Вы находитесь на странице: 1из 1
CENTRAL POWER DISTRIBUTION COMPANY OF AP LIMITED Sowers Toting ope en O/o The Chief General Manager (Commi & RA), APCPDCL, Corporate Office, 6-1-50, 2°4 Floor, Mint Compound, Hyderabad — 500 063, Memo. No. CGM(Comml & RAC)/SE(IPC)/F. Twin Hickory/D. No.3) OC /13, dt: 5-02-2013. ‘Sub: - APCPDCL ~ RE Projects - Proposed setting up of 5 MW Capacity solar power project at Puleru (V} in Gorantla (M), Anantapur district by M/s Twin Hickory Power Private Limited — Processing of estimate - Regarding. Ref: -1. M/s Twin Hickory Power Private Limited letter dated: 07-11-2012. 2. Memo No. CGM (Commi)/SE(IPC}/F. Twin 5 MW/D.No, 1985/12, dt: 27-11-12. 3. Lr. No.SE/O/ATP/Coml-/F. Twin 5 MW/D.No.3656, Dt: 10.01.2013. 4, lr No. CGM [Comml & RAC}/SE(IPC)/F. Twin Hickory/D.No. 2379/12, dated: 22-12-12, 5. M/s Twin Hickory Power Private Limited letter dated: 14-02-2013. In the reference 3 cited above, technical feasibility was furnished to Corporate Office for evacuation of power from the proposed 5 MW Solar power project to be setup by M/s Twin Hickory Power Private Limited at Puleru (V) in Gorentla (M), Anantapur district at 33 KV level fo the 33/11 KV Gorantla Sub-station, Anantapur district. ln this regard, it is requested to amange to get the sanction of estimate for evacuation of power from the proposed 5 MW Solar Power Project to the 33/11 KV Gorantia Sub-station at 33 KV level by competent authority. Yours faithfully, Chief General Sy nmuan The Superintending Engineer/Operation/ APCPDCL/Anantapur. To,

Вам также может понравиться