Composite Job Pack

REVISION DESCRIPTION SHEET



REV.

PARA.

REVISION DESCRIPTION

Issued for Comment


Approved For Construction


1.1

Revised to include P&IDs for Isolation Sequence


,

Re-issued Approved for Construction

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 2 of 42

Composite Job Pack

TABLE of CONTENTS
1.0

2.0

3.0

SCOPE OF WORK
1.1

Introduction

1.2

Scope

1.3

Project Specific Requirements

1.4

Scaffolding

LIST OF REFERENCE DOCUMENTS


2.1

TCO Specifications

2.2

TCO Procedures

2.3

General

2.4

National Standards and Codes

ATTACHMENTS

ATTACHMENT A

Project Drawings / Vendor Drawings

ATTACHMENT B

TCO Standard Drawings

ATTACHMENT C

Index for Scope of Work

ATTACHMENT D

Turnover Status Report

ATTACHMENT E

Purchase Orders / Material Requisitions / MWRs

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 3 of 42

Composite Job Pack

1.0

SCOPE OF WORK
1.1

INTRODUCTION
The scope of the Plant Firewater Upgrade Project includes the replacement of all
valves, hydrants and monitors in the Tengiz plant firewater system, including all the
associated pipework and pipe-laying, destruct of existing hydrant and monitor pits,
construction of precast concrete chambers and repairs to valve pits.
The scope of work in this Job Pack comprises the following:
Area
Item

OBH FW
TANKS

Isolation Area:
17/18-07

Specific
Clauses

Total
Number

1.2.4

Hydrant/Monitor Pits

1.2.4 & 1.2.5

Monitors

1.2.4 & 1.2.5

Valve Pits

1.2.6

Direct Buried Valves

1.2.7

Hydrant Pits

Identifier

Old
Identifier

VP-283

Isolations for all Job Packs within the Old Boiler House Area (17/18 Area) are to be
determined on site, in strict accordance with the Switch-Over Philosophy document
PHL-056-07-B-0100. To assist with the determination of isolations a set of P&IDs
is attached, marked up with a series of isolations for the valves and hydrants in this
job pack. In general these isolations must be carried out in the step by step
sequence indicated by the P&ID sheets.
Work sequence of Job Packs should generally be in numerical order, from Isolation
Area 17/18-01 to 17/18-16. There are no Civil Job Packs for Isolation Areas 17/1803, 17/18-06, 17/18-08, 17/18-13 and 17/18-14 but there are Piping Job Packs for
Isolation Areas 17/18-03, 17/18-13 and 17/18-14.
Contractor should note that the existing chambers are not water-tight and are
currently full of water due to leakage through the chamber walls and/or from pipe
work.
It is a requirement that all new Hydrant and Monitor chambers be watertight. This
will be determined by visual inspection one week after dewatering is turned off.
Water on any concrete surface sufficient to wet tissue paper will constitute failure.

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 4 of 42

Composite Job Pack

1.2

SCOPE
This scope of work shall be read in conjunction with the TCO Project Drawings and
the documentation referenced in Section 2 of this scope of work, as well as revision
3 of Addendum to Standard Job Pack for all disciplines FE-A-JP-0001. By
reference hereinafter, these drawings and documentation form an integral part of
the WORK to be performed by the CONTRACTOR. All construction and piping
materials will be free-issued to Contractor.
CONTRACTOR shall determine his own sequence of working, and reflect this in
his method statements. Method Statement for the Job Pack shall be approved by
PFU Construction Manager Rob Winfield/Sultanbek Shalov prior to works start.
All construction activity will be executed in accordance with COMPANY
specifications, RoK legislation and applicable national and international standards.
It is the CONTRACTORS responsibility to ask COMPANY to provide any relevant
COMPANY standards, specifications or other documents relevant to the works
which have not been submitted or received by the CONTRACTOR. Non-receipt of
any relevant COMPANY documentation is not an acceptable excuse for noncompliance.
Construction within the RoK territory is governed by legislation concerned with
ensuring the provision of a safe working environment. Consent from State bodies
is to be sought and received where necessary to ensure compliance with state
requirements in the field of Safety.
The scope of work shall essentially comprise the following:

1.2.1

Preparatory Work - General


CONTRACTOR shall carry out the following preparatory and enabling works at
each location. All inspection packages and CQI Packages are to be prepared in
advance, prior to the start of the construction activities. A Request For Inspection
(RFI) will be submitted 24 hrs in advance, to allow the TCO Inspectors to review
the inspection package prior to the inspection hold point:
1. Obtain all necessary permits before commencing work;
2. Comply with all TCO Safety Measures and Safety Procedures;
3. Prepare the QA/QC inspection packages related to the specifics of the job. The
work start will not be approved before COMPANY Site Representative (QA/QC
Manager) confirms that the CONTRACTOR is ready to proceed with the
construction activities.
4. Prepare method statements requirements. Shoring and excavation methods will
be defined by construction contractor for approval of COMPANY Site
Representative;
5. Prepare an isolation plan to carry out all the piping activity as per COMPANY
requirements.
6. Contactor must submit his temporary works design, with calculations, for
approval by COMPANY prior to commencing each excavation. Shoring of
excavations adjacent to roads must be designed for a surcharge of 15kN/m
and encroachment into the road must be kept to a minimum;
7. Fabricate precast concrete units. Units MUST be manufactured under
controlled conditions in a precasting yard, in full compliance with TCO
specifications and procedures. Precast concrete cover slabs and chamber

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 5 of 42

Composite Job Pack

walls must be cast with flat surfaces for correct seating between cover slab and
top of wall. Tolerance for twist or deviation in level is 3mm over the length or
width of the cover slab or wall. Tolerance for local projections is 1mm.
8. Coat the external faces of all below-ground precast concrete, including the
underside of the base, with 3 coats of modified bitumen to give a total thickness
of 1 mm;
9. Fabricate steel ladders and fixing brackets in accordance with project drawings
and M-ST-2002, including preparation of shop fabrication details if required.
Hot dip galvanise all items.
10. Fabricate pipe spools as required and perform the tests and inspection as per
TCO specification L-ST-2007.
11. Welding Procedure Specification (WPS) shall be in accordance with TCO
Welding Procedure Selection Spreadsheet for KTL pipe classes. For 150HDPE
and 150B901 classes the Bonding Procedure Specification (BPS) shall be in
accordance with ASME B31.3.
1.2.2

Preparatory Work High Density Polyethylene (HDPE) Chambers


CONTRACTOR shall carry out the following preparatory work on the HDPE
Chambers in an approved location remote from the work site so that on-site
activities are minimized.
1. Receive HDPE chamber from the warehouse. Thoroughly inspect for any
damage and ensure that all HDPE welded joints are complete and water-tight.
Any defects are to be reported to TCO QA/QC Inspector so that appropriate
reparation can be made prior to preparatory works starting.
2. Stand the chamber upright on a sand bed, set at a small angle to achieve
45mm slope in the floor. Internally install reinforcement for floor and shuttering
for drainage sump. Cast concrete using self-leveling concrete with a plasticizer
additive. The upper surface of concrete should be horizontal and smooth;
trowelled if necessary. When hardened, remove shuttering from drain sump.
3. Re-set chamber vertically on sand bed. (The inner concrete floor will now have
the requisite slope towards the drain sump). Fix reinforcement and shuttering
for internal thrust block, including any cast in items, and cast concrete.
4. Install external reinforcement around chamber. Install circular shuttering
around chamber and fix lifting sockets. Install shuttering around openings in
roof for pipe entries and manhole cover and provide temporary support to the
roof top plate. Cast concrete to sides and cover slab. Top surface to be
trowelled smooth with 25mm chamfer to edges.
5. When concrete has hardened, remove shuttering. Apply epoxy paint to top
surface and down sides to 200mm below top of concrete.
6. Paint 3 coats of bitumen externally onto bottom and vertical sides up to 125mm
below top of concrete, to give 75mm overlap with epoxy.
7. Check location for valve extension spindle and cut HDPE pipe to suit.
Electrofusion weld stub flange with backing ring.
8. Install Isolation valve without spindle and housing. Install pipe fittings and pipe
supports.
9. Install valve extension spindle with housing and adjust positioning to align with
holes in the cover slab. Install hydrant in Hydrant and Hydrant Monitor
chambers;

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 6 of 42

Composite Job Pack

10. Test all pipework;


11. Install permanent dewatering pipe, including fixings to wall and quick coupling
unit;
12. Encase cover slab penetrations in EMACO R101 and seal with Thioflex, as
shown on the drawings; Install cast iron manhole cover frame, bedded in
EMACO R101.
13. Install 100mm thick closed-cell polystyrene layer to the internal roof of chamber.
1.2.3

General Construction Work


HOLD POINT: Before any specific work start CONTRACTOR shall verify that the
inspection QA/QC package is prepared according to the specific activity ready to be
used by the CONTRACTOR during each stage of the specific job.
At each site CONTRACTOR shall carry out the following work:
1. Divert Plant roads, as agreed with TCO, to provide safe working space around
excavations. Erect barriers and diversion signage as required to effect these
diversions;
2. Erect temporary barriers around the construction site. Barriers around
excavations to be at least 1m from excavation edges. Where barriers restrict
access to equipment and stairways, Contactor is to provide alternative access,
including scaffold stairways, as necessary and agreed by TCO Operations.
Mitigate the works site safety conditions once the works has started in order to
take precautions whenever the new unsafe condition occurred (Example:
Excavated trench shall be barricaded accordingly).
3. Provide support to TCO Operations for isolation of the fire water ring main and
provide all labour. Work to include: making site area safe; extracting water from
chambers and maintaining pumps during the works, disposal of water, provision
of safety equipment for chamber entry (tripod, harnesses, gas testing meters,
lights, etc.);
4. Confirm that the pipework to be replaced is properly isolated, in accordance
with the marked-up P&ID attached to this Job Pack and per the isolation
procedure developed and approved by the TCO Operations Superintendant.;
5. In paved areas break back paving to cut edges. In concrete paving break back
to saw-cut edges or construction joints. Form local penetrations for wellpointing, as required;
6. Install well-points and bring the water table down to at least 500mm below the
founding level of any new chamber and bottom of pipe trenches. This level to
be maintained until completion of backfilling. Excavations must be kept free of
water at all times;
7. Carry out exploratory hand excavations to determine the location of
underground services. Confirm the location of the new chambers with TCO
Construction Representative after all services have been located. Hydrants
must be located no more than 2.5m behind the road kerb or other hardstanding.
8. Excavate using trench sheeting or other approved shoring method. Excavation
in the vicinity of buried services must be carried out by hand;
9. Stockpile excavated material for future use, using sheets and barriers to avoid
cross contamination. Immediately arrange for testing of excavated material by
TCO Ecology Group. Remove all unsuitable or contaminated excavation

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 7 of 42

Composite Job Pack

material, and any surplus material, and dispose of in accordance with the
COMPANY representatives instructions to a designated COMPANY site.
Provide replacement fill material if required;
10. Remove redundant pipework and blank off unused branches. Break down and
remove abandoned chambers, all as described in the destruct drawings;
1.2.4

HDPE Hydrant, Monitor and Hydrant/Monitor Chamber Construction


At each HDPE hydrant or monitor chamber site CONTRACTOR shall carry out the
following work:
1. Compact the ground under the base of the new chamber. Place and level
50mm of fine sand. Install the precast chamber unit, bedded on sand, with the
unit truly plumb;
2. When required, cut and install a new Tee into the firewater main to suit the
location of the new chamber;
3. Lay pipe to the new chamber as described in the detail drawings. Adjust the
level as necessary using a pair of bends and/or rotating the pipe, and complete
the tie-in.
4. Fix insulation board around the outside of the chamber to a depth of 1.5m
below finished ground level. Fit insulation board plug inside the manhole
opening.

1.2.5

Monitor Pad Construction


For each monitor CONTRACTOR shall also carry out the following work:
1. Lay carbon steel pipe from the monitor chamber to the location of the new
monitor and test pipework;
2. Upon completion of backfilling to the monitor chamber and pipeline, excavate
for monitor pads, compact existing ground and place geotextile. Place and
compact 6FA in 150mm layers;
3. Place blinding concrete and polyethylene sheet. Construct concrete monitor
pad in accordance with Q-ST-2020, including test cubes and concrete
protective coatings;
4. Install monitor and pipe support, fixed to concrete pad with resin anchors.

1.2.6

Valve Chamber Construction


At each valve chamber site CONTRACTOR shall carry out the following work:
1. Remove the precast cover slab and dispose of off-site as directed by
COMPANY;
2. Pump out all water from the valve chamber and dispose of water at locations
agreed with COMPANY
3. Wash out the chamber with a pressure hose to remove slime and silt from the
pipework and concrete.
4. Cut away existing ladder. Cut fixings back to at least 25mm below concrete
face and repair concrete with concrete repair mortar.
5. Verify the dimensions of the pit and external pipes before fabricating any piping
spools.

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 8 of 42

Composite Job Pack

6. Fabricate inspect and test where able, pipe spools and assemblies as required.
7. Remove the existing valves and pipework as described in destruct piping detail
drawings.
8. Cut existing pipes outside the chamber where described in destruct piping detail
drawings then break out and remove the cast-in pipe sections;
9. Locate new pipe sections with thrust arrestors and stub flanges so that the
thrust arrestors are approximately central in the wall and stub flanges are
correctly located in relation to the new valves and pipework.
10. Cast mass concrete plinths as required under pipe supports
11. Install Isolation valves without spindle and housing. Install spacers, pipe spools,
pipe fittings and supports including two-piece spilt backing ring to existing castin stub flanges.
12. Complete external pipe joints;
13. Carry out Test on all pipework;
14. Apply two rings of hydrophilic sealant around the cast-in pipe sections and
around the cutout concrete faces and cast in the pipes using C25 concrete;
15. Thoroughly clean the top surface of chamber walls and break off any damaged
concrete. Fix shuttering around top of wall. Apply BASF EMACO bonding
agent and pour layer of C25 concrete to achieve a smooth level surface.
Concrete thickness to be between 50mm and 150mm. Check smoothness of
finished concrete and grind off any projections more than 2mm. Check the
surface for deviation from true and apply epoxy mortar if necessary to meet the
required tolerance. Tolerance for deviation in plane is 3mm over the length or
width of the chamber. If existing tops of walls are found to be within tolerance
then application of C25 concrete layer may be omitted but height of precast
access rings will then need to be increased to compensate.
16. Install new precast cover slab, bedded on sealant strips as shown on the
drawings;
17. Install valve extension spindles with housings and adjust positioning to align
with holes in cover slab;
18. Install permanent dewatering pipe, including fixings to wall and quick coupling
unit.
19. Install precast access rings as required, bedded on Concresive 1418(T)
Polyester Resin Bedding Mortar. Install cast iron manhole cover frame, bedded
in Concresive 1418(T). Fill manhole cover with concrete;
20. Install new fabricated steel ladder, adjusting fixing brackets as required to
achieve vertical installation. Make good any damage to galvanizing with zinc
rich paint. Ladder installation shall be SID compliant as far as practicable.
Note: maximum depth from top of chamber to first rung is not to exceed
500mm.
21. Encase dewatering pipe and valve spindle housing penetrations in R101
Concrete Repair Mortar.
22. For valve chambers in the road, install surface boxes, supported on mass
concrete and bedded in Concresive 1418(T), all as shown on the drawings;
23. Fix insulation board to the underside of cover slab and around the outside of the
access shaft and chamber to a depth of 1.5m below ground. Fit insulation board
plug inside the manhole opening,;
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 9 of 42

Composite Job Pack

1.2.7

Direct Buried Valves


At each direct buried valve site CONTRACTOR shall carry out the following work:
1. Remove the existing valve and cut back the pipework as shown in destruct
piping detail drawings.
2. Prepare ground and cast reinforced concrete base and mass concrete plinth for
the new valve;
3. Complete connections to existing pipe and install isolation valve complete with
spindle extension and housing.
4. Carry out tests on all pipework.

1.2.8

Reinstatement
Upon completion of testing and the acceptance of the work by the COMPANY Site
Representative, CONTRACTOR shall carry out the following:
1. Backfill with selected excavated material, supplemented by material from
COMPANY if necessary, compacting in layers to achieve 95% Proctor value;
2. Reinstate roads, paved areas, filter drains etc as per existing;
3. Apply epoxy paint to exposed concrete surfaces and to buried sides of concrete
to a depth of 150mm.
4. At each Hydrant installation lay compacted granular hard-standing surfaces as
required to achieve a minimum of 10m of hard-standing either side of the
hydrant;
5. Install bollards as shown on the drawings;
6. Install new identification sign board, provided by TCO;
7. Install handwheel to valve spindle where required.
8. In the event of a leak into the chamber being detected, carry out remedial works
as directed by COMPANY representatives;
9. Remove from site all temporary works and unused materials.
10. Collate all Quality Assurance data and issue QA Report immediately on
completion of works to allow rapid re-commissioning of the firewater system.

1.2.9

General Scope
All water removed from within the chambers and any water from well-pointing or
dewatering operations must be transported to a suitable location and disposed of
correctly, as instructed by the COMPANY Site Representative.
Contractor shall maintain a clean and tidy site.

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 10 of 42

Composite Job Pack

1.3

PROJECT SPECIFIC REQUIREMENTS

1.3.1

NATURE USE PERMIT (Emission Payments)

A) Unless otherwise notified during the bid process, TCO requests the Contractor to
use his Republic of Kazakhstan (RoK) approved Nature Use Permit (NUP) covering
the current calendar year estimated emissions. In compliance with this NUP, the
Contractor is responsible for payment of any fees associated with emissions
generated during the execution of a TCO project. All costs related to late payment
penalties or interest is for Contractor's account.
B) Some TCO projects will require the Contractor to apply for a project specific RoK
NUP. When applicable, the Contractor will be notified during the bidding process,
either by specific instructions in the Job Packs, or other written communication, that
a Project specific RoK NUP is required to execute the Project. In these instances,
the Contractor shall submit documentation of their Project specific RoK NUP to the
TCO Construction Engineer prior to the start of work. Contractor shall provide
proof of fee payment(s) at the end of the project, and prior to submitting final
invoice for works completed. All costs related to late payment penalties or interest
is for Contractor's account.
1.3.2 COMMUNICATION
TCO PFU Project Representatives for all communications shall be:
Construction Interface Engineer
Damir Okashev
PSN KazStroy
Dostyk Plaza
46 Satpayeva St
Atyrau, Republic of Kazakhstan
060011
Tel #: (8)712 302 1204
E-Mail: doap@tengizchevroil.com
TCO Construction Manager
Sultanbek Shalov/Rob Winfield
TCOIB-NCC-PFU, office 15
Tengiz, Atyrau, Republic of Kazakhstan
060002
Tel #: (8)712 302 4528
E-Mail: pfucman@tengizchevroil.com
CONTRACTOR shall designate, in a similar fashion, a contact representative
for technical supervision and communication.
Please refer to TCO Project Number X-000-056-07 in all communications to
ensure proper routing to the responsible parties.

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 11 of 42

Composite Job Pack

1.4

TEMPORARY WORKS

1.4.1

CONTRACTOR shall supply, erect, maintain and dismantle and remove from
site upon completion all scaffolding needed to perform the work. All scaffolding
materials shall comply with the requirements of TCOs Safety Instruction SI-152
Working at heights.

1.4.2

CONTRACTOR shall supply, operate, maintain and remove from site upon
completion of the works all well-pointing and dewatering equipment.

1.4.3

CONTRACTOR shall supply, operate, maintain and remove from site upon
completion of the works all equipment necessary to remove water from within
the existing chambers and keep them clear of water throughout the works.

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 12 of 42

Composite Job Pack

2.0

LIST OF REFERENCE DOCUMENTS

FE-A-JP-0001

2.1

Addendum to Standard Job Pack for All Disciplines

Latest

TCO SPECIFICATIONS

Specification No.

Title

A-ST-2005

Galvanizing

L-ST-2001

Underground Firewater Ring Main and


Underground Foam Concentric Ringmain

L-ST-2003

Piping Material Classes

L-ST-2004

Piping Fabrication

L-ST-2007

Piping Installation and Testing

L-ST-2010

Pipe Support Standards

L-ST-2014

Piping Tie-ins

L-ST-2025

Specification for Piping Standard Details

M-ST-2002

Structural Steelwork Design and


Fabrication

M-ST-2003

Structural Steelwork Erection

Q-ST-2016

Structural Design Criteria

Q-ST-2020

Plain and Reinforced Concrete and Grouts

S-ST-2001

Specification for Construction


of Underground Services

S-ST-2002

Earthworks

S-ST-2003

Roads and Paving

S-ST-2004

Specification for Fencing

W-ST-2000

Welding, PWHT and NDE of Piping

X-ST-2000

Paint and Protective Coatings

2.2

Rev. No.

TCO PROCEDURES

Document No.

Title

Rev. No.

PRO-056-07-A-0215

PFU Mechanical Completion Checklist Procedure

PRO-056-07-A-0140

PFU Turnover Work Process Procedure

PRO-056-07-A-0182

PFU Red Line As-Built Procedure

PRO-056-07-A-0153

PFU Project Site Engineering Query Procedure


(SEQ)

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 13 of 42

Composite Job Pack

X-000-L-PRO-0001

Procedure for hydrostatic testing of piping system

Q001

Documentation Requirements for welding ,PWHT


and NDE of piping
Qualification of welders

Receipt Inspections, Storage, Handling and


Control of Project Material
TCO Safety instruction Crane, Lifting & Rigging
Operations
TCO Welding Procedures Selection Spreadsheet
For KTL Pipe Classes
Construction Quality Program. Section 1-Quality
Program Elements.
Construction Quality Program. Section 2-Standard
Work. Processes
Construction Quality Program. Section 3Inspection and Test Plans.

Q002
Q003
TCO-SI-119
____
056-07-PRG-A-0001
056-07-PRG-A-0002
056-07-PRG-A-0003

2.3

2009
Feb
2010

GENERAL

Document No.
A-ST-2008
A-ST-2010
TSID
O-ST-2011
RPT-056-07-A-0051
RPT-056-07-S-0014

2.4

Title

Rev. No.

Basic Engineering Data


Safe Operations Procedure for the Issue and
Receipt of Bulk Materials in the TCO Gravel Yard
TCO Safety in Designs Handbook
Safety in Design Checklist
Waste Management Plan
Reclamation Package for the Lands Disturbance

1
2
4
0

NATIONAL STANDARDS AND CODES

Document No.
SN RK 1.03-14-2011
SN RK 1.03-00-2011

SNIP RK 2.02-05-2009
SNIP RK 5.04-18-2002
SNiP RoK 4.01-02-2009
RDS RoK 2.02-18-2005

Title

Rev. No.

Occupational Safety and Health Protection in


Construction Industry
Construction Operations. Organization of
Construction of the Enterprises, Buildings and
Structures
Fire Safety of Buildings and Constructions
Steel structures. Fabrication and commissioning
works
Water supply, external networks and facilities
Designing of firefighting system for TCO objectoriented development

Latest
Latest

Latest
Latest
Latest
Latest

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 14 of 42

Composite Job Pack

3.0

ATTACHMENTS

ATTACHMENT "A"
Project Drawings (For Construction)
JPK-056-07-Q-0794
Drawing No.

Rev
No.

Drawing Title

O-3000-S-5048
O-3000-Q-5120
O-3000-Q-5121
O-3000-Q-5122
O-3000-M-5171

X-000-Q-5117
X-000-Q-5120
X-000-Q-5144
X-000-Q-5152

0
0
0
0
0

SITE PLAN VP-283 LOCATION PLAN


FOUNDATION LAYOUT VP-283 GENERAL ARRANGEMENT
FOUNDATION LAYOUT VP-283 COVER SLAB GA
RC DETAILS FOUNDATIONS VP-283 COVER SLAB
STRUCTURAL STEELWORK DETAILS LADDER DETAILS VP-283

2
1
0
1

FOUNDATION LAYOUT TYPICAL VALVE PIT DETAILS


FOUNDATION LAYOUT TYPICAL BOLLARD DETAILS
FOUNDATION LAYOUT PRECAST CONCRETE UNIT TYPE `C'
FOUNDATION LAYOUT PRECAST CONCRETE UNIT TYPE `L'

X-000-M-5065

STRUCTURAL STEELWORK DETAILS TYPICAL SUCTION PIPE


FIXING BRAKETS

X-000-S-5075

X-000-S-5076
X-000-S-5077

0
0

UNDERGROUND SERVICES LAYOUT TYPICAL PIPE LAYING


DETAILS
ROAD AND PAVING LAYOUT EARTHWORKS FOR CHAMBER
ROAD AND PAVING LAYOUT EARTHWORKS AND ROAD
REINSTATEMENT

O-3000-L-5317
L-SK-7479
O-3000-L-5437

0
0
0

PIPING DETAILS VALVE PIT VP -283


PIPING DETAILS EXISTING VALVE DESTRUCT
PIPING MATERIAL TAKE OFF

For Information
Drawing No.
Marked up P&ID
(Attached to this
document)
PLL-056-07-B-0026

Rev. No.

Drawing Title

LINE LIST

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 15 of 42

Composite Job Pack

ATTACHMENT "B"
TCO Standard Drawings
Drawing No.
M-ST-5031
M-ST-5032
M-ST-5036
M-ST-5037
M-ST-5038
Q-ST-2002
L-ST-2010

Rev. No.
0
1
1
1
1
0
5

Drawing Title
Specification. Typical symbology for welding
Structural steelwork layout. Design standards ladder and
stairways.
Structural steelwork layout. Ladder details. Sheet 1 of 3
Structural steelwork layout. Ladder details. Sheet 2 of 3
Structural steelwork layout. Ladder details. Sheet 3 of 3
Typical Road Details
Standard Pipe Supports

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 16 of 42

Composite Job Pack

ATTACHMENT "C"
Index for Scope of Work

NOT USED

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 17 of 42

Composite Job Pack

ATTACHMENT "D"
Turnover Status Report
-

NOT APPLICABLE

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 18 of 42

Composite Job Pack

ATTACHMENT "E"
Purchase Orders / Material Requisitions / MWRs
PO / MR No.

Title / Description

Date in
Tengiz

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 19 of 42

Composite Job Pack

List of Civil/Structural Materials for Valve Pit


#

ITEMS

JPK-056-07-Q-0794
UNIT

TOTAL

COVER AND FRAME: ELKINGTON GATIC D400 TYPE M


750x600 CLEAR OPENING

EA

PIPE: 3" DIA. GALV. CS

4.5

PIPE: 3" DIA. GALV. CS 90 DEGREE BEND

EA

PIPE: 4" DIA. SCH. 40 CS

HOSE CONNECTION: GALV. 'FAST' TRUCK

EA

FLAT: 25x3 GOST 103-76

10 FLAT: GALV. 40x4 GOST 103-76

1.5

11 FLAT: 50x14 GOST 103-76

13 FLAT: 110x10 GOST 103-76

1.5

14 ANGLE : 160x100x10 GOST 8510-86

15 BOLT: M10x25 WITH WASHER & NUT

EA

16 BOLT: M16x40 WITH WASHER & NUT

EA

12

17 BOLT: HILTI HAS-F M10x68

EA

18 BOLT: HILTI HAS-F M16x140

EA

19 BOLT: HILTI HRD-SRT 10x60/10

EA

33 LIFTING SOCKETS: HALFEN PA8 36125

EA

34 LIFTING LOOP: HALFEN PX36

EA

35 SEALING CAPS: HALFEN PR36

EA

40 REINFORCEMENT: R6 MILD STEEL

43 REINFORCEMENT: T10 HIGH YIELD

8.5

45 REINFORCEMENT: T16 HIGH YIELD

175.5

46 REINFORCEMENT: T20 HIGH YIELD

13

48 CONCRETE: STRUCTURAL C25

M3

52 FILL: 20/40 GRAVEL

M3

3.5

54 MORTAR: BASF EMACO R101

KG

24

55 MORTAR: BASF CONCRESSIVE 1418

KG

120

12

60 GEOTEXTILE: TERRAM 1000

M2

61 POLYTHENE: 1000 GAUGE

M2

62 INSULATION: POLYSTYRENE CLOSED CELL 100 THICK.

M2

3.5

EA

59 BITUMEN: BASF MASTERSEAL 420

63

INSULATION: POLYSTYRENE CLOSED CELL


750x600x250 THICK. PLUG

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 20 of 42

Composite Job Pack

65

ADHESIVE: UNIBOND NO MORE NAILS ALL WEATHER


(300ml CARTRIDGE)

EA

67 PAINT: AMERCOAT 450 BLACK (RAL 9011)

0.5

68 PAINT: AMERCOAT 450 YELLOW (RAL 1021)

78 SEALANT: CRETCO BUTYL-NEK STRIP (22x30)

24

79 REFLECTORS: RED (FOR BOLLARDS)

EA

80 REFLECTORS: WHITE (FOR BOLLARDS)

EA

88 FIXING: 10x160 STOLIT STUD WITH PLASTIC ROD

EA

77

SEALANT: FOSROC THIOFLEX 600 POLYSULPHIDE


(GUN GRADE)

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 21 of 42

Composite Job Pack

1.0

2.0

3.0


1.1

1.2

1.3

1.4


2.1

2.2

2.3

2.4

/ /

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 22 of 42

Composite Job Pack

1.0


1.1


,
,
,
,
.
:

:
17/18-07

1.2.4

1.2.4 & 1.2.5

1.2.4 & 1.2.5

1.2.6

1.2.7

K-283


( 17/18) ,
" " PHL-056-07-B0100. ,
,
. ,
, .

,
17/18-01 17/18-16.
17/18-03, 17/18-06, 17/18-08, 17/18-13 17/18-14
,
17/18 -03, 17/18-13
17/18-14.
,

/ .
,

.

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 23 of 42

Composite Job Pack

1.2



,
2 , 3
c FE-A-JP-0001.
,
.

.
,
.

/ .

,
.

,
,
.

.
,
. ,


:

1.2.1

-

.
, .
(RFI) 24 ,
:
1. ;
2.
;

3. /,
.
(
/) .
4.
;
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 24 of 42

Composite Job Pack


;
5.
;
6.
.

15/,
;
7.

.

.


.
3.
1;

8.

,
,
; 1 ;

9.
M-ST-2002, ,
, ,
. ;
10.
L-ST-2007;
11.
.
150 150901
ASME B31.3.
1.2.2 -

,
,
,

1.

.
- ,
,
. -
,
/

.

2.

,
, , 45 .

.

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 25 of 42

Composite Job Pack

.
; .
, .
3.


(
).
,
.

4.

.
.

.
.
25
.

5.

, .
200

6.

3
125 , 75

7.


.
.

8.

,
;

9.

,
;


10. ;
11. ,
;
12. EMACO R101
Thioflex , .
, EMACO R101
13. 100
.
1.2.3.
:
/

.

:
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 26 of 42

Composite Job Pack

1.

, ,
.
;

2.

.

.
,
, ,
, .


(:
);

3.



.
,
,
,
,

(, ,
, ..);

4.

, ,

,
,
;

5.


.
.

6.


500
.


.
;

7.


.
,

.
2,5 . .

8.

,

.
.

9.


,
.

. ,

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 27 of 42

Composite Job Pack


, .
;
10.


, . .
1.2.4


, /

:
1. .
50.

2. ,



;
3. , ,
, /
, ;
4.
1,5 .

1.2.5

:
1.



;
2.
,
,
. 6FA
150;
3. .

Q-ST-2020,

;
4. ,
.

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 28 of 42

Composite Job Pack

1.2.6

:
1.

-
.

2.

,
.

3.

,
.

4.

.
25 ,

.

5.

6.

7.

,
.

8.

, .

9.

-
,
,
.

10. .
11.
,
, , ,

.
12. .
13. - .
14.
,
C25 .
15.
. .
BASF EMACO
C25 .
50 150 .

2 .

, .

3.
,
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 29 of 42

Composite Job Pack

C25 ,
.
16.
, .
17.
,
,
.
18. ,
.
19.
Concresive
1418(T). , Concresive
1418(T). .
20.

,
.
.
. :

500
21.
R101.
22. , ,


Concresive 1418(T), .
23.

1.5
.

.
1.2.7

:
1. ,
.
2. ,

.
3.
.
4. .
1.2.8

:
1. ,

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 30 of 42

Composite Job Pack

. 95%
;
2. ,
.. ;

3.
150 .

4.
10 ,

5. , ;
6. , ;
7. , ;
8. ,
;

9.
;
10. , ,
,
.
1.2.9
, ,

,

.

.

1.3

1.3.1

(
)

A) ,

(), ,
.
,
,
.

.
B)
.
,
,
, ,
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 31 of 42

Composite Job Pack


. ,

.

.

.
1.3.2
:



060011,
. . , 46,

.: (8)712 302 1204
. : doap@tengizchevroil.com

/
--, 15
, ,
060002
: (8)712 302 4528
. : pfucman@tengizchevroil.com

.
X-000056-07
.

1.4

1.4.1 ,
,
,
, . ,
,
-152 .
1.4.2 ,
,

.
1.4.3 ,
,

,

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 32 of 42

Composite Job Pack

2.0


FE-A-JP-0001

2.1

A-ST-2005

L-ST-2003

L-ST-2001

L-ST-2004

L-ST-2007

L-ST-2010

L-ST-2014

L-ST-2025

M-ST-2002

M-ST-2003

Q-ST-2016

Q-ST-2020

S-ST-2001

S-ST-2002

S-ST-2003

S-ST-2004

W-ST-2000

X-ST-2000

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 33 of 42

Composite Job Pack

2.2


PRO-056-07-A-0215

PRO-056-07-A-0140
PRO-056-07-A-0182
PRO-056-07-A-0153
X-000-L-PRO-0001




(SEQ)

Q001

Q002
Q003

TCO-SI-119
____
056-07-PRG-A-0001
056-07-PRG-A-0002
056-07-PRG-A-0003

2.3

, ,
1

. , 2009


.
2010

.
1-
.
2 - . .
.
3- .


A-ST-2008
A-ST-2010

TSID
O-ST-2011
RPT-056-07-A-0051
RPT-056-07-S-0014

1
2

4
0

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 34 of 42

Composite Job Pack

2.4


K 1.03-14-2011
K 1.03-00-2 011

K 2.02-05-2009
K 5.04-18-2002
C 4.01-02-2009
2.02-18-2005

.
,

.
.

.
.

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 35 of 42

Composite Job Pack

3.0

A
( )
JPK-056-07-Q-0794

O-3000-S-5048
O-3000-Q-5120
O-3000-Q-5121
O-3000-Q-5122
O-3000-M-5171

.
0
0
0
0
0



K-283
K-283
C K-283


K-283

K-283

X-000-Q-5117
X-000-Q-5120

1
1

C
C . . .
.
C `C'
C `L'

X-000-Q-5144
X-000-Q-5152

0
1

-000-M-5065

X-000-S-5075

X-000-S-5076

X-000-S-5077



C

C

O-3000-L-5317
L-SK-7479
O-3000-L-5437

0
0
0

-283
.

(

)
PLL-056-07-B-0026

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 36 of 42

Composite Job Pack

B


M-ST-5031

.
0

M-ST-5032

M-ST-5036

M-ST-5037

M-ST-5038

Q-ST-2002
L-ST-2010

0
5


.
.
.
.
.
- . 1 3
.
- . 2 3
.
- . 3 3
.

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 37 of 42

Composite Job Pack

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 38 of 42

Composite Job Pack

D
-

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 39 of 42

Composite Job Pack

E
/ /

PO / MR

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 40 of 42

Composite Job Pack

JPK-056-07-Q-0794
.
.

4.5

10 : . 40x4 103-76

1.5

11 : 50x14 103-76

13 : 110x10 103-76

1.5

14 :16010010 8510-86

15 : 1025

16 : 1640

12

17 : HILTI HAS-F M10x68

18 : HILTI HAS-F M16x140

19 : HILTI HRD-SRT 10x60/10

33 : HALFEN PA8 36125

34 : HALFEN PX36

35 . : HALFEN PR36

40 : 6 ..

43 : 10 ..

8.5

45 : 16 ..

175.5

46 : 20 ..

13

48 : 25

52 : 20/40

3.5

54 : BASF EMACO R101

24

55 : BASF CONCRESSIVE 1418

120

59 : BASF MASTERSEAL 420

12

M2

#
2
5
6

: ELKINGTON GATIC D400


M 750x600.
: 3"

: 3" . ,
90 .

: 4" . . . 40

: 25x3 103-76

60 : TERRAM 1000

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 41 of 42

Composite Job Pack

61 : 1000

M2

M2

3.5

67 : AMERCOAT 450 (RAL 9011)

0.5

68 : AMERCOAT 450 (RAL 1021)

24

:
100
: 750x600x250 C
63
.
: UNIBOND NO MORE NAILS
65
( 300)
62

77

: FOSROC THIOFLEX 600


()

78 : CRETCO BUTYL-NEK STRIP (22x30)


: (
)
: (
80
)
:
88
10160
79

The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001

Page 42 of 42

1
2
3

LENGTH
UNIT
EA
EA
EA

1
1
4

1
1
4

1
2
3

6310110271

AFE No

07/12/2012

APPROVED FOR CONSTRUCTION

MT

MAM

SS

CW

19/11/2012

ISSUED FOR COMMENT

MT

MAM

KVR

CW

REV

DATE

DESCRIPTION

BY

CHKD

ENG

SUP

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xlsFITTINGS 14/12/2012 12:46

TENGIZCHEVROIL
PLANT FIREWATER UPGRADE PROJECT
PIPING MATERIAL TAKE OFF
(FITTINGS)

ITEM NO

STOCK
CODE

DESCRIPTION
150H04
16"x12" TEE RED. BW LTCS A420-WPL6 SCH10
16"x12" REDUCER CONC
CONC.BW
BW LTCS A420-WPL6
A420 WPL6 SCH10
12" SPADE & SPACER RF LTCS A516-70 CL150

TOTAL

ITEM
No

O-3000-L--5317

DRAWING
No

PO/PR/MR NUMBERS

MTO REV
VISION
NO

MTO REVISION NO

REV

DRAWING NUMBER

O-3000-L-5437
SHEET

of

16

STOCK
CODE

LENGTH
UNIT
EA

TENGIZCHEVROIL
0

07/12/2012

APPROVED FOR CONSTRUCTION

MT

MAM

SS

CW

19/11/2012

ISSUED FOR COMMENT

MT

MAM

KVR

CW

REV

DATE

DESCRIPTION

BY

CHKD

ENG

SUP

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xlsFLANGES 14/12/2012 12:46

ITEM NO

DESCRIPTION
150H04
12" WN FLANGE LTCS A350LF2 CL.1 CL.150 SCH 10 RF STDF B16.5, WITH JACKSCREW

MTO REV
VISION
NO

ITEM
No

O-3000-L--5317

DRAWING
No

PO/PR/MR NUMBERS

TOT
TAL

MTO REVISION NO

PLANT FIREWATER UPGRADE PROJECT


PIPING MATERIAL TAKE OFF
(FLANGES)

PROJ No

X-000-056-07

AFE No

6310110271

REV

DRAWING NUMBER

O-3000-L-5437
O
3000 L 5437
SHEET

of

16

LENGTH
UNIT

EA

ITEM NO

STOCK
CODE

DESCRIPTION

TOTAL

ITEM
No

O-3000-L-5317

DRAWING
No

PO/PR/MR NUMBERS

MTO REVISION
NO

MTO REVISION NO

150H04

12" VALVE GATE AS PER DATA SHEET DS-SP-056-07-102 C/W EXTENDED


SPINDLE 4370mm LONG FROM CENTER LINE OF VALVE TO SPINDLE HEX.
TOP. TYPE1.

X-000-056-07

PROJ No

TENGIZCHEVROIL
0

07/12/2012

APPROVED FOR CONSTRUCTION

MT

MAM

SS

CW

19/11/2012

ISSUED FOR COMMENT

MT

MAM

KVR

CW

REV

DATE

DESCRIPTION

BY

CHKD

ENG

SUP

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xlsVALVES 14/12/2012 12:46

PLANT FIREWATER UPGRADE PROJECT


PIPING MATERIAL TAKE OFF
(VALVES & SPECIALITIES)

6310110271

AFE No

REV

DRAWING NUMBER

O-3000-L-5437
SHEET

of

16

1
2

STOCK
CODE

LENGTH
UNIT
EA
EA

8
4

8
4

1
2

X-000-056-07

PROJ No

TENGIZCHEVROIL
0

07/12/2012

APPROVED FOR CONSTRUCTION

MT

MAM

SS

CW

19/11/2012

ISSUED FOR COMMENT

MT

MAM

KVR

CW

REV

DATE

DESCRIPTION

BY

CHKD

ENG

SUP

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xlsGASKETS 14/12/2012 12:46

PLANT FIREWATER UPGRADE PROJECT


PIPING MATERIAL TAKE OFF
(GASKETS)

ITEM NO

DESCRIPTION
150H04
12" GASKET SPWND 316L-FG 1/8" SSSS CL150 B16.20 B16.5 LS
12" PIKOTEK FLANGE INSULATION KIT CL.150 B16.5

MTO REVIS
SION
NO

ITEM
No

TOTAL

DRAWING
No

PO/PR/MR NUMBERS

O-3000-L-5
5317

MTO REVISION NO

6310110271

AFE No

REV

DRAWING NUMBER

O-3000-L-5437
SHEET

of

16

MTO REVI0
SION NO

LENGTH
UNIT
EA

48

48

X-000-056-07

PROJ No

TENGIZCHEVROIL
0

07/12/2012

APPROVED FOR CONSTRUCTION

MT

MAM

SS

CW

19/11/2012

ISSUED FOR COMMENT

MT

MAM

KVR

CW

REV

DATE

DESCRIPTION

BY

CHKD

ENG

SUP

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xlsSTUDBOLTS 14/12/2012 12:46

PLANT FIREWATER UPGRADE PROJECT


PIPING MATERIAL TAKE OFF
(STUD-BOLTS)

ITEM
M NO

STOCK
CODE

MTO RE
EVISION
NO

DESCRIPTION
150H04
M22x180 LG STUD-BOLT AND TWO NUTS A182 GR F55 (25%-CR. ALLOY STEEL)

TOTAL

ITEM
No

O-3000-L--5317

DRAWING
No

PO/PR/MR NUMBERS

6310110271

AFE No

REV

DRAWING NUMBER

O-3000-L-5437
SHEET

of

16

LENGTH
UNIT

EA
EA

2
2

2
2

1
2

ITEM NO

STOCK
CODE

TOTAL

ITEM
No

O-3000-L-5317

DRAWING
No

PO/PR/MR NUMBERS

MTO REVISION
NO

MTO REVISION NO

1
2

DESCRIPTION
PIPE SUPPORTS
PLATE 550x550x20mm THICK, LTCS
PLATE250 250 10
PLATE250x250x10mm
THICK
THICK, LTCS

8" PIPE LTCS A333-6 SMLS SCH 20 BBE

M20x175 LG,THREADED ROD WITH HILTI HY150 RESIN CAPSULE


ADHESIVE C/W 2 NUTS AND 2 WASHERS LTCS

EA

X-000-056-07

PROJ No

TENGIZCHEVROIL
0

07/12/2012

APPROVED FOR CONSTRUCTION

MT

MAM

SS

CW

19/11/2012

ISSUED FOR COMMENT

MT

MAM

KVR

CW

REV

DATE

DESCRIPTION

BY

CHKD

ENG

SUP

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xlsSUPPORTS 14/12/2012 12:46

PLANT FIREWATER UPGRADE PROJECT


PIPING MATERIAL TAKE OFF
(SUPPORTS)

6310110271

AFE No

REV

DRAWING NUMBER

O-3000-L-5437
SHEET

of

16

COAL TAR EPOXY (3-COATS)

LENGTH
UNIT

LITRES

4.7

ITEM NO

STOCK
CODE

DESCRIPTION
"EH" SYSTEM

MTO REVISION
NO

ITEM
No

O-3000-L-5317

DRAWING
No

PO/PR/MR NUMBERS

TAL
TOT

MTO REVISION NO

4.7

PAINT QUANTITY IS WITH 100% MARGIN

X-000-056-07

PROJ No

TENGIZCHEVROIL
0

07/12/2012

APPROVED FOR CONSTRUCTION

MT

MAM

SS

CW

PLANT FIREWATER UPGRADE PROJECT

19/11/2012

ISSUED FOR COMMENT

MT

MAM

KVR

CW

REV

DATE

DESCRIPTION

BY

CHKD

ENG

SUP

PIPING MATERIAL TAKE OFF


(PAINTING)

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xlsPAINTING 14/12/2012 12:46

6310110271

AFE No

REV

DRAWING NUMBER

O-3000-L-5437
SHEET

of

16

150H04
12" LTCS A333-6 SMLS SCH 10 BBE

. .

O-3000-L-5317

0.5

0.5

TENGIZCHEVROIL
0
A

07/12/2012
19/11/2012

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xls 14/12/2012 12:46

MT
MT
.

MAM
MAM
.

SS
KVR
.

CW
CW
.

.-..-

()

PO/PR/MR

. . .

.
. .

X-000-056-07
6310110271

O-3000-L-5437
`

9 16

1
2
3

150H04
16"x12" BW LTCS A420-WPL6 SCH10
16"x12" CONC.BW LTCS A420-WPL6 SCH10
12" RF LTCS A516-70 CL.150

. .

O-3000-L-5317

1
1

1
2
3

1
1
4

TENGIZCHEVROIL
0
A

07/12/2012
19/11/2012

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xls 14/12/2012 12:46

MT
MT
.

MAM
MAM
.

SS
KVR
.

CW
CW
.

.-..-

()

..

PO/PR/MR

. .. .

.
. .

X-000-056-07
6310110271

O-3000-L-5437

10 16

150H04
12" WN LTCS A350LF2 CL.1 CL.150 SCH 10 RF STDF B16.5, WITH JACKSCREW

. .

O-3000-L-5317
O

TENGIZCHEVROIL
0
A

07/12/2012
19/11/2012

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xls 14/12/2012 12:46

MT
MT

MAM
MAM

SS
KVR

CW
CW

.-..-

()

PO/PR/MR

. . .

.
. .

X-000-056-07
6310110271

O-3000-L-5437

11 16

12" DS-SP-056-07-102
4370mm
. 1.

. .

O-3000-L-5317

PO/PR/MR

.
. .

.
. .

150H04

X-000-056-07

TENGIZCHEVROIL
0
A

07/12/2012
19/11/2012

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xls 14/12/2012 12:46

MT
MT
.

MAM
MAM
.

SS
KVR
.

CW
CW
.

.-..-

()

6310110271

O-3000-L-5437

12 16

1
2

150H04
12" SPWND 316L-FG 1/8" SSSS CL150 B16.20 B16.5 LS
12" PIKOTEK CL150 B16.5

. .

O-3000-L-5317
O

1
2

8
4

8
4

PLANT FIRE WATER UPGRADE

TENGIZCHEVROIL
0
A

07/12/2012
19/11/2012

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xls 14/12/2012 12:46

MT
MT

MAM
MAM

SS
KVR

CW
CW

.-..-

()

PO/PR/MR

. . .

.
. .

X-000-056-07
6310110271

O-3000-L-5437

13 16

150H04
M22x180 LG A182 GR F55 (25%-CR. )

. .

48

O-3000-L-5317
O

48

TENGIZCHEVROIL
0
A

07/12/2012
19/11/2012

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xls 14/12/2012 12:46

MT
MT
.

MAM
MAM
.

SS
KVR
.

CW
CW
.

.-..-

()

PO/PR/MR

. . .

.
. .

6310110271

O-3000-L-5437

14 16

1
2
3
4


550x550x20mm THICK, LTCS
250x250x10mm THICK, LTCS
8" LTCS A333-6 SMLS SCH 20BBE
M20x175 LG, HILTI HY150
2 2 LTCS

. .

O-3000-L-5317
O

2
2

2
2

1
2
3

TENGIZCHEVROIL
0
A

07/12/2012
19/11/2012

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xls 14/12/2012 12:46

PO/PR/MR

. . .

.
. .

MT
MT
.

MAM
MAM
.

SS
KVR
.

CW
CW
.

.-..-

( )

X-000-056-07
6310110271

O-3000-L-5437

155
166

"EH"
(3-)

. .

O-3000-L-5317

4.7

4.7

PO/PR/MR

. . .

.
. .

100%

TENGIZCHEVROIL
0
A

07/12/2012
19/11/2012

O:\DCC\PSN DCC work Folder\Sholpan Work Folder\PSN-PFU-1497\Attachment A\O-3000-L-5437.xls 14/12/2012 12:46

MT
MT
.

MAM
MAM
.

SS
KVR
.

CW
CW
.

.-..-

()

X-000-056-07
6310110271

O-3000-L-5437

16 16

NOTE: 1
THE ISOLATION VALVES MARKED ARE TO IMPLEMENT
ALL REPLACEMENTS IN THE JOB PACK. REPLACEMENTS
HAVE TO BE DONE ONE BY ONE. SO THAT MINIMUM
NUMBER OF ISOLATION VALVES ARE CLOSED AT ONE
TIME.

O-3000-B-2010-05607.dgn 23/07/2012 14:17:03

NOTE: 1
THE ISOLATION VALVES MARKED ARE TO IMPLEMENT
ALL REPLACEMENTS IN THE JOB PACK. REPLACEMENTS
HAVE TO BE DONE ONE BY ONE. SO THAT MINIMUM
NUMBER OF ISOLATION VALVES ARE CLOSED AT ONE
TIME.

O-3000-B-2009-05607.dgn 18/07/2012 09:39:11

NOTE: 1
THE ISOLATION VALVES MARKED ARE TO IMPLEMENT
ALL REPLACEMENTS IN THE JOB PACK. REPLACEMENTS
HAVE TO BE DONE ONE BY ONE. SO THAT MINIMUM
NUMBER OF ISOLATION VALVES ARE CLOSED AT ONE
TIME.

O-3000-B-2015-05607.dgn 23/07/2012 14:20:58

TENGIZCHEVROIL /

PROJECT TITLE: PLANT FIREWATER UPGRADE PROJECT


:
PROJECT NUMBER / : X-000-056-07
AFE NUMBER / : 6310110271
DOCUMENT TITLE: LINE LIST (FIRE WATER SYSTEM)
: ( )
DOCUMENT NUMBER / : PLL-056-07-B-0026

02.05.2012

AFC

KU

VMM

CW

28.12.2011

Re-IFC

KU

VMM

CW

28.12.10

Re-AFD

NK

VMM

NI

4.11.10

AFD

AV

NK/ VMM

NI

15.07.10

IFRC

KU

NK / VMM

NI

REV/

DATE/

STATUS
CODE /

BY /
.

CHK/

APP/

RW
PROJ/

CONST/

MAINT/

OPS/

REVISION DESCRIPTION SHEET



REV/

PG TP

REVISION DESCRIPTION /
Issued for Review & Comments

Approved for design

Re-Approved for design

Re - Issued for Comments Phase-4
-4
Approved for construction

Re-issued approved for construction

UNIT/
.

LINE NUMBER/
NOM.BORE/
.
LINE No
SERV./

No

PIPE SPEC

OPER.TEMP./
.
FROM/

TO/

CONDITIONS/
OPER.PRESS./
DESIGN TEMP./
.
.

DESIGN PRESS./
.
INSUL.TYPE/

CONSTRUCT.
TEST/
.

NDT/
.

STRESS
RELIEF/

PAINT SYSTEM/

REMARKS

P&ID/

in/

deg C/.

bar g/()

deg C/.

bar g/()

bar g/()

3000

WF

4003

20

150H04

3000-WF-4026-20-150H04

G-106 A

+5 / +40

ATM - 1.2

-40 / +75

14.5 (Note-1)

HCW5 (Note-2/.-2)

21.75
(Note-1)

5%

NO /

CA / EH

O-3000-B-2010-05607
O-3000-B-5041

3000

WF

4004

20

150H04

3000-WF-4025-20-150H04

G-106 B

+5 / +40

ATM - 1.2

-40 / +75

14.5 (Note-1)

HCW5 (Note-2/.-2)

21.75
(Note-1)

5%

NO /

CA / EH

O-3000-B-2010-05607
O-3000-B-5041

3000

WF

4005

150H04

3000-WF-4025-20-150H04

G-105 A

+5 / +40

ATM - 1.2

-40 / +75

14.5 (Note-1)

HCW5 (Note-2/.-2)

21.75
(Note-1)

5%

NO /

CA / EH

O-3000-B-2010-05607
O-3000-B-5042

3000

WF

4006

150H04

3000-WF-4026-20-150H04

G-105 B

+5 / +40

ATM - 1.2

-40 / +75

14.5 (Note-1)

HCW5 (Note-2/.-2)

21.75
(Note-1)

5%

NO /

CA / EH

O-3000-B-2010-05607
O-3000-B-5042

3000

WF

4007

16

150H04

G-106 A

3000-WF-4022-20-150H04

+5 / +40

8 - 9.5

-40 / +75

14.5

NO/

21.75

5%

NO /

CA

O-3000-B-5041
O-3000-B-5044

3000

WF

4008

16

150H04

G-106 B

3000-WF-4023-20-150H04

+5 / +40

8 - 9.5

-40 / +75

14.5

NO/

21.75

5%

NO /

CA

O-3000-B-5041
O-3000-B-5044

3000

WF

4009

150H04

G-105 A

3000-WF-4011-6-150H04

+5 / +40

8 - 9.5

-40 / +75

14.5

NO /

21.75

5%

NO /

CA

O-3000-B-5042

3000

WF

4010

150H04

G-105 B

3000-WF-4012-6-150H04

+5 / +40

8 - 9.5

-40 / +75

14.5

NO /

21.75

5%

NO /

CA

O-3000-B-5042

3000

WF

4011

150H04

3000-WF-4012-6-150H04

3000-WF-4022-20-150H04

+5 / +40

8 - 9.5

-40 / +75

14.5

NO/

21.75

5%

NO /

CA

O-3000-B-5042
O-3000-B-5044

3000

WF

4012

150H04

3000-WF-4011-6-150H04

3000-WF-4023-20-150H04

+5 / +40

8 - 9.5

-40 / +75

14.5

NO/

21.75

5%

NO /

CA

O-3000-B-5042
O-3000-B-5044

3000

WF

4013

12, 8

150H04

3000-WF4029-16-150H04

3000-WF-4014-12-150H04

+5 / +40

8 - 9.5

-40 / +75

14.5

NO /

21.75

5%

NO /

CA

O-3000-B-5041

3000

WF

4014

8, 12

150H04

3000-WF-4013-12-150H04

3000-WF-4020-16-150H04

+5 / +40

1.0 - 2.0

-40 / +75

14.5

NO/

21.75

5%

NO /

CA / EH

O-3000-B-5041
O-3000-B-5044

3000

WF

4015

4, 3

150H04

3000-WF4011-6-150H04
3000-WF4012-6-150H04

FV-300382 A/B

+5 / +40

8 - 9.5

-40 / +75

14.5

NO /

21.75

5%

NO /

CA

O-3000-B-5042

3000

WF

4016

3, 4

150H04

FV-300382 A/B

3000-WF-4020-16-150H04

+5 / +40

1.0 - 2.0

-40 / +75

14.5

NO/

21.75

5%

NO /

CA / EH

O-3000-B-5042
O-3000-B-5044

3000

WF

4017

16

150H04

PSV-300395 A/B

3000-WF-4020-16-150H04

+5 / +40

ATM - 2

-40 / +75

14.5

NO/

21.75

5%

NO /

CA / EH

O-3000-B-5044

3000

WF

4018

16

150H04

3000-WF-4022-20-150H04

PCV-300395

+5 / +40

8 - 9.5

-40 / +75

14.5

NO/

21.75

5%

NO /

CA

O-3000-B-5044

3000

WF

4019

16

150H04

3000-WF-4023-20-150H04

PSV-300395 A/B

+5 / +40

8 - 9.5

-40 / +75

14.5

NO/

21.75

5%

NO /

CA

O-3000-B-5044

3000

WF

4020

16

150H04

3000-WF-4014-12-150H04

300-WP-1019-12-XXX
300-WE-1007-10-XXX

+5 / +40

1.0 - 2.0

-40 / +75

14.5

HCW5 (Note-2/.-2)

21.75

5%

NO /

CA / EH

O-3000-B-5044
O-3000-B-2015-05607

3000

WF

4021

16

150H04

3000-WF-4020-16-150H04

3000-WP-1014-12-XXX
300 WE 1002 10 XXX
300-WE-1002-10-XXX

+5 / +40

1.0 - 2.0

-40 / +75

14.5

NO/

21.75

5%

NO /

EH

O-3000-B-2010-05607

3000

WF

4022

20

150H04

3000-WF-4023-20-150H04

Existing FW Ring Main / TP-3027

+5 / +40

8 - 9.5

-40 / +75

14.5

NO/

21.75

5%

NO /

CA / EH

O-3000-B-5044
O-3000-B-2011-05607

3000

WF

4023

20

150H04

3000-WF-4022-20-150H04

Existing FW Ring Main / TP-3028

+5 / +40

8 - 9.5

-40 / +75

14.5

NO/

21.75

5%

NO /

CA / EH

O-3000-B-5044
O-3000-B-2011-05607

3000

WF

4024

12

150HDPE

TP-3041 / Existing FW Ring Main

TP-3042 / Existing FW Ring Main

+5 / +40

8 - 9.5

-40 / +40

14.5

NO /

21.75

100%visual

NO /

N/A

O-3000-B-2013-05607

3000

WF

4025

16, 20

150H04

TP-3001 / 300-WF-1008-16-XXX

3000-WF-4026-20-150H04

+5 / +40

ATM - 1.2

-40 / +75

14.5
(Note-1)

NO /

21.75
(Note-1)

5%

NO /

EH

O-3000-B-2010-05607

3000

WF

4026

16, 20

150H04

3000-WF-4025-20-150H04 /TP-3004

TP-3002 / 300-WF-1008-16-XXX

+5 / +40

ATM - 1.2

-40 / +75

14.5
(N t 1)

NO /

21.75
(N t 1)

5%

NO /

EH

O-3000-B-2010-05607

3000

WF

4028

16

150H04

PCV-300394

3000-WF-4037-16-150H04

+5 / +40

8 - 9.5

-40 / +75

14.5

NO /

21.75

5%

NO /

CA

O-3000-B-5044

3000-WF4013-12-150H04

+5 / +40

8 - 9.5

-40 / +75

14.5

NO /

21.75

5%

NO /

CA

O-3000-B-5041

3000

WF

4029

12

150H04

3000-WF4007-16-150H04
3000-WF4008-16-150H04

3000

WF

4030

150H04

3000-WF-4023-20-150H04

FILLING POINT FOR FIRE FIGHTING


+5 / +40

8 - 9.5

-40 / +75

14.5

HCW5 (Note-2/.-2)

21.75

5%

NO /

AD

O-3000-B-5044

3000

WF

4031

150H04

3000-WF-4022-20-150H04

FILLING POINT FOR FIRE FIGHTING


+5 / +40

8 - 9.5

-40 / +75

14.5

HCW5 (Note-2/.-2)

21.75

5%

NO /

AD

O-3000-B-5044

3000

WF

4032

150H04

3000-WF-4019-16-150H04

3000-WF-4038-3-150H04
3000-WF-4039-3-150H04

+5 / +40

8 - 9.5

-40 / +75

14.5

NO/

21.75

5%

NO /

CA

O-3000-B-5044

3000

WF

4033

8, 12

150H04

3000-WF-4013-12-150H04

3000-WF-4014-12-150H04

+5 / +40

1.0 - 2.0

-40 / +75

14.5

NO/

21.75

5%

NO /

CA

O-3000-B-5041

3000

WF

4034

150H04

3000-WF-4012-6-150H04

3000-WF-4015-4-150H04

+5 / +40

8 - 9.5

-40 / +75

14.5

NO/

21.75

5%

NO /

CA

O-3000-B-5042

3000

WF

4035

150H04

3000-WF-4015-4-150H04

3000-WF-4016-4-150H04

+5 / +40

1.0 - 2.0

-40 / +75

14.5

NO/

21.75

5%

NO /

CA

O-3000-B-5042

3000

WF

4036

16

150H04

3000-WF-4018-16-150H04

3000-WF-4037-16-150H04

+5 / +40

8 - 9.5

-40 / +75

14.5

NO /

21.75

5%

NO /

CA

O-3000-B-5044

3000

WF

4037

16

150H04

3000-WF-4036-16-150H04

3000-WF-4014-12-150H04

+5 / +40

8 - 9.5

-40 / +75

14.5

NO /

21.75

5%

NO /

CA

O-3000-B-5044

3000

WF

4038

2, 3/4

150H04

3000-WF-4032-3-150H04

HOSE REEL /

+5 / +40

8 - 9.5

-40 / +75

14.5

NO/

21.75

5%

NO /

CA

O-3000-B-5044

3000

WF

4039

2, 3/4

150H04

3000-WF-4032-3-150H04

HOSE REEL /

+5 / +40

8 - 9.5

-40 / +75

14.5

NO/

21.75

5%

NO /

CA

O-3000-B-5044

various

WF

CS spur
connections

150H04

Spur connections to Hydrants/Monitors


/

+5 / +40

8 - 9.5

-40/75

14.5

NO/

21.75

5%

NO /

AD / CA

various /

various

WF

HDPE spur
connections

150HDPE

Spur connections to Hydrants/Monitors


/

+5 / +40

8 - 9.5

-40 / +40

14.5

NO/

21.75

100%visual

NO /

NA

various /

various

WF

GRE spur
connections

150GRE /
150B901

Spur connections to Hydrants/Monitors


/

+5 / +40

8 - 9.5

-20 / +75

14.5

NO/

21.75

100%visual

NO /

NA

various /

KU
KU
NK
AV
KU
BY / .

VMM
VMM
VMM
NK/ VMM
NK / VMM
HK /

VMM
VMM
VMM
NK/ VMM
NK / VMM
ENG/

CW
CW
NI
NI
NI
SUP/

0
0
D
C
B
A
REV / .

02.05.2012
28.12.2011
28.12.10
4.11.10
15.07.10
DATE /

Approved for construction /


Re - Issued for Comments Phase-4 / -4
Re-Approved for design /
Approved for design /
Issued for Review & Comments /
DESCRIPTION/

PFU /
LINE LIST /

RW
MGR/

PROJECT No
AFE No
DOCUMENT NUMBER

X-000-056-07
6310110271
REV/

PLL-056-07-B-0026
OPER/

0
3 OF/ 4

LINE NUMBER/
UNIT/

.
SERV./
No

NOM.BORE/
.
in/

LINE No

PIPE SPEC

FROM/

TO/

OPER.TEMP./
.
deg C/.

CONDITIONS/
OPER.PRESS./
DESIGN TEMP./ .
.
bar g/()
deg C/.

CONSTRUC
NDT/
T. TEST/
.
DESIGN
INSUL.TYPE/
.

PRESS./
bar g/()
bar g/()
%

STRESS
RELIEF/

PAINT
REMARKS
SYSTEM/

P&ID/

000

WF

4016

10

150HDPE

Existing 12" FW Line

000-WF-4017-10"-150HDPE

+5 / +40

8 - 9.5

-40 / +40 (Note-3 /.-3)

14.5

NO/

21.75

100%visual

NO /

N/A

O-000-B-2001-05607

000

WF

4017

10

150HDPE

000-WF-4016-10"-150HDPE

000-WF-4018-10"-150HDPE

+5 / +40

8 - 9.5

-40 / +40

14.5

NO/

21.75

100%visual

NO /

N/A

O-000-B-2001-05607

000

WF

4018

6, 10

150H04 /
150HDPE

Existing 6" FW Line to Sulphur Pads

Existing 6" FW Line in Chemical Storage

+5 / +40

8 - 9.5

-40 / +40

14.5

NO/

21.75

5%

NO /

N/A

2-000-B-2000-05607
O-000-B-2001-05607

000

WF

4019

150H04

TP-1257

F-3209

+5 / +40

8-9.5

-40 / +75

14.5

HCW5 (Note-2/.-2)

21.75

5%

NO /

AD

0-000-B-2002-05607

000

WF

4020

12

150HDPE

TP-945/ WF001-12-150B901-NI

TP-946/ WF015-12-150B901-NI

+5/+40

8-9.5

-40 / +40 (Note-3 /.-3)

14.5

NO/

21.75

100%visual

NO/

N/A

2-000-B-2003-05607

000

WF

4021

10

150HDPE

K-134

KTL-1 / K-4

+5 / +40

8-9.5

-40 / +40 (Note-3 /.-3)

14.5

NO /

21.75

100% visual

NO /

N/A

O-000-B-2003-05607
1-000-B-2000-05607

000

WF

4022

150H04

Existing 8" FW Ringmain / TP-3080,3081

NEW UW/TW PUMP HOUSE/

+5 / +40

8-9.5

-40 / +75

14.5

HCW5

21.75

5%

NO/

AD

-000--5015

000

WF

4023

150H04

Existing 24" FW Line / TP-223A/B

Existing 8" FW Ringmain / TP-3072

+5/+40

8-9.5

-40/+75

14.5

NO/

21.75

5%

NO/

AD

O-000-B-5015

000

WF

4024

150H04

Existing 24" FW Line / TP-222A/B

Existing 8" FW Ringmain / TP-3075

+5/+40

8-9.5

-40/+75

14.5

NO/

21.75

5%

NO/

AD

O-000-B-5015

000

WF

4026

150H04

Existing 8" FW Line / TP-216

Existing 8" FW Line / TP-217

+5/+40

8-9.5

-40 / +75

14.5

NO/

21.75

5%

NO/

AD

O-000-B-5015

000

WF

4027

150H04

Existing 8" FW Line / TP-218

Existing 8" FW Line / TP-219

+5/+40

8-9.5

-40 / +75

14.5

NO/

21.75

5%

NO/

AD

O-000-B-5015

060

WF

3170

150H04 /
150HDPE

TP-1093 / 060-WF-1018-12-HDPE

F-624

+5 / +40

8-9.5

-40 / +75

10

HCW5 (Note-2/.-2)

15

5%

NO /

AD

X-600-B-2007-05607

060

WF

3171

150H04 /
150HDPE

TP-1092 / 060-WF-1003-10-HDPE

F-625

+5 / +40

8-9.5

-40 / +75

10

HCW5 (Note-2/.-2)

15

5%

NO /

AD

X-600-B-2007-05607

060

WF

3172

10

150HDPE

TP-1111 / 060-WF-1002-10-HDPE

TP-1110B

+5 / +40

8-9.5

-40 / +40 (Note-3 /.-3)

10

NO /

15

100% visual

NO /

N/A

X-600-B-2006-05607

060

WF

3174

12

150H04

TP-1029

TP-1030

+5/+40

8-9.5

-40/+75

14.5

HCW5 (Note-2/.-2)

21.75

5%

NO/

AD

X-600-B-2006-05607

060

WF

3175

150H04

TP-1113

TP-1112

+5/+40

8-9.5

-40/+75

14.5

HCW5 (Note-2/.-2)

21.75

5%

NO/

AD

X-600-B-2006-05607

060

WF

3176

12

150H04

TP-1037

TP-1038

+5/+40

8-9.5

-40/+75

14.5

HCW5 (Note-2/.-2)

21.75

5%

NO/

AD

X-600-B-2006-05607

3200

WF

4112

14

150H04

O-3200-WF-4027-16-150PE2-NI / TP-1132A

O-3200-WF-4113-14-150H04-HCW5

+5 / +40

8-9.5

-40 / +75

14.5

HCW5 (Note-2/.-2)

21.75

5%

NO/

AD

O-3200-B-5056-05607

3200

WF

4113

14

150H04

O 3200 4026 16 150PE2 NI / TP


O-3200-4026-16-150PE2-NI
TP-1131A
1131A

PCV 320050
PCV-320050

+5 / +40

895
8-9.5

-40
40 / +75

14 5
14.5

HCW5 (N
(Note-2/.-2)
t 2/
2)

21 75
21.75

5%

NO/

AD

O 3200 B 5056 05607


O-3200-B-5056-05607

3200

WF

4114

14

150H04

O-3200-WF-4113-14-150H04-HCW5

PSV-320051A/B

+5 / +40

8-9.5

-40 / +75

14.5

HCW5 (Note-2/.-2)

21.75

5%

NO/

AD

O-3200-B-5056-05607

3200

WF

4115

14

150H04

PSV-320051A/B

O-3200-WF-4016-14-150H04-HCW5

+5 / +40

8-9.5

-40 / +75

14.5

HCW5 (Note-2/.-2)

21.75

5%

NO/

AD

O-3200-B-5056-05607

3200

WF

4116

14

150H04

PCV-320050

O-3200-WF-4024-14-150H2G-NI /TP-1133

+5/+40

ATM-1.2

-40 / +75

14.5

HCW5 (Note-2/.-2)

21.75

5%

NO/

AD

O-3200-B-5056-05607

3510 / 4600

WF

4000

20

150HDPE

TP-301B / 351-WF1000-300-GOST-NI

TP-512B / WF-203-10-C14A

+5 / +40

8-9.5

-40 / +40 (Note-3 /.-3)

14.5

NO /

21.75

100% visual

NO /

N/A

O-3510-B-2081-05607
O-4600-B-5008-05607

3510 / 4600

WF

4001

20

150HDPE

TP-301A / 351-WF1000-300-GOST-NI

TP-512A / WF-203-10-C14A

+5 / +40

8-9.5

-40 / +40 (Note-3 /.-3)

14.5

NO /

21.75

100% visual

NO /

N/A

O-3510-B-2081-05607
O-4600-B-5008-05607

4600

WF

4050

20

150H04 /
150HDPE

WF-203-10"-C14A

10"-WF-1005-C14A

+5 / +40

8-9.5

-40 / +40 (Note-3 /.-3)

14.5

NO /

21.75

100% visual

NO /

N/A

O-4600-B-2140-05607
O-4600-B-5008-05607

4600

WF

4051

20

150H04 /
150HDPE

WF-203-10"-C14A

10"-WF-1005-C14A

+5 / +40

8-9.5

-40 / +40 (Note-3 /.-3)

14.5

NO /

21.75

100% visual

NO /

N/A

O-4600-B-2140-05607
O-4600-B-5008-05607

9200

WF

4012

12

150HDPE

TP-1347

last FW hydrant

+5/+40

8-9.5

-40 / +40 (Note-3 /.-3)

14.5

NO/

21.75

100%visual

NO/

N/A

62-9200-B-PID-9211-01-05607

NOTES
1

Minimum design pressure and hydrotest pressure requirement for these FW lines are 1.5 barg and 2.25 barg respectively. However, 14.5 barg design pressure and 21.75 barg hydrotest pressure are specified for consistency with specifications for other lines
in FW network.
1.5 . 2.25 . . ,
14.5 . 21.75 . .

All new underground lines shall be of HDPE material (150HDPE piping spec). All aboveground lines in FW service shall be of CS material (150H04 spec). Aboveground CS lines outside pump house shall be heat traced to 5 oC.
( ) 150HDPE ( 150H04). 5oC

For HDPE pipes, design temperature is -40 / +40 0C, DP = 14.5 barg. = -40 / +40 C, = 14.5 .

This line list includes new lines only. For the existing lines being modified, design and test conditions will be: Sulphur Pad area: HDPE pipes: DP = 10.0 barg, Hydrotest Pressure = 15.0 barg. Other areas: CS lines: DP=14.5 barg, Test pressure=14.5 barg. HDPE/GRE lines: DP = 14.5 barg, Test Pressure = 21.75 barg.
. . , . : ( ): = 10.0 ., = 15.0 .
: : . = 14.5 , . = 14.5 . . /: . = 14.5 , . = 21.75 .
0
D
C
B
A

02.05.2012
28.12.2011
28.12.10
4.11.10
15.07.10

Approved for construction /


Re - Issued for Comments Phase-4 / -4
Re-Approved for design /
Approved for design /
Issued for Review & Comments /

KU
KU
NK
AV
KU

VMM
VMM
VMM
NK/ VMM
NK / VMM

VMM
VMM
VMM
NK/ VMM
NK / VMM

CW
CW
NI
NI
NI

REV / .

DATE /

DESCRIPTION/

BY / .

HK /

ENG/

SUP/