CENTRAL POWER DISTRIBUTION COMPANY OF AP LIMITED
Sowers
Toting ope en
O/o The Chief General Manager (Commi & RA),
APCPDCL, Corporate Office,
6-1-50, 2°4 Floor, Mint Compound,
Hyderabad — 500 063,
Memo. No. CGM(Comml & RAC)/SE(IPC)/F. Twin Hickory/D. No.3) OC /13, dt: 5-02-2013.
‘Sub: - APCPDCL ~ RE Projects - Proposed setting up of 5 MW Capacity solar power
project at Puleru (V} in Gorantla (M), Anantapur district by M/s Twin Hickory
Power Private Limited — Processing of estimate - Regarding.
Ref: -1. M/s Twin Hickory Power Private Limited letter dated: 07-11-2012.
2. Memo No. CGM (Commi)/SE(IPC}/F. Twin 5 MW/D.No, 1985/12, dt: 27-11-12.
3. Lr. No.SE/O/ATP/Coml-/F. Twin 5 MW/D.No.3656, Dt: 10.01.2013.
4, lr No. CGM [Comml & RAC}/SE(IPC)/F. Twin Hickory/D.No. 2379/12, dated:
22-12-12,
5. M/s Twin Hickory Power Private Limited letter dated: 14-02-2013.
In the reference 3 cited above, technical feasibility was furnished to Corporate
Office for evacuation of power from the proposed 5 MW Solar power project to be setup
by M/s Twin Hickory Power Private Limited at Puleru (V) in Gorentla (M), Anantapur district
at 33 KV level fo the 33/11 KV Gorantla Sub-station, Anantapur district.
ln this regard, it is requested to amange to get the sanction of estimate for
evacuation of power from the proposed 5 MW Solar Power Project to the 33/11 KV
Gorantia Sub-station at 33 KV level by competent authority.
Yours faithfully,
Chief General Sy nmuan
The Superintending Engineer/Operation/ APCPDCL/Anantapur.