| Desain Pondasi Tapak Beton Bertulang |
| S K S N I - T 1 5 - 1 9 9 1 - 0 3 |
| suyono.nt@gmail.com (2001) |
| |
+----------------------------------------------------------+
Data-data
---------
Material :
Mutu beton, f_c = 20.00 MPa
Kuat leleh baja tul., f_y = 400.00 MPa
Diameter tul. arah-X, D_tul = 13.00 mm
arah-Y, d_tul = 10.00 mm
Pembebanan tambahan :
- Akibat berat sendiri pondasi
w_p = (h * l * b * 2400) + (b_kol * h_kol * D_z * 2400)
= (0.15 * 2.30 * 1.30 * 2400) + (0.20 * 0.30 * 1.50 * 2400)
= 716.49 Kgf
Jadi digunakan dimensi tapak pondasi B_ pon = 130.00 cm, L_pon = 235.00 cm
x = L_pon/2 - h_kol/2 - d
= 2350.00/2 - 300.00/2 - 93.50
= 931.50 mm = 0.93 m
Kontrol, (V_u = 55.77 kN) < (phi*V_c = 133.15 kN) ... Okey
Arah sumbu lemah (Y)
--------------------
Tegangan tanah yang terjadi (ultimit),
sigma_tymax = (P_u/(B_pon*L_pon)) + (M_ux/((1.0/6.0)*B_pon**2*L_pon))
= (80.41/(1.30*2.35)) + (10.00/(1/6*1.30^2*2.35))
= 26.322 + 15.112
= 34.682 kN/m^2 (kPa)
y = B_pon/2 - b_kol/2 - d
= 1300.00/2 - 200.00/2 - 93.50
= 456.50 mm = 0.46 m
Kontrol, (V_u = 29.14 kN) < (phi*V_c = 240.70 kN) ... Okey
alpha_s = 30.00
Kontrol, (V_u = 67.45 kN) < (phi*V_c = 75.10 kN) ... Okey
x = L_pon/2 - h_kol/2
= 2.35/2 - 0.30/2
= 1.03 m
K_maks = (382.5*beta_1*f_c*(600+f_y-225*beta_1))/(600+f_y)^2
= (382.5*0.85*20.00*(600+400.00-225*0.85))/(600+400.00)^2
= 5.26 MPa
Kontrol :
K_t < K_maks
3.59 MPa < 5.26 MPa, Analisa Pelat dgn tul. TUNGGAL (Tebal pelat memenuhi)
Kontrol :
rho < rho_maks
1.10 % < 1.63 % ... Okey
Faktor pengali :
Jarak antar tul. atas dan bawah s > 300 mm
K_1 = 1.40
K_2 = 2 - 400/f_y
= 2 - 400/400.00
= 1.00
s_tul < 150, dan s_tepi < 70
K_3 = 1.00
K_maks = (382.5*beta_1*f_c*(600+f_y-225*beta_1))/(600+f_y)^2
= (382.5*0.85*20.00*(600+400.00-225*0.85))/(600+400.00)^2
= 5.26 MPa
Kontrol :
K_t < K_maks
0.34 MPa < 5.26 MPa, Analisa Pelat dgn tul. TUNGGAL (Tebal pelat memenuhi)
Tinggi blok tegangan tekan beton, a_t = (1 - sqrt(1-(2*K_t/0.85*f_c))) * d
= (1 - sqrt(1-(2*0.34/0.85*20.00))) * 83.50
= 1.71 mm
Kontrol :
rho < rho_maks
0.41 % < 1.63 % ... Okey
Faktor pengali :
Jarak antar tul. atas dan bawah s > 300 mm
K_1 = 1.40
K_2 = 2 - 400/f_y
= 2 - 400/400.00
= 1.00
s_tul < 150 and s_tepi < 70
K_3 = 1.00
K_4 = A_su / A_st
= 686.79 / 796.39
= 0.86
>>>