SL.

N
O

ACTIVITY

SEPTEMBER'14
8

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

SL.N
O
1

ACTIVITY

Column Alignment, Levelling & Grouting works (Grid AB-AE / A11A14)

1.1 Column Levelling & Alignment


1.2 Frame Bolting
1.3 Grouting
2

Column Alignment, Levelling & Grouting works (Grid AB-AE / A9A11)

2.1 Column Levelling & Alignment


2.2 Frame Bolting
2.3 Grouting
3.0 Crane Beam Erection(Grid AB-AE/A9-A11)

4
4/9

3.1 Crane Beam (24 m Length ) - LDN & LDS (Grid AC-A11-A13)
1

Delivery / Shifting to Site Location

Assembly of Crane Beam

Lifting / Erection

3.2 Crane Girder - (12m Length) (Betn.Grid AB-A11-13 & AE /A11-A13)


1

Delivery / Shifting to Site Location

Lifting / Erection

3.2 Crane Girder - (12m Length) (Betn.Grid AB-AE- A13-A14)


1

Delivery / Shifting to Site Location

Lifting / Erection

SEPTEMBER'14
8

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

10
8/9
9/9

10/9
7
11/9

7
12/9

9/9

10/9
11/9

13/9
15/9

16/9

2 nos / 6 members

4 nos

6 nos
6 nos

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30