
TOTAL
COMMENTS:
CONTRACTOR
COMMENTS:
Sheet 2 of 2
01/21/2015
F2 - Daily Report
PROJECT
MATERIAL TRANSMITTAL
Contractor:
Material Description:
Document No.
YES
NO
YES
NO
YES
NO
Serial
No.
Specification Reference
Section
Page
Contractor's Rep.
Reviewed
01/21/2015
Clause
Drg Ref. /
Location
Checked
Revision
Date
Specification
Requirement
Proposed
Material / Product
Manufacturer /
Supplier Details
Remarks /
Attachment
Date
Approved
F4 - Material Transmit
Contractors Logo
SAMPLE SUBMITTAL
Contractor
Document No :
Contractors Logo
Contractors Logo
SAMPLE SUBMITTAL
SAMPLE SUBMITTAL
Contractor
Rev.: 0
Document No :
Rev.: 0
Document No :
Date
Date
Date
Item Desc.
Item Desc.
Item Desc.
Reference.
Reference.
Reference.
CONTRACTOR'S REP. :
APPROVED
CONTRACTOR'S REP. :
NOT
APPROVED
APPROVED
Project Engineer
01/21/2015
Contractor
CONTRACTOR'S REP. :
NOT
APPROVED
APPROVED
Project Engineer
Rev.: 0
NOT
APPROVED
Project Engineer
257925900.xlsx
F7 - Sample Tag
TO
DRAWING,
REF. No. :
TRANS.
SPECIFICATION
ITEM
NO. &
OR BOQ. PAGE
NO.
REV. NO.
TYPE
DESCRIPTION
OF
PLANNED
SUBMITTED
RETURNED BY
SUB.
SUB. DATE
BY CONTR.
ENG. REP.
ACTION
APPROVAL
REQUIRED
CCS
NEEDED BY
ON JOB
ACTIVITY ID
REMARKS
Page 6 of 9
PROJECT
TO
DRAWING,
REF. No. :
TRANS.
SPECIFICATION
ITEM
NO. &
OR BOQ. PAGE
NO.
REV. NO.
TYPE
DESCRIPTION
OF
PLANNED
SUBMITTED
RETURNED BY
SUB.
SUB. DATE
BY CONTR.
ENG. REP.
ACTION
APPROVAL
REQUIRED
CCS
NEEDED BY
ON JOB
ACTIVITY ID
REMARKS
Page 7 of 9
PROJECT
TO
DRAWING,
REF. No. : ..
TRANS.
SPECIFICATION
ITEM
NO. &
OR BOQ. PAGE
NO.
REV. NO.
TYPE
DESCRIPTION
OF
PLANNED
SUBMITTED
RETURNED BY
SUB.
SUB. DATE
BY CONTR.
ENG. REP.
ACTION
APPROVAL
REQUIRED
CCS
NEEDED BY
ON JOB
ACTIVITY ID
REMARKS
Page 8 of 9
PROJECT
REF NO. :
TO
ACTIVITY
NO.
CCS ACTIVITY ID
DESCRIPTION
SPEC /
BOQ.
EST.
PAGE
ITEM
QTY.
NO.
ORDERED
UNIT
QTY.
REQ.
DATE
ISSUED
PURCHASE
ORDER
NO.
METHOD SHIPPING
SUPPLIER
LOCATION
E.M.D.
LEAD
OF
DATE TO
TO
TIME
SHIPPING
QATAR
SITE
REMARKS
01/21/2015
Page 9 of 9