Engineers Handbook
1 foot
1. OD
2. LBS/FT
3. CUFT/FT
4. Displacement BBL/FT
Engineers Handbook
1 foot
1 foot
1. OD
2. LBS/FT
3. CUFT/FT
4. Displacement BBL/FT
1. OD outside casing
2. LBS/FT outside casing
3. OD inside casing
4. CUFT/FT
Engineers Handbook
1 foot
1 foot
1 foot
1. OD
2. LBS/FT
3. CUFT/FT
4. Displacement BBL/FT
1. OD outside casing
2. LBS/FT outside casing
3. OD inside casing
4. CUFT/FT
1. OD casing
2. OH diameter
3. CUFT/FT
Previous
Casing
Open Hole
Collar
Shoe
Previous
Casing
Open Hole
Collar
Shoe
Previous
Casing
3. Inside casing
(between collar and shoe)
2
3
3
Open Hole
Collar
Shoe
Cement Calculations
z Volume of open hole below the casing shoe is not
calculated.
z Cement circulates out of the shoe and up the annulus.
z Any cement displacing the mud below by gravity is
considered negligible.
Problem 1
Casing
:
7 - 32 LB/Ft
Shoe
:
4600
Collar
:
4510
Previous casing :
9 5/8 - 47 LB/Ft
Shoe
:
2670
Open hole
:
8.5
Top of cement
:
1000
Calculate Total Amount of Slurry Required in CuFt
9
Solution
Capacities
1. Cas-Cas
- 0.1438 cuft/ft
2. Cas - OH
- 0.1268 cuft/ft
3. Cas
1000ft
1
Volumes
2670ft
2
3
3
4510ft
4600ft
Solution
Capacities
1. Cas-Cas
- 0.1438 cuft/ft
2. Cas - OH
- 0.1268 cuft/ft
3. Cas
1000ft
1
Volumes
2670ft
4510ft
4600ft
Solution
Capacities
1. Cas-Cas
- 0.1438 cuft/ft
2. Cas - OH
- 0.1268 cuft/ft
3. Cas
1000ft
1
Volumes
2670ft
4510ft
4600ft
Solution
Capacities
1. Cas-Cas
- 0.1438 cuft/ft
2. Cas - OH
- 0.1268 cuft/ft
3. Cas
1000ft
1
Volumes
2670ft
3
3
4510ft
4600ft
Solution
Capacities
1. Cas-Cas
- 0.1438 cuft/ft
2. Cas - OH
- 0.1268 cuft/ft
3. Cas
1000ft
1
Volumes
2670ft
3
3
4510ft
4600ft
Excess
Example: Problem 1
z OH 50% Excess
z OH volume (2) of the previous problem:
244.7
cuft
z Excess Volume:
Total OH Volume:
367.05 cuft
z OR
16 Single Stage Cementing
YIELD
CEMENT
CEMENT
WATER
CEMENT
WATER
SLURRY
Note:
1 sack of cement
of 94 lbs
= 1 cuft
= 0.66 cuft
Note:
1 sack of cement
of 94 lbs
= 1 cuft
= 0.66 cuft
= 1.66 cuft
Note:
1 sack of cement
of 94 lbs
= 1 cuft
= 0.66 cuft
But the
Handbook states:
1.15 cuft/sack
WHY ?
1 cuft + 0.66 cuft
= 1.66 cuft
Pour water
into cement
Same size drum
0.66 of water
Air in pore spaces will
be displaced by water
25 Single Stage Cementing
Note
z Yield varies with density
Bentonite
API States:
Ideal Mix (15.8 ppg)
1 cu/ft
4.97 gals
1 cu/ft
4.97 gals
Cement
Water
Cement
Water
12%
BWOC
Extra
Water
1.15 cuft/sack
Bentonite
Bentonite
API States:
Ideal Mix (15.8 ppg)
1 cu/ft
4.97 gals
1 cu/ft
4.97 gals
Cement
Water
Cement
Water
12%
BWOC
Extra
Water
Bentonite
7.18 gals
1.15 cuft/sack
Bentonite
z Bentonite is used in large quantities in oilfield slurries.
z As much as 25% BWOC is possible
z Offshore this presents a problem due to limited storage
Handbook Gives:
Ref
Class G Neat
700.06
240.2 cuft
Tail volume [2 + 3] :
+ 18.2 cuft
385.35 cuft
240.2 cuft
Tail volume [2 + 3] :
+ 18.2 cuft
385.35 cuft
Use:
Lead Slurry :
Tail Slurry Neat
240.2 cuft
Tail volume [2 + 3] :
+ 18.2 cuft
385.35 cuft
Use:
Lead Slurry :
6% D20 at 13.9 ppg
Tail Slurry Neat
:
15.8 ppg
Cement volume Lead:
Cement volume Tail:
240.2 cuft
sacks
1.655 cuft/sack
= 145.2
240.2 cuft
Use:
Lead Slurry
:
Tail Slurry Neat :
Cement volume Lead:
Cement volume Tail:
= 145.2 sacks
385.25 cuft
1.15 cuft/sack
= 335.0 sacks
42 gal/bbl
1241.2 gal
42 gal/bbl
Tail mix water
1241.2 gal
1241.2 gal
42 gal/bbl
Tail mix water
39.64 bbls
1664.95 gal =
42 gal/bbl
1241.2 gal
29.55 bbls
1664.95 gal =
39.64 bbls
42 gal/bbl
42 gal/bbl
69.19 bbls
1241.2 gal
29.55 bbls
1664.95 gal =
39.64 bbls
42 gal/bbl
Tail mix water
42 gal/bbl
Total mix water
69.19 bbls
13.84 bbls
1241.2 gal
29.55 bbls
1664.95 gal =
39.64 bbls
42 gal/bbl
Tail mix water
42 gal/bbl
Total mix water
69.19 bbls
13.84 bbls
0 bbls
1241.2 gal
29.55 bbls
1664.95 gal =
39.64 bbls
42 gal/bbl
Tail mix water
42 gal/bbl
Total mix water
69.19 bbls
13.84 bbls
0 bbls
20 bbls
1241.2 gal
29.55 bbls
1664.95 gal =
39.64 bbls
42 gal/bbl
Tail mix water
42 gal/bbl
Total mix water
69.19 bbls
13.84 bbls
0 bbls
Priming, washing up
20 bbls
103 bbls
Additives - Step E
z Solid Additives
z Calculated as a % by weight of dry cement.
Except: Salt
Small amounts will not effect calculation
z Liquid Additives
z Calculated as gallons of additives per sack of bulk
cement
z Subtract total amount of liquid additives from amount
of mix fluid to have real amount of mix water.
49 Single Stage Cementing
(145 sks)
(335 sks)
= 817.8 lbs
Displacement
z To FLOAT COLLAR unless otherwise stated
Exceptions
1. STAB-IN CEMENTING:
Displacement to 10-15 before stab-in shoe
Check returns - OK - pull out and circulate
2. GUIDE SHOE:
Displace to 20-30 before shoe
NEVER OVERDISPLACE
51 Single Stage Cementing
Displacement
z To FLOAT COLLAR unless otherwise stated
Exceptions
1. STAB-IN CEMENTING:
Displacement to 10-15 before stab-in shoe
Check returns - OK - pull out and circulate
2. GUIDE SHOE:
Displace to 20-30 before shoe
NEVER OVERDISPLACE
52 Single Stage Cementing
42.8
68.6
:
:
Displacement:
Dropping Plugs
Total
z
4 bpm
8bpm
10.5 mins
8.5 mins
11mins
9 mins
To allow a safe margin to do this job we expect at least 1 hr extra for the
cement to be still pumpable after it is put in place.
ie, 1hrs 44 mins
Examples - Example 1
Calculate : Slurry Volumes, Cement Volumes,
Mix Water, Additives, Displacement
Job Time
Well Data: 9 5/8 53.5 lb/ft casing, shoe at 9800,
collar at 9760, OH 12 1/4 + 25% excess,
previous casing 13 3/8 68 lb/ft at 2900
Slurries:
Examples - Example 1
Calculate : Slurry Volumes, Cement Volumes,
Mix Water, Additives, Displacement
Job Time
Well Data: 9 5/8 53.5 lb/ft casing, shoe at 9800,
collar at 9760, OH 12 1/4 + 25% excess,
previous casing 13 3/8 68 lb/ft at 2900
Sluuries:
13 3/8" , 68 lbs/ft
2900'
9300'
3
4
Solution - Example 1
z Capacities
CAS/CAS
: 0.3354 cuft/ft
CAS OH
: 0.3132 cuft/ft
CAS
z 1. Volumes
Solution - Example 1
z Capacities
CAS/CAS
: 0.3354 cuft/ft
CAS OH
: 0.3132 cuft/ft
CAS
z 1. Volumes
Lead
(1) 2900ft x 0.3354 cuft/ft
(2) 9300ft - 2900ft x 0.3132
= 972.7 cuft
= 2004 cuft
501 cuft
Tail
(3) 9800ft - 9300ft x 0.3132 cuft/ft = 156.cuft
(4) 40ft x 0.3973 cuft/ft
= 15.9 cuft
Excess 156.6 cuft x 0.25
= 39.2 cuft
Solution - Example 1
Capacities
CAS/CAS
:0.3354 CUFT/FT
CAS OH
:0.3132 CUFT/FT
CAS :
0.3973 CUFT/FT, 0.0708 BBL/FT
1.
Volumes
Lead
(1) 2900ft x 0.3354 cuft/ft
(2) 9300ft - 2900ft x 0.3132
= 972.7 cuft
= 2004 cuft
501 cuft
Tail
(3) 9800ft - 9300ft x 0.3132 cuft/ft = 156.cuft
(4) 40ft x 0.3973 cuft/ft
= 15.9 cuft
Excess 156.6 cuft x 0.25
2. Yield
Handbook 700.013
700.006
59 Single Stage Cementing
= 39.2 cuft
z 3. Cement
Lead :
Solution - Example 1
3477 cuft
= 1606 sacks
2.165 cuft/sk
Tail :
z 4. Mix Fluid
Lead :
= 464.5 bbls
42 gal/bbl
Tail :
21.8 bbls
Solution - Example 1
z 5. Additives
Lead :
Tail :
= 18116 lbs
D20 : 1606sk x 94lbs/sk x 0.12
D13 : 1606sk x 94lbs/sk x 0.003 = 453 lbs
D28 : 184sk x 94lbs/sk x 0.0005 = 8.6 lbs
D65 : 184sk x 94lbs/sk x 0.005 = 86 lbs
Solution - Example 1
z
6. Displacement
9760ft x 0.0708 bbl/ft = 691 bbls
Example 2
Data :
Casing
Open hole
Cement
Calculate :
Slurry Volume
Cement Volume
Mix water
Additives
Displacement @ 7 bpm
Job Time
Solution - Example 2
9 5/8" , 53.5 lbs/ft
3
44
5
8600'
8.5" OH
7", 29 lbs/ft
10200'
9" OH
10800'
11507'
14230'
14300'
Capacities
CAS/CAS
CAS/OHX
Solution - Example 2
: 0.1301 cuft/ft
: 0.1745 cuft/ft
CAS OH
CAS
: 0.1268 cuft/ft
: 0.2086 cuft/ft , 0.0371 bbl/ft
1. Volumes
Tail : Yield is 1.475 cuft/sk
250 sacks
---> 250 x 1.475
= 368.75 cuft
Volume (5) + (6)
= 368.75 cuft
(6)
= 70 x 0.2086
= 14.6 cuft
(5)
= 368.75 - 14.6
= 354.15 cuft
Height in annulus
354.15 cuft
= 2793
0.1268 cuft/ft
14300 - 2793'
= 11, 507'
Lead: Surface - 11, 507'
(1) 8600 x 0.1301
= 1118.86 cuft
(2) (10200 - 8600) x 0.1268
= 202.88 cuft
(3) (10800 - 10200) x 0.1745
= 104.70 cuft
(4) (11507 - 10800) x 0.1268
= 89.64 cuft
Total Lead = 1516.1 cu ft
Solution - Example 2
z
2. Cement sacks
Lead
:
Tail
z
3. Mix fluid
Lead
Tail
193.1 bbls
36.6 bbls
831 sacks
4. Additives
Lead:
Tail:D66
5. Mix water
Lead:
Tail:
Solution - Example 2
D20
: 831 sks x 94 x 0.08
= 6249 lbs
D109
: 831 sks x 0.05 gals/sk
= 41.5 gals
D80
: 831 sks x 0.1 gals/sk
= 83.1 gals
Total fluid = 124.6 gals
: 250 sks x 94 x 0.3
= 7050 lbs
D81
: 250 sks x 0.1 gals/sk
= 25 gals
D603
: 250 sks x 0.5 gals/sk
= 125 gals
Total fluid = 150 gals
Solution - Example 2
z
6. Displacement
14230ft' x 0.0371 bbl/ft
= 527.9 bbl
Lead
Tail
: 270 bbls :
: 65.7 bbls :
5 bpm
Plugs
Displacement 527.9 bbls
Safety Margin
7 bpm
38.5
13.1
min
:
:
7 bpm
:
Min TT is 3 hrs 16 min
min
10
75
min
60
min
min
Job Pressures
z Example No 1
13 3/8" , 68 lbs/ft
2900'
end of Job
69 Single Stage Cementing
9300'
3
4
13 3/8" , 68 lbs/ft
2900'
9300'
3
4
13 3/8" , 77 lbs/ft
Mud @ 11.3 ppg
1
2100
9480'
3
4
9 5/8", 40 lbs/ft
12 1/4" OH
9900'
Tail Slurry @ 15.8 ppg
9980'
Capacities
Csg/OH Ann = 0.0558 bbls/ft
Csg/Csg Ann = 0.0564 bbls/ft
9 5/8 Csg cap (40 #/ft) = 0.0758 bbls/ft
Tail volume = Vol of Shoe track
+ Vol outside csg (with XS)
= 0.0758 x (9980 - 9900)
+ 0.0558 x (9980 - 9480) x 1.10
= 6.06 + 30.69 = 36.75 = 37 Bbls
= 206.3 cuft
Lead volume = Vol in Csg/OH Ann (with XS)
+ Vol in Csg/Csg Ann
= 0.0558 x (9480 - 3150) x 1.10
+ 0.0564 x (3150 - 2100)
= 388.53 + 59.22 = 447.75
= 448 Bbls
= 2514.04 cuft
13 3/8" , 77 lbs/ft
Mud @ 11.3 ppg
1
2100
9480'
3
4
9 5/8", 40 lbs/ft
12 1/4" OH
9900'
Tail Slurry @ 15.8 ppg
9980'
Capacities
Csg/OH Ann = 0.0558 bbls/ft
Csg/Csg Ann = 0.0564 bbls/ft
9 5/8 Csg cap (40 #/ft) = 0.0758
bbls/ft
Displacement volume = Csg Vol to
float
collar
= 0.0758 x 9900
= 750 Bbls
Differential pressure at end of Job :
= Hydrostatic of Lead and tail cement
columns + Hydrostatic of wash +
Hydrostatic of remaining mud in
annulus LESS Hydrostatic of
displacing fluid + Hydrostatic of Tail
cement in shoe joint
13 3/8" , 77 lbs/ft
Mud @ 11.3 ppg
1
2100
9480'
3
4
9 5/8", 40 lbs/ft
12 1/4" OH
9900'
Tail Slurry @ 15.8 ppg
9980'
Capacities
Csg/OH Ann = 0.0558 bbls/ft
Csg/Csg Ann = 0.0564 bbls/ft
9 5/8 Csg cap (40 #/ft) = 0.0758
bbls/ft
Height of Chemical wash in Csg/Csg
Ann
= 50 / 0.0564
= 886 ft
Height of Tail = 9980 - 9480 = 500 ft
Height of Lead = 9480 - 2100 = 7380 ft
Height of Chem Wash = 886 ft
Remainder is Mud behind casing
= 9900 - (420 + 7380 + 886)
= 1214 ft
13 3/8" , 77 lbs/ft
Mud @ 11.3 ppg
1
2100
9480'
3
4
9 5/8", 40 lbs/ft
12 1/4" OH
9900'
Tail Slurry @ 15.8 ppg
9980'
13 3/8" , 77 lbs/ft
Mud @ 11.3 ppg
1
2100
9480'
3
4
9 5/8", 40 lbs/ft
12 1/4" OH
9900'
Tail Slurry @ 15.8 ppg
9980'