RESUMEN DE CRONOGRAMA VALORIZADO DE OBRA

OBRA : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C

05/09/13-30/09/13

01/10/13-31/10/13

01/11/13-30/11/13

01/12/13-31/12/13

01/01/14-31/01/14

01/02/14-28/02/14

01/03/14-04/03/14

OBRAS CIVILES

4,221,879.74

178,655.41

284,308.12

487,757.20

969,091.31

1,151,924.57

575,236.60

574,906.53

EQUIPAMIENTO

264,438.20

0.00

0.00

0.00

11,632.94

48,881.62

203,923.64

0.00

TOTAL PRESUPUESTO S/. (INC. IGV)


% DE AVANCE MENSUAL
% AVANCE ACUMULADO

4,486,317.94

178,655.41
3.98
3.98

284,308.12
6.34
10.32

487,757.20
10.87
21.19

980,724.25
21.86
43.05

1,200,806.18
26.77
69.82

779,160.24
17.37
87.19

574,906.53
12.81
100.00

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA_OBRAS CIVILES


OBRA : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

01.00.00
01.01
01.02
01.03
01.04
01.05
02
02.01
02.01.01
02.01.02
02.02

02.02.01
02.02.02
02.02.03
02.02.04
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.02
03.02.01
03.02.02
03.02.03
03.03
03.03.01
03.03.01.01
03.03.01.02
03.03.01.03
03.03.02
03.03.02.01
03.03.02.02
03.03.02.03
03.03.03
03.03.03.01
03.03.03.02
03.03.03.03
03.03.04
03.03.04.01
03.03.04.02
03.03.04.03
03.03.04.04
03.04
03.04.01
03.04.02
03.04.03
03.05
03.05.01
03.06
03.06.01
03.06.02
03.06.03
03.06.04
03.07
03.07.01
03.07.02
03.08
03.08.01
03.08.02
03.08.03
03.09
03.09.01
03.09.02
03.09.03
03.10
03.10.01
03.10.02
03.11
03.11.01
03.11.02
03.11.03
03.12
03.12.01
03.12.01.01
03.12.01.02
03.12.02
03.12.02.01
03.12.02.02
03.12.02.03
03.13

Descripcin

ARQUITECTURA Y ESTRUCTURAS
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACIN DE OBRA DE 3.60 X 2.40 M
ALMACEN, OFICINA, CASETA DE GUARDIANIA
INSTALACION PROVISIONAL PARA DEPOSITO DE AGUA
SERVICIO DE BAO PORTATIL (INODORO - LAVADERO) INC. MONTAJE
CERCO PROVISIONAL
HABILITACION DEL TERRENO
TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
LIMPIEZA Y DESFORESTACION RENDIMIENTO 1.0 HAS/DIA
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO RENDIMIENTO=570 M3/DIA
CORTE MATERIAL SUELTO MATERIA ORGANICA H=0.70M , SEGUN ESTUDIO SUELOS
RELLENO Y COMPACT. CON MATERIAL DE PRESTAMO C/EQUIPO
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
CERCO PERIMETRICO Y CASETA DE CONTROL
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMIENTACION
RELLENO COMPACTADO CON HORMIGN PARA CIMIENTOS, E= 0.20 M
BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO
RELLENO COMPACTADO DE ZANJAS CON MATERIAL PROPIO
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
OBRAS CONCRETO SIMPLE
SOLADO 1:12 e=0.10
FALSO PISO MEZCLA 1:8 E= 10cm
CIMIENTOS CORRIDOS 1:10 +30% P.G
OBRAS DE CONCRETO ARMADO
SOBRECIMIENTOS ARMADOS
CONCRETO F'C=210 KG/CM2. PARA SOBRECIMIENTO
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
ACERO FY=4200 kg/cm2 PARA SOBRECIMIENTO
COLUMNAS
CONCRETO F'C=210 KG/CM2. PARA COLUMNAS.
ENCOFRADO Y DESENCOFRADO NORMAL DE COLUMNAS
ACERO FY=4200 kg/cm2 PARA COLUMNAS
VIGAS
CONCRETO F'C=210 KG/CM2. PARA VIGAS
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS.
ACERO FY=4200 kg/cm2 PARA VIGAS
LOSA ALIGERADA
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS
ACERO GRADO 60 EN LOSAS ALIGERADAS
LADRILLO HUECO DE ARCILLA 15 X 30 X 30 CM PARA TECHO ALIGERADO
MUROS DE ALBAILERIA
MURO DE LADRILLO KK DE SOGA (1:4) CEMENTO-ARENA
MUROS DE LADRILLO KK DE CABEZA (1:4)
ACERO FY=4200 kg/cm2
JUNTAS DE DILATACION
JUNTA DE CONSTRUCCION CON TEKNOPORT
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO COLUMNAS MEZ. C:A 1.5 E=1.5 CM
TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO-ARENA
TARRAJEO MUROS INTERIORES Y EXTERIORES C.A 1:4 e=1.5cm.
CIELO RASOS CON MEZCLA 1:5
CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO EXTERIOR H= 30 cm C.A. 1:2
e=1.5 cm
CONTRAZOCALO DE CERAMICA H=10CM, INTERIOR, CASETA CONTROL
PISOS CERAMICO ANTIDESLIZANTE
PISO DE CERAMICA ANTIDESLIZANTE 0.30 x 0.30 cm. TRANSITO INTENSO
CANTONERA DE ALUMINIO 2"
CONTRAPISO DE e= 20 mm MEXCLA 1:3
PINTURA
PINTURA LATEX LDOS MANOS EN MUROS, COLUMNAS Y VIGAS
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO
PINTURA LATEX DOS MANOS EN CIELO RASO
CARPINTERIA DE MADERA
PUERTA MADERA CEDRO INC/PINTURA
VENTANA MADERA CEDRO INC/PINTURA
CARPINTERIA METALICA
PORTON METALICO (4.00 x 7.50) SEGUN DISEO
PUERTA METALICA CON PERFILES ANGULARES 1"X1"X1/8"
REJILLA METALICA SOBRECIMIENTO
CERRAJERIA
BISAGRAS
BISAGRA ALUMINIZADA 4" PESADA PARA PUERTA
BISAGRA ALUMINIZADA 4" PARA VENTANAS
CERRADURAS
CERRADURA TRES GOLPES PARA PUERTA CON TIRADOR
MANIJA DE BRONCE PARA PORTAUELAS EN VETANAS DE FIERRO
CERROJO DE ALUMINIO 3" PARA VENTANAS
VIDRIOS, CRISTALES Y SIMILARES

Und

Metrado

Precio

und
m2
und
und
m

1.00
48.00
1.00
3.00
269.98

821.29
102.09
809.12
300.00
22.88

m2
HA

20,000.21
2.00

1.24
1,545.84

m3
m3
m3
m3

4,049.58
9,800.10
14,201.62
16,619.62

4.21
4.21
49.91
6.90

m3
m3
m2
m3
m3

384.37
76.62
6.00
29.82
425.46

26.62
114.17
11.68
34.52
6.90

m2
m2
m3

12.54
6.00
269.43

24.43
27.21
158.43

m3
m2
kg

48.64
637.93
2,824.66

414.69
33.94
3.65

m3
m2
kg

35.49
492.60
6,455.97

440.12
50.47
3.65

m3
m2
kg

18.41
212.42
1,775.26

388.80
56.31
3.65

m3
m2
kg
und

1.59
21.57
118.40
151.00

356.65
32.04
3.65
2.50

m2
m2
kg

1,401.55
30.62
545.08

46.55
79.94
3.65

217.75

3.80

m2
m2
m2
m2

492.60
212.42
175.00
21.57

29.14
34.72
18.61
31.13

m
m

684.01
8.80

12.28
10.64

m2
m
m2

6.00
1.80
6.00

41.99
7.02
15.25

m2
m2
m2

880.01
205.20
21.57

6.56
9.27
5.43

m2
m2

3.78
5.38

445.70
238.66

und
m2
und

1.00
3.30
1.00

7,153.50
303.47
217.43

pza
pza

6.00
8.00

6.44
6.12

und
pza
pza

3.00
4.00
2.00

73.55
1.63
5.73

Parcial

821.29
4,900.32
809.12
900.00
6,177.14
24,800.26
3,091.68
17,048.73
41,258.42
708,802.85
114,675.38
10,231.93
8,747.71
70.08
1,029.39
2,935.67
306.35
163.26
42,685.79
20,170.52
21,651.34
10,310.01
15,619.86
24,861.52
23,564.29
7,157.81
11,961.37
6,479.70
567.07
691.10
432.16
377.50
65,242.15
2,447.76
1,989.54
827.45
14,354.36
7,375.22
3,256.75
671.47
8,399.64
93.63
251.94
12.64
91.50
5,772.87
1,902.20
117.13
1,684.75
1,283.99
7,153.50
1,001.45
217.43
38.64
48.96
220.65
6.52
11.46
-

PLAZO DE EJECUCION = 06 MESES = 180 D.C

05/09/13-30/09/13

821.29
4,900.32
404.56

01/10/13-31/10/13

01/11/13-30/11/13

01/12/13-31/12/13

404.56
150.00

150.00

150.00

4,960.05
3,091.68

4,960.05

4,960.05

9,920.10

8,524.37
8,251.68
70,880.29
17,201.31

8,524.37
8,251.68
141,760.57
17,201.31

24,755.05
141,760.57
17,201.31

354,401.43
63,071.46

3,069.58
2,624.31
35.04
205.88

3,069.58
2,624.31
35.04
617.63

4,268.58

306.35
163.26
6,402.87

32,014.34

1,031.00

6,051.16
6,495.40
2,062.00

14,119.36
15,155.94
7,217.01

5,891.07

4,685.96
8,701.53
4,712.86

10,933.90
16,159.99
12,960.36

01/01/14-31/01/14

150.00

6,177.14

4,092.77
3,499.08
205.88
2,935.67

7,157.81
11,961.37
6,479.70
567.07
691.10
432.16
377.50
6,524.22
2,447.76
1,193.72

6,524.22

496.47

330.98

1,435.44
737.52
325.68

1,435.44
737.52
325.68

2,519.89
93.63

5,879.75

52,193.72

795.82

11,483.49
5,900.18
2,605.40
671.47

251.94
12.64
91.50
5,772.87
1,902.20
117.13
1,684.75
1,283.99
7,153.50
1,001.45
217.43

38.64
48.96
220.65
6.52
11.46

01/02/14-28/02/14

150.00

01/03/14-04/03/14

150.00

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA_OBRAS CIVILES


OBRA : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item
03.13.01

Descripcin
VIDRIO INCOLORO SEMIDOBLE

04
04.01
04.01.01
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06

CONSTRUCCION DE PLATAFORMA DE HELIPUERTO


TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
MOVIMIENTO DE TIERRAS
CORTE TERRENO NATURAL A NIVEL DE SUBRASANTE
EXCAVACION DE ZANJAS PARA SARDINELES
CONFORMACION Y COMPACTACION DE SUBRASANTE CON EQUIPO
SUB BASE AFIRMADO C/EQUIPO E= 0.10 M C/EQUIPO
BASE AFIRMADO C/EQUIPO E= 0.20 M C/EQUIPO, EXTENDIDO, RIEGO Y COMPACTACION
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
OBRAS CONCRETO SIMPLE
CONCRETO EN LOSAS F'C=280 KG/CM2
ENCOFRADO Y DESENCOFRADO DE LOSAS
CONEXION ENTRE LOSAS RIGIDAS (PAVIMENTOS) JUNTA DILATACION
CONEXION ENTRE LOSAS RIGIDAS JUNTA CONTRACCION
CURADO DE CONCRETO
JUNTAS DE DILATACION E=1" CON TEKNOPORT

05
05.01
05.01.01
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.02.06
05.03
05.03.01
05.03.02
05.03.03
05.03.04
05.03.05
05.03.06

CONSTRUCCION DE PLATAFORMA CARGA Y DESCARGA


TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
MOVIMIENTO DE TIERRAS
CORTE TERRENO NATURAL A NIVEL DE SUBRASANTE
EXCAVACION DE ZANJAS PARA SARDINELES
CONFORMACION Y COMPACTACION DE SUBRASANTE CON EQUIPO
SUB BASE AFIRMADO C/EQUIPO E= 0.10 M C/EQUIPO
BASE AFIRMADO C/EQUIPO E= 0.20 M C/EQUIPO, EXTENDIDO, RIEGO Y COMPACTACION
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
OBRAS CONCRETO SIMPLE
LOSA DE CONCRETO F'c=210 Kg/cm2 , E=0.20M
ENCOFRADO Y DESENCOFRADO DE LOSAS
CONEXION ENTRE LOSAS RIGIDAS (PAVIMENTOS) JUNTA DILATACION
CONEXION ENTRE LOSAS RIGIDAS JUNTA CONTRACCION
CURADO DE CONCRETO
JUNTAS DE DILATACION E=1" CON TEKNOPORT

06
06.01
06.01.01
06.02
06.02.01
06.02.02
06.02.03
06.02.04
06.03
06.03.01
06.03.02
06.03.03
06.03.04
06.03.05

CONSTRUCCION DE PLATAFORMA ENTRENAMIENTO


TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA SARDINELES
NIVELACION INTERIOR Y COMPACTACIN DE SUBRASANTE
BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
OBRAS CONCRETO SIMPLE
PLATAFORMA CONCRETO F'c=175 kg/cm2 e=10.0cm
CONCRETO DE SARDINELES F'C= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO PAOS DE PLATAFORMA
CURADO DE CONCRETO
JUNTAS DE DILATACION E=1" CON TEKNOPORT

07
07.01
07.01.01
07.01.02
07.01.03
07.01.04
07.01.05
07.02
07.02.01
07.02.02
07.02.03
07.02.04
07.02.05
07.02.06

VEREDAS DE CONCRETO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA SARDINELES
RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO
NIVELACION INTERIOR Y COMPACTACIN DE SUBRASANTE
BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
OBRAS CONCRETO SIMPLE
CONCRETO F'C= 175 KG/CM2 ACABADO FROTACHADO Y BRUADEO - VEREDAS EXTERIORES
CONCRETO F'C= 175 KG/CM2 - SARDINEL DE VEERDAS
ENCOFRADO Y DESENCOFRADO DE VEREDAS
ENCOFRADO Y DESENCOFRADO DE SARDINELES
CURADO DE CONCRETO
JUNTAS DE DILATACION E=1" CON TEKNOPORT

08
08.01
08.01.01
08.02
08.02.01
08.02.02
08.02.03
08.02.04
08.02.05
08.02.06
08.02.07
08.02.08
08.03
08.03.01
08.03.02
08.03.03

CONSTRUCCION DE ACCESOS PRINCIPALES Y ACCESO AUXILIAR


TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO RENDIMIENTO=570 M3/DIA
EXCAVACION DE ZANJAS PARA SARDINELES
RELLENO Y COMPACT. CON MATERIAL DE PRESTAMO C/EQUIPO
CONFORMACION Y COMPACTACION DE SUBRASANTE CON EQUIPO
SUB BASE AFIRMADO C/EQUIPO E= 0.10 M C/EQUIPO
SUB BASE AFIRMADO C/EQUIPO e= 20 cm., VIA AUXILIAR
BASE AFIRMADO C/EQUIPO E= 0.20 M C/EQUIPO, EXTENDIDO, RIEGO Y COMPACTACION
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
PAVIMENTACION CON BLOQUETAS
CAMA DE ARENA GRUESA DE E= 5 CM PARA ASENTADO DE ADOQUINES
PAVIMENTACIN DE VAS CON ADOQUINES (10 X 20 X8M)
CORTE DE ADOQUINES DE CONCRETO

Und
p2

Metrado

Precio

57.84

5.26

m2

957.00

1.24

m3
m3
m2
m2
m2
m3

143.55
0.68
957.00
957.00
957.00
173.08

25.85
26.62
2.53
7.00
17.50
6.90

m3
m2
und
und
m2
m

198.96
167.00
184.00
1,462.00
957.00
587.00

418.89
25.31
13.17
6.99
0.69
10.43

m2

1,404.00

1.24

m3
m3
m2
m2
m2
m3

421.20
0.89
1,404.00
1,404.00
1,404.00
506.51

25.85
26.62
2.53
7.00
17.50
6.90

m3
m2
und
und
m2
m

290.84
235.80
362.00
1,982.00
1,404.00
855.00

357.98
25.31
13.17
6.99
0.69
10.43

m2

375.00

1.24

m3
m2
m2
m3

0.44
375.00
375.00
0.53

26.62
3.82
11.68
6.90

m2
m3
m2
m2
m

375.00
3.60
52.50
375.00
205.00

45.01
348.82
17.41
0.69
10.43

m3
m3
m2
m2
m3

4.75
101.89
1,202.43
1,063.52
5.70

26.62
98.79
3.82
11.68
6.90

m2
m3
m2
m2
m2
m

1,202.43
39.92
336.06
27.45
1,202.43
718.83

46.41
354.11
25.31
38.77
0.69
10.43

m2

2,642.64

1.24

m3
m3
m3
m2
m2
m2
m2
m3

115.74
12.80
811.28
2,642.64
877.99
1,724.02
877.99
154.25

4.21
26.62
49.91
2.53
7.00
12.35
17.50
6.90

m2
m2
m

877.99
877.99
357.79

5.45
52.52
9.25

Parcial
304.24
1,186.68
3,710.77
18.10
2,421.21
6,699.00
16,747.50
1,194.25
83,342.35
4,226.77
2,423.28
10,219.38
660.33
6,122.41
1,740.96
10,888.02
23.69
3,552.12
9,828.00
24,570.00
3,494.92
104,114.90
5,968.10
4,767.54
13,854.18
968.76
8,917.65
465.00
11.71
1,432.50
4,380.00
3.66
16,878.75
1,255.75
914.03
258.75
2,138.15
126.45
10,065.71
4,593.28
12,421.91
39.33
55,804.78
14,136.07
8,505.68
1,064.24
829.68
7,497.40
3,276.87
487.27
340.74
40,490.98
6,685.88
6,145.93
21,291.65
15,364.83
1,064.33
4,785.05
46,112.03
3,309.56

PLAZO DE EJECUCION = 06 MESES = 180 D.C

05/09/13-30/09/13

01/10/13-31/10/13

01/11/13-30/11/13

01/12/13-31/12/13

01/01/14-31/01/14

304.24

01/02/14-28/02/14

1,186.68
3,710.77
18.10
1,210.61
3,349.50
8,373.75
238.85

1,210.61
3,349.50
8,373.75
477.70

1,690.71
969.31
4,087.75
264.13
2,448.96

4,167.12
2,536.06
1,453.97
6,131.63
396.20
3,673.45

477.70
79,175.23

1,740.96
4,355.21
9.48
1,420.85
982.80
2,457.00
349.49

6,532.81
14.21
2,131.27
8,845.20
22,113.00
3,145.43
5,205.75
298.41
238.38
692.71
48.44
445.88

98,909.16
5,669.70
4,529.16
13,161.47
920.32
8,471.77

465.00
11.71
1,432.50
4,380.00
3.66
16,878.75
1,255.75
914.03
258.75
2,138.15

126.45
5,032.86
2,296.64
6,210.96
19.67

5,032.86
2,296.64
6,210.96
19.67
2,790.24
706.80
425.28
53.21
41.48
374.87

53,014.54
13,429.27
8,080.40
1,011.03
788.20
7,122.53

48.73
34.07
2,024.55
668.59
614.59
2,129.17
1,536.48
106.43

389.82
272.59
36,441.88
5,348.70
4,916.74
17,033.32
12,291.86
851.46

3,276.87
48.73
34.07
2,024.55
668.59
614.59
2,129.17
1,536.48
106.43

4,785.05
27,667.22
1,985.74

18,444.81
1,323.82

01/03/14-04/03/14

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA_OBRAS CIVILES


OBRA : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item
08.04
08.04.01
08.04.02
08.04.03
08.04.04
08.05
08.05.01

Descripcin

Und

SARDINEL DE CONFINAMIENTO
SARDINELES DE CONFINAMIENTO F'C=210 KG/CM2.
m3
ENCOFRADO Y DESENCOFRADO DE SARDINELES
m2
CURADO DE CONCRETO
m2
JUNTAS DE DILATACION E=1" CON TEKNOPORT
m
ENCIMADO BUZONES
ENCIMADO DE BUZN DE CONCRETO EXISTENTE MAX=1.50M PARA ADECUACION DE RASANTEund

Metrado

Precio

22.01
280.35
51.19
29.25

357.98
38.77
0.69
10.43

4.00

317.34

09
09.01
09.02
09.03
09.04
09.05
09.06

AREAS VERDES
TIERRA DE CHACRA PARA RELLENO EN AREAS VERDES (Material de Prestamo)
EXTENDIDO Y NIVELACION DE TIERRA DE CHACRA PARA SEMBRADO DE GRAS
PREPARACION DE TIERRA DE CHACRA INC. FERTILIZANTES
SEMBRADO DE GRASS (Incluye Suministro y Seleccion)
RIEGO DE GRAS CON MANGUERA
PLANTA TIPICA PLANTONES

m3
m2
m3
m2
m2
und

726.04
4,821.19
726.04
4,821.19
4,821.19
68.00

49.58
1.33
22.73
2.78
0.26
15.10

10
10.01
10.02

VARIOS
LIMPIEZA GENERAL DE OBRA
PLACA RECORDATORIA DE BRONCE

m2
und

4,700.00
1.00

0.89
458.17

11
11.01

FLETE TERRETRE
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS

GLB

1.00

1,300.00

12
12.01
12.02
12.03
12.04

MEDIDAS DE MITIGACION AMBIENTAL


CAPACITACION AMBIENTAL
SUMINISTRO DE DEPOSITOS PARA BASURA
SUMINISTRO DE IMPLEMENTOS DE SEGURIDAD
ACONDICIONAMIENTO DE BOTADEROS

mes
und
und
und

3.00
10.00
1.00
1.00

3,500.00
52.20
2,263.90
800.00

01
01.01
01.01.01
01.01.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.03
01.03.01
01.03.02
01.04
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
01.04.06
01.04.07
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.05.05

INSTALACIONES SANITARIAS
LINEA DE CONDUCCION AGUA POTABLE
TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO (REDES)
DEMOLICION DE PAVIMENTO ASFALTICO 2"
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS H=1.20M
NIVELACION Y FONDOS PARA TUBERIA
CAMA DE APOYO MATERIAL GRUESO (0.60X0.10m)
RELLENO Y COMPACTACION DE ZANJAS
RED DE CONDUCCION
SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 2"
PRUEBA HIDRAULICA + DESINFECCION
ACCESORIOS Y VALVULAS
CONEXION A RED DE AGUA EXISTENTE
CODO PVC X 90 2"
CODO PVC X 12.25 2"
CODO PVC X 22.5 2"
TAPON PVC C.10 2"
VALVULA DE INTERRUPCION DE 2"
SUMINISTRO E INSTALACION CAJA C/MARCO-TAPA FF P/VALVULA
REPOSICION DE PAVIMENTACION ASFALTICA
CONFORMACIN Y COMPACTACIN SUBRASANTE CON EQUIPO
RELLENO COMPACTADO CON AFIRMADO
BASE E=0.20M CON EQUIPO EXTENDIDO, RIEGO Y COMPACTADO
IMPRIMACION ASFALTICA
CARPETA ASFALTICA EN CALIENTE DE 2"

m
m2

498.51
48.00

1.40
42.58

m
m
m
m

498.51
498.51
498.51
498.51

26.62
1.06
5.80
9.22

m
m

498.51
498.51

11.04
2.32

1.00
1.00
2.00
4.00
1.00
1.00
1.00

762.85
19.86
20.45
19.86
6.41
243.14
236.00

48.00
3.60
7.20
48.00
48.00

6.54
116.42
154.50
4.90
35.00

02
02.01
02.01.01
02.01.02
02.01.03
02.01.04
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.04
02.04.01
02.05
02.05.01
02.05.01.01

RED DE DISTRIBUCION AGUA POTABLE


MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
REFINE Y NIVELACION DE FONDO DE ZANJA
CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
RELLENO Y COMPACTACION DE ZANJAS
RED DE DISTRIBUCION
SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 11/2"
SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 1"
SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 1/2"
PRUEBA HIDRAULICA + DESINFECCION
CAJA DE REGISTRO PARA AGUA (BY PAS) DE 0.40 x 0.50 cm H= 1.00 M.
ACCESORIOS Y VALVULAS
ACCESORIOS DISTRIBUCION DE AGUA
VALVULA COMPUERTA DE BRONCE DE 1"
CONEXIONES DOMICILIARIAS
SUMINISTRO INST. CONEXION DOMICI. AGUA 1/2" A TUB 2", tapa termoplastica
SISTEMA DE AGUA FRIA Y REDES
SALIDAS DE AGUA FRIA
SALIDA DE AGUA FRIA PVC SAP DE 1/2" INC. GRIFO P/ JARDIN

m
m
m
m

183.80
183.80
183.80
183.80

10.65
1.06
0.89
9.22

m
m
m
m
und

56.10
104.70
23.00
183.80
1.00

7.07
4.64
3.61
2.32
248.08

und
und

1.00
1.00

422.53
139.45

und

1.00

278.83

pto

3.00

345.09

03
03.01
03.01.01
03.01.02
03.01.03
03.01.04

RED DE DISTRIBUCION DE DESAGUE


MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
REFINE Y NIVELACION DE FONDO DE ZANJA
CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
RELLENO Y COMPACTACION DE ZANJAS

179.85
179.85
179.85
179.85

10.65
1.06
0.89
9.22

GLB
pza
pza
pza
und
und
und
m2
m3
m3
m2
m2

m
m
m
m

Parcial
7,879.14
10,869.17
35.32
305.08
1,269.36
35,997.06
6,412.18
16,502.89
13,402.91
1,253.51
1,026.80
4,183.00
458.17
1,300.00
10,500.00
522.00
2,263.90
800.00
697.91
2,043.84
13,270.34
528.42
2,891.36
4,596.26
5,503.55
1,156.54
762.85
19.86
40.90
79.44
6.41
243.14
236.00
313.92
419.11
1,112.40
235.20
1,680.00
1,957.47
194.83
163.58
1,694.64
396.63
485.81
83.03
426.42
248.08
422.53
139.45
278.83
1,035.27
1,915.40
190.64
160.07
1,658.22

PLAZO DE EJECUCION = 06 MESES = 180 D.C

05/09/13-30/09/13

01/10/13-31/10/13

01/11/13-30/11/13

01/12/13-31/12/13

01/01/14-31/01/14
4,727.48
6,521.50
21.19
183.05

01/02/14-28/02/14

01/03/14-04/03/14

3,151.66
4,347.67
14.13
122.03

1,269.36

35,997.06
6,412.18
16,502.89
13,402.91
1,253.51
1,026.80

2,091.50
458.17

650.00

226.39
80.00

650.00

1,050.00
104.40
452.78
160.00

1,050.00
104.40
452.78
160.00

1,050.00
104.40
452.78
160.00

5,250.00
104.40
452.78
160.00

2,100.00
104.40
226.39
80.00

697.91
2,043.84
1,327.03
52.84
289.14
459.63

11,943.31
475.58
2,602.22
4,136.63
5,503.55
1,156.54
762.85
19.86
40.90
79.44
6.41
243.14
236.00
313.92
419.11
1,112.40
235.20
1,680.00

978.74
97.42
81.79
847.32

978.74
97.42
81.79
847.32

198.32
242.91
41.52
213.21
124.04

198.32
242.91
41.52
213.21
124.04

211.27
69.73

211.27
69.73

139.42

139.42

517.64

517.64

957.70
95.32
80.04
829.11

957.70
95.32
80.04
829.11

2,091.50

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA_OBRAS CIVILES


OBRA : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.03
03.03.01
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07

Descripcin
RED DE DISTRIBUCION
SUMINISTRO E INST. TUBERIA PVC SAL DE 4"
SUM. E INSTALACION TUBERIA PVC DESAGUE 6"
CAJA DE REGISTRO DE DESAGUE 10" X 24"
CAJA DE REGISTRO DE DESAGUE 12" X 24"
CAJA DE REGISTRO DE DESAGUE 18" X 24"
CAJA DE REGISTRO DE DESAGUE 24" X 24"
BUZON TIPICO D=1.20 M. C/MARCO Y TAPA DE CONCRETO, H=1.50 M
CONEXIONES DOMICILIARIAS
SUMIN/ INST. CONEXION DOMICILIARIA DESAGUE PVC L = 10m No - Inc/caja
SISTEMA DE EVACUACION PLUVIAL
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
CUNETAS
CONFORMACION DE SUB RASANTE CON PLANCHA DE CUNETA
BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO
CONCRETO F'C=140 KG/CM2.PARA CUNETA
ENCOFRADO Y DESENCOFRADO PARA CUNETA
CURADO DE CONCRETO
JUNTAS DE DILATACION E=1" CON TEKNOPORT
REJILLA METALICA PARA CUNETA

Und

Metrado

Precio

m
m
pza
pza
pza
pza
und

99.40
80.45
7.00
3.00
3.00
3.00
1.00

9.63
24.26
176.90
179.38
146.62
155.22
1,879.34

und

1.00

368.42

m3
m3

45.62
54.74

30.42
6.90

m2
m2
m3
m2
m2
m
m

124.05
124.05
20.80
168.50
292.55
74.26
139.45

3.97
11.68
294.26
39.11
0.69
10.43
79.56

und
und
und

3.00
2.00
5.00

1,090.00
1,250.00
8.40

und
und
und
und
und
und
und

3.00
2
2.00
2.00
2
1.00
1.00

78.00
60.00
100.98
220.00
117.65
210.08
18.00

m
m
m
m
und
m
m
und
und

404.88
14.00
73.00
416.58
5.00
12.00
10.00
4.00
6

5.00
6.72
25.00
40.00
437.23
2.10
0.58
4.08
10.16

und
und
und

7.00
6
4

36.21
63.03
12.71

und
und
und
und
und
und
und
und
und
und
und
m
und
und
und
und

6
18
24
6
4
5
1
6
16
12
6
33
22
3
3
5

194.92
0.90
0.90
6.36
6.00
11.34
11.34
5.51
4.07
5.88
4.66
3.36
1.06
250.00
8.00
12.00

m
und
und
und
und
und
BOL
BOL
und
m3

72
12
5
5
5
5
12
12
6
7.8

7.25
3.90
22.46
2.54
15.00
10.00
30.00
11.86
2.97
27.73

INSTALACIONES ELECTRICAS
1 SISTEMA DE UTILIZACIN PRIMARIA 10KV. COER
1.01 SUMINISTRO DE MATERIALES PARA EL SISTEMA DE UTILIZACION
01.01.01
POSTES Y CRUCETAS
01.01.01.01 POSTES CONCRETO ARMADO CENTRIFUGADO DE:
01.01.01.01.0 Poste CAC 13/400/2/210/405
01.01.01.01.0 Poste CAC 13/600/2/210/405
01.01.01.01.0 Perilla de Concreto
01.01.01.02 CRUCETAS DE CONCRETO ARMADO VIBRADO Y DUCTOS
01.01.01.02.0 Mensula de CAV M/0.80/500
01.01.01.02.0 Cruceta de madera tratada de 1.50 m x 110mm x 90mm
01.01.01.02.0 Media Palomilla Simple de C.AV. Mp/1.10/150
01.01.01.02.0 Media Loza de CAV 1.10m/750
01.01.01.02.0 Palomilla Simple de C.AV. Mp/1.50/150
01.01.01.02.0 Media Loza de CAV 1.30m/750
01.01.01.02.0 Ducto de concreto de dos vias
01.01.02
CONDUCTORES, CABLES Y ACCESORIOS:
01.01.02.01 Conductor de Aleacin de Aluminio 6201-T81 (AAAC), cableado 120 mm2.
01.01.02.02 Conductor de cobre desnudo, cableado, temple blando , 35 mm 2
01.01.02.03 Conductor de cobre desnudo, cableado, temple duro , 95 mm 2
01.01.02.04 Cable subterraneo N2XSY 150mm2 8.7/15 KV
01.01.02.05 Cabeza Terminal 8.7/15 KV P/ N2XSY x 150mm2 tipo exterior
01.01.02.06 Cinta plana de armar segn requerimiento
01.01.02.07 Alambre de Al 16 mm2 para amarre
01.01.02.08 Varilla de armar simple Al-Al , para conductor segn requerimiento
01.01.02.09 Grapa tipo pistola de Al-Al para conductor de segn requerimiento
01.01.03
AISLADORES Y ESPIGAS:
01.01.03.01 Aislador Polimerico Tipo Pin para 15 KV + accesorios de fijacion
01.01.03.02 Aisladores Polimricos tipo Suspensin 15 Kv
01.01.03.03 Espiga para vertice de poste para PIN Polimerico 15 KV
01.01.04
FERRETERIA:
01.01.04.01 Seccionador Cut-Out,15KV,95KV-BIL, 100 A, tipo Expulsin
01.01.04.02 Arandela cuadrada plana de A G A G 57 mm x 57mm x 5 mm,agujero de 18 mm
01.01.04.03 Arandela cuadrada curva de A G A G 76 mm x 76mm x 5 mm,agujero de 18 mm
01.01.04.04 Perno Ojo A G de 16mm x 308 mm long, 102 mm maquinado con tuerca y contrat.
01.01.04.05 Perno doble armado de 508mm long. x 16mm ? con tuerca y contratuerca
01.01.04.06 Perno maquinado A G 16mm x 457 mm con 152 mm tca y cttca.
01.01.04.07 Perno maquinado A G 16mm x 508 mm con 152 mm tca y cttca.
01.01.04.08 Adaptador tipo lira de AG de 16mm x 78 mm long.
01.01.04.09 Plancha de Cobre tipo "J"
01.01.04.10 Conector tipo Split bolt para cable 35 mm2
01.01.04.11 Conector tipo cua tipo AMPAC
01.01.04.12 Fleje de acero inoxidable (Cinta Band it), de 19 mm
01.01.04.13 Hebilla de acero inoxidable para fleje de 19 mm
01.01.04.14 Tubo de FG de 6" diam x 6m ms Curva FG 4"
01.01.04.15 Fusible de expulsin tipo K 6A
01.01.04.16 Silicona liquida
01.01.05
PUESTA A TIERRA
01.01.05.01 Conductor de Puesta a Tierra de cobre recocido de 25 mm2 o Cooperweld N 02 AWG tipo P
01.01.05.02 Conector tipo Split bolt para cable 25 mm2
01.01.05.03 Electrodo de Copperweld de 16 mm x 2400 mm long.
01.01.05.04 Conector de Bronce para electrodo de 16 mm
01.01.05.05 Caja de concreto
01.01.05.06 Registro de concreto para inspeccin de puesta a tierra (tapa)
01.01.05.07 Bentonita (Saco de 50 kg)
01.01.05.08 Sal Industrial (Saco de 50 kg)
01.01.05.09 Tubo PVC SAP 3/4" x 1 m de long
01.01.05.10 Tierra vegetal cernida

Parcial
957.22
1,951.72
1,238.30
538.14
439.86
465.66
1,879.34
368.42
1,387.76
377.71
492.48
1,448.90
6,120.61
6,590.04
201.86
774.53
11,094.64
3,270.00
2,500.00
42.00
234.00
120.00
201.96
440.00
235.30
210.08
18.00
2,024.40
94.08
1,825.00
16,663.20
2,186.15
25.20
5.80
16.32
60.96
253.47
378.18
50.84
1,169.52
16.20
21.60
38.16
24.00
56.70
11.34
33.06
65.12
70.56
27.96
110.88
23.32
750.00
24.00
60.00
522.00
46.80
112.30
12.70
75.00
50.00
360.00
142.32
17.82
216.29

PLAZO DE EJECUCION = 06 MESES = 180 D.C

05/09/13-30/09/13

01/10/13-31/10/13

01/11/13-30/11/13

01/12/13-31/12/13

01/01/14-31/01/14

01/02/14-28/02/14

478.61
975.86
619.15
269.07
219.93
232.83
939.67

478.61
975.86
619.15
269.07
219.93
232.83
939.67

184.21

184.21

1,387.76
377.71
492.48
1,448.90
6,120.61
6,590.04

5,547.32

327.00
250.00
4.20

2,943.00
2,250.00
37.80

23.40
12.00
20.20
44.00
23.53
21.01
1.80

210.60
108.00
181.76
396.00
211.77
189.07
16.20

202.44
9.41
182.50
1,666.32
218.62
2.52
0.58
1.63
6.10
0.00
25.35
37.82
5.08

1,821.96
84.67
1,642.50
14,996.88
1,967.54
22.68
5.22
14.69
54.86
0.00
228.12
340.36
45.76

116.95
1.62
2.16
3.82
2.40
5.67
1.13
3.31
6.51
7.06
2.80
11.09
2.33
75.00
2.40
6.00

1,052.57
14.58
19.44
34.34
21.60
51.03
10.21
29.75
58.61
63.50
25.16
99.79
20.99
675.00
21.60
54.00

52.20
4.68
11.23
1.27
7.50
5.00
36.00
14.23
1.78
21.63

469.80
42.12
101.07
11.43
67.50
45.00
324.00
128.09
16.04
194.66

201.86
774.53
5,547.32

01/03/14-04/03/14

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA_OBRAS CIVILES


OBRA : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item
01.01.06
01.01.06.01
01.01.06.02
01.01.06.03
01.01.06.04
01.01.06.05
01.01.06.06
01.01.06.07
01.01.06.08
01.01.06.09
01.01.07
01.01.07.01
01.01.07.02
01.01.07.03
01.01.08
01.01.08.01
01.01.08.02
01.01.08.03
01.02
01.02.01
01.02.01.01
01.02.01.02
01.02.01.03
01.02.02
01.02.02.01
01.02.02.02
01.02.02.03
01.02.02.04
01.02.02.05
01.02.02.06
01.02.02.07
01.02.02.08
01.02.03
01.02.03.01
01.02.03.02
01.02.03.03
01.02.04
01.02.04.01
01.02.04.02
01.02.04.03
01.02.04.04
01.02.04.05
01.02.04.06
01.02.04.07
01.02.04.08
01.02.05
01.02.05.01
01.02.05.02
01.02.05.03
01.02.06
01.02.06.01
01.02.06.02
01.02.06.03
01.02.06.04
01.02.07
01.02.07.01
01.02.08
01.02.08.01
01.02.08.02
02
02.01
02.01.01
02.01.02
02.01.03
02.01.04
02.02
02.02.01
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.04
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.05
02.05.01
02.05.02
02.05.03
02.05.04

Descripcin
RETENIDAS
Cable de Acero HS de 10mm
Varilla de ancl. c/guardacabo AG 5/8" x2.40m(8') provisto de ojal guardacabo en un ext, con Tca
Arandela de anclaje cuadrada plana de A G 102 mm x 102mm x 6 mm con agujero central de 18
Perno angular 16 mm x 308 mm long, 102 mm maquinado con tuerca y contrat.
Aislador de Porcelana de Traccin Clase ANSI 54-2.
Canaleta guardacable de AG de 1/2" x 30 mm x 2,4 m con perno y tuerca en un extremo
Bloque de concreto armado 0.50 x 0.50 x 0.20m. Con agujero central de 11/16"
Mordaza preformada de acero para cable de 10 mm
Arandela cuadrada curva de A G 57 mm x 57mm x 5 mm con agujero central de 18 mm
SISTEMA DE MEDICION EN MEDIA TENSION
Transformador mixto 10kV, 15 - 20 - 25/5 A, cl 0,2
Medidor electrnico multitarifa y multifuncin, 4 hilos, cl 0,2
Caja portamedidor estandarizada
SUBESTACION AEREA TIPO MONOPOSTE
Transformador trifasico 100 KVA 10/0.38-0.23 KV
Tablero de Distribucin 3 280/220, para SED 100 KVA
Cable NYY, 3 - 1 x 50 mm2
MONTAJE ELECTROMECANICO DEL SISTEMA DE UTILIZACION
TRABAJOS PRELIMINARES
Replanteo topografico de la linea y ubicacin de estructuras
Ingenieria de Detalle y Expediente de Replanteo.
Campamentos y almecen general
MONTAJE DE POSTES:
Transporte de postes de almacen a punto de izaje
Excavacion hueco para poste en terreno normal
Instalacion poste de concreto armado
Cimentacion de Poste de Concreto
Construccin de Solado de Concreto
Recubrimiento de la Base con Sustancia Bituminosa
Recubrimiento base del poste con sellador impermeabilizante
Sealizacin de Estructura
TENDIDO Y FLECHADO DE CONDUCTORES, CABLES Y ACCESORIOS:
Tendido y Puesta en flecha de conductor AAAC
Tendido de Cable subterraneo N2XSY 1x150mm2 - 8.7/15 KV
Instalacion de terminaciones, para cable N2XSY 1x50mm2 - 8.7/15 KV exterior
ISNTALACION DE ARMADOS Y EQUIPOS DE MEDIA TENSION
Armado tipo PD-SEC C.A.C.
Armado tipo PMI-SEC C.A.C.
Armado tipo PTV-3S C.A.C.
Armado tipo PSVM-3 C.A.C.
Armado tipo SABM-3FC C.A.C.
Montaje de Trasformador Trifasico de 100 KVA 10 KV/0.38-0.23kV
Montaje de Tablero de Distribucion
Instalacion de Trafomix
INSTALACION DE RETENIDAS
Excavacion zanja para retenida en terreno normal
Instalacion de retenida inclinada
Relleno y compactacin de retenida inclinada
INSTALACION DE PUESTA A TIERRA
Excavacion de hueco para puesta a tierra, en terreno normal.
Instalacion de Puesta a Tierra tipo PAT-1 (incluye relleno y compactacin)
Instalacion de Puesta a Tierra tipo PAT-2 (incluye relleno y compactacin)
Inst. de Puesta a Tierra tipo PAT-3 (en postes de aliniamientos)
OBRAS CIVILES
Excavacion de zanja de 0.6 x 1.2 m para la instalacion de cable subterraneo en ducto de C.A de dos
PRUEBAS Y PUESTA EN SERVICIO
Prueba y puesta en servicio
Expediente tecnico conforme a obra
INSTALACIONES ELECTRICAS INTERIORES COER
SALIDAS
SALIDA DE TECHO ( CENTRO DE LUZ )
SALIDA PARA INTERRUPTORE SIMPLE
SALIDA PARA TOMACORRIENTE SIMPLE + PUESTA A TIERRA
POZO PUESTA A TIERRA DE R < 3 Ohm
CAJAS
BUZN DE REGISTRO PASA CABLES
TABLEROS
TABLERO GENERAL
TABLEROS DE CONTROL Y TRANSFERENCIA
TABLEROS DE DISTRIBUCIN (TD-1). VER ESP. TEC.
TABLEROS DE DISTRIBUCIN (TD-2). VER ESP. TEC.
TABLEROS DE DISTRIBUCIN (TD-3). VER ESP. TEC.
ALIMENTADORES
ALIMENTADOR 3 - 1 x 50 + 1 x 35 mm2 NYY, TUB. PVC 70 mm
TG -TD-01 - 3 x 1 x 10 + 1 x 6 mm2 NYY, TUB. 50 mm.
TG -TD-02 - 3 x 1 x 10 + 1 x 6 mm2 NYY, TUB. 50 mm.
TG -TD-03 - 3 x 1 x 6 + 1 x 6 mm2 NYY, TUB. 40 mm.
CONDUCTOR 2-1x6mm, TUB. PVC 40 mm - POSTES Y HELIPUERTO
ARTEFACTOS DE ILUMINACIN
ARTEFACTO C/2 LMPARAS FLUORESCENTES DE 2 x 36W PARA ADOSAR AL T.
REFLECTOR DE 400 W EN POSTE
POSTE DE CAC . 9 mts/200/120/255
REFLECTOR SENCILLO O DOBLE CON POSIBILIDAD DE LUZ PERIMETRAL SUPERIOR SERIE LOR

Und

Metrado

Precio

m
yund
und
und
und
und
und
und
und

63
4
4
4
4
4
4
12
8

2.46
20.76
3.22
6.45
4.24
27.73
30.51
4.24
0.77

und
und
und

1
1
1

9,500.00
1,600.00
800.00

und
und
m

1
1
50

16,101.70
3,500.00
150.00

KM
KM
GLB

0.24
0.24
1

2,655.78
562.40
1,300.63

und
und
und
und
und
und
und
und

5
5
5
5
5
5
5
5

81.24
124.49
273.30
136.75
51.37
27.40
29.78
33.45

m
m
und

404.88
416.58
5

1.47
1.38
117.29

und
und
und
und
und
und
und
und

1
1
1
1
1
1
1
1

199.36
439.47
199.36
130.36
569.88
477.50
184.67
617.95

und
und
und

4
4
4

5.33
112.15
11.03

und
und
und
und

6
1
2
1

122.12
115.83
98.60
201.65

105

27.72

GLB
GLB

1
1

824.85
562.41

pto
pto
pto
und

1
1
1
4

88.32
95.99
157.83
306.76

und

285.69

und
und
und
und
und

1
1
1
1
1

5,039.83
6,525.00
979.77
1,005.11
956.09

77.8
22
124
111.5
860

85.62
45.22
45.22
39.96
16.31

1
28
14
6

91.05
939.80
979.71
2,187.71

m
m
m
m
m
und
und
und
und

Parcial
154.98
83.04
12.88
25.80
16.96
110.92
122.04
50.88
6.16
9,500.00
1,600.00
800.00
16,101.70
3,500.00
7,500.00
637.39
134.98
1,300.63
406.20
622.45
1,366.50
683.75
256.85
137.00
148.90
167.25
595.17
574.88
586.45
199.36
439.47
199.36
130.36
569.88
477.50
184.67
617.95
21.32
448.60
44.12
732.72
115.83
197.20
201.65
2,910.60
824.85
562.41
88.32
95.99
157.83
1,227.04
2,285.52
5,039.83
6,525.00
979.77
1,005.11
956.09
6,661.24
994.84
5,607.28
4,455.54
14,026.60
91.05
26,314.40
13,715.94
13,126.26

PLAZO DE EJECUCION = 06 MESES = 180 D.C

05/09/13-30/09/13

01/10/13-31/10/13

01/11/13-30/11/13

01/12/13-31/12/13

01/01/14-31/01/14

15.50
8.30
1.29
2.58
1.70
11.09
12.20
5.09
0.62

139.48
74.74
11.59
23.22
15.26
99.83
109.84
45.79
5.54

950.00
160.00
80.00

8,550.00
1,440.00
720.00

1,610.17
350.00
750.00

14,491.53
3,150.00
6,750.00

40.62
62.25
136.65
68.38
25.69
13.70
14.89
16.73

365.58
560.21
1,229.85
615.38
231.17
123.30
134.01
150.53

59.52
57.49
58.65

535.65
517.39
527.81

19.94
43.95
19.94
13.04
56.99
47.75
18.47
61.80

179.42
395.52
179.42
117.32
512.89
429.75
166.20
556.16

01/02/14-28/02/14

637.39
134.98
1,300.63

21.32
448.60
44.12
732.72
115.83
197.20
201.65
2,910.60
412.43
281.21

412.43
281.21

88.32
95.99
157.83
1,227.04
2,285.52
5,039.83
6,525.00
979.77
1,005.11
956.09
6,661.24
994.84
5,607.28
4,455.54
14,026.60
91.05
2,631.44
1,371.59
1,312.63

23,682.96
12,344.35
11,813.63

01/03/14-04/03/14

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA_OBRAS CIVILES


OBRA : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item
02.05.05
02.05.06
02.05.07
02.05.08
02.05.09
02.05.10
02.06
02.06.01
02.06.02
02.06.03
02.06.04
02.06.05

Descripcin

Und

FARO PERIMETRAL OMNIDIRECCIONAL COLOR AMARILLO SERIE LO


und
FARO DE EMPOTRAR OMNIDIRECCIONAL COLORES AMARILLO O VERDE SERIE LO-H2
und
FARO DE LOCALIZACION DEL HELIPUERTO SERIE FX
und
MANAGVELETA CON SISTEMA DE ILUMINACION Y LUZ DE OBSTRUCCION SERIE MS-C
und
FARO DE APROXIMACION OMNIDIRECCIONAL COLORES BLANCO, AMARILLO O VERDE PUEDEN SER INTund
DISPOSITIVO DE CONTROL Y MANIOBRA POR VIGILANCIA PARA REFLECTORES
und
VARIOS
SUM. E INST. DE GRUPO ELECTROGENO 70 KW
und
PRUEBAS ELECTRICAS
und
EXCAVACION DE ZANJAS PARA REDES EXTERIORES
m
RELLENO CON MATERIAL PROPIO
m
Prueba y puesta en servicio
GLB

INSTALACIONES COMUNICACIONES
1.01 COMUNICACIONES POR RADIO
1.02 TELEFONIA SATELITAL

COSTO DIRECTO S/.


GASTOS GENERALES 10%
UTILIDAD 10%
SUB TOTAL
IGV 18%
TOTAL PRESUPUESTO S/.
% DE AVANCE
% ACUMULADO

GLB
GLB

Metrado

Precio

8
10
1
1
4
1

1,666.28
1,446.13
3,633.31
7,145.63
709.90
2,394.71

1
1
1189.5
1189.5
1

70,751.39
778.85
5.33
7.10
824.85

1
1

276310.96
299437.00

COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (10%)
SUBTOTAL
IGV 18%
TOTAL DEL PRESUPUESTO

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C

05/09/13-30/09/13

01/10/13-31/10/13

01/11/13-30/11/13

01/12/13-31/12/13

13,330.24
14,461.30
3,633.31
7,145.63
2,839.60
2,394.71
70,751.39
778.85
6,340.04
8,445.45
824.85
276,310.96
299,437.00

2,981,553.49
298,155.35
298,155.35
3,577,864.19
644,015.55
4,221,879.74

01/01/14-31/01/14

1,333.02
1,446.13
363.33
714.56
283.96
239.47
7,075.14

01/02/14-28/02/14

11,997.22
13,015.17
3,269.98
6,431.07
2,555.64
2,155.24

01/03/14-04/03/14

63,676.25
778.85

6,340.04

126,169.07
12,616.91
12,616.91
151,402.89
27,252.52
178,655.41
4.23
4.23

200,782.57
20,078.26
20,078.26
240,939.08
43,369.04
284,308.12
6.73
10.97

344,461.30
34,446.13
34,446.13
413,353.56
74,403.64
487,757.20
11.55
22.52

684,386.52
68,438.65
68,438.65
821,263.82
147,827.49
969,091.31
22.95
45.47

8,445.45
82.49

742.37

27,631.10
29,943.70

55,262.19
59,887.40

193,417.67
209,605.90

813,506.05
81,350.60
81,350.60
976,207.26
175,717.31
1,151,924.57
27.28
72.76

406,240.54
40,624.05
40,624.05
487,488.65
87,747.96
575,236.60
13.63
86.38

406,007.44
40,600.74
40,600.74
487,208.92
87,697.61
574,906.53
13.62
100.00

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA_EQUIPAMIENTO


OBRA : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C

Und

Metrado

Und
Und
Und
Und

2.00
1.00
1.00
1.00

322.03
850.00
254.24
50.00

644.07

322.03

322.03

850.00
254.24
50.00

425.00
127.12
25.00

425.00
127.12
25.00

Und
Und
Und
Und
Und
Und
Und
Und
Und

1.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00

805.08
76.27
254.24
5,500.00
293.22
2,700.00
480.00
470.00
50.00

805.08
152.54
508.48
5,500.00

402.54
76.27
254.24

402.54
76.27
254.24

293.22
2,700.00
480.00

146.61

146.61

240.00

240.00

Und

76.27
1,016.95
470.00
1,500.00
2,500.00
50.00

915.24
1,016.95
470.00
1,500.00
2,500.00
50.00

457.62
508.48

Und
Und

12.00
1.00
1.00
1.00
1.00
1.00

Und
Und
Und
Und
Und
Und
Und

24.00
3.00
1.00
1.00
1.00
1.00
1.00

76.27
254.24
830.51
4,980.00
1,500.00
2,500.00
50.00

1,830.48
762.72
830.51
4,980.00
1,500.00
2,500.00
50.00

915.24
381.36
415.26

Und
Und
Und
Und
Und
Und
Und

18.00
1.00
1.00
1.00
1.00
1.00
1.00

76.27
1,694.92
4,980.00
2,500.00
6,300.00
2,000.00
50.00

1,372.86
1,694.92
4,980.00
2,500.00
6,300.00
2,000.00
50.00

686.43
847.46

Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und
Und

13.00
11.00
2.00
11.00
1.00
1.00
8.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
10.00
2.00
2.00
48.00
20.00
1.00
1.00
5.00

254.24
381.36
50.00
2,700.00
1,500.00
480.00
5,500.00
3,600.00
940.00
2,800.00
2,550.00
21,322.29
1,200.00
500.00
4,800.00
1,900.00
6,500.00
470.00
20.00
1,300.00
350.00
65.00
50.00
2,500.00
1,500.00
134.75

3,305.12
4,194.96
100.00
29,700.00
1,500.00
480.00
44,000.00
7,200.00
1,880.00
2,800.00
2,550.00
21,322.29
1,200.00
500.00
4,800.00
1,900.00
6,500.00
470.00
200.00
2,600.00
700.00
3,120.00
1,000.00
2,500.00
1,500.00
673.75

1,652.56
838.99

05/09/13-30/09/13

01/10/13-31/10/13

01/11/13-30/11/13

01/12/13-31/12/13

01/01/14-31/01/14

01/02/14-28/02/14

MODULO DE OPERACIONES REGIONAL

Hall - Recepcion
MMC
MCR
MSG
MXP

Sillones tapizados respaldor de 01 asiento


Mueble Counter de Melanime 1.20
Sillas Giratorias/Acolchadas c/ Brazos Rodable
papelera Metalica

Oficina de Director COER


MEG

Escritorio gerencial con cajones 1.60 x 1.40 x 0.60m

MSM
MSG

Sillas metlicas acolchonada

ME1
MCP
MET
MIP
MXP

Escritorio de madera
cedro GEFORCE
de 0.70X1.20 mtGT 640M W8
750GB

Sillas Giratorias/Acolchadas c/ Brazos Rodable


NOTEBOOK SONY CORE i7 -3520M RAM 8GB HDD
COMPUTADORA INTEL Core i5 3.20GHz/4GB-LCD
21.5"
Estante de madera con puertas y llaves
IMPRESORA HP LASERJET PRO P1102
papelera Metalica

5,500.00
2,700.00

470.00
50.00

470.00
50.00

Sala de Operaciones
MSA

sillas acolchadas

MM2
MIP

Und
Mesa de Madera cedro de 3.60x1.30
Und
IMPRESORA HP LASERJET PRO P1102
ECRAN ELECTRICO A CONTROL REMOTO MEDIDAS : 2.40 X 2.40 MTS / 96 X 9 Und

MXP

AIRE ACONDICIONADO CORRIER DE 36 000 BTU


papelera Metalica

457.62
508.48
470.00
1,500.00
2,500.00
50.00

Sala de Prensa
MSM
MSG
MM3

MXP

Sillas metlicas acolchonada


Sillas Giratorias/Acolchadas c/ Brazos Rodable
Mueble de Melanime de 2.00x0.80m para sala de prensa
PROJECTOR MULTI MEDIA POWERLITE PRO 4000 LUMENES, RESOLUCCIO
ECRAN ELECTRICO A CONTROL REMOTO MEDIDAS : 2.40 X 2.40 MTS / 96 X 9
AIRE ACONDICIONADO CORRIER DE 36 000 BTU
papelera Metalica

915.24
381.36
415.26
4,980.00
1,500.00
2,500.00
50.00

Sala de Reuniones
MSA
MM1

MXP

Sillas metlicas acolchonada


Mesa de Madera cedro de 5.20x1.30
PROJECTOR MULTI MEDIA POWERLITE PRO 4000 LUMENES, RESOLUCCIO
AIRE ACONDICIONADO CARRIER DE 36 000 BTU
TELEVISOR LED SANSUMG DE 55 FULL HD
EQUIPO DE SONIDO (DVD, CD, USB, BLUE RAID)
papelera Metalica

686.43
847.46
4,980.00
2,500.00
6,300.00
2,000.00
50.00

Sala de Control Operador de Radio


MSG
ME

Sillas Giratorias/Acolchadas c/ Brazos Rodable


Modulo de Melamine de 0.70X1.20 mt para computo

MXP
MCP
MC
MET

papelera Metalica
COMPUTADORA INTEL Core i5 3.20GHz/4GB-LCD 21.5"
Cama Equipada (tarima 1,5 plaza c/ colchon de resortes)
Estante de madera con puertas y llaves
NOTEBOOK SONY CORE i7 -3520M RAM 8GB HDD 750GB GEFORCE GT 6
UNIDAD CENTRAL PROCESOS CPU INTEL CORE i7 3.4GHZ RAM 16GB HDD
MONITOR 21.5" LED FULL HD, RESOLUCCION 1920X1080
IBM SERVER XEON 4C E3-1220 80W 3.1 GHZ/8MB 1TB 7.2K SATA 3.5IN DV
SWITCH HP 48 PUERTOS AUTOSENSING 10/100/1000 RJ45, 4 PUERTOS 10
PLOTTERS HP DESIGNJET T2300 Emfp printer-multifuncional
ACCESS POINT D-LINK DAP - 3520P
GABINETE MODELO PBSE24 BLADEVAULT
PROJECTOR MULTI MEDIA POWERLITE PRO 4000 LUMENES, RESOLUCCIO
SISTEMA DE VIDEO CONFERENCIA (AMPLIFICADOR12CANALES, EFECTO PA
FOTOCOPIADORA TOSHIBA e-STUDIO556
IMPRESORA HP LASERJET PRO P1102
SUPRESORES DE PICO
UPS SMARTPRO 1.5KVA LINE INTERACTIVE UPIS TOWER SERIAL 230V 2
DISCOS DUROS EXTERNOS (BAKUP) 1 TB
PUNTOS DE RED DATOS CAT6
PUNTOS DE RED PARA TELEFONIA
AIRE ACONDICIONADO CARRIER DE 36 000 BTU
ECRAN ELECTRICO A CONTROL REMOTO MEDIDAS : 2.40 X 2.40 MTS / 96 X 9
MEGAPHONE

240.00

1,652.56
3,355.97
100.00
5,940.00
240.00
8,800.00
3,600.00

780.00

23,760.00
1,500.00
35,200.00
3,600.00
1,880.00
2,800.00
2,550.00
21,322.29
1,200.00
500.00
4,800.00
1,900.00
6,500.00
470.00
200.00
1,820.00
700.00
3,120.00
1,000.00
2,500.00
1,500.00
673.75

Caseta de Control y Guardiania


MSM
MXP
MCL
MC

Sillas metlicas acolchonada


papelera Metalica
Estante de madera con puertas y llaves
cama equipada (tarima 1,5 plaza c/ colchon de resortes)

Und
Und
Und
Und

1.00
1.00
1.00
1.00

76.27
50.00
480.00
1,270.00

76.27
50.00
480.00
1,270.00

76.27
50.00
480.00

MSG
ME1
MCP

Almacen General
Sillas Giratorias/Acolchadas c/ Brazos Rodable
Escritorio de madera Cedro de 0.70X1.20 mt
COMPUTADORA INTEL Core i5 3.20GHz/4GB-LCD 21.5"

Und
Und
Und

1.00
1.00
1.00

254.24
293.22
1,700.00

254.24
293.22
1,700.00

254.24
293.22

1,270.00

1,700.00

01/03/14-04/03/14

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA_EQUIPAMIENTO


OBRA : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

MIP
MSM

IMPRESORA HP LASERJET PRO P1102


Sillas metlicas acolchonada

MET
MC
MXP

Estante de madera con puertas y llaves


cama equipada (tarima 1,5 plaza c/ colchon de resortes)
papelera Metalica

Und

Metrado

Und
Und
Und
Und
Und

1.00
1.00
1.00
1.00
1.00

Precio

470.00
76.27
480.00
1,270.00
50.00

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C

05/09/13-30/09/13

01/10/13-31/10/13

01/11/13-30/11/13

01/12/13-31/12/13

470.00
76.27
480.00
1,270.00
50.00

01/01/14-31/01/14

01/02/14-28/02/14

01/03/14-04/03/14

470.00
76.27
480.00
1,270.00
50.00

COSTO DIRECTO S/.


GASTOS GENERALES 10%

COSTO DIRECTO
GASTOS GENERALES (10%)

203,727.43
20,372.74

0.00
0.00

0.00
0.00

0.00
0.00

8,962.21
896.22

37,659.18
3,765.92

157,106.04
15,710.60

0.00
0.00

SUB TOTAL
IGV 18%
TOTAL PRESUPUESTO S/.
% DE AVANCE
% ACUMULADO

SUBTOTAL
IGV 18%
TOTAL DEL PRESUPUESTO

224,100.17
40,338.03
264,438.20

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

9,858.43
1,774.52
11,632.94
4.40
4.40

41,425.10
7,456.52
48,881.62
18.49
22.88

172,816.64
31,107.00
203,923.64
77.12
100.00

0.00
0.00
0.00
0.00
100.00

CRONOGRAMA DE ADQUISICION DE MATERIALES E INSUMOS


OBRA : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

DESCRIPCIN

Item

UND

CANTIDAD

C.U.

PARCIAL

PRIMER MES
CANTIDAD

SEGUNDO MES

COSTO S/.

CANTIDAD

TERCER MES

COSTO S/.

CANTIDAD

CUARTO MES

COSTO S/.

CANTIDAD

QUINTO MES

COSTO S/.

CANTIDAD

SEXTO MES

COSTO S/.

CANTIDAD

COSTO S/.

MATERIALES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110

CLAVOS PARA MADERA C/C 3"

kg

928.47

3.20

ALAMBRE NEGRO N16

kg

1493.39

3.20

ALAMBRE NEGRO N8

kg

905.60

3.20

CLAVOS DE ALAMBRE PARA MADERA C/C DE 1"

kg

2.80

4.25

PERNO 5/8" X 10"

pza

9.00

0.55

ACERO DE REFUERZO FY=4200 GRADO 60

kg

18972.59

2.31

FIERRO CORRUGADO 5/8"

2080.26

3.50

UREA

kg

74.47

1.17

ARENA FINA

m3

94.11

24.58

TIERRA DE CHACRA

m3

1357.69

38.00

ARENA GRUESA

m3

625.53

41.93

MATERIAL DE RELLENO (30%ARENA FINA+70%MATERIAL GRANULAR)

m3

15417.09

38.00

PIEDRA GRANDE

m3

204.77

50.00

PIEDRA CHANCADA DE 1/2"

m3

626.99

84.33

MATERIAL CLASIFICADO PARA BASE

m3

695.94

60.00

TUBERIA PVC SAP C-5 3/4"(PARA CONEXION LOSAS)

345.80

1.20

ASFALTO RC-250

gln

318.03

10.92

LADRILLO ARCILLA DE 9 X 12 X 24 CM, MAQUINADO

und

87306.13

LADRILLO P/TECHO DE 15x30x30 CM 8 HCOS.

und

317.01

1.61

CEMENTO PORTLAND TIPO MS (42.5KG)

BOL

9691.75

19.58

CEMENTO PORTLAND TIPO MS

BOL

174.67

19.58

CERAMICA DE 30 x 30 cm. ANTIDESLIZANTE DE TRANSITO INTENSO

m2

14.54

20.85

BISAGRA DE FIERRO 4"

und

9.90

3.00

BISAGRA DE TUBERIA Fo.No. 41/2"x150 cm

und

12.00

30.00

BISAGRA ALUMINIZ.CAPUCHINA 4"x4"

und

12.00

BISAGRA ALUMINIZADA 4"x4"

und

16.00

2.95

PICAPORTE DE FIERRO LISO 1/2" X 10"

und

4.00

20.00

CERROJO ALUMINIO 3"

und

4.00

3.00

RUEDAS CON SOPORTE Y GUIA

und

4.00

35.00

MANIJA DE BRONCE P/VENTANA FIERRO

und

8.00

CERRADURA 3 GOLPES TIPO FORTE ALTA SEGURIDAD C/TIRADOR

pza

6.00

56.50

EXTINTORES CONTRAINCENDIOS

und

3.00

156.70

SOLDADURA

kg

4.26

12.42

SOLDADURA CELLOCORD

kg

189.83

12.42

PLANTON FICUS

und

136.00

9.50

YESO DE 16 Kg

BOL

641.79

4.35

PORCELANA

kg

3.43

2.55

PASTA MURAL TIPO VENCELATEX O SIMILAR

gln

1.51

19.95

LACA SELLADORA PARA MADERA

gln

1.19

34.75

CURADOR QUIMICO

gln

149.88

8.00

PINTURA BARNIZ

gln

0.92

39.83

ESTERA DE 1.90 X 2.90 M

und

96.33

12.50

GUAYAQUIL

und

192.84

14.00

LIJA PARA MADERA

und

3.00

0.76

SILICONA

TUB

9.23

10.90

GUANO

kg

68.00

1.20

IMPRIMANTE

gln

54.14

18.65

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

GLB

1.00

1,300.00

PLANCHA DE CALAMINA DE 0.83 X 1.80 M

pln

36.00

7.40

HORMIGON

m3

685.67

38.15

AFIRMADO CLASIFICADO

m3

933.48

40.00

COLA SINTETICA FULLER

gln

0.92

11.18

LIJA PARA MADERA

und

130.27

0.76

LIJA DE FIERRO

und

6.00

AGUA

m3

597.53

6.80

CILINDRO P/DEPOSITO DE BASURA

und

10.00

52.20

SERVICIO DE BAO PORTATIL (INODORO - LAVADERO) INC. MONTAJE

und

3.00

300.00

INSUMOS DE AGRICULTURA

kg

726.04

1.50

MADERA TORNILLO

p2

12479.85

4.24

CAA

und

144.44

6.00

MADERA CEDRO (REGLAS)

p2

10.03

8.10

MADERA DE CEDRO

p2

461.72

8.10

REGLA DE MADERA

p2

34.57

5.08

TRIPLAY DE 4'x8'x 4 mm

pln

PLACA RECORDATORIA

und

FIERRO LISO 5/8"

ANGULO 1 1/4"x1 1/4"x1/8"

26.06

5.65

PLATINA DE FIERRO 3/16" X 3"

24.00

7.77

ANGULO 1" X 1" X 3/16"

154.00

5.25

ANGULO DE FIERRO 3/16" X X 2" X 2"

9.24

9.39

CERROJO ALUMINIO DE 3"

pza

9.68

3.00

PERFIL T 1" X 1" X 1/8"

18.37

CANTONERAS DE ALUMINIO 2"

3.79

3.50

GRASA AMARILLA

kg

0.80

20.51

GRASS

sac

670.33

9.35

ACONDICIONAMIENTO DE BOTADEROS

und

1.00

800.00

PINTURA LATEX

gln

90.35

23.73

PINTURA ESMALTE SINTETICO

gln

37.41

32.20

PINTURA ESMALTE

gln

4.99

32.20

PINTURA ANTICORROSIVA EPOXICA

gln

4.99

27.55

PLANCHA METALICA 2"X4"X1/4", con hueco d=2cm x 1.22m x 6.00m

und

8.00

20.00

PLANCHA DE ACERO 4' X 8' X 1/16"

pln

21.26

310.00

PLANCHA DE ACERO LAC 1/20" X4' X 8'

pln

4.95

248.00

TEKNOPOR DE 1" x 4' x 8'

pln

204.65

11.44

TUBERIA DE FIERRO NEGRO 4" X 3 MM

16.10

33.65

TUBERIA DE FIERRO NEGRO 2" X 3 MM

53.00

18.76

VIDRIO INCOLORO SEMIDOBLE

p2

121.49

1.99

FOSFATO DIAMONICO

kg

ADOQUINES DE CONCRETO 10X20X8 cm

und

33282.84

0.79

LUBRICANTES DE PVC

GLB

0.01

63.56

CLAVOS PARA MADERA C/C 2"

kg

0.05

3.20

REJILLA F.F 1 1/4" X 1 1/4"

UND

2.00

25.00

CACHIMBA PVC DESAGUE 200MM A 160MM

UND

1.00

38.14

ASFALTO RC-250

GLB

0.55

3.00

1.50

1.20

30.40

22.88

3.00

423.73

327.60

10.20

145.21

4.24

6.30

9.86

10.92

48.00

35.00

CAJA DE REGISTRO DE CONCRETO 12"X24" COMPLETA (INCL. MARCO, TAPA E IN UND

3.00

92.58

CAJA DE REGISTRO DE CONCRETO 18"X24" COMPLETA (INCLUYE MARCO, TAPA E UND

3.00

95.30

CAJA DE REGISTRO DE CONCRETO 10"X24" COMPLETA

UND

7.00

90.10

CAJA DE REGISTRO DE CONCRETO 24"X24" COMPLETA

UND

3.00

103.90

CAJA DE CONCRETO P/MEDIDOR 1/2"-3/4"

UND

2.00

44.24

CEMENTO PORTLAND TIPO V (42.5 KG)

BOL

23.22

23.32

YESO EN BOLSAS DE 25KG

BOL

2.63

5.68

ACOPLES DE PVC 6"

UND

1.00

35.00

MICROMEDIDORES ESP. SECA AGUA FRIA C/ACCESORIOS

UND

2.00

110.17

PEGAMENTO PARA PVC

GLN

4.25

80.93

CINTA TEFLON

PZA

0.31

0.85

GRIFO DE RIEGO JARDIN 1/2"

UND

6.00

21.62

MARCO Y TAPA TERMOPLASTICA P/MEDIDOR DE AGUA

UND

2.00

35.00

HIPOCLORITO DE CALCIO AL 70%

KG

43.29

21.01

CAJA DE CONCRETO PARA VALVULAS

UND

1.00

95.00

MEZCLA ASFALTICA EN CALIENTE E=2" C/EQUIPO PREPARACION, TRANSPORTE M2

2,971.12
4,778.85
2,897.92
11.92
4.95
43,826.69
7,280.92
87.12
2,313.34
51,592.38
26,228.35
585,849.25
10,238.34
52,873.85
41,756.13
414.96
3,472.86
48,018.37
510.38
189,764.38
3,420.08
303.16
29.70
360.00
36.00
47.20
80.00
12.00
140.00
12.00
339.00
470.10
52.89
2,357.71
1,292.00
2,791.78
8.74
30.20
41.26
1,199.01
36.46
1,204.11
2,699.79
2.28
100.64
81.60
1,009.77
1,300.00
266.40
26,158.28
37,339.20
10.26
99.00
7.20
4,063.18
522.00
900.00
1,089.06
52,914.57
866.64
81.27
3,739.92
175.60
695.64
1,271.19
3,341.52
147.25
186.48
808.50
86.76
29.05
77.88
13.26
16.38
6,267.55
800.00
2,144.03
1,204.66
160.68
137.46
160.00
6,590.60
1,227.60
2,341.25
541.76
994.28
241.77
914.81
26,293.44
0.51
0.16
50.00
38.14
107.68
1,680.00
277.74
285.90
630.70
311.70
88.48
541.49
14.96
35.00
220.34
343.98
0.26
129.72
70.00
909.43
95.00

#REF!
#REF!
#REF!
#REF!
9.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
4625.13
61.43

#REF!
#REF!
#REF!
#REF!
4.95
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
175754.78
3071.50

208.78
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

12526.84
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
4625.13
61.43
#REF!
208.78
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
175754.78
3071.50
#REF!
12526.84
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
3083.42
40.95
#REF!
139.19
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
117169.85
2047.67
#REF!
8351.23
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
3083.42
40.95
#REF!
139.19
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
14.54
9.90
12.00
12.00
16.00
4.00
4.00

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
117169.85
2047.67
#REF!
8351.23
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
303.16
29.70
360.00
36.00
47.20
80.00
12.00

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
8.00
6.00
3.00
4.26

#REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
140.00
12.00
339.00
470.10
52.89

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
#REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
#REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00

189.83
136.00
641.79
3.43
1.51
1.19
149.88
0.92
96.33

2357.71
1292.00
2791.78
8.74
30.20
41.26
1199.01
36.46
1204.11

54.14
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
726.04
#REF!
144.44
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
670.33
#REF!
90.35
37.41
4.99
4.99
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
121.49
#REF!

1009.77
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1089.06
#REF!
866.64
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
6267.55
#REF!
2144.03
1204.66
160.68
137.46
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
241.77
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
0.00
0.00
0.00
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
0.00
0.00
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
0.00
0.00
0.00
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
0.00
0.00
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
0.00
0.00
0.00
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
0.00
0.00
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
0.00
0.00
0.00
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
#REF!
0.00
0.00
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

96.42
1.50
4.62
34.00

1349.89
1.14
50.32
40.80

96.42
1.50
4.62
34.00

1349.89
1.14
50.32
40.80

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
33282.84
0.01
#REF!
#REF!
#REF!
9.86
48.00
3.00
3.00
7.00
3.00
2.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
26293.44
0.51
#REF!
#REF!
#REF!
107.68
1680.00
277.74
285.90
630.70
311.70
88.48
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

CRONOGRAMA DE ADQUISICION DE MATERIALES E INSUMOS


OBRA : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

DESCRIPCIN

Item
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223

UND

CANTIDAD

C.U.

PARCIAL

MARCO Y TAPA FF P/REGISTRO VALVULAS

UND

1.00

35.00

MARCO Y TAPA DE CONCRETO PARA BUZON

UND

1.00

176.28

PLATINA 1"X 1/4"

976.15

ANGULO DE FIERRO 1 1/4" X 1 1/4" X 1/4"

557.80

3.55

PINTURA ANTICORROSIVA ZINCROMATO

GLN

13.77

27.55

IMPRIMANTE ASFALTICA SUM. Y COLOC. C/EQUIPO

M2

48.00

4.90

UNION UNIVERSAL DE F GALV. DE 1/2

UND

12.00

6.90

UNION UNIVERSAL DE F GALV. DE 1"

PZA

4.00

8.39

TAPON 1/2"

UND

4.00

0.40

TAPON 1"

UND

4.00

0.85

NIPLE DE FG 1/2" X 71/2"

PZA

2.00

NIPLE DE F GALV DE 1 1/2" X 1"

PZA

4.00

0.85

UNION UNIVERSAL 2"

UND

2.00

19.33

ABRAZADERA DE F F 2" X 1/2"

UND

2.00

4.24

TUB. PVC SAP PRESION C-10 EC DE 1/2" X 5M

UND

49.31

1.75

TUB. PVC SAP PRESION C-10 EC DE 1" X 5M

UND

215.68

2.00

TUB. PVC SAP PRESION C-10 EC DE 1 1/2" X 5M

UND

115.53

TUB. PVC SAP PRESION C-10 EC DE 2" X 5M

UND

513.43

6.35

UNION PVC C-10 6"

UND

1.00

54.52

TUBERIA PVC ALCANT. U.F ISO S-25 UF D=200MM

1.00

25.28

TUBERIA PVC 160MM ISO 4435 S-20 UF

10.00

20.56

REDUCCION SP PVC SAP P/AGUA 1 1/2" A 1"

UND

2.00

1.66

REDUCCION SP PVC SAP P/AGUA 1 1/2" A 1/2"

UND

4.00

1.66

UNION PR PVC SAP P/AGUA DE 1/2"

UND

4.00

0.45

CURVA PVC AGUA 1/2" X 45

UND

2.00

CURVA PVC AGUA 1/2" X 90

UND

2.00

0.70

CODO PVC C-10 6"X2"

UND

1.00

60.55

TEE PVC SAP C-10 6"X 2"

UND

1.00

60.55

TEE PVC SAP 1 1/2"

UND

6.00

4.58

TUB. PVC SAL P/DESAGUE DE 6"

84.47

18.62

TAPON PVC 2"

UND

1.00

2.97

LLAVE PASO RT-NIPLE-TUERCA-EMPAQ. 1/2"

UND

4.00

7.65

CODO PVC SAP-SP C-10 2"X 90

UND

1.00

5.41

CODO PVC SAP DE 1/2" X 90

und

5.14

CODO C-10 1" X 45

PZA

4.00

1.74

TUBERIA PVC C-10 6"

2.00

258.48

TUBERIA PVC SAL 2" X3M

8.00

2.20

TUBERIA PVC SAL CAMPANA 4" X3M

104.44

5.52

TEE PVC 1" X 1

UND

6.00

2.50

REDUCCION C-10 PVC 1" A 1/2"

PZA

6.00

0.97

TUBO PVC C-10 1/2" X 5M C/R

VALVULA CORPORATION PVC 1/2"

UND

2.00

5.94

VALVULA COMPUERTA DE BRONCE 1"

UND

2.00

35.60

VALVULA ESFERICA DE 2"

UND

1.00

135.59

VALVULA COMPUERTA BRONCE 1 1/2"

UND

Perno maquinado A G 16mm x 457 mm con 152 mm tc


und
Perno maquinado A G 16mm x 508 mm con 152 mm tca y cttca.
und
Mordaza preformada de acero para cable de 10 mm

12.00

3.99

0.75

4.04

0.70

0.70

1.75

6.00

55.08

5.00

11.34

4.00

6.00

UND

12.00

4.24

Canaleta guardacable de AG de 1/2" x 30 mm x 2,4 m con perno y tuerca en un extremo UND

4.00

27.73

Espiga para vertice de poste para PIN Polimerico 15 KV

und

4.00

12.71

Adaptador tipo lira de AG de 16mm x 78 mm long.

UND

6.00

5.51

Fleje de acero inoxidable (Cinta Band it), de 19 mm

33.00

3.36

Hebilla de acero inoxidable para fleje de 19 mm

UND

22.00

1.06

Perno maquinado A G 16mm x 508 mm con 152 mm tca y cttca.

UND

6.00

6.36

Perno Ojo A G de 16mm x 308 mm long, 102 mm maquinado con tuerca y contrat.

UND

6.00

Perno angular 16 mm x 308 mm long, 102 mm maquinado con tuerca y contrat.

UND

4.00

6.45

4.00

20.76

Varilla de ancl. c/guardacabo AG 5/8" x2.40m(8') provisto de ojal guardacabo en un ext,und

6.36

Arandela cuadrada curva de A G A G 76 mm x 76mm x 5 mm,agujero de 18 mm

UND

24.00

Tubo PVC SAP 3/4" x 1 m de long

UND

6.00

2.97

Grapa tipo pistola de Al-Al para conductor de segn requerimiento

UND

6.00

10.16

0.90

Tierra vegetal cernida

M3

Conductor de cobre desnudo, cableado, temple blando , 25 mm 2

7.80

27.73

40.00

7.12

Conductor de Puesta a Tierra de cobre recocido de 25 mm2 o Cooperweld N 02 AWG tipo M

72.00

Conductor de cobre desnudo, cableado, temple blando , 35 mm 2

14.00

6.72

Conductor de cobre desnudo, cableado, temple duro , 95 mm 2

73.00

25.00

Conector tipo Split bolt para cable 25 mm2

UND

12.00

3.90

Conector tipo cua tipo AMPAC

UND

6.00

4.66

Conector tipo Split bolt para cable 35 mm2

UND

12.00

5.88

Conector de Bronce para electrodo de 16 mm

UND

9.00

2.54

Aislador de Porcelana de Traccin Clase ANSI 54-2.

UND

4.00

4.24

Cabeza Terminal 8.7/15 KV P/ N2XSY x 150mm2 tipo exterior

UND

5.00

437.23

Aisladores Polimricos tipo Suspensin 15 Kv

UND

6.00

63.03

Aisladores Polimricos tipo Suspensin 15 Kv+ ACCESORIO DE FIJACION

UND

7.00

36.21

Electrodo de Copperweld de 16 mm x 2400 mm long.

UND

9.00

22.46

Plancha de Cobre tipo "J"

UND

16.00

4.07

Conductor de cobre desnudo, cableado, THW 2.5 mm2

11.09

1.80

Conductor de cobre desnudo, cableado, THW 4 mm2

27.92

cable thw awg 2.5 mm2

16.00

0.76

cinta vulcanizante 3m-23

und

35.86

25.00

Registro de concreto para inspeccin de puesta a tierra (tapa)

und

5.00

10.00

REFLECTOR SENCILLO O DOBLE CON POSIBILIDAD DE LUZ PERIMETRAL SUPERI und

6.00

2,139.03

FARO PERIMETRAL OMNIDIRECCIONAL COLOR AMARILLO SERIE LO

8.00

1,617.60

10.00

1,397.45

1.00

3,584.63

MANAGVELETA CON SISTEMA DE ILUMINACION Y LUZ DE OBSTRUCCION SERIE Mund

1.00

6,950.92

FARO DE APROXIMACION OMNIDIRECCIONAL COLORES BLANCO, AMARILLO O VEund

4.00

661.22

DISPOSITIVO DE CONTROL Y MANIOBRA POR VIGILANCIA PARA REFLECTORES

und

1.00

2,200.00

Fusible de expulsin tipo K 6A

und

3.00

Seccionador Cut-Out,15KV,95KV-BIL, 100 A, tipo Expulsin

und

6.00

194.92

Tablero de Distribucin 3 280/220, para SED 100 KVA

und

1.00

3,500.00

Medidor electrnico multitarifa y multifuncin, 4 hilos, cl 0,2

und

1.00

1,600.00

interruptor termomagnetico 2x15 A

UND

2.00

25.34

TABLERO GENERAL TG (EQUIPADO)

UND

1.00

4,237.29

TOMACORRIENTE BIPOLAR SIMPLE + TOMA TIERRA

UND

1.00

12.00

CAJA DE FG OCTOGONAL 100X55X50 MM

UND

1.00

5.00

interruptor termomagnetico 2x20 A

UND

7.00

25.34

INTERRUTOR DIFERENCIAL 30 MA

UND

2.00

CAJA RECTANGULAR GALV. LIVIANA DE 100X55X50MM

UND

2.00

4.50

LUMINARIA BIH-A-100R 400 W- VAPOR SODIO

UND

28.00

810.00

INTERRUPTOR TERMOMAGNETICO 2X30 A

UND

1.00

6.30

INTERRUPTOR SIMPLE

PZA

1.00

42.37

ARTEFACTO C/2 LMPARAS FLUORESCENTES DE 2 x 36W PARA ADOSAR AL T.

UND

1.00

42.37

CABLE DE ENERGIA NYY 1X6 MM2 - 1KV

270.38

15.00

CABLE NYY, 3 -1X50MM2

50.00

150.00

Cable subterraneo N2XSY 150mm2 8.7/15 KV

374.92

40.00

Varilla de armar simple Al-Al , para conductor segn requerimiento

UND

CABLE 3-1X50MM2 NYY

CABLE 3-1X10MM2 NYY

UND

CABLE 3 - 1X6MM2 2NYY


CABLE 2 - 1X6MM2 NYY
CEMENTO PORTLAND TIPO I (42KG)

BOL

CHEMAFLEX

GLN

CARBON VEGETAL

KG

und

FARO DE EMPOTRAR OMNIDIRECCIONAL COLORES AMARILLO O VERDE SERIE L UND


FARO DE LOCALIZACION DEL HELIPUERTO SERIE FX

UND

7.25

2.80

8.00

4.50

4.00

4.08

81.69

58.90

153.30

16.90

117.08

13.4

903.00

6.70

23.80

19.58

0.38

45.00

200.00

0.50

35.00
176.28
3,894.84
1,980.19
379.30
235.20
82.80
33.56
1.60
3.40
1.50
3.40
38.66
8.48
86.30
431.36
466.74
3,260.26
54.52
25.28
205.60
3.32
6.64
1.80
1.40
1.40
60.55
60.55
27.48
1,572.80
2.97
30.60
5.41
3.60
6.96
516.96
17.60
576.52
15.00
5.82
21.00
11.88
71.20
135.59
330.48
56.70
24.00
50.88
110.92
50.84
33.06
110.88
23.32
38.16
38.16
25.80
83.04
21.60
17.82
60.96
216.29
284.80
522.00
94.08
1,825.00
46.80
27.96
70.56
22.86
16.96
2,186.15
378.18
253.47
202.14
65.12
19.96
78.18
12.16
896.48
50.00
12,834.18
12,940.80
13,974.50
3,584.63
6,950.92
2,644.88
2,200.00
24.00
1,169.52
3,500.00
1,600.00
50.68
4,237.29
12.00
5.00
177.38
9.00
9.00
22,680.00
6.30
42.37
42.37
4,055.63
7,500.00
14,996.88
16.32
4,811.54
2,590.77
1,568.81
6,050.10
466.00
16.88
100.00

PRIMER MES
CANTIDAD
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

SEGUNDO MES

COSTO S/.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

CANTIDAD
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
5.00
4.00
12.00
4.00
4.00
6.00
33.00
22.00
6.00
6.00
4.00
4.00
24.00
6.00
6.00
7.80
40.00
72.00
14.00
73.00
12.00
6.00
12.00
9.00
4.00
5.00
6.00
7.00
9.00
16.00
11.09
27.92
16.00
35.86
5.00

TERCER MES

COSTO S/.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
56.70
24.00
50.88
110.92
50.84
33.06
110.88
23.32
38.16
38.16
25.80
83.04
21.60
17.82
60.96
216.29
284.80
522.00
94.08
1825.00
46.80
27.96
70.56
22.86
16.96
2186.15
378.18
253.47
202.14
65.12
19.96
78.18
12.16
896.48
50.00

CANTIDAD
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
8.00
10.00
1.00
1.00
4.00
1.00
3.00
6.00
1.00
1.00
2.00
1.00
1.00
1.00
7.00
2.00
2.00
28.00
1.00
1.00
1.00
270.38
50.00
374.92
4.00
81.69
153.30
117.08
903.00
23.80
0.38
200.00

CUARTO MES

COSTO S/.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12834.18
12940.80
13974.50
3584.63
6950.92
2644.88
2200.00
24.00
1169.52
3500.00
1600.00
50.68
4237.29
12.00
5.00
177.38
9.00
9.00
22680.00
6.30
42.37
42.37
4055.63
7500.00
14996.88
16.32
4811.54
2590.77
1568.81
6050.10
466.00
16.88
100.00

CANTIDAD

QUINTO MES

COSTO S/.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CANTIDAD
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SEXTO MES

COSTO S/.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CANTIDAD
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

COSTO S/.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CRONOGRAMA DE ADQUISICION DE MATERIALES E INSUMOS


OBRA : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

DESCRIPCIN

Item

UND

CANTIDAD

C.U.

PARCIAL

224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303

CINTA AISLANTE

UND

0.15

2.79

CORDEL

0.02

0.30

EXPEDIENTE TECNICO CONFORME A OBRA

UND

1.00

562.41

INGENIERIA DE DETALLE Y EXPEDIENTE DE REPLANTEO

GLB

0.24

562.40

CABLE DE ACERO HS DE 10MM

63.00

2.46

SILICONA LIQUIDA

UND

5.00

12.00

GABINETE DE FG DE 3/32" DE ESPESOR MED 0.80X0.60X0.30M

UND

3.00

250.00

ACCESORIOS PARA CONEXIONES

CJT

3.00

200.00

DUCTO DE CONCRETO DE 2 VIAS, 1M DE LONGITUD

UND

1.00

18.00

SAL INDUSTRIAL (SACO DE 50KG)

BOL

28.00

11.86

BENTONITA (SACO 50KG)

BOL

12.00

30.00

BUZONES PASACABLES 0.80X0.80X1.00M

UND

8.00

80.00

PRUEBA Y PUESTA EN SERVICIO

GLB

2.00

824.85

MADERA TORNILLO CEPILLADO

P2

1.42

ESTACA DE MADERA

UND

0.24

0.50

Transformador mixto 10kV, 15 - 20 - 25/5 A, cl 0,2


Transformador trifasico 100 KVA 10/0.38-0.23 KV

UND
UND

1.00

9,500.00

304
305

Sillas Giratorias/Acolchadas c/ Brazos Rodable


papelera Metalica

306
307

Escritorio gerencial con cajones 1.60 x 1.40 x 0.60m


Sillas metlicas acolchonada

308
309

Escritorio de madera cedro de 0.70X1.20 mt

UND

13.00

293.22

3,811.86

310

COMPUTADORA INTEL Core i5 3.20GHz/4GB-LCD


21.5"

12.00

2,700.00

32,400.00

4.00

480.00

3.00

470.00

1.00

1,016.00

1,920.00
1,410.00
1,016.00

3.00

1,500.00

3.00

2,500.00

4,500.00
7,500.00

1.00

16,101.70

GRUPO ELECTROGENO 70 KW 400/230 V

UND

1.00

67,796.61

Caja portamedidor estandarizada

UND

1.00

800.00

Cinta plana de armar segn requerimiento

12.00

2.10

ALAMBRE DE 16 M2 PARA AMARRE

10.00

Conductor de Aleacin de Aluminio 6201-T81 (AAAC), cableado 120 mm2.

404.88

5.00

BREA INDUSTRIAL

GLB

0.50

10.00

IMPRIMANTE

GLN

0.25

18.65

Arandela cuadrada curva de A G 57 mm x 57mm x 5 mm con agujero central de 18 mm UND

8.00

0.77

TABLEROS DE CONTROL Y TRANSFERENCIA

UND

1.00

6,264.18

Cruceta de madera tratada de 1.50 m x 110mm x 90mm

UND

2.00

60.00

Perilla de Concreto

PZA

5.00

8.40

POSTES CAC 13/400/2/210/405

UND

3.00

1,090.00

POSTES CAC 13/600/2/210/405

UND

2.00

1,250.00

Mensula de CAV M/0.80/500

UND

3.00

78.00

Media Palomilla Simple de C.AV. Mp/1.10/150

UND

2.00

100.98

Palomilla Simple de C.AV. Mp/1.50/150

UND

2.00

117.65

MEDIA LOSA DE CAV DE 1.10M - REFORZADA

UND

1.00

210.08

MEDIA LOSA DE CAV DE 1.10M/750

UND

2.00

220.00

BLOQUE DE CONCRETO ARMADO 0.50X0.50X0.20M CON AGUJERO CENTRAL DE 11UND

4.00

30.51
798.00

0.58

POSTES CAV 9 M/200/120/255

UND

14.00

CAJA DE CONCRETO

UND

5.00

15.00

TUBO DE FG DE 6 DIAM X 6M MAS CURVA FG 4"

UND

3.00

250.00

TAPA DE CONCRETO ARMADO PARA BUZON INC MARCO

UND

8.00

45.00

TUBERIA PVC-P 20MM2

UND

8.70

0.50

CURVA 90 DE PVC -P 20MM2

UND

4.00

2.50

CONEXIN DE CAJA PVC SAP INST ELECT 3/4"

UND

2.00

0.80

CURVA PVC SEL 3/4"

UND

3.00

0.80

UNION DE CAJA PLASTICA PVC-P 20MM

UND

4.00

0.50

TUBERIA PVC SEL 3/4"

3.00

1.50

TUBERIA PVC SAP-P 70 MM2

81.69

9.50

TUBERIA PVC DIAM 50MM

153.30

6.30

TUBERIA PVC DIAM 40MM

1020.08

TUBO DE PVC SAP 5/8" DIAM X0.80M LOG

UND

4.80

4.00

1.50

Arandela de anclaje cuadrada plana de A G 102 mm x UND


Radio HF 30Ch 1.6-30Mhz 125w 12V 9 Amps Temp: -30 A 70C Inc: Micro,Parlante,DC UND
UND
Antena Multibanda 2-30Mhz 150w Pep Inc:30Mts de Cable Coaxial y Conectores
UND
Fuente de Alimentacion 220Vac 13.8Vdc @ 22Amps con Cargador de Bateria
UND
Cable (3mts) para Conexin a bateria - Utilizado con Fuente Poder
UND
Bateria de Libre Mantenimiento 12Vd 100 Amps/Hr
UND
Protector Contra Descargas 1.5-400Mhz N Ambos Lados / HF (2Kw), VHF (375w)
Extension de 2 mts de Cable RG8 Inc: Conector NM, Conector PL259, Inc. Software y C UND
Radio Base VHF 45 watts 60 CH 12VdcAnalogo/Digital Inc: Microfono, Montura Sujecion UND
UND
Antena Base VHF de 7db de Ganancia
UND
Soporte de Fierro para Antena Tipo L Inc: Abrazaderas
UND
Fuente de Alimentacion 220Vac 13.8Vdc 20 Amps con Cargador de Bateria
UND
Bateria de Libre Mantenimiento 12Vd 100 Amps/Hr
UND
Cable Coaxial de 50 Ohm
UND
Kit de Conectores NM x 2 (Antena - Protector)
UND
Protector Contra Descargas 1.5-400Mhz N Ambos Lados / HF (2Kw), VHF (375w)
Extension de 2 mts de Cable RG8 Inc: Conector NM, Conector PL259 , Adpatador RFU-62UND
Pararrayo Tetra Puntal con 9 Bolsas Cemento Conductivo, Aisladores, Poste, Caja Registr UND
UND
Luz de Balizaje Tipo Led 13.8Vdc Inc: Cable de Energia
Torre de Fierro de 30 mts de altura, base triangular de 30cmts Inc: Cable Acerado, templad UND
Radio Portatil Analogo/Digital VHF 16ch 5w Inc: 2 Baterias, Antena, Cargador 220Vac , Ca UND
UND
Instalacion de 1 Sistema de Comunicacin VHF /HF
UND
Celular inc. GPS
UND
GPS etrex 20, inc. Batteria y cargador
UND
Instalacin del Sistema VSAT
UND
Sistema de parrarayos
UND
Base concreto f'c=210kg/cm2 de 60x60x55cm
UND
Fletes y/o gastos de traslado
UND
Sillones tapizados respaldor de 01 asiento

4.00

3.22

1.00

30,209.13

1.00

6,884.01

1.00

7,624.98

UND
UND

Mueble Counter de Melanime 1.20

1.00

722.85

1.00

1,723.80

1.00

912.60

1.00

253.50

1.00

2,366.00

1.00

1,977.30

1.00

354.90

1.00

1,521.00

1.00

1,723.80

45.00

45.63

1.00

152.10

1.00

912.60

1.00

304.20

1.00

11,661.00

1.00

3,042.00

1.00

15,210.00

30.00

6,084.00

1.00

32,760.00

10.00

650.00

1.00

749.84

23.00

6,019.00

23.00

3,900.00

23.00

100.00

23.00

3,000.00

2.00

322.03

1.00

850.00
254.24

8.00

50.00

1.00

805.08

UND

58.00

76.27

805.08
4,423.66

NOTEBOOK SONY CORE i7 -3520M RAM 8GB HDD


UND
750GB GEFORCE GT 640M W8

9.00

5,500.00

49,500.00

UND
UND
UND
UND

Estante de madera con puertas y llaves

314
315

ECRAN ELECTRICO A CONTROL REMOTO MEDIDAS : 2.40 X 2.40 MTS / 96 UND


X
UND
AIRE ACONDICIONADO CORRIER DE 36 000 BTU
UND
Mueble de Melanime de 2.00x0.80m para sala de prensa
UND
Mesa de Madera cedro de 5.20x1.30

IMPRESORA HP LASERJET PRO P1102


Mesa de Madera cedro de 3.60x1.30

2.00

830.51

1.00

1,694.92

1.00

6,300.00

1.00

2,000.00

3.00

1,500.00

2.00

3,600.00

2.00

940.00

1.00

2,800.00

1.00

2,550.00

1.00

21,322.29

1.00

1,200.00

330
331

und
und
GABINETE MODELO PBSE24 BLADEVAULT
PROJECTOR MULTI MEDIA POWERLITE PRO 4000 LUMENES, RESOLUC und
SISTEMA DE VIDEO CONFERENCIA (AMPLIFICADOR12CANALES, EFECTOund
und
FOTOCOPIADORA TOSHIBA e-STUDIO556

1.00

6,500.00

332
333

IMPRESORA HP LASERJET PRO P1102


SUPRESORES DE PICO

und
und

1.00

15,210.00

10.00

20.00

319
320
322
323
324
325
326
327
328
329

und
und

und
UNIDAD CENTRAL PROCESOS CPU INTEL CORE i7 3.4GHZ RAM 16GB H und
und
MONITOR 21.5" LED FULL HD, RESOLUCCION 1920X1080
IBM SERVER XEON 4C E3-1220 80W 3.1 GHZ/8MB 1TB 7.2K SATA 3.5IN und
SWITCH HP 48 PUERTOS AUTOSENSING 10/100/1000 RJ45, 4 PUERTOS und
und
PLOTTERS HP DESIGNJET T2300 Emfp printer-multifuncional

TELEVISOR LED SANSUMG DE 55 FULL HD


EQUIPO DE SONIDO (DVD, CD, USB, BLUE RAID)
Cama Equipada (tarima 1,5 plaza c/ colchon de resortes)

ACCESS POINT D-LINK DAP - 3520P

1.00

500.00

1.00

4,800.00

1.00

1,900.00

1.00
0.24
#REF!

SEGUNDO MES

COSTO S/.

562.41
134.98
#REF!

CANTIDAD

TERCER MES

COSTO S/.

#REF!
5.00
3.00
3.00
1.00
28.00
12.00
8.00

#REF!
60.00
750.00
600.00
18.00
332.08
360.00
640.00

1.42
0.24
1.00
1.00
1.00
1.00
12.00
10.00
404.88
0.50
0.25
8.00
1.00
2.00
5.00
3.00
2.00
3.00
2.00
2.00
1.00
2.00
4.00
14.00
5.00
3.00
8.00
8.70
4.00
2.00
3.00
4.00
3.00
81.69
153.30
1020.08
4.00
4.00

6.02
0.12
9500.00
16101.70
67796.61
800.00
25.20
5.80
2024.40
5.00
4.66
6.16
6264.18
120.00
42.00
3270.00
2500.00
234.00
201.96
235.30
210.08
440.00
122.04
11172.00
75.00
750.00
360.00
4.35
10.00
1.60
2.40
2.00
4.50
776.06
965.79
4896.36
6.00
12.88

CANTIDAD
0.15
0.02
0.00
0.00
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

6.90

CUARTO MES

COSTO S/.
0.42
0.01
0.00
0.00
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1649.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
30209.13
6884.01
7624.98
722.85
1723.80
912.60
253.50
2366.00

20700.00

5,084.80
400.00

20.00

UND
UND

311
312
313

316
317
318

4.24

0.42
0.01
562.41
134.98
154.98
60.00
750.00
600.00
18.00
332.08
360.00
640.00
1,649.70
6.02
0.12
9,500.00
16,101.70
67,796.61
800.00
25.20
5.80
2,024.40
5.00
4.66
6.16
6,264.18
120.00
42.00
3,270.00
2,500.00
234.00
201.96
235.30
210.08
440.00
122.04
11,172.00
75.00
750.00
360.00
4.35
10.00
1.60
2.40
2.00
4.50
776.06
965.79
4,896.36
6.00
12.88
30,209.13
6,884.01
7,624.98
722.85
1,723.80
912.60
253.50
2,366.00
1,977.30
354.90
1,521.00
1,723.80
2,053.35
152.10
912.60
304.20
11,661.00
3,042.00
15,210.00
182,520.00
32,760.00
6,500.00
749.84
138,437.00
89,700.00
2,300.00
69,000.00
644.06
850.00

PRIMER MES
CANTIDAD

CANTIDAD

QUINTO MES

COSTO S/.
0.00
0.00
0.00
0.00
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.00
1.00
1.00
1.00
45.00
1.00
1.00
1.00
1.00
1.00
1.00

1977.30
354.90
1521.00
1723.80
2053.35
152.10
912.60
304.20
11661.00
3042.00
15210.00

CANTIDAD

SEXTO MES

COSTO S/.

0.00
0.00
0.00
0.00
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1649.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

30.00
1.00
10.00
1.00
23.00
23.00
23.00
6.90

182520.00
32760.00
6500.00
749.84
138437.00
89700.00
2300.00
20700.00

CANTIDAD

COSTO S/.

0.00
0.00
0.00
0.00
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-1649.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

9.20
2.00

27600.00
644.06

1.00
20.00

850.00
5084.80

0.00
0.00

0.00
0.00

8.00
1.00

400.00
805.08

0.00
0.00

0.00
0.00

58.00

4423.66

0.00

0.00

2.70

14850.00

#REF!
13.00

#REF!
3811.86

#REF!

#REF!

#REF!
0.00

#REF!
0.00

3.60

9720.00

#REF!
1920.00
#REF!
1016.00

#REF!

423.00

#REF!
4.00
#REF!
1.00

#REF!

0.90

#REF!

#REF!

#REF!
0.00
#REF!
0.00

#REF!
0.00
#REF!
0.00

0.90
0.90

1350.00
2250.00

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

2.00
1.00

1661.02
1694.92

0.00
0.00

0.00
0.00

0.30
0.30

1890.00
600.00

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

0.60

2160.00

3.00
#REF!

4500.00
#REF!

#REF!

#REF!

0.00
#REF!

0.00
#REF!

0.60
0.30

564.00
840.00

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

0.30
0.30

765.00
6396.69

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

500.00
4,800.00

0.30
0.30
0.30

360.00
150.00
1440.00

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

1,900.00
6,500.00

0.30
0.30

570.00
1950.00

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

15,210.00
200.00

0.30
3.00

4563.00
60.00

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

1,661.02
1,694.92
6,300.00
2,000.00
4,500.00
7,200.00
1,880.00
2,800.00
2,550.00
21,322.29
1,200.00

CRONOGRAMA DE ADQUISICION DE MATERIALES E INSUMOS


OBRA : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

DESCRIPCIN

Item
334
335
336
337
338
339
340

UND

UPS SMARTPRO 1.5KVA LINE INTERACTIVE UPIS TOWER SERIAL 230V und
und
DISCOS DUROS EXTERNOS (BAKUP) 1 TB
und
PUNTOS DE RED DATOS CAT6
und
PUNTOS DE RED PARA TELEFONIA
und
AIRE ACONDICIONADO CARRIER DE 36 000 BTU
ECRAN ELECTRICO A CONTROL REMOTO MEDIDAS : 2.40 X 2.40 MTS / 96 und
X
und
MEGAPHONE

CANTIDAD

C.U.

CANTIDAD

SEGUNDO MES

COSTO S/.

CANTIDAD

TERCER MES

COSTO S/.

CANTIDAD

CUARTO MES

COSTO S/.

CANTIDAD

QUINTO MES

COSTO S/.

CANTIDAD

SEXTO MES

COSTO S/.

CANTIDAD

COSTO S/.

0.60

780.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

3,120.00
1,000.00

0.60
14.40
6.00

210.00
936.00
300.00

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

2,500.00
322.03

0.30
0.30

750.00
96.61

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

134.75

673.75

1.50

202.13

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

6.36

190.80
102.00
319.40
297.00
258.00
164.10
462.50
356.97
19,912.63
79.60
67,937.11
240.00
101.82
801.45
13,686.41
25,187.96
2,240.00
55,530.62
25,784.95
6,337.03
17,034.31
3,242.36
16,838.34
6,176.70
5,199.47
1,861.07
171.42
415.72
557.80
120.00
720.01
54.84
533.60
443.71
600.00
102.92
343.51
240.00

30.00
30.00
20.00
30.00
20.00
30.00
25.00
17.85
142.23
3.98
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

190.80
102.00
319.40
297.00
258.00
164.10
462.50
356.97
19912.63
79.60
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

0.00

0.00

0.00

0.00

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

5,719.76
7,500.00
3,000.00
153,572.26
87,203.26
221,556.71
40,008.65

#REF!
#REF!
#REF!
918.49
608.54
1714.84

#REF!
#REF!
#REF!
15357.23
8720.33
22155.67
#REF!

#REF!
#REF!
#REF!
2755.48
1825.61
5144.51
#REF!

#REF!
#REF!
#REF!
46071.68
26160.98
66467.01
#REF!

#REF!
#REF!
#REF!
2755.48
1825.61
5144.51
#REF!

#REF!
#REF!
#REF!
46071.68
26160.98
66467.01
#REF!

#REF!
#REF!
#REF!
1377.74
912.80
2572.25
#REF!

#REF!
#REF!
#REF!
23035.84
13080.49
33233.51
#REF!

#REF!
#REF!
#REF!
918.49
608.54
1714.84
#REF!

#REF!
#REF!
#REF!
15357.23
8720.33
22155.67
#REF!

#REF!
#REF!
#REF!
459.25
304.27
857.42
#REF!

#REF!
#REF!
#REF!
7678.61
4360.16
11077.84
#REF!

2.00

1,300.00

2.00

350.00

48.00

65.00

20.00

50.00

1.00

2,500.00

1.00

322.03

5.00

PRIMER MES

PARCIAL
2,600.00
700.00

EQUIPOS
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127

GUANTES DE JEBE

PAR

30.00

PROTECTOR DE OIDOS

pza

30.00

3.40

ANTEOJOS P/SOLD.

und

20.00

15.97

CASCOS PARA OBRA

pza

30.00

9.90

CHALECOS P/OBRA C/MALLA REFLECTANTE

pza

20.00

12.90

MASCARA CONTRA POLVO

pza

30.00

5.47

BOTAS DE JEBE

PAR

25.00

18.50

MEZCLADORA DE CONCRETO DE 9 -11P3

hm

17.85

20.00

CAMION CISTERNA 4x2 (AGUA) 122 HP 2,000

hm

142.23

140.00

SOLDADORA ELECTRICA

hm

3.98

20.00

VOLQUETE DE 10 M3

hm

566.14

120.00

MAQUINA DE SOLDAR TB 2002 - 300 AMP.

hm

8.00

30.00

ANDAMIO METALICO

hm

40.73

2.50

EQUIPO DE CORTE PARA ADOQUINES

hm

114.49

7.00

COMPACTADOR VIBR. TIPO PLANCHA 7 HP

hm

547.46

25.00

RODILLO LISO VIBR AUTOP 101-135HP 10-12T

hm

167.92

150.00

TRACTOR DE ORUGAS DE 140-160 HP

hm

16.00

140.00

TRACTOR DE ORUGAS DE 190-240 HP

hm

198.32

280.00

CARGADOR C/LLANTAS CAT. 950 200 HP

hm

128.92

200.00

VIBRADOR A GASOLINA DE 2.4" - 4HP

hm

422.47

15.00

MOTONIVELADORA DE 125 HP

hm

126.18

135.00

MOTONIVELADORA DE 130-135 HP

hm

24.02

135.00

MEZCLADORA CONCRETO TROMPO 8 HP 9 P3

hm

561.28

30.00

COMPACTADORA VIBRAT. TIPO PLANCHA 7HP

hm

247.07

25.00

TEODOLITO

hm

346.63

15.00

NIVEL TOPOGRAFICO

hm

186.11

10.00

CEPILLADORA ELECTRICA

hm

11.43

15.00

BALDE PRUEBA - TAPON-ABRAZ. Y ACCESORIO

he

27.71

MOTO SOLDADORA DE 250 AMPERIOS

hm

27.89

20.00

ENCOFRADO METALICO

und

1.20

100.00

RODILLO VIBRATORIO AUTOPROPULSADO 1.5TON

hm

8.00

VIBRADOR DE CONCRETO 4HP -1.50"

hm

6.85

8.00

CAMION PLATAFORMA 4X2 122 HP 8 TON

hm

4.64

115.00

CAMIONETA 4X4

hm

12.68

35.00

CAMION GRUA AUTOPROPULSADA, 6TN

hm

4.00

150.00

TECLE DE 1 TON

hm

4.05

CAMIONETA PICK-UP 4X2 90HP 1 TON

hm

9.81

35.00

GRUA 5TN

hm

1.60

150.00

TOPOGRAFO

hh

342.09

16.72

ING C/ESPECIALIDAD EN MEDIO AMBIENTE

mes

3.00

2,500.00

CAPACITADOR

mes

3.00

1,000.00

OPERARIO

hh

9184.94

16.72

OFICIAL

hh

6085.36

14.33

PEON

hh

17148.35

12.92

% MANO DE OBRA

1.00

15.00

90.00

25.42

MANO DE OBRA
117
118
119
120
121
122
123

COSTO DIRECTO
PORCENTAJE DE AVANCE

3,185,280.92

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

FECHA : FEBRERO 2012

Descripcin

Und

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

MES 02

MES 03

MES 04

16.67%

16.67%

16.67%

ARQUITECTURA Y ESTRUCTURAS
01.00.00

OBRAS PROVISIONALES

01.01

CARTEL DE IDENTIFICACIN DE OBRA DE 3.60 X 2.40 M

und

1.00

821.29

821.29

01.02

ALMACEN, OFICINA, CASETA DE GUARDIANIA

m2

48.00

102.09

4,900.32

01.03

INSTALACION PROVISIONAL PARA DEPOSITO DE AGUA

und

1.00

809.12

809.12

01.04

SERVICIO DE BAO PORTATIL (INODORO - LAVADERO) INC. MONTAJE

und

3.00

300.00

900.00

01.05

CERCO PROVISIONAL

269.98

22.88

6,177.14

02

HABILITACION DEL TERRENO

02.01

TRABAJOS PRELIMINARES

02.01.01

TRAZO NIVEL Y REPLANTEO

m2

20,000.21

1.24

24,800.26

02.01.02

LIMPIEZA Y DESFORESTACION RENDIMIENTO 1.0 HAS/DIA

HA

2.00

1,545.84

3,091.68

02.02

CORTE DE MATERIAL SUELTO RENDIMIENTO=570 M3/DIA

m3

4,049.58

4.21

17,048.73

02.02.02

CORTE MATERIAL SUELTO MATERIA ORGANICA H=0.70M , SEGUN ESTUDIO SU m3

9,800.10

4.21

41,258.42

02.02.03

RELLENO Y COMPACT. CON MATERIAL DE PRESTAMO C/EQUIPO

m3

14,201.62

49.91

708,802.85

02.02.04

ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM

m3

16,619.62

6.90

114,675.38

03.01

100%
100%
16.67%
100%

100%
100%

MOVIMIENTO DE TIERRAS

02.02.01

03

100%

100%
100%
60%

40%

100%

CERCO PERIMETRICO Y CASETA DE CONTROL


MOVIMIENTO DE TIERRAS

03.01.01

EXCAVACION DE ZANJAS PARA CIMIENTACION

m3

384.37

26.62

10,231.93

03.01.02

RELLENO COMPACTADO CON HORMIGN PARA CIMIENTOS, E= 0.20 M

m3

76.62

114.17

8,747.71

03.01.03

BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO

m2

6.00

11.68

70.08

100%
100%
100%

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

FECHA : FEBRERO 2012

Und

Metrado

Precio

Parcial

03.01.04

RELLENO COMPACTADO DE ZANJAS CON MATERIAL PROPIO

m3

29.82

34.52

1,029.39

03.01.05

ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM

m3

425.46

6.90

2,935.67

03.02

SOLADO 1:12 e=0.10

m2

12.54

24.43

306.35

03.02.02

FALSO PISO MEZCLA 1:8 E= 10cm

m2

6.00

27.21

163.26

03.02.03

CIMIENTOS CORRIDOS 1:10 +30% P.G

m3

269.43

158.43

42,685.79

03.03

OBRAS DE CONCRETO ARMADO

03.03.01

SOBRECIMIENTOS ARMADOS

03.03.01.01

CONCRETO F'C=210 KG/CM2. PARA SOBRECIMIENTO

m3

48.64

414.69

20,170.52

03.03.01.02

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

m2

637.93

33.94

21,651.34

03.03.01.03

ACERO FY=4200 kg/cm2 PARA SOBRECIMIENTO

kg

2,824.66

3.65

10,310.01

CONCRETO F'C=210 KG/CM2. PARA COLUMNAS.

m3

35.49

440.12

15,619.86

03.03.02.02

ENCOFRADO Y DESENCOFRADO NORMAL DE COLUMNAS

m2

492.60

50.47

24,861.52

03.03.02.03

ACERO FY=4200 kg/cm2 PARA COLUMNAS

kg

6,455.97

3.65

23,564.29

100%
100%

100%
100%
100%

100%
100%
100%

100%
100%
100%

VIGAS

03.03.03.01

CONCRETO F'C=210 KG/CM2. PARA VIGAS

m3

18.41

388.80

7,157.81

03.03.03.02

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS.

m2

212.42

56.31

11,961.37

03.03.03.03

ACERO FY=4200 kg/cm2 PARA VIGAS

kg

1,775.26

3.65

6,479.70

03.03.04

MES 03

COLUMNAS

03.03.02.01

03.03.03

MES 02

OBRAS CONCRETO SIMPLE

03.02.01

03.03.02

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

100%
100%
100%

LOSA ALIGERADA

03.03.04.01

CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2

m3

1.59

356.65

567.07

03.03.04.02

ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS

m2

21.57

32.04

691.10

100%
100%

MES 04

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

FECHA : FEBRERO 2012

Descripcin

Und

Metrado

Precio

Parcial

03.03.04.03

ACERO GRADO 60 EN LOSAS ALIGERADAS

kg

118.40

3.65

432.16

03.03.04.04

LADRILLO HUECO DE ARCILLA 15 X 30 X 30 CM PARA TECHO ALIGERADO

und

151.00

2.50

377.50

03.04

MURO DE LADRILLO KK DE SOGA (1:4) CEMENTO-ARENA

m2

1,401.55

46.55

65,242.15

03.04.02

MUROS DE LADRILLO KK DE CABEZA (1:4)

m2

30.62

79.94

2,447.76

03.04.03

ACERO FY=4200 kg/cm2

kg

545.08

3.65

1,989.54

217.75

3.80

827.45

03.05.01
03.06

JUNTA DE CONSTRUCCION CON TEKNOPORT

m2

492.60

29.14

14,354.36

03.06.02

TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO-ARENA

m2

212.42

34.72

7,375.22

03.06.03

TARRAJEO MUROS INTERIORES Y EXTERIORES C.A 1:4 e=1.5cm.

m2

175.00

18.61

3,256.75

03.06.04

CIELO RASOS CON MEZCLA 1:5

m2

21.57

31.13

671.47

e=1.5 m

684.01

12.28

8,399.64

8.80

10.64

93.63

CONTRAZOCALO DE CEMENTO PULIDO EXTERIOR H= 30 cm C.A. 1:2

03.07.02

CONTRAZOCALO DE CERAMICA H=10CM, INTERIOR, CASETA CONTROL

100%
100%
100%

100%

100%
100%
100%
100%

100%
100%

PISOS CERAMICO ANTIDESLIZANTE

03.08.01

PISO DE CERAMICA ANTIDESLIZANTE 0.30 x 0.30 cm. TRANSITO INTENSO

m2

6.00

41.99

251.94

03.08.02

CANTONERA DE ALUMINIO 2"

1.80

7.02

12.64

03.08.03

CONTRAPISO DE e= 20 mm MEXCLA 1:3

m2

6.00

15.25

91.50

m2

880.01

6.56

5,772.87

03.09.01

100%

CONTRAZOCALOS

03.07.01

03.09

100%

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO COLUMNAS MEZ. C:A 1.5 E=1.5 CM

03.08

MES 03

JUNTAS DE DILATACION

03.06.01

03.07

MES 02

MUROS DE ALBAILERIA

03.04.01

03.05

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

PINTURA
PINTURA LATEX LDOS MANOS EN MUROS, COLUMNAS Y VIGAS

100%
100%
100%

MES 04

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

FECHA : FEBRERO 2012

Und

Metrado

Precio

Parcial

03.09.02

PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO

m2

205.20

9.27

1,902.20

03.09.03

PINTURA LATEX DOS MANOS EN CIELO RASO

m2

21.57

5.43

117.13

03.10

CARPINTERIA DE MADERA

03.10.01

PUERTA MADERA CEDRO INC/PINTURA

m2

3.78

445.70

1,684.75

03.10.02

VENTANA MADERA CEDRO INC/PINTURA

m2

5.38

238.66

1,283.99

03.11

CARPINTERIA METALICA

03.11.01

PORTON METALICO (4.00 x 7.50) SEGUN DISEO

und

1.00

7,153.50

7,153.50

03.11.02

PUERTA METALICA CON PERFILES ANGULARES 1"X1"X1/8"

m2

3.30

303.47

1,001.45

03.11.03

REJILLA METALICA SOBRECIMIENTO

und

1.00

217.43

217.43

03.12
03.12.01

CERRAJERIA
BISAGRAS

03.12.01.01

BISAGRA ALUMINIZADA 4" PESADA PARA PUERTA

pza

6.00

6.44

38.64

03.12.01.02

BISAGRA ALUMINIZADA 4" PARA VENTANAS

pza

8.00

6.12

48.96

03.12.02

CERRADURAS

03.12.02.01

CERRADURA TRES GOLPES PARA PUERTA CON TIRADOR

und

3.00

73.55

220.65

03.12.02.02

MANIJA DE BRONCE PARA PORTAUELAS EN VETANAS DE FIERRO

pza

4.00

1.63

6.52

03.12.02.03

CERROJO DE ALUMINIO 3" PARA VENTANAS

pza

2.00

5.73

11.46

57.84

5.26

304.24

03.13
03.13.01

04
04.01

VIDRIOS, CRISTALES Y SIMILARES


VIDRIO INCOLORO SEMIDOBLE

CONSTRUCCION DE PLATAFORMA DE HELIPUERTO


TRABAJOS PRELIMINARES

p2

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

MES 02

MES 03

MES 04

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item
04.01.01
04.02

Descripcin
TRAZO NIVEL Y REPLANTEO

FECHA : FEBRERO 2012

Und

Metrado

Precio

Parcial

m2

957.00

1.24

1,186.68

CORTE TERRENO NATURAL A NIVEL DE SUBRASANTE

m3

143.55

25.85

3,710.77

04.02.02

EXCAVACION DE ZANJAS PARA SARDINELES

m3

0.68

26.62

18.10

04.02.03

CONFORMACION Y COMPACTACION DE SUBRASANTE CON EQUIPO

m2

957.00

2.53

2,421.21

04.02.04

SUB BASE AFIRMADO C/EQUIPO E= 0.10 M C/EQUIPO

m2

957.00

7.00

6,699.00

04.02.05

BASE AFIRMADO C/EQUIPO E= 0.20 M C/EQUIPO, EXTENDIDO, RIEGO Y COMP m2

957.00

17.50

16,747.50

04.02.06

ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM

m3

173.08

6.90

1,194.25

CONCRETO EN LOSAS F'C=280 KG/CM2

m3

198.96

418.89

83,342.35

04.03.02

ENCOFRADO Y DESENCOFRADO DE LOSAS

m2

167.00

25.31

4,226.77

04.03.03

CONEXION ENTRE LOSAS RIGIDAS (PAVIMENTOS) JUNTA DILATACION

und

184.00

13.17

2,423.28

04.03.04

CONEXION ENTRE LOSAS RIGIDAS JUNTA CONTRACCION

und

1,462.00

6.99

10,219.38

04.03.05

CURADO DE CONCRETO

m2

957.00

0.69

660.33

04.03.06

JUNTAS DE DILATACION E=1" CON TEKNOPORT

587.00

10.43

6,122.41

m2

1,404.00

1.24

1,740.96

05

CONSTRUCCION DE PLATAFORMA CARGA Y DESCARGA

05.01

TRABAJOS PRELIMINARES

05.02

MES 03

MES 04

100%

100%
100%
100%
100%
100%
100%

OBRAS CONCRETO SIMPLE

04.03.01

05.01.01

MES 02

MOVIMIENTO DE TIERRAS

04.02.01

04.03

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

TRAZO NIVEL Y REPLANTEO

100%
100%
100%
100%
100%
100%

100%

MOVIMIENTO DE TIERRAS

05.02.01

CORTE TERRENO NATURAL A NIVEL DE SUBRASANTE

m3

421.20

25.85

10,888.02

05.02.02

EXCAVACION DE ZANJAS PARA SARDINELES

m3

0.89

26.62

23.69

100%
100%

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

FECHA : FEBRERO 2012

Und

Metrado

Precio

Parcial

05.02.03

CONFORMACION Y COMPACTACION DE SUBRASANTE CON EQUIPO

m2

1,404.00

2.53

3,552.12

05.02.04

SUB BASE AFIRMADO C/EQUIPO E= 0.10 M C/EQUIPO

m2

1,404.00

7.00

9,828.00

05.02.05

BASE AFIRMADO C/EQUIPO E= 0.20 M C/EQUIPO, EXTENDIDO, RIEGO Y COMP m2

1,404.00

17.50

24,570.00

05.02.06

ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM

m3

506.51

6.90

3,494.92

05.03

LOSA DE CONCRETO F'c=210 Kg/cm2 , E=0.20M

m3

290.84

357.98

104,114.90

05.03.02

ENCOFRADO Y DESENCOFRADO DE LOSAS

m2

235.80

25.31

5,968.10

05.03.03

CONEXION ENTRE LOSAS RIGIDAS (PAVIMENTOS) JUNTA DILATACION

und

362.00

13.17

4,767.54

05.03.04

CONEXION ENTRE LOSAS RIGIDAS JUNTA CONTRACCION

und

1,982.00

6.99

13,854.18

05.03.05

CURADO DE CONCRETO

m2

1,404.00

0.69

968.76

05.03.06

JUNTAS DE DILATACION E=1" CON TEKNOPORT

855.00

10.43

8,917.65

m2

375.00

1.24

465.00

06

CONSTRUCCION DE PLATAFORMA ENTRENAMIENTO

06.01

TRABAJOS PRELIMINARES

06.02

TRAZO NIVEL Y REPLANTEO

EXCAVACION DE ZANJAS PARA SARDINELES

m3

0.44

26.62

11.71

06.02.02

NIVELACION INTERIOR Y COMPACTACIN DE SUBRASANTE

m2

375.00

3.82

1,432.50

06.02.03

BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO

m2

375.00

11.68

4,380.00

06.02.04

ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM

m3

0.53

6.90

3.66

m2

375.00

45.01

16,878.75

06.03.01

MES 03

MES 04

100%
100%
100%
100%

100%
100%
100%
100%
100%
100%

100%

MOVIMIENTO DE TIERRAS

06.02.01

06.03

MES 02

OBRAS CONCRETO SIMPLE

05.03.01

06.01.01

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

100%
100%
100%
100%

OBRAS CONCRETO SIMPLE


PLATAFORMA CONCRETO F'c=175 kg/cm2 e=10.0cm

100%

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

FECHA : FEBRERO 2012

Und

Metrado

Precio

Parcial

06.03.02

CONCRETO DE SARDINELES F'C= 175 KG/CM2

m3

3.60

348.82

1,255.75

06.03.03

ENCOFRADO Y DESENCOFRADO PAOS DE PLATAFORMA

m2

52.50

17.41

914.03

06.03.04

CURADO DE CONCRETO

m2

375.00

0.69

258.75

06.03.05

JUNTAS DE DILATACION E=1" CON TEKNOPORT

205.00

10.43

2,138.15

07
07.01

VEREDAS DE CONCRETO
MOVIMIENTO DE TIERRAS

07.01.01

EXCAVACION DE ZANJAS PARA SARDINELES

m3

4.75

26.62

126.45

07.01.02

RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO

m3

101.89

98.79

10,065.71

07.01.03

NIVELACION INTERIOR Y COMPACTACIN DE SUBRASANTE

m2

1,202.43

3.82

4,593.28

07.01.04

BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO

m2

1,063.52

11.68

12,421.91

07.01.05

ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM

m3

5.70

6.90

39.33

07.02.01

CONCRETO F'C= 175 KG/CM2 ACABADO FROTACHADO Y BRUADEO - VERED m2

1,202.43

46.41

55,804.78

07.02.02

CONCRETO F'C= 175 KG/CM2 - SARDINEL DE VEERDAS

m3

39.92

354.11

14,136.07

07.02.03

ENCOFRADO Y DESENCOFRADO DE VEREDAS

m2

336.06

25.31

8,505.68

07.02.04

ENCOFRADO Y DESENCOFRADO DE SARDINELES

m2

27.45

38.77

1,064.24

07.02.05

CURADO DE CONCRETO

m2

1,202.43

0.69

829.68

07.02.06

JUNTAS DE DILATACION E=1" CON TEKNOPORT

718.83

10.43

7,497.40

2,642.64

1.24

3,276.87

07.02

08
08.01
08.01.01

OBRAS CONCRETO SIMPLE

CONSTRUCCION DE ACCESOS PRINCIPALES YACCESO AUXILIAR


TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO

m2

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

MES 02

MES 03

MES 04

100%
100%
100%
100%

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item
08.02

Descripcin

FECHA : FEBRERO 2012

Und

Metrado

Precio

Parcial

MOVIMIENTO DE TIERRAS

08.02.01

CORTE DE MATERIAL SUELTO RENDIMIENTO=570 M3/DIA

m3

115.74

4.21

487.27

08.02.02

EXCAVACION DE ZANJAS PARA SARDINELES

m3

12.80

26.62

340.74

08.02.03

RELLENO Y COMPACT. CON MATERIAL DE PRESTAMO C/EQUIPO

m3

811.28

49.91

40,490.98

08.02.04

CONFORMACION Y COMPACTACION DE SUBRASANTE CON EQUIPO

m2

2,642.64

2.53

6,685.88

08.02.05

SUB BASE AFIRMADO C/EQUIPO E= 0.10 M C/EQUIPO

m2

877.99

7.00

6,145.93

08.02.06

SUB BASE AFIRMADO C/EQUIPO e= 20 cm., VIA AUXILIAR

m2

1,724.02

12.35

21,291.65

08.02.07

BASE AFIRMADO C/EQUIPO E= 0.20 M C/EQUIPO, EXTENDIDO, RIEGO Y COMP m2

877.99

17.50

15,364.83

08.02.08

ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM

m3

154.25

6.90

1,064.33

08.03

PAVIMENTACION CON BLOQUETAS

08.03.01

CAMA DE ARENA GRUESA DE E= 5 CM PARA ASENTADO DE ADOQUINES

m2

877.99

5.45

4,785.05

08.03.02

PAVIMENTACIN DE VAS CON ADOQUINES (10 X 20 X8M)

m2

877.99

52.52

46,112.03

08.03.03

CORTE DE ADOQUINES DE CONCRETO

357.79

9.25

3,309.56

08.04

SARDINEL DE CONFINAMIENTO

08.04.01

SARDINELES DE CONFINAMIENTO F'C=210 KG/CM2.

m3

22.01

357.98

7,879.14

08.04.02

ENCOFRADO Y DESENCOFRADO DE SARDINELES

m2

280.35

38.77

10,869.17

08.04.03

CURADO DE CONCRETO

m2

51.19

0.69

35.32

08.04.04

JUNTAS DE DILATACION E=1" CON TEKNOPORT

29.25

10.43

305.08

4.00

317.34

1,269.36

08.05
08.05.01

09

ENCIMADO BUZONES
ENCIMADO DE BUZN DE CONCRETO EXISTENTE MAX=1.50M PARA ADECUAund

AREAS VERDES

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

MES 02

MES 03

MES 04

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

FECHA : FEBRERO 2012

Und

Metrado

Precio

Parcial

09.01

TIERRA DE CHACRA PARA RELLENO EN AREAS VERDES (Material de Prestamo)

m3

726.04

49.58

35,997.06

09.02

EXTENDIDO Y NIVELACION DE TIERRA DE CHACRA PARA SEMBRADO DE GRAS

m2

4,821.19

1.33

6,412.18

09.03

PREPARACION DE TIERRA DE CHACRA INC. FERTILIZANTES

m3

726.04

22.73

16,502.89

09.04

SEMBRADO DE GRASS (Incluye Suministro y Seleccion)

m2

4,821.19

2.78

13,402.91

09.05

RIEGO DE GRAS CON MANGUERA

m2

4,821.19

0.26

1,253.51

09.06

PLANTA TIPICA PLANTONES

und

68.00

15.10

1,026.80

4,700.00

0.89

4,183.00

10

VARIOS

10.01

LIMPIEZA GENERAL DE OBRA

m2

10.02

PLACA RECORDATORIA DE BRONCE

und

1.00

458.17

458.17

GLB

1.00

1,300.00

1,300.00

11
11.01

12

FLETE TERRETRE
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS

MEDIDAS DE MITIGACION AMBIENTAL

12.01

CAPACITACION AMBIENTAL

mes

3.00

3,500.00

10,500.00

12.02

SUMINISTRO DE DEPOSITOS PARA BASURA

und

10.00

52.20

522.00

12.03

SUMINISTRO DE IMPLEMENTOS DE SEGURIDAD

und

1.00

2,263.90

2,263.90

12.04

ACONDICIONAMIENTO DE BOTADEROS

und

1.00

800.00

800.00

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

MES 02

MES 03

MES 04

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

FECHA : FEBRERO 2012

Descripcin

Und

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

MES 02

INSTALACIONES SANITARIAS
01
01.01

LINEA DE CONDUCCION AGUA POTABLE


TRABAJOS PRELIMINARES

01.01.01

TRAZO NIVEL Y REPLANTEO (REDES)

01.01.02

DEMOLICION DE PAVIMENTO ASFALTICO 2"

m2

01.02

498.51

1.40

697.91

48.00

42.58

2,043.84

EXCAVACION DE ZANJAS H=1.20M

498.51

26.62

13,270.34

01.02.02

NIVELACION Y FONDOS PARA TUBERIA

498.51

1.06

528.42

01.02.03

CAMA DE APOYO MATERIAL GRUESO (0.60X0.10m)

498.51

5.80

2,891.36

01.02.04

RELLENO Y COMPACTACION DE ZANJAS

498.51

9.22

4,596.26

SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 2"

498.51

11.04

5,503.55

01.03.02

PRUEBA HIDRAULICA + DESINFECCION

498.51

2.32

1,156.54

100%
100%
100%

100%
100%

ACCESORIOS Y VALVULAS

01.04.01

CONEXION A RED DE AGUA EXISTENTE

GLB

1.00

762.85

762.85

01.04.02

CODO PVC X 90 2"

pza

1.00

19.86

19.86

01.04.03

CODO PVC X 12.25 2"

pza

2.00

20.45

40.90

01.04.04

CODO PVC X 22.5 2"

pza

4.00

19.86

79.44

01.04.05

TAPON PVC C.10 2"

und

1.00

6.41

6.41

01.04.06

VALVULA DE INTERRUPCION DE 2"

und

1.00

243.14

243.14

01.04.07

SUMINISTRO E INSTALACION CAJA C/MARCO-TAPA FF P/VALVULA

und

1.00

236.00

236.00

01.05

100%

RED DE CONDUCCION

01.03.01

01.04

100%

MOVIMIENTO DE TIERRAS

01.02.01

01.03

100%

REPOSICION DE PAVIMENTACION ASFALTICA

100%
100%
100%
100%
100%
100%
100%

MES 03

MES 04

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

FECHA : FEBRERO 2012

Und

Metrado

Precio

Parcial

01.05.01

CONFORMACIN Y COMPACTACIN SUBRASANTE CON EQUIPO

m2

48.00

6.54

313.92

01.05.02

RELLENO COMPACTADO CON AFIRMADO

m3

3.60

116.42

419.11

01.05.03

BASE E=0.20M CON EQUIPO EXTENDIDO, RIEGO Y COMPACTADO

m3

7.20

154.50

1,112.40

01.05.04

IMPRIMACION ASFALTICA

m2

48.00

4.90

235.20

01.05.05

CARPETA ASFALTICA EN CALIENTE DE 2"

m2

48.00

35.00

1,680.00

02
02.01

183.80

10.65

1,957.47

02.01.02

REFINE Y NIVELACION DE FONDO DE ZANJA

183.80

1.06

194.83

02.01.03

CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO

183.80

0.89

163.58

02.01.04

RELLENO Y COMPACTACION DE ZANJAS

183.80

9.22

1,694.64

100%
100%
100%
100%

100%
100%
100%
100%

RED DE DISTRIBUCION

02.02.01

SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 11/2"

56.10

7.07

396.63

02.02.02

SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 1"

104.70

4.64

485.81

02.02.03

SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 1/2"

23.00

3.61

83.03

02.02.04

PRUEBA HIDRAULICA + DESINFECCION

183.80

2.32

426.42

02.02.05

CAJA DE REGISTRO PARA AGUA (BY PAS) DE 0.40 x 0.50 cm H= 1.00 M.

und

1.00

248.08

248.08

100%
100%
100%
100%
100%

ACCESORIOS Y VALVULAS

02.03.01

ACCESORIOS DISTRIBUCION DE AGUA

und

1.00

422.53

422.53

02.03.02

VALVULA COMPUERTA DE BRONCE DE 1"

und

1.00

139.45

139.45

02.04

MES 03

100%

MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS

02.03

MES 02

RED DE DISTRIBUCION AGUA POTABLE

02.01.01

02.02

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

CONEXIONES DOMICILIARIAS

100%
100%

MES 04

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item
02.04.01
02.05
02.05.01
02.05.01.01

03
03.01

Descripcin

FECHA : FEBRERO 2012

Und

SUMINISTRO INST. CONEXION DOMICI. AGUA 1/2" A TUB 2", tapa termoplas und

Metrado

Precio

Parcial

1.00

278.83

278.83

3.00

345.09

1,035.27

SALIDA DE AGUA FRIA PVC SAP DE 1/2" INC. GRIFO P/ JARDIN

pto

100%

100%

RED DE DISTRIBUCION DE DESAGUE


MOVIMIENTO DE TIERRAS
m

179.85

10.65

1,915.40

03.01.02

REFINE Y NIVELACION DE FONDO DE ZANJA

179.85

1.06

190.64

03.01.03

CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO

179.85

0.89

160.07

03.01.04

RELLENO Y COMPACTACION DE ZANJAS

179.85

9.22

1,658.22

100%
100%
100%
100%

RED DE DISTRIBUCION

03.02.01

SUMINISTRO E INST. TUBERIA PVC SAL DE 4"

99.40

9.63

957.22

03.02.02

SUM. E INSTALACION TUBERIA PVC DESAGUE 6"

80.45

24.26

1,951.72

03.02.03

CAJA DE REGISTRO DE DESAGUE 10" X 24"

pza

7.00

176.90

1,238.30

03.02.04

CAJA DE REGISTRO DE DESAGUE 12" X 24"

pza

3.00

179.38

538.14

03.02.05

CAJA DE REGISTRO DE DESAGUE 18" X 24"

pza

3.00

146.62

439.86

03.02.06

CAJA DE REGISTRO DE DESAGUE 24" X 24"

pza

3.00

155.22

465.66

03.02.07

BUZON TIPICO D=1.20 M. C/MARCO Y TAPA DE CONCRETO, H=1.50 M

und

1.00

1,879.34

1,879.34

und

1.00

368.42

368.42

03.03.01

MES 03

SALIDAS DE AGUA FRIA

EXCAVACION DE ZANJAS

03.03

MES 02

SISTEMA DE AGUA FRIA Y REDES

03.01.01

03.02

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

100%
100%
100%
100%
100%
100%
100%

CONEXIONES DOMICILIARIAS
SUMIN/ INST. CONEXION DOMICILIARIA DESAGUE PVC L = 10m No - Inc/caja

100%

MES 04

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

FECHA : FEBRERO 2012

Descripcin

04

Und

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

MES 02

SISTEMA DE EVACUACION PLUVIAL

04.01

MOVIMIENTO DE TIERRAS

04.01.01

EXCAVACION DE ZANJAS

m3

45.62

30.42

1,387.76

04.01.02

ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM

m3

54.74

6.90

377.71

04.02

CUNETAS

04.02.01

CONFORMACION DE SUB RASANTE CON PLANCHA DE CUNETA

m2

124.05

3.97

492.48

04.02.02

BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO

m2

124.05

11.68

1,448.90

04.02.03

CONCRETO F'C=140 KG/CM2.PARA CUNETA

m3

20.80

294.26

6,120.61

04.02.04

ENCOFRADO Y DESENCOFRADO PARA CUNETA

m2

168.50

39.11

6,590.04

04.02.05

CURADO DE CONCRETO

m2

292.55

0.69

201.86

04.02.06

JUNTAS DE DILATACION E=1" CON TEKNOPORT

74.26

10.43

774.53

04.02.07

REJILLA METALICA PARA CUNETA

139.45

79.56

11,094.64

INSTALACIONES ELECTRICAS

1 SISTEMA DE UTILIZACIN PRIMARIA 10KV. COER


1.01 SUMINISTRO DE MATERIALES PARA EL SISTEMA DE UTILIZACION
01.01.01

POSTES Y CRUCETAS

01.01.01.01

POSTES CONCRETO ARMADO CENTRIFUGADO DE:

01.01.01.01.0 Poste CAC 13/400/2/210/405

und

3.00

1,090.00

3,270.00

01.01.01.01.0 Poste CAC 13/600/2/210/405

und

2.00

1,250.00

2,500.00

100%
100%

MES 03

MES 04

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

01.01.01.01.0 Perilla de Concreto

FECHA : FEBRERO 2012

Und

Metrado

Precio

Parcial

und

5.00

8.40

42.00

01.01.01.02.0 Mensula de CAV M/0.80/500

und

3.00

78.00

234.00

01.01.01.02.0 Cruceta de madera tratada de 1.50 m x 110mm x 90mm

und

60

120.00

01.01.01.02.0 Media Palomilla Simple de C.AV. Mp/1.10/150

und

2.00

100.98

201.96

01.01.01.02.0 Media Loza de CAV 1.10m/750

und

2.00

220.00

440.00

01.01.01.02.0 Palomilla Simple de C.AV. Mp/1.50/150

und

117.65

235.30

01.01.01.02.0 Media Loza de CAV 1.30m/750

und

1.00

210.08

210.08

01.01.01.02.0 Ducto de concreto de dos vias

und

1.00

18.00

18.00

404.88

2,024.40

14.00

6.72

94.08

73.00

25.00

1,825.00

416.58

40.00

16,663.20

5.00

437.23

2,186.15

12.00

2.10

25.20

10.00

0.58

5.80

4.00

4.08

16.32

10.16

60.96

7.00

36.21

253.47

63.03

378.18

12.71

50.84

01.01.01.02

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

MES 02

100%

CRUCETAS DE CONCRETO ARMADO VIBRADO Y DUCTOS

01.01.02

CONDUCTORES, CABLES Y ACCESORIOS:

01.01.02.01

Conductor de Aleacin de Aluminio 6201-T81 (AAAC), cableado 120 mm2.

01.01.02.02

Conductor de cobre desnudo, cableado, temple blando , 35 mm 2

01.01.02.03

Conductor de cobre desnudo, cableado, temple duro , 95 mm 2

01.01.02.04

Cable subterraneo N2XSY 150mm2 8.7/15 KV

01.01.02.05

Cabeza Terminal 8.7/15 KV P/ N2XSY x 150mm2 tipo exterior

01.01.02.06

Cinta plana de armar segn requerimiento

01.01.02.07

Alambre de Al 16 mm2 para amarre

01.01.02.08

Varilla de armar simple Al-Al , para conductor segn requerimiento

und

01.01.02.09

Grapa tipo pistola de Al-Al para conductor de segn requerimiento

und

01.01.03

AISLADORES Y ESPIGAS:

01.01.03.01

Aislador Polimerico Tipo Pin para 15 KV + accesorios de fijacion

und

01.01.03.02

Aisladores Polimricos tipo Suspensin 15 Kv

und

01.01.03.03

Espiga para vertice de poste para PIN Polimerico 15 KV

und

100%
100%
100%
100%
100%
100%
100%

100%
m
m
m
m
und

m
m

100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%

MES 03

MES 04

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

FECHA : FEBRERO 2012

Und

01.01.04

FERRETERIA:

01.01.04.01

Seccionador Cut-Out,15KV,95KV-BIL, 100 A, tipo Expulsin

01.01.04.02

Arandela cuadrada plana de A G A G 57 mm x 57mm x 5 mm,agujero de 18 und

01.01.04.03

Arandela cuadrada curva de A G A G 76 mm x 76mm x 5 mm,agujero de 18 und

01.01.04.04

Perno Ojo A G de 16mm x 308 mm long, 102 mm maquinado con tuerca y conund

01.01.04.05

Perno doble armado de 508mm long. x 16mm ? con tuerca y contratuerca

und

01.01.04.06

Perno maquinado A G 16mm x 457 mm con 152 mm tca y cttca.

und

01.01.04.07

Perno maquinado A G 16mm x 508 mm con 152 mm tca y cttca.

und

01.01.04.08

Adaptador tipo lira de AG de 16mm x 78 mm long.

und

01.01.04.09

Plancha de Cobre tipo "J"

und

01.01.04.10

Conector tipo Split bolt para cable 35 mm2

und

01.01.04.11

Conector tipo cua tipo AMPAC

und

01.01.04.12

Fleje de acero inoxidable (Cinta Band it), de 19 mm

01.01.04.13

Hebilla de acero inoxidable para fleje de 19 mm

und

01.01.04.14

Tubo de FG de 6" diam x 6m ms Curva FG 4"

und

01.01.04.15

Fusible de expulsin tipo K 6A

und

01.01.04.16

Silicona liquida

und

01.01.05

PUESTA A TIERRA

01.01.05.01

Conductor de Puesta a Tierra de cobre recocido de 25 mm2 o Cooperweld N 02 Am

01.01.05.02

Conector tipo Split bolt para cable 25 mm2

und

01.01.05.03

Electrodo de Copperweld de 16 mm x 2400 mm long.

und

01.01.05.04

Conector de Bronce para electrodo de 16 mm

und

und

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

MES 02

100%
6

194.92

1,169.52

18

0.9

16.20

24

0.9

21.60

6.36

38.16

24.00

11.34

56.70

11.34

11.34

5.51

33.06

16

4.07

65.12

12

5.88

70.56

4.66

27.96

33

3.36

110.88

22

1.06

23.32

250

750.00

24.00

12

60.00

72

7.25

522.00

12

3.9

46.80

22.46

112.30

2.54

12.70

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%

MES 03

MES 04

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

FECHA : FEBRERO 2012

Und

01.01.05.05

Caja de concreto

und

01.01.05.06

Registro de concreto para inspeccin de puesta a tierra (tapa)

und

01.01.05.07

Bentonita (Saco de 50 kg)

BOL

01.01.05.08

Sal Industrial (Saco de 50 kg)

BOL

01.01.05.09

Tubo PVC SAP 3/4" x 1 m de long

und

01.01.05.10

Tierra vegetal cernida

m3

01.01.06

RETENIDAS

01.01.06.01

Cable de Acero HS de 10mm

01.01.06.02

Varilla de ancl. c/guardacabo AG 5/8" x2.40m(8') provisto de ojal guardacabo e


und

01.01.06.03

Arandela de anclaje cuadrada plana de A G 102 mm x 102mm x 6 mm con aguj und

01.01.06.04

Perno angular 16 mm x 308 mm long, 102 mm maquinado con tuerca y contrat und

01.01.06.05

Aislador de Porcelana de Traccin Clase ANSI 54-2.

01.01.06.06

Canaleta guardacable de AG de 1/2" x 30 mm x 2,4 m con perno y tuerca en un und

01.01.06.07

Bloque de concreto armado 0.50 x 0.50 x 0.20m. Con agujero central de 11/16"

und

01.01.06.08

Mordaza preformada de acero para cable de 10 mm

und

01.01.06.09

Arandela cuadrada curva de A G 57 mm x 57mm x 5 mm con agujero central

und

01.01.07

SISTEMA DE MEDICION EN MEDIA TENSION

01.01.07.01

Transformador mixto 10kV, 15 - 20 - 25/5 A, cl 0,2

und

01.01.07.02

Medidor electrnico multitarifa y multifuncin, 4 hilos, cl 0,2

und

01.01.07.03

Caja portamedidor estandarizada

und

01.01.08

SUBESTACION AEREA TIPO MONOPOSTE

01.01.08.01

Transformador trifasico 100 KVA 10/0.38-0.23 KV

und

und

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

MES 02

100%
5

15

75.00

10

50.00

12

30

360.00

12

11.86

142.32

2.97

17.82

7.8

27.73

216.29

63

2.46

154.98

20.76

83.04

3.22

12.88

6.45

25.80

4.24

16.96

27.73

110.92

30.51

122.04

12

4.24

50.88

0.77

6.16

9500

9,500.00

1600

1,600.00

800

800.00

16101.7

16,101.70

100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%

100%

MES 03

MES 04

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

FECHA : FEBRERO 2012

Und

01.01.08.02

Tablero de Distribucin 3 280/220, para SED 100 KVA

und

01.01.08.03

Cable NYY, 3 - 1 x 50 mm2

01.02

MONTAJE ELECTROMECANICO DEL SISTEMA DE UTILIZACION

01.02.01

TRABAJOS PRELIMINARES

01.02.01.01

Replanteo topografico de la linea y ubicacin de estructuras

KM

01.02.01.02

Ingenieria de Detalle y Expediente de Replanteo.

KM

01.02.01.03

Campamentos y almecen general

GLB

01.02.02

MONTAJE DE POSTES:

01.02.02.01

Transporte de postes de almacen a punto de izaje

und

01.02.02.02

Excavacion hueco para poste en terreno normal

und

01.02.02.03

Instalacion poste de concreto armado

und

01.02.02.04

Cimentacion de Poste de Concreto

und

01.02.02.05

Construccin de Solado de Concreto

und

01.02.02.06

Recubrimiento de la Base con Sustancia Bituminosa

und

01.02.02.07

Recubrimiento base del poste con sellador impermeabilizante

und

01.02.02.08

Sealizacin de Estructura

und

01.02.03

TENDIDO Y FLECHADO DE CONDUCTORES, CABLES Y ACCESORIOS:

01.02.03.01

Tendido y Puesta en flecha de conductor AAAC

01.02.03.02

Tendido de Cable subterraneo N2XSY 1x150mm2 - 8.7/15 KV

01.02.03.03

Instalacion de terminaciones, para cable N2XSY 1x50mm2 - 8.7/15 KV exterior

und

01.02.04

ISNTALACION DE ARMADOS Y EQUIPOS DE MEDIA TENSION

01.02.04.01

Armado tipo PD-SEC C.A.C.

und

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

MES 02

MES 03

100%
1

3500

3,500.00

50

150

7,500.00

0.24

2655.78

637.39

0.24

562.4

134.98

1300.63

1,300.63

81.24

406.20

124.49

622.45

273.3

1,366.50

136.75

683.75

51.37

256.85

27.4

137.00

29.78

148.90

33.45

167.25

404.88

1.47

595.17

416.58

1.38

574.88

117.29

586.45

199.36

199.36

100%

100%
100%
100%

100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%

100%

MES 04

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

FECHA : FEBRERO 2012

Und

01.02.04.02

Armado tipo PMI-SEC C.A.C.

und

01.02.04.03

Armado tipo PTV-3S C.A.C.

und

01.02.04.04

Armado tipo PSVM-3 C.A.C.

und

01.02.04.05

Armado tipo SABM-3FC C.A.C.

und

01.02.04.06

Montaje de Trasformador Trifasico de 100 KVA 10 KV/0.38-0.23kV

und

01.02.04.07

Montaje de Tablero de Distribucion

und

01.02.04.08

Instalacion de Trafomix

und

01.02.05

INSTALACION DE RETENIDAS

01.02.05.01

Excavacion zanja para retenida en terreno normal

und

01.02.05.02

Instalacion de retenida inclinada

und

01.02.05.03

Relleno y compactacin de retenida inclinada

und

01.02.06

INSTALACION DE PUESTA A TIERRA

01.02.06.01

Excavacion de hueco para puesta a tierra, en terreno normal.

und

01.02.06.02

Instalacion de Puesta a Tierra tipo PAT-1 (incluye relleno y compactacin)

und

01.02.06.03

Instalacion de Puesta a Tierra tipo PAT-2 (incluye relleno y compactacin)

und

01.02.06.04

Inst. de Puesta a Tierra tipo PAT-3 (en postes de aliniamientos)

und

01.02.07

OBRAS CIVILES

01.02.07.01

Excavacion de zanja de 0.6 x 1.2 m para la instalacion de cable subterraneo en d m

01.02.08

PRUEBAS Y PUESTA EN SERVICIO

01.02.08.01

Prueba y puesta en servicio

GLB

01.02.08.02

Expediente tecnico conforme a obra

GLB

02

INSTALACIONES ELECTRICAS INTERIORES COER

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

MES 02

MES 03

100%
1

439.47

439.47

199.36

199.36

130.36

130.36

569.88

569.88

477.5

477.50

184.67

184.67

617.95

617.95

5.33

21.32

112.15

448.60

11.03

44.12

122.12

732.72

115.83

115.83

98.6

197.20

201.65

201.65

105

27.72

2,910.60

824.85

824.85

562.41

562.41

100%
100%
100%
100%
100%
100%

100%
100%
100%

100%
100%
100%
100%

100%

100%
100%

MES 04

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

Descripcin

FECHA : FEBRERO 2012

Und

02.01

SALIDAS

02.01.01

SALIDA DE TECHO ( CENTRO DE LUZ )

pto

02.01.02

SALIDA PARA INTERRUPTORE SIMPLE

pto

02.01.03

SALIDA PARA TOMACORRIENTE SIMPLE + PUESTA A TIERRA

pto

02.01.04

POZO PUESTA A TIERRA DE R < 3 Ohm

und

02.02

CAJAS

02.02.01

BUZN DE REGISTRO PASA CABLES

02.03

TABLEROS

02.03.01

TABLERO GENERAL

und

02.03.02

TABLEROS DE CONTROL Y TRANSFERENCIA

und

02.03.03

TABLEROS DE DISTRIBUCIN (TD-1). VER ESP. TEC.

und

02.03.04

TABLEROS DE DISTRIBUCIN (TD-2). VER ESP. TEC.

und

02.03.05

TABLEROS DE DISTRIBUCIN (TD-3). VER ESP. TEC.

und

02.04

ALIMENTADORES

02.04.01

ALIMENTADOR 3 - 1 x 50 + 1 x 35 mm2 NYY, TUB. PVC 70 mm

02.04.02

TG -TD-01 - 3 x 1 x 10 + 1 x 6 mm2 NYY, TUB. 50 mm.

02.04.03

TG -TD-02 - 3 x 1 x 10 + 1 x 6 mm2 NYY, TUB. 50 mm.

02.04.04

TG -TD-03 - 3 x 1 x 6 + 1 x 6 mm2 NYY, TUB. 40 mm.

02.04.05

CONDUCTOR 2-1x6mm, TUB. PVC 40 mm - POSTES Y HELIPUERTO

02.05

ARTEFACTOS DE ILUMINACIN

02.05.01

ARTEFACTO C/2 LMPARAS FLUORESCENTES DE 2 x 36W PARA ADOSAR AL T.

und

und

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

MES 02

MES 03

MES 04

100%
1

88.32

88.32

95.99

95.99

157.83

157.83

306.76

1,227.04

285.69

2,285.52

5039.83

5,039.83

6525

6,525.00

979.77

979.77

1005.11

1,005.11

956.09

956.09

77.8

85.62

6,661.24

22

45.22

994.84

124

45.22

5,607.28

111.5

39.96

4,455.54

860

16.31

14,026.60

91.05

91.05

100%
100%
100%

100%

100%
100%
100%
100%
100%

100%
100%
100%
100%
100%

100%

CRONOGRAMA GANNT
PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA

Item

FECHA : FEBRERO 2012

Descripcin

Und

02.05.02

REFLECTOR DE 400 W EN POSTE

und

02.05.03

POSTE DE CAC . 9 mts/200/120/255

und

02.05.04

REFLECTOR SENCILLO O DOBLE CON POSIBILIDAD DE LUZ PERIMETRAL SUPERIOR und

02.05.05

FARO PERIMETRAL OMNIDIRECCIONAL COLOR AMARILLO SERIE LO

02.05.06

FARO DE EMPOTRAR OMNIDIRECCIONAL COLORES AMARILLO O VERDE SERIE LO-Hund

02.05.07

FARO DE LOCALIZACION DEL HELIPUERTO SERIE FX

02.05.08

MANAGVELETA CON SISTEMA DE ILUMINACION Y LUZ DE OBSTRUCCION SERIE MS und

02.05.09

FARO DE APROXIMACION OMNIDIRECCIONAL COLORES BLANCO, AMARILLO O VERD


und

02.05.10

DISPOSITIVO DE CONTROL Y MANIOBRA POR VIGILANCIA PARA REFLECTORES

02.06

VARIOS

02.06.01

SUM. E INST. DE GRUPO ELECTROGENO 70 KW

und

02.06.02

PRUEBAS ELECTRICAS

und

02.06.03

EXCAVACION DE ZANJAS PARA REDES EXTERIORES

02.06.04

RELLENO CON MATERIAL PROPIO

02.06.05

Prueba y puesta en servicio

GLB

und

und

und

Metrado

Precio

Parcial

GLB

1.02 TELEFONIA SATELITAL

GLB

MES 02

MES 03

MES 04

100%
28

939.8

26,314.40

14

979.71

13,715.94

2187.71

13,126.26

1666.28

13,330.24

10

1446.13

14,461.30

3633.31

3,633.31

7145.63

7,145.63

709.9

2,839.60

2394.71

2,394.71

70751.39

70,751.39

778.85

778.85

1189.5

5.33

6,340.04

1189.5

7.1

8,445.45

824.85

824.85

276310.96

276,310.96

299437.00

299,437.00

100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%

INSTALACIONES COMUNICACIONES
1.01 COMUNICACIONES POR RADIO

PLAZO DE EJECUCION = 07 MESES = 210 D.C


MES 01

ES = 210 D.C
MES 05

MES 06

16.67%

16.65%

ES = 210 D.C
MES 05

MES 06

ES = 210 D.C
MES 05

MES 06

100%

ES = 210 D.C
MES 05

MES 06

100%
100%

100%
100%

100%
100%
100%

100%
100%

100%
100%
100%

100%

ES = 210 D.C
MES 05

MES 06

ES = 210 D.C
MES 05

MES 06

ES = 210 D.C
MES 05

MES 06

100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%

100%

ES = 210 D.C
MES 05

MES 06

100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%

100%
100%
100%
100%

100%

ES = 210 D.C
MES 05

MES 06

100%
100%
100%
100%
100%
100%

100%
100%

100%

100%
100%
100%
100%

ES = 210 D.C
MES 05

MES 06

ES = 210 D.C
MES 05

MES 06

ES = 210 D.C
MES 05

MES 06

ES = 210 D.C
MES 05

100%
100%

100%
100%
100%
100%
100%
100%
100%

MES 06

ES = 210 D.C
MES 05

MES 06

ES = 210 D.C
MES 05

MES 06

ES = 210 D.C
MES 05

MES 06

ES = 210 D.C
MES 05

MES 06

ES = 210 D.C
MES 05

MES 06

ES = 210 D.C
MES 05

MES 06

ES = 210 D.C
MES 05

MES 06

70%

30%

70%

30%

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item

01.00.00
01.01
01.02
01.03
01.04
01.05
02
02.01
02.01.01
02.01.02
02.02

02.02.01
02.02.02
02.02.03
02.02.04
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.02
03.02.01
03.02.02
03.02.03
03.03
03.03.01
03.03.01.01
03.03.01.02
03.03.01.03
03.03.02
03.03.02.01
03.03.02.02
03.03.02.03
03.03.03
03.03.03.01
03.03.03.02
03.03.03.03
03.03.04
03.03.04.01
03.03.04.02
03.03.04.03
03.03.04.04
03.04
03.04.01
03.04.02
03.04.03
03.05
03.05.01
03.06
03.06.01
03.06.02
03.06.03
03.06.04
03.07

Descripcin

Und

ARQUITECTURA Y ESTRUCTURAS
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACIN DE OBRA DE 3.60 X 2.40 M
und
ALMACEN, OFICINA, CASETA DE GUARDIANIA
m2
INSTALACION PROVISIONAL PARA DEPOSITO DE AGUA
und
SERVICIO DE BAO PORTATIL (INODORO - LAVADERO) INC. MONTAJE
und
CERCO PROVISIONAL
m
HABILITACION DEL TERRENO
TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
m2
LIMPIEZA Y DESFORESTACION RENDIMIENTO 1.0 HAS/DIA
HA
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO RENDIMIENTO=570 M3/DIA
m3
CORTE MATERIAL SUELTO MATERIA ORGANICA H=0.70M , SEGUN ESTUDIO SU m3
RELLENO Y COMPACT. CON MATERIAL DE PRESTAMO C/EQUIPO
m3
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
m3
CERCO PERIMETRICO Y CASETA DE CONTROL
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMIENTACION
m3
RELLENO COMPACTADO CON HORMIGN PARA CIMIENTOS, E= 0.20 M
m3
BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO
m2
RELLENO COMPACTADO DE ZANJAS CON MATERIAL PROPIO
m3
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
m3
OBRAS CONCRETO SIMPLE
SOLADO 1:12 e=0.10
m2
FALSO PISO MEZCLA 1:8 E= 10cm
m2
CIMIENTOS CORRIDOS 1:10 +30% P.G
m3
OBRAS DE CONCRETO ARMADO
SOBRECIMIENTOS ARMADOS
CONCRETO F'C=210 KG/CM2. PARA SOBRECIMIENTO
m3
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
m2
ACERO FY=4200 kg/cm2 PARA SOBRECIMIENTO
kg
COLUMNAS
CONCRETO F'C=210 KG/CM2. PARA COLUMNAS.
m3
ENCOFRADO Y DESENCOFRADO NORMAL DE COLUMNAS
m2
ACERO FY=4200 kg/cm2 PARA COLUMNAS
kg
VIGAS
CONCRETO F'C=210 KG/CM2. PARA VIGAS
m3
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS.
m2
ACERO FY=4200 kg/cm2 PARA VIGAS
kg
LOSA ALIGERADA
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
m3
ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS
m2
ACERO GRADO 60 EN LOSAS ALIGERADAS
kg
LADRILLO HUECO DE ARCILLA 15 X 30 X 30 CM PARA TECHO ALIGERADO
und
MUROS DE ALBAILERIA
MURO DE LADRILLO KK DE SOGA (1:4) CEMENTO-ARENA
m2
MUROS DE LADRILLO KK DE CABEZA (1:4)
m2
ACERO FY=4200 kg/cm2
kg
JUNTAS DE DILATACION
JUNTA DE CONSTRUCCION CON TEKNOPORT
m
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO COLUMNAS MEZ. C:A 1.5 E=1.5 CM
m2
TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO-ARENA
m2
TARRAJEO MUROS INTERIORES Y EXTERIORES C.A 1:4 e=1.5cm.
m2
CIELO RASOS CON MEZCLA 1:5
m2
CONTRAZOCALOS

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C


MES 01

MES 02

MES 03

1.00
48.00
1.00
3.00
269.98

821.29
102.09
809.12
300.00
22.88

821.29
4,900.32
809.12
900.00
6,177.14

821.29
4,900.32
809.12
150.00
6,177.14

20,000.21
2.00

1.24
1,545.84

24,800.26
3,091.68

24,800.26
3,091.68

4,049.58
9,800.10
14,201.62
16,619.62

4.21
4.21
49.91
6.90

17,048.73
41,258.42
708,802.85
114,675.38

17,048.73
41,258.42
425,281.71
114,675.38

384.37
76.62
6.00
29.82
425.46

26.62
114.17
11.68
34.52
6.90

10,231.93
8,747.71
70.08
1,029.39
2,935.67

10,231.93
8,747.71
70.08
1,029.39
2,935.67

12.54
6.00
269.43

24.43
27.21
158.43

306.35
163.26
42,685.79

306.35
163.26
42,685.79

48.64
637.93
2,824.66

414.69
33.94
3.65

20,170.52
21,651.34
10,310.01

20,170.52
21,651.34
10,310.01

35.49
492.60
6,455.97

440.12
50.47
3.65

15,619.86
24,861.52
23,564.29

15,619.86
24,861.52
23,564.29

18.41
212.42
1,775.26

388.80
56.31
3.65

7,157.81
11,961.37
6,479.70

7,157.81
11,961.37
6,479.70

1.59
21.57
118.40
151.00

356.65
32.04
3.65
2.50

567.07
691.10
432.16
377.50

567.07
691.10
432.16
377.50

1,401.55
30.62
545.08

46.55
79.94
3.65

65,242.15
2,447.76
1,989.54

65,242.15
2,447.76
1,989.54

217.75

3.80

827.45

827.45

14,354.36
7,375.22
3,256.75
671.47

14,354.36
7,375.22
3,256.75
671.47

492.60
212.42
175.00
21.57

29.14
34.72
18.61
31.13

150.00

150.00

283,521.14

MES 04

150.00

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item

Descripcin

Und

03.07.01
03.07.02
03.08
03.08.01
03.08.02
03.08.03
03.09
03.09.01
03.09.02
03.09.03
03.10
03.10.01
03.10.02
03.11
03.11.01
03.11.02
03.11.03
03.12
03.12.01
03.12.01.01
03.12.01.02
03.12.02
03.12.02.01
03.12.02.02
03.12.02.03
03.13
03.13.01

CONTRAZOCALO DE CEMENTO PULIDO EXTERIOR H= 30 cm C.A. 1:2


e=1.5 m
CONTRAZOCALO DE CERAMICA H=10CM, INTERIOR, CASETA CONTROL
m
PISOS CERAMICO ANTIDESLIZANTE
PISO DE CERAMICA ANTIDESLIZANTE 0.30 x 0.30 cm. TRANSITO INTENSO
m2
CANTONERA DE ALUMINIO 2"
m
CONTRAPISO DE e= 20 mm MEXCLA 1:3
m2
PINTURA
PINTURA LATEX LDOS MANOS EN MUROS, COLUMNAS Y VIGAS
m2
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO
m2
PINTURA LATEX DOS MANOS EN CIELO RASO
m2
CARPINTERIA DE MADERA
PUERTA MADERA CEDRO INC/PINTURA
m2
VENTANA MADERA CEDRO INC/PINTURA
m2
CARPINTERIA METALICA
PORTON METALICO (4.00 x 7.50) SEGUN DISEO
und
PUERTA METALICA CON PERFILES ANGULARES 1"X1"X1/8"
m2
REJILLA METALICA SOBRECIMIENTO
und
CERRAJERIA
BISAGRAS
BISAGRA ALUMINIZADA 4" PESADA PARA PUERTA
pza
BISAGRA ALUMINIZADA 4" PARA VENTANAS
pza
CERRADURAS
CERRADURA TRES GOLPES PARA PUERTA CON TIRADOR
und
MANIJA DE BRONCE PARA PORTAUELAS EN VETANAS DE FIERRO
pza
CERROJO DE ALUMINIO 3" PARA VENTANAS
pza
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO INCOLORO SEMIDOBLE
p2

04
04.01
04.01.01
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06

CONSTRUCCION DE PLATAFORMA DE HELIPUERTO


TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
m2
MOVIMIENTO DE TIERRAS
CORTE TERRENO NATURAL A NIVEL DE SUBRASANTE
m3
EXCAVACION DE ZANJAS PARA SARDINELES
m3
CONFORMACION Y COMPACTACION DE SUBRASANTE CON EQUIPO
m2
SUB BASE AFIRMADO C/EQUIPO E= 0.10 M C/EQUIPO
m2
BASE AFIRMADO C/EQUIPO E= 0.20 M C/EQUIPO, EXTENDIDO, RIEGO Y COMP m2
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
m3
OBRAS CONCRETO SIMPLE
CONCRETO EN LOSAS F'C=280 KG/CM2
m3
ENCOFRADO Y DESENCOFRADO DE LOSAS
m2
CONEXION ENTRE LOSAS RIGIDAS (PAVIMENTOS) JUNTA DILATACION
und
CONEXION ENTRE LOSAS RIGIDAS JUNTA CONTRACCION
und
CURADO DE CONCRETO
m2
JUNTAS DE DILATACION E=1" CON TEKNOPORT
m

05
05.01
05.01.01
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.02.06
05.03
05.03.01

CONSTRUCCION DE PLATAFORMA CARGA Y DESCARGA


TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
m2
MOVIMIENTO DE TIERRAS
CORTE TERRENO NATURAL A NIVEL DE SUBRASANTE
m3
EXCAVACION DE ZANJAS PARA SARDINELES
m3
CONFORMACION Y COMPACTACION DE SUBRASANTE CON EQUIPO
m2
SUB BASE AFIRMADO C/EQUIPO E= 0.10 M C/EQUIPO
m2
BASE AFIRMADO C/EQUIPO E= 0.20 M C/EQUIPO, EXTENDIDO, RIEGO Y COMP m2
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
m3
OBRAS CONCRETO SIMPLE
LOSA DE CONCRETO F'c=210 Kg/cm2 , E=0.20M
m3

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C


MES 01

MES 02

684.01
8.80

12.28
10.64

8,399.64
93.63

MES 03
8,399.64
93.63

MES 04

6.00
1.80
6.00

41.99
7.02
15.25

251.94
12.64
91.50

251.94
12.64
91.50

880.01
205.20
21.57

6.56
9.27
5.43

5,772.87
1,902.20
117.13

3.78
5.38

445.70
238.66

1,684.75
1,283.99

1.00
3.30
1.00

7,153.50
303.47
217.43

7,153.50
1,001.45
217.43

6.00
8.00

6.44
6.12

38.64
48.96

3.00
4.00
2.00

73.55
1.63
5.73

220.65
6.52
11.46

57.84

5.26

304.24

957.00

1.24

1,186.68

1,186.68

143.55
0.68
957.00
957.00
957.00
173.08

25.85
26.62
2.53
7.00
17.50
6.90

3,710.77
18.10
2,421.21
6,699.00
16,747.50
1,194.25

3,710.77
18.10
2,421.21
6,699.00
16,747.50
1,194.25

198.96
167.00
184.00
1,462.00
957.00
587.00

418.89
25.31
13.17
6.99
0.69
10.43

83,342.35
4,226.77
2,423.28
10,219.38
660.33
6,122.41

83,342.35
4,226.77
2,423.28
10,219.38
660.33
6,122.41

1,404.00

1.24

1,740.96

1,740.96

421.20
0.89
1,404.00
1,404.00
1,404.00
506.51

25.85
26.62
2.53
7.00
17.50
6.90

10,888.02
23.69
3,552.12
9,828.00
24,570.00
3,494.92

10,888.02
23.69
3,552.12
9,828.00
24,570.00
3,494.92

290.84

357.98

104,114.90

104,114.90

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item
05.03.02
05.03.03
05.03.04
05.03.05
05.03.06

Descripcin
ENCOFRADO Y DESENCOFRADO DE LOSAS
CONEXION ENTRE LOSAS RIGIDAS (PAVIMENTOS) JUNTA DILATACION
CONEXION ENTRE LOSAS RIGIDAS JUNTA CONTRACCION
CURADO DE CONCRETO
JUNTAS DE DILATACION E=1" CON TEKNOPORT

Und

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C

m2
und
und
m2
m

235.80
362.00
1,982.00
1,404.00
855.00

25.31
13.17
6.99
0.69
10.43

5,968.10
4,767.54
13,854.18
968.76
8,917.65

MES 04
5,968.10
4,767.54
13,854.18
968.76
8,917.65

m2

375.00

1.24

465.00

465.00

m3
m2
m2
m3

0.44
375.00
375.00
0.53

26.62
3.82
11.68
6.90

11.71
1,432.50
4,380.00
3.66

11.71
1,432.50
4,380.00
3.66

m2
m3
m2
m2
m

375.00
3.60
52.50
375.00
205.00

45.01
348.82
17.41
0.69
10.43

16,878.75
1,255.75
914.03
258.75
2,138.15

16,878.75
1,255.75
914.03
258.75
2,138.15

4.75
101.89
1,202.43
1,063.52
5.70

26.62
98.79
3.82
11.68
6.90

126.45
10,065.71
4,593.28
12,421.91
39.33

1,202.43
39.92
336.06
27.45
1,202.43
718.83

46.41
354.11
25.31
38.77
0.69
10.43

55,804.78
14,136.07
8,505.68
1,064.24
829.68
7,497.40

m2

2,642.64

1.24

3,276.87

m3
m3
m3
m2
m2
m2
m2
m3

115.74
12.80
811.28
2,642.64
877.99
1,724.02
877.99
154.25

4.21
26.62
49.91
2.53
7.00
12.35
17.50
6.90

487.27
340.74
40,490.98
6,685.88
6,145.93
21,291.65
15,364.83
1,064.33

m2
m2
m

877.99
877.99
357.79

5.45
52.52
9.25

4,785.05
46,112.03
3,309.56

m3
m2
m2
m

22.01
280.35
51.19
29.25

357.98
38.77
0.69
10.43

7,879.14
10,869.17
35.32
305.08

06
06.01
06.01.01
06.02
06.02.01
06.02.02
06.02.03
06.02.04
06.03
06.03.01
06.03.02
06.03.03
06.03.04
06.03.05

CONSTRUCCION DE PLATAFORMA ENTRENAMIENTO


TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA SARDINELES
NIVELACION INTERIOR Y COMPACTACIN DE SUBRASANTE
BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
OBRAS CONCRETO SIMPLE
PLATAFORMA CONCRETO F'c=175 kg/cm2 e=10.0cm
CONCRETO DE SARDINELES F'C= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO PAOS DE PLATAFORMA
CURADO DE CONCRETO
JUNTAS DE DILATACION E=1" CON TEKNOPORT

07
07.01
07.01.01
07.01.02
07.01.03
07.01.04
07.01.05
07.02
07.02.01
07.02.02
07.02.03
07.02.04
07.02.05
07.02.06

VEREDAS DE CONCRETO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA SARDINELES
m3
RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO
m3
NIVELACION INTERIOR Y COMPACTACIN DE SUBRASANTE
m2
BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO
m2
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
m3
OBRAS CONCRETO SIMPLE
CONCRETO F'C= 175 KG/CM2 ACABADO FROTACHADO Y BRUADEO - VERED m2
CONCRETO F'C= 175 KG/CM2 - SARDINEL DE VEERDAS
m3
ENCOFRADO Y DESENCOFRADO DE VEREDAS
m2
ENCOFRADO Y DESENCOFRADO DE SARDINELES
m2
CURADO DE CONCRETO
m2
JUNTAS DE DILATACION E=1" CON TEKNOPORT
m

08
08.01
08.01.01
08.02
08.02.01
08.02.02
08.02.03
08.02.04
08.02.05
08.02.06
08.02.07
08.02.08
08.03
08.03.01
08.03.02
08.03.03
08.04
08.04.01
08.04.02
08.04.03
08.04.04
08.05

CONSTRUCCION DE ACCESOS PRINCIPALES YACCESO AUXILIAR


TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO RENDIMIENTO=570 M3/DIA
EXCAVACION DE ZANJAS PARA SARDINELES
RELLENO Y COMPACT. CON MATERIAL DE PRESTAMO C/EQUIPO
CONFORMACION Y COMPACTACION DE SUBRASANTE CON EQUIPO
SUB BASE AFIRMADO C/EQUIPO E= 0.10 M C/EQUIPO
SUB BASE AFIRMADO C/EQUIPO e= 20 cm., VIA AUXILIAR
BASE AFIRMADO C/EQUIPO E= 0.20 M C/EQUIPO, EXTENDIDO, RIEGO Y COMP
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
PAVIMENTACION CON BLOQUETAS
CAMA DE ARENA GRUESA DE E= 5 CM PARA ASENTADO DE ADOQUINES
PAVIMENTACIN DE VAS CON ADOQUINES (10 X 20 X8M)
CORTE DE ADOQUINES DE CONCRETO
SARDINEL DE CONFINAMIENTO
SARDINELES DE CONFINAMIENTO F'C=210 KG/CM2.
ENCOFRADO Y DESENCOFRADO DE SARDINELES
CURADO DE CONCRETO
JUNTAS DE DILATACION E=1" CON TEKNOPORT
ENCIMADO BUZONES

MES 01

MES 02

MES 03

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item
08.05.01

Descripcin

Und

ENCIMADO DE BUZN DE CONCRETO EXISTENTE MAX=1.50M PARA ADECUAund

Metrado

Precio

Parcial

4.00

317.34

1,269.36

09
09.01
09.02
09.03
09.04
09.05
09.06

AREAS VERDES
TIERRA DE CHACRA PARA RELLENO EN AREAS VERDES (Material de Prestamo)
EXTENDIDO Y NIVELACION DE TIERRA DE CHACRA PARA SEMBRADO DE GRAS
PREPARACION DE TIERRA DE CHACRA INC. FERTILIZANTES
SEMBRADO DE GRASS (Incluye Suministro y Seleccion)
RIEGO DE GRAS CON MANGUERA
PLANTA TIPICA PLANTONES

m3
m2
m3
m2
m2
und

726.04
4,821.19
726.04
4,821.19
4,821.19
68.00

49.58
1.33
22.73
2.78
0.26
15.10

35,997.06
6,412.18
16,502.89
13,402.91
1,253.51
1,026.80

10
10.01
10.02

VARIOS
LIMPIEZA GENERAL DE OBRA
PLACA RECORDATORIA DE BRONCE

m2
und

4,700.00
1.00

0.89
458.17

4,183.00
458.17

11
11.01

FLETE TERRETRE
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS

GLB

1.00

1,300.00

1,300.00

12
12.01
12.02
12.03
12.04

MEDIDAS DE MITIGACION AMBIENTAL


CAPACITACION AMBIENTAL
SUMINISTRO DE DEPOSITOS PARA BASURA
SUMINISTRO DE IMPLEMENTOS DE SEGURIDAD
ACONDICIONAMIENTO DE BOTADEROS

mes
und
und
und

3.00
10.00
1.00
1.00

3,500.00
52.20
2,263.90
800.00

10,500.00
522.00
2,263.90
800.00

PLAZO DE EJECUCION = 06 MESES = 180 D.C


MES 01

MES 02

MES 03

1,300.00

640,314.05

283,671.14

454,150.51

INSTALACIONES SANITARIAS
01
01.01
01.01.01
01.01.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.03
01.03.01
01.03.02
01.04
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
01.04.06
01.04.07
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.05.05

LINEA DE CONDUCCION AGUA POTABLE


TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO (REDES)
DEMOLICION DE PAVIMENTO ASFALTICO 2"
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS H=1.20M
NIVELACION Y FONDOS PARA TUBERIA
CAMA DE APOYO MATERIAL GRUESO (0.60X0.10m)
RELLENO Y COMPACTACION DE ZANJAS
RED DE CONDUCCION
SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 2"
PRUEBA HIDRAULICA + DESINFECCION
ACCESORIOS Y VALVULAS
CONEXION A RED DE AGUA EXISTENTE
CODO PVC X 90 2"
CODO PVC X 12.25 2"
CODO PVC X 22.5 2"
TAPON PVC C.10 2"
VALVULA DE INTERRUPCION DE 2"
SUMINISTRO E INSTALACION CAJA C/MARCO-TAPA FF P/VALVULA
REPOSICION DE PAVIMENTACION ASFALTICA
CONFORMACIN Y COMPACTACIN SUBRASANTE CON EQUIPO
RELLENO COMPACTADO CON AFIRMADO
BASE E=0.20M CON EQUIPO EXTENDIDO, RIEGO Y COMPACTADO
IMPRIMACION ASFALTICA
CARPETA ASFALTICA EN CALIENTE DE 2"

02
02.01
02.01.01
02.01.02
02.01.03

RED DE DISTRIBUCION AGUA POTABLE


MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
REFINE Y NIVELACION DE FONDO DE ZANJA
CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO

m
m2

498.51
48.00

1.40
42.58

697.91
2,043.84

697.91
2,043.84

m
m
m
m

498.51
498.51
498.51
498.51

26.62
1.06
5.80
9.22

13,270.34
528.42
2,891.36
4,596.26

13,270.34
528.42
2,891.36
4,596.26

m
m

498.51
498.51

11.04
2.32

5,503.55
1,156.54

5,503.55
1,156.54

1.00
1.00
2.00
4.00
1.00
1.00
1.00

762.85
19.86
20.45
19.86
6.41
243.14
236.00

762.85
19.86
40.90
79.44
6.41
243.14
236.00

762.85
19.86
40.90
79.44
6.41
243.14
236.00

48.00
3.60
7.20
48.00
48.00

6.54
116.42
154.50
4.90
35.00

313.92
419.11
1,112.40
235.20
1,680.00

313.92
419.11
1,112.40
235.20
1,680.00

183.80
183.80
183.80

10.65
1.06
0.89

1,957.47
194.83
163.58

GLB
pza
pza
pza
und
und
und
m2
m3
m3
m2
m2

m
m
m

MES 04

1,957.47
194.83
163.58

220,577.14

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item

Descripcin

Und

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C

183.80

9.22

1,694.64

MES 03
1,694.64

56.10
104.70
23.00
183.80
1.00

7.07
4.64
3.61
2.32
248.08

396.63
485.81
83.03
426.42
248.08

396.63
485.81
83.03
426.42
248.08

1.00
1.00

422.53
139.45

422.53
139.45

422.53
139.45

1.00

278.83

278.83

278.83

3.00

345.09

1,035.27

1,035.27

179.85
179.85
179.85
179.85

10.65
1.06
0.89
9.22

1,915.40
190.64
160.07
1,658.22

1,915.40
190.64
160.07
1,658.22

m
m
pza
pza
pza
pza
und

99.40
80.45
7.00
3.00
3.00
3.00
1.00

9.63
24.26
176.90
179.38
146.62
155.22
1,879.34

957.22
1,951.72
1,238.30
538.14
439.86
465.66
1,879.34

957.22
1,951.72
1,238.30
538.14
439.86
465.66
1,879.34

und

1.00

368.42

368.42

368.42

m3
m3

45.62
54.74

30.42
6.90

1,387.76
377.71

m2
m2
m3
m2
m2
m
m

124.05
124.05
20.80
168.50
292.55
74.26
139.45

3.97
11.68
294.26
39.11
0.69
10.43
79.56

492.48
1,448.90
6,120.61
6,590.04
201.86
774.53
11,094.64

02.01.04
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.04
02.04.01
02.05
02.05.01
02.05.01.01

RELLENO Y COMPACTACION DE ZANJAS


m
RED DE DISTRIBUCION
SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 11/2"
m
SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 1"
m
SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 1/2"
m
PRUEBA HIDRAULICA + DESINFECCION
m
CAJA DE REGISTRO PARA AGUA (BY PAS) DE 0.40 x 0.50 cm H= 1.00 M.
und
ACCESORIOS Y VALVULAS
ACCESORIOS DISTRIBUCION DE AGUA
und
VALVULA COMPUERTA DE BRONCE DE 1"
und
CONEXIONES DOMICILIARIAS
SUMINISTRO INST. CONEXION DOMICI. AGUA 1/2" A TUB 2", tapa termoplasund
SISTEMA DE AGUA FRIA Y REDES
SALIDAS DE AGUA FRIA
SALIDA DE AGUA FRIA PVC SAP DE 1/2" INC. GRIFO P/ JARDIN
pto

03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.03
03.03.01

RED DE DISTRIBUCION DE DESAGUE


MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
REFINE Y NIVELACION DE FONDO DE ZANJA
CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
RELLENO Y COMPACTACION DE ZANJAS
RED DE DISTRIBUCION
SUMINISTRO E INST. TUBERIA PVC SAL DE 4"
SUM. E INSTALACION TUBERIA PVC DESAGUE 6"
CAJA DE REGISTRO DE DESAGUE 10" X 24"
CAJA DE REGISTRO DE DESAGUE 12" X 24"
CAJA DE REGISTRO DE DESAGUE 18" X 24"
CAJA DE REGISTRO DE DESAGUE 24" X 24"
BUZON TIPICO D=1.20 M. C/MARCO Y TAPA DE CONCRETO, H=1.50 M
CONEXIONES DOMICILIARIAS
SUMIN/ INST. CONEXION DOMICILIARIA DESAGUE PVC L = 10m No - Inc/caja

04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07

SISTEMA DE EVACUACION PLUVIAL


MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
CUNETAS
CONFORMACION DE SUB RASANTE CON PLANCHA DE CUNETA
BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO
CONCRETO F'C=140 KG/CM2.PARA CUNETA
ENCOFRADO Y DESENCOFRADO PARA CUNETA
CURADO DE CONCRETO
JUNTAS DE DILATACION E=1" CON TEKNOPORT
REJILLA METALICA PARA CUNETA

m
m
m
m

MES 01

MES 02

0.00

35,837.45

INSTALACIONES ELECTRICAS
1 SISTEMA DE UTILIZACIN PRIMARIA 10KV. COER
1.01 SUMINISTRO DE MATERIALES PARA EL SISTEMA DE UTILIZACION
01.01.01
POSTES Y CRUCETAS
01.01.01.01
POSTES CONCRETO ARMADO CENTRIFUGADO DE:
01.01.01.01.01
Poste CAC 13/400/2/210/405
01.01.01.01.02
Poste CAC 13/600/2/210/405
01.01.01.01.03
Perilla de Concreto
01.01.01.02
CRUCETAS DE CONCRETO ARMADO VIBRADO Y DUCTOS
01.01.01.02.01
Mensula de CAV M/0.80/500

und
und
und

3.00
2.00
5.00

1,260.50
1,596.64
8.40

3,781.50
3,193.28
42.00

3,781.50
3,193.28
42.00

und

3.00

92.63

277.89

277.89

19,289.56

MES 04

0.00

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item
01.01.01.02.02
01.01.01.02.03
01.01.01.02.04
01.01.01.02.05
01.01.01.02.06
01.01.01.02.07
01.01.02
01.01.02.01
01.01.02.02
01.01.02.03
01.01.02.04
01.01.02.05
01.01.02.06
01.01.02.07
01.01.02.08
01.01.02.09
01.01.03
01.01.03.01
01.01.03.02
01.01.03.03
01.01.04
01.01.04.01
01.01.04.02
01.01.04.03
01.01.04.04
01.01.04.05
01.01.04.06
01.01.04.07
01.01.04.08
01.01.04.09
01.01.04.10
01.01.04.11
01.01.04.12
01.01.04.13
01.01.04.14
01.01.04.15
01.01.04.16
01.01.05
01.01.05.01
01.01.05.02
01.01.05.03
01.01.05.04
01.01.05.05
01.01.05.06
01.01.05.07
01.01.05.08
01.01.05.09
01.01.05.10
01.01.06
01.01.06.01
01.01.06.02
01.01.06.03
01.01.06.04
01.01.06.05
01.01.06.06
01.01.06.07
01.01.06.08
01.01.06.09

Descripcin

Und

Cruceta de madera tratada de 1.50 m x 110mm x 90mm


und
Media Palomilla Simple de C.AV. Mp/1.10/150
und
Media Loza de CAV 1.10m/750
und
Palomilla Simple de C.AV. Mp/1.50/150
und
Media Loza de CAV 1.30m/750
und
Ducto de concreto de dos vias
und
CONDUCTORES, CABLES Y ACCESORIOS:
m
Conductor de Aleacin de Aluminio 6201-T81 (AAAC), cableado 120 mm2.
m
Conductor de cobre desnudo, cableado, temple blando , 35 mm 2
m
Conductor de cobre desnudo, cableado, temple duro , 95 mm 2
m
Cable subterraneo N2XSY 150mm2 8.7/15 KV
Cabeza Terminal 8.7/15 KV P/ N2XSY x 150mm2 tipo exterior
und
m
Cinta plana de armar segn requerimiento
m
Alambre de Al 16 mm2 para amarre
Varilla de armar simple Al-Al , para conductor segn requerimiento
und
Grapa tipo pistola de Al-Al para conductor de segn requerimiento
und
AISLADORES Y ESPIGAS:
Aislador Polimerico Tipo Pin para 15 KV + accesorios de fijacion
und
Aisladores Polimricos tipo Suspensin 15 Kv
und
Espiga para vertice de poste para PIN Polimerico 15 KV
und
FERRETERIA:
Seccionador Cut-Out,15KV,95KV-BIL, 100 A, tipo Expulsin
und
Arandela cuadrada plana de A G A G 57 mm x 57mm x 5 mm,agujero de 18 und
Arandela cuadrada curva de A G A G 76 mm x 76mm x 5 mm,agujero de 18 und
Perno Ojo A G de 16mm x 308 mm long, 102 mm maquinado con tuerca y con
und
Perno doble armado de 508mm long. x 16mm ? con tuerca y contratuerca
und
Perno maquinado A G 16mm x 457 mm con 152 mm tca y cttca.
und
Perno maquinado A G 16mm x 508 mm con 152 mm tca y cttca.
und
Adaptador tipo lira de AG de 16mm x 78 mm long.
und
Plancha de Cobre tipo "J"
und
Conector tipo Split bolt para cable 35 mm2
und
Conector tipo cua tipo AMPAC
und
Fleje de acero inoxidable (Cinta Band it), de 19 mm
m
Hebilla de acero inoxidable para fleje de 19 mm
und
Tubo de FG de 6" diam x 6m ms Curva FG 4"
und
Fusible de expulsin tipo K 6A
und
Silicona liquida
und
PUESTA A TIERRA
Conductor de Puesta a Tierra de cobre recocido de 25 mm2 o Cooperweld N 02 m
Conector tipo Split bolt para cable 25 mm2
und
Electrodo de Copperweld de 16 mm x 2400 mm long.
und
Conector de Bronce para electrodo de 16 mm
und
Caja de concreto
und
Registro de concreto para inspeccin de puesta a tierra (tapa)
und
Bentonita (Saco de 50 kg)
BOL
Sal Industrial (Saco de 50 kg)
BOL
Tubo PVC SAP 3/4" x 1 m de long
und
Tierra vegetal cernida
m3
RETENIDAS
Cable de Acero HS de 10mm
m
Varilla de ancl. c/guardacabo AG 5/8" x2.40m(8') provisto de ojal guardacabo u
end
Arandela de anclaje cuadrada plana de A G 102 mm x 102mm x 6 mm con aguj und
Perno angular 16 mm x 308 mm long, 102 mm maquinado con tuerca y contratund
Aislador de Porcelana de Traccin Clase ANSI 54-2.
und
Canaleta guardacable de AG de 1/2" x 30 mm x 2,4 m con perno y tuerca en u und
Bloque de concreto armado 0.50 x 0.50 x 0.20m. Con agujero central de 11/16" und
Mordaza preformada de acero para cable de 10 mm
und
Arandela cuadrada curva de A G 57 mm x 57mm x 5 mm con agujero central und

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C


MES 01

MES 02
120.00
201.96
369.74
235.30
210.08
18.00

2
2.00
2.00
2
1.00
1.00

60
100.98
184.87
117.65
210.08
18.00

120.00
201.96
369.74
235.30
210.08
18.00

404.88
14.00
73.00
416.58
5.00
12.00
10.00
4.00
6

5
6.72
25.00
40.00
437.23
2.10
1.26
5.88
15.13

2,024.40
94.08
1,825.00
16,663.20
2,186.15
25.20
12.60
23.52
90.78

2,024.40
94.08
1,825.00
16,663.20
2,186.15
25.20
12.60
23.52
90.78

7.00
6
4

36.21
63.03
25

253.47
378.18
100.00

253.47
378.18
100.00

6
18
24
6
4
5
1
6
16
12
6
33
22
3
3
5

294.12
1.09
1.09
5.88
6
11.34
11.34
8.4
5.04
5.88
13.45
3.36
1.26
335
8
12

1,764.72
19.62
26.16
35.28
24.00
56.70
11.34
50.40
80.64
70.56
80.70
110.88
27.72
1,005.00
24.00
60.00

1,764.72
19.62
26.16
35.28
24.00
56.70
11.34
50.40
80.64
70.56
80.70
110.88
27.72
1,005.00
24.00
60.00

72
12
5
5
5
5
12
12
6
7.8

8.4
5.88
23.53
2.86
20
10
30
25.21
10.92
27.73

604.80
70.56
117.65
14.30
100.00
50.00
360.00
302.52
65.52
216.29

604.80
70.56
117.65
14.30
100.00
50.00
360.00
302.52
65.52
216.29

63
4
4
4
4
4
4
12
8

2.94
36.97
4.2
38.46
7.91
27.73
31.07
6.24
1.09

185.22
147.88
16.80
153.84
31.64
110.92
124.28
74.88
8.72

185.22
147.88
16.80
153.84
31.64
110.92
124.28
74.88
8.72

MES 03

MES 04

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item
01.01.07
01.01.07.01
01.01.07.02
01.01.07.03
01.01.08
01.01.08.01
01.01.08.02
01.01.08.03
01.02
01.02.01
01.02.01.01
01.02.01.02
01.02.01.03
01.02.02
01.02.02.01
01.02.02.02
01.02.02.03
01.02.02.04
01.02.02.05
01.02.02.06
01.02.02.07
01.02.02.08
01.02.03
01.02.03.01
01.02.03.02
01.02.03.03
01.02.04
01.02.04.01
01.02.04.02
01.02.04.03
01.02.04.04
01.02.04.05
01.02.04.06
01.02.04.07
01.02.04.08
01.02.05
01.02.05.01
01.02.05.02
01.02.05.03
01.02.06
01.02.06.01
01.02.06.02
01.02.06.03
01.02.06.04
01.02.07
01.02.07.01
01.02.08
01.02.08.01
01.02.08.02
02
02.01
02.01.01
02.01.02
02.01.03
02.01.04
02.02
02.02.01
02.03

Descripcin

Und

SISTEMA DE MEDICION EN MEDIA TENSION


Transformador mixto 10kV, 15 - 20 - 25/5 A, cl 0,2
und
Medidor electrnico multitarifa y multifuncin, 4 hilos, cl 0,2
und
Caja portamedidor estandarizada
und
SUBESTACION AEREA TIPO MONOPOSTE
Transformador trifasico 100 KVA 10/0.38-0.23 KV
und
Tablero de Distribucin 3 280/220, para SED 100 KVA
und
Cable NYY, 3 - 1 x 50 mm2
m
MONTAJE ELECTROMECANICO DEL SISTEMA DE UTILIZACION
TRABAJOS PRELIMINARES
Replanteo topografico de la linea y ubicacin de estructuras
KM
Ingenieria de Detalle y Expediente de Replanteo.
KM
Campamentos y almecen general
GLB
MONTAJE DE POSTES:
Transporte de postes de almacen a punto de izaje
und
Excavacion hueco para poste en terreno normal
und
Instalacion poste de concreto armado
und
Cimentacion de Poste de Concreto
und
Construccin de Solado de Concreto
und
Recubrimiento de la Base con Sustancia Bituminosa
und
Recubrimiento base del poste con sellador impermeabilizante
und
Sealizacin de Estructura
und
TENDIDO Y FLECHADO DE CONDUCTORES, CABLES Y ACCESORIOS:
Tendido y Puesta en flecha de conductor AAAC
m
Tendido de Cable subterraneo N2XSY 1x150mm2 - 8.7/15 KV
m
Instalacion de terminaciones, para cable N2XSY 1x50mm2 - 8.7/15 KV exterior und
ISNTALACION DE ARMADOS Y EQUIPOS DE MEDIA TENSION
Armado tipo PD-SEC C.A.C.
und
Armado tipo PMI-SEC C.A.C.
und
Armado tipo PTV-3S C.A.C.
und
Armado tipo PSVM-3 C.A.C.
und
Armado tipo SABM-3FC C.A.C.
und
Montaje de Trasformador Trifasico de 100 KVA 10 KV/0.38-0.23kV
und
Montaje de Tablero de Distribucion
und
Instalacion de Trafomix
und
INSTALACION DE RETENIDAS
Excavacion zanja para retenida en terreno normal
und
Instalacion de retenida inclinada
und
Relleno y compactacin de retenida inclinada
und
INSTALACION DE PUESTA A TIERRA
Excavacion de hueco para puesta a tierra, en terreno normal.
und
Instalacion de Puesta a Tierra tipo PAT-1 (incluye relleno y compactacin)
und
Instalacion de Puesta a Tierra tipo PAT-2 (incluye relleno y compactacin)
und
Inst. de Puesta a Tierra tipo PAT-3 (en postes de aliniamientos)
und
OBRAS CIVILES
Excavacion de zanja de 0.6 x 1.2 m para la instalacion de cable subterraneo en d m
PRUEBAS Y PUESTA EN SERVICIO
Prueba y puesta en servicio
GLB
Expediente tecnico conforme a obra
GLB
INSTALACIONES ELECTRICAS INTERIORES COER
SALIDAS
SALIDA DE TECHO ( CENTRO DE LUZ )
pto
SALIDA PARA INTERRUPTORE SIMPLE
pto
SALIDA PARA TOMACORRIENTE SIMPLE + PUESTA A TIERRA
pto
POZO PUESTA A TIERRA DE R < 3 Ohm
und
CAJAS
BUZN DE REGISTRO PASA CABLES
und
TABLEROS

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C


MES 01

MES 02

MES 03

MES 04

1
1
1

9500
1600
800

9,500.00
1,600.00
800.00

9,500.00
1,600.00
800.00

1
1
50

150000
3500
150

150,000.00
3,500.00
7,500.00

150,000.00
3,500.00
7,500.00

0.24
0.24
1

2655.78
562.4
1300.62

637.39
134.98
1,300.62

637.39
134.98
1,300.62

5
5
5
5
5
5
5
5

81.24
124.49
238.44
136.75
51.37
27.4
29.78
33.45

406.20
622.45
1,192.20
683.75
256.85
137.00
148.90
167.25

406.20
622.45
1,192.20
683.75
256.85
137.00
148.90
167.25

404.88
416.58
5

1.24
1.38
117.29

502.05
574.88
586.45

502.05
574.88
586.45

1
1
1
1
1
1
1
1

199.36
439.47
199.36
130.36
569.88
613.5
184.67
753.95

199.36
439.47
199.36
130.36
569.88
613.50
184.67
753.95

199.36
439.47
199.36
130.36
569.88
613.50
184.67
753.95

4
4
4

36.17
113.97
22.89

144.68
455.88
91.56

144.68
455.88
91.56

6
1
2
1

124.49
115.83
98.6
201.65

746.94
115.83
197.20
201.65

746.94
115.83
197.20
201.65

105

152.72

16,035.60

16,035.60

1
1

824.85
562.41

824.85
562.41

824.85
562.41

1
1
1
4

98.78
95.99
157.83
1514.01

98.78
95.99
157.83
6,056.04

98.78
95.99
157.83
6,056.04

285.69

2,285.52

2,285.52

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.04
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.05
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.05.06
02.05.07
02.05.08
02.05.09
02.05.10
02.06
02.06.01
02.06.02
02.06.03
02.06.04
02.06.05

Descripcin

Und

TABLERO GENERAL
und
TABLEROS DE CONTROL Y TRANSFERENCIA
und
TABLEROS DE DISTRIBUCIN (TD-1). VER ESP. TEC.
und
TABLEROS DE DISTRIBUCIN (TD-2). VER ESP. TEC.
und
TABLEROS DE DISTRIBUCIN (TD-3). VER ESP. TEC.
und
ALIMENTADORES
ALIMENTADOR 3 - 1 x 50 + 1 x 35 mm2 NYY, TUB. PVC 70 mm
m
TG -TD-01 - 3 x 1 x 10 + 1 x 6 mm2 NYY, TUB. 50 mm.
m
TG -TD-02 - 3 x 1 x 10 + 1 x 6 mm2 NYY, TUB. 50 mm.
m
TG -TD-03 - 3 x 1 x 6 + 1 x 6 mm2 NYY, TUB. 40 mm.
m
CONDUCTOR 2-1x6mm, TUB. PVC 40 mm - POSTES Y HELIPUERTO
m
ARTEFACTOS DE ILUMINACIN
ARTEFACTO C/2 LMPARAS FLUORESCENTES DE 2 x 36W PARA ADOSAR AL T.
und
REFLECTOR DE 400 W EN POSTE
und
POSTE DE CAC . 9 mts/200/120/255
und
REFLECTOR SENCILLO O DOBLE CON POSIBILIDAD DE LUZ PERIMETRAL SUPERIORund
FARO PERIMETRAL OMNIDIRECCIONAL COLOR AMARILLO SERIE LO
und
FARO DE EMPOTRAR OMNIDIRECCIONAL COLORES AMARILLO O VERDE SERIE LO- und
FARO DE LOCALIZACION DEL HELIPUERTO SERIE FX
und
MANAGVELETA CON SISTEMA DE ILUMINACION Y LUZ DE OBSTRUCCION SERIE MS und
FARO DE APROXIMACION OMNIDIRECCIONAL COLORES BLANCO, AMARILLO O VERD
und
DISPOSITIVO DE CONTROL Y MANIOBRA POR VIGILANCIA PARA REFLECTORES
und
VARIOS
SUM. E INST. DE GRUPO ELECTROGENO 70 KW
und
PRUEBAS ELECTRICAS
und
EXCAVACION DE ZANJAS PARA REDES EXTERIORES
m
RELLENO CON MATERIAL PROPIO
m
Prueba y puesta en servicio
GLB

1.01 COMUNICACIONES POR RADIO


1.02 TELEFONIA SATELITAL

INSTALACIONES COMUNICACIONES
GLB
GLB

COSTO DIRECTO S/.


GASTOS GENERALES 10%
UTILIDAD 10%
SUB TOTAL
IGV 18%
TOTAL PRESUPUESTO S/.
% DE AVANCE

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C


MES 01

MES 02

MES 03

MES 04
5,802.54
4,360.82
2,203.41
2,238.41
4,898.41

1
1
1
1
1

5802.54
4360.82
2203.41
2238.41
4898.41

5,802.54
4,360.82
2,203.41
2,238.41
4,898.41

77.8
22
124
111.5
860

85.62
45.22
45.22
39.96
16.31

6,661.24
994.84
5,607.28
4,455.54
14,026.60

6,661.24
994.84
5,607.28
4,455.54
14,026.60

1
28
14
6
8
10
1
1
4
1

148.68
939.8
979.71
2187.71
1666.28
1446.13
3633.31
7145.63
709.9
2694.71

148.68
26,314.40
13,715.94
13,126.26
13,330.24
14,461.30
3,633.31
7,145.63
2,839.60
2,694.71

148.68
26,314.40
13,715.94
13,126.26
13,330.24
14,461.30
3,633.31
7,145.63
2,839.60
2,694.71

1
1
1189.5
1189.5
1

82954.78
778.85
36.17
7.23
824.85

82,954.78
778.85
43,024.22
8,600.09
824.85

82,954.78
778.85
43,024.22
8,600.09
824.85

1
1

276310.96
299437.00

COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (10%)
SUBTOTAL
IGV 18%
TOTAL DEL PRESUPUESTO

0.00

211,229.87

29,818.12

293,536.11

1,280,628.10
128,062.81
128,062.81
1,536,753.72
276,615.67
1,813,369.39
40.134

1,061,476.92
106,147.69
106,147.69
1,273,772.30
229,279.01
1,503,051.32
33.266

1,006,516.38
100,651.64
100,651.64
1,207,819.66
217,407.54
1,425,227.19
31.544

1,028,226.50
102,822.65
102,822.65
1,233,871.80
222,096.92
1,455,968.72
32.224

276,310.96
299,437.00

3,190,844.37
319,084.44
319,084.44
3,829,013.24
689,222.38
4,518,235.63

= 06 MESES = 180 D.C


MES 05

150.00

MES 06

150.00

= 06 MESES = 180 D.C


MES 05

MES 06

5,772.87
1,902.20
117.13
1,684.75
1,283.99
7,153.50
1,001.45
217.43

38.64
48.96
220.65
6.52
11.46
304.24

= 06 MESES = 180 D.C


MES 05

MES 06

126.45
10,065.71
4,593.28
12,421.91
39.33
55,804.78
14,136.07
8,505.68
1,064.24
829.68
7,497.40

3,276.87
487.27
340.74
40,490.98
6,685.88
6,145.93
21,291.65
15,364.83
1,064.33
4,785.05
46,112.03
3,309.56
7,879.14
10,869.17
35.32
305.08

= 06 MESES = 180 D.C


MES 05

MES 06
1,269.36

35,997.06
6,412.18
16,502.89
13,402.91
1,253.51
1,026.80

4,183.00
458.17

10,500.00
522.00
2,263.90
800.00

115,234.53

282,949.40

= 06 MESES = 180 D.C


MES 05

1,387.76
377.71
492.48
1,448.90
6,120.61
6,590.04
201.86
774.53
11,094.64
28,488.53

MES 06

= 06 MESES = 180 D.C


MES 05

MES 06

= 06 MESES = 180 D.C


MES 05

MES 06

= 06 MESES = 180 D.C


MES 05

MES 06

193,417.67
209,605.90

82,893.29
89,831.10

403,023.57

172,724.39

1,093,493.26
109,349.33
109,349.33
1,312,191.92
236,194.55
1,548,386.46
34.270

911,347.58
91,134.76
91,134.76
1,093,617.09
196,851.08
1,290,468.17
28.561

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item

01.00.00
01.01
01.02
01.03
01.04
01.05
02
02.01
02.01.01
02.01.02
02.02

02.02.01
02.02.02
02.02.03
02.02.04
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.02
03.02.01
03.02.02
03.02.03
03.03
03.03.01
03.03.01.01
03.03.01.02
03.03.01.03
03.03.02
03.03.02.01
03.03.02.02
03.03.02.03
03.03.03
03.03.03.01
03.03.03.02
03.03.03.03
03.03.04
03.03.04.01
03.03.04.02
03.03.04.03
03.03.04.04
03.04
03.04.01
03.04.02
03.04.03
03.05
03.05.01
03.06
03.06.01
03.06.02
03.06.03
03.06.04
03.07

Descripcin

Und

ARQUITECTURA Y ESTRUCTURAS
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACIN DE OBRA DE 3.60 X 2.40 M
und
ALMACEN, OFICINA, CASETA DE GUARDIANIA
m2
INSTALACION PROVISIONAL PARA DEPOSITO DE AGUA
und
SERVICIO DE BAO PORTATIL (INODORO - LAVADERO) INC. MONTAJE
und
CERCO PROVISIONAL
m
HABILITACION DEL TERRENO
TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
m2
LIMPIEZA Y DESFORESTACION RENDIMIENTO 1.0 HAS/DIA
HA
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO RENDIMIENTO=570 M3/DIA
m3
CORTE MATERIAL SUELTO MATERIA ORGANICA H=0.70M , SEGUN ESTUDIO SU m3
RELLENO Y COMPACT. CON MATERIAL DE PRESTAMO C/EQUIPO
m3
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
m3
CERCO PERIMETRICO Y CASETA DE CONTROL
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMIENTACION
m3
RELLENO COMPACTADO CON HORMIGN PARA CIMIENTOS, E= 0.20 M
m3
BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO
m2
RELLENO COMPACTADO DE ZANJAS CON MATERIAL PROPIO
m3
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
m3
OBRAS CONCRETO SIMPLE
SOLADO 1:12 e=0.10
m2
FALSO PISO MEZCLA 1:8 E= 10cm
m2
CIMIENTOS CORRIDOS 1:10 +30% P.G
m3
OBRAS DE CONCRETO ARMADO
SOBRECIMIENTOS ARMADOS
CONCRETO F'C=210 KG/CM2. PARA SOBRECIMIENTO
m3
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
m2
ACERO FY=4200 kg/cm2 PARA SOBRECIMIENTO
kg
COLUMNAS
CONCRETO F'C=210 KG/CM2. PARA COLUMNAS.
m3
ENCOFRADO Y DESENCOFRADO NORMAL DE COLUMNAS
m2
ACERO FY=4200 kg/cm2 PARA COLUMNAS
kg
VIGAS
CONCRETO F'C=210 KG/CM2. PARA VIGAS
m3
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS.
m2
ACERO FY=4200 kg/cm2 PARA VIGAS
kg
LOSA ALIGERADA
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
m3
ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS
m2
ACERO GRADO 60 EN LOSAS ALIGERADAS
kg
LADRILLO HUECO DE ARCILLA 15 X 30 X 30 CM PARA TECHO ALIGERADO
und
MUROS DE ALBAILERIA
MURO DE LADRILLO KK DE SOGA (1:4) CEMENTO-ARENA
m2
MUROS DE LADRILLO KK DE CABEZA (1:4)
m2
ACERO FY=4200 kg/cm2
kg
JUNTAS DE DILATACION
JUNTA DE CONSTRUCCION CON TEKNOPORT
m
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO COLUMNAS MEZ. C:A 1.5 E=1.5 CM
m2
TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO-ARENA
m2
TARRAJEO MUROS INTERIORES Y EXTERIORES C.A 1:4 e=1.5cm.
m2
CIELO RASOS CON MEZCLA 1:5
m2
CONTRAZOCALOS

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C


MES 01

MES 02

MES 03

1.00
48.00
1.00
3.00
269.98

821.29
102.09
809.12
300.00
22.88

821.29
4,900.32
809.12
900.00
6,177.14

821.29
4,900.32
809.12
150.00
6,177.14

20,000.21
2.00

1.24
1,545.84

24,800.26
3,091.68

24,800.26
3,091.68

4,049.58
9,800.10
14,201.62
16,619.62

4.21
4.21
49.91
6.90

17,048.73
41,258.42
708,802.85
114,675.38

17,048.73
41,258.42
425,281.71
114,675.38

384.37
76.62
6.00
29.82
425.46

26.62
114.17
11.68
34.52
6.90

10,231.93
8,747.71
70.08
1,029.39
2,935.67

10,231.93
8,747.71
70.08
1,029.39
2,935.67

12.54
6.00
269.43

24.43
27.21
158.43

306.35
163.26
42,685.79

306.35
163.26
42,685.79

48.64
637.93
2,824.66

414.69
33.94
3.65

20,170.52
21,651.34
10,310.01

20,170.52
21,651.34
10,310.01

35.49
492.60
6,455.97

440.12
50.47
3.65

15,619.86
24,861.52
23,564.29

15,619.86
24,861.52
23,564.29

18.41
212.42
1,775.26

388.80
56.31
3.65

7,157.81
11,961.37
6,479.70

7,157.81
11,961.37
6,479.70

1.59
21.57
118.40
151.00

356.65
32.04
3.65
2.50

567.07
691.10
432.16
377.50

567.07
691.10
432.16
377.50

1,401.55
30.62
545.08

46.55
79.94
3.65

65,242.15
2,447.76
1,989.54

65,242.15
2,447.76
1,989.54

217.75

3.80

827.45

827.45

14,354.36
7,375.22
3,256.75
671.47

14,354.36
7,375.22
3,256.75
671.47

492.60
212.42
175.00
21.57

29.14
34.72
18.61
31.13

150.00

150.00

283,521.14

MES 04

150.00

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item

Descripcin

Und

03.07.01
03.07.02
03.08
03.08.01
03.08.02
03.08.03
03.09
03.09.01
03.09.02
03.09.03
03.10
03.10.01
03.10.02
03.11
03.11.01
03.11.02
03.11.03
03.12
03.12.01
03.12.01.01
03.12.01.02
03.12.02
03.12.02.01
03.12.02.02
03.12.02.03
03.13
03.13.01

CONTRAZOCALO DE CEMENTO PULIDO EXTERIOR H= 30 cm C.A. 1:2


e=1.5 m
CONTRAZOCALO DE CERAMICA H=10CM, INTERIOR, CASETA CONTROL
m
PISOS CERAMICO ANTIDESLIZANTE
PISO DE CERAMICA ANTIDESLIZANTE 0.30 x 0.30 cm. TRANSITO INTENSO
m2
CANTONERA DE ALUMINIO 2"
m
CONTRAPISO DE e= 20 mm MEXCLA 1:3
m2
PINTURA
PINTURA LATEX LDOS MANOS EN MUROS, COLUMNAS Y VIGAS
m2
PINTURA ESMALTE DOS MANOS EN CONTRAZOCALO
m2
PINTURA LATEX DOS MANOS EN CIELO RASO
m2
CARPINTERIA DE MADERA
PUERTA MADERA CEDRO INC/PINTURA
m2
VENTANA MADERA CEDRO INC/PINTURA
m2
CARPINTERIA METALICA
PORTON METALICO (4.00 x 7.50) SEGUN DISEO
und
PUERTA METALICA CON PERFILES ANGULARES 1"X1"X1/8"
m2
REJILLA METALICA SOBRECIMIENTO
und
CERRAJERIA
BISAGRAS
BISAGRA ALUMINIZADA 4" PESADA PARA PUERTA
pza
BISAGRA ALUMINIZADA 4" PARA VENTANAS
pza
CERRADURAS
CERRADURA TRES GOLPES PARA PUERTA CON TIRADOR
und
MANIJA DE BRONCE PARA PORTAUELAS EN VETANAS DE FIERRO
pza
CERROJO DE ALUMINIO 3" PARA VENTANAS
pza
VIDRIOS, CRISTALES Y SIMILARES
VIDRIO INCOLORO SEMIDOBLE
p2

04
04.01
04.01.01
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.03
04.03.01
04.03.02
04.03.03
04.03.04
04.03.05
04.03.06

CONSTRUCCION DE PLATAFORMA DE HELIPUERTO


TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
m2
MOVIMIENTO DE TIERRAS
CORTE TERRENO NATURAL A NIVEL DE SUBRASANTE
m3
EXCAVACION DE ZANJAS PARA SARDINELES
m3
CONFORMACION Y COMPACTACION DE SUBRASANTE CON EQUIPO
m2
SUB BASE AFIRMADO C/EQUIPO E= 0.10 M C/EQUIPO
m2
BASE AFIRMADO C/EQUIPO E= 0.20 M C/EQUIPO, EXTENDIDO, RIEGO Y COMP m2
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
m3
OBRAS CONCRETO SIMPLE
CONCRETO EN LOSAS F'C=280 KG/CM2
m3
ENCOFRADO Y DESENCOFRADO DE LOSAS
m2
CONEXION ENTRE LOSAS RIGIDAS (PAVIMENTOS) JUNTA DILATACION
und
CONEXION ENTRE LOSAS RIGIDAS JUNTA CONTRACCION
und
CURADO DE CONCRETO
m2
JUNTAS DE DILATACION E=1" CON TEKNOPORT
m

05
05.01
05.01.01
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.02.06
05.03
05.03.01

CONSTRUCCION DE PLATAFORMA CARGA Y DESCARGA


TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
m2
MOVIMIENTO DE TIERRAS
CORTE TERRENO NATURAL A NIVEL DE SUBRASANTE
m3
EXCAVACION DE ZANJAS PARA SARDINELES
m3
CONFORMACION Y COMPACTACION DE SUBRASANTE CON EQUIPO
m2
SUB BASE AFIRMADO C/EQUIPO E= 0.10 M C/EQUIPO
m2
BASE AFIRMADO C/EQUIPO E= 0.20 M C/EQUIPO, EXTENDIDO, RIEGO Y COMP m2
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
m3
OBRAS CONCRETO SIMPLE
LOSA DE CONCRETO F'c=210 Kg/cm2 , E=0.20M
m3

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C


MES 01

MES 02

684.01
8.80

12.28
10.64

8,399.64
93.63

MES 03
8,399.64
93.63

MES 04

6.00
1.80
6.00

41.99
7.02
15.25

251.94
12.64
91.50

251.94
12.64
91.50

880.01
205.20
21.57

6.56
9.27
5.43

5,772.87
1,902.20
117.13

3.78
5.38

445.70
238.66

1,684.75
1,283.99

1.00
3.30
1.00

7,153.50
303.47
217.43

7,153.50
1,001.45
217.43

6.00
8.00

6.44
6.12

38.64
48.96

3.00
4.00
2.00

73.55
1.63
5.73

220.65
6.52
11.46

57.84

5.26

304.24

957.00

1.24

1,186.68

1,186.68

143.55
0.68
957.00
957.00
957.00
173.08

25.85
26.62
2.53
7.00
17.50
6.90

3,710.77
18.10
2,421.21
6,699.00
16,747.50
1,194.25

3,710.77
18.10
2,421.21
6,699.00
16,747.50
1,194.25

198.96
167.00
184.00
1,462.00
957.00
587.00

418.89
25.31
13.17
6.99
0.69
10.43

83,342.35
4,226.77
2,423.28
10,219.38
660.33
6,122.41

83,342.35
4,226.77
2,423.28
10,219.38
660.33
6,122.41

1,404.00

1.24

1,740.96

1,740.96

421.20
0.89
1,404.00
1,404.00
1,404.00
506.51

25.85
26.62
2.53
7.00
17.50
6.90

10,888.02
23.69
3,552.12
9,828.00
24,570.00
3,494.92

10,888.02
23.69
3,552.12
9,828.00
24,570.00
3,494.92

290.84

357.98

104,114.90

104,114.90

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item
05.03.02
05.03.03
05.03.04
05.03.05
05.03.06

Descripcin
ENCOFRADO Y DESENCOFRADO DE LOSAS
CONEXION ENTRE LOSAS RIGIDAS (PAVIMENTOS) JUNTA DILATACION
CONEXION ENTRE LOSAS RIGIDAS JUNTA CONTRACCION
CURADO DE CONCRETO
JUNTAS DE DILATACION E=1" CON TEKNOPORT

Und

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C

m2
und
und
m2
m

235.80
362.00
1,982.00
1,404.00
855.00

25.31
13.17
6.99
0.69
10.43

5,968.10
4,767.54
13,854.18
968.76
8,917.65

MES 04
5,968.10
4,767.54
13,854.18
968.76
8,917.65

m2

375.00

1.24

465.00

465.00

m3
m2
m2
m3

0.44
375.00
375.00
0.53

26.62
3.82
11.68
6.90

11.71
1,432.50
4,380.00
3.66

11.71
1,432.50
4,380.00
3.66

m2
m3
m2
m2
m

375.00
3.60
52.50
375.00
205.00

45.01
348.82
17.41
0.69
10.43

16,878.75
1,255.75
914.03
258.75
2,138.15

16,878.75
1,255.75
914.03
258.75
2,138.15

4.75
101.89
1,202.43
1,063.52
5.70

26.62
98.79
3.82
11.68
6.90

126.45
10,065.71
4,593.28
12,421.91
39.33

1,202.43
39.92
336.06
27.45
1,202.43
718.83

46.41
354.11
25.31
38.77
0.69
10.43

55,804.78
14,136.07
8,505.68
1,064.24
829.68
7,497.40

m2

2,642.64

1.24

3,276.87

m3
m3
m3
m2
m2
m2
m2
m3

115.74
12.80
811.28
2,642.64
877.99
1,724.02
877.99
154.25

4.21
26.62
49.91
2.53
7.00
12.35
17.50
6.90

487.27
340.74
40,490.98
6,685.88
6,145.93
21,291.65
15,364.83
1,064.33

m2
m2
m

877.99
877.99
357.79

5.45
52.52
9.25

4,785.05
46,112.03
3,309.56

m3
m2
m2
m

22.01
280.35
51.19
29.25

357.98
38.77
0.69
10.43

7,879.14
10,869.17
35.32
305.08

06
06.01
06.01.01
06.02
06.02.01
06.02.02
06.02.03
06.02.04
06.03
06.03.01
06.03.02
06.03.03
06.03.04
06.03.05

CONSTRUCCION DE PLATAFORMA ENTRENAMIENTO


TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA SARDINELES
NIVELACION INTERIOR Y COMPACTACIN DE SUBRASANTE
BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
OBRAS CONCRETO SIMPLE
PLATAFORMA CONCRETO F'c=175 kg/cm2 e=10.0cm
CONCRETO DE SARDINELES F'C= 175 KG/CM2
ENCOFRADO Y DESENCOFRADO PAOS DE PLATAFORMA
CURADO DE CONCRETO
JUNTAS DE DILATACION E=1" CON TEKNOPORT

07
07.01
07.01.01
07.01.02
07.01.03
07.01.04
07.01.05
07.02
07.02.01
07.02.02
07.02.03
07.02.04
07.02.05
07.02.06

VEREDAS DE CONCRETO
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA SARDINELES
m3
RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO
m3
NIVELACION INTERIOR Y COMPACTACIN DE SUBRASANTE
m2
BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO
m2
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
m3
OBRAS CONCRETO SIMPLE
CONCRETO F'C= 175 KG/CM2 ACABADO FROTACHADO Y BRUADEO - VERED m2
CONCRETO F'C= 175 KG/CM2 - SARDINEL DE VEERDAS
m3
ENCOFRADO Y DESENCOFRADO DE VEREDAS
m2
ENCOFRADO Y DESENCOFRADO DE SARDINELES
m2
CURADO DE CONCRETO
m2
JUNTAS DE DILATACION E=1" CON TEKNOPORT
m

08
08.01
08.01.01
08.02
08.02.01
08.02.02
08.02.03
08.02.04
08.02.05
08.02.06
08.02.07
08.02.08
08.03
08.03.01
08.03.02
08.03.03
08.04
08.04.01
08.04.02
08.04.03
08.04.04
08.05

CONSTRUCCION DE ACCESOS PRINCIPALES YACCESO AUXILIAR


TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO RENDIMIENTO=570 M3/DIA
EXCAVACION DE ZANJAS PARA SARDINELES
RELLENO Y COMPACT. CON MATERIAL DE PRESTAMO C/EQUIPO
CONFORMACION Y COMPACTACION DE SUBRASANTE CON EQUIPO
SUB BASE AFIRMADO C/EQUIPO E= 0.10 M C/EQUIPO
SUB BASE AFIRMADO C/EQUIPO e= 20 cm., VIA AUXILIAR
BASE AFIRMADO C/EQUIPO E= 0.20 M C/EQUIPO, EXTENDIDO, RIEGO Y COMP
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
PAVIMENTACION CON BLOQUETAS
CAMA DE ARENA GRUESA DE E= 5 CM PARA ASENTADO DE ADOQUINES
PAVIMENTACIN DE VAS CON ADOQUINES (10 X 20 X8M)
CORTE DE ADOQUINES DE CONCRETO
SARDINEL DE CONFINAMIENTO
SARDINELES DE CONFINAMIENTO F'C=210 KG/CM2.
ENCOFRADO Y DESENCOFRADO DE SARDINELES
CURADO DE CONCRETO
JUNTAS DE DILATACION E=1" CON TEKNOPORT
ENCIMADO BUZONES

MES 01

MES 02

MES 03

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item
08.05.01

Descripcin

Und

ENCIMADO DE BUZN DE CONCRETO EXISTENTE MAX=1.50M PARA ADECUAund

Metrado

Precio

Parcial

4.00

317.34

1,269.36

PLAZO DE EJECUCION = 06 MESES = 180 D.C


MES 01

MES 02

09
09.01
09.02
09.03
09.04
09.05
09.06

AREAS VERDES
TIERRA DE CHACRA PARA RELLENO EN AREAS VERDES (Material de Prestamo)
EXTENDIDO Y NIVELACION DE TIERRA DE CHACRA PARA SEMBRADO DE GRAS
PREPARACION DE TIERRA DE CHACRA INC. FERTILIZANTES
SEMBRADO DE GRASS (Incluye Suministro y Seleccion)
RIEGO DE GRAS CON MANGUERA
PLANTA TIPICA PLANTONES

m3
m2
m3
m2
m2
und

726.04
4,821.19
726.04
4,821.19
4,821.19
68.00

49.58
1.33
22.73
2.78
0.26
15.10

35,997.06
6,412.18
16,502.89
13,402.91
1,253.51
1,026.80

10
10.01
10.02

VARIOS
LIMPIEZA GENERAL DE OBRA
PLACA RECORDATORIA DE BRONCE

m2
und

4,700.00
1.00

0.89
458.17

4,183.00
458.17

11
11.01

FLETE TERRETRE
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS

GLB

1.00

1,300.00

1,300.00

12
12.01
12.02
12.03
12.04

MEDIDAS DE MITIGACION AMBIENTAL


CAPACITACION AMBIENTAL
SUMINISTRO DE DEPOSITOS PARA BASURA
SUMINISTRO DE IMPLEMENTOS DE SEGURIDAD
ACONDICIONAMIENTO DE BOTADEROS

mes
und
und
und

3.00
10.00
1.00
1.00

3,500.00
52.20
2,263.90
800.00

10,500.00
522.00
2,263.90
800.00

01
01.01
01.01.01
01.01.02
01.02
01.02.01
01.02.02
01.02.03
01.02.04
01.03
01.03.01
01.03.02
01.04
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
01.04.06
01.04.07
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.05.05

INSTALACIONES SANITARIAS
LINEA DE CONDUCCION AGUA POTABLE
TRABAJOS PRELIMINARES
TRAZO NIVEL Y REPLANTEO (REDES)
m
DEMOLICION DE PAVIMENTO ASFALTICO 2"
m2
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS H=1.20M
m
NIVELACION Y FONDOS PARA TUBERIA
m
CAMA DE APOYO MATERIAL GRUESO (0.60X0.10m)
m
RELLENO Y COMPACTACION DE ZANJAS
m
RED DE CONDUCCION
SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 2"
m
PRUEBA HIDRAULICA + DESINFECCION
m
ACCESORIOS Y VALVULAS
CONEXION A RED DE AGUA EXISTENTE
GLB
CODO PVC X 90 2"
pza
CODO PVC X 12.25 2"
pza
CODO PVC X 22.5 2"
pza
TAPON PVC C.10 2"
und
VALVULA DE INTERRUPCION DE 2"
und
SUMINISTRO E INSTALACION CAJA C/MARCO-TAPA FF P/VALVULA
und
REPOSICION DE PAVIMENTACION ASFALTICA
CONFORMACIN Y COMPACTACIN SUBRASANTE CON EQUIPO
m2
RELLENO COMPACTADO CON AFIRMADO
m3
BASE E=0.20M CON EQUIPO EXTENDIDO, RIEGO Y COMPACTADO
m3
IMPRIMACION ASFALTICA
m2
CARPETA ASFALTICA EN CALIENTE DE 2"
m2

498.51
48.00

1.40
42.58

697.91
2,043.84

697.91
2,043.84

498.51
498.51
498.51
498.51

26.62
1.06
5.80
9.22

13,270.34
528.42
2,891.36
4,596.26

13,270.34
528.42
2,891.36
4,596.26

498.51
498.51

11.04
2.32

5,503.55
1,156.54

5,503.55
1,156.54

1.00
1.00
2.00
4.00
1.00
1.00
1.00

762.85
19.86
20.45
19.86
6.41
243.14
236.00

762.85
19.86
40.90
79.44
6.41
243.14
236.00

762.85
19.86
40.90
79.44
6.41
243.14
236.00

48.00
3.60
7.20
48.00
48.00

6.54
116.42
154.50
4.90
35.00

313.92
419.11
1,112.40
235.20
1,680.00

313.92
419.11
1,112.40
235.20
1,680.00

02
02.01
02.01.01
02.01.02
02.01.03

RED DE DISTRIBUCION AGUA POTABLE


MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
REFINE Y NIVELACION DE FONDO DE ZANJA
CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO

183.80
183.80
183.80

10.65
1.06
0.89

1,957.47
194.83
163.58

m
m
m

MES 03

MES 04

1,300.00

640,314.05
0.2148

283,671.14
0.0951

454,150.51
0.1523

1,957.47
194.83
163.58

220,577.14
0.07398

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item

Descripcin

Und

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C

183.80

9.22

1,694.64

MES 03
1,694.64

56.10
104.70
23.00
183.80
1.00

7.07
4.64
3.61
2.32
248.08

396.63
485.81
83.03
426.42
248.08

396.63
485.81
83.03
426.42
248.08

1.00
1.00

422.53
139.45

422.53
139.45

422.53
139.45

1.00

278.83

278.83

278.83

3.00

345.09

1,035.27

1,035.27

179.85
179.85
179.85
179.85

10.65
1.06
0.89
9.22

1,915.40
190.64
160.07
1,658.22

1,915.40
190.64
160.07
1,658.22

m
m
pza
pza
pza
pza
und

99.40
80.45
7.00
3.00
3.00
3.00
1.00

9.63
24.26
176.90
179.38
146.62
155.22
1,879.34

957.22
1,951.72
1,238.30
538.14
439.86
465.66
1,879.34

957.22
1,951.72
1,238.30
538.14
439.86
465.66
1,879.34

und

1.00

368.42

368.42

368.42

m3
m3

45.62
54.74

30.42
6.90

1,387.76
377.71

m2
m2
m3
m2
m2
m
m

124.05
124.05
20.80
168.50
292.55
74.26
139.45

3.97
11.68
294.26
39.11
0.69
10.43
79.56

492.48
1,448.90
6,120.61
6,590.04
201.86
774.53
11,094.64

und
und
und

3.00
2.00
5.00

1,090.00
1,250.00
8.40

3,270.00
2,500.00
42.00

3,270.00
2,500.00
42.00

und

3.00

78.00

234.00

234.00

02.01.04
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.04
02.04.01
02.05
02.05.01
02.05.01.01

RELLENO Y COMPACTACION DE ZANJAS


m
RED DE DISTRIBUCION
SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 11/2"
m
SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 1"
m
SUMINISTRO E INST. TUBERIA PVC C-10, DIAMETRO 1/2"
m
PRUEBA HIDRAULICA + DESINFECCION
m
CAJA DE REGISTRO PARA AGUA (BY PAS) DE 0.40 x 0.50 cm H= 1.00 M.
und
ACCESORIOS Y VALVULAS
ACCESORIOS DISTRIBUCION DE AGUA
und
VALVULA COMPUERTA DE BRONCE DE 1"
und
CONEXIONES DOMICILIARIAS
SUMINISTRO INST. CONEXION DOMICI. AGUA 1/2" A TUB 2", tapa termoplasund
SISTEMA DE AGUA FRIA Y REDES
SALIDAS DE AGUA FRIA
SALIDA DE AGUA FRIA PVC SAP DE 1/2" INC. GRIFO P/ JARDIN
pto

03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.03
03.03.01

RED DE DISTRIBUCION DE DESAGUE


MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
REFINE Y NIVELACION DE FONDO DE ZANJA
CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO
RELLENO Y COMPACTACION DE ZANJAS
RED DE DISTRIBUCION
SUMINISTRO E INST. TUBERIA PVC SAL DE 4"
SUM. E INSTALACION TUBERIA PVC DESAGUE 6"
CAJA DE REGISTRO DE DESAGUE 10" X 24"
CAJA DE REGISTRO DE DESAGUE 12" X 24"
CAJA DE REGISTRO DE DESAGUE 18" X 24"
CAJA DE REGISTRO DE DESAGUE 24" X 24"
BUZON TIPICO D=1.20 M. C/MARCO Y TAPA DE CONCRETO, H=1.50 M
CONEXIONES DOMICILIARIAS
SUMIN/ INST. CONEXION DOMICILIARIA DESAGUE PVC L = 10m No - Inc/caja

04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.02.05
04.02.06
04.02.07

SISTEMA DE EVACUACION PLUVIAL


MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS
ELIMINACION MATERIAL EXCEDENTE, Dp= 1.5 KM
CUNETAS
CONFORMACION DE SUB RASANTE CON PLANCHA DE CUNETA
BASE AFIRMADO E= 0.10M, EXTENDIDO, RIEGO, COMPACTADO
CONCRETO F'C=140 KG/CM2.PARA CUNETA
ENCOFRADO Y DESENCOFRADO PARA CUNETA
CURADO DE CONCRETO
JUNTAS DE DILATACION E=1" CON TEKNOPORT
REJILLA METALICA PARA CUNETA

m
m
m
m

MES 01

MES 02

35,837.45
0.01202

INSTALACIONES ELECTRICAS
1 SISTEMA DE UTILIZACIN PRIMARIA 10KV. COER
1.01 SUMINISTRO DE MATERIALES PARA EL SISTEMA DE UTILIZACION
01.01.01
POSTES Y CRUCETAS
01.01.01.01
POSTES CONCRETO ARMADO CENTRIFUGADO DE:
01.01.01.01.01
Poste CAC 13/400/2/210/405
01.01.01.01.02
Poste CAC 13/600/2/210/405
01.01.01.01.03
Perilla de Concreto
01.01.01.02
CRUCETAS DE CONCRETO ARMADO VIBRADO Y DUCTOS
01.01.01.02.01
Mensula de CAV M/0.80/500

19,289.56
0.00647

MES 04

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item
01.01.01.02.02
01.01.01.02.03
01.01.01.02.04
01.01.01.02.05
01.01.01.02.06
01.01.01.02.07
01.01.02
01.01.02.01
01.01.02.02
01.01.02.03
01.01.02.04
01.01.02.05
01.01.02.06
01.01.02.07
01.01.02.08
01.01.02.09
01.01.03
01.01.03.01
01.01.03.02
01.01.03.03
01.01.04
01.01.04.01
01.01.04.02
01.01.04.03
01.01.04.04
01.01.04.05
01.01.04.06
01.01.04.07
01.01.04.08
01.01.04.09
01.01.04.10
01.01.04.11
01.01.04.12
01.01.04.13
01.01.04.14
01.01.04.15
01.01.04.16
01.01.05
01.01.05.01
01.01.05.02
01.01.05.03
01.01.05.04
01.01.05.05
01.01.05.06
01.01.05.07
01.01.05.08
01.01.05.09
01.01.05.10
01.01.06
01.01.06.01
01.01.06.02
01.01.06.03
01.01.06.04
01.01.06.05
01.01.06.06
01.01.06.07
01.01.06.08
01.01.06.09

Descripcin

Und

Cruceta de madera tratada de 1.50 m x 110mm x 90mm


und
Media Palomilla Simple de C.AV. Mp/1.10/150
und
Media Loza de CAV 1.10m/750
und
Palomilla Simple de C.AV. Mp/1.50/150
und
Media Loza de CAV 1.30m/750
und
Ducto de concreto de dos vias
und
CONDUCTORES, CABLES Y ACCESORIOS:
m
Conductor de Aleacin de Aluminio 6201-T81 (AAAC), cableado 120 mm2.
m
Conductor de cobre desnudo, cableado, temple blando , 35 mm 2
m
Conductor de cobre desnudo, cableado, temple duro , 95 mm 2
m
Cable subterraneo N2XSY 150mm2 8.7/15 KV
Cabeza Terminal 8.7/15 KV P/ N2XSY x 150mm2 tipo exterior
und
m
Cinta plana de armar segn requerimiento
m
Alambre de Al 16 mm2 para amarre
Varilla de armar simple Al-Al , para conductor segn requerimiento
und
Grapa tipo pistola de Al-Al para conductor de segn requerimiento
und
AISLADORES Y ESPIGAS:
Aislador Polimerico Tipo Pin para 15 KV + accesorios de fijacion
und
Aisladores Polimricos tipo Suspensin 15 Kv
und
Espiga para vertice de poste para PIN Polimerico 15 KV
und
FERRETERIA:
Seccionador Cut-Out,15KV,95KV-BIL, 100 A, tipo Expulsin
und
Arandela cuadrada plana de A G A G 57 mm x 57mm x 5 mm,agujero de 18 und
Arandela cuadrada curva de A G A G 76 mm x 76mm x 5 mm,agujero de 18 und
Perno Ojo A G de 16mm x 308 mm long, 102 mm maquinado con tuerca y con
und
Perno doble armado de 508mm long. x 16mm ? con tuerca y contratuerca
und
Perno maquinado A G 16mm x 457 mm con 152 mm tca y cttca.
und
Perno maquinado A G 16mm x 508 mm con 152 mm tca y cttca.
und
Adaptador tipo lira de AG de 16mm x 78 mm long.
und
Plancha de Cobre tipo "J"
und
Conector tipo Split bolt para cable 35 mm2
und
Conector tipo cua tipo AMPAC
und
Fleje de acero inoxidable (Cinta Band it), de 19 mm
m
Hebilla de acero inoxidable para fleje de 19 mm
und
Tubo de FG de 6" diam x 6m ms Curva FG 4"
und
Fusible de expulsin tipo K 6A
und
Silicona liquida
und
PUESTA A TIERRA
Conductor de Puesta a Tierra de cobre recocido de 25 mm2 o Cooperweld N 02 m
Conector tipo Split bolt para cable 25 mm2
und
Electrodo de Copperweld de 16 mm x 2400 mm long.
und
Conector de Bronce para electrodo de 16 mm
und
Caja de concreto
und
Registro de concreto para inspeccin de puesta a tierra (tapa)
und
Bentonita (Saco de 50 kg)
BOL
Sal Industrial (Saco de 50 kg)
BOL
Tubo PVC SAP 3/4" x 1 m de long
und
Tierra vegetal cernida
m3
RETENIDAS
Cable de Acero HS de 10mm
m
Varilla de ancl. c/guardacabo AG 5/8" x2.40m(8') provisto de ojal guardacabo u
end
Arandela de anclaje cuadrada plana de A G 102 mm x 102mm x 6 mm con aguj und
Perno angular 16 mm x 308 mm long, 102 mm maquinado con tuerca y contratund
Aislador de Porcelana de Traccin Clase ANSI 54-2.
und
Canaleta guardacable de AG de 1/2" x 30 mm x 2,4 m con perno y tuerca en u und
Bloque de concreto armado 0.50 x 0.50 x 0.20m. Con agujero central de 11/16" und
Mordaza preformada de acero para cable de 10 mm
und
Arandela cuadrada curva de A G 57 mm x 57mm x 5 mm con agujero central und

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C


MES 01

2
2.00
2.00
2
1.00
1.00

60.00
100.98
220.00
117.65
210.08
18.00

120.00
201.96
440.00
235.30
210.08
18.00

MES 02
120.00
201.96
440.00
235.30
210.08
18.00

404.88
14.00
73.00
416.58
5.00
12.00
10.00
4.00
6

5.00
6.72
25.00
40.00
437.23
2.10
0.58
4.08
10.16

2,024.40
94.08
1,825.00
16,663.20
2,186.15
25.20
5.80
16.32
60.96

2,024.40
94.08
1,825.00
16,663.20
2,186.15
25.20
5.80
16.32
60.96

7.00
6
4

36.21
63.03
12.71

253.47
378.18
50.84

253.47
378.18
50.84

6
18
24
6
4
5
1
6
16
12
6
33
22
3
3
5

194.92
0.90
0.90
6.36
6.00
11.34
11.34
5.51
4.07
5.88
4.66
3.36
1.06
250.00
8.00
12.00

1,169.52
16.20
21.60
38.16
24.00
56.70
11.34
33.06
65.12
70.56
27.96
110.88
23.32
750.00
24.00
60.00

1,169.52
16.20
21.60
38.16
24.00
56.70
11.34
33.06
65.12
70.56
27.96
110.88
23.32
750.00
24.00
60.00

72
12
5
5
5
5
12
12
6
7.8

7.25
3.90
22.46
2.54
15.00
10.00
30.00
11.86
2.97
27.73

522.00
46.80
112.30
12.70
75.00
50.00
360.00
142.32
17.82
216.29

522.00
46.80
112.30
12.70
75.00
50.00
360.00
142.32
17.82
216.29

63
4
4
4
4
4
4
12
8

2.46
20.76
3.22
6.45
4.24
27.73
30.51
4.24
0.77

154.98
83.04
12.88
25.80
16.96
110.92
122.04
50.88
6.16

154.98
83.04
12.88
25.80
16.96
110.92
122.04
50.88
6.16

MES 03

MES 04

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item
01.01.07
01.01.07.01
01.01.07.02
01.01.07.03
01.01.08
01.01.08.01
01.01.08.02
01.01.08.03
01.02
01.02.01
01.02.01.01
01.02.01.02
01.02.01.03
01.02.02
01.02.02.01
01.02.02.02
01.02.02.03
01.02.02.04
01.02.02.05
01.02.02.06
01.02.02.07
01.02.02.08
01.02.03
01.02.03.01
01.02.03.02
01.02.03.03
01.02.04
01.02.04.01
01.02.04.02
01.02.04.03
01.02.04.04
01.02.04.05
01.02.04.06
01.02.04.07
01.02.04.08
01.02.05
01.02.05.01
01.02.05.02
01.02.05.03
01.02.06
01.02.06.01
01.02.06.02
01.02.06.03
01.02.06.04
01.02.07
01.02.07.01
01.02.08
01.02.08.01
01.02.08.02
02
02.01
02.01.01
02.01.02
02.01.03
02.01.04
02.02
02.02.01
02.03

Descripcin

Und

SISTEMA DE MEDICION EN MEDIA TENSION


Transformador mixto 10kV, 15 - 20 - 25/5 A, cl 0,2
und
Medidor electrnico multitarifa y multifuncin, 4 hilos, cl 0,2
und
Caja portamedidor estandarizada
und
SUBESTACION AEREA TIPO MONOPOSTE
Transformador trifasico 100 KVA 10/0.38-0.23 KV
und
Tablero de Distribucin 3 280/220, para SED 100 KVA
und
Cable NYY, 3 - 1 x 50 mm2
m
MONTAJE ELECTROMECANICO DEL SISTEMA DE UTILIZACION
TRABAJOS PRELIMINARES
Replanteo topografico de la linea y ubicacin de estructuras
KM
Ingenieria de Detalle y Expediente de Replanteo.
KM
Campamentos y almecen general
GLB
MONTAJE DE POSTES:
Transporte de postes de almacen a punto de izaje
und
Excavacion hueco para poste en terreno normal
und
Instalacion poste de concreto armado
und
Cimentacion de Poste de Concreto
und
Construccin de Solado de Concreto
und
Recubrimiento de la Base con Sustancia Bituminosa
und
Recubrimiento base del poste con sellador impermeabilizante
und
Sealizacin de Estructura
und
TENDIDO Y FLECHADO DE CONDUCTORES, CABLES Y ACCESORIOS:
Tendido y Puesta en flecha de conductor AAAC
m
Tendido de Cable subterraneo N2XSY 1x150mm2 - 8.7/15 KV
m
Instalacion de terminaciones, para cable N2XSY 1x50mm2 - 8.7/15 KV exterior und
ISNTALACION DE ARMADOS Y EQUIPOS DE MEDIA TENSION
Armado tipo PD-SEC C.A.C.
und
Armado tipo PMI-SEC C.A.C.
und
Armado tipo PTV-3S C.A.C.
und
Armado tipo PSVM-3 C.A.C.
und
Armado tipo SABM-3FC C.A.C.
und
Montaje de Trasformador Trifasico de 100 KVA 10 KV/0.38-0.23kV
und
Montaje de Tablero de Distribucion
und
Instalacion de Trafomix
und
INSTALACION DE RETENIDAS
Excavacion zanja para retenida en terreno normal
und
Instalacion de retenida inclinada
und
Relleno y compactacin de retenida inclinada
und
INSTALACION DE PUESTA A TIERRA
Excavacion de hueco para puesta a tierra, en terreno normal.
und
Instalacion de Puesta a Tierra tipo PAT-1 (incluye relleno y compactacin)
und
Instalacion de Puesta a Tierra tipo PAT-2 (incluye relleno y compactacin)
und
Inst. de Puesta a Tierra tipo PAT-3 (en postes de aliniamientos)
und
OBRAS CIVILES
Excavacion de zanja de 0.6 x 1.2 m para la instalacion de cable subterraneo en d m
PRUEBAS Y PUESTA EN SERVICIO
Prueba y puesta en servicio
GLB
Expediente tecnico conforme a obra
GLB
INSTALACIONES ELECTRICAS INTERIORES COER
SALIDAS
SALIDA DE TECHO ( CENTRO DE LUZ )
pto
SALIDA PARA INTERRUPTORE SIMPLE
pto
SALIDA PARA TOMACORRIENTE SIMPLE + PUESTA A TIERRA
pto
POZO PUESTA A TIERRA DE R < 3 Ohm
und
CAJAS
BUZN DE REGISTRO PASA CABLES
und
TABLEROS

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C


MES 01

MES 02

MES 03

MES 04

1
1
1

9,500.00
1,600.00
800.00

9,500.00
1,600.00
800.00

9,500.00
1,600.00
800.00

1
1
50

16,101.70
3,500.00
150.00

16,101.70
3,500.00
7,500.00

16,101.70
3,500.00
7,500.00

0.24
0.24
1

2,655.78
562.40
1,300.63

637.39
134.98
1,300.63

637.39
134.98
1,300.63

5
5
5
5
5
5
5
5

81.24
124.49
273.30
136.75
51.37
27.40
29.78
33.45

406.20
622.45
1,366.50
683.75
256.85
137.00
148.90
167.25

406.20
622.45
1,366.50
683.75
256.85
137.00
148.90
167.25

404.88
416.58
5

1.47
1.38
117.29

595.17
574.88
586.45

595.17
574.88
586.45

1
1
1
1
1
1
1
1

199.36
439.47
199.36
130.36
569.88
477.50
184.67
617.95

199.36
439.47
199.36
130.36
569.88
477.50
184.67
617.95

199.36
439.47
199.36
130.36
569.88
477.50
184.67
617.95

4
4
4

5.33
112.15
11.03

21.32
448.60
44.12

21.32
448.60
44.12

6
1
2
1

122.12
115.83
98.60
201.65

732.72
115.83
197.20
201.65

732.72
115.83
197.20
201.65

105

27.72

2,910.60

2,910.60

1
1

824.85
562.41

824.85
562.41

824.85
562.41

1
1
1
4

88.32
95.99
157.83
306.76

88.32
95.99
157.83
1,227.04

88.32
95.99
157.83
1,227.04

285.69

2,285.52

2,285.52

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA


PROYECTO : 'INSTALACION DEL CENTRO DE OPERACIONES DE EMERGENCIA REGIONAL COER PIURA, DEPARTAMENTO DE PIURA"
PROPIETARIO : GOBIERNO REGIONAL DE PIURA
FECHA : FEBRERO 2013

Item
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.04
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.05
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.05.06
02.05.07
02.05.08
02.05.09
02.05.10
02.06
02.06.01
02.06.02
02.06.03
02.06.04
02.06.05

Descripcin

Und

TABLERO GENERAL
und
TABLEROS DE CONTROL Y TRANSFERENCIA
und
TABLEROS DE DISTRIBUCIN (TD-1). VER ESP. TEC.
und
TABLEROS DE DISTRIBUCIN (TD-2). VER ESP. TEC.
und
TABLEROS DE DISTRIBUCIN (TD-3). VER ESP. TEC.
und
ALIMENTADORES
ALIMENTADOR 3 - 1 x 50 + 1 x 35 mm2 NYY, TUB. PVC 70 mm
m
TG -TD-01 - 3 x 1 x 10 + 1 x 6 mm2 NYY, TUB. 50 mm.
m
TG -TD-02 - 3 x 1 x 10 + 1 x 6 mm2 NYY, TUB. 50 mm.
m
TG -TD-03 - 3 x 1 x 6 + 1 x 6 mm2 NYY, TUB. 40 mm.
m
CONDUCTOR 2-1x6mm, TUB. PVC 40 mm - POSTES Y HELIPUERTO
m
ARTEFACTOS DE ILUMINACIN
ARTEFACTO C/2 LMPARAS FLUORESCENTES DE 2 x 36W PARA ADOSAR AL T.
und
REFLECTOR DE 400 W EN POSTE
und
POSTE DE CAC . 9 mts/200/120/255
und
REFLECTOR SENCILLO O DOBLE CON POSIBILIDAD DE LUZ PERIMETRAL SUPERIORund
FARO PERIMETRAL OMNIDIRECCIONAL COLOR AMARILLO SERIE LO
und
FARO DE EMPOTRAR OMNIDIRECCIONAL COLORES AMARILLO O VERDE SERIE LO- und
FARO DE LOCALIZACION DEL HELIPUERTO SERIE FX
und
MANAGVELETA CON SISTEMA DE ILUMINACION Y LUZ DE OBSTRUCCION SERIE MS und
FARO DE APROXIMACION OMNIDIRECCIONAL COLORES BLANCO, AMARILLO O VERD
und
DISPOSITIVO DE CONTROL Y MANIOBRA POR VIGILANCIA PARA REFLECTORES
und
VARIOS
SUM. E INST. DE GRUPO ELECTROGENO 70 KW
und
PRUEBAS ELECTRICAS
und
EXCAVACION DE ZANJAS PARA REDES EXTERIORES
m
RELLENO CON MATERIAL PROPIO
m
Prueba y puesta en servicio
GLB

1.01 COMUNICACIONES POR RADIO


1.02 TELEFONIA SATELITAL

INSTALACIONES COMUNICACIONES
GLB
GLB

COSTO DIRECTO S/.


GASTOS GENERALES 10%
UTILIDAD 10%
SUB TOTAL
IGV 18%
TOTAL PRESUPUESTO S/.
% DE AVANCE

Metrado

Precio

Parcial

PLAZO DE EJECUCION = 06 MESES = 180 D.C


MES 01

MES 02

1
1
1
1
1

5,039.83
6,525.00
979.77
1,005.11
956.09

5,039.83
6,525.00
979.77
1,005.11
956.09

MES 04
5,039.83
6,525.00
979.77
1,005.11
956.09

77.8
22
124
111.5
860

85.62
45.22
45.22
39.96
16.31

6,661.24
994.84
5,607.28
4,455.54
14,026.60

6,661.24
994.84
5,607.28
4,455.54
14,026.60

1
28
14
6
8
10
1
1
4
1

91.05
939.80
979.71
2,187.71
1,666.28
1,446.13
3,633.31
7,145.63
709.90
2,394.71

91.05
26,314.40
13,715.94
13,126.26
13,330.24
14,461.30
3,633.31
7,145.63
2,839.60
2,394.71

91.05
26,314.40
13,715.94
13,126.26
13,330.24
14,461.30
3,633.31
7,145.63
2,839.60
2,394.71

1
1
1189.5
1189.5
1

70,751.39
778.85
5.33
7.10
824.85

70,751.39
778.85
6,340.04
8,445.45
824.85

70,751.39
778.85
6,340.04
8,445.45
824.85

74,497.95
0.02499

MES 03

16,496.25
0.00553

234,299.02
0.0786
1
1

276310.96
299437.00

COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (10%)
SUBTOTAL
IGV 18%
TOTAL DEL PRESUPUESTO

276,310.96
299,437.00

2,981,553.49
298,155.35
298,155.35
3,577,864.19
644,015.55
4,221,879.74

1,280,628.31
128,062.83
128,062.83
1,536,753.98
276,615.72
1,813,369.69
42.95

788,013.21
78,801.32
78,801.32
945,615.85
170,210.85
1,115,826.71
26.43

979,872.80
909,752.47
97,987.28
90,975.25
97,987.28
90,975.25
1,175,847.37 1,091,702.97
211,652.53
196,506.53
1,387,499.89 1,288,209.50
32.86
30.51

= 06 MESES = 180 D.C


MES 05

150.00

MES 06

150.00

= 06 MESES = 180 D.C


MES 05

MES 06

5,772.87
1,902.20
117.13
1,684.75
1,283.99
7,153.50
1,001.45
217.43

38.64
48.96
220.65
6.52
11.46
304.24

= 06 MESES = 180 D.C


MES 05

MES 06

126.45
10,065.71
4,593.28
12,421.91
39.33
55,804.78
14,136.07
8,505.68
1,064.24
829.68
7,497.40

3,276.87
487.27
340.74
40,490.98
6,685.88
6,145.93
21,291.65
15,364.83
1,064.33
4,785.05
46,112.03
3,309.56
7,879.14
10,869.17
35.32
305.08

= 06 MESES = 180 D.C


MES 05

MES 06
1,269.36

35,997.06
6,412.18
16,502.89
13,402.91
1,253.51
1,026.80

4,183.00
458.17

115,234.53
0.0386

10,500.00
522.00
2,263.90
800.00
282,949.40
0.0949

= 06 MESES = 180 D.C


MES 05

1,387.76
377.71
492.48
1,448.90
6,120.61
6,590.04
201.86
774.53
11,094.64
28,488.53
0.00955

MES 06

= 06 MESES = 180 D.C


MES 05

MES 06

= 06 MESES = 180 D.C


MES 05

MES 06

= 06 MESES = 180 D.C


MES 05

MES 06

193,417.67
209,605.90
403,023.57
0.1352

82,893.29
89,831.10
172,724.39
0.0579

1,093,493.45
109,349.34
109,349.34
1,312,192.14
236,194.58
1,548,386.72
36.68

911,347.73
91,134.77
91,134.77
1,093,617.27
196,851.11
1,290,468.38
30.57

Вам также может понравиться