PARA.
REVISION DESCRIPTION
1.1
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 2 of 42
TABLE of CONTENTS
1.0
2.0
3.0
SCOPE OF WORK
1.1
Introduction
1.2
Scope
1.3
1.4
Scaffolding
TCO Specifications
2.2
TCO Procedures
2.3
General
2.4
ATTACHMENTS
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 3 of 42
1.0
SCOPE OF WORK
1.1
INTRODUCTION
The scope of the Plant Firewater Upgrade Project includes the replacement of all
valves, hydrants and monitors in the Tengiz plant firewater system, including all the
associated pipework and pipe-laying, destruct of existing hydrant and monitor pits,
construction of precast concrete chambers and repairs to valve pits.
The scope of work in this Job Pack comprises the following:
Area
Item
OBH FW
TANKS
Isolation Area:
17/18-07
Specific
Clauses
Total
Number
1.2.4
Hydrant/Monitor Pits
Monitors
Valve Pits
1.2.6
1.2.7
Hydrant Pits
Identifier
Old
Identifier
VP-283
Isolations for all Job Packs within the Old Boiler House Area (17/18 Area) are to be
determined on site, in strict accordance with the Switch-Over Philosophy document
PHL-056-07-B-0100. To assist with the determination of isolations a set of P&IDs
is attached, marked up with a series of isolations for the valves and hydrants in this
job pack. In general these isolations must be carried out in the step by step
sequence indicated by the P&ID sheets.
Work sequence of Job Packs should generally be in numerical order, from Isolation
Area 17/18-01 to 17/18-16. There are no Civil Job Packs for Isolation Areas 17/1803, 17/18-06, 17/18-08, 17/18-13 and 17/18-14 but there are Piping Job Packs for
Isolation Areas 17/18-03, 17/18-13 and 17/18-14.
Contractor should note that the existing chambers are not water-tight and are
currently full of water due to leakage through the chamber walls and/or from pipe
work.
It is a requirement that all new Hydrant and Monitor chambers be watertight. This
will be determined by visual inspection one week after dewatering is turned off.
Water on any concrete surface sufficient to wet tissue paper will constitute failure.
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 4 of 42
1.2
SCOPE
This scope of work shall be read in conjunction with the TCO Project Drawings and
the documentation referenced in Section 2 of this scope of work, as well as revision
3 of Addendum to Standard Job Pack for all disciplines FE-A-JP-0001. By
reference hereinafter, these drawings and documentation form an integral part of
the WORK to be performed by the CONTRACTOR. All construction and piping
materials will be free-issued to Contractor.
CONTRACTOR shall determine his own sequence of working, and reflect this in
his method statements. Method Statement for the Job Pack shall be approved by
PFU Construction Manager Rob Winfield/Sultanbek Shalov prior to works start.
All construction activity will be executed in accordance with COMPANY
specifications, RoK legislation and applicable national and international standards.
It is the CONTRACTORS responsibility to ask COMPANY to provide any relevant
COMPANY standards, specifications or other documents relevant to the works
which have not been submitted or received by the CONTRACTOR. Non-receipt of
any relevant COMPANY documentation is not an acceptable excuse for noncompliance.
Construction within the RoK territory is governed by legislation concerned with
ensuring the provision of a safe working environment. Consent from State bodies
is to be sought and received where necessary to ensure compliance with state
requirements in the field of Safety.
The scope of work shall essentially comprise the following:
1.2.1
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 5 of 42
walls must be cast with flat surfaces for correct seating between cover slab and
top of wall. Tolerance for twist or deviation in level is 3mm over the length or
width of the cover slab or wall. Tolerance for local projections is 1mm.
8. Coat the external faces of all below-ground precast concrete, including the
underside of the base, with 3 coats of modified bitumen to give a total thickness
of 1 mm;
9. Fabricate steel ladders and fixing brackets in accordance with project drawings
and M-ST-2002, including preparation of shop fabrication details if required.
Hot dip galvanise all items.
10. Fabricate pipe spools as required and perform the tests and inspection as per
TCO specification L-ST-2007.
11. Welding Procedure Specification (WPS) shall be in accordance with TCO
Welding Procedure Selection Spreadsheet for KTL pipe classes. For 150HDPE
and 150B901 classes the Bonding Procedure Specification (BPS) shall be in
accordance with ASME B31.3.
1.2.2
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 6 of 42
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 7 of 42
material, and any surplus material, and dispose of in accordance with the
COMPANY representatives instructions to a designated COMPANY site.
Provide replacement fill material if required;
10. Remove redundant pipework and blank off unused branches. Break down and
remove abandoned chambers, all as described in the destruct drawings;
1.2.4
1.2.5
1.2.6
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 8 of 42
6. Fabricate inspect and test where able, pipe spools and assemblies as required.
7. Remove the existing valves and pipework as described in destruct piping detail
drawings.
8. Cut existing pipes outside the chamber where described in destruct piping detail
drawings then break out and remove the cast-in pipe sections;
9. Locate new pipe sections with thrust arrestors and stub flanges so that the
thrust arrestors are approximately central in the wall and stub flanges are
correctly located in relation to the new valves and pipework.
10. Cast mass concrete plinths as required under pipe supports
11. Install Isolation valves without spindle and housing. Install spacers, pipe spools,
pipe fittings and supports including two-piece spilt backing ring to existing castin stub flanges.
12. Complete external pipe joints;
13. Carry out Test on all pipework;
14. Apply two rings of hydrophilic sealant around the cast-in pipe sections and
around the cutout concrete faces and cast in the pipes using C25 concrete;
15. Thoroughly clean the top surface of chamber walls and break off any damaged
concrete. Fix shuttering around top of wall. Apply BASF EMACO bonding
agent and pour layer of C25 concrete to achieve a smooth level surface.
Concrete thickness to be between 50mm and 150mm. Check smoothness of
finished concrete and grind off any projections more than 2mm. Check the
surface for deviation from true and apply epoxy mortar if necessary to meet the
required tolerance. Tolerance for deviation in plane is 3mm over the length or
width of the chamber. If existing tops of walls are found to be within tolerance
then application of C25 concrete layer may be omitted but height of precast
access rings will then need to be increased to compensate.
16. Install new precast cover slab, bedded on sealant strips as shown on the
drawings;
17. Install valve extension spindles with housings and adjust positioning to align
with holes in cover slab;
18. Install permanent dewatering pipe, including fixings to wall and quick coupling
unit.
19. Install precast access rings as required, bedded on Concresive 1418(T)
Polyester Resin Bedding Mortar. Install cast iron manhole cover frame, bedded
in Concresive 1418(T). Fill manhole cover with concrete;
20. Install new fabricated steel ladder, adjusting fixing brackets as required to
achieve vertical installation. Make good any damage to galvanizing with zinc
rich paint. Ladder installation shall be SID compliant as far as practicable.
Note: maximum depth from top of chamber to first rung is not to exceed
500mm.
21. Encase dewatering pipe and valve spindle housing penetrations in R101
Concrete Repair Mortar.
22. For valve chambers in the road, install surface boxes, supported on mass
concrete and bedded in Concresive 1418(T), all as shown on the drawings;
23. Fix insulation board to the underside of cover slab and around the outside of the
access shaft and chamber to a depth of 1.5m below ground. Fit insulation board
plug inside the manhole opening,;
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 9 of 42
1.2.7
1.2.8
Reinstatement
Upon completion of testing and the acceptance of the work by the COMPANY Site
Representative, CONTRACTOR shall carry out the following:
1. Backfill with selected excavated material, supplemented by material from
COMPANY if necessary, compacting in layers to achieve 95% Proctor value;
2. Reinstate roads, paved areas, filter drains etc as per existing;
3. Apply epoxy paint to exposed concrete surfaces and to buried sides of concrete
to a depth of 150mm.
4. At each Hydrant installation lay compacted granular hard-standing surfaces as
required to achieve a minimum of 10m of hard-standing either side of the
hydrant;
5. Install bollards as shown on the drawings;
6. Install new identification sign board, provided by TCO;
7. Install handwheel to valve spindle where required.
8. In the event of a leak into the chamber being detected, carry out remedial works
as directed by COMPANY representatives;
9. Remove from site all temporary works and unused materials.
10. Collate all Quality Assurance data and issue QA Report immediately on
completion of works to allow rapid re-commissioning of the firewater system.
1.2.9
General Scope
All water removed from within the chambers and any water from well-pointing or
dewatering operations must be transported to a suitable location and disposed of
correctly, as instructed by the COMPANY Site Representative.
Contractor shall maintain a clean and tidy site.
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 10 of 42
1.3
1.3.1
A) Unless otherwise notified during the bid process, TCO requests the Contractor to
use his Republic of Kazakhstan (RoK) approved Nature Use Permit (NUP) covering
the current calendar year estimated emissions. In compliance with this NUP, the
Contractor is responsible for payment of any fees associated with emissions
generated during the execution of a TCO project. All costs related to late payment
penalties or interest is for Contractor's account.
B) Some TCO projects will require the Contractor to apply for a project specific RoK
NUP. When applicable, the Contractor will be notified during the bidding process,
either by specific instructions in the Job Packs, or other written communication, that
a Project specific RoK NUP is required to execute the Project. In these instances,
the Contractor shall submit documentation of their Project specific RoK NUP to the
TCO Construction Engineer prior to the start of work. Contractor shall provide
proof of fee payment(s) at the end of the project, and prior to submitting final
invoice for works completed. All costs related to late payment penalties or interest
is for Contractor's account.
1.3.2 COMMUNICATION
TCO PFU Project Representatives for all communications shall be:
Construction Interface Engineer
Damir Okashev
PSN KazStroy
Dostyk Plaza
46 Satpayeva St
Atyrau, Republic of Kazakhstan
060011
Tel #: (8)712 302 1204
E-Mail: doap@tengizchevroil.com
TCO Construction Manager
Sultanbek Shalov/Rob Winfield
TCOIB-NCC-PFU, office 15
Tengiz, Atyrau, Republic of Kazakhstan
060002
Tel #: (8)712 302 4528
E-Mail: pfucman@tengizchevroil.com
CONTRACTOR shall designate, in a similar fashion, a contact representative
for technical supervision and communication.
Please refer to TCO Project Number X-000-056-07 in all communications to
ensure proper routing to the responsible parties.
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 11 of 42
1.4
TEMPORARY WORKS
1.4.1
CONTRACTOR shall supply, erect, maintain and dismantle and remove from
site upon completion all scaffolding needed to perform the work. All scaffolding
materials shall comply with the requirements of TCOs Safety Instruction SI-152
Working at heights.
1.4.2
CONTRACTOR shall supply, operate, maintain and remove from site upon
completion of the works all well-pointing and dewatering equipment.
1.4.3
CONTRACTOR shall supply, operate, maintain and remove from site upon
completion of the works all equipment necessary to remove water from within
the existing chambers and keep them clear of water throughout the works.
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 12 of 42
2.0
FE-A-JP-0001
2.1
Latest
TCO SPECIFICATIONS
Specification No.
Title
A-ST-2005
Galvanizing
L-ST-2001
L-ST-2003
L-ST-2004
Piping Fabrication
L-ST-2007
L-ST-2010
L-ST-2014
Piping Tie-ins
L-ST-2025
M-ST-2002
M-ST-2003
Q-ST-2016
Q-ST-2020
S-ST-2001
S-ST-2002
Earthworks
S-ST-2003
S-ST-2004
W-ST-2000
X-ST-2000
2.2
Rev. No.
TCO PROCEDURES
Document No.
Title
Rev. No.
PRO-056-07-A-0215
PRO-056-07-A-0140
PRO-056-07-A-0182
PRO-056-07-A-0153
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 13 of 42
X-000-L-PRO-0001
Q001
Q002
Q003
TCO-SI-119
____
056-07-PRG-A-0001
056-07-PRG-A-0002
056-07-PRG-A-0003
2.3
2009
Feb
2010
GENERAL
Document No.
A-ST-2008
A-ST-2010
TSID
O-ST-2011
RPT-056-07-A-0051
RPT-056-07-S-0014
2.4
Title
Rev. No.
1
2
4
0
Document No.
SN RK 1.03-14-2011
SN RK 1.03-00-2011
SNIP RK 2.02-05-2009
SNIP RK 5.04-18-2002
SNiP RoK 4.01-02-2009
RDS RoK 2.02-18-2005
Title
Rev. No.
Latest
Latest
Latest
Latest
Latest
Latest
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 14 of 42
3.0
ATTACHMENTS
ATTACHMENT "A"
Project Drawings (For Construction)
JPK-056-07-Q-0794
Drawing No.
Rev
No.
Drawing Title
O-3000-S-5048
O-3000-Q-5120
O-3000-Q-5121
O-3000-Q-5122
O-3000-M-5171
X-000-Q-5117
X-000-Q-5120
X-000-Q-5144
X-000-Q-5152
0
0
0
0
0
2
1
0
1
X-000-M-5065
X-000-S-5075
X-000-S-5076
X-000-S-5077
0
0
O-3000-L-5317
L-SK-7479
O-3000-L-5437
0
0
0
For Information
Drawing No.
Marked up P&ID
(Attached to this
document)
PLL-056-07-B-0026
Rev. No.
Drawing Title
LINE LIST
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 15 of 42
ATTACHMENT "B"
TCO Standard Drawings
Drawing No.
M-ST-5031
M-ST-5032
M-ST-5036
M-ST-5037
M-ST-5038
Q-ST-2002
L-ST-2010
Rev. No.
0
1
1
1
1
0
5
Drawing Title
Specification. Typical symbology for welding
Structural steelwork layout. Design standards ladder and
stairways.
Structural steelwork layout. Ladder details. Sheet 1 of 3
Structural steelwork layout. Ladder details. Sheet 2 of 3
Structural steelwork layout. Ladder details. Sheet 3 of 3
Typical Road Details
Standard Pipe Supports
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 16 of 42
ATTACHMENT "C"
Index for Scope of Work
NOT USED
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 17 of 42
ATTACHMENT "D"
Turnover Status Report
-
NOT APPLICABLE
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 18 of 42
ATTACHMENT "E"
Purchase Orders / Material Requisitions / MWRs
PO / MR No.
Title / Description
Date in
Tengiz
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 19 of 42
ITEMS
JPK-056-07-Q-0794
UNIT
TOTAL
EA
4.5
EA
EA
1.5
1.5
EA
EA
12
EA
EA
EA
EA
EA
EA
8.5
175.5
13
M3
M3
3.5
KG
24
KG
120
12
M2
M2
M2
3.5
EA
63
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 20 of 42
65
EA
0.5
24
EA
EA
EA
77
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 21 of 42
1.0
2.0
3.0
1.1
1.2
1.3
1.4
2.1
2.2
2.3
2.4
/ /
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 22 of 42
1.0
1.1
,
,
,
,
.
:
:
17/18-07
1.2.4
1.2.6
1.2.7
K-283
( 17/18) ,
" " PHL-056-07-B0100. ,
,
. ,
, .
,
17/18-01 17/18-16.
17/18-03, 17/18-06, 17/18-08, 17/18-13 17/18-14
,
17/18 -03, 17/18-13
17/18-14.
,
/ .
,
.
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 23 of 42
1.2
,
2 , 3
c FE-A-JP-0001.
,
.
.
,
.
/ .
,
.
,
,
.
.
,
. ,
:
1.2.1
-
.
, .
(RFI) 24 ,
:
1. ;
2.
;
3. /,
.
(
/) .
4.
;
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 24 of 42
;
5.
;
6.
.
15/,
;
7.
.
.
.
3.
1;
8.
,
,
; 1 ;
9.
M-ST-2002, ,
, ,
. ;
10.
L-ST-2007;
11.
.
150 150901
ASME B31.3.
1.2.2 -
,
,
,
1.
.
- ,
,
. -
,
/
.
2.
,
, , 45 .
.
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 25 of 42
.
; .
, .
3.
(
).
,
.
4.
.
.
.
.
25
.
5.
, .
200
6.
3
125 , 75
7.
.
.
8.
,
;
9.
,
;
10. ;
11. ,
;
12. EMACO R101
Thioflex , .
, EMACO R101
13. 100
.
1.2.3.
:
/
.
:
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 26 of 42
1.
, ,
.
;
2.
.
.
,
, ,
, .
(:
);
3.
.
,
,
,
,
(, ,
, ..);
4.
, ,
,
,
;
5.
.
.
6.
500
.
.
;
7.
.
,
.
2,5 . .
8.
,
.
.
9.
,
.
. ,
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 27 of 42
, .
;
10.
, . .
1.2.4
, /
:
1. .
50.
2. ,
;
3. , ,
, /
, ;
4.
1,5 .
1.2.5
:
1.
;
2.
,
,
. 6FA
150;
3. .
Q-ST-2020,
;
4. ,
.
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 28 of 42
1.2.6
:
1.
-
.
2.
,
.
3.
,
.
4.
.
25 ,
.
5.
6.
7.
,
.
8.
, .
9.
-
,
,
.
10. .
11.
,
, , ,
.
12. .
13. - .
14.
,
C25 .
15.
. .
BASF EMACO
C25 .
50 150 .
2 .
, .
3.
,
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 29 of 42
C25 ,
.
16.
, .
17.
,
,
.
18. ,
.
19.
Concresive
1418(T). , Concresive
1418(T). .
20.
,
.
.
. :
500
21.
R101.
22. , ,
Concresive 1418(T), .
23.
1.5
.
.
1.2.7
:
1. ,
.
2. ,
.
3.
.
4. .
1.2.8
:
1. ,
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 30 of 42
. 95%
;
2. ,
.. ;
3.
150 .
4.
10 ,
5. , ;
6. , ;
7. , ;
8. ,
;
9.
;
10. , ,
,
.
1.2.9
, ,
,
.
.
1.3
1.3.1
(
)
A) ,
(), ,
.
,
,
.
.
B)
.
,
,
, ,
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 31 of 42
. ,
.
.
.
1.3.2
:
060011,
. . , 46,
.: (8)712 302 1204
. : doap@tengizchevroil.com
/
--, 15
, ,
060002
: (8)712 302 4528
. : pfucman@tengizchevroil.com
.
X-000056-07
.
1.4
1.4.1 ,
,
,
, . ,
,
-152 .
1.4.2 ,
,
.
1.4.3 ,
,
,
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 32 of 42
2.0
FE-A-JP-0001
2.1
A-ST-2005
L-ST-2003
L-ST-2001
L-ST-2004
L-ST-2007
L-ST-2010
L-ST-2014
L-ST-2025
M-ST-2002
M-ST-2003
Q-ST-2016
Q-ST-2020
S-ST-2001
S-ST-2002
S-ST-2003
S-ST-2004
W-ST-2000
X-ST-2000
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 33 of 42
2.2
PRO-056-07-A-0215
PRO-056-07-A-0140
PRO-056-07-A-0182
PRO-056-07-A-0153
X-000-L-PRO-0001
(SEQ)
Q001
Q002
Q003
TCO-SI-119
____
056-07-PRG-A-0001
056-07-PRG-A-0002
056-07-PRG-A-0003
2.3
, ,
1
. , 2009
.
2010
.
1-
.
2 - . .
.
3- .
A-ST-2008
A-ST-2010
TSID
O-ST-2011
RPT-056-07-A-0051
RPT-056-07-S-0014
1
2
4
0
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 34 of 42
2.4
K 1.03-14-2011
K 1.03-00-2 011
K 2.02-05-2009
K 5.04-18-2002
C 4.01-02-2009
2.02-18-2005
.
,
.
.
.
.
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 35 of 42
3.0
A
( )
JPK-056-07-Q-0794
O-3000-S-5048
O-3000-Q-5120
O-3000-Q-5121
O-3000-Q-5122
O-3000-M-5171
.
0
0
0
0
0
K-283
K-283
C K-283
K-283
K-283
X-000-Q-5117
X-000-Q-5120
1
1
C
C . . .
.
C `C'
C `L'
X-000-Q-5144
X-000-Q-5152
0
1
-000-M-5065
X-000-S-5075
X-000-S-5076
X-000-S-5077
C
C
O-3000-L-5317
L-SK-7479
O-3000-L-5437
0
0
0
-283
.
(
)
PLL-056-07-B-0026
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 36 of 42
B
M-ST-5031
.
0
M-ST-5032
M-ST-5036
M-ST-5037
M-ST-5038
Q-ST-2002
L-ST-2010
0
5
.
.
.
.
.
- . 1 3
.
- . 2 3
.
- . 3 3
.
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 37 of 42
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 38 of 42
D
-
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 39 of 42
E
/ /
PO / MR
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 40 of 42
JPK-056-07-Q-0794
.
.
4.5
10 : . 40x4 103-76
1.5
11 : 50x14 103-76
13 : 110x10 103-76
1.5
14 :16010010 8510-86
15 : 1025
16 : 1640
12
34 : HALFEN PX36
35 . : HALFEN PR36
40 : 6 ..
43 : 10 ..
8.5
45 : 16 ..
175.5
46 : 20 ..
13
48 : 25
52 : 20/40
3.5
24
120
12
M2
#
2
5
6
: 3" . ,
90 .
: 4" . . . 40
: 25x3 103-76
60 : TERRAM 1000
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 41 of 42
61 : 1000
M2
M2
3.5
0.5
24
:
100
: 750x600x250 C
63
.
: UNIBOND NO MORE NAILS
65
( 300)
62
77
The current revision 15 of St. Job Pack FE-M-JP-0001 was approved by TCO FE Constr. Supt. on 02-Nov-2010
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\02Struct.Std.JP_FE-M-JP-0001
Page 42 of 42
1
2
3
LENGTH
UNIT
EA
EA
EA
1
1
4
1
1
4
1
2
3
6310110271
AFE No
07/12/2012
MT
MAM
SS
CW
19/11/2012
MT
MAM
KVR
CW
REV
DATE
DESCRIPTION
BY
CHKD
ENG
SUP
TENGIZCHEVROIL
PLANT FIREWATER UPGRADE PROJECT
PIPING MATERIAL TAKE OFF
(FITTINGS)
ITEM NO
STOCK
CODE
DESCRIPTION
150H04
16"x12" TEE RED. BW LTCS A420-WPL6 SCH10
16"x12" REDUCER CONC
CONC.BW
BW LTCS A420-WPL6
A420 WPL6 SCH10
12" SPADE & SPACER RF LTCS A516-70 CL150
TOTAL
ITEM
No
O-3000-L--5317
DRAWING
No
PO/PR/MR NUMBERS
MTO REV
VISION
NO
MTO REVISION NO
REV
DRAWING NUMBER
O-3000-L-5437
SHEET
of
16
STOCK
CODE
LENGTH
UNIT
EA
TENGIZCHEVROIL
0
07/12/2012
MT
MAM
SS
CW
19/11/2012
MT
MAM
KVR
CW
REV
DATE
DESCRIPTION
BY
CHKD
ENG
SUP
ITEM NO
DESCRIPTION
150H04
12" WN FLANGE LTCS A350LF2 CL.1 CL.150 SCH 10 RF STDF B16.5, WITH JACKSCREW
MTO REV
VISION
NO
ITEM
No
O-3000-L--5317
DRAWING
No
PO/PR/MR NUMBERS
TOT
TAL
MTO REVISION NO
PROJ No
X-000-056-07
AFE No
6310110271
REV
DRAWING NUMBER
O-3000-L-5437
O
3000 L 5437
SHEET
of
16
LENGTH
UNIT
EA
ITEM NO
STOCK
CODE
DESCRIPTION
TOTAL
ITEM
No
O-3000-L-5317
DRAWING
No
PO/PR/MR NUMBERS
MTO REVISION
NO
MTO REVISION NO
150H04
X-000-056-07
PROJ No
TENGIZCHEVROIL
0
07/12/2012
MT
MAM
SS
CW
19/11/2012
MT
MAM
KVR
CW
REV
DATE
DESCRIPTION
BY
CHKD
ENG
SUP
6310110271
AFE No
REV
DRAWING NUMBER
O-3000-L-5437
SHEET
of
16
1
2
STOCK
CODE
LENGTH
UNIT
EA
EA
8
4
8
4
1
2
X-000-056-07
PROJ No
TENGIZCHEVROIL
0
07/12/2012
MT
MAM
SS
CW
19/11/2012
MT
MAM
KVR
CW
REV
DATE
DESCRIPTION
BY
CHKD
ENG
SUP
ITEM NO
DESCRIPTION
150H04
12" GASKET SPWND 316L-FG 1/8" SSSS CL150 B16.20 B16.5 LS
12" PIKOTEK FLANGE INSULATION KIT CL.150 B16.5
MTO REVIS
SION
NO
ITEM
No
TOTAL
DRAWING
No
PO/PR/MR NUMBERS
O-3000-L-5
5317
MTO REVISION NO
6310110271
AFE No
REV
DRAWING NUMBER
O-3000-L-5437
SHEET
of
16
MTO REVI0
SION NO
LENGTH
UNIT
EA
48
48
X-000-056-07
PROJ No
TENGIZCHEVROIL
0
07/12/2012
MT
MAM
SS
CW
19/11/2012
MT
MAM
KVR
CW
REV
DATE
DESCRIPTION
BY
CHKD
ENG
SUP
ITEM
M NO
STOCK
CODE
MTO RE
EVISION
NO
DESCRIPTION
150H04
M22x180 LG STUD-BOLT AND TWO NUTS A182 GR F55 (25%-CR. ALLOY STEEL)
TOTAL
ITEM
No
O-3000-L--5317
DRAWING
No
PO/PR/MR NUMBERS
6310110271
AFE No
REV
DRAWING NUMBER
O-3000-L-5437
SHEET
of
16
LENGTH
UNIT
EA
EA
2
2
2
2
1
2
ITEM NO
STOCK
CODE
TOTAL
ITEM
No
O-3000-L-5317
DRAWING
No
PO/PR/MR NUMBERS
MTO REVISION
NO
MTO REVISION NO
1
2
DESCRIPTION
PIPE SUPPORTS
PLATE 550x550x20mm THICK, LTCS
PLATE250 250 10
PLATE250x250x10mm
THICK
THICK, LTCS
EA
X-000-056-07
PROJ No
TENGIZCHEVROIL
0
07/12/2012
MT
MAM
SS
CW
19/11/2012
MT
MAM
KVR
CW
REV
DATE
DESCRIPTION
BY
CHKD
ENG
SUP
6310110271
AFE No
REV
DRAWING NUMBER
O-3000-L-5437
SHEET
of
16
LENGTH
UNIT
LITRES
4.7
ITEM NO
STOCK
CODE
DESCRIPTION
"EH" SYSTEM
MTO REVISION
NO
ITEM
No
O-3000-L-5317
DRAWING
No
PO/PR/MR NUMBERS
TAL
TOT
MTO REVISION NO
4.7
X-000-056-07
PROJ No
TENGIZCHEVROIL
0
07/12/2012
MT
MAM
SS
CW
19/11/2012
MT
MAM
KVR
CW
REV
DATE
DESCRIPTION
BY
CHKD
ENG
SUP
6310110271
AFE No
REV
DRAWING NUMBER
O-3000-L-5437
SHEET
of
16
150H04
12" LTCS A333-6 SMLS SCH 10 BBE
. .
O-3000-L-5317
0.5
0.5
TENGIZCHEVROIL
0
A
07/12/2012
19/11/2012
MT
MT
.
MAM
MAM
.
SS
KVR
.
CW
CW
.
.-..-
()
PO/PR/MR
. . .
.
. .
X-000-056-07
6310110271
O-3000-L-5437
`
9 16
1
2
3
150H04
16"x12" BW LTCS A420-WPL6 SCH10
16"x12" CONC.BW LTCS A420-WPL6 SCH10
12" RF LTCS A516-70 CL.150
. .
O-3000-L-5317
1
1
1
2
3
1
1
4
TENGIZCHEVROIL
0
A
07/12/2012
19/11/2012
MT
MT
.
MAM
MAM
.
SS
KVR
.
CW
CW
.
.-..-
()
..
PO/PR/MR
. .. .
.
. .
X-000-056-07
6310110271
O-3000-L-5437
10 16
150H04
12" WN LTCS A350LF2 CL.1 CL.150 SCH 10 RF STDF B16.5, WITH JACKSCREW
. .
O-3000-L-5317
O
TENGIZCHEVROIL
0
A
07/12/2012
19/11/2012
MT
MT
MAM
MAM
SS
KVR
CW
CW
.-..-
()
PO/PR/MR
. . .
.
. .
X-000-056-07
6310110271
O-3000-L-5437
11 16
12" DS-SP-056-07-102
4370mm
. 1.
. .
O-3000-L-5317
PO/PR/MR
.
. .
.
. .
150H04
X-000-056-07
TENGIZCHEVROIL
0
A
07/12/2012
19/11/2012
MT
MT
.
MAM
MAM
.
SS
KVR
.
CW
CW
.
.-..-
()
6310110271
O-3000-L-5437
12 16
1
2
150H04
12" SPWND 316L-FG 1/8" SSSS CL150 B16.20 B16.5 LS
12" PIKOTEK CL150 B16.5
. .
O-3000-L-5317
O
1
2
8
4
8
4
TENGIZCHEVROIL
0
A
07/12/2012
19/11/2012
MT
MT
MAM
MAM
SS
KVR
CW
CW
.-..-
()
PO/PR/MR
. . .
.
. .
X-000-056-07
6310110271
O-3000-L-5437
13 16
150H04
M22x180 LG A182 GR F55 (25%-CR. )
. .
48
O-3000-L-5317
O
48
TENGIZCHEVROIL
0
A
07/12/2012
19/11/2012
MT
MT
.
MAM
MAM
.
SS
KVR
.
CW
CW
.
.-..-
()
PO/PR/MR
. . .
.
. .
6310110271
O-3000-L-5437
14 16
1
2
3
4
550x550x20mm THICK, LTCS
250x250x10mm THICK, LTCS
8" LTCS A333-6 SMLS SCH 20BBE
M20x175 LG, HILTI HY150
2 2 LTCS
. .
O-3000-L-5317
O
2
2
2
2
1
2
3
TENGIZCHEVROIL
0
A
07/12/2012
19/11/2012
PO/PR/MR
. . .
.
. .
MT
MT
.
MAM
MAM
.
SS
KVR
.
CW
CW
.
.-..-
( )
X-000-056-07
6310110271
O-3000-L-5437
155
166
"EH"
(3-)
. .
O-3000-L-5317
4.7
4.7
PO/PR/MR
. . .
.
. .
100%
TENGIZCHEVROIL
0
A
07/12/2012
19/11/2012
MT
MT
.
MAM
MAM
.
SS
KVR
.
CW
CW
.
.-..-
()
X-000-056-07
6310110271
O-3000-L-5437
16 16
NOTE: 1
THE ISOLATION VALVES MARKED ARE TO IMPLEMENT
ALL REPLACEMENTS IN THE JOB PACK. REPLACEMENTS
HAVE TO BE DONE ONE BY ONE. SO THAT MINIMUM
NUMBER OF ISOLATION VALVES ARE CLOSED AT ONE
TIME.
NOTE: 1
THE ISOLATION VALVES MARKED ARE TO IMPLEMENT
ALL REPLACEMENTS IN THE JOB PACK. REPLACEMENTS
HAVE TO BE DONE ONE BY ONE. SO THAT MINIMUM
NUMBER OF ISOLATION VALVES ARE CLOSED AT ONE
TIME.
NOTE: 1
THE ISOLATION VALVES MARKED ARE TO IMPLEMENT
ALL REPLACEMENTS IN THE JOB PACK. REPLACEMENTS
HAVE TO BE DONE ONE BY ONE. SO THAT MINIMUM
NUMBER OF ISOLATION VALVES ARE CLOSED AT ONE
TIME.
TENGIZCHEVROIL /
02.05.2012
AFC
KU
VMM
CW
28.12.2011
Re-IFC
KU
VMM
CW
28.12.10
Re-AFD
NK
VMM
NI
4.11.10
AFD
AV
NK/ VMM
NI
15.07.10
IFRC
KU
NK / VMM
NI
REV/
DATE/
STATUS
CODE /
BY /
.
CHK/
APP/
RW
PROJ/
CONST/
MAINT/
OPS/
PG TP
REVISION DESCRIPTION /
Issued for Review & Comments
Approved for design
Re-Approved for design
Re - Issued for Comments Phase-4
-4
Approved for construction
Re-issued approved for construction
UNIT/
.
LINE NUMBER/
NOM.BORE/
.
LINE No
SERV./
No
PIPE SPEC
OPER.TEMP./
.
FROM/
TO/
CONDITIONS/
OPER.PRESS./
DESIGN TEMP./
.
.
DESIGN PRESS./
.
INSUL.TYPE/
CONSTRUCT.
TEST/
.
NDT/
.
STRESS
RELIEF/
PAINT SYSTEM/
REMARKS
P&ID/
in/
deg C/.
bar g/()
deg C/.
bar g/()
bar g/()
3000
WF
4003
20
150H04
3000-WF-4026-20-150H04
G-106 A
+5 / +40
ATM - 1.2
-40 / +75
14.5 (Note-1)
HCW5 (Note-2/.-2)
21.75
(Note-1)
5%
NO /
CA / EH
O-3000-B-2010-05607
O-3000-B-5041
3000
WF
4004
20
150H04
3000-WF-4025-20-150H04
G-106 B
+5 / +40
ATM - 1.2
-40 / +75
14.5 (Note-1)
HCW5 (Note-2/.-2)
21.75
(Note-1)
5%
NO /
CA / EH
O-3000-B-2010-05607
O-3000-B-5041
3000
WF
4005
150H04
3000-WF-4025-20-150H04
G-105 A
+5 / +40
ATM - 1.2
-40 / +75
14.5 (Note-1)
HCW5 (Note-2/.-2)
21.75
(Note-1)
5%
NO /
CA / EH
O-3000-B-2010-05607
O-3000-B-5042
3000
WF
4006
150H04
3000-WF-4026-20-150H04
G-105 B
+5 / +40
ATM - 1.2
-40 / +75
14.5 (Note-1)
HCW5 (Note-2/.-2)
21.75
(Note-1)
5%
NO /
CA / EH
O-3000-B-2010-05607
O-3000-B-5042
3000
WF
4007
16
150H04
G-106 A
3000-WF-4022-20-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO/
21.75
5%
NO /
CA
O-3000-B-5041
O-3000-B-5044
3000
WF
4008
16
150H04
G-106 B
3000-WF-4023-20-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO/
21.75
5%
NO /
CA
O-3000-B-5041
O-3000-B-5044
3000
WF
4009
150H04
G-105 A
3000-WF-4011-6-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO /
21.75
5%
NO /
CA
O-3000-B-5042
3000
WF
4010
150H04
G-105 B
3000-WF-4012-6-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO /
21.75
5%
NO /
CA
O-3000-B-5042
3000
WF
4011
150H04
3000-WF-4012-6-150H04
3000-WF-4022-20-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO/
21.75
5%
NO /
CA
O-3000-B-5042
O-3000-B-5044
3000
WF
4012
150H04
3000-WF-4011-6-150H04
3000-WF-4023-20-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO/
21.75
5%
NO /
CA
O-3000-B-5042
O-3000-B-5044
3000
WF
4013
12, 8
150H04
3000-WF4029-16-150H04
3000-WF-4014-12-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO /
21.75
5%
NO /
CA
O-3000-B-5041
3000
WF
4014
8, 12
150H04
3000-WF-4013-12-150H04
3000-WF-4020-16-150H04
+5 / +40
1.0 - 2.0
-40 / +75
14.5
NO/
21.75
5%
NO /
CA / EH
O-3000-B-5041
O-3000-B-5044
3000
WF
4015
4, 3
150H04
3000-WF4011-6-150H04
3000-WF4012-6-150H04
FV-300382 A/B
+5 / +40
8 - 9.5
-40 / +75
14.5
NO /
21.75
5%
NO /
CA
O-3000-B-5042
3000
WF
4016
3, 4
150H04
FV-300382 A/B
3000-WF-4020-16-150H04
+5 / +40
1.0 - 2.0
-40 / +75
14.5
NO/
21.75
5%
NO /
CA / EH
O-3000-B-5042
O-3000-B-5044
3000
WF
4017
16
150H04
PSV-300395 A/B
3000-WF-4020-16-150H04
+5 / +40
ATM - 2
-40 / +75
14.5
NO/
21.75
5%
NO /
CA / EH
O-3000-B-5044
3000
WF
4018
16
150H04
3000-WF-4022-20-150H04
PCV-300395
+5 / +40
8 - 9.5
-40 / +75
14.5
NO/
21.75
5%
NO /
CA
O-3000-B-5044
3000
WF
4019
16
150H04
3000-WF-4023-20-150H04
PSV-300395 A/B
+5 / +40
8 - 9.5
-40 / +75
14.5
NO/
21.75
5%
NO /
CA
O-3000-B-5044
3000
WF
4020
16
150H04
3000-WF-4014-12-150H04
300-WP-1019-12-XXX
300-WE-1007-10-XXX
+5 / +40
1.0 - 2.0
-40 / +75
14.5
HCW5 (Note-2/.-2)
21.75
5%
NO /
CA / EH
O-3000-B-5044
O-3000-B-2015-05607
3000
WF
4021
16
150H04
3000-WF-4020-16-150H04
3000-WP-1014-12-XXX
300 WE 1002 10 XXX
300-WE-1002-10-XXX
+5 / +40
1.0 - 2.0
-40 / +75
14.5
NO/
21.75
5%
NO /
EH
O-3000-B-2010-05607
3000
WF
4022
20
150H04
3000-WF-4023-20-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO/
21.75
5%
NO /
CA / EH
O-3000-B-5044
O-3000-B-2011-05607
3000
WF
4023
20
150H04
3000-WF-4022-20-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO/
21.75
5%
NO /
CA / EH
O-3000-B-5044
O-3000-B-2011-05607
3000
WF
4024
12
150HDPE
+5 / +40
8 - 9.5
-40 / +40
14.5
NO /
21.75
100%visual
NO /
N/A
O-3000-B-2013-05607
3000
WF
4025
16, 20
150H04
TP-3001 / 300-WF-1008-16-XXX
3000-WF-4026-20-150H04
+5 / +40
ATM - 1.2
-40 / +75
14.5
(Note-1)
NO /
21.75
(Note-1)
5%
NO /
EH
O-3000-B-2010-05607
3000
WF
4026
16, 20
150H04
3000-WF-4025-20-150H04 /TP-3004
TP-3002 / 300-WF-1008-16-XXX
+5 / +40
ATM - 1.2
-40 / +75
14.5
(N t 1)
NO /
21.75
(N t 1)
5%
NO /
EH
O-3000-B-2010-05607
3000
WF
4028
16
150H04
PCV-300394
3000-WF-4037-16-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO /
21.75
5%
NO /
CA
O-3000-B-5044
3000-WF4013-12-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO /
21.75
5%
NO /
CA
O-3000-B-5041
3000
WF
4029
12
150H04
3000-WF4007-16-150H04
3000-WF4008-16-150H04
3000
WF
4030
150H04
3000-WF-4023-20-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
HCW5 (Note-2/.-2)
21.75
5%
NO /
AD
O-3000-B-5044
3000
WF
4031
150H04
3000-WF-4022-20-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
HCW5 (Note-2/.-2)
21.75
5%
NO /
AD
O-3000-B-5044
3000
WF
4032
150H04
3000-WF-4019-16-150H04
3000-WF-4038-3-150H04
3000-WF-4039-3-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO/
21.75
5%
NO /
CA
O-3000-B-5044
3000
WF
4033
8, 12
150H04
3000-WF-4013-12-150H04
3000-WF-4014-12-150H04
+5 / +40
1.0 - 2.0
-40 / +75
14.5
NO/
21.75
5%
NO /
CA
O-3000-B-5041
3000
WF
4034
150H04
3000-WF-4012-6-150H04
3000-WF-4015-4-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO/
21.75
5%
NO /
CA
O-3000-B-5042
3000
WF
4035
150H04
3000-WF-4015-4-150H04
3000-WF-4016-4-150H04
+5 / +40
1.0 - 2.0
-40 / +75
14.5
NO/
21.75
5%
NO /
CA
O-3000-B-5042
3000
WF
4036
16
150H04
3000-WF-4018-16-150H04
3000-WF-4037-16-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO /
21.75
5%
NO /
CA
O-3000-B-5044
3000
WF
4037
16
150H04
3000-WF-4036-16-150H04
3000-WF-4014-12-150H04
+5 / +40
8 - 9.5
-40 / +75
14.5
NO /
21.75
5%
NO /
CA
O-3000-B-5044
3000
WF
4038
2, 3/4
150H04
3000-WF-4032-3-150H04
HOSE REEL /
+5 / +40
8 - 9.5
-40 / +75
14.5
NO/
21.75
5%
NO /
CA
O-3000-B-5044
3000
WF
4039
2, 3/4
150H04
3000-WF-4032-3-150H04
HOSE REEL /
+5 / +40
8 - 9.5
-40 / +75
14.5
NO/
21.75
5%
NO /
CA
O-3000-B-5044
various
WF
CS spur
connections
150H04
+5 / +40
8 - 9.5
-40/75
14.5
NO/
21.75
5%
NO /
AD / CA
various /
various
WF
HDPE spur
connections
150HDPE
+5 / +40
8 - 9.5
-40 / +40
14.5
NO/
21.75
100%visual
NO /
NA
various /
various
WF
GRE spur
connections
150GRE /
150B901
+5 / +40
8 - 9.5
-20 / +75
14.5
NO/
21.75
100%visual
NO /
NA
various /
KU
KU
NK
AV
KU
BY / .
VMM
VMM
VMM
NK/ VMM
NK / VMM
HK /
VMM
VMM
VMM
NK/ VMM
NK / VMM
ENG/
CW
CW
NI
NI
NI
SUP/
0
0
D
C
B
A
REV / .
02.05.2012
28.12.2011
28.12.10
4.11.10
15.07.10
DATE /
PFU /
LINE LIST /
RW
MGR/
PROJECT No
AFE No
DOCUMENT NUMBER
X-000-056-07
6310110271
REV/
PLL-056-07-B-0026
OPER/
0
3 OF/ 4
LINE NUMBER/
UNIT/
.
SERV./
No
NOM.BORE/
.
in/
LINE No
PIPE SPEC
FROM/
TO/
OPER.TEMP./
.
deg C/.
CONDITIONS/
OPER.PRESS./
DESIGN TEMP./ .
.
bar g/()
deg C/.
CONSTRUC
NDT/
T. TEST/
.
DESIGN
INSUL.TYPE/
.
PRESS./
bar g/()
bar g/()
%
STRESS
RELIEF/
PAINT
REMARKS
SYSTEM/
P&ID/
000
WF
4016
10
150HDPE
000-WF-4017-10"-150HDPE
+5 / +40
8 - 9.5
14.5
NO/
21.75
100%visual
NO /
N/A
O-000-B-2001-05607
000
WF
4017
10
150HDPE
000-WF-4016-10"-150HDPE
000-WF-4018-10"-150HDPE
+5 / +40
8 - 9.5
-40 / +40
14.5
NO/
21.75
100%visual
NO /
N/A
O-000-B-2001-05607
000
WF
4018
6, 10
150H04 /
150HDPE
+5 / +40
8 - 9.5
-40 / +40
14.5
NO/
21.75
5%
NO /
N/A
2-000-B-2000-05607
O-000-B-2001-05607
000
WF
4019
150H04
TP-1257
F-3209
+5 / +40
8-9.5
-40 / +75
14.5
HCW5 (Note-2/.-2)
21.75
5%
NO /
AD
0-000-B-2002-05607
000
WF
4020
12
150HDPE
TP-945/ WF001-12-150B901-NI
TP-946/ WF015-12-150B901-NI
+5/+40
8-9.5
14.5
NO/
21.75
100%visual
NO/
N/A
2-000-B-2003-05607
000
WF
4021
10
150HDPE
K-134
KTL-1 / K-4
+5 / +40
8-9.5
14.5
NO /
21.75
100% visual
NO /
N/A
O-000-B-2003-05607
1-000-B-2000-05607
000
WF
4022
150H04
+5 / +40
8-9.5
-40 / +75
14.5
HCW5
21.75
5%
NO/
AD
-000--5015
000
WF
4023
150H04
+5/+40
8-9.5
-40/+75
14.5
NO/
21.75
5%
NO/
AD
O-000-B-5015
000
WF
4024
150H04
+5/+40
8-9.5
-40/+75
14.5
NO/
21.75
5%
NO/
AD
O-000-B-5015
000
WF
4026
150H04
+5/+40
8-9.5
-40 / +75
14.5
NO/
21.75
5%
NO/
AD
O-000-B-5015
000
WF
4027
150H04
+5/+40
8-9.5
-40 / +75
14.5
NO/
21.75
5%
NO/
AD
O-000-B-5015
060
WF
3170
150H04 /
150HDPE
TP-1093 / 060-WF-1018-12-HDPE
F-624
+5 / +40
8-9.5
-40 / +75
10
HCW5 (Note-2/.-2)
15
5%
NO /
AD
X-600-B-2007-05607
060
WF
3171
150H04 /
150HDPE
TP-1092 / 060-WF-1003-10-HDPE
F-625
+5 / +40
8-9.5
-40 / +75
10
HCW5 (Note-2/.-2)
15
5%
NO /
AD
X-600-B-2007-05607
060
WF
3172
10
150HDPE
TP-1111 / 060-WF-1002-10-HDPE
TP-1110B
+5 / +40
8-9.5
10
NO /
15
100% visual
NO /
N/A
X-600-B-2006-05607
060
WF
3174
12
150H04
TP-1029
TP-1030
+5/+40
8-9.5
-40/+75
14.5
HCW5 (Note-2/.-2)
21.75
5%
NO/
AD
X-600-B-2006-05607
060
WF
3175
150H04
TP-1113
TP-1112
+5/+40
8-9.5
-40/+75
14.5
HCW5 (Note-2/.-2)
21.75
5%
NO/
AD
X-600-B-2006-05607
060
WF
3176
12
150H04
TP-1037
TP-1038
+5/+40
8-9.5
-40/+75
14.5
HCW5 (Note-2/.-2)
21.75
5%
NO/
AD
X-600-B-2006-05607
3200
WF
4112
14
150H04
O-3200-WF-4027-16-150PE2-NI / TP-1132A
O-3200-WF-4113-14-150H04-HCW5
+5 / +40
8-9.5
-40 / +75
14.5
HCW5 (Note-2/.-2)
21.75
5%
NO/
AD
O-3200-B-5056-05607
3200
WF
4113
14
150H04
PCV 320050
PCV-320050
+5 / +40
895
8-9.5
-40
40 / +75
14 5
14.5
HCW5 (N
(Note-2/.-2)
t 2/
2)
21 75
21.75
5%
NO/
AD
3200
WF
4114
14
150H04
O-3200-WF-4113-14-150H04-HCW5
PSV-320051A/B
+5 / +40
8-9.5
-40 / +75
14.5
HCW5 (Note-2/.-2)
21.75
5%
NO/
AD
O-3200-B-5056-05607
3200
WF
4115
14
150H04
PSV-320051A/B
O-3200-WF-4016-14-150H04-HCW5
+5 / +40
8-9.5
-40 / +75
14.5
HCW5 (Note-2/.-2)
21.75
5%
NO/
AD
O-3200-B-5056-05607
3200
WF
4116
14
150H04
PCV-320050
O-3200-WF-4024-14-150H2G-NI /TP-1133
+5/+40
ATM-1.2
-40 / +75
14.5
HCW5 (Note-2/.-2)
21.75
5%
NO/
AD
O-3200-B-5056-05607
3510 / 4600
WF
4000
20
150HDPE
TP-301B / 351-WF1000-300-GOST-NI
TP-512B / WF-203-10-C14A
+5 / +40
8-9.5
14.5
NO /
21.75
100% visual
NO /
N/A
O-3510-B-2081-05607
O-4600-B-5008-05607
3510 / 4600
WF
4001
20
150HDPE
TP-301A / 351-WF1000-300-GOST-NI
TP-512A / WF-203-10-C14A
+5 / +40
8-9.5
14.5
NO /
21.75
100% visual
NO /
N/A
O-3510-B-2081-05607
O-4600-B-5008-05607
4600
WF
4050
20
150H04 /
150HDPE
WF-203-10"-C14A
10"-WF-1005-C14A
+5 / +40
8-9.5
14.5
NO /
21.75
100% visual
NO /
N/A
O-4600-B-2140-05607
O-4600-B-5008-05607
4600
WF
4051
20
150H04 /
150HDPE
WF-203-10"-C14A
10"-WF-1005-C14A
+5 / +40
8-9.5
14.5
NO /
21.75
100% visual
NO /
N/A
O-4600-B-2140-05607
O-4600-B-5008-05607
9200
WF
4012
12
150HDPE
TP-1347
last FW hydrant
+5/+40
8-9.5
14.5
NO/
21.75
100%visual
NO/
N/A
62-9200-B-PID-9211-01-05607
NOTES
1
Minimum design pressure and hydrotest pressure requirement for these FW lines are 1.5 barg and 2.25 barg respectively. However, 14.5 barg design pressure and 21.75 barg hydrotest pressure are specified for consistency with specifications for other lines
in FW network.
1.5 . 2.25 . . ,
14.5 . 21.75 . .
All new underground lines shall be of HDPE material (150HDPE piping spec). All aboveground lines in FW service shall be of CS material (150H04 spec). Aboveground CS lines outside pump house shall be heat traced to 5 oC.
( ) 150HDPE ( 150H04). 5oC
For HDPE pipes, design temperature is -40 / +40 0C, DP = 14.5 barg. = -40 / +40 C, = 14.5 .
This line list includes new lines only. For the existing lines being modified, design and test conditions will be: Sulphur Pad area: HDPE pipes: DP = 10.0 barg, Hydrotest Pressure = 15.0 barg. Other areas: CS lines: DP=14.5 barg, Test pressure=14.5 barg. HDPE/GRE lines: DP = 14.5 barg, Test Pressure = 21.75 barg.
. . , . : ( ): = 10.0 ., = 15.0 .
: : . = 14.5 , . = 14.5 . . /: . = 14.5 , . = 21.75 .
0
D
C
B
A
02.05.2012
28.12.2011
28.12.10
4.11.10
15.07.10
KU
KU
NK
AV
KU
VMM
VMM
VMM
NK/ VMM
NK / VMM
VMM
VMM
VMM
NK/ VMM
NK / VMM
CW
CW
NI
NI
NI
REV / .
DATE /
DESCRIPTION/
BY / .
HK /
ENG/
SUP/
PFU /
LINE LIST /
RW
MGR/
PROJECT No
AFE No
DOCUMENT NUMBER
X-000-056-07
6310110271
REV/
0
PLL-056-07-B-0026
OPER/
4 OF/ 4