SL.

NO
1

ACTIVITY

SEPTEMBER'14
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Column Alignment, Levelling & Grouting works (Grid


AB-AE / A11-A14)
4

1.1 Column Levelling & Alignment

10

4/9

8/9

1.2 Frame Bolting

9/9

10/9
7

1.3 Grouting
2

11/9

12/9

Column Alignment, Levelling & Grouting works (Grid


AB-AE / A9-A11)
4

2.1 Column Levelling & Alignment

9/9

2.2 Frame Bolting

10/9
11/9

13/9

2.3 Grouting
3.0 Crane Beam Erection(Grid AB-AE/A9-A11)

15/9

16/9

3.1 Crane Beam (24 m Length ) - LDN & LDS (Grid AC-A11-A13)
1

Delivery / Shifting to Site Location

Assembly of Crane Beam

Lifting / Erection

2 nos / 6 members

3.2 Crane Girder - (12m Length) (Betn.Grid AB-A11-13 & AE /A11-A13)


1

Delivery / Shifting to Site Location

Lifting / Erection

4 nos

3.2 Crane Girder - (12m Length) (Betn.Grid AB-AE- A13-A14)


1

Delivery / Shifting to Site Location

Lifting / Erection

6 nos
6 nos