Вы находитесь на странице: 1из 19

Construction of North East Underground Carpark Contract No.

XC10101100
#
1
2
3
4
5
6
7
8
9

WBS

WBS Name

Activity ID

Activity Name

BL Project
Duration

Activity % Remaining
Complete Duration

BL Project
Start

BL Project
Finish

Actual Start

626

301

06-Sep-11

04-Sep-13

06-Sep-11

626

301

06-Sep-11

04-Sep-13

626

198

06-Sep-11

04-Sep-13

Construction of NEUCP - Forecast Schedule_26Feb13


GENERAL
MILESTONES (Contract)
PMS and SUBSTATION EVENTS
MOBILIZATION

ENGINEERING
IFC DRAWINGS
IFC DRAWINGS AVAILABILITY

SHOP DRAWING SUBMITTALS & APPROVALS

20-Jan-14

30-May-13

20-Jan-14

31-Jan-13

10-Apr-13

75

31-Jan-13

01-Jan-14

11

06-Sep-11

617

285

06-Sep-11

25-Aug-13

06-Sep-11

06-Sep-11

06-Sep-11

06-Sep-11

06-Sep-11

0
540

0
285

06-Sep-11
05-Dec-11

06-Sep-11
25-Aug-13

06-Sep-11
19-Jan-12

06-Sep-11

205
205
12

20-Nov-12
20-Nov-12
20-Nov-12

17-Jul-13
17-Jul-13
04-Dec-12

09-Nov-12
09-Nov-12

01-Jan-14

11

31-Jan-13
31-Jan-13
31-Jan-13

27-Mar-13
27-Mar-13
13-Feb-13

59
59
0

03-Mar-13

14-Feb-13

02-Mar-13

18

17-Jun-13

01-Jul-13

26-Feb-13

11-Mar-13

59

01-Jul-13

17-Jul-13

12-Mar-13

27-Mar-13

59

04-Dec-12

03-Jan-13

09-Nov-12
03-Dec-12

04-Feb-13

12

04-Dec-12

18-Dec-12

09-Nov-12

12-Feb-13

21-Nov-12

0%
0%

14

14-Feb-13

14

NECP-Rebase_06Sep12-4.EN.SDS.1.3
GROUND LEVEL
NEENSDS1550

Street Lighting Layout & Details

12

0%

12

15

NECP-Rebase_06Sep12-4.EN.SDS.1.3
GROUND LEVEL
NEENSDS1580

Street Lighting Layout & Details Approval

14

0%

14

16
17

Issues on Round About Dimensions (Elevated Roadway)


26
NECP-Rebase_06Sep12-4.EN.SDS.1.3.4
Issues on Round About Dimensions
NEENSDS1700
(Elevated Roadway)
Terna Rqstd (thru RFI-03-0169 Rev A dtd 03Dec12) Dimensions of Round About
0

100%

32
0

18

NECP-Rebase_06Sep12-4.EN.SDS.1.3.4
Issues on Round About Dimensions
NEENSDS1710
(Elevated Roadway)
PIL Confirmed (thru RFI-03-0188 Rev A dtd 04Feb12) UB Columns Set Out is 0
Acceptable
0%

19

NECP-Rebase_06Sep12-4.EN.SDS.1.3.4
Issues on Round About Dimensions
NEENSDS1720
(Elevated Roadway)
PIL To Confirm (thru RFI-03-0188 Rev A dtd 04Feb12) GF Beams Set Out by 11Feb13
0
0%

20

NECP-Rebase_06Sep12-4.EN.SDS.1.3.4
Issues on Round About Dimensions
NEENSDS1540
(Elevated Roadway)
Roadworks Layout & Details

12

0%

14

Feb

Mar

Apr

0
0

04-Feb-13

11-Feb-13

25-Feb-13

26-Feb-13

13-Mar-13

Roadworks Layout & Details Approval

0%

24-Feb-13
24-Feb-13
24-Feb-13

01-Jan-14
19-Mar-13
03-Mar-13

11
62
55

HVAC Equipment Layout & Details, Lower Basement

HVAC Equipment Layout & Details, Lower Basement Approval

14

0%

14

10-Mar-12

25-Mar-12

04-Mar-13

19-Mar-13

62

HVAC Equipment Layout & Details, Upper Basement

21
7

0%

21
7

10-Mar-12
10-Mar-12

02-Apr-12
17-Mar-12

04-Mar-13
04-Mar-13

27-Mar-13
11-Mar-13

55
55

HVAC Equipment Layout & Details, Upper Basement Approval

14

0%

14

18-Mar-12

02-Apr-12

12-Mar-13

27-Mar-13

55

27-Jul-13
27-Jul-13

25-Aug-13
29-Jul-13

23-Nov-13
23-Nov-13

01-Jan-14
25-Nov-13

11
28

NECP-Rebase_06Sep12-4.EN.SDS.3.2
UPPER BASEMENT
NEENSDS400

29
30

GROUND LEVEL
NECP-Rebase_06Sep12-4.EN.SDS.3.3
GROUND LEVEL
NEENSDS1440

Chilled Water System Layout & Tie-In Details, Ground Level

26
3

0%

34
3

31

NECP-Rebase_06Sep12-4.EN.SDS.3.3
GROUND LEVEL
NEENSDS1490

Chilled Water System Layout & Tie-In Details, Ground Level Approval

14

0%

14

10-Aug-13

25-Aug-13

26-Nov-13

11-Dec-13

28

32

NECP-Rebase_06Sep12-4.EN.SDS.3.3
GROUND LEVEL
NEENSDS1470

Irrigation Main Line Layout & Tie-In Details, Ground Level

0%

06-Aug-13

08-Aug-13

12-Dec-13

15-Dec-13

11

33

NECP-Rebase_06Sep12-4.EN.SDS.3.3
GROUND LEVEL
NEENSDS1520

Irrigation Main Line Layout & Tie-In Details, Ground Level Approval

14

0%

14

10-Aug-13

25-Aug-13

16-Dec-13

01-Jan-14

11

50%

53
53
4

06-Dec-11
12-Dec-11
20-Dec-11

18-Apr-12
28-Mar-12
27-Dec-11

19-Jan-12
19-Jan-12
02-Sep-12

31-Jan-13
31-Jan-13
31-Jan-13

02-Apr-13
02-Apr-13
04-Feb-13

87
54
54

24-Jun-12

Electrical Distribution Load Schedule, Lower Basement Approval (w/ Substation


14 Issue in25%
UB Slab Area1113) 22-Dec-11

07-Jan-12

Cable Tray Layout & Details, Lower Basement Approval

39

NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS490

40

31-Jan-13

12-Feb-13

14

0%

14

28-Dec-11

12-Jan-12

04-Feb-13

20-Feb-13

54

Parking Guidance Layout & Single Line Diagram, Lower Basement

0%

12-Dec-11

19-Dec-11

20-Feb-13

27-Feb-13

NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS460

Security System Layout & Single Line Diagram, Lower Basement

0%

26-Feb-12

04-Mar-12

26-Feb-13

05-Mar-13

41

NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS780

Parking Guidance Layout & Single Line Diagram, Lower Basement Approval 14

0%

14

20-Dec-11

04-Jan-12

28-Feb-13

16-Mar-13

42

NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS470

BMS/Telemetry/SCADA Layout & Single Line Diagram, Lower Basement

43

NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS750

Security System Layout & Single Line Diagram, Lower Basement Approval

44

NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS1620

UPS/Battery Lay out & Details, Lower Basement

45

NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS760

46

NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS1660

47
48

IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals
49
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS550
Letter 0295-13 dtd Substations:
04Feb13): Re-Submittals
HV SWGRs, &XFMRs,
Approvals
Generators, MV Panels Layout & Details, Lower
5
Basement
85%

0%

05-Mar-12

12-Mar-12

06-Mar-13

13-Mar-13

14

0%

14

05-Mar-12

20-Mar-12

06-Mar-13

21-Mar-13

0%

01-Feb-12

08-Feb-12

07-Mar-13

14-Mar-13

56

BMS/Telemetry/SCADA Layout & Single Line Diagram, Lower Basement Approval


14

0%

14

13-Mar-12

28-Mar-12

14-Mar-13

30-Mar-13

UPS/Battery Lay out & Details, Lower Basement Approval

0%

14

09-Feb-12

25-Feb-12

16-Mar-13

31-Mar-13

56

53
1

22-Dec-11
02-Jan-12

16-Feb-12
07-Jan-12

19-Jan-12
19-Jan-12

31-Jan-13
31-Jan-13

02-Apr-13
31-Jan-13

0
17

14

49

NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS840
Letter 0295-13 dtd Substations:
04Feb13): Re-Submittals
HV SWGRs, &XFMRs,
Approvals
Generators, MV Panels Layout & Details, 14
Lower Basement
85% Approval
2

08-Jan-12

23-Jan-12

30-Jan-12

14-Feb-13

17-Feb-13

17

50

NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS540
Letter 0295-13 dtd LV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Lower Basement (w/ Substation Issue in UB 7Slab Area
21.43%
13)

25-Dec-11

01-Jan-12

17-Jun-12

11-Mar-13

17-Mar-13

51

NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS830
Letter 0295-13 dtd LV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Lower Basement Approval (w/ Substation Issue
14 in 21.43%
UB Slab Area 13)11

02-Jan-12

17-Jan-12

24-Jun-12

21-Mar-13

02-Apr-13

52

NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS430
Letter 0295-13 dtd Lighting
04Feb13):
Layout
Re-Submittals
& Single Line
& Approvals
Diagram, Lower Basement

0%

13

28-Dec-11

04-Jan-12

08-Feb-12

31-Jan-13

14-Feb-13

53

NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS520
Letter 0295-13 dtd HV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Lower Basement

0%

25

22-Dec-11

29-Dec-11

20-Aug-12

31-Jan-13

28-Feb-13

54

NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS1670
Letter 0295-13 dtd Issue
04Feb13):
IFC-9Re-Submittals
Drawings (MEP)
& Approvals

55

NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS720
Letter 0295-13 dtd Lighting
04Feb13):
Layout
Re-Submittals
& Single Line
& Approvals
Diagram, Lower Basement Approval

28-Mar-12

56

NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS1610
Letter 0295-13 dtd Bus
04Feb13):
Ducts/Bus
Re-Submittals
Bars Layout
& Approvals
& Details, Lower Basement

57

0%

04-Feb-13

14

0%

14

05-Jan-12

21-Jan-12

20-Feb-13

07-Mar-13

0%

24-Jan-12

31-Jan-12

27-Feb-13

06-Mar-13

NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS810
Letter 0295-13 dtd HV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Lower Basement Approval

14

0%

14

31-Dec-11

15-Jan-12

02-Mar-13

17-Mar-13

58

NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS1650
Letter 0295-13 dtd Bus
04Feb13):
Ducts/Bus
Re-Submittals
Bars Layout
& Approvals
& Details, Lower Basement Approval

14

0%

14

01-Feb-12

16-Feb-12

07-Mar-13

23-Mar-13

59
60

Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5.1
Under Review - PIL Release
NEENSDS1680
Date to ASTAD dtd
MV
22Jan13,
Switchgear
Assumed
UnderASTAD
ReviewApproval
by ASTAD,
Date:
Assumed
21Feb13
Approval:21Feb13

21
0

24-Dec-11

16-Jan-12

21-Feb-13

0%

21
0

18-Mar-13
21-Feb-13

0
0

61

NECP-Rebase_06Sep12-4.EN.SDS.2.1.5.1
Under Review - PIL Release
NEENSDS530
Date to ASTAD dtd
MV
22Jan13,
Layout &Assumed
Single Line
ASTAD
Diagram,
Approval
Lower
Date:
Basement
21Feb13
(w/ Substation Issue in UB7Slab Area0%
13)

62

NECP-Rebase_06Sep12-4.EN.SDS.2.1.5.1
Under Review - PIL Release
NEENSDS820
Date to ASTAD dtd
MV
22Jan13,
Layout &Assumed
Single Line
ASTAD
Diagram,
Approval
Lower
Date:
Basement
21Feb13
Approval

24-Dec-11

31-Dec-11

0%

14

01-Jan-12

16-Jan-12

116
Emergency Lighting Layout & Single Line Diagram, Upper Basement Approval14

20%

53
11

06-Dec-11
29-Feb-12

18-Apr-12
15-Mar-12

17-Jun-12
18-Jun-12

NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS950

Electrical Distribution Load Schedule, Upper Basement Approval

14

10%

13

02-Apr-12

17-Apr-12

18-Jun-12

NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS610

Security System Layout & Single Line Diagram, Upper Basement

0%

08-Jan-12

15-Jan-12

67

NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS570

Cable Tray Layout & Details, Upper Basement

0%

06-Dec-11

68

NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS620

BMS/Telemetry/SCADA Layout & Single Line Diagram, Upper Basement

0%

16-Jan-12

69

NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS630

Photovoltaic Layout & Single Line Diagram, PMS

0%

16-Jan-12

70

NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS900

Security System Layout & Single Line Diagram, Upper Basement Approval

14

0%

14

71

NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS860

Cable Tray Layout & Details, Upper Basement Approval

14

0%

14

72

NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS640

Parking Guidance Layout & Single Line Diagram, Upper Basement

0%

73

NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS910

BMS/Telemetry/SCADA Layout & Single Line Diagram, Upper Basement Approval


14

0%

74

NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS920

Photovoltaic Layout & Single Line Diagram, PMS Approval

14

0%

75

NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS930

Parking Guidance Layout & Single Line Diagram, Upper Basement Approval 14

0%

76
77

IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals
106
NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS690
Letter 0295-13 dtd LV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Upper Basement (w/ Substation Issue in UB 7Slab Area
20%
13)

Chilled Water System Layout & Tie-In Details, Ground Level


Chilled Water System Layout & Tie-In Details, Ground Level Approval
Irrigation Main Line Layout & Tie-In Details, Ground Level
Irrigation Main Line Layout & Tie-In Details, G

Cable Tray Layout & Details, Lower Basement


Electrical Distribution Load Schedule, Lower Basement Approval (w/ Substation Issue in UB Slab Area 13)
Cable Tray Layout & Details, Lower Basement Approval
Parking Guidance Layout & Single Line Diagram, Lower Basement
Security System Layout & Single Line Diagram, Lower Basement
Parking Guidance Layout & Single Line Diagram, Lower Basement Approval
BMS/Telemetry/SCADA Layout & Single Line Diagram, Lower Basement
Security System Layout & Single Line Diagram, Lower Basement Approval
UPS/Battery Lay out & Details, Lower Basement
BMS/Telemetry/SCADA Layout & Single Line Diagram, Lower Basement Approval
UPS/Battery Lay out & Details, Lower Basement Approval
Substations: HV SWGRs, XFMRs, Generators, MV Panels Layout & Details, Lower Basement
Substations: HV SWGRs, XFMRs, Generators, MV Panels Layout & Details, Lower Basement Approval
LV Layout & Single Line Diagram, Lower Basement (w/ Substation Issue in UB Slab Area 13)
LV Layout & Single Line Diagram, Lower Basement Approval (w/ Substation Issue in UB Slab Area 13)
Lighting Layout & Single Line Diagram, Lower Basement
HV Layout & Single Line Diagram, Lower Basement
Issue IFC-9 Drawings (MEP)
Lighting Layout & Single Line Diagram, Lower Basement Approval
Bus Ducts/Bus Bars Layout & Details, Lower Basement
HV Layout & Single Line Diagram, Lower Basement Approval
Bus Ducts/Bus Bars Layout & Details, Lower Basement Approval
MV Switchgear Under Review by ASTAD, Assumed Approval:21Feb13
MV Layout & Single Line Diagram, Lower Basement (w/ Substation Issue in UB Slab Area 13)

02-Mar-13
18-Mar-13

02-Apr-13
13-Feb-13

87
20

31-Jan-13

14-Feb-13

31-Jan-13

07-Feb-13

18

13-Dec-11

04-Feb-13

12-Feb-13

67

23-Jan-12

09-Feb-13

16-Feb-13

18

BMS/Telemetry/SCADA Layout & Single Line Diagram, Upper Basement

23-Jan-12

09-Feb-13

16-Feb-13

18

Photovoltaic Layout & Single Line Diagram, PMS

08-Mar-12

24-Mar-12

09-Feb-13

24-Feb-13

22

22-Feb-12

08-Mar-12

12-Feb-13

28-Feb-13

67

24-Jan-12

31-Jan-12

17-Feb-13

24-Feb-13

18

14

03-Apr-12

18-Apr-12

17-Feb-13

04-Mar-13

22

14

17-Mar-12

01-Apr-12

17-Feb-13

04-Mar-13

112

14

25-Mar-12

09-Apr-12

25-Feb-13

12-Mar-13

18

53
6

14-Dec-11
14-Feb-12

15-Apr-12
21-Feb-12

17-Jun-12
17-Jun-12

31-Jan-13
11-Mar-13

02-Apr-13
17-Mar-13

0
0

78

NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS980
Letter 0295-13 dtd LV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Upper Basement Approval (w/ Substation Issue
14 in UB20%
Slab Area 13)11

22-Feb-12

08-Mar-12

21-Jun-12

20-Mar-13

02-Apr-13

79

NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS870
Letter 0295-13 dtd Lighting
04Feb13):
Layout
Re-Submittals
& Single Line
& Approvals
Diagram, Upper Basement Approval

13-Feb-12

28-Feb-12

22-Jul-12

31-Jan-13

14-Feb-13

18

Lighting Layout & Single Line Diagram, Upper Basement Approval


Lighting Layout & Single Line Diagram, Upper Basement

66

14

10%

80

NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS580
Letter 0295-13 dtd Lighting
04Feb13):
Layout
Re-Submittals
& Single Line
& Approvals
Diagram, Upper Basement

81

NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS650
Letter 0295-13 dtd Telephone/Structured
04Feb13): Re-Submittals
Cabling
& Approvals
Layout & Details, Upper Basement

82

NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS940
Letter 0295-13 dtd Telephone/Structured
04Feb13): Re-Submittals
Cabling
& Approvals
Layout & Details, Upper Basement Approval

83

NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS670
Letter 0295-13 dtd HV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Upper Basement (w/ Substation Issue in UB7Slab Area0%
13)

84

NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS960
Letter 0295-13 dtd HV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Upper Basement Approval

85
86

Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13
21
NECP-Rebase_06Sep12-4.EN.SDS.2.2.1.1
Under Review - PIL Release
NEENSDS680
Date to ASTAD dtd
MV
22Jan13,
Layout &Assumed
Single Line
ASTAD
Diagram,
Approval
Upper
Date:
Basement
21Feb13
(w/ Substation Issue in UB7Slab Area0%
13)

87

NECP-Rebase_06Sep12-4.EN.SDS.2.2.1.1
Under Review - PIL Release
NEENSDS970
Date to ASTAD dtd
MV
22Jan13,
Layout &Assumed
Single Line
ASTAD
Diagram,
Approval
Upper
Date:
Basement
21Feb13
Approval

10%

14-Dec-11

21-Dec-11

07-Feb-13

14-Feb-13

18

0%

24-Jan-12

31-Jan-12

17-Feb-13

24-Feb-13

18

14

0%

14

31-Mar-12

15-Apr-12

25-Feb-13

12-Mar-13

18

09-Feb-12

16-Feb-12

26-Feb-13

05-Mar-13

14

18-Feb-12

04-Mar-12

06-Mar-13

21-Mar-13

21
7

12-Feb-12
12-Feb-12

06-Mar-12
19-Feb-12

28-Feb-13
28-Feb-13

24-Mar-13
07-Mar-13

0
0

09-Mar-13

24-Mar-13

31-Jan-13
31-Jan-13

21-Mar-13
07-Feb-13

70
32

14

0%

14

0%

14

20-Feb-12

06-Mar-12

Street Lighting Layout & Details, Ground Level

35
7

5%

43
7

22-Feb-12
01-Mar-12

02-Apr-12
08-Mar-12

Street Lighting Layout & Details, Ground Level Approval

14

88
89

GROUND LEVEL
NECP-Rebase_06Sep12-4.EN.SDS.2.3
GROUND LEVEL
NEENSDS1380

90

NECP-Rebase_06Sep12-4.EN.SDS.2.3
GROUND LEVEL
NEENSDS1410

91
92

IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals
NECP-Rebase_06Sep12-4.EN.SDS.2.3.1
IFC-9 DRAWINGS (ASTAD
NEENSDS1370
Letter 0295-13 dtd HV
04Feb13):
Cable Routing
Re-Submittals
and Details,
& Approvals
Ground Level

93

NECP-Rebase_06Sep12-4.EN.SDS.2.3.1
IFC-9 DRAWINGS (ASTAD
NEENSDS1400
Letter 0295-13 dtd HV
04Feb13):
Cable Routing
Re-Submittals
and Details,
& Approvals
Ground Level Approval

94

NECP-Rebase_06Sep12-4.EN.SDS.2.3.1
IFC-9 DRAWINGS (ASTAD
NEENSDS1390
Letter 0295-13 dtd Telephone
04Feb13): Routing
Re-Submittals
& Details,
& Approvals
Ground Level

95

NECP-Rebase_06Sep12-4.EN.SDS.2.3.1
IFC-9 DRAWINGS (ASTAD
NEENSDS1420
Letter 0295-13 dtd Telephone
04Feb13): Routing
Re-Submittals
& Details,
& Approvals
Ground Level Approval

96
97
98

13

FINISHES - SHOP DRAWINGS SUBMITTALS & APPROVALS


LOWER BASEMENT
NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1180
Suspended Ceiling Layout & Details, Lower Basement Approval

17-Jul-12

HVAC Equipment Layout & Details, Upper Basement Approval

31-Jan-13
31-Jan-13

65

30-Aug-12
30-Aug-12

0%

14

10-Mar-12

25-Mar-12

07-Feb-13

24-Feb-13

32

35
7

50%

29
4

22-Feb-12
22-Feb-12

02-Apr-12
29-Feb-12

30-Aug-12
30-Aug-12

17-Feb-13
02-Mar-13

21-Mar-13
05-Mar-13

70
2

14

50%

01-Mar-12

17-Mar-12

06-Sep-12

14-Mar-13

21-Mar-13

0%

10-Mar-12

17-Mar-12

17-Feb-13

24-Feb-13

78

14

0%

14

18-Mar-12

02-Apr-12

25-Feb-13

12-Mar-13

78

221
221
14

10%

82
82
13

05-Dec-11
05-Dec-11
05-Dec-11

18-Aug-12
18-Aug-12
20-Dec-11

13-Nov-12
13-Nov-12
13-Nov-12

31-Jan-13
31-Jan-13
31-Jan-13

06-May-13
06-May-13
14-Feb-13

212
198
86

23-Nov-12

06-Feb-13

21-Feb-13

109

31-Jan-13

07-Feb-13

13

99

NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1240

Signage & Wayfinding Layout & Details, Lower Basement Approval

14

10%

13

25-Jul-12

09-Aug-12

100

NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1000

Finishing Schedule & Details, Lower Basement

0%

05-Dec-11

12-Dec-11

101

NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1060

Furniture Layout & Details, Lower Basement

0%

25-Jul-12

01-Aug-12

31-Jan-13

07-Feb-13

259

102

NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1010

Door Schedule & Details, Lower Basement

0%

22-Dec-11

29-Dec-11

09-Feb-13

16-Feb-13

13

Actual Work
Remaining Work
Critical Remaining Work

Feb

HVAC Equipment Layout & Details, Lower Basement Approval

03-Mar-13

UPPER BASEMENT
NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS890

Jan

HVAC Equipment Layout & Details, Upper Basement

23-Feb-13

63
64

14

Dec

Roadworks Layout & Details

03-Jan-13
25-Aug-13
25-Mar-12
08-Mar-12

NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS710

Nov

PIL To Confirm (thru RFI-03-0188 Rev A dtd 04Feb12) GF Beams Set Out by 11Feb13

01-Mar-12
01-Mar-12
01-Mar-12

NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS800

Oct

PIL Confirmed (thru RFI-03-0188 Rev A dtd 04Feb12) UB Columns Set Out is Acceptable

18-Dec-12

38

Sep

Street Lighting Layout & Details Approval

14

37

Aug

Street Lighting Layout & Details

265
21
7

116
93
7

2014
Jul

Retaining Wall Type 1, 2, & 3 Layout & Details, Axis 49 Approval

0%

ELECTRICAL - SHOP DRAWINGS SUBMITTALS & APPROVALS


LOWER BASEMENT
NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS420
Cable Tray Layout & Details, Lower Basement

Jun

Retaining Wall Type 1, 2, & 3, Axis 49

465
21
7

NECP-Rebase_06Sep12-4.EN.SDS.1.3.4
Issues on Round About Dimensions
NEENSDS1570
(Elevated Roadway)
Roadworks Layout & Details Approval
MECHANICAL - SHOP DRAWINGS SUBMITTALS & APPROVALS
LOWER BASEMENT
NECP-Rebase_06Sep12-4.EN.SDS.3.1
LOWER BASEMENT
NEENSDS210
HVAC Equipment Layout & Details, Lower Basement

May

13-Mar-13
0
Terna Rqstd (thru RFI-03-0169 Rev A dtd 03Dec12) Dimensions of Round About

28

34
35
36

2013
Jan

28-Jan-13

31-Jan-13

14

UPPER BASEMENT
NECP-Rebase_06Sep12-4.EN.SDS.3.2
UPPER BASEMENT
NEENSDS270

31-Jan-13

06-Sep-11

18-Jan-12

Retaining Wall Type 1, 2, & 3 Layout & Details, Axis 49 Approval

26
27

06-Sep-11

06-Sep-11

NECP-Rebase_06Sep12-4.EN.SDS.1.3
GROUND LEVEL
NEENSDS1560

NECP-Rebase_06Sep12-4.EN.SDS.3.1
LOWER BASEMENT
NEENSDS340

13

25

Total
Float

20-Jan-14

60

48
48
12

22
23
24

Early Finish

31-Jan-13

CIVIL - SHOP DRAWINGS SUBMITTALS & APPROVALS


GROUND LEVEL
NECP-Rebase_06Sep12-4.EN.SDS.1.3
GROUND LEVEL
NEENSDS1530

21

Early Start

07-Sep-12

Actual
Finish

116

10
11
12

Retaining Wall Type 1, 2, & 3, Axis 49

Page 1 of 19/27-Feb-13 09:03

Execution Programme Level 3

MV Layout & Single Line Diagram, Lower Basement Approval


Emergency Lighting Layout & Single Line Diagram, Upper Basement Approval
Electrical Distribution Load Schedule, Upper Basement Approval
Security System Layout & Single Line Diagram, Upper Basement
Cable Tray Layout & Details, Upper Basement

Security System Layout & Single Line Diagram, Upper Basement Approval
Cable Tray Layout & Details, Upper Basement Approval
Parking Guidance Layout & Single Line Diagram, Upper Basement
BMS/Telemetry/SCADA Layout & Single Line Diagram, Upper Basement Approval
Photovoltaic Layout & Single Line Diagram, PMS Approval
Parking Guidance Layout & Single Line Diagram, Upper Basement Approval
LV Layout & Single Line Diagram, Upper Basement (w/ Substation Issue in UB Slab Area 13)
LV Layout & Single Line Diagram, Upper Basement Approval (w/ Substation Issue in UB Slab Area 13)

Telephone/Structured Cabling Layout & Details, Upper Basement


Telephone/Structured Cabling Layout & Details, Upper Basement Approval
HV Layout & Single Line Diagram, Upper Basement (w/ Substation Issue in UB Slab Area 13)
HV Layout & Single Line Diagram, Upper Basement Approval
MV Layout & Single Line Diagram, Upper Basement (w/ Substation Issue in UB Slab Area 13)
MV Layout & Single Line Diagram, Upper Basement Approval
Street Lighting Layout & Details, Ground Level
Street Lighting Layout & Details, Ground Level Approval
HV Cable Routing and Details, Ground Level
HV Cable Routing and Details, Ground Level Approval
Telephone Routing & Details, Ground Level
Telephone Routing & Details, Ground Level Approval

Suspended Ceiling Layout & Details, Lower Basement Approval


Signage & Wayfinding Layout & Details, Lower Basement Approval
Finishing Schedule & Details, Lower Basement
Furniture Layout & Details, Lower Basement
Door Schedule & Details, Lower Basement

TERNA

Milestone
Date
26-Feb-13

Revision
Data Date: 31-Jan-13
(Based on 06Sep12 Submitted Forecast Schedule)

Checked
DS

Approved
AT

Construction of North East Underground Carpark Contract No. XC10101100


#

WBS

WBS Name

Activity ID

Activity Name

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

103

NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1190

Finishing Schedule & Details, Lower Basement Approval

BL Project
Duration
14

0%

14

13-Dec-11

28-Dec-11

09-Feb-13

24-Feb-13

78

104

NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1250

Furniture Layout & Details, Lower Basement Approval

14

0%

14

02-Aug-12

18-Aug-12

09-Feb-13

24-Feb-13

259

105

NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1020

Glazing Layout & Details, Lower Basement

0%

31-Dec-11

07-Jan-12

17-Feb-13

24-Feb-13

43

106

NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1200

Door Schedule & Details, Lower Basement Approval

14

0%

14

31-Dec-11

15-Jan-12

17-Feb-13

04-Mar-13

50

107

NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1210

Glazing Layout & Details, Lower Basement Approval

14

0%

14

08-Jan-12

23-Jan-12

25-Feb-13

12-Mar-13

43

108

NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1040

Stainless Steel Barrier/Detection System & Details, Lower Basement

0%

09-Jul-12

16-Jul-12

13-Apr-13

20-Apr-13

87

109

NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1230

Stainless Steel Barrier/Detection System & Details, Lower Basement Approval14

0%

14

17-Jul-12

01-Aug-12

110
111

UPPER BASEMENT
NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1320

143
14

10%

78
13

05-Dec-11
12-Apr-12

19-May-12
28-Apr-12

112

NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1070

Suspended Ceiling Layout & Details, Upper Basement

0%

05-Dec-11

113

NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1120

Stainless Steel Barrier/Detection System & Details, Upper Basement

0%

05-Jan-12

114

NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1080

Finishing Schedule & Details, Upper Basement

0%

115

NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1140

Furniture Layout & Details, Upper Basement

0%

116

NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1260

Suspended Ceiling Layout & Details, Upper Basement Approval

14

0%

14

117

NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1310

Stainless Steel Barrier/Detection System & Details, Upper Basement Approval14

0%

14

118

NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1090

Door Schedule & Details, Upper Basement

0%

Signage & Wayfinding Layout & Details, Upper Basement Approval

Activity % Remaining
Complete Duration

Actual Start

Actual
Finish

2013
Jan

Feb

Mar

Apr

May

Stainless Steel Barrier/Detection System & Details, Lower Basement


Stainless Steel Barrier/Detection System & Details, Lower Basement Approval

21-Apr-13

06-May-13

87

02-May-13
02-May-13

216
109

12-Dec-11

31-Jan-13

07-Feb-13

20

Suspended Ceiling Layout & Details, Upper Basement

12-Jan-12

31-Jan-13

07-Feb-13

71

Stainless Steel Barrier/Detection System & Details, Upper Basement

13-Dec-11

20-Dec-11

09-Feb-13

16-Feb-13

13

22-Jan-12

29-Jan-12

09-Feb-13

16-Feb-13

266

13-Dec-11

28-Dec-11

09-Feb-13

24-Feb-13

78

03-May-12

19-May-12

09-Feb-13

24-Feb-13

148

28-Dec-11

04-Jan-12

17-Feb-13

24-Feb-13

13

Door Schedule & Details, Upper Basement


Glazing Layout & Details, Upper Basement

Signage & Wayfinding Layout & Details, Upper Basement Approval

Finishing Schedule & Details, Upper Basement


Furniture Layout & Details, Upper Basement
Suspended Ceiling Layout & Details, Upper Basement Approval
Stainless Steel Barrier/Detection System & Details, Upper Basement Approval

Glazing Layout & Details, Upper Basement

0%

28-Dec-11

04-Jan-12

17-Feb-13

24-Feb-13

57

Finishing Schedule & Details, Upper Basement Approval

14

0%

14

29-Dec-11

14-Jan-12

17-Feb-13

04-Mar-13

20

121

NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1280

Door Schedule & Details, Upper Basement Approval

14

0%

14

14-Jan-12

29-Jan-12

25-Feb-13

12-Mar-13

13

Door Schedule & Details, Upper Basement Approval

122

NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1290

Glazing Layout & Details, Upper Basement Approval

14

0%

14

22-Jan-12

06-Feb-12

25-Feb-13

12-Mar-13

57

Glazing Layout & Details, Upper Basement Approval

123

NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1330

Furniture Layout & Details, Upper Basement Approval

14

0%

14

05-Mar-12

20-Mar-12

25-Feb-13

12-Mar-13

259

124
125

GROUND LEVEL
NECP-Rebase_06Sep12-4.EN.SDS.4.3
GROUND LEVEL
NEENSDS1150

Facade Layout & Details, Ground Level

35
7

0%

21
7

14-Jan-12
14-Jan-12

22-Feb-12
21-Jan-12

31-Jan-13
31-Jan-13

24-Feb-13
07-Feb-13

71
71

Facade Layout & Details, Ground Level

126

NECP-Rebase_06Sep12-4.EN.SDS.4.3
GROUND LEVEL
NEENSDS1170

Finishing Schedule & Details, Ground Level

0%

30-Jan-12

06-Feb-12

31-Jan-13

07-Feb-13

27

Finishing Schedule & Details, Ground Level

127

NECP-Rebase_06Sep12-4.EN.SDS.4.3
GROUND LEVEL
NEENSDS1340

Facade Layout & Details, Ground Level Approval

14

0%

14

22-Jan-12

06-Feb-12

09-Feb-13

24-Feb-13

71

Facade Layout & Details, Ground Level Approval

128

NECP-Rebase_06Sep12-4.EN.SDS.4.3
GROUND LEVEL
NEENSDS1360

Finishing Schedule & Details, Ground Level Approval

14

0%

14

07-Feb-12

22-Feb-12

09-Feb-13

24-Feb-13

27

Finishing Schedule & Details, Ground Level Approval

230

169

19-Dec-11

11-Sep-12

31-Jan-13

15-Aug-13

108

69
7

0%

35
7

24-Jun-12
24-Jun-12

11-Sep-12
01-Jul-12

31-Jan-13
31-Jan-13

12-Mar-13
07-Feb-13

135
45

132

NECP-Rebase_06Sep12-4.EN.MSS.2
MECHANICAL - METHODNEENMSS230
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Fans Installation

133

NECP-Rebase_06Sep12-4.EN.MSS.2
MECHANICAL - METHODNEENMSS300
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for HVAC Equipment Installation Approval

134

NECP-Rebase_06Sep12-4.EN.MSS.2
MECHANICAL - METHODNEENMSS240
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Pumps Installation

135

NECP-Rebase_06Sep12-4.EN.MSS.2
MECHANICAL - METHODNEENMSS310
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Fans Installation Approval

0%

18-Jul-12

25-Jul-12

09-Feb-13

16-Feb-13

45

14

0%

14

02-Jul-12

17-Jul-12

09-Feb-13

24-Feb-13

52

0%

19-Aug-12

26-Aug-12

17-Feb-13

24-Feb-13

135

14

0%

14

26-Jul-12

11-Aug-12

17-Feb-13

04-Mar-13

45

136

NECP-Rebase_06Sep12-4.EN.MSS.2
MECHANICAL - METHODNEENMSS320
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Pumps Installation Approval

14

0%

14

27-Aug-12

11-Sep-12

25-Feb-13

12-Mar-13

135

137
138

ELECTRICAL - METHOD STATEMENT SUBMITTALS & APPROVALS


NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS360
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Lifts & Escalators Installation

130
7

0%

169
7

19-Dec-11
19-Dec-11

17-May-12
26-Dec-11

31-Jan-13
31-Jan-13

15-Aug-13
07-Feb-13

58
18

139

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS370
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Switchgears Installation

140

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS470
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Lifts & Escalators Installation Approval

141
142

Finishing Schedule & Details, Upper Basement Approval

Furniture Layout & Details, Upper Basement Approval

Method Statement for HVAC Equipment Installation


Method Statement for Fans Installation
Method Statement for HVAC Equipment Installation Approval
Method Statement for Pumps Installation
Method Statement for Fans Installation Approval
Method Statement for Pumps Installation Approval
Method Statement for Lifts & Escalators Installation
Method Statement for Switchgears Installation

0%

27-Dec-11

03-Jan-12

09-Feb-13

16-Feb-13

18

14

0%

14

26-Feb-12

12-Mar-12

09-Feb-13

24-Feb-13

119

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS380
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Transformers Installation

0%

02-Jan-12

09-Jan-12

17-Feb-13

24-Feb-13

18

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS390
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Generators Installation

0%

10-Jan-12

17-Jan-12

25-Feb-13

04-Mar-13

18

143

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS400
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Parking Guidance System Installation

0%

18-Jan-12

25-Jan-12

05-Mar-13

12-Mar-13

18

144

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS500
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Generators Installation Approval

14

0%

14

18-Feb-12

04-Mar-12

05-Mar-13

20-Mar-13

118

145

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS410
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Security System Installation

0%

26-Jan-12

02-Feb-12

13-Mar-13

20-Mar-13

80

Method Statement for Security System Installation

146

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS420
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for UPS Installation

0%

04-Feb-12

11-Feb-12

21-Mar-13

28-Mar-13

80

Method Statement for UPS Installation

147

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS430
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Panel Boards Installation

0%

12-Feb-12

19-Feb-12

30-Mar-13

06-Apr-13

80

148

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS530
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for UPS Installation Approval

14

0%

14

24-Apr-12

09-May-12

30-Mar-13

14-Apr-13

164

149

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS540
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Panel Boards Installation Approval

14

0%

14

26-Apr-12

12-May-12

07-Apr-13

22-Apr-13

80

150

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS480
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Switchgears Installation Approval

14

0%

14

01-Feb-12

16-Feb-12

20-Apr-13

05-May-13

128

151

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS490
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Transformers Installation Approval

14

0%

14

01-Feb-12

16-Feb-12

08-May-13

23-May-13

119

152

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS520
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Security System Installation Approval

14

0%

14

02-May-12

17-May-12

06-Jul-13

21-Jul-13

40

153

NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS510
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Parking Guidance System Installation Approval

14

0%

14

26-Jan-12

11-Feb-12

31-Jul-13

15-Aug-13

18

21
7

0%

21
7

24-Mar-12
24-Mar-12

16-Apr-12
31-Mar-12

12-Mar-13
12-Mar-13

04-Apr-13
19-Mar-13

222
222

14

0%

222

154
155
156
157
158
159
160
161
162
163
164
165
166

FINISHES - METHOD STATEM ENT SUBMITTALS & APPROVALS


NECP-Rebase_06Sep12-4.EN.MSS.3
FINISHES - METHOD STATEMENT
NEENMSS590
SUBMITTALS
Method
& APPROVALS
Statement for Signage & Wayfinding Installation
NECP-Rebase_06Sep12-4.EN.MSS.3
FINISHES - METHOD STATEMENT
NEENMSS640
SUBMITTALS
Method
& APPROVALS
Statement for Signage & Wayfinding Installation Approval

PROCUREMENT
MATERIAL SUBMITTALS & APPROVALS
CIVIL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALS
NECP-Rebase_06Sep12-4.PR.MTS.BM
CIVIL - BULK MATERIALSNEPRMTS380
RFQ & SUBMITTALS
Heavy
& APPROVALS
Duty Rubber Vehicle Stoppers
NECP-Rebase_06Sep12-4.PR.MTS.BM
CIVIL - BULK MATERIALSNEPRMTS430
RFQ & SUBMITTALS
Heavy
& APPROVALS
Duty Rubber Vehicle Stoppers Approval
MECHANICAL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALS
NECP-Rebase_06Sep12-4.PR.MTS.2
MECHANICAL - BULK MATERIALS
NEPRMTS520
RFQ & SUBMITTALS
Ductile Iron&Pipes
APPROVALS
& Fittings (Extl Firefighting) Approval
NECP-Rebase_06Sep12-4.PR.MTS.2
MECHANICAL - BULK MATERIALS
NEPRMTS570
RFQ & SUBMITTALS
FM200 Gas&Fire
APPROVALS
Suppression Approval
FINISHES - BULK MATERIAL RFQ , SUBMITTALS & APPROVALS
NECP-Rebase_06Sep12-4.PR.MTS.6
FINISHES - BULK MATERIAL
NEPRMTS680
RFQ , SUBMITTALS
Signages
& APPROVALS
& Wayfinding

14

01-Apr-12

16-Apr-12

20-Mar-13

04-Apr-13

541

223

13-Sep-11

04-Jun-13

21-Nov-11

31-Jan-13

20-Oct-13

54

117

61

13-Sep-11

26-Jan-12

21-Nov-11

31-Jan-13

11-Apr-13

134

21
7

0%

21
7

06-Oct-11
06-Oct-11

30-Oct-11
13-Oct-11

31-Jan-13
31-Jan-13

24-Feb-13
07-Feb-13

103
103

14

0%

14

15-Oct-11

30-Oct-11

09-Feb-13

24-Feb-13

103

72
14

50%

13
7

29-Sep-11
29-Sep-11

21-Dec-11
15-Oct-11

14-May-12
14-May-12

31-Jan-13
31-Jan-13

14-Feb-13
07-Feb-13

32
23

14

10%

13

06-Dec-11

21-Dec-11

30-Jul-12

31-Jan-13

14-Feb-13

32

26
5

15%

61
4

29-Oct-11
06-Nov-11

27-Nov-11
10-Nov-11

09-May-12
09-May-12

31-Jan-13
31-Jan-13

11-Apr-13
05-Feb-13

87
109

14

0%

14

12-Nov-11

27-Nov-11

05-Feb-13

21-Feb-13

109

18-Mar-13

Method Statement for Lifts & Escalators Installation Approval


Method Statement for Transformers Installation
Method Statement for Generators Installation
Method Statement for Parking Guidance System Installation
Method Statement for Generators Installation Approval

Method Statement for Panel Boards Installation


Method Statement for UPS Installation Approval
Method Statement for Panel Boards Installation Approval
Method Statement for Switchgears Installation Approval
Method Statement for Transformers Installation Approval
Method Statement for Security System Installation Approval
Method Statement for Parking Guidance System Installation Approval
Method Statement for Signage & Wayfinding Installation
Method Statement for Signage & Wayfinding Installation Approval

Heavy Duty Rubber Vehicle Stoppers


Heavy Duty Rubber Vehicle Stoppers Approval
Ductile Iron Pipes & Fittings (Extl Firefighting) Approval
FM200 Gas Fire Suppression Approval
Signages & Wayfinding
Signages & Wayfinding Approval

167

NECP-Rebase_06Sep12-4.PR.MTS.6
FINISHES - BULK MATERIAL
NEPRMTS730
RFQ , SUBMITTALS
Signages
& APPROVALS
& Wayfinding Approval

168

NECP-Rebase_06Sep12-4.PR.MTS.6
FINISHES - BULK MATERIAL
NEPRMTS2760
RFQ , SUBMITTALS
Assumed
& APPROVALS
ASTAD CR Issuance date: 18Mar13 - Change Specs for Barriers/Bollards/Column
0
0% Protectors
0

169

NECP-Rebase_06Sep12-4.PR.MTS.6
FINISHES - BULK MATERIAL
NEPRMTS660
RFQ , SUBMITTALS
Stainless
& APPROVALS
Steel Barriers/Bollards (CR awaited from ASTAD)

0%

29-Oct-11

05-Nov-11

19-Mar-13

26-Mar-13

87

Stainless Steel Barriers/Bollards (CR awaited from ASTAD)

170

NECP-Rebase_06Sep12-4.PR.MTS.6
FINISHES - BULK MATERIAL
NEPRMTS670
RFQ , SUBMITTALS
Stainless
& APPROVALS
Steel Column Protectors (CR awaited from ASTAD)

0%

29-Oct-11

05-Nov-11

19-Mar-13

26-Mar-13

87

Stainless Steel Column Protectors (CR awaited from ASTAD)

171

NECP-Rebase_06Sep12-4.PR.MTS.6
FINISHES - BULK MATERIAL
NEPRMTS710
RFQ , SUBMITTALS
Stainless
& APPROVALS
Steel Barriers/Bollards Approval (CR awaited from ASTAD)

14

0%

14

06-Nov-11

21-Nov-11

27-Mar-13

11-Apr-13

87

Stainless Steel Barriers/Bollards Approval (CR awaited from ASTAD)

NECP-Rebase_06Sep12-4.PR.MTS.6
FINISHES - BULK MATERIAL
NEPRMTS720
RFQ , SUBMITTALS
Stainless
& APPROVALS
Steel Column Protectors Approval (CR awaited from ASTAD)

14

0%

14

06-Nov-11

21-Nov-11

Stainless Steel Column Protectors Approval (CR awaited from ASTAD)

172
173
174

MECHANICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALS


45
21
06-Dec-11
26-Jan-12
NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS810
ITEMS SUBMITTALS
AHUs &Approval
APPROVALS
(Rejected Vendor: Johnson Control-York; see Act ID NEPRMTS1666
14
Approve
10% New Vendor:
13
20-Dec-11
Euroclima) 04-Jan-12

27-Mar-13

11-Apr-13

87

04-Jun-12
29-Jul-12

31-Jan-13
31-Jan-13

24-Feb-13
14-Feb-13

174
30

Assumed ASTAD CR Issuance date: 18Mar13 - Change Specs for Barriers/Bollards/Column Protectors

AHUs Approval (Rejected Vendor: Johnson Control-York; see Act ID NEPRMTS1666 Approve New Vendor: Euroclima)

175

NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS830
ITEMS SUBMITTALS
Duct Mounted
& APPROVALS
Extract Fans Approval

14

10%

13

28-Dec-11

12-Jan-12

12-Nov-12

31-Jan-13

14-Feb-13

47

Duct Mounted Extract Fans Approval

176

NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS840
ITEMS SUBMITTALS
Jet Fans
& APPROVALS
Approval

14

10%

13

28-Dec-11

12-Jan-12

12-Nov-12

31-Jan-13

14-Feb-13

62

Jet Fans Approval

177

NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS1840
ITEMS SUBMITTALS
Sewage
& APPROVALS
Ejector Pumps Approval

14

10%

13

04-Jan-12

19-Jan-12

04-Jun-12

31-Jan-13

14-Feb-13

157

178

NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS740
ITEMS SUBMITTALS
Sound&Attenuators
APPROVALS

0%

06-Dec-11

11-Dec-11

31-Jan-13

05-Feb-13

41

179

NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS760
ITEMS SUBMITTALS
Air Curtain
& APPROVALS

0%

20-Dec-11

27-Dec-11

31-Jan-13

07-Feb-13

52

180

NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS1810
ITEMS SUBMITTALS
Water&Filter
APPROVALS
Pumps

0%

04-Jan-12

10-Jan-12

31-Jan-13

06-Feb-13

55

Water Filter Pumps

181

NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS1820
ITEMS SUBMITTALS
Condensate
& APPROVALS
Pumps

0%

04-Jan-12

10-Jan-12

31-Jan-13

06-Feb-13

55

Condensate Pumps

182

NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS800
ITEMS SUBMITTALS
Sound&Attenuators
APPROVALS
Approval

14

0%

14

12-Dec-11

27-Dec-11

06-Feb-13

21-Feb-13

41

183

NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS1870
ITEMS SUBMITTALS
Water&Filter
APPROVALS
Pumps Approval

14

0%

14

11-Jan-12

26-Jan-12

07-Feb-13

23-Feb-13

175

Water Filter Pumps Approval

184

NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS1880
ITEMS SUBMITTALS
Condensate
& APPROVALS
Pumps Approval

14

0%

14

11-Jan-12

26-Jan-12

07-Feb-13

23-Feb-13

55

Condensate Pumps Approval

185

NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS820
ITEMS SUBMITTALS
Air Curtain
& APPROVALS
Approval

14

0%

14

28-Dec-11

12-Jan-12

09-Feb-13

24-Feb-13

52

79
7

40%

39
4

13-Sep-11
21-Sep-11

13-Dec-11
28-Sep-11

21-Nov-11
23-Nov-11

31-Jan-13
31-Jan-13

17-Mar-13
05-Feb-13

1
22

186
187

ELECTRICAL - LONG LEAD ITEMS SUBMITTALS & APPROVALS


NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS880
ITEMS SUBMITTALS
MV Panels
& APPROVALS
& Accessories

Sewage Ejector Pumps Approval


Sound Attenuators
Air Curtain

Sound Attenuators Approval

Air Curtain Approval


MV Panels & Accessories

188

NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS970
ITEMS SUBMITTALS
Telemetry/Scada
& APPROVALS
(BMS) & Accessories

40%

20-Nov-11

27-Nov-11

03-Jan-12

31-Jan-13

05-Feb-13

11

Telemetry/Scada (BMS) & Accessories

189

NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS990
ITEMS SUBMITTALS
Parking
& APPROVALS
Guidance System & Accessories

40%

20-Nov-11

24-Nov-11

05-Dec-11

31-Jan-13

03-Feb-13

Parking Guidance System & Accessories

190

NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS930
ITEMS SUBMITTALS
LV Cables
& APPROVALS
& Accessories

0%

25

08-Oct-11

12-Oct-11

02-May-12

31-Jan-13

28-Feb-13

191

NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS950
ITEMS SUBMITTALS
Light &
Fittings
APPROVALS
& Accessories

0%

14

19-Oct-11

26-Oct-11

21-Nov-11

31-Jan-13

16-Feb-13

192

NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS1150
ITEMS SUBMITTALS
Parking
& APPROVALS
Guidance System & Accessories Approval

14

0%

14

26-Nov-11

11-Dec-11

04-Feb-13

19-Feb-13

193

NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS1040
ITEMS SUBMITTALS
MV Panels
& APPROVALS
& Accessories Approval

14

0%

14

29-Sep-11

15-Oct-11

05-Feb-13

21-Feb-13

22

MV Panels & Accessories Approval

194

NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS1130
ITEMS SUBMITTALS
Telemetry/Scada
& APPROVALS
(BMS) & Accessories Approval

14

0%

14

28-Nov-11

13-Dec-11

05-Feb-13

21-Feb-13

11

Telemetry/Scada (BMS) & Accessories Approval

195

NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS1110
ITEMS SUBMITTALS
Light &
Fittings
APPROVALS
& Accessories Approval

14

0%

14

27-Oct-11

12-Nov-11

17-Feb-13

04-Mar-13

196

NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS1090
ITEMS SUBMITTALS
LV Cables
& APPROVALS
& Accessories Approval

14

0%

14

13-Oct-11

29-Oct-11

05-Jul-12

02-Mar-13

17-Mar-13

197
198

IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals
79
NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS1010
Letter 0295-13 dtd Distribution
04Feb13): Re-Submittals
Boards & Accessories
& Approvals
(w/ Substation Issue in UB Slab Area 13) 7

42.86%

32
4

13-Sep-11
29-Sep-11

13-Dec-11
06-Oct-11

23-Nov-11
23-Nov-11

31-Jan-13
31-Jan-13

09-Mar-13
04-Feb-13

0
0

LV Cables & Accessories


Light Fittings & Accessories
Parking Guidance System & Accessories Approval

Light Fittings & Accessories Approval


LV Cables & Accessories Approval
Distribution Boards & Accessories (w/ Substation Issue in UB Slab Area 13)
Security System & Accessories Approval

199

NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS1140
Letter 0295-13 dtd Security
04Feb13):
System
Re-Submittals
& Accessories
& Approvals
Approval

14

10%

13

28-Nov-11

13-Dec-11

22-Nov-12

11-Feb-13

25-Feb-13

200

NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS860
Letter 0295-13 dtd HV
04Feb13):
Switchgear
Re-Submittals
& Accessories
& Approvals

0%

18

13-Sep-11

20-Sep-11

24-Nov-11

31-Jan-13

20-Feb-13

201

NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS940
Letter 0295-13 dtd Bus
04Feb13):
Ducts/Bus
Re-Submittals
Bars & Accessories
& Approvals

0%

13-Oct-11

18-Oct-11

26-Nov-11

31-Jan-13

10-Feb-13

Bus Ducts/Bus Bars & Accessories

202

NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS980
Letter 0295-13 dtd Security
04Feb13):
System
Re-Submittals
& Accessories
& Approvals

0%

20-Nov-11

27-Nov-11

Security System & Accessories

203

NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS1170
Letter 0295-13 dtd Distribution
04Feb13): Re-Submittals
Boards & Accessories
& Approvals
Approval (w/ Substation Issue in UB Slab Area
14 13)

0%

14

08-Oct-11

23-Oct-11

204

NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS1100
Letter 0295-13 dtd Bus
04Feb13):
Ducts/Bus
Re-Submittals
Bars & Accessories
& Approvals
Approval

14

0%

14

19-Oct-11

03-Nov-11

205

NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS1020
Letter 0295-13 dtd HV
04Feb13):
Switchgear
Re-Submittals
& Accessories
& Approvals
Approval

14

0%

14

21-Sep-11

06-Oct-11

206
207

Await Reply from ASTAD re: Terna Letter 112/113 dtd 06Jan13, Assumed ASTAD Approval Date: 06Mar13
NECP-Rebase_06Sep12-4.PR.MTS.11.1.2
Await Reply from ASTAD re:
NEPRMTS985
Terna Letter 112/113
Fire
dtd
Alarm
06Jan13,
System
Assumed
& Accessories
ASTAD Approval Date: 06Mar13

21
7

100%

0
0

20-Nov-11
20-Nov-11

13-Dec-11
27-Nov-11

01-Dec-11
01-Dec-11

13-Sep-12

208

NECP-Rebase_06Sep12-4.PR.MTS.11.1.2
Await Reply from ASTAD re:
NEPRMTS1145
Terna Letter 112/113
Fire
dtd
Alarm
06Jan13,
System
Assumed
& Accessories
ASTAD Approval Date: 06Mar13

14

100%

28-Nov-11

13-Dec-11

14-Sep-12

10-Jan-13

209

NECP-Rebase_06Sep12-4.PR.MTS.11.1.2
Await Reply from ASTAD re:
NEENSDS1690
Terna Letter 112/113
Await
dtd ASTAD
06Jan13,
Reply
Assumed
to Terna
ASTAD
LetterApproval
112/113,Date:
Assumed
06Mar13
Approval: 06Mar13

0%

0
20-Jun-12

210
211
212

MATERIAL PROCUREMENT
CIVIL - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURER
NECP-Rebase_06Sep12-4.PR.MT.BM
CIVIL - BULK MATERIALSNEPRMTS1300
- RELEASE OF ORDER
PO for
FOR
Heavy
VENDOR/SUPPLIER/MANUFACTURER
Duty Rubber Vehicle Stoppers

420

223

01-Feb-12

04-Jun-13

10
10

6
6

19-Mar-12
19-Mar-12

29-Mar-12
29-Mar-12

0%

03-Dec-11
03-Dec-12

31-Jan-13

10-Feb-13

05-Feb-13

20-Feb-13

11-Feb-13

26-Feb-13

21-Feb-13

09-Mar-13

06-Mar-13

06-Mar-13

HV Switchgear & Accessories

Distribution Boards & Accessories Approval (w/ Substation Issue in UB Slab Area 13)
Bus Ducts/Bus Bars & Accessories Approval
HV Switchgear & Accessories Approval

Fire Alarm System & Accessories Approval


06-Mar-13

31-Jan-13

20-Oct-13

54

25-Feb-13
25-Feb-13

03-Mar-13
03-Mar-13

103
103

Oct

Glazing Layout & Details, Lower Basement Approval

NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1270

MECHANICAL - METHOD STATEMENT SUBMITTALS & APPROVALS


NECP-Rebase_06Sep12-4.EN.MSS.2
MECHANICAL - METHODNEENMSS220
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for HVAC Equipment Installation

Sep

Door Schedule & Details, Lower Basement Approval

NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1100

METHOD STATEMENT SUBMITTALS & APPROVALS

Aug

Glazing Layout & Details, Lower Basement

119

130
131

2014
Jul

Furniture Layout & Details, Lower Basement Approval

31-Jan-13
17-Apr-13

29-Nov-12
29-Nov-12

Jun

Finishing Schedule & Details, Lower Basement Approval

120

129

Page 2 of 19/27-Feb-13 09:03

Execution Programme Level 3

Await ASTAD Reply to Terna Letter 112/113, Assumed Approval: 06Mar13

PO for Heavy Duty Rubber Vehicle Stoppers

Nov

Dec

Jan

Feb

Construction of North East Underground Carpark Contract No. XC10101100


#

WBS

WBS Name

Activity ID

Activity Name

BL Project
Duration

Activity % Remaining
Complete Duration

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

90
90

0%

90
90

05-May-12
05-May-12

16-Aug-12
16-Aug-12

04-Mar-13
04-Mar-13

16-Jun-13
16-Jun-13

103
103

MECHANICAL - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURER


25
NECP-Rebase_06Sep12-4.PR.MT.2
MECHANICAL - BULK MATERIALS
NEPRMTS1370
- RELEASEPO
OFfor
ORDER
Extra Strength
FOR VENDOR/SUPPLIER/MANUFACTURER
Vitrified Clay (ESVC) Pipes & Fittings (Changed to GRP14
by ASTAD)0%

213
214

CIVIL - BULK MATERIALS - M ANUFACTURING & DELIVERY


NECP-Rebase_06Sep12-4.PR.MT.1
CIVIL - BULK MATERIALSNEPRMTS1340
- MANUFACTURING
Manufacture
& DELIVERY
& Deliver Heavy Duty Rubber Vehicle Stoppers

215
216
217

NECP-Rebase_06Sep12-4.PR.MT.2
MECHANICAL - BULK MATERIALS
NEPRMTS1360
- RELEASEPO
OFfor
ORDER
Ductile FOR
Iron Pipes
VENDOR/SUPPLIER/MANUFACTURER
& Fittings

Actual Start

Actual
Finish

133
6

13-May-12
26-May-12

10-Jun-12
10-Jun-12

31-Jan-13
31-Jan-13

04-Jul-13
06-Feb-13

23
37

14

0%

13-May-12

28-May-12

29-Jun-13

04-Jul-13

23

218
219

MECHANICAL - BULK MATERIALS - MANUFACTURING & DELIVERY


NECP-Rebase_06Sep12-4.PR.MT.3
MECHANICAL - BULK MATERIALS
NEPRMTS1420
- MANUFACTURING
Manufacture
&&
DELIVERY
Deliver Black Steel Pipes & Fittings

182
90

50%

223
30

14-Feb-12
14-Feb-12

12-Sep-12
28-May-12

20-Jun-12
09-Nov-12

31-Jan-13
31-Jan-13

20-Oct-13
06-Mar-13

23
57

220

NECP-Rebase_06Sep12-4.PR.MT.3
MECHANICAL - BULK MATERIALS
NEPRMTS1470
- MANUFACTURING
Manufacture
&&
DELIVERY
Deliver AC Ducts & Accessories

75

50%

38

22-May-12

16-Aug-12

13-Aug-12

31-Jan-13

16-Mar-13

102

221

NECP-Rebase_06Sep12-4.PR.MT.3
MECHANICAL - BULK MATERIALS
NEPRMTS1435
- MANUFACTURING
Manufacture
&&
DELIVERY
Deliver Copper Pipes & Fittings

90

50%

45

31-May-12

12-Sep-12

20-Jun-12

31-Jan-13

24-Mar-13

180

222

NECP-Rebase_06Sep12-4.PR.MT.3
MECHANICAL - BULK MATERIALS
NEPRMTS1450
- MANUFACTURING
Manufacture
&&
DELIVERY
Deliver GRP Pipes & Fittings

75

20%

60

04-Jun-12

29-Aug-12

16-Jan-13

31-Jan-13

10-Apr-13

186

223

NECP-Rebase_06Sep12-4.PR.MT.3
MECHANICAL - BULK MATERIALS
NEPRMTS1440
- MANUFACTURING
Manufacture
&&
DELIVERY
Deliver Extra Strength Vitrified Clay (ESVC) Pipes & Fittings (Changed
75
to 0%
GRP by ASTAD)
75

11-Jun-12

05-Sep-12

07-Feb-13

05-May-13

37

224

NECP-Rebase_06Sep12-4.PR.MT.3
MECHANICAL - BULK MATERIALS
NEPRMTS1480
- MANUFACTURING
Manufacture
&&
DELIVERY
Deliver FM200 Gas Fire Suppression

60

0%

60

08-Apr-12

16-Jun-12

14-Feb-13

25-Apr-13

32

NECP-Rebase_06Sep12-4.PR.MT.3
MECHANICAL - BULK MATERIALS
NEPRMTS1430
- MANUFACTURING
Manufacture
&&
DELIVERY
Deliver Ductile Iron Pipes & Fittings (Extl Fire Line)

225

90

0%

90

29-May-12

10-Sep-12

06-Jul-13

20-Oct-13

23

226
227

FINISHES - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURER


NECP-Rebase_06Sep12-4.PR.MT.6
FINISHES - BULK MATERIALS
NEPRMTS1590
- RELEASE OFPO
ORDER
for Signages
FOR VENDOR/SUPPLIER/MANUFACTURER
& Wayfinding

90
14

0%

16
6

25-Nov-12
25-Nov-12

09-Mar-13
10-Dec-12

02-May-13
02-May-13

20-May-13
09-May-13

99
109

228

NECP-Rebase_06Sep12-4.PR.MT.6
FINISHES - BULK MATERIALS
NEPRMTS1570
- RELEASE OFPO
ORDER
for Stainless
FOR VENDOR/SUPPLIER/MANUFACTURER
Steel Barriers/Bollards

14

0%

05-Feb-13

20-Feb-13

07-May-13

13-May-13

87

229

NECP-Rebase_06Sep12-4.PR.MT.6
FINISHES - BULK MATERIALS
NEPRMTS1580
- RELEASE OFPO
ORDER
for Stainless
FOR VENDOR/SUPPLIER/MANUFACTURER
Steel Column Protectors

14

0%

21-Feb-13

09-Mar-13

14-May-13

20-May-13

87

04-Jun-13
27-May-12

16-Aug-12
19-Oct-12

06-Feb-13
06-Feb-13

15-Aug-13
04-Mar-13

108
71

16-Aug-12

2013
Jan

Feb

Mar

Apr

May

Manufacture & Deliver Extra Strength Vitrified Clay (ESVC) Pipes & Fittings (Changed to GRP by ASTAD)
Manufacture & Deliver FM200 Gas Fire Suppression
Manufacture & Deliver Ductile Iron Pipes & Fittings (Extl Fire Line)
PO for Signages & Wayfinding
PO for Stainless Steel Barriers/Bollards
PO for Stainless Steel Column Protectors

NECP-Rebase_06Sep12-4.PR.MT.7
FINISHES - BULK MATERIALS
NEPRMTS1610
- MANUFACTURING
Manufacture
& DELIVERY
& Deliver Tiling Materials

60

25%

34

31-Mar-12

07-Jun-12

14-Mar-13

22-Apr-13

57

233

NECP-Rebase_06Sep12-4.PR.MT.7
FINISHES - BULK MATERIALS
NEPRMTS1620
- MANUFACTURING
Manufacture
& DELIVERY
& Deliver Stainless Steel Barriers/Bollards

75

0%

75

21-Feb-13

19-May-13

14-May-13

08-Aug-13

93

234

NECP-Rebase_06Sep12-4.PR.MT.7
FINISHES - BULK MATERIALS
NEPRMTS1630
- MANUFACTURING
Manufacture
& DELIVERY
& Deliver Stainless Steel Column Protectors

75

0%

75

10-Mar-13

04-Jun-13

21-May-13

15-Aug-13

87

NECP-Rebase_06Sep12-4.PR.MT.7
FINISHES - BULK MATERIALS
NEPRMTS1640
- MANUFACTURING
Manufacture
& DELIVERY
& Deliver Signages & Wayfinding

70

15-Jan-13

06-Apr-13

26-May-13

15-Aug-13

109

11-Feb-13

21-Mar-13
11-Feb-13

-33
-33

ASTAD Letter 0374-13 dtd 11Feb13: Rejection of JCI as AHU Vendor


Re-submit AHU New Vendor (Euroclima)

Manufacture & Deliver Paint Materials


Manufacture & Deliver Tiling Materials
Manufacture & Deliver Stainless Steel Barriers/Bollards
Manufacture & Deliver Stainless Steel Column Protectors
Manufacture & Deliver Signages & Wayfinding

0%

33
0

238

NECP-Rebase_06Sep12-4.PR.MT.9
MECHANICAL - LONG LEAD
NEPRMTS1664
ITEMS - RELEASE
Re-submit
OF ORDER
AHU FOR
New Vendor
VENDOR/SUPPLIER/MANUFACTURER
(Euroclima)

0%

15

11-Feb-13

28-Feb-13

-33

239

NECP-Rebase_06Sep12-4.PR.MT.9
MECHANICAL - LONG LEAD
NEPRMTS1666
ITEMS - RELEASE
Approve
OF ORDER
AHU New
FOR
Vendor
VENDOR/SUPPLIER/MANUFACTURER
(Euroclima)

0%

14

28-Feb-13

17-Mar-13

-33

240

NECP-Rebase_06Sep12-4.PR.MT.9
MECHANICAL - LONG LEAD
NEPRMTS1668
ITEMS - RELEASE
POOF
for AHU
ORDER
NewFOR
Vendor
VENDOR/SUPPLIER/MANUFACTURER
(Euroclima)

0%

17-Mar-13

21-Mar-13

-33

238
120

10-Mar-12
10-Mar-12

11-Dec-12
26-Jul-12

09-Nov-12
09-Nov-12

31-Jan-13
31-Jan-13

08-Aug-13
10-Apr-13

63
85
110

Manufacture & Deliver Sewage Ejector Pumps (Faisal)

Approve AHU New Vendor (Euroclima)


PO for AHU New Vendor (Euroclima)

50%

162
60

243

NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1960
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Sewage Ejector Pumps (Faisal)

120

50%

60

24-Mar-12

09-Aug-12

09-Nov-12

31-Jan-13

10-Apr-13

244

NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1970
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Stormwater Pumps (Faisal)

120

50%

60

07-Apr-12

23-Aug-12

09-Nov-12

31-Jan-13

10-Apr-13

110

Manufacture & Deliver Stormwater Pumps (Faisal)

245

NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1980
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Booster Pumps (Faisal)

120

50%

60

07-Apr-12

23-Aug-12

09-Nov-12

31-Jan-13

10-Apr-13

165

Manufacture & Deliver Booster Pumps (Faisal)

246

NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1950
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Fire Pumps (NAFFCO)

180

10%

162

24-Mar-12

18-Oct-12

18-Jan-13

31-Jan-13

07-Aug-13

63

247

NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1740
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Duct Mounted Extract Fans (Techview)

60

0%

60

11-Apr-12

19-Jun-12

14-Feb-13

25-Apr-13

47

Manufacture & Deliver Duct Mounted Extract Fans (Techview)

248

NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1750
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Jet Fans (Techview)

90

0%

60

19-Apr-12

01-Aug-12

14-Feb-13

25-Apr-13

90

Manufacture & Deliver Jet Fans (Techview)

249

NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1710
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Sound Attenuators (Techview)

60

0%

60

11-Apr-12

19-Jun-12

23-Feb-13

02-May-13

41

250

NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1990
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Water Filter Pumps (Faisal), Not Long Lead Item

120

0%

30

25-Jul-12

11-Dec-12

24-Feb-13

30-Mar-13

175

Manufacture & Deliver Water Filter Pumps (Faisal), Not Long Lead Item

251

NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS2000
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Condensate Pumps (Techview), Not Long Lead Item 70

0%

30

25-Jul-12

14-Oct-12

24-Feb-13

30-Mar-13

113

Manufacture & Deliver Condensate Pumps (Techview), Not Long Lead Item

NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1730
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Air Curtain (Berner)

120

0%

25-Feb-13

09-Jun-13

52

NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1720
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver AHUs (New Vendor: Euroclima)

120

21-Mar-13

08-Aug-13

09-Mar-13
09-Mar-13

06-Apr-13
14-Mar-13

0
0

16-Mar-13

21-Mar-13

252
253
254
255
256
257
258
259

MECHANICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERY


NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1760
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Sump Pumps (Faisal)

ELECTRICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURER


NECP-Rebase_06Sep12-4.PR.MT.11
ELECTRICAL - LONG LEAD
NEPRMTS2110
ITEMS - RELEASE
POOF
forORDER
Light Fittings
FOR &
VENDOR/SUPPLIER/MANUFACTURER
Accessories (w/ IFC-9 Drawings issue)
NECP-Rebase_06Sep12-4.PR.MT.11
ELECTRICAL - LONG LEAD
NEPRMTS2140
ITEMS - RELEASE
POOF
forORDER
SecurityFOR
System
VENDOR/SUPPLIER/MANUFACTURER
& Accessories (CHIP)
NECP-Rebase_06Sep12-4.PR.MT.11
ELECTRICAL - LONG LEAD
NEPRMTS2130
ITEMS - RELEASE
POOF
forORDER
Telemetry/Scada
FOR VENDOR/SUPPLIER/MANUFACTURER
(BMS) & Accessories (Siemens)
ELECTRICAL - LONG LEAD ITEMS - MANUFACTURING & DELIVERY
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2220
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Elevators & Accessories (Schindler)

90

19-Apr-12

0%

120

19-Apr-12

05-Sep-12

18
6

11-Apr-12
11-Apr-12

01-May-12
17-Apr-12

25-Sep-12

0%

25
6

0%

25-Sep-12

05-Sep-12

24-Apr-12

01-May-12

0%

24-Apr-12

01-May-12

333
150

50%

206
75

01-Feb-12
26-Feb-12

23-Feb-13
18-Aug-12

31-Jul-12
31-Jul-12

Manufacture & Deliver Elevators & Accessories (Schindler)


Manufacture & Deliver Escalators & Accessories (Schindler)

75

26-Feb-12

18-Aug-12

31-Jul-12

31-Jan-13

28-Apr-13

86

10%

81

24-Apr-12

19-Nov-12

25-Sep-12

16-May-13

18-Aug-13

56

262

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2180
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Transformer & Accessories (Eng'g Supplies) (w/ Substation
180
Issue5%
by Kahramaa)
171

01-Feb-12

28-Aug-12

28-Jan-13

31-Jan-13

18-Aug-13

45

263

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2200
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Generators & Accessories (Qatar Site Power)

210

5%

114

18-Feb-12

18-Oct-12

21-Jan-13

31-Jan-13

12-Jun-13

106

264

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2320
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Photo Voltaic System & Accessories (Enviromena)

120

0%

60

08-May-12

24-Sep-12

31-Jan-13

10-Apr-13

80

265

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2210
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Distribution Boards & Accessories (Al Naema)

90

0%

120

26-Apr-12

08-Aug-12

21-Feb-13

10-Jul-13

266

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2305
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Fire Alarm System & Accessories (NAFFCO)

90

0%

90

11-Nov-12

23-Feb-13

07-Mar-13

19-Jun-13

30

267

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2170
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver HV Switchgear & Accessories (Gulf Lights) (w/ Substation
180 Issue by
0%Kahramaa)
150

01-Feb-12

28-Aug-12

10-Mar-13

31-Aug-13

268

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2270
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Light Fittings & Accessories (w/ IFC-9 Drawings issue)
120

0%

120

18-Apr-12

04-Sep-12

16-Mar-13

01-Aug-13

269

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2190
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver MV Panels & Accessories (Al Naema)

150

0%

120

09-Feb-12

01-Aug-12

19-Mar-13

05-Aug-13

270

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2300
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Security System & Accessories (CHIP)

90

0%

90

02-May-12

14-Aug-12

23-Mar-13

04-Jul-13

271

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2260
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Bus Ducts/Bus Bars & Accessories (Gulf Lights)

90

0%

90

11-Apr-12

24-Jul-12

24-Mar-13

06-Jul-13

272

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2240
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver HV Cables & Accessories (Elsewedy) (w/ IFC-9 Drawings
120 issue) 0%

90

25-Mar-12

11-Aug-12

25-Mar-13

07-Jul-13

273

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2250
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver LV Cables & Accessories (Elsewedy) (w/ IFC-9 Drawings
90 issue) 0%

90

04-Apr-12

17-Jul-12

03-Apr-13

16-Jul-13

274

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2290
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Telemetry/Scada (BMS) & Accessories (Siemens)

150

02-May-12

14-Aug-12

07-Apr-13

28-Sep-13

277
278

0%

90

30-Apr-12

12-Aug-12

156

04-Jun-12

04-May-13

19-Jun-12

11-Dec-12
11-Dec-12

150
0

0%

112
0

279

NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2520
ITEMS DELIVERY
Condensate
MILESTONES
Pumps (Techview)

0%

280

NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2460
ITEMS DELIVERY
Sump
MILESTONES
Pumps (Faisal)

0%

281

NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2480
ITEMS DELIVERY
Sewage
MILESTONES
Ejector Pumps (Faisal)

0%

282

NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2490
ITEMS DELIVERY
Stormwater
MILESTONES
Pumps (Faisal)

283

NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2500
ITEMS DELIVERY
Booster
MILESTONES
Pumps (Faisal)

284

23-Apr-12

12-Jun-13

24-Sep-13

30-Mar-13

28-Sep-13

21

30-Mar-13

Manufacture & Deliver UPS/Battery System & Accessories (Gulf Lights)


Manufacture & Deliver Transformer & Accessories (Eng'g Supplies) (w/ Substation Issue by Kahramaa)
Manufacture & Deliver Generators & Accessories (Qatar Site Power)
Manufacture & Deliver Photo Voltaic System & Accessories (Enviromena)
Manufacture & Deliver Distribution Boards & Accessories (Al Naema)
Manufacture & Deliver Fire Alarm System & Accessories (NAFFCO)
Manufacture & Deliver HV Switchgear & Accessories (Gulf Lights) (w/ Substation Issue by Kahramaa)
Manufacture & Deliver Light Fittings & Accessories (w/ IFC-9 Drawings issue)
Manufacture & Deliver MV Panels & Accessories (Al Naema)
Manufacture & Deliver Security System & Accessories (CHIP)
Manufacture & Deliver Bus Ducts/Bus Bars & Accessories (Gulf Lights)
Manufacture & Deliver HV Cables & Accessories (Elsewedy) (w/ IFC-9 Drawings issue)
Manufacture & Deliver LV Cables & Accessories (Elsewedy) (w/ IFC-9 Drawings issue)
Manufacture & Deliver Telemetry/Scada (BMS) & Accessories (Siemens)
Manufacture & Deliver Parking Guidance System & Accessories (CHIP)

08-Aug-13
30-Mar-13

63
175

Water Filter Pumps (Faisal)

14-Oct-12

30-Mar-13

113

Condensate Pumps (Techview)

26-Jul-12

10-Apr-13

85

09-Aug-12

10-Apr-13

110

Sewage Ejector Pumps (Faisal)

0%

23-Aug-12

10-Apr-13

110

Stormwater Pumps (Faisal)

0%

23-Aug-12

10-Apr-13

165

Booster Pumps (Faisal)

NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2440
ITEMS DELIVERY
Duct
MILESTONES
Mounted Extract Fans (Techview)

0%

19-Jun-12

25-Apr-13

47

Duct Mounted Extract Fans (Techview)

285

NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2450
ITEMS DELIVERY
JetMILESTONES
Fans (Techview)

0%

01-Aug-12

25-Apr-13

90

Jet Fans (Techview)

286

NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2410
ITEMS DELIVERY
Sound
MILESTONES
Attenuators (Techview)

0%

19-Jun-12

02-May-13

41

287

NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2430
ITEMS DELIVERY
AirMILESTONES
Curtain (Berner)

0%

05-Sep-12

09-Jun-13

52

288

NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2470
ITEMS DELIVERY
Fire
MILESTONES
Pumps (NAFFCO)

0%

18-Oct-12

07-Aug-13

63

289

NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2420
ITEMS DELIVERY
AHUs
MILESTONES
(New Vendor: Euroclima)

0%

05-Sep-12

08-Aug-13

249
0

0%

146
0

28-Sep-13
10-Apr-13

21
80

Photo Voltaic System & Accessories (Enviromena)

290
291

MECHANICAL - LONG LEAD ITEMS DELIVERY MILESTONES


NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2510
ITEMS DELIVERY
Water
MILESTONES
Filter Pumps (Faisal)

90
286

PO for Telemetry/Scada (BMS) & Accessories (Siemens)

50%

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2310
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Parking Guidance System & Accessories (CHIP)

PO for Security System & Accessories (CHIP)

180

DELIVERY MILESTONES - LONG LEAD AND CRITICAL ITEMS

Manufacture & Deliver AHUs (New Vendor: Euroclima)


PO for Light Fittings & Accessories (w/ IFC-9 Drawings issue)

21
65

150

276

Manufacture & Deliver Air Curtain (Berner)

06-Apr-13

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2280
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver UPS/Battery System & Accessories (Gulf Lights)

275

Manufacture & Deliver Sound Attenuators (Techview)

28-Sep-13
28-Apr-13

NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2230
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Escalators & Accessories (Schindler)

0%

Manufacture & Deliver Fire Pumps (NAFFCO)

31-Jan-13
31-Jan-13

261

90

Manufacture & Deliver Sump Pumps (Faisal)

31-Mar-13

260

ELECTRICAL - LONG LEAD ITEMS DELIVERY MILESTONES


NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2680
ITEMS DELIVERYPhoto
MILESTONES
Voltaic System & Accessories (Enviromena)

17-Jul-12

04-May-13
24-Sep-12

10-Apr-13

Sump Pumps (Faisal)

Sound Attenuators (Techview)


Air Curtain (Berner)
Fire Pumps (NAFFCO)
AHUs (New Vendor: Euroclima)

292

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2580
ITEMS DELIVERYElevators
MILESTONES
& Accessories (Schindler)

0%

18-Aug-12

65

Elevators & Accessories (Schindler)

293

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2590
ITEMS DELIVERYEscalators
MILESTONES
& Accessories (Schindler)

0%

18-Aug-12

28-Apr-13

86

Escalators & Accessories (Schindler)

294

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2560
ITEMS DELIVERYGenerators
MILESTONES
& Accessories (Qatar Site Power)

0%

18-Oct-12

12-Jun-13

106

295

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2665
ITEMS DELIVERYFire
MILESTONES
Alarm System & Accessories (NAFFCO)

0%

04-May-13

19-Jun-13

30

296

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2660
ITEMS DELIVERYSecurity
MILESTONES
System & Accessories (CHIP)

0%

14-Aug-12

04-Jul-13

297

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2620
ITEMS DELIVERYBus
MILESTONES
Ducts/Bus Bars & Accessories (Gulf Lights)

0%

24-Jul-12

06-Jul-13

298

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2600
ITEMS DELIVERYHV
MILESTONES
Cables & Accessories (Elsewedy)

0%

11-Aug-12

07-Jul-13

299

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2570
ITEMS DELIVERYDistribution
MILESTONES
Boards & Accessories (Al Naema)

0%

08-Aug-12

10-Jul-13

Distribution Boards & Accessories (Al Naema)

300

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2610
ITEMS DELIVERYLVMILESTONES
Cables & Accessories (Elsewedy)

0%

17-Jul-12

16-Jul-13

LV Cables & Accessories (Elsewedy)

301

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2630
ITEMS DELIVERYLight
MILESTONES
Fittings & Accessories

0%

04-Sep-12

04-Aug-13

302

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2550
ITEMS DELIVERYMV
MILESTONES
Panels & Accessories (Al Naema)

0%

01-Aug-12

05-Aug-13

303

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2540
ITEMS DELIVERYTransformer
MILESTONES
& Accessories (Eng'g Supplies) (w/ Substation Issue by Kahramaa)
0

0%

28-Aug-12

18-Aug-13

45

Transformer & Accessories (Eng'g Supplies) (w/ Substation Issue by Kahramaa)

304

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2640
ITEMS DELIVERYUPS/Battery
MILESTONES
System & Accessories (Gulf Lights)

0%

19-Nov-12

18-Aug-13

56

UPS/Battery System & Accessories (Gulf Lights)

305

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2530
ITEMS DELIVERYHV
MILESTONES
Switchgear & Accessories (Gulf Lights) (w/ Substation Issue by Kahramaa)0

0%

28-Aug-12

31-Aug-13

306

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2670
ITEMS DELIVERYParking
MILESTONES
Guidance System & Accessories (CHIP)

0%

12-Aug-12

24-Sep-13

307

NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2650
ITEMS DELIVERYTelemetry/Scada
MILESTONES (BMS) & Accessories (Siemens)

0%

14-Aug-12

28-Sep-13

245
0

0
0

01-May-13

14

100%

308
309

FINISHES - LONG LEAD ITEM S DELIVERY MILESTONES


NECP-Rebase_06Sep12-4.PR.DM.3
FINISHES - LONG LEAD NEPRMTS2720
ITEMS DELIVERY MILESTONES
Timber Louver Screens (NA as per Tender Adjustment Schedule)

04-Jun-12

17-Mar-13
17-Mar-13

28-Apr-13

23-Apr-12

01-May-13

Generators & Accessories (Qatar Site Power)


Fire Alarm System & Accessories (NAFFCO)
Security System & Accessories (CHIP)
Bus Ducts/Bus Bars & Accessories (Gulf Lights)
HV Cables & Accessories (Elsewedy)

Light Fittings & Accessories


MV Panels & Accessories (Al Naema)

HV Switchgear & Accessories (Gulf Lights) (w/ Substation Issue by Kahramaa)


Parking Guidance System & Accessories (CHIP)
Telemetry/Scada (BMS) & Accessories (Siemens)

23-Apr-12

310

NECP-Rebase_06Sep12-4.PR.DM.3
FINISHES - LONG LEAD NEPRMTS2690
ITEMS DELIVERY MILESTONES
Aluminum Chaotic Facade (Alumco)

0%

17-Jul-12

01-May-13

14

Aluminum Chaotic Facade (Alumco)

311

NECP-Rebase_06Sep12-4.PR.DM.3
FINISHES - LONG LEAD NEPRMTS2700
ITEMS DELIVERY MILESTONES
Glazing (Curtain Wall, Sliding Doors, Edge Glass, Rooflights) (Alumco)

0%

12-Jun-12

01-May-13

14

Glazing (Curtain Wall, Sliding Doors, Edge Glass, Rooflights) (Alumco)

312

NECP-Rebase_06Sep12-4.PR.DM.3
FINISHES - LONG LEAD NEPRMTS2710
ITEMS DELIVERY MILESTONES
Aluminum/Steel Doors (by S/C), Louver Screens (Alumco)

0%

04-Jun-12

01-May-13

313

Aluminum/Steel Doors (by S/C), Louver Screens (Alumco)

323

98

08-Dec-11

19-Dec-12

12-Feb-12

31-Jan-13

26-May-13

109

323
0

08-Dec-11
08-Dec-11

19-Dec-12

12-Feb-12
12-Feb-12

31-Jan-13

26-May-13

109

100%

98
0

Tiles, Wall

0%

14

22-Mar-12

22-Mar-12

31-Jan-13

16-Feb-13

57

Tiles, Wall

Traffic Floor Paint

0%

14

11-Mar-12

11-Mar-12

31-Jan-13

16-Feb-13

85

Traffic Floor Paint

NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS260

Fire Stop Barrier

0%

14

14-Feb-12

14-Feb-12

31-Jan-13

16-Feb-13

73

Fire Stop Barrier

NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS290

Gypsum Ceiling

0%

14

11-Mar-12

11-Mar-12

31-Jan-13

16-Feb-13

20

Gypsum Ceiling

320

NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS130

Toilet Tiles

0%

14

22-Mar-12

22-Mar-12

17-Feb-13

04-Mar-13

57

Toilet Tiles

321

NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS230

Tactile Tiles

0%

14

22-Mar-12

22-Mar-12

17-Feb-13

04-Mar-13

85

Tactile Tiles

322

NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS310

Plaster Board Paint

0%

14

11-Mar-12

11-Mar-12

17-Feb-13

04-Mar-13

20

Plaster Board Paint

MOCK UPS

314
315

MOCK UPS - COMPLETION/APPROVAL


NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS50

316

NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS80

317

NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS210

318
319

Concrete Formwork

Dec

Manufacture & Deliver GRP Pipes & Fittings

232

241
242

Nov

Manufacture & Deliver Copper Pipes & Fittings

19-Mar-12
19-Mar-12

70

Oct

Manufacture & Deliver AC Ducts & Accessories

164
23

0%

Sep

PO for Ductile Iron Pipes & Fittings

25%

0
0

Aug

Manufacture & Deliver Black Steel Pipes & Fittings

380
60

MECHANICAL - LONG LEAD ITEMS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURER


NECP-Rebase_06Sep12-4.PR.MT.9
MECHANICAL - LONG LEAD
NEPRMTS1662
ITEMS - RELEASE
ASTAD
OF ORDER
Letter 0374-13
FOR VENDOR/SUPPLIER/MANUFACTURER
dtd 11Feb13: Rejection of JCI as AHU Vendor

Jul

PO for Extra Strength Vitrified Clay (ESVC) Pipes & Fittings (Changed to GRP by ASTAD)

FINISHES - BULK MATERIALS - MANUFACTURING & DELIVERY


NECP-Rebase_06Sep12-4.PR.MT.7
FINISHES - BULK MATERIALS
NEPRMTS1600
- MANUFACTURING
Manufacture
& DELIVERY
& Deliver Paint Materials

236
237

2014

Jun

Manufacture & Deliver Heavy Duty Rubber Vehicle Stoppers

230
231

235

Page 3 of 19/27-Feb-13 09:03

Execution Programme Level 3

Jan

Feb

Construction of North East Underground Carpark Contract No. XC10101100


#

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

323

NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS140

Toilet Cubicle Laminate

0%

14

31-Mar-12

31-Mar-12

05-Mar-13

20-Mar-13

57

Toilet Cubicle Laminate

324

NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS240

Tactile Surface Indicators

0%

14

22-Mar-12

22-Mar-12

05-Mar-13

20-Mar-13

85

Tactile Surface Indicators

325

NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS250

Entrance Flooring System

0%

14

22-Mar-12

22-Mar-12

05-Mar-13

20-Mar-13

85

Entrance Flooring System

326

NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS320

Alucore Ceiling

0%

14

29-Feb-12

29-Feb-12

05-Mar-13

20-Mar-13

20

Alucore Ceiling

327

NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS270

Black Granite Counter Top

0%

14

22-Mar-12

22-Mar-12

21-Mar-13

06-Apr-13

57

328

NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS200

GRC

0%

14

31-Mar-12

31-Mar-12

07-Apr-13

22-Apr-13

57

NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS330

Signage and Wayfinding

0%

14

19-Dec-12

19-Dec-12

09-May-13

26-May-13

109

34

30-Oct-11

29-Dec-12

13-Dec-12

31-Jan-13

11-Mar-13

82

13-Dec-12

329
330
331

WBS

WBS Name

Activity ID

Activity Name

366

34

30-Oct-11

29-Dec-12

10
10

02-Dec-12
02-Dec-12

12-Dec-12
12-Dec-12

366
Pre-qualification of Subcontractor - BMS Approval (same as Telemetry by Siemens)
14

50%

34
7

30-Oct-11
30-Oct-11

29-Dec-12
14-Nov-11

NECP-Rebase_06Sep12-4.SC.1.2
PRE-QUALIFICATION APPROVALS
NESBPQS200

Pre-qualification of Subcontractor - Parking Guidance System Approval (CHIP)


14

50%

15-Dec-11

21-Jan-13

NECP-Rebase_06Sep12-4.SC.1.2
PRE-QUALIFICATION APPROVALS
NESBPQS190

Pre-qualification of Subcontractor - Telemetry/SCADA Approval (Siemens)

14

0%

14

13-Nov-11

28-Nov-11

25-Dec-12

NECP-Rebase_06Sep12-4.SC.1.2
PRE-QUALIFICATION APPROVALS
NESBPQS230

Pre-qualification of Subcontractor - Asphalting Approval

14

0%

14

13-Dec-12

29-Dec-12

24
10

100%

21
0

26-Dec-11
26-Dec-11

22-Jan-12
05-Jan-12

13-Dec-12
13-Dec-12

14

50%

0%

Pre-qualification of Subcontractor - Asphalting

334
335

PRE-QUALIFICATION APPROVALS
NECP-Rebase_06Sep12-4.SC.1.2
PRE-QUALIFICATION APPROVALS
NESBPQS180

336
337
338

342
343
344
345

Actual Start

0%

PRE-QUALIFICATION OF SUBCONTRACTORS
PRE-QUALIFICATION SUBMITTALS
NECP-Rebase_06Sep12-4.SC.1.PQS
PRE-QUALIFICATION SUBMITTALS
NESBPQS120

341

Activity % Remaining
Complete Duration

366

332
333

339
340

BL Project
Duration

SUBCONTRACTING

CHANGE IN MANUFACTURER by ASTAD (Terna Letter 0118 dtd 24Jan13): Re-Submittals & Approvals
NECP-Rebase_06Sep12-4.SC.1.1
CHANGE IN MANUFACTURER
NESBPQS110
by ASTAD (Terna
Pre-qualification
Letter 0118 dtd
of Subcontractor
24Jan13): Re-Submittals
- Security System
& Approvals
(CHIP)
NECP-Rebase_06Sep12-4.SC.1.1
CHANGE IN MANUFACTURER
NESBPQS220
by ASTAD (Terna
Pre-qualification
Letter 0118 dtd
of Subcontractor
24Jan13): Re-Submittals
- Security System
& Approvals
Approval (CHIP)
NECP-Rebase_06Sep12-4.SC.1.1
CHANGE IN MANUFACTURER
NESBPQS250
by ASTAD (Terna
Await
Letter
Reply
0118
to Terna
dtd 24Jan13):
Letter 118,
Re-Submittals
Assumed Approval:
& Approvals
24Feb13

10
10

TOWER CRANE ERECTION


INTERFACE COORDINATION

30-Nov-11

Actual
Finish

24-Dec-12
24-Dec-12

31-Jan-13

11-Mar-13

82

12-Feb-13
12-Feb-13

23-Feb-13
23-Feb-13

82
82

31-Jan-13
31-Jan-13

11-Mar-13
07-Feb-13

82
43

31-Jan-13

2013
Jan

Feb

Mar

Apr

May

Aug

Sep

Oct

Nov

Dec

Jan

Pre-qualification of Subcontractor - Asphalting


Pre-qualification of Subcontractor - BMS Approval (same as Telemetry by Siemens)
Pre-qualification of Subcontractor - Parking Guidance System Approval (CHIP)

106

16-Feb-13

36

Pre-qualification of Subcontractor - Telemetry/SCADA Approval (Siemens)

11-Mar-13

82

Pre-qualification of Subcontractor - Asphalting Approval

31-Jan-13

24-Feb-13
07-Feb-13

0
Pre-qualification of Subcontractor - Security System (CHIP)

07-Jan-12

22-Jan-12

25-Dec-12

31-Jan-13

24-Feb-13

22-Sep-11

29-Aug-13

22-Sep-11

19-Aug-13

08-Jan-14

10

255

16-Jan-12

09-Nov-12

22-Feb-12

605

119

22-Sep-11

29-Aug-13

22-Sep-11

19-Aug-13

08-Jan-14

10

538
0

25-Oct-11

13-Jul-13
28-Nov-12

25-Oct-11

100%

116
0

25-Oct-11

Pre-qualification of Subcontractor - Security System Approval (CHIP)

14

Await Reply to Terna Letter 118, Assumed Approval: 24Feb13

15-Sep-12

346
347

EDUCATION CITY PROJECTS


NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO10

348

NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO40

Temporary Access Roads, Roads Tie-in

100%

349

NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO120

Oxygen Park, West Facade (MAN)

100%

29-Sep-12

350

NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO100

Landscaping Package, Main Irrigation Line Tie-in

0%

03-Jan-13

19-Aug-13

11

351

NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO20

Dukhan Expressway, Roads Tie-in (QD-SBG)

0%

11-Jun-13

15-Oct-13

82

Dukhan Expressway, Roads Tie-in (QD-SBG)

352

NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO70

Primary Roads, Roads Tie-in

0%

11-Jun-13

15-Oct-13

82

Primary Roads, Roads Tie-in

353

NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO110

Male Student Housing

0%

11-Jun-13

15-Oct-13

82

Male Student Housing

354

NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO130

Faculty of Islamic Studies

0%

11-Jun-13

15-Oct-13

82

Faculty of Islamic Studies

355

NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO140

South East Car Park

0%

11-Jun-13

15-Oct-13

82

South East Car Park

356

NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO60

Central Plant CP7, CHW Pipes Tie-in (Unicorp)

0%

22-Jun-13

02-Dec-13

37

357

NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO80

Primary Infrastructure (Power/Water/Storm/Sewer), Utilities Tie-in

0%

03-Jan-13

04-Dec-13

30

358

NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO30

South Campus Utility Tunnel, Services Tie-in

0%

22-Jun-13

11-Dec-13

28

South Campus Utility Tunnel, Services Tie-in

359

NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO90

Security/IT/Telecom, Infrastructure Tie-in

0%

24-Jun-13

11-Dec-13

28

Security/IT/Telecom, Infrastructure Tie-in

360

NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO50

Primary Substation EDC4, Electrical Power Tie-in

361
362

GOVERNMENT AUTHORITIES
NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO150

363

NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO180

364

NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO190

365
366

South Campus People Mover Station, (PMs Rail Works)

28-Nov-12

19-Aug-13
05-Jan-14
13
South Campus People Mover Station, (PMs Rail Works)

25-Oct-11
29-Sep-12

100%

Municipality, Building Permit

100%

22-Sep-11

22-Sep-11

Municipality, Approved Drawings/Specs/Calculations

100%

14-Nov-11

14-Nov-11

NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO170

Civil Defence, Health & Fire Safety

0%

29-Aug-13

29-Aug-13

Civil Defence, Health & Fire Safety

NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO240

Facility License Office, Occupancy Permit (ASTAD/QF)

0%

29-Aug-13

29-Aug-13

Facility License Office, Occupancy Permit (ASTAD/QF)

367

NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO160

Public Works Authority, Dukhan Expressway Construction

0%

11-Jun-13

15-Oct-13

82

Public Works Authority, Dukhan Expressway Construction

368

NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO200

Roads Department, Tie-in Approvals

0%

11-Jun-13

15-Oct-13

82

Roads Department, Tie-in Approvals

369

NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO210

Drainage Department, Drainage Tie-in Approvals

0%

12-Jan-13

12-Dec-13

32

370

NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO220

Qtel, IT/Telecom Tie-in (by Others)

0%

27-Jun-13

15-Dec-13

30

371

NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO230

Kahramaa, Electrical Power & Water Tie-in (by Others)

0%

16-Jul-13

08-Jan-14

10
4

372
373

CONSTRUCTION/INSTALLATION

29-Aug-13

8
10

Primary Substation EDC4, Electrical Power Tie-in

22-Sep-11

08-Jan-14

Primary Infrastructure (Power/Water/Storm/Sewer), Utilities Tie-in

111
0

29-Aug-13
25-Sep-11

05-Jan-14

Central Plant CP7, CHW Pipes Tie-in (Unicorp)

0%

Public Works Authority, Transport of Excavated Materials

13-Jul-13

Landscaping Package, Main Irrigation Line Tie-in

605
0

22-Sep-11

15-Dec-11

607

297

27-Sep-11

03-Sep-13

28-Dec-11

31-Jan-13

15-Jan-14

605

297

27-Sep-11

02-Sep-13

28-Dec-11

31-Jan-13

15-Jan-14

374
375
376

M2-Const. Compl. of Demol., Diversion of Exstg Services, Temp. Serv Conn., Excav Phase (1) Axis 1-29
PHASE 1 - DEWATERING
NECP-Rebase_06Sep12-4.CO.1.5.9
PHASE 1 - DEWATERINGNECOSDE100
Dewatering Works

265
265
265

72.45%

73
73
73

27-Sep-11
27-Sep-11
27-Sep-11

31-Jul-12
31-Jul-12
31-Jul-12

28-Dec-11
28-Dec-11
28-Dec-11

31-Jan-13
31-Jan-13
31-Jan-13

25-Apr-13
25-Apr-13
25-Apr-13

14
14
14

377
378
379
380
381

M3-Const. Compl. of Phase (1) Axis 1-29 RC Substruc. & Superstr. incl. Blockwork & All Reqd Services
Upper Basement Floor
PHASE 1 - UPPER BASEMENT SLABS
Area A12
NECP-Rebase_06Sep12-4.CO.1.8.2.8.12
Area A12
NECOLBSS2176
RC Suspended Slab, Upper Basement Area A12

218
211
0
0
0

29-Dec-11
29-Dec-11

08-Sep-12
30-Aug-12

30-Mar-12
30-Mar-12
05-Sep-12
05-Sep-12
05-Sep-12

31-Jan-13
31-Jan-13
31-Jan-13
31-Jan-13
31-Jan-13

26-May-13
22-Apr-13
22-Apr-13
23-Feb-13
23-Feb-13

6
33
33
42
42

PHASE 1 WORKS

Drainage Department, Drainage Tie-in Approvals


Qtel, IT/Telecom Tie-in (by Others)
Kahramaa, Electrical Power & Water Tie-in (by Others)

Dewatering Works

0%

99
70
70
20
20

382

NECP-Rebase_06Sep12-4.CO.1.8.2.8.12
Area A12
NECOLBSS2186

Small power conduits

0%

18

12-Sep-12

31-Jan-13

21-Feb-13

42

Small power conduits

383

NECP-Rebase_06Sep12-4.CO.1.8.2.8.12
Area A12
NECOLBSS2196

Security system conduits

0%

18

12-Sep-12

31-Jan-13

21-Feb-13

42

Security system conduits

384

NECP-Rebase_06Sep12-4.CO.1.8.2.8.12
Area A12
NECOLBSS2206

Earthing conduits

0%

18

12-Sep-12

31-Jan-13

21-Feb-13

42

Earthing conduits

385

NECP-Rebase_06Sep12-4.CO.1.8.2.8.12
Area A12
NECOLBSS2216

Lighting conduits

0%

18

12-Sep-12

31-Jan-13

21-Feb-13

42

Lighting conduits

386

NECP-Rebase_06Sep12-4.CO.1.8.2.8.12
Area A12
NECOLBSS2226

Fire Alaram conduits

0%

18

12-Sep-12

31-Jan-13

21-Feb-13

42

Fire Alaram conduits

NECP-Rebase_06Sep12-4.CO.1.8.2.8.12
Area A12
NECOLBSS2236

Telephone conduits

12-Sep-12

Telephone conduits

387

RC Suspended Slab, Upper Basement Area A12

0%

18

31-Jan-13

21-Feb-13

42

388
389

Vehicular Ramp - Axis L-M/3-7 (At Raft Foundation 16)


NECP-Rebase_06Sep12-4.CO.1.8.2.8.1
Vehicular Ramp - Axis L-M/3-7
NECOLBSS3040
(At Raft Foundation
RC Ramp,
16)
Axis L-M/3-7 (at Raft Foundation 16)

0
0

0%

21
21

05-Mar-13
05-Mar-13

28-Mar-13
28-Mar-13

0
0

390
391

Vehicular Ramp - Axis A-B/3-7 (At Raft Foundation 17)


NECP-Rebase_06Sep12-4.CO.1.8.2.8.2
Vehicular Ramp - Axis A-B/3-7
NECOLBSS3050
(At Raft Foundation
RC 17)
Ramp, Axis A-B/3-7 (at Raft Foundation 17)

0
0

0%

21
21

30-Mar-13
30-Mar-13

22-Apr-13
22-Apr-13

33
33

131
Powerfloat Concrete Finishes, Lower Basement & Upper Basement Floors 131

92.37%

10
10

29-Dec-11
29-Dec-11

29-May-12
29-May-12

30-Mar-12
30-Mar-12

12-Feb-13
12-Feb-13

23-Feb-13
23-Feb-13

76
76

6
6
0

3
3
0

24-Apr-12
24-Apr-12

30-Apr-12
30-Apr-12

95%

17-Oct-12
17-Oct-12
17-Oct-12

31-Jan-13
31-Jan-13
31-Jan-13

03-Feb-13
03-Feb-13
31-Jan-13

37
37
40

RC Retaining Wall, Upper Basement Area 12

56.01%

24-Apr-12

30-Apr-12

19-Nov-12

31-Jan-13

03-Feb-13

37

RC Columns Upper Basement Area 12

0
0
0

07-Dec-12
07-Dec-12
07-Dec-12

31-Jan-13
31-Jan-13
31-Jan-13

16-Mar-13
05-Feb-13
05-Feb-13

42
71
63

392
393

PHASE 1 - POWERFLOAT FINISHES


NECP-Rebase_06Sep12-4.CO.1.8.2.10
PHASE 1 - POWERFLOAT
NECOBFW1200
FINISHES

394
395
396

PHASE 1 - UPPER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNS


Area 12
NECP-Rebase_06Sep12-4.CO.1.8.2.2.12
Area 12
NECOUBWC1185 RC Retaining Wall, Upper Basement Area 12

397
398
399
400

NECP-Rebase_06Sep12-4.CO.1.8.2.2.12
Area 12
NECOUBWC1190

RC Columns Upper Basement Area 12

PHASE 1 - GROUND FLOOR SLABS (incl. Protective Screed)


Area A12
NECP-Rebase_06Sep12-4.CO.1.8.2.1.12
Area A12
NECOUBSS2176
RC Suspended Slab, Ground Floor Area A12

RC Ramp, Axis L-M/3-7 (at Raft Foundation 16)


RC Ramp, Axis A-B/3-7 (at Raft Foundation 17)
Powerfloat Concrete Finishes, Lower Basement & Upper Basement Floors

50%

38
5
5

401

NECP-Rebase_06Sep12-4.CO.1.8.2.1.12
Area A12
NECOUBSS2186

Small power conduits

50%

12-Dec-12

31-Jan-13

02-Feb-13

74

Small power conduits

402

NECP-Rebase_06Sep12-4.CO.1.8.2.1.12
Area A12
NECOUBSS2196

Security system conduits

50%

12-Dec-12

31-Jan-13

02-Feb-13

74

Security system conduits

403

NECP-Rebase_06Sep12-4.CO.1.8.2.1.12
Area A12
NECOUBSS2206

Earthing conduits

50%

12-Dec-12

31-Jan-13

02-Feb-13

74

Earthing conduits

404

NECP-Rebase_06Sep12-4.CO.1.8.2.1.12
Area A12
NECOUBSS2216

Lighting conduits

50%

12-Dec-12

31-Jan-13

02-Feb-13

74

Lighting conduits

405

NECP-Rebase_06Sep12-4.CO.1.8.2.1.12
Area A12
NECOUBSS2226

Fire Alaram conduits

50%

12-Dec-12

31-Jan-13

02-Feb-13

74

Fire Alaram conduits

406

NECP-Rebase_06Sep12-4.CO.1.8.2.1.12
Area A12
NECOUBSS2236

Telephone conduits

50%

12-Dec-12

31-Jan-13

02-Feb-13

74

Telephone conduits

407
408

Area A13
NECP-Rebase_06Sep12-4.CO.1.8.2.1.13
Area A13
NECOUBSS2246

RC Suspended Slab, Ground Floor Area A13

0
0

0%

15
8

26-Feb-13
26-Feb-13

16-Mar-13
07-Mar-13

42
37

409

NECP-Rebase_06Sep12-4.CO.1.8.2.1.13
Area A13
NECOUBSS2256

Small power conduits

0%

02-Mar-13

06-Mar-13

50

Small power conduits

410

NECP-Rebase_06Sep12-4.CO.1.8.2.1.13
Area A13
NECOUBSS2266

Security system conduits

0%

02-Mar-13

06-Mar-13

50

Security system conduits

RC Suspended Slab, Ground Floor Area A12

RC Suspended Slab, Ground Floor Area A13

411

NECP-Rebase_06Sep12-4.CO.1.8.2.1.13
Area A13
NECOUBSS2276

Earthing conduits

0%

02-Mar-13

06-Mar-13

50

Earthing conduits

412

NECP-Rebase_06Sep12-4.CO.1.8.2.1.13
Area A13
NECOUBSS2286

Lighting conduits

0%

02-Mar-13

06-Mar-13

50

Lighting conduits

413

NECP-Rebase_06Sep12-4.CO.1.8.2.1.13
Area A13
NECOUBSS2296

Fire Alaram conduits

0%

02-Mar-13

06-Mar-13

50

Fire Alaram conduits

414

NECP-Rebase_06Sep12-4.CO.1.8.2.1.13
Area A13
NECOUBSS2306

Telephone conduits

0%

12-Mar-13

16-Mar-13

42

95
19

12.5%

54
17

13-May-12
09-Aug-12

30-Aug-12
30-Aug-12

07-Nov-12
14-Nov-12

31-Jan-13
16-Mar-13

03-Apr-13
03-Apr-13

3
3

415
416

PHASE 1 - BACKFILLING (incl. Waterproofing) TO RETAINING WALLS AROUND BUILDING


NECP-Rebase_06Sep12-4.CO.1.8.2.9
PHASE 1 - BACKFILLINGNECOEX1250
(incl. Waterproofing)Backfilling
TO RETAINING
AroundWALLS
Building,AROUND
Area 12 -BUILDING
Area 13 - Area 14

Telephone conduits
Backfilling Around Building, Area 12 - Area 13 - Area 14
Backfilling Around Building, Area 1 - Area 2

417

NECP-Rebase_06Sep12-4.CO.1.8.2.9
PHASE 1 - BACKFILLINGNECOEX1210
(incl. Waterproofing)Backfilling
TO RETAINING
AroundWALLS
Building,AROUND
Area 1 - Area
BUILDING
2

19

11.25%

17

13-May-12

03-Jun-12

07-Nov-12

31-Jan-13

19-Feb-13

418

NECP-Rebase_06Sep12-4.CO.1.8.2.9
PHASE 1 - BACKFILLINGNECOEX1220
(incl. Waterproofing)Backfilling
TO RETAINING
AroundWALLS
Building,AROUND
Area 3 - Area
BUILDING
4

19

3%

18

04-Jun-12

25-Jun-12

30-Jan-13

19-Feb-13

12-Mar-13

Backfilling Around Building, Area 3 - Area 4

19

3%

18

21-Nov-12

19-Feb-13

Backfilling Around Building, Area 5 - Area 6 - Area 8 - Area 9

19

419
420

NECP-Rebase_06Sep12-4.CO.1.8.2.9
PHASE 1 - BACKFILLINGNECOEX1230
(incl. Waterproofing)Backfilling
TO RETAINING
AroundWALLS
Building,AROUND
Area 5 - Area
BUILDING
6 - Area 8 - Area 9

26-Jun-12

17-Jul-12

0%

19

18-Jul-12

08-Aug-12

147
147
25
23

50%

99
99
8
6

21-Mar-12
21-Mar-12
09-Apr-12
09-Apr-12

08-Sep-12
08-Sep-12
07-May-12
05-May-12

Installation of Sanitary pipes

16

0%

19-Apr-12

07-May-12

Small power conduits

16

0%

19-Apr-12

07-May-12

Blockwork, Lower Basement, Area 5 - Area 6

25
23

15%

12
10

02-Jun-12
02-Jun-12

30-Jun-12
27-Jun-12

NECP-Rebase_06Sep12-4.CO.1.8.3.8.4
LB Area A5 - A6
NECOCW72

Installation of Sanitary pipes

16

0%

12-Jun-12

NECP-Rebase_06Sep12-4.CO.1.8.3.8.4
LB Area A5 - A6
NECOCW73

Small power conduits

16

0%

12-Jun-12

Blockwork, Lower Basement, Area 3 - Area 4

25
23

15%

12
10

06-May-12
06-May-12

03-Jun-12
31-May-12

Installation of Sanitary pipes

16

0%

16-May-12

03-Jun-12

NECP-Rebase_06Sep12-4.CO.1.8.2.9
PHASE 1 - BACKFILLINGNECOEX1240
(incl. Waterproofing)Backfilling
TO RETAINING
AroundWALLS
Building,AROUND
Area 8 - Area
BUILDING
9 - Area 10 - Area 11

421
422
423
424

Blockworks and Services


PHASE 1 - BLOCKWORK & SERVICES
LB Area A1 - A2
NECP-Rebase_06Sep12-4.CO.1.8.3.8.1
LB Area A1 - A2
NECOCW50

425

NECP-Rebase_06Sep12-4.CO.1.8.3.8.1
LB Area A1 - A2
NECOCW52

426

NECP-Rebase_06Sep12-4.CO.1.8.3.8.1
LB Area A1 - A2
NECOCW53

427
428

LB Area A5 - A6
NECP-Rebase_06Sep12-4.CO.1.8.3.8.4
LB Area A5 - A6
NECOCW70

429
430
431
432

LB Area A3 - A4
NECP-Rebase_06Sep12-4.CO.1.8.3.8.2
LB Area A3 - A4
NECOCW60

433

NECP-Rebase_06Sep12-4.CO.1.8.3.8.2
LB Area A3 - A4
NECOCW62

Blockwork, Lower Basement, Area 1 - Area 2

Feb

Signage and Wayfinding

07-Feb-13

2014
Jul

GRC

31-Jan-13

24-Dec-12

Jun

Black Granite Counter Top

24-Feb-13

119

605

PRE-CONSTRUCTION

Page 4 of 19/27-Feb-13 09:03

Execution Programme Level 3

12-Mar-13

12-Mar-13

03-Apr-13

31-Jan-13
31-Jan-13
31-Jan-13
31-Jan-13

26-May-13
26-May-13
09-Feb-13
06-Feb-13

6
6
46
46

03-Feb-13

09-Feb-13

46

Installation of Sanitary pipes

03-Feb-13

09-Feb-13

46

Small power conduits

31-Jan-13
31-Jan-13

14-Feb-13
12-Feb-13

91
64

30-Jun-12

07-Feb-13

14-Feb-13

78

30-Jun-12

07-Feb-13

14-Feb-13

91

31-Jan-13
31-Jan-13

14-Feb-13
12-Feb-13

91
78

07-Feb-13

14-Feb-13

78

29-Nov-12
29-Nov-12
06-Dec-12
06-Dec-12

02-Jan-13
02-Jan-13

27-Dec-12
27-Dec-12

Backfilling Around Building, Area 8 - Area 9 - Area 10 - Area 11

Blockwork, Lower Basement, Area 1 - Area 2

Blockwork, Lower Basement, Area 5 - Area 6


Installation of Sanitary pipes
Small power conduits
Blockwork, Lower Basement, Area 3 - Area 4
Installation of Sanitary pipes

Construction of North East Underground Carpark Contract No. XC10101100


#

WBS

WBS Name

Activity ID

BL Project
Start

BL Project
Finish

0%

16-May-12

03-Jun-12

Blockwork, Lower Basement, Area 7 - Area 8

24
22

40%

9
7

28-Jun-12
28-Jun-12

25-Jul-12
23-Jul-12

Installation of Sanitary pipes

16

0%

08-Jul-12

Small power conduits

16

0%

08-Jul-12

Blockwork, Lower Basement, Area 9 - Area 10

24
22

0%

14
12

NECP-Rebase_06Sep12-4.CO.1.8.3.8.8
LB Area A9 - A10
NECOCW92

Installation of Sanitary pipes

16

0%

NECP-Rebase_06Sep12-4.CO.1.8.3.8.8
LB Area A9 - A10
NECOCW93

Small power conduits

16

0%

Blockwork, Lower Basement, Area 11 - Area 12 - Area 13

0
0

NECP-Rebase_06Sep12-4.CO.1.8.3.8.10
LB Area A11 - A12 - A13 NECOCW233

Installation of Sanitary pipes

446

NECP-Rebase_06Sep12-4.CO.1.8.3.8.10
LB Area A11 - A12 - A13 NECOCW243

Small power conduits

447
448

UB Area A1 - A2
NECP-Rebase_06Sep12-4.CO.1.8.3.8.3
UB Area A1 - A2
NECOCW170

449
450

434

NECP-Rebase_06Sep12-4.CO.1.8.3.8.2
LB Area A3 - A4
NECOCW63

435
436

LB Area A7 - A8
NECP-Rebase_06Sep12-4.CO.1.8.3.8.6
LB Area A7 - A8
NECOCW80

437

NECP-Rebase_06Sep12-4.CO.1.8.3.8.6
LB Area A7 - A8
NECOCW82

438

NECP-Rebase_06Sep12-4.CO.1.8.3.8.6
LB Area A7 - A8
NECOCW83

439
440

LB Area A9 - A10
NECP-Rebase_06Sep12-4.CO.1.8.3.8.8
LB Area A9 - A10
NECOCW90

441
442
443
444

LB Area A11 - A12 - A13


NECP-Rebase_06Sep12-4.CO.1.8.3.8.10
LB Area A11 - A12 - A13 NECOCW223

445

Activity Name

BL Project
Duration

Early Start

Early Finish

Total
Float

07-Feb-13

14-Feb-13

91

31-Jan-13
31-Jan-13

11-Feb-13
09-Feb-13

94
69

25-Jul-12

04-Feb-13

11-Feb-13

94

Installation of Sanitary pipes

25-Jul-12

04-Feb-13

11-Feb-13

94

Small power conduits

24-Jul-12
24-Jul-12

20-Aug-12
18-Aug-12

09-Feb-13
09-Feb-13

25-Feb-13
23-Feb-13

82
69

02-Aug-12

20-Aug-12

18-Feb-13

25-Feb-13

69

Installation of Sanitary pipes

02-Aug-12

20-Aug-12

18-Feb-13

25-Feb-13

82

Small power conduits

0%

14
12

24-Mar-13
24-Mar-13

09-Apr-13
07-Apr-13

38
37

0%

02-Apr-13

09-Apr-13

37

Small power conduits

16

Activity % Remaining
Complete Duration

0%

Blockwork, Upper Basement, Area 1 - Area 2

25
23

20%

99
10

21-Mar-12
21-Mar-12

18-Apr-12
16-Apr-12

NECP-Rebase_06Sep12-4.CO.1.8.3.8.3
UB Area A1 - A2
NECOCW171

Installaton of Rainwater pipes

16

0%

01-Apr-12

NECP-Rebase_06Sep12-4.CO.1.8.3.8.3
UB Area A1 - A2
NECOCW172

Installation of Sanitary pipes

16

0%

01-Apr-12

451

NECP-Rebase_06Sep12-4.CO.1.8.3.8.3
UB Area A1 - A2
NECOCW173

Small power conduits

16

0%

01-Apr-12

452
453

Siemens PMS Control Room (Manager's Room) - Assumed CR Issuance Date: 31Mar13
0
NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1
Siemens PMS Control Room
NECOCW303
(Manager's Room)Await
- Assumed
CR for CR
Blockwork
Issuance
Re-configuration
Date: 31Mar13(Managers Room), Siemens Control 0Room

0%

48
0

Actual Start

Actual
Finish

29-Nov-12
29-Nov-12

2013
Jan

Feb

Mar

18-Apr-12

06-Feb-13

13-Feb-13

93

Installaton of Rainwater pipes

18-Apr-12

06-Feb-13

13-Feb-13

93

Installation of Sanitary pipes

18-Apr-12

06-Feb-13

13-Feb-13

90

Small power conduits

31-Mar-13

26-May-13
31-Mar-13

0
0

31-Mar-13

08-Apr-13

08-Apr-13

24-Apr-13

456

NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1
Siemens PMS Control Room
NECOCW333
(Manager's Room)Blockwork
- Assumed
Re-configuration
CR Issuance Date:
(Managers
31Mar13
Room), Siemens Control Room

0%

21

24-Apr-13

19-May-13

457

NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1
Siemens PMS Control Room
NECOCW343
(Manager's Room)Small
- Assumed
power conduits
CR Issuance
(Managers
Date: 31Mar13
Room), Siemens Control Room

0%

19-May-13

26-May-13

Blockwork, Upper Basement, Area 3 - Area 4

25
23

0%

14
12

17-Apr-12
17-Apr-12

15-May-12
13-May-12

11-Feb-13
11-Feb-13

27-Feb-13
25-Feb-13

81
37

Submit Shop Dwgs, Blockwork Re-configuration (Managers Room), Siemens Control Room
Approve Shop Dwgs, Blockwork Re-configuration (Managers Room), Siemens Control Room
Blockwork Re-configuration (Managers Room), Siemens Control Room
Small power conduits (Managers Room), Siemens Control Room

460

NECP-Rebase_06Sep12-4.CO.1.8.3.8.5
UB Area A3 - A4
NECOCW181

Installaton of Rainwater pipes

16

0%

28-Apr-12

15-May-12

20-Feb-13

27-Feb-13

81

Installaton of Rainwater pipes

461

NECP-Rebase_06Sep12-4.CO.1.8.3.8.5
UB Area A3 - A4
NECOCW182

Installation of Sanitary pipes

16

0%

28-Apr-12

15-May-12

20-Feb-13

27-Feb-13

81

Installation of Sanitary pipes

462

NECP-Rebase_06Sep12-4.CO.1.8.3.8.5
UB Area A3 - A4
NECOCW183

Small power conduits

16

0%

28-Apr-12

15-May-12

20-Feb-13

27-Feb-13

73

Small power conduits

463
464

UB Area A5 - A6
NECP-Rebase_06Sep12-4.CO.1.8.3.8.7
UB Area A5 - A6
NECOCW190

Blockwork, Upper Basement, Area 5 - Area 6

25
23

0%

14
12

14-May-12
14-May-12

11-Jun-12
09-Jun-12

25-Feb-13
25-Feb-13

13-Mar-13
11-Mar-13

67
37

465

NECP-Rebase_06Sep12-4.CO.1.8.3.8.7
UB Area A5 - A6
NECOCW191

Installaton of Rainwater pipes

16

0%

24-May-12

11-Jun-12

06-Mar-13

13-Mar-13

67

Installaton of Rainwater pipes

466

NECP-Rebase_06Sep12-4.CO.1.8.3.8.7
UB Area A5 - A6
NECOCW192

Installation of Sanitary pipes

16

0%

24-May-12

11-Jun-12

06-Mar-13

13-Mar-13

67

Installation of Sanitary pipes

467

NECP-Rebase_06Sep12-4.CO.1.8.3.8.7
UB Area A5 - A6
NECOCW193

Small power conduits

16

0%

24-May-12

11-Jun-12

06-Mar-13

13-Mar-13

67

Small power conduits

468
469

UB Area A8 - A9
NECP-Rebase_06Sep12-4.CO.1.8.3.8.9
UB Area A8 - A9
NECOCW200

Blockwork, Upper Basement, Area 8 - Area 9

24
22

0%

14
12

10-Jun-12
10-Jun-12

07-Jul-12
04-Jul-12

11-Mar-13
11-Mar-13

27-Mar-13
25-Mar-13

55
37

470

NECP-Rebase_06Sep12-4.CO.1.8.3.8.9
UB Area A8 - A9
NECOCW202

Installation of Sanitary pipes

16

0%

19-Jun-12

07-Jul-12

20-Mar-13

27-Mar-13

55

Installation of Sanitary pipes

471

NECP-Rebase_06Sep12-4.CO.1.8.3.8.9
UB Area A8 - A9
NECOCW203

Small power conduits

16

0%

19-Jun-12

07-Jul-12

20-Mar-13

27-Mar-13

55

Small power conduits

472
473

UB Area A10 - A11


NECP-Rebase_06Sep12-4.CO.1.8.3.8.11
UB Area A10 - A11
NECOCW210

Blockwork, Upper Basement, Area 10 - Area 11

56
22

0%

14
12

05-Jul-12
05-Jul-12

08-Sep-12
30-Jul-12

25-Mar-13
25-Mar-13

10-Apr-13
08-Apr-13

37
37

474

NECP-Rebase_06Sep12-4.CO.1.8.3.8.11
UB Area A10 - A11
NECOCW212

Installation of Sanitary pipes

16

0%

21-Aug-12

08-Sep-12

03-Apr-13

10-Apr-13

37

Installation of Sanitary pipes

475

NECP-Rebase_06Sep12-4.CO.1.8.3.8.11
UB Area A10 - A11
NECOCW213

Small power conduits

14

21-Aug-12

05-Sep-12

Small power conduits

476
477

UB Area A12 - A13


NECP-Rebase_06Sep12-4.CO.1.8.3.8.13
UB Area A12 - A13
NECOCW253

478
479

Blockwork, Upper Basement, Area 8 - Area 9

Blockwork, Upper Basement, Area 10 - Area 11

03-Apr-13

10-Apr-13

37

Blockwork, Upper Basement, Area 12 - Area 13

0%

14
12

01-Apr-13
01-Apr-13

17-Apr-13
15-Apr-13

37
37

NECP-Rebase_06Sep12-4.CO.1.8.3.8.13
UB Area A12 - A13
NECOCW263

Installation of Sanitary pipes

0%

10-Apr-13

17-Apr-13

37

Installation of Sanitary pipes

NECP-Rebase_06Sep12-4.CO.1.8.3.8.13
UB Area A12 - A13
NECOCW273

Small power conduits

0%

10-Apr-13

17-Apr-13

37

Small power conduits

0
0

100%

0
0

25-Nov-12
25-Nov-12

28-Jan-13
09-Dec-12

Approve Revised Shop Dwgs, Upper Basement Slab Area 12

NECP-Rebase_06Sep12-4.CO.1.10
M4a-Receipt of Revised IFC
NECOLBSS3010
Drawgs for Substation
Approve
in UB
Revised
Slab Area
Shop
12Dwgs, Upper Basement Slab Area 12

100%

10-Dec-12

27-Dec-12

NECP-Rebase_06Sep12-4.CO.1.10
M4a-Receipt of Revised IFC
NECOLBSS3020
Drawgs for Substation
Re-Submit
in UB Slab
Revised
AreaShop
12 Dwgs, Upper Basement Slab Area 12

100%

28-Dec-12

13-Jan-13

484

NECP-Rebase_06Sep12-4.CO.1.10
M4a-Receipt of Revised IFC
NECOLBSS3030
Drawgs for Substation
Approve
in UB
Re-Submitted
Slab Area 12Revised Shop Dwgs, Upper Basement Slab Area 12

100%

14-Jan-13

28-Jan-13

0
0
0
0

0%

103
103
21
7

31-Jan-13
31-Jan-13
31-Jan-13
31-Jan-13

30-May-13
30-May-13
24-Feb-13
07-Feb-13

0
0
0
0

0%

14

09-Feb-13

24-Feb-13

0%

45
45

25-Feb-13
25-Feb-13

17-Apr-13
17-Apr-13

0
0

09-Apr-13
09-Apr-13

30-May-13
30-May-13

0
0

NECP-Rebase_06Sep12-4.CO.1.1.1.15
External Staircase Shop Dwgs
NEENSDS1740
Submittals & Approvals
External RC Staircase Layout & Details Approval

490
491

External Staicase - Axis M-H/1


NECP-Rebase_06Sep12-4.CO.1.1.1.1
External Staicase - Axis M-H/1
NECOLBSS3060

492
493

External Staicase - Axis A-E/1


NECP-Rebase_06Sep12-4.CO.1.1.1.14
External Staicase - Axis A-E/1
NECOLBSS3070

External RC Staircase, Axis M-H/1

0
0

External RC Staircase, Axis A-E/1

0
0

0%

0
0

08-Sep-12
08-Sep-12

29-Oct-12
22-Sep-12

Re-Submit Revised Shop Dwgs, Upper Basement Slab Area 12


Approve Re-Submitted Revised Shop Dwgs, Upper Basement Slab Area 12

External RC Staircase Layout & Details


External RC Staircase Layout & Details Approval
External RC Staircase, Axis M-H/1
External RC Staircase, Axis A-E/1

100%

0
0

496

NECP-Rebase_06Sep12-4.CO.1.9
M5a-Official Receipt of Approval
NECOUBSS3010
for Embedded Approve
Items & Fenestrations
Revised Shop for
Dwgs,
GF Slab
Ground
Areas
Floor
1 Slab Area 1

100%

23-Sep-12

06-Oct-12

497

NECP-Rebase_06Sep12-4.CO.1.9
M5a-Official Receipt of Approval
NECOUBSS3020
for Embedded Re-Submit
Items & Fenestrations
Revised Shop
for Dwgs,
GF Slab
Ground
Areas Floor
1
Slab Area 1

100%

07-Oct-12

14-Oct-12

498

NECP-Rebase_06Sep12-4.CO.1.9
M5a-Official Receipt of Approval
NECOUBSS3030
for Embedded Approve
Items & Fenestrations
Re-Submitted for
Revised
GF Slab
Shop
Areas
Dwgs,
1 Ground Floor Slab Area 1

100%

Re-Submitted Revised Shop Dwgs, Ground Floor Slab Area 1


15-Oct-12 Approve
29-Oct-12

0
0

13-Oct-12 08-Dec-12
Revised Shop Dwgs, Ground Floor Slab Area 2
13-Oct-12 Submit
28-Oct-12

499
500

M5a-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 1
NECP-Rebase_06Sep12-4.CO.1.9
M5a-Official Receipt of Approval
NECOUBSS3000
for Embedded Submit
Items &Revised
Fenestrations
Shop Dwgs,
for GFGround
Slab Areas
Floor1 Slab Area 1

45
45

Blockwork, Upper Basement, Area 12 - Area 13

Submit Revised Shop Dwgs, Upper Basement Slab Area 12

483

494
495

Blockwork, Upper Basement, Area 5 - Area 6

0%

482

489

Blockwork, Upper Basement, Area 3 - Area 4

0
0

M4b-Const. Compl. of Phase (1) West Elevation Facade Axis A-M, Bkfl & All Necessary External Works
West Facade Elevation
External Staircase Shop Dwgs Submittals & Approvals
NECP-Rebase_06Sep12-4.CO.1.1.1.15
External Staircase Shop Dwgs
NEENSDS1730
Submittals & Approvals
External RC Staircase Layout & Details

100%

0
0

501

NECP-Rebase_06Sep12-4.CO.1.12
M5b-Official Receipt of Approval
NECOUBSS3050
for Embedded Approve
Items & Fenestrations
Revised Shop for
Dwgs,
GF Slab
Ground
Areas
Floor
2 Slab Area 2

100%

29-Oct-12

502

NECP-Rebase_06Sep12-4.CO.1.12
M5b-Official Receipt of Approval
NECOUBSS3060
for Embedded Re-Submit
Items & Fenestrations
Revised Shop
for Dwgs,
GF Slab
Ground
Areas Floor
2
Slab Area 2

100%

14-Nov-12

21-Nov-12

503

NECP-Rebase_06Sep12-4.CO.1.12
M5b-Official Receipt of Approval
NECOUBSS3070
for Embedded Approve
Items & Fenestrations
Re-Submitted for
Revised
GF Slab
Shop
Areas
Dwgs,
2 Ground Floor Slab Area 2

100%

22-Nov-12

08-Dec-12

100%

35
0

504
505

M5b-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 2
NECP-Rebase_06Sep12-4.CO.1.12
M5b-Official Receipt of Approval
NECOUBSS3040
for Embedded Submit
Items &Revised
Fenestrations
Shop Dwgs,
for GFGround
Slab Areas
Floor2 Slab Area 2

M5c.1-Complete 90-Day Suspension & Resume PMS Steel Structure Fabrication


127
NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS1331
& ResumeSuspend:
PMS Steel
Manufacture
Structure Fabrication
& Deliver Structural Steel (for 90 Days from 03Sep12) 0

21-Feb-12

17-Jul-12

13-Nov-12 Approve Revised Shop Dwgs, Ground Floor Slab Area 2

03-Sep-12
03-Sep-12

02-Dec-12

NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS1332
& ResumeSubmit
PMS Steel
New Structure
Shop Drawings,
Fabrication
PMS Structural Steel Works

100%

03-Dec-12

16-Dec-12

507

NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS1333
& ResumeApprove
PMS Steel
NewStructure
Shop Drawings,
Fabrication
PMS Structural Steel Works

100%

17-Dec-12

23-Dec-12

508

NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS1334
& ResumeRe-submit
PMS SteelNew
Structure
Shop Drawings,
FabricationPMS Structural Steel Works

100%

24-Dec-12

30-Dec-12

509

NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS1335
& ResumeApprove
PMS Steel
Re-submitted
Structure Fabrication
New Shop Drawings, PMS Structural Steel Works

100%

31-Dec-12

06-Jan-13

510

NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS1336
& ResumeResume:
PMS Steel
Manufacture
Structure Fabrication
& Deliver Structural Steel (Frijns)

43.55%

35

511

NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS2370
& ResumeManufacture
PMS Steel Structure
& Deliver Fabrication
Aluminum Chaotic Facade (Alumco)

120

0%

30

29-Feb-12

17-Jul-12

NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS2380
& ResumeManufacture
PMS Steel Structure
& Deliver Fabrication
Glazing (Curtain Wall, Sliding Doors, Edge Glass, Rooflights)
90
(Alumco)
0%

30

29-Feb-12

12-Jun-12

NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS2390
& ResumeManufacture
PMS Steel Structure
& Deliver Fabrication
Aluminum/Steel Doors (by S/C), Louver Screens (Alumco)
90

30

21-Feb-12

04-Jun-12

513
514
515

0%

M5c.2-Suspend Aluminum Painting from Grey to White


0
NECP-Rebase_06Sep12-4.CO.1.13
M5c.2-Suspend AluminumNECOCW283
Painting from Grey toASTAD
White Hold Order: 02Jan13 (Suspend Aluminum Painting of Structures from Grey
0
to 100%
White)

07-Jan-13

21
0

Re-Submit Revised Shop Dwgs, Ground Floor Slab Area 2


Approve Re-Submitted Revised Shop Dwgs, Ground Floor Slab Area 2
28-Mar-13

506

512

02-Jan-13
02-Jan-13

07-May-13
9
Suspend: Manufacture & Deliver Structural Steel (for 90 Days from 03Sep12)
Submit New Shop Drawings, PMS Structural Steel Works
Approve New Shop Drawings, PMS Structural Steel Works
Re-submit New Shop Drawings, PMS Structural Steel Works
Approve Re-submitted New Shop Drawings, PMS Structural Steel Works
07-May-13

28-Mar-13

01-May-13

14

Manufacture & Deliver Aluminum Chaotic Facade (Alumco)

28-Mar-13

01-May-13

14

Manufacture & Deliver Glazing (Curtain Wall, Sliding Doors, Edge Glass, Rooflights) (Alumco)

28-Mar-13

01-May-13

03-Mar-13

27-Mar-13

NECP-Rebase_06Sep12-4.CO.1.13
M5c.2-Suspend AluminumNECOCW293
Painting from Grey toASTAD
White Release Order: 03Mar13 (Assumed Decision Date of Aluminum Painting
0 of Structures
0% from Grey
0 to White)

03-Mar-13

NECP-Rebase_06Sep12-4.CO.1.13
M5c.2-Suspend AluminumNEPRMTS2730
Painting from Grey toSubmit
White New Color, PMS Structural Steel Works

0%

04-Mar-13

11-Mar-13

518

NECP-Rebase_06Sep12-4.CO.1.13
M5c.2-Suspend AluminumNEPRMTS2740
Painting from Grey toApprove
White New Color, PMS Structural Steel Works

0%

14

12-Mar-13

27-Mar-13

22-Mar-12
22-Mar-12

28-Nov-12
28-Nov-12
22-Mar-12

23-Dec-12
23-Dec-12

28-Mar-13
28-Mar-13

28-Aug-13
28-Aug-13

28-Mar-12

16-May-12

17-Jan-13

100%

131
131
0

43

44%

24

0%

14

Roofing & Insulation

60

0%

45

24-May-12

01-Aug-12

Walls, Floor and Plaster Finish

14

0%

14

17-May-12

02-Jun-12

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOMEP250

Hydraulic Pipes, HVAC Works, Plumbing works

33

0%

33

03-Jun-12

527

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW370

Aluminum Louvers, Aluminum Panels, Cladding, Handrails & Metal works (Alumco)
40

0%

40

11-Jun-12

528

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW430

Ceiling

45

0%

67

05-Sep-12

529

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW380

Glazing (Alumco)

30

0%

30

09-Jul-12

12-Aug-12

530

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW390

Screeds, Ramps

29

0%

29

17-Jul-12

531

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW410

Chaotic Pattern Facade - PMS (Alumco)

55

0%

30

532

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW400

Tiling

50

0%

30

533

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOCW160

Infrastructure - Roadways Interface with Rail Lines (NA?)

30

0%

30

534

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOMEP260

Electrical Works

45

0%

535

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOMEP270

Photovoltaic installations

50

536

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOMEP280

Fall Protection - Cable System

12

537

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW420

Joinery

11

538

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW440

Access Walkways

15

539

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOMEP290

EM Equipment (AHUs), Security Installation, Telephone Installation

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW450

522

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOCW150

Steel Structure (Frijns)

523

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW345

Blockworks, Public Services Area

524

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW360

525

NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW350

526

540

23-Dec-12

Submit New Color, PMS Structural Steel Works


Approve New Color, PMS Structural Steel Works

Steel Structure (Frijns)

28-Mar-13

25-Apr-13

27-Apr-13

12-May-13

04-May-13

24-Jun-13

39

13-May-13

28-May-13

10-Jul-12

13-May-13

19-Jun-13

26-Jul-12

29-May-13

14-Jul-13

27-Oct-12

01-Jun-13

17-Aug-13

15-Jun-13

18-Jul-13

19-Aug-12

23-Jun-13

25-Jul-13

10

13-Aug-12

15-Oct-12

23-Jun-13

27-Jul-13

02-Aug-12

29-Sep-12

26-Jun-13

30-Jul-13

10

Tiling

16-Aug-12

19-Sep-12

26-Jun-13

30-Jul-13

10

Infrastructure - Roadways Interface with Rail Lines (NA?)

30

28-Aug-12

18-Oct-12

26-Jun-13

30-Jul-13

Electrical Works

0%

15

25-Sep-12

21-Nov-12

14-Jul-13

30-Jul-13

Photovoltaic installations

0%

12

20-Aug-12

02-Sep-12

27-Jul-13

08-Aug-13

12

0%

11

20-Aug-12

01-Sep-12

27-Jul-13

07-Aug-13

13

0%

15

20-Sep-12

07-Oct-12

31-Jul-13

17-Aug-13

10

30

0%

15

20-Oct-12

22-Nov-12

10-Aug-13

26-Aug-13

Painting, Finishing Works

0%

24-Nov-12

28-Nov-12

24-Aug-13

28-Aug-13

Metal Frame & Chaotic Screens, Axis 1 (Alumco)

0
0

0%

49
21

30-Jun-13
30-Jun-13

25-Aug-13
23-Jul-13

124
124

Architectural Works at Axis A-M/1


NECP-Rebase_06Sep12-4.CO.1.14
Architectural Works at AxisNECOCW31
A-M/1

543

NECP-Rebase_06Sep12-4.CO.1.14
Architectural Works at AxisNECOCW32
A-M/1

Steel Railings and Glazed Balustrades, Axis 1 Ground Level (Alumco)

0%

14

24-Jul-13

08-Aug-13

124

544

NECP-Rebase_06Sep12-4.CO.1.14
Architectural Works at AxisNECOCW33
A-M/1

Glazed Curtain Wall Panels, Axis 1 (Alumco)

0%

14

10-Aug-13

25-Aug-13

124

08-May-13

08-Aug-13

78

Roofing & Facade

ASTAD Release Order: 03Mar13 (Assumed Decision Date of Aluminum Painting of Structures from Grey to White)

0
0
Completion of All Phase 1 Concrete Works - incl. Grd Floor Slabs Area 1 & 2

541
542

545

Manufacture & Deliver Aluminum/Steel Doors (by S/C), Louver Screens (Alumco)
ASTAD Hold Order: 02Jan13 (Suspend Aluminum Painting of Structures from Grey to White)

517

M5d-Const. Compl. of People Mover Station (Fit Out, MEP, Facade & All Necessary External Works)
215
People Mover Station (PMS)
215
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOCW40
Completion of All Phase 1 Concrete Works - incl. Grd Floor Slabs Area 1 & 2 0

Resume: Manufacture & Deliver Structural Steel (Frijns)

28-Mar-13

516

519
520
521

80

80

12-Sep-12

15-Dec-12

Nov

Await CR for Blockwork Re-configuration (Managers Room), Siemens Control Room

UB Area A3 - A4
NECP-Rebase_06Sep12-4.CO.1.8.3.8.5
UB Area A3 - A4
NECOCW180

485
486
487
488

Oct

Blockwork, Upper Basement, Area 1 - Area 2

458
459

M4a-Receipt of Revised IFC Drawgs for Substation in UB Slab Area 12


NECP-Rebase_06Sep12-4.CO.1.10
M4a-Receipt of Revised IFC
NECOLBSS3000
Drawgs for Substation
Submit
in UB
Revised
Slab Area
Shop12
Dwgs, Upper Basement Slab Area 12

Sep

Small power conduits

6
37

Aug

Installation of Sanitary pipes

38

14

2014
Jul

Blockwork, Lower Basement, Area 11 - Area 12 - Area 13

09-Apr-13

NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1
Siemens PMS Control Room
NECOCW323
(Manager's Room)Approve
- Assumed
ShopCR
Dwgs,
Issuance
Blockwork
Date: Re-configuration
31Mar13
(Managers Room), Siemens0Control Room
0%

Jun

Blockwork, Lower Basement, Area 9 - Area 10

26-May-13
11-Feb-13

NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1
Siemens PMS Control Room
NECOCW313
(Manager's Room)Submit
- Assumed
Shop CR
Dwgs,
Issuance
Blockwork
Date:
Re-configuration
31Mar13
(Managers Room), Siemens Control
0
Room
0%

May

Blockwork, Lower Basement, Area 7 - Area 8

02-Apr-13

455

Apr

Small power conduits

31-Jan-13
31-Jan-13

06-Dec-12
06-Dec-12

454

480
481

Page 5 of 19/27-Feb-13 09:03

Execution Programme Level 3

Blockworks, Public Services Area


Roofing & Insulation
Walls, Floor and Plaster Finish
Hydraulic Pipes, HVAC Works, Plumbing works
Aluminum Louvers, Aluminum Panels, Cladding, Handrails & Metal works (Alumco)
Ceiling
Glazing (Alumco)
Screeds, Ramps
Chaotic Pattern Facade - PMS (Alumco)

Fall Protection - Cable System


Joinery
Access Walkways
EM Equipment (AHUs), Security Installation, Telephone Installation
Painting, Finishing Works
Metal Frame & Chaotic Screens, Axis 1 (Alumco)
Steel Railings and Glazed Balustrades, Axis 1 Ground Level (Alumco)
Glazed Curtain Wall Panels, Axis 1 (Alumco)

Dec

Jan

Feb

Construction of North East Underground Carpark Contract No. XC10101100


#

Activity ID

Activity Name

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

546

NECP-Rebase_06Sep12-4.CO.1.P11
Roofing & Facade

NECOBFW30

Roofing Insulation Works, Area A9-A10

20

0%

20

12-Sep-12

06-Oct-12

08-May-13

30-May-13

78

547

NECP-Rebase_06Sep12-4.CO.1.P11
Roofing & Facade

NECOBFW60

Roofing Membrane and Ballast Gravel, Area A9-A10

20

0%

20

06-Oct-12

29-Oct-12

01-Jun-13

23-Jun-13

78

NECP-Rebase_06Sep12-4.CO.1.P11
Roofing & Facade

NECOBFW40

Stainless Steel Capping & Flashing, Area A9-A10

20

0%

NECP-Rebase_06Sep12-4.CO.1.P11
Roofing & Facade

NECOBFW50

Stainless Steel Soffit Panels, Area A9-A10

20

548
549
550
551
552

WBS

WBS Name

BL Project
Duration

Steel Frame for Walway Canopies & Intrepretive Centre


NECP-Rebase_06Sep12-4.CO.1.P1
Steel Frame for Walway Canopies
NECOCW100
& IntrepretiveSteel
Centre
frame for Walkway Canopies (Frijns)
NECP-Rebase_06Sep12-4.CO.1.P1
Steel Frame for Walway Canopies
NECOCW110
& IntrepretiveSteel
Centre
frame for Interpretive Center (Alumco)

Page 6 of 19/27-Feb-13 09:03

Execution Programme Level 3


Activity % Remaining
Complete Duration

Actual Start

Actual
Finish

20

29-Oct-12

21-Nov-12

24-Jun-13

16-Jul-13

78

0%

20

21-Nov-12

15-Dec-12

17-Jul-13

08-Aug-13

78

70
35

0%

70
35

02-Aug-12
02-Aug-12

23-Oct-12
12-Sep-12

28-Mar-13
28-Mar-13

17-Jun-13
07-May-13

79
78

2013
Jan

Feb

Mar

Apr

May

2014

Jun

Jul

Aug

Sep

Stainless Steel Soffit Panels, Area A9-A10


Steel frame for Walkway Canopies (Frijns)
Steel frame for Interpretive Center (Alumco)

35

0%

35

12-Sep-12

23-Oct-12

08-May-13

17-Jun-13

79

NECOBFW300

Canopies A, Area A5-A6

108
14

0%

94
14

03-Apr-13
03-Apr-13

06-Aug-13
18-Apr-13

18-Jun-13
18-Jun-13

05-Oct-13
03-Jul-13

88
79

555

NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre

NECOBFW310

Canopies B, Area A5-A6

14

0%

14

20-Apr-13

05-May-13

04-Jul-13

20-Jul-13

79

Canopies B, Area A5-A6

556

NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre

NECOBFW320

Canopies A, Area A7-A8

14

0%

14

06-May-13

21-May-13

04-Jul-13

20-Jul-13

79

Canopies A, Area A7-A8

557

NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre

NECOBFW330

Canopies B, Area A7-A8

14

0%

14

22-May-13

06-Jun-13

21-Jul-13

05-Aug-13

79

558

NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre

NECOBFW260

Screed & Tiles, Area A5-A6, Area A7-A8

18

0%

18

08-Jun-13

27-Jun-13

06-Aug-13

26-Aug-13

79

559

NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre

NECOBFW240

Curtain Wall, Area A5-A6, Area A7-A8 (Alumco)

14

0%

14

29-Jun-13

14-Jul-13

27-Aug-13

11-Sep-13

79

560

NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre

NECOBFW270

Cladding & Insulation, Area A5-A6, Area A7-A8 (Alumco)

20

0%

20

29-Jun-13

21-Jul-13

27-Aug-13

18-Sep-13

79

561

NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre

NECOBFW280

Doors

10

0%

10

22-Jul-13

01-Aug-13

19-Sep-13

30-Sep-13

88

562

NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre

NECOBFW290

Removable Panels

14

0%

14

22-Jul-13

06-Aug-13

19-Sep-13

05-Oct-13

88

16-May-12
17-Jun-12
25-Jun-12
25-Jun-12

21-May-13
21-May-13
22-Sep-12
03-Jul-12

31-Jan-13
31-Jan-13
02-May-13
02-May-13

30-Nov-13
26-Nov-13
23-Jul-13
11-May-13

40
43
32
32

318
291
77
8

0%

258
255
70
7

567

NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1515
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A2

0%

04-Jul-12

12-Jul-12

11-May-13

19-May-13

32

568

NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1525
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A3

0%

14-Jul-12

22-Jul-12

19-May-13

27-May-13

32

569

NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1535
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A4

0%

23-Jul-12

31-Jul-12

27-May-13

04-Jun-13

32

570

NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1545
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A5

0%

01-Aug-12

09-Aug-12

04-Jun-13

12-Jun-13

32

571

NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1555
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A6

0%

11-Aug-12

19-Aug-12

12-Jun-13

20-Jun-13

32

572

NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1565
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A7

0%

20-Aug-12

28-Aug-12

20-Jun-13

29-Jun-13

32

573

NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1575
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A8

0%

29-Aug-12

05-Sep-12

29-Jun-13

07-Jul-13

32

574

NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1585
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A9

0%

06-Sep-12

13-Sep-12

07-Jul-13

15-Jul-13

32

575

NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1595
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A10

0%

15-Sep-12

22-Sep-12

15-Jul-13

23-Jul-13

32

143
79
7

17-Jun-12
17-Jun-12
17-Jun-12

29-Nov-12
16-Sep-12
24-Jun-12

25-Apr-13
25-Apr-13
25-Apr-13

29-Aug-13
04-Jul-13
02-May-13

35
42
32

576
577
578

PHASE 1 LOWER BASEMENT - SANITARY & FIRE FIGHTING PIPES


FIRE FIGHTING PIPES
NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1300
Installation of Firefighting Pipes - Area A1

29-Dec-12
29-Dec-12

0%

108
60
6

579

NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1310

Installation of Firefighting Pipes - Area A2

0%

25-Jun-12

02-Jul-12

02-May-13

09-May-13

42

580

NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1320

Installation of Firefighting Pipes - Area A3

0%

03-Jul-12

10-Jul-12

09-May-13

16-May-13

42

581

NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1330

Installation of Firefighting Pipes -Area A4

0%

11-Jul-12

18-Jul-12

16-May-13

23-May-13

42

582

NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1340

Installation of Firefighting Pipes - Area A5

0%

19-Jul-12

26-Jul-12

23-May-13

30-May-13

42

583

NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1350

Installation of Firefighting Pipes - Area A6

0%

30-Jul-12

06-Aug-12

30-May-13

06-Jun-13

42

584

NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1360

Installation of Firefighting Pipes - Area A7

0%

09-Aug-12

16-Aug-12

06-Jun-13

13-Jun-13

42

585

NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1370

Installation of Firefighting Pipes - Area A8

0%

20-Aug-12

26-Aug-12

13-Jun-13

20-Jun-13

42

586

NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1380

Installation of Firefighting Pipes - Area A9

0%

30-Aug-12

05-Sep-12

20-Jun-13

27-Jun-13

42

587

NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1390

Installation of Firefighting Pipes - Area A10

0%

10-Sep-12

16-Sep-12

27-Jun-13

04-Jul-13

42

588
589

SANITARY PIPES
NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1301

Installation of Sanitary Pipes - Area A1

79
7

0%

60
6

17-Jun-12
17-Jun-12

16-Sep-12
24-Jun-12

25-Apr-13
25-Apr-13

04-Jul-13
02-May-13

33
32

590

NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1311

Installation of Sanitary Pipes - Area A2

0%

25-Jun-12

02-Jul-12

02-May-13

09-May-13

33

591

NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1321

Installation of Sanitary Pipes - Area A3

0%

03-Jul-12

10-Jul-12

09-May-13

16-May-13

33

592

NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1331

Installation of Sanitary Pipes -Area A4

0%

11-Jul-12

18-Jul-12

16-May-13

23-May-13

33

593

NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1341

Installation of Sanitary Pipes - Area A5

0%

19-Jul-12

26-Jul-12

23-May-13

30-May-13

33

594

NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1351

Installation of Sanitary Pipes - Area A6

0%

30-Jul-12

06-Aug-12

30-May-13

06-Jun-13

33

595

NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1361

Installation of Sanitary Pipes - Area A7

0%

09-Aug-12

16-Aug-12

06-Jun-13

13-Jun-13

33

596

NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1371

Installation of Sanitary Pipes - Area A8

0%

20-Aug-12

26-Aug-12

13-Jun-13

20-Jun-13

33

597

NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1381

Installation of Sanitary Pipes - Area A9

0%

30-Aug-12

05-Sep-12

20-Jun-13

27-Jun-13

33

598

NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1391

Installation of Sanitary Pipes - Area A10

599
600

WATER SUPPLY
NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6030

601
602

Canopies A, Area A5-A6

Canopies B, Area A7-A8


Screed & Tiles, Area A5-A6, Area A7-A8
Curtain Wall, Area A5-A6, Area A7-A8 (Alumco)
Cladding & Insulation, Area A5-A6, Area A7-A8 (Alumco)
Doors
Removable Panels

Black Steel Pipes, CHW, Area A1


Black Steel Pipes, CHW, Area A2
Black Steel Pipes, CHW, Area A3
Black Steel Pipes, CHW, Area A4
Black Steel Pipes, CHW, Area A5
Black Steel Pipes, CHW, Area A6
Black Steel Pipes, CHW, Area A7
Black Steel Pipes, CHW, Area A8
Black Steel Pipes, CHW, Area A9
Black Steel Pipes, CHW, Area A10

Installation of Firefighting Pipes - Area A1


Installation of Firefighting Pipes - Area A2
Installation of Firefighting Pipes - Area A3
Installation of Firefighting Pipes -Area A4
Installation of Firefighting Pipes - Area A5
Installation of Firefighting Pipes - Area A6
Installation of Firefighting Pipes - Area A7
Installation of Firefighting Pipes - Area A8
Installation of Firefighting Pipes - Area A9
Installation of Firefighting Pipes - Area A10
Installation of Sanitary Pipes - Area A1
Installation of Sanitary Pipes - Area A2
Installation of Sanitary Pipes - Area A3
Installation of Sanitary Pipes -Area A4
Installation of Sanitary Pipes - Area A5
Installation of Sanitary Pipes - Area A6
Installation of Sanitary Pipes - Area A7
Installation of Sanitary Pipes - Area A8
Installation of Sanitary Pipes - Area A9

0%

10-Sep-12

16-Sep-12

27-Jun-13

04-Jul-13

33

Installation of Sanitary Pipes - Area A10

Installation of Water supply Pipes - Area A1

62
7

0%

54
6

19-Sep-12
19-Sep-12

29-Nov-12
26-Sep-12

27-Jun-13
27-Jun-13

29-Aug-13
04-Jul-13

35
33

Installation of Water supply Pipes - Area A1

NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6040

Installation of Water supply Pipes - Area A2

0%

27-Sep-12

04-Oct-12

04-Jul-13

11-Jul-13

33

NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6050

Installation of Water supply Pipes - Area A3

0%

06-Oct-12

13-Oct-12

11-Jul-13

18-Jul-13

33

603

NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6060

Installation of Water supply Pipes - Area A4

0%

14-Oct-12

21-Oct-12

18-Jul-13

25-Jul-13

33

604

NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6070

Installation of Water supply Pipes - Area A5

0%

22-Oct-12

29-Oct-12

25-Jul-13

01-Aug-13

33

605

NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6080

Installation of Water supply Pipes - Area A6

0%

30-Oct-12

06-Nov-12

01-Aug-13

08-Aug-13

33

606

NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6090

Installation of Water supply Pipes - Area A7

0%

07-Nov-12

14-Nov-12

08-Aug-13

15-Aug-13

33

607

NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6000

Installation of Water supply Pipes - Area A8

0%

15-Nov-12

22-Nov-12

15-Aug-13

22-Aug-13

33

608

NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6010

Installation of Water supply Pipes - Area A9

0%

24-Nov-12

29-Nov-12

22-Aug-13

29-Aug-13

33

Installation of Water supply Pipes - Area A9

609

NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6020

Installation of Water supply Pipes - Area A10

0%

24-Nov-12

29-Nov-12

22-Aug-13

29-Aug-13

35

Installation of Water supply Pipes - Area A10

610
611
612

PHASE 1 LOWER BASEMENT - DUCTS


INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1600

AC Ducts Installation works - Area A1

125
77
8

0%

66
60
6

25-Jun-12
25-Jun-12
25-Jun-12

17-Nov-12
22-Sep-12
03-Jul-12

04-May-13
04-May-13
04-May-13

18-Jul-13
11-Jul-13
09-May-13

59
41
41

613

NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1610

AC Ducts Installation works - Area A2

0%

04-Jul-12

12-Jul-12

11-May-13

16-May-13

41

614

NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1620

AC Ducts Installation works- Area A3

0%

14-Jul-12

22-Jul-12

18-May-13

23-May-13

41

615

NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1630

AC Ducts Installation works- Area A4

0%

23-Jul-12

31-Jul-12

25-May-13

30-May-13

41

616

NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1640

AC Ducts Installation works-Area A5

0%

01-Aug-12

09-Aug-12

01-Jun-13

06-Jun-13

41

617

NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1650

AC Ducts Installation works- Area A6

0%

11-Aug-12

19-Aug-12

08-Jun-13

13-Jun-13

41

618

NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1660

AC Ducts Installation works- Area A7

0%

20-Aug-12

28-Aug-12

15-Jun-13

20-Jun-13

41

619

NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1670

AC Ducts Installation works- Area A8

0%

29-Aug-12

05-Sep-12

22-Jun-13

27-Jun-13

41

620

NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1680

AC Ducts Installation works- Area A9

0%

06-Sep-12

13-Sep-12

29-Jun-13

04-Jul-13

41

621

NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1690

AC Ducts Installation works- Area A10

0%

15-Sep-12

22-Sep-12

06-Jul-13

11-Jul-13

41

622
623

INSULATION
NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5090

AC Ducts Insulation - Area A1

79
8

0%

60
6

18-Aug-12
18-Aug-12

17-Nov-12
26-Aug-12

11-May-13
11-May-13

18-Jul-13
16-May-13

59
54

624

NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5100

AC Ducts Insulation - Area A2

0%

27-Aug-12

04-Sep-12

18-May-13

23-May-13

54

625

NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5110

AC Ducts Insulation- Area A3

0%

05-Sep-12

13-Sep-12

25-May-13

30-May-13

54

626

NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5120

AC Ducts Insulation- Area A4

0%

15-Sep-12

23-Sep-12

01-Jun-13

06-Jun-13

54

627

NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5130

AC Ducts Insulation-Area A5

0%

24-Sep-12

02-Oct-12

08-Jun-13

13-Jun-13

59

628

NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5140

AC Ducts Insulation- Area A6

0%

03-Oct-12

13-Oct-12

15-Jun-13

20-Jun-13

59

629

NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5150

AC Ducts Insulation- Area A7

0%

14-Oct-12

23-Oct-12

22-Jun-13

27-Jun-13

59

630

NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5160

AC Ducts Insulation- Area A8

0%

24-Oct-12

31-Oct-12

29-Jun-13

04-Jul-13

59

631

NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5170

AC Ducts Insulation- Area A9

0%

01-Nov-12

08-Nov-12

06-Jul-13

11-Jul-13

59

632

NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5180

AC Ducts Insulation- Area A10

0%

10-Nov-12

17-Nov-12

13-Jul-13

18-Jul-13

59

633
634

PHASE 1 LOWER BASEMENT - SPRINKLER SYSTEM


NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1305
- SPRINKLER SYSTEM
Sprinkler Head & Accessories , Area A1

92
10

0%

90
9

11-Aug-12
11-Aug-12

25-Nov-12
21-Aug-12

12-Jun-13
12-Jun-13

25-Sep-13
23-Jun-13

94
69

635

NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1315
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A2

10

0%

22-Aug-12

02-Sep-12

23-Jun-13

03-Jul-13

69

636

NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1325
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A3

0%

03-Sep-12

12-Sep-12

03-Jul-13

14-Jul-13

69

637

NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1335
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A4

0%

13-Sep-12

23-Sep-12

14-Jul-13

24-Jul-13

69

638

NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1345
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A5

0%

24-Sep-12

03-Oct-12

24-Jul-13

04-Aug-13

69

639

NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1355
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A6

0%

04-Oct-12

14-Oct-12

04-Aug-13

14-Aug-13

94

640

NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1365
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A7

0%

15-Oct-12

24-Oct-12

14-Aug-13

25-Aug-13

94

641

NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1375
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A8

0%

25-Oct-12

04-Nov-12

25-Aug-13

04-Sep-13

94

642

NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1385
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A9

0%

05-Nov-12

14-Nov-12

04-Sep-13

15-Sep-13

94

643

0%

15-Nov-12

25-Nov-12

15-Sep-13

25-Sep-13

94

644
645

PHASE 1 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENT


NECP-Rebase_06Sep12-4.CO.1.6.1.11
PHASE 1 LOWER BASEMENT
NECOMEP1800
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip/Pumps,
EQUIPMENT
Supply & Ventilation Fans, Area A1-A4

35
15

0%

35
15

21-Oct-12
21-Oct-12

29-Nov-12
06-Nov-12

08-Aug-13
08-Aug-13

18-Sep-13
26-Aug-13

17
1

646

NECP-Rebase_06Sep12-4.CO.1.6.1.11
PHASE 1 LOWER BASEMENT
NECOMEP1810
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip/Pumps,
EQUIPMENT
Supply & Ventilation Fans, Area A5-A7

10

0%

10

07-Nov-12

18-Nov-12

26-Aug-13

07-Sep-13

17

647

NECP-Rebase_06Sep12-4.CO.1.6.1.11
PHASE 1 LOWER BASEMENT
NECOMEP1820
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip/Pumps,
EQUIPMENT
Supply & Ventilation Fans, Area A8-A10

10

0%

10

19-Nov-12

29-Nov-12

07-Sep-13

18-Sep-13

17

PHASE 1 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONS


60
NECP-Rebase_06Sep12-4.CO.1.6.1.12
PHASE 1 LOWER BASEMENT
NECOMEP1230
- SANITARY, RAINWATER
Sump Pumps,Sewage
INSTALLATIONS
Ejector pumps,Stormwater Pumps Installations, Area A1-A4
10

0%

46
10

12-Sep-12
12-Sep-12

20-Nov-12
23-Sep-12

23-May-13
23-May-13

16-Jul-13
04-Jun-13

57
73

NECP-Rebase_06Sep12-4.CO.1.6.1.12
PHASE 1 LOWER BASEMENT
NECOMEP1240
- SANITARY, RAINWATER
Sump Pumps,Sewage
INSTALLATIONS
Ejector pumps,Stormwater Pumps Installations, Area A5-A7
10

0%

NECP-Rebase_06Sep12-4.CO.1.6.1.12
PHASE 1 LOWER BASEMENT
NECOMEP1250
- SANITARY, RAINWATER
Sump Pumps,Sewage
INSTALLATIONS
Ejector pumps,Stormwater Pumps Installations, Area A8-A10
10

648
649
650
651

NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1395
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A10

652
653
654

PHASE 1 LOWER BASEMENT - BMS


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.1.13.1
WIRING
NECOMEP1203

655

NECP-Rebase_06Sep12-4.CO.1.6.1.13.1
WIRING
NECOMEP1213

656

NECP-Rebase_06Sep12-4.CO.1.6.1.13.1
WIRING
NECOMEP1223

10

29-Oct-12

08-Nov-12

13-Jun-13

25-Jun-13

65

0%

10

10-Nov-12

20-Nov-12

04-Jul-13

16-Jul-13

57

Building Management System Wiring, Area A1-A4

103
54
10

0%

108
28
10

11-Aug-12
11-Aug-12
11-Aug-12

08-Dec-12
11-Oct-12
21-Aug-12

17-Jul-13
17-Jul-13
17-Jul-13

21-Nov-13
18-Aug-13
28-Jul-13

0
0
0

Building Management System Wiring, Area A5-A7

0%

08-Sep-12

17-Sep-12

29-Jul-13

07-Aug-13

Building Management System Wiring, Area A8-A10

0%

02-Oct-12

11-Oct-12

08-Aug-13

18-Aug-13

Dec

Stainless Steel Capping & Flashing, Area A9-A10

Interpretive Centre
NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre

MEP Works
Lower Basement Floor
PHASE 1 LOWER BASEMENT - BLACK STEEL PIPES
NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1505
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A1

Nov

Roofing Membrane and Ballast Gravel, Area A9-A10

553
554

563
564
565
566

Oct

Roofing Insulation Works, Area A9-A10

Installation of Water supply Pipes - Area A2


Installation of Water supply Pipes - Area A3
Installation of Water supply Pipes - Area A4
Installation of Water supply Pipes - Area A5
Installation of Water supply Pipes - Area A6
Installation of Water supply Pipes - Area A7
Installation of Water supply Pipes - Area A8

AC Ducts Installation works - Area A1


AC Ducts Installation works - Area A2
AC Ducts Installation works- Area A3
AC Ducts Installation works- Area A4
AC Ducts Installation works-Area A5
AC Ducts Installation works- Area A6
AC Ducts Installation works- Area A7
AC Ducts Installation works- Area A8
AC Ducts Installation works- Area A9
AC Ducts Installation works- Area A10
AC Ducts Insulation - Area A1
AC Ducts Insulation - Area A2
AC Ducts Insulation- Area A3
AC Ducts Insulation- Area A4
AC Ducts Insulation-Area A5
AC Ducts Insulation- Area A6
AC Ducts Insulation- Area A7
AC Ducts Insulation- Area A8
AC Ducts Insulation- Area A9
AC Ducts Insulation- Area A10
Sprinkler Head & Accessories , Area A1
Sprinkler Head & Accessories, Area A2
Sprinkler Head & Accessories, Area A3
Sprinkler Head & Accessories, Area A4
Sprinkler Head & Accessories, Area A5
Sprinkler Head & Accessories, Area A6
Sprinkler Head & Accessories, Area A7
Sprinkler Head & Accessories, Area A8
Sprinkler Head & Accessories, Area A9
Sprinkler Head & Accessories, Area A10
AC/Refrigeration Equip/Pumps, Supply & Ventilation Fans, Area A1-A4
AC/Refrigeration Equip/Pumps, Supply & Ventilation Fans, Area A5-A7
AC/Refrigeration Equip/Pumps, Supply & Ventilation Fans, Area A8-A10
Sump Pumps,Sewage Ejector pumps,Stormwater Pumps Installations, Area A1-A4
Sump Pumps,Sewage Ejector pumps,Stormwater Pumps Installations, Area A5-A7
Sump Pumps,Sewage Ejector pumps,Stormwater Pumps Installations, Area A8-A10

Building Management System Wiring, Area A1-A4


Building Management System Wiring, Area A5-A7
Building Management System Wiring, Area A8-A10

Jan

Feb

Construction of North East Underground Carpark Contract No. XC10101100


#
657
658
659
660
661
662
663

WBS

WBS Name

Activity ID

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.13.2
DEVICE INSTALLATION NECOMEP5200

Activity Name

BL Project
Duration

Activity % Remaining
Complete Duration

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

27
7

0%

64
7

07-Nov-12
19-Nov-12

08-Dec-12
26-Nov-12

07-Sep-13
07-Sep-13

21-Nov-13
15-Sep-13

0
33

30

Building Management System Devices Installation,Area A5-A7

Actual Start

Actual
Finish

NECP-Rebase_06Sep12-4.CO.1.6.1.13.2
DEVICE INSTALLATION NECOMEP5210

Building Management System Devices Installation,, Area A8-A10

0%

01-Dec-12

08-Dec-12

18-Sep-13

26-Sep-13

NECP-Rebase_06Sep12-4.CO.1.6.1.13.2
DEVICE INSTALLATION NECOMEP5190

Building Management System Devices Installation, Area A1-A4

0%

07-Nov-12

14-Nov-12

14-Nov-13

21-Nov-13

PHASE 1 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATION


24
NECP-Rebase_06Sep12-4.CO.1.6.1.14
PHASE 1 LOWER BASEMENT
NECOMEP1290
- COLD WATER,
Cold
HOT
Water
WATER,
& HotFIREFIGHTING
Water Pipe, Booster
INSTALLATION
Pumps & Firefighting Pumps Installation,
8 Area A1-A4
0%

56
8

16-Dec-12
16-Dec-12

12-Jan-13
24-Dec-12

08-Aug-13
08-Aug-13

12-Oct-13
17-Aug-13

33
63

18-Aug-13

NECP-Rebase_06Sep12-4.CO.1.6.1.14
PHASE 1 LOWER BASEMENT
NECOMEP1500
- COLD WATER,
Cold
HOT
Water
WATER,
& HotFIREFIGHTING
Water Pipe, Booster
INSTALLATION
Pumps & Firefighting Pumps Installation,
7 Area A5-A7
0%

2013
Jan

Feb

Mar

Apr

25-Aug-13

67

12-Jan-13

03-Oct-13

12-Oct-13

33

8.99%

01-Oct-12
31-Jul-12

29-Dec-12
29-Dec-12

31-Jan-13
31-Jan-13

02-Jun-13
06-Feb-13

72
153

Cable Trays, Cable Ladders, Cable Trunking, Area A3

8.99%

01-Aug-12

09-Aug-12

22-Jan-13

31-Jan-13

06-Feb-13

138

Cable Trays, Cable Ladders, Cable Trunking, Area A4

8.99%

11-Aug-12

19-Aug-12

07-Jan-13

31-Jan-13

06-Feb-13

171

Cable Trays, Cable Ladders, Cable Trunking, Area A5

NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1755
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A6

8.99%

20-Aug-12

28-Aug-12

20-Jan-13

31-Jan-13

06-Feb-13

171

Cable Trays, Cable Ladders, Cable Trunking, Area A6

NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1765
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A7

8.99%

29-Aug-12

06-Sep-12

17-Jan-13

31-Jan-13

06-Feb-13

148

Cable Trays, Cable Ladders, Cable Trunking, Area A7

671

NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1775
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A8

8.99%

08-Sep-12

15-Sep-12

20-Jan-13

31-Jan-13

06-Feb-13

140

Cable Trays, Cable Ladders, Cable Trunking, Area A8

672

NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1785
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A9

8.99%

16-Sep-12

23-Sep-12

19-Jan-13

31-Jan-13

06-Feb-13

151

Cable Trays, Cable Ladders, Cable Trunking, Area A9

673

NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1795
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A10

0%

24-Sep-12

01-Oct-12

13-Feb-13

20-Feb-13

145

674

NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1705
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A1

0%

04-Jul-12

12-Jul-12

19-May-13

26-May-13

54

675

NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1715
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A2

0%

14-Jul-12

22-Jul-12

26-May-13

02-Jun-13

54

25-Jul-12
25-Jul-12
25-Jul-12

17-Oct-12
17-Oct-12
01-Aug-12

06-Aug-13
06-Aug-13
06-Aug-13

16-Oct-13
16-Oct-13
12-Aug-13

0
0
18

NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1735
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A4

668

NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1745
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A5

669
670

676
677
678

PHASE 1 LOWER BASEMENT - BUS DUCT, BUS BAR


BUS DUCT
NECP-Rebase_06Sep12-4.CO.1.6.1.16.1
BUS DUCT
NECOMEP3790

Bus Duct - Area A1

73
73
7

0%

60
60
6

679

NECP-Rebase_06Sep12-4.CO.1.6.1.16.1
BUS DUCT
NECOMEP3800

Bus Duct - Area A2

0%

02-Aug-12

09-Aug-12

13-Aug-13

19-Aug-13

18

680

NECP-Rebase_06Sep12-4.CO.1.6.1.16.1
BUS DUCT
NECOMEP3820

Bus Duct -Area A4

0%

19-Aug-12

26-Aug-12

27-Aug-13

02-Sep-13

12

681

NECP-Rebase_06Sep12-4.CO.1.6.1.16.1
BUS DUCT
NECOMEP3840

Bus Duct - Area A6

0%

04-Sep-12

11-Sep-12

10-Sep-13

16-Sep-13

682

NECP-Rebase_06Sep12-4.CO.1.6.1.16.1
BUS DUCT
NECOMEP3860

Bus Duct - Area A8

0%

20-Sep-12

27-Sep-12

24-Sep-13

30-Sep-13

683

NECP-Rebase_06Sep12-4.CO.1.6.1.16.1
BUS DUCT
NECOMEP3870

Bus Duct - Area A9

0%

29-Sep-12

07-Oct-12

01-Oct-13

07-Oct-13

684

NECP-Rebase_06Sep12-4.CO.1.6.1.16.1
BUS DUCT
NECOMEP3880

Bus Duct - Area A10

685
686

BUS BAR
NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3690

687
688

0%

08-Oct-12

17-Oct-12

08-Oct-13

16-Oct-13

Bus bar - Area A1

73
7

0%

60
6

25-Jul-12
25-Jul-12

17-Oct-12
01-Aug-12

06-Aug-13
06-Aug-13

16-Oct-13
12-Aug-13

0
0

NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3700

Bus bar - Area A2

0%

02-Aug-12

09-Aug-12

13-Aug-13

19-Aug-13

NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3710

Bus bar - Area A3

0%

11-Aug-12

18-Aug-12

20-Aug-13

26-Aug-13

689

NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3720

Bus bar - Area A4

0%

19-Aug-12

26-Aug-12

27-Aug-13

02-Sep-13

690

NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3730

Bus bar - Area A5

0%

27-Aug-12

03-Sep-12

03-Sep-13

09-Sep-13

691

NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3740

Bus bar - Area A6

0%

04-Sep-12

11-Sep-12

10-Sep-13

16-Sep-13

692

NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3750

Bus bar - Area A7

0%

12-Sep-12

19-Sep-12

17-Sep-13

23-Sep-13

693

NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3760

Bus bar - Area A8

0%

20-Sep-12

27-Sep-12

24-Sep-13

30-Sep-13

694

NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3770

Bus bar - Area A9

0%

29-Sep-12

07-Oct-12

01-Oct-13

07-Oct-13

695

NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3780

Bus bar - Area A10

0%

08-Oct-12

17-Oct-12

08-Oct-13

16-Oct-13

69
62
18

11-Aug-12
11-Aug-12
11-Aug-12

29-Oct-12
21-Oct-12
30-Aug-12

17-Jul-13
17-Jul-13
17-Jul-13

24-Sep-13
16-Sep-13
06-Aug-13

52
15
15

696
697
698

0%

60
53
18

699

NECP-Rebase_06Sep12-4.CO.1.6.1.17.1
WIRING
NECOMEP1903

Telephone wiring works at Cable Trays, Area A5-A7

18

0%

18

08-Sep-12

27-Sep-12

07-Aug-13

27-Aug-13

15

700

NECP-Rebase_06Sep12-4.CO.1.6.1.17.1
WIRING
NECOMEP1913

Telephone wiring works at Cable Trays, Area A8-A10

17

0%

17

02-Oct-12

21-Oct-12

28-Aug-13

16-Sep-13

15

701
702

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.17.2
DEVICE INSTALLATION NECOMEP5220

Telephone Devices Installation, Area A1-A4

51
7

0%

42
7

01-Sep-12
01-Sep-12

29-Oct-12
08-Sep-12

07-Aug-13
07-Aug-13

24-Sep-13
14-Aug-13

52
57

NECP-Rebase_06Sep12-4.CO.1.6.1.17.2
DEVICE INSTALLATION NECOMEP5230

Telephone Devices Installation, Area A5-A7

0%

NECP-Rebase_06Sep12-4.CO.1.6.1.17.2
DEVICE INSTALLATION NECOMEP5240

Telephone Devices Installation, Area A8-A10

703
704
705
706
707
708
709
710

PHASE 1 LOWER BASEMENT - TELEPHONE INSTALLATION CABLE TRAYS


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.1.17.1
WIRING
NECOMEP1893
Telephone wiring works at Cable Trays, Area A1-A4

29-Sep-12

06-Oct-12

28-Aug-13

04-Sep-13

54

0%

22-Oct-12

29-Oct-12

17-Sep-13

24-Sep-13

52

135
45

0%

35
21

24-Oct-12
24-Oct-12

30-Mar-13
15-Dec-12

02-Oct-13
02-Oct-13

13-Nov-13
28-Oct-13

0
0

NECP-Rebase_06Sep12-4.CO.1.6.1.87
PHASE 1 LOWER BASEMENT
NECOMEP1113
- HV INSTALLATION
Substation
(SUBSTATION
1: Transformer
NO. Installation,
1)
Area A10

45

0%

21

16-Dec-12

05-Feb-13

10-Oct-13

05-Nov-13

NECP-Rebase_06Sep12-4.CO.1.6.1.87
PHASE 1 LOWER BASEMENT
NECOMEP1123
- HV INSTALLATION
Substation
(SUBSTATION
1: MV Panels
NO.
Installation,
1)
Area A10

45

PHASE 1 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 1)


NECP-Rebase_06Sep12-4.CO.1.6.1.87
PHASE 1 LOWER BASEMENT
NECOMEP1103
- HV INSTALLATION
Substation
(SUBSTATION
1: Switchgear
NO.Installation,
1)
Area A10

PHASE 1 LOWER BASEMENT - ELEVATORS


NECP-Rebase_06Sep12-4.CO.1.6.1.18
PHASE 1 LOWER BASEMENT
NECOMEP2840
- ELEVATORS Rails, Supports, Area A2 & Area A10

0%

21

06-Feb-13

30-Mar-13

21-Oct-13

13-Nov-13

45
14

0%

45
14

03-Jan-13
03-Jan-13

25-Feb-13
20-Jan-13

29-Apr-13
29-Apr-13

19-Jun-13
14-May-13

65
65

711

NECP-Rebase_06Sep12-4.CO.1.6.1.18
PHASE 1 LOWER BASEMENT
NECOMEP2850
- ELEVATORS Car, Area A2 & Area A10

10

0%

10

20-Jan-13

31-Jan-13

15-May-13

26-May-13

65

712

NECP-Rebase_06Sep12-4.CO.1.6.1.18
PHASE 1 LOWER BASEMENT
NECOMEP2890
- ELEVATORS Hoist Machine, Lift Cables, Area A2 & Area A10

0%

31-Jan-13

09-Feb-13

27-May-13

03-Jun-13

65

713

NECP-Rebase_06Sep12-4.CO.1.6.1.18
PHASE 1 LOWER BASEMENT
NECOMEP2900
- ELEVATORS Electrical, Controls, Area A2 & Area A10

0%

09-Feb-13

17-Feb-13

04-Jun-13

11-Jun-13

65

714

NECP-Rebase_06Sep12-4.CO.1.6.1.18
PHASE 1 LOWER BASEMENT
NECOMEP2910
- ELEVATORS Frames, Doors, Area A2 & Area A10

0%

17-Feb-13

25-Feb-13

12-Jun-13

19-Jun-13

65

24-Oct-12
24-Oct-12

30-Mar-13
15-Dec-12

17-Oct-13
17-Oct-13

26-Nov-13
10-Nov-13

0
0

26-Oct-13

18-Nov-13

715
716

PHASE 1 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEM


NECP-Rebase_06Sep12-4.CO.1.6.1.19
PHASE 1 LOWER BASEMENT
NECOMEP2970
- GENERATOR,
Generator,
UPS, BATTERY
Area A10
SYSTEM

135
45

0%

35
21

717

NECP-Rebase_06Sep12-4.CO.1.6.1.19
PHASE 1 LOWER BASEMENT
NECOMEP2980
- GENERATOR,
UPS,
UPS,Area
BATTERY
A10 SYSTEM

45

0%

21

16-Dec-12

05-Feb-13

718

NECP-Rebase_06Sep12-4.CO.1.6.1.19
PHASE 1 LOWER BASEMENT
NECOMEP2990
- GENERATOR,
Battery
UPS, System,
BATTERY
Area
SYSTEM
A10

45

0%

21

06-Feb-13

30-Mar-13

03-Nov-13

26-Nov-13

719
720

PHASE 1 LOWER BASEMENT - ESCALATORS


NECP-Rebase_06Sep12-4.CO.1.6.1.20
PHASE 1 LOWER BASEMENT
NECOMEP3030
- ESCALATORS
Steel Truss, Area A1-Area A2

30
6

10-Feb-13
10-Feb-13

16-Mar-13
16-Feb-13

13-May-13
13-May-13

16-Jun-13
19-May-13

74
74

Bus Duct - Area A1


Bus Duct - Area A2
Bus Duct -Area A4
Bus Duct - Area A6
Bus Duct - Area A8
Bus Duct - Area A9
Bus Duct - Area A10
Bus bar - Area A1
Bus bar - Area A2
Bus bar - Area A3
Bus bar - Area A4
Bus bar - Area A5
Bus bar - Area A6
Bus bar - Area A7
Bus bar - Area A8
Bus bar - Area A9
Bus bar - Area A10

Telephone wiring works at Cable Trays, Area A1-A4


Telephone wiring works at Cable Trays, Area A5-A7
Telephone wiring works at Cable Trays, Area A8-A10
Telephone Devices Installation, Area A1-A4
Telephone Devices Installation, Area A5-A7
Telephone Devices Installation, Area A8-A10
Substation 1: Switchgear Installation, Area A10
Substation 1: Transformer Installation, Area A10
Substation 1: MV Panels Installation, Area A10
Rails, Supports, Area A2 & Area A10
Car, Area A2 & Area A10
Hoist Machine, Lift Cables, Area A2 & Area A10
Electrical, Controls, Area A2 & Area A10
Frames, Doors, Area A2 & Area A10
Generator, Area A10
UPS, Area A10
Battery System, Area A10

0%

0%

17-Feb-13

24-Feb-13

20-May-13

27-May-13

74

NECP-Rebase_06Sep12-4.CO.1.6.1.20
PHASE 1 LOWER BASEMENT
NECOMEP3050
- ESCALATORS
Steps Assembly, Area A1-Area A2

0%

25-Feb-13

04-Mar-13

28-May-13

04-Jun-13

74

Steps Assembly, Area A1-Area A2

723

NECP-Rebase_06Sep12-4.CO.1.6.1.20
PHASE 1 LOWER BASEMENT
NECOMEP3060
- ESCALATORS
Handrail, Area A1-Area A2

0%

05-Mar-13

09-Mar-13

05-Jun-13

09-Jun-13

74

Handrail, Area A1-Area A2

724

NECP-Rebase_06Sep12-4.CO.1.6.1.20
PHASE 1 LOWER BASEMENT
NECOMEP3070
- ESCALATORS
Electrical, Controls, Area A1-Area A2

0%

10-Mar-13

16-Mar-13

10-Jun-13

16-Jun-13

74

66
41
13

18-Jul-12
18-Jul-12
18-Jul-12

02-Oct-12
03-Sep-12
01-Aug-12

17-Jul-13
17-Jul-13
17-Jul-13

09-Sep-13
27-Aug-13
30-Jul-13

0
4
0

0%

NECP-Rebase_06Sep12-4.CO.1.6.1.21.1
WIRING
NECOMEP3140

Luminaires, Lighting Points, Switch Points, etc.Wiring works, Area A5-A7

12

0%

12

02-Aug-12

15-Aug-12

31-Jul-13

13-Aug-13

729

NECP-Rebase_06Sep12-4.CO.1.6.1.21.1
WIRING
NECOMEP3150

Luminaires, Lighting Points, Switch Points, etc.Wiring works, Area A8-A10

12

0%

12

21-Aug-12

03-Sep-12

14-Aug-13

27-Aug-13

730
731

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.21.2
DEVICE INSTALLATION NECOMEP5250

Luminaires, Lighting Points, Switch Points, etc.Installation, Area A1-A4

24
7

0%

31
7

05-Sep-12
05-Sep-12

02-Oct-12
12-Sep-12

05-Aug-13
05-Aug-13

09-Sep-13
12-Aug-13

0
0

732

NECP-Rebase_06Sep12-4.CO.1.6.1.21.2
DEVICE INSTALLATION NECOMEP5260

Luminaires, Lighting Points, Switch Points, etc.Installation, Area A5-A7

0%

13-Sep-12

20-Sep-12

25-Aug-13

01-Sep-13

733

NECP-Rebase_06Sep12-4.CO.1.6.1.21.2
DEVICE INSTALLATION NECOMEP5270

Luminaires, Lighting Points, Switch Points, etc.Installation, Area A8-A10

0%

25-Sep-12

02-Oct-12

02-Sep-13

09-Sep-13

52
38
13

04-Aug-12
04-Aug-12
04-Aug-12

02-Oct-12
16-Sep-12
18-Aug-12

25-Jul-13
25-Jul-13
25-Jul-13

17-Sep-13
04-Sep-13
07-Aug-13

0
0
0

734
735
736

0%

47
36
12

737

NECP-Rebase_06Sep12-4.CO.1.6.1.22.1
WIRING
NECOMEP3260

Switchboard, Small power Wiring works, Area A5-A7

13

0%

12

19-Aug-12

02-Sep-12

08-Aug-13

21-Aug-13

738

NECP-Rebase_06Sep12-4.CO.1.6.1.22.1
WIRING
NECOMEP3270

Switchboard, Small power Wiring works, Area A8-A10

12

0%

12

03-Sep-12

16-Sep-12

22-Aug-13

04-Sep-13

739
740

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.22.2
DEVICE INSTALLATION NECOMEP5280

Switchboard, Small power Installation, Area A1-A4

39
7

0%

21
7

19-Aug-12
19-Aug-12

02-Oct-12
26-Aug-12

25-Aug-13
25-Aug-13

17-Sep-13
01-Sep-13

0
0

741

NECP-Rebase_06Sep12-4.CO.1.6.1.22.2
DEVICE INSTALLATION NECOMEP5290

Switchboard, Small power Installation, Area A5-A7

0%

03-Sep-12

10-Sep-12

02-Sep-13

09-Sep-13

742

NECP-Rebase_06Sep12-4.CO.1.6.1.22.2
DEVICE INSTALLATION NECOMEP5300

Switchboard, Small power Installation, Area A8-A10

0%

25-Sep-12

02-Oct-12

10-Sep-13

17-Sep-13

743
744
745

PHASE 1 LOWER BASEMENT - SECURITY SYSTEM


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.1.23.1
WIRING
NECOMEP3370

Security System Wiring, Area A1-A4

28
21
7

0%

65
21
7

16-Sep-12
16-Sep-12
16-Sep-12

17-Oct-12
09-Oct-12
23-Sep-12

07-Sep-13
07-Sep-13
07-Sep-13

23-Nov-13
30-Sep-13
14-Sep-13

0
0
0

746

NECP-Rebase_06Sep12-4.CO.1.6.1.23.1
WIRING
NECOMEP3380

Security System Wiring, Area A5-A7

0%

24-Sep-12

01-Oct-12

15-Sep-13

22-Sep-13

747

NECP-Rebase_06Sep12-4.CO.1.6.1.23.1
WIRING
NECOMEP3390

Security System Wiring, Area A8-A10

0%

02-Oct-12

09-Oct-12

23-Sep-13

30-Sep-13

748
749

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.23.2
DEVICE INSTALLATION NECOMEP5320

Security System Devices Installation, Area A5-A7

21
7

0%

44
7

24-Sep-12
02-Oct-12

17-Oct-12
09-Oct-12

01-Oct-13
01-Oct-13

23-Nov-13
08-Oct-13

0
0

750

NECP-Rebase_06Sep12-4.CO.1.6.1.23.2
DEVICE INSTALLATION NECOMEP5330

Security System Devices Installation,Area A8-A10

0%

10-Oct-12

17-Oct-12

09-Oct-13

19-Oct-13

751

NECP-Rebase_06Sep12-4.CO.1.6.1.23.2
DEVICE INSTALLATION NECOMEP5310

Security System Devices Installation, Area A1-A4

0%

24-Sep-12

01-Oct-12

16-Nov-13

23-Nov-13

174
21
7

16-Sep-12
16-Sep-12
16-Sep-12

06-Apr-13
09-Oct-12
23-Sep-12

07-Sep-13
07-Sep-13
07-Sep-13

21-Nov-13
30-Sep-13
14-Sep-13

0
0
0

752
753
754

PHASE 1 LOWER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATION


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.1.22.1
WIRING
NECOMEP3250
Switchboard, Small power Wiring works, Area A1-A4

PHASE 1 LOWER BASEMENT - PARKING GUIDANCE SYSTEM


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.1.24.1
WIRING
NECOMEP3490
Parking Guidance System Wiring works, Area A1-A4

0%

64
21
7

755

NECP-Rebase_06Sep12-4.CO.1.6.1.24.1
WIRING
NECOMEP3500

Parking Guidance System Wiring works, Area A5-A7

0%

24-Sep-12

01-Oct-12

15-Sep-13

22-Sep-13

756

NECP-Rebase_06Sep12-4.CO.1.6.1.24.1
WIRING
NECOMEP3510

Parking Guidance System Wiring works, Area A8-A10

0%

02-Oct-12

09-Oct-12

23-Sep-13

30-Sep-13

757
758

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.24.2
DEVICE INSTALLATION NECOMEP5340

Parking Guidance System Devices Installation, Area A1-A4

63
7

0%

21
7

23-Jan-13
23-Jan-13

06-Apr-13
30-Jan-13

29-Oct-13
29-Oct-13

21-Nov-13
05-Nov-13

0
0

759

NECP-Rebase_06Sep12-4.CO.1.6.1.24.2
DEVICE INSTALLATION NECOMEP5350

Parking Guidance System Devices Installation, Area A5-A7

0%

26-Feb-13

05-Mar-13

06-Nov-13

13-Nov-13

760

NECP-Rebase_06Sep12-4.CO.1.6.1.24.2
DEVICE INSTALLATION NECOMEP5360

Parking Guidance System Devices Installation, Area A8-A10

0%

30-Mar-13

06-Apr-13

14-Nov-13

21-Nov-13

761
762
763

PHASE 1 LOWER BASEMENT - TELEMETRY/SCADA


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.1.25.1
WIRING
NECOMEP3610

Telemetry/SCADA, Wiring works - Area A1-A10

31
15
15

0%

31
15
15

07-Nov-12
07-Nov-12
07-Nov-12

12-Dec-12
24-Nov-12
24-Nov-12

26-Aug-13
26-Aug-13
26-Aug-13

30-Sep-13
11-Sep-13
11-Sep-13

43
0
0

764
765

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.25.2
DEVICE INSTALLATION NECOMEP5380

Telemetry/SCADA, Device Installation- Area A1-A10

16
16

0%

16
16

25-Nov-12
25-Nov-12

12-Dec-12
12-Dec-12

12-Sep-13
12-Sep-13

30-Sep-13
30-Sep-13

43
43

766
767
768

PHASE 1 LOWER BASEMENT - FIRE ALARM SYSTEM


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.1.26.1
WIRING
NECOMEP3650

0%

30
15
15

24-Nov-12
24-Nov-12
24-Nov-12

21-May-13
10-Dec-12
10-Dec-12

11-Sep-13
11-Sep-13
11-Sep-13

17-Oct-13
28-Sep-13
28-Sep-13

30
0
0

Fire Alarm Wiring, Area A1-A10

154
15
15

Jan

Cable Trays, Cable Ladders, Cable Trunking, Area A2

NECP-Rebase_06Sep12-4.CO.1.6.1.20
PHASE 1 LOWER BASEMENT
NECOMEP3040
- ESCALATORS
Gear Assembly, Area A1-Area A2

728

Dec

Cable Trays, Cable Ladders, Cable Trunking, Area A1

722

47
36
12

Nov

Cable Trays, Cable Ladders, Cable Trunking, Area A10

721

PHASE 1 LOWER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTS


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.1.21.1
WIRING
NECOMEP3130
Luminaires, Lighting Points, Switch Points, etc.Wiring works, Area A1-A4

Oct

Cold Water & Hot Water Pipe, Booster Pumps & Firefighting Pumps Installation, Area A8-A10

30
6

725
726
727

Sep

Cold Water & Hot Water Pipe, Booster Pumps & Firefighting Pumps Installation, Area A5-A7

01-Jan-13

04-Jul-12
23-Jul-12

667

Aug

Building Management System Devices Installation, Area A1-A4

05-Jan-13

77
8

2014
Jul

Cold Water & Hot Water Pipe, Booster Pumps & Firefighting Pumps Installation, Area A1-A4

25-Dec-12

PHASE 1 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKING


NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1725
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A3

Jun

Building Management System Devices Installation,, Area A8-A10

NECP-Rebase_06Sep12-4.CO.1.6.1.14
PHASE 1 LOWER BASEMENT
NECOMEP1510
- COLD WATER,
Cold
HOT
Water
WATER,
& HotFIREFIGHTING
Water Pipe, Booster
INSTALLATION
Pumps & Firefighting Pumps Installation,
7 Area A8-A10
0%

665
666

May

Building Management System Devices Installation,Area A5-A7

105
5

664

Page 7 of 19/27-Feb-13 09:03

Execution Programme Level 3

Steel Truss, Area A1-Area A2


Gear Assembly, Area A1-Area A2

Electrical, Controls, Area A1-Area A2

Luminaires, Lighting Points, Switch Points, etc.Wiring works, Area A1-A4


Luminaires, Lighting Points, Switch Points, etc.Wiring works, Area A5-A7
Luminaires, Lighting Points, Switch Points, etc.Wiring works, Area A8-A10
Luminaires, Lighting Points, Switch Points, etc.Installation, Area A1-A4
Luminaires, Lighting Points, Switch Points, etc.Installation, Area A5-A7
Luminaires, Lighting Points, Switch Points, etc.Installation, Area A8-A10

Switchboard, Small power Wiring works, Area A1-A4


Switchboard, Small power Wiring works, Area A5-A7
Switchboard, Small power Wiring works, Area A8-A10
Switchboard, Small power Installation, Area A1-A4
Switchboard, Small power Installation, Area A5-A7
Switchboard, Small power Installation, Area A8-A10

Security System Wiring, Area A1-A4


Security System Wiring, Area A5-A7
Security System Wiring, Area A8-A10
Security System Devices Installation, Area A5-A7
Security System Devices Installation,Area A8-A10
Security System Devices Installation, Area A1-A4

Parking Guidance System Wiring works, Area A1-A4


Parking Guidance System Wiring works, Area A5-A7
Parking Guidance System Wiring works, Area A8-A10
Parking Guidance System Devices Installation, Area A1-A4
Parking Guidance System Devices Installation, Area A5-A7
Parking Guidance System Devices Installation, Area A8-A10

Telemetry/SCADA, Wiring works - Area A1-A10


Telemetry/SCADA, Device Installation- Area A1-A10

Fire Alarm Wiring, Area A1-A10

Feb

Construction of North East Underground Carpark Contract No. XC10101100


#
769
770

WBS

WBS Name

Activity ID

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.26.2
DEVICE INSTALLATION NECOMEP5370

Activity Name

Fire Alarm Device Installation, Area A1-A10

BL Project
Duration

Activity % Remaining
Complete Duration

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

15
15

0%

15
15

05-May-13
05-May-13

21-May-13
21-May-13

Actual Start

Actual
Finish

29-Sep-13
29-Sep-13

17-Oct-13
17-Oct-13

30
30

12-Mar-13
23-Jul-13
23-Jul-13

30-Nov-13
15-Oct-13
31-Jul-13

40
32
32

771
772
773

Upper Basement Floor


PHASE 1 UPPER BASEMENT - BLACK STEEL PIPES
NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1605
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A1

295
81
8

0%

223
70
7

16-May-12
29-Sep-12
29-Sep-12

24-Apr-13
31-Dec-12
07-Oct-12

774

NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1615
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A2

0%

08-Oct-12

16-Oct-12

31-Jul-13

08-Aug-13

32

775

NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1625
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A3

0%

17-Oct-12

25-Oct-12

08-Aug-13

17-Aug-13

32

776

NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1635
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A4

0%

27-Oct-12

04-Nov-12

17-Aug-13

25-Aug-13

32

777

NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1645
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A5

0%

05-Nov-12

13-Nov-12

25-Aug-13

02-Sep-13

32

778

NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1655
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A6

0%

14-Nov-12

22-Nov-12

02-Sep-13

10-Sep-13

32

779

NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1665
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A7

0%

24-Nov-12

02-Dec-12

10-Sep-13

18-Sep-13

32

780

NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1675
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A8

0%

03-Dec-12

10-Dec-12

18-Sep-13

26-Sep-13

32

781

NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1685
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A9

0%

13-Dec-12

20-Dec-12

26-Sep-13

05-Oct-13

32

782

NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1695
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A10

0%

24-Dec-12

31-Dec-12

05-Oct-13

15-Oct-13

32

87
87
7

20-Sep-12
20-Sep-12
20-Sep-12

30-Dec-12
30-Dec-12
27-Sep-12

04-Jul-13
04-Jul-13
04-Jul-13

19-Sep-13
12-Sep-13
11-Jul-13

48
54
42

783
784
785

PHASE 1 UPPER BASEMENT - PIPE INSTALLATION(SANITARY,FIRE FIGHTING & WATER SUPPLY)


FIRE FIGHTING
NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3890
Fire fightinf pipe installation Area A1

0%

66
60
6

786

NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3900

Fire fightinf pipe installation Area A2

0%

01-Oct-12

08-Oct-12

11-Jul-13

18-Jul-13

48

787

NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3910

Fire fightinf pipe installation Area A3

0%

11-Oct-12

18-Oct-12

18-Jul-13

25-Jul-13

50

788

NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3920

Fire fightinf pipe installation Area A4

0%

22-Oct-12

29-Oct-12

25-Jul-13

01-Aug-13

52

789

NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3930

Fire fightinf pipe installation Area A5

0%

01-Nov-12

08-Nov-12

01-Aug-13

08-Aug-13

54

790

NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3940

Fire fightinf pipe installation Area A6

0%

12-Nov-12

19-Nov-12

08-Aug-13

15-Aug-13

54

791

NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3950

Fire fightinf pipe installation Area A7

0%

22-Nov-12

29-Nov-12

15-Aug-13

22-Aug-13

54

792

NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3960

Fire fightinf pipe installation Area A8

0%

03-Dec-12

09-Dec-12

22-Aug-13

29-Aug-13

54

793

NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3970

Fire fightinf pipe installation Area A9

0%

13-Dec-12

19-Dec-12

29-Aug-13

05-Sep-13

54

794

NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3980

Fire fightinf pipe installation Area A10

0%

24-Dec-12

30-Dec-12

05-Sep-13

12-Sep-13

54

795
796

WATER SUPPLY
NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP3990

Water supply pipe installation Area A1

87
7

0%

66
6

20-Sep-12
20-Sep-12

30-Dec-12
27-Sep-12

04-Jul-13
04-Jul-13

19-Sep-13
11-Jul-13

48
42

797

NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4000

Water supply pipe installation Area A2

0%

01-Oct-12

08-Oct-12

11-Jul-13

18-Jul-13

48

798

NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4010

Water supply pipe installation Area A3

0%

11-Oct-12

18-Oct-12

21-Jul-13

28-Jul-13

48

799

NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4020

Water supply pipe installation Area A4

0%

22-Oct-12

29-Oct-12

30-Jul-13

06-Aug-13

48

800

NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4030

Water supply pipe installation Area A5

0%

01-Nov-12

08-Nov-12

08-Aug-13

15-Aug-13

48

801

NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4040

Water supply pipe installation Area A6

0%

12-Nov-12

19-Nov-12

15-Aug-13

22-Aug-13

48

802

NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4050

Water supply pipe installation Area A7

0%

22-Nov-12

29-Nov-12

22-Aug-13

29-Aug-13

48

803

NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4060

Water supply pipe installation Area A8

0%

03-Dec-12

09-Dec-12

29-Aug-13

05-Sep-13

48

804

NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4070

Water supply pipe installation Area A9

0%

13-Dec-12

19-Dec-12

05-Sep-13

12-Sep-13

48

805

NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4080

Water supply pipe installation Area A10

0%

24-Dec-12

30-Dec-12

12-Sep-13

19-Sep-13

48

806
807

PHASE 1 UPPER BASEMENT - SPRINKLER SYSTEM


NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1405
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A1

92
10

0%

70
7

01-Jan-13
01-Jan-13

17-Apr-13
12-Jan-13

02-Sep-13
02-Sep-13

25-Nov-13
10-Sep-13

44
44

808

NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1415
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A2

10

0%

13-Jan-13

23-Jan-13

10-Sep-13

18-Sep-13

44

809

NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1425
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A3

0%

24-Jan-13

03-Feb-13

18-Sep-13

26-Sep-13

44

810

NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1435
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A4

0%

04-Feb-13

13-Feb-13

26-Sep-13

05-Oct-13

44

811

NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1445
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A5

0%

14-Feb-13

24-Feb-13

05-Oct-13

15-Oct-13

44

812

NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1455
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A6

0%

25-Feb-13

06-Mar-13

15-Oct-13

23-Oct-13

44

813

NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1465
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A7

0%

07-Mar-13

17-Mar-13

23-Oct-13

31-Oct-13

44

814

NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1475
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A8

0%

18-Mar-13

27-Mar-13

31-Oct-13

09-Nov-13

44

815

NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1485
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A9

0%

28-Mar-13

07-Apr-13

09-Nov-13

17-Nov-13

44

816

NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1495
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A10

0%

08-Apr-13

17-Apr-13

17-Nov-13

25-Nov-13

44

AC Ducts Installation - Area A1

84
77
8

0%

66
60
6

24-Dec-12
24-Dec-12
24-Dec-12

31-Mar-13
23-Mar-13
01-Jan-13

13-Jul-13
13-Jul-13
13-Jul-13

26-Sep-13
19-Sep-13
18-Jul-13

61
61
41

AC Ducts Installation - Area A2

0%

02-Jan-13

10-Jan-13

20-Jul-13

25-Jul-13

42

AC Ducts Installation - Area A3

0%

12-Jan-13

20-Jan-13

27-Jul-13

01-Aug-13

43

NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1730

AC Ducts Installation - Area A4

0%

21-Jan-13

29-Jan-13

03-Aug-13

08-Aug-13

53

823

NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1740

AC Ducts Installation - Area A5

0%

30-Jan-13

07-Feb-13

10-Aug-13

15-Aug-13

56

824

NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1750

AC Ducts Installation - Area A6

0%

09-Feb-13

17-Feb-13

17-Aug-13

22-Aug-13

57

825

NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1760

AC Ducts Installation - Area A7

0%

18-Feb-13

26-Feb-13

24-Aug-13

29-Aug-13

58

826

NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1770

AC Ducts Installation - Area A8

0%

27-Feb-13

06-Mar-13

31-Aug-13

05-Sep-13

59

827

NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1780

AC Ducts Installation - Area A9

0%

07-Mar-13

14-Mar-13

07-Sep-13

12-Sep-13

60

828

NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1790

AC Ducts Installation - Area A10

829
830

INSULATION
NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4090

831
832

817
818
819

PHASE 1 UPPER BASEMENT - DUCTS


INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1700

820

NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1710

821

NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1720

822

0%

16-Mar-13

23-Mar-13

14-Sep-13

19-Sep-13

61

AC Ducts Insulation works - Area A1

76
8

0%

60
6

02-Jan-13
02-Jan-13

31-Mar-13
10-Jan-13

20-Jul-13
20-Jul-13

26-Sep-13
25-Jul-13

61
41

NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4100

AC Ducts Insulation works - Area A2

0%

12-Jan-13

20-Jan-13

27-Jul-13

01-Aug-13

42

NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4110

AC Ducts Insulation works - Area A3

0%

21-Jan-13

30-Jan-13

03-Aug-13

08-Aug-13

43

833

NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4120

AC Ducts Insulation works - Area A4

0%

30-Jan-13

07-Feb-13

10-Aug-13

15-Aug-13

53

834

NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4130

AC Ducts Insulation works - Area A5

0%

09-Feb-13

17-Feb-13

17-Aug-13

22-Aug-13

56

835

NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4140

AC Ducts Insulation works- Area A6

0%

18-Feb-13

26-Feb-13

24-Aug-13

29-Aug-13

57

836

NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4150

AC Ducts Insulation works - Area A7

0%

27-Feb-13

07-Mar-13

31-Aug-13

05-Sep-13

58

837

NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4160

AC Ducts Insulation works - Area A8

0%

07-Mar-13

14-Mar-13

07-Sep-13

12-Sep-13

59

838

NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4170

AC Ducts Insulation works - Area A9

0%

16-Mar-13

24-Mar-13

14-Sep-13

19-Sep-13

60

839

NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4180

AC Ducts Insulation works - Area A10

0%

24-Mar-13

31-Mar-13

21-Sep-13

26-Sep-13

61

09-Feb-13
09-Feb-13

04-Apr-13
25-Feb-13

18-Sep-13
18-Sep-13

31-Oct-13
06-Oct-13

49
17

09-Mar-13

19-Mar-13

06-Oct-13

20-Oct-13

26

840
841

PHASE 1 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENT


NECP-Rebase_06Sep12-4.CO.1.6.2.50
PHASE 1 UPPER BASEMENT
NECOMEP1830
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area A1-A4

48
15

0%

35
15

842

NECP-Rebase_06Sep12-4.CO.1.6.2.50
PHASE 1 UPPER BASEMENT
NECOMEP1840
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area A5-A7

10

0%

10

NECP-Rebase_06Sep12-4.CO.1.6.2.50
PHASE 1 UPPER BASEMENT
NECOMEP1850
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area A8-A10

10

843

Page 8 of 19/27-Feb-13 09:03

Execution Programme Level 3

0%

10

25-Mar-13

04-Apr-13

20-Oct-13

31-Oct-13

49

844
845

PHASE 1 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONS


NECP-Rebase_06Sep12-4.CO.1.6.2.51
PHASE 1 UPPER BASEMENT
NECOMEP1260
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area A1-A4

30
10

0%

30
10

24-Dec-12
24-Dec-12

27-Jan-13
03-Jan-13

16-Jul-13
16-Jul-13

20-Aug-13
28-Jul-13

57
57

846

NECP-Rebase_06Sep12-4.CO.1.6.2.51
PHASE 1 UPPER BASEMENT
NECOMEP1270
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area A5-A7

10

0%

10

05-Jan-13

15-Jan-13

28-Jul-13

08-Aug-13

57

847

NECP-Rebase_06Sep12-4.CO.1.6.2.51
PHASE 1 UPPER BASEMENT
NECOMEP1280
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area A8-A10

10

0%

10

16-Jan-13

27-Jan-13

08-Aug-13

20-Aug-13

57

07-Feb-13
21-Jan-13

18-Aug-13
18-Aug-13

28-Sep-13
25-Aug-13

72
63

848
849

PHASE 1 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATION


NECP-Rebase_06Sep12-4.CO.1.6.2.52
PHASE 1 UPPER BASEMENT
NECOMEP1520
- COLD WATER,
Cold
HOT
Water,
WATER,
Hot Water
FIREF &
IGHTING
Firefighting
INSTALLATION
Installation, Area A1-A4

23
8

0%

36
7

13-Jan-13
13-Jan-13

850

NECP-Rebase_06Sep12-4.CO.1.6.2.52
PHASE 1 UPPER BASEMENT
NECOMEP1530
- COLD WATER,
Cold
HOT
Water,
WATER,
Hot Water
FIREF &
IGHTING
Firefighting
INSTALLATION
Installation, Area A5-A7

0%

22-Jan-13

30-Jan-13

29-Aug-13

07-Sep-13

83

851

NECP-Rebase_06Sep12-4.CO.1.6.2.52
PHASE 1 UPPER BASEMENT
NECOMEP1540
- COLD WATER,
Cold
HOT
Water,
WATER,
Hot Water
FIREF &
IGHTING
Firefighting
INSTALLATION
Installation, Area A8-A10

0%

31-Jan-13

07-Feb-13

19-Sep-13

28-Sep-13

72

08-Nov-12
08-Nov-12
08-Nov-12

15-Apr-13
10-Jan-13
18-Nov-12

19-Aug-13
19-Aug-13
19-Aug-13

09-Nov-13
18-Sep-13
28-Aug-13

49
22
11

852
853
854

PHASE 1 UPPER BASEMENT - BMS


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.2.53.1
WIRING
NECOMEP1233

Building Management System Wiring, Area A1-A4

136
55
9

0%

68
27
9

855

NECP-Rebase_06Sep12-4.CO.1.6.2.53.1
WIRING
NECOMEP1243

Building Management System Wiring, Area A5-A7

0%

06-Dec-12

16-Dec-12

29-Aug-13

08-Sep-13

11

856

NECP-Rebase_06Sep12-4.CO.1.6.2.53.1
WIRING
NECOMEP1253

Building Management System Wiring, Area A8-A10

0%

01-Jan-13

10-Jan-13

09-Sep-13

18-Sep-13

22

857
858

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.53.2
DEVICE INSTALLATION NECOMEP5400

Building Management System Devices Installation, Area A1-A4

42
7

0%

27
7

26-Feb-13
26-Feb-13

15-Apr-13
05-Mar-13

06-Oct-13
06-Oct-13

09-Nov-13
16-Oct-13

49
29

859

NECP-Rebase_06Sep12-4.CO.1.6.2.53.2
DEVICE INSTALLATION NECOMEP5410

Building Management System Devices Installation, Area A5-A7

0%

20-Mar-13

27-Mar-13

20-Oct-13

28-Oct-13

26

860

NECP-Rebase_06Sep12-4.CO.1.6.2.53.2
DEVICE INSTALLATION NECOMEP5420

Building Management System Devices Installation, Area A8-A10

0%

08-Apr-13

15-Apr-13

31-Oct-13

09-Nov-13

49

02-Oct-12
02-Oct-12

31-Dec-12
10-Oct-12

02-May-13
02-May-13

11-Jul-13
09-May-13

67
67

861
862

PHASE 1 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKING


NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1805
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A1

78
8

0%

60
6

863

NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1815
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A2

0%

11-Oct-12

20-Oct-12

09-May-13

16-May-13

67

864

NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1825
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A3

0%

21-Oct-12

29-Oct-12

16-May-13

23-May-13

67

865

NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1835
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A4

0%

30-Oct-12

07-Nov-12

23-May-13

30-May-13

67

866

NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1845
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A5

0%

08-Nov-12

17-Nov-12

30-May-13

06-Jun-13

67

867

NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1855
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A6

0%

18-Nov-12

26-Nov-12

06-Jun-13

13-Jun-13

67

868

NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1865
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A7

0%

27-Nov-12

05-Dec-12

13-Jun-13

20-Jun-13

67

869

NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1875
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A8

0%

06-Dec-12

13-Dec-12

20-Jun-13

27-Jun-13

67

870

NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1885
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A9

0%

15-Dec-12

22-Dec-12

27-Jun-13

04-Jul-13

67

871

NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1895
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A10

0%

24-Dec-12

31-Dec-12

04-Jul-13

11-Jul-13

67

11-Oct-12
11-Oct-12
11-Oct-12

08-Jan-13
08-Jan-13
18-Oct-12

09-May-13
09-May-13
09-May-13

18-Jul-13
18-Jul-13
16-May-13

67
67
67

21-Oct-12

28-Oct-12

16-May-13

23-May-13

67

872
873
874

PHASE 1 UPPER BASEMENT - BUS BAR


BUS BAR LIGHTING
NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1900

Bus Bar Area A1

77
77
7

0%

60
60
6

875

NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1910

Bus Bar Area A2

0%

876

NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1920

Bus Bar Area A3

0%

30-Oct-12

06-Nov-12

23-May-13

30-May-13

67

877

NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1930

Bus Bar Area A4

0%

08-Nov-12

15-Nov-12

30-May-13

06-Jun-13

67

878

NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1940

Bus Bar Area A5

0%

18-Nov-12

25-Nov-12

06-Jun-13

13-Jun-13

67

879

NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1950

Bus Bar Area A6

0%

27-Nov-12

04-Dec-12

13-Jun-13

20-Jun-13

67

2013
Jan

Feb

Mar

Apr

May

2014

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Fire Alarm Device Installation, Area A1-A10

Black Steel Pipes, CHW, Area A1


Black Steel Pipes, CHW, Area A2
Black Steel Pipes, CHW, Area A3
Black Steel Pipes, CHW, Area A4
Black Steel Pipes, CHW, Area A5
Black Steel Pipes, CHW, Area A6
Black Steel Pipes, CHW, Area A7
Black Steel Pipes, CHW, Area A8
Black Steel Pipes, CHW, Area A9
Black Steel Pipes, CHW, Area A10

Fire fightinf pipe installation Area A1


Fire fightinf pipe installation Area A2
Fire fightinf pipe installation Area A3
Fire fightinf pipe installation Area A4
Fire fightinf pipe installation Area A5
Fire fightinf pipe installation Area A6
Fire fightinf pipe installation Area A7
Fire fightinf pipe installation Area A8
Fire fightinf pipe installation Area A9
Fire fightinf pipe installation Area A10
Water supply pipe installation Area A1
Water supply pipe installation Area A2
Water supply pipe installation Area A3
Water supply pipe installation Area A4
Water supply pipe installation Area A5
Water supply pipe installation Area A6
Water supply pipe installation Area A7
Water supply pipe installation Area A8
Water supply pipe installation Area A9
Water supply pipe installation Area A10
Sprinkler Head & Accessories, Area A1
Sprinkler Head & Accessories, Area A2
Sprinkler Head & Accessories, Area A3
Sprinkler Head & Accessories, Area A4
Sprinkler Head & Accessories, Area A5
Sprinkler Head & Accessories, Area A6
Sprinkler Head & Accessories, Area A7
Sprinkler Head & Accessories, Area A8
Sprinkler Head & Accessories, Area A9
Sprinkler Head & Accessories, Area A10

AC Ducts Installation - Area A1


AC Ducts Installation - Area A2
AC Ducts Installation - Area A3
AC Ducts Installation - Area A4
AC Ducts Installation - Area A5
AC Ducts Installation - Area A6
AC Ducts Installation - Area A7
AC Ducts Installation - Area A8
AC Ducts Installation - Area A9
AC Ducts Installation - Area A10
AC Ducts Insulation works - Area A1
AC Ducts Insulation works - Area A2
AC Ducts Insulation works - Area A3
AC Ducts Insulation works - Area A4
AC Ducts Insulation works - Area A5
AC Ducts Insulation works- Area A6
AC Ducts Insulation works - Area A7
AC Ducts Insulation works - Area A8
AC Ducts Insulation works - Area A9
AC Ducts Insulation works - Area A10
AC/Refrigeration Equip, Supply & Ventilation Fans, Area A1-A4
AC/Refrigeration Equip, Supply & Ventilation Fans, Area A5-A7
AC/Refrigeration Equip, Supply & Ventilation Fans, Area A8-A10
Sanitary Installation, Rainwater Installations, Area A1-A4
Sanitary Installation, Rainwater Installations, Area A5-A7
Sanitary Installation, Rainwater Installations, Area A8-A10
Cold Water, Hot Water & Firefighting Installation, Area A1-A4
Cold Water, Hot Water & Firefighting Installation, Area A5-A7
Cold Water, Hot Water & Firefighting Installation, Area A8-A10

Building Management System Wiring, Area A1-A4


Building Management System Wiring, Area A5-A7
Building Management System Wiring, Area A8-A10
Building Management System Devices Installation, Area A1-A4
Building Management System Devices Installation, Area A5-A7
Building Management System Devices Installation, Area A8-A10
Cable Trays, Cable Ladders, Cable Trunking, Area A1
Cable Trays, Cable Ladders, Cable Trunking, Area A2
Cable Trays, Cable Ladders, Cable Trunking, Area A3
Cable Trays, Cable Ladders, Cable Trunking, Area A4
Cable Trays, Cable Ladders, Cable Trunking, Area A5
Cable Trays, Cable Ladders, Cable Trunking, Area A6
Cable Trays, Cable Ladders, Cable Trunking, Area A7
Cable Trays, Cable Ladders, Cable Trunking, Area A8
Cable Trays, Cable Ladders, Cable Trunking, Area A9
Cable Trays, Cable Ladders, Cable Trunking, Area A10

Bus Bar Area A1


Bus Bar Area A2
Bus Bar Area A3
Bus Bar Area A4
Bus Bar Area A5
Bus Bar Area A6

Feb

Construction of North East Underground Carpark Contract No. XC10101100


#

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

880

NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1960

Bus Bar Area A7

0%

06-Dec-12

13-Dec-12

20-Jun-13

27-Jun-13

67

881

NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1970

Bus Bar Area A8

0%

15-Dec-12

22-Dec-12

27-Jun-13

04-Jul-13

67

NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1980

Bus Bar Area A9

0%

NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1990

Bus Bar Area A10

882
883
884
885
886

WBS

WBS Name

Activity ID

Activity Name

BL Project
Duration

Activity % Remaining
Complete Duration

Actual Start

Actual
Finish

04-Jul-13

2013
Jan

Feb

Mar

Apr

May

2014

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Bus Bar Area A8


Bus Bar Area A9

23-Dec-12

30-Dec-12

11-Jul-13

67

0%

01-Jan-13

08-Jan-13

11-Jul-13

18-Jul-13

67

136
63
18

08-Nov-12
08-Nov-12
06-Dec-12

15-Apr-13
20-Jan-13
26-Dec-12

08-Sep-13
08-Sep-13
08-Sep-13

19-Oct-13
08-Oct-13
28-Sep-13

66
33
42

Telephone Conduites wiring - Area A5-A7


Telephone Conduites wiring - Area A8-A10

Bus Bar Area A10

0%

887

NECP-Rebase_06Sep12-4.CO.1.6.2.56.1
WIRING
NECOMEP4310

Telephone Conduites wiring - Area A8-A10

17

0%

17

01-Jan-13

20-Jan-13

09-Sep-13

28-Sep-13

11

888

NECP-Rebase_06Sep12-4.CO.1.6.2.56.1
WIRING
NECOMEP4290

Telephone Conduites wiring - Area A1-A4

19

0%

19

08-Nov-12

29-Nov-12

17-Sep-13

08-Oct-13

15

Telephone Conduites wiring - Area A1-A4

889
890

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.56.2
DEVICE INSTALLATION NECOMEP1933

Telephone Devices Installation - Area A5-A7

37
7

0%

16
7

04-Mar-13
07-Mar-13

15-Apr-13
14-Mar-13

29-Sep-13
29-Sep-13

19-Oct-13
06-Oct-13

66
42

Telephone Devices Installation - Area A5-A7

NECP-Rebase_06Sep12-4.CO.1.6.2.56.2
DEVICE INSTALLATION NECOMEP1943

Telephone Devices Installation - Area A8-A10

0%

Telephone Devices Installation - Area A8-A10

NECP-Rebase_06Sep12-4.CO.1.6.2.56.2
DEVICE INSTALLATION NECOMEP1923

Telephone Devices Installation - Area A1-A4

892
893
894

PHASE 1 UPPER BASEMENT - ELEVATORS


NECP-Rebase_06Sep12-4.CO.1.6.2.57
PHASE 1 UPPER BASEMENT
NECOMEP2920
- ELEVATORS Rails, Supports, Area A1

08-Apr-13

29-Sep-13

06-Oct-13

75

0%

04-Mar-13

11-Mar-13

09-Oct-13

19-Oct-13

15

24
7

0%

24
7

20-Jan-13
20-Jan-13

17-Feb-13
28-Jan-13

15-Apr-13

15-May-13
15-May-13

11-Jun-13
22-May-13

78
78

Telephone Devices Installation - Area A1-A4


Rails, Supports, Area A1
Car, Area A1

895

NECP-Rebase_06Sep12-4.CO.1.6.2.57
PHASE 1 UPPER BASEMENT
NECOMEP2930
- ELEVATORS Car, Area A1

0%

28-Jan-13

03-Feb-13

23-May-13

28-May-13

78

896

NECP-Rebase_06Sep12-4.CO.1.6.2.57
PHASE 1 UPPER BASEMENT
NECOMEP2940
- ELEVATORS Hoist Machine, Lift Cables, Area A1

0%

03-Feb-13

07-Feb-13

29-May-13

02-Jun-13

78

Hoist Machine, Lift Cables, Area A1

897

NECP-Rebase_06Sep12-4.CO.1.6.2.57
PHASE 1 UPPER BASEMENT
NECOMEP2950
- ELEVATORS Electrical, Controls, Area A1

0%

07-Feb-13

12-Feb-13

03-Jun-13

06-Jun-13

78

Electrical, Controls, Area A1

898

NECP-Rebase_06Sep12-4.CO.1.6.2.57
PHASE 1 UPPER BASEMENT
NECOMEP2960
- ELEVATORS Frames, Doors, Area A1

0%

12-Feb-13

17-Feb-13

08-Jun-13

11-Jun-13

78

Frames, Doors, Area A1

30
6

0%

30
6

17-Mar-13
17-Mar-13

20-Apr-13
23-Mar-13

17-Jun-13
17-Jun-13

21-Jul-13
23-Jun-13

74
74

899
900

PHASE 1 UPPER BASEMENT - ESCALATORS


NECP-Rebase_06Sep12-4.CO.1.6.2.59
PHASE 1 UPPER BASEMENT
NECOMEP3080
- ESCALATORSSteel Truss, Area A1-Area A2

Steel Truss, Area A1-Area A2


Gear Assembly, Area A1-Area A2

901

NECP-Rebase_06Sep12-4.CO.1.6.2.59
PHASE 1 UPPER BASEMENT
NECOMEP3090
- ESCALATORSGear Assembly, Area A1-Area A2

0%

24-Mar-13

31-Mar-13

24-Jun-13

01-Jul-13

74

902

NECP-Rebase_06Sep12-4.CO.1.6.2.59
PHASE 1 UPPER BASEMENT
NECOMEP3100
- ESCALATORSSteps Assembly, Area A1-Area A2

0%

01-Apr-13

08-Apr-13

02-Jul-13

09-Jul-13

74

Steps Assembly, Area A1-Area A2

903

NECP-Rebase_06Sep12-4.CO.1.6.2.59
PHASE 1 UPPER BASEMENT
NECOMEP3110
- ESCALATORSHandrail, Area A1-Area A2

0%

09-Apr-13

13-Apr-13

10-Jul-13

14-Jul-13

74

Handrail, Area A1-Area A2

904
905
906
907

NECP-Rebase_06Sep12-4.CO.1.6.2.59
PHASE 1 UPPER BASEMENT
NECOMEP3120
- ESCALATORSElectrical, Controls, Area A1-Area A2

0%

14-Apr-13

20-Apr-13

15-Jul-13

21-Jul-13

74

287
77
13

16-May-12
16-May-12
16-May-12

15-Apr-13
13-Aug-12
30-May-12

12-Mar-13
12-Mar-13
12-Mar-13

24-Aug-13
25-Apr-13
27-Mar-13

46
90
90

05-Jul-12

19-Jul-12

27-Mar-13

11-Apr-13

90

0%

141
38
13

NECP-Rebase_06Sep12-4.CO.1.6.2.60.1
WIRING
NECOMEP3170

Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A5-A7

13

0%

13

909

NECP-Rebase_06Sep12-4.CO.1.6.2.60.1
WIRING
NECOMEP3180

Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A8-A10

12

0%

12

31-Jul-12

13-Aug-12

11-Apr-13

25-Apr-13

90

910
911

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.60.2
DEVICE INSTALLATION NECOMEP4320

Luminaires, Lighting Points, Switch Points, etc., Area A1-A4

61
7

0%

61
7

04-Feb-13
04-Feb-13

15-Apr-13
11-Feb-13

15-Jun-13
15-Jun-13

24-Aug-13
22-Jun-13

46
86

912

NECP-Rebase_06Sep12-4.CO.1.6.2.60.2
DEVICE INSTALLATION NECOMEP4330

Luminaires, Lighting Points, Switch Points, etc., Area A5-A7

0%

07-Mar-13

14-Mar-13

16-Jul-13

23-Jul-13

66

913

NECP-Rebase_06Sep12-4.CO.1.6.2.60.2
DEVICE INSTALLATION NECOMEP4340

Luminaires, Lighting Points, Switch Points, etc., Area A8-A10

0%

08-Apr-13

15-Apr-13

17-Aug-13

24-Aug-13

46

188
39
13

17-Sep-12
17-Sep-12
17-Sep-12

23-Apr-13
31-Oct-12
01-Oct-12

05-Sep-13
05-Sep-13
05-Sep-13

27-Oct-13
19-Oct-13
18-Sep-13

0
0
0

02-Oct-12

16-Oct-12

19-Sep-13

02-Oct-13

908

914
915
916

PHASE 1 UPPER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTS


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.2.60.1
WIRING
NECOMEP3160
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A1-A4

0%

43
36
12

NECP-Rebase_06Sep12-4.CO.1.6.2.61.1
WIRING
NECOMEP3290

Wiring for Switchboard, Small power Area A5-A7

13

0%

12

918

NECP-Rebase_06Sep12-4.CO.1.6.2.61.1
WIRING
NECOMEP3300

Wiring for Switchboard, Small power Area A8-A10

13

0%

12

17-Oct-12

31-Oct-12

03-Oct-13

19-Oct-13

919
920

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.61.2
DEVICE INSTALLATION NECOMEP4350

Switchboard, Small power Devices Installation, Area A1-A4

61
7

0%

31
7

12-Feb-13
12-Feb-13

23-Apr-13
19-Feb-13

19-Sep-13
19-Sep-13

27-Oct-13
26-Sep-13

0
10

921

NECP-Rebase_06Sep12-4.CO.1.6.2.61.2
DEVICE INSTALLATION NECOMEP4360

Switchboard, Small power Devices Installation, Area A5-A7

0%

16-Mar-13

23-Mar-13

03-Oct-13

10-Oct-13

922

NECP-Rebase_06Sep12-4.CO.1.6.2.61.2
DEVICE INSTALLATION NECOMEP4370

Switchboard, Small power Devices Installation, Area A8-A10

0%

16-Apr-13

23-Apr-13

20-Oct-13

27-Oct-13

923
924
925

PHASE 1 UPPER BASEMENT - SECURITY SYSTEM


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.2.62.1
WIRING
NECOMEP3400

Security System wiring works , Area A1-A4

136
53
7

0%

45
38
7

08-Nov-12
08-Nov-12
08-Nov-12

15-Apr-13
08-Jan-13
15-Nov-12

07-Oct-13
07-Oct-13
07-Oct-13

30-Nov-13
21-Nov-13
16-Oct-13

12
12
4

926

NECP-Rebase_06Sep12-4.CO.1.6.2.62.1
WIRING
NECOMEP3410

Security System wiring works , Area A5-A7

0%

06-Dec-12

13-Dec-12

06-Nov-13

13-Nov-13

927

NECP-Rebase_06Sep12-4.CO.1.6.2.62.1
WIRING
NECOMEP3420

Security System wiring works , A8-A10

928
929

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.62.2
DEVICE INSTALLATION NECOMEP4380

930
931

917

932
933
934
935

PHASE 1 UPPER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATION


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.2.61.1
WIRING
NECOMEP3280
Wiring for Switchboard, Small power Area A1-A4

0%

01-Jan-13

08-Jan-13

14-Nov-13

21-Nov-13

12

Security System Devices Installation , Area A1-A4

61
7

0%

21
7

04-Feb-13
04-Feb-13

15-Apr-13
11-Feb-13

06-Nov-13
06-Nov-13

30-Nov-13
13-Nov-13

12
11

NECP-Rebase_06Sep12-4.CO.1.6.2.62.2
DEVICE INSTALLATION NECOMEP4390

Security System Devices Installation , Area A5-A7

0%

07-Mar-13

14-Mar-13

14-Nov-13

21-Nov-13

NECP-Rebase_06Sep12-4.CO.1.6.2.62.2
DEVICE INSTALLATION NECOMEP4400

Security System Devices Installation , A8-A10

0%

08-Apr-13

15-Apr-13

23-Nov-13

30-Nov-13

12

136
53
7

0%

28
21
7

08-Nov-12
08-Nov-12
08-Nov-12

15-Apr-13
08-Jan-13
15-Nov-12

01-Oct-13
01-Oct-13
01-Oct-13

04-Nov-13
27-Oct-13
08-Oct-13

33
0
0

0%

10-Dec-12

17-Dec-12

09-Oct-13

19-Oct-13

PHASE 1 UPPER BASEMENT - PARKING GUIDANCE SYSTEM


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.2.63.1
WIRING
NECOMEP3520
Parking Guidance System wiring, Area A1-A4
NECP-Rebase_06Sep12-4.CO.1.6.2.63.1
WIRING
NECOMEP3530

Parking Guidance System wiring, Area A5-A7

936

NECP-Rebase_06Sep12-4.CO.1.6.2.63.1
WIRING
NECOMEP3540

Parking Guidance System wiring, Area A8-A10

937
938

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.63.2
DEVICE INSTALLATION NECOMEP4410

939
940
941
942
943

PHASE 1 UPPER BASEMENT - TELEMETRY/SCADA


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.2.64.1
WIRING
NECOMEP3620

944
945

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.64.2
DEVICE INSTALLATION NECOMEP5430

946
947
948

PHASE 1 UPPER BASEMENT - FIRE ALARM SYSTEM


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.2.65.1
WIRING
NECOMEP3660

949
950

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.65.2
DEVICE INSTALLATION NECOMEP5440

Jan

Bus Bar Area A7

34
27
18

891

PHASE 1 UPPER BASEMENT - TELEPHONE INSTALLATION CABLE TRAYS


WIRING
NECP-Rebase_06Sep12-4.CO.1.6.2.56.1
WIRING
NECOMEP4300
Telephone Conduites wiring - Area A5-A7

Page 9 of 19/27-Feb-13 09:03

Execution Programme Level 3

Electrical, Controls, Area A1-Area A2

Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A1-A4
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A5-A7
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A8-A10
Luminaires, Lighting Points, Switch Points, etc., Area A1-A4
Luminaires, Lighting Points, Switch Points, etc., Area A5-A7
Luminaires, Lighting Points, Switch Points, etc., Area A8-A10

Wiring for Switchboard, Small power Area A1-A4


Wiring for Switchboard, Small power Area A5-A7
Wiring for Switchboard, Small power Area A8-A10
Switchboard, Small power Devices Installation, Area A1-A4
Switchboard, Small power Devices Installation, Area A5-A7
Switchboard, Small power Devices Installation, Area A8-A10

Security System wiring works , Area A1-A4


Security System wiring works , Area A5-A7
Security System wiring works , A8-A10
Security System Devices Installation , Area A1-A4
Security System Devices Installation , Area A5-A7
Security System Devices Installation , A8-A10

Parking Guidance System wiring, Area A1-A4


Parking Guidance System wiring, Area A5-A7

0%

01-Jan-13

08-Jan-13

20-Oct-13

27-Oct-13

Parking Guidance System wiring, Area A8-A10

Parking Guidance System Devices Installation , Area A1-A4

61
7

0%

21
7

04-Feb-13
04-Feb-13

15-Apr-13
11-Feb-13

09-Oct-13
09-Oct-13

04-Nov-13
19-Oct-13

33
33

Parking Guidance System Devices Installation , Area A1-A4

NECP-Rebase_06Sep12-4.CO.1.6.2.63.2
DEVICE INSTALLATION NECOMEP4420

Parking Guidance System Devices Installation , Area A5-A7

0%

07-Mar-13

14-Mar-13

20-Oct-13

27-Oct-13

26

NECP-Rebase_06Sep12-4.CO.1.6.2.63.2
DEVICE INSTALLATION NECOMEP4430

Parking Guidance System Devices Installation , Area A8-A10

0%

08-Apr-13

15-Apr-13

28-Oct-13

04-Nov-13

33

0%

30
15
15

01-Jan-13
01-Jan-13
01-Jan-13

24-Apr-13
17-Jan-13
17-Jan-13

12-Sep-13
12-Sep-13
12-Sep-13

19-Oct-13
29-Sep-13
29-Sep-13

47
14
14

08-Apr-13
08-Apr-13

24-Apr-13
24-Apr-13

30-Sep-13
30-Sep-13

19-Oct-13
19-Oct-13

47
47

Telemetry/SCADA Wiring, Area A1-A10

98
15
15

Telemetry/SCADA Device Installation, Area A1-A10

15
15

0%

15
15

Fire Alarm Wiring works, Area A1-A10

98
15
15

0%

30
15
15

01-Jan-13
01-Jan-13
01-Jan-13

24-Apr-13
17-Jan-13
17-Jan-13

29-Sep-13
29-Sep-13
29-Sep-13

04-Nov-13
17-Oct-13
17-Oct-13

33
0
0

Fire Alarm Device Installation, Area A1-A10

15
15

0%

15
15

08-Apr-13
08-Apr-13

24-Apr-13
24-Apr-13

19-Oct-13
19-Oct-13

04-Nov-13
04-Nov-13

33
33

08-May-12
08-May-12
08-May-12
08-May-12

02-Sep-13
17-Aug-13
08-Sep-12
19-May-12

31-Jan-13
31-Jan-13
10-Feb-13
10-Feb-13

15-Jan-14
15-Jan-14
17-Apr-13
20-Feb-13

4
4
46
46

12-Dec-12
12-Dec-12

Parking Guidance System Devices Installation , Area A5-A7


Parking Guidance System Devices Installation , Area A8-A10

Telemetry/SCADA Wiring, Area A1-A10


Telemetry/SCADA Device Installation, Area A1-A10

Fire Alarm Wiring works, Area A1-A10


Fire Alarm Device Installation, Area A1-A10

951
952
953
954

Internal Finishes
Lower Basement Floor
PHASE 1 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDS
NECP-Rebase_06Sep12-4.CO.1.7.1.2
PHASE 1 LOWER BASEMENT
NECOBFW1600
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A1

413
399
106
10

0%

297
297
58
10

955

NECP-Rebase_06Sep12-4.CO.1.7.1.2
PHASE 1 LOWER BASEMENT
NECOBFW1610
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A2

10

0%

10

20-May-12

30-May-12

21-Feb-13

04-Mar-13

46

956

NECP-Rebase_06Sep12-4.CO.1.7.1.2
PHASE 1 LOWER BASEMENT
NECOBFW1620
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A5

10

0%

10

28-Jun-12

09-Jul-12

05-Mar-13

16-Mar-13

46

957

NECP-Rebase_06Sep12-4.CO.1.7.1.2
PHASE 1 LOWER BASEMENT
NECOBFW1630
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A6

10

0%

10

10-Jul-12

21-Jul-12

17-Mar-13

27-Mar-13

46

958

NECP-Rebase_06Sep12-4.CO.1.7.1.2
PHASE 1 LOWER BASEMENT
NECOBFW1640
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A9

0%

19-Aug-12

28-Aug-12

28-Mar-13

07-Apr-13

46

959

NECP-Rebase_06Sep12-4.CO.1.7.1.2
PHASE 1 LOWER BASEMENT
NECOBFW1650
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A10

0%

29-Aug-12

08-Sep-12

08-Apr-13

17-Apr-13

46

28-May-12
28-May-12
30-Jul-12

13-Jul-13
09-Sep-12
08-Aug-12

12-Dec-12
12-Dec-12
26-Dec-12

31-Jan-13
31-Jan-13
31-Jan-13

29-Dec-13
18-Mar-13
06-Feb-13

19
108
137

Painting Ceiling, Area A7

Plasterworks, Gypsum Boards, Plasterboards, Area A1


Plasterworks, Gypsum Boards, Plasterboards, Area A2
Plasterworks, Gypsum Boards, Plasterboards, Area A5
Plasterworks, Gypsum Boards, Plasterboards, Area A6
Plasterworks, Gypsum Boards, Plasterboards, Area A9
Plasterworks, Gypsum Boards, Plasterboards, Area A10

960
961
962

PHASE 1 LOWER BASEMENT - PAINTING CEILING


PRIMER & FIRST COATS
NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1260

Painting Ceiling, Area A7

352
90
9

15%

282
40
5

963

NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1220

Painting Ceiling, Area A3

12.01%

18-Jun-12

27-Jun-12

15-Dec-12

31-Jan-13

06-Feb-13

113

Painting Ceiling, Area A3

964

NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1230

Painting Ceiling, Area A4

12.01%

28-Jun-12

08-Jul-12

15-Dec-12

31-Jan-13

06-Feb-13

119

Painting Ceiling, Area A4

965

NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1240

Painting Ceiling, Area A5

12.01%

09-Jul-12

18-Jul-12

12-Dec-12

31-Jan-13

06-Feb-13

125

Painting Ceiling, Area A5

966

NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1250

Painting Ceiling, Area A6

12.01%

19-Jul-12

29-Jul-12

21-Dec-12

31-Jan-13

06-Feb-13

131

Painting Ceiling, Area A6

967

NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1270

Painting Ceiling, Area A8

12.01%

09-Aug-12

19-Aug-12

15-Jan-13

31-Jan-13

06-Feb-13

143

Painting Ceiling, Area A8

968

NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1280

Painting Ceiling, Area A9

12.01%

20-Aug-12

29-Aug-12

21-Dec-12

31-Jan-13

06-Feb-13

84

Painting Ceiling, Area A9

969

NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1290

Painting Ceiling, Area A10

0%

30-Aug-12

09-Sep-12

06-Feb-13

13-Feb-13

84

970

NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1190

Painting Ceiling, Area A1

0%

28-May-12

06-Jun-12

05-Mar-13

11-Mar-13

71

971

NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1210

Painting Ceiling, Area A2

0%

07-Jun-12

17-Jun-12

12-Mar-13

18-Mar-13

72

972
973

FINAL COAT
NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1191

Painting Ceiling, Area A1

31
3

0%

30
3

06-Jun-13
06-Jun-13

13-Jul-13
10-Jun-13

24-Nov-13
24-Nov-13

29-Dec-13
26-Nov-13

19
0

974

NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1211

Painting Ceiling, Area A2

0%

10-Jun-13

13-Jun-13

27-Nov-13

30-Nov-13

975

NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1221

Painting Ceiling, Area A3

0%

13-Jun-13

17-Jun-13

01-Dec-13

03-Dec-13

976

NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1231

Painting Ceiling, Area A4

0%

17-Jun-13

20-Jun-13

04-Dec-13

07-Dec-13

977

NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1241

Painting Ceiling, Area A5

0%

20-Jun-13

24-Jun-13

08-Dec-13

10-Dec-13

978

NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1251

Painting Ceiling, Area A6

0%

24-Jun-13

27-Jun-13

11-Dec-13

14-Dec-13

19

979

NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1261

Painting Ceiling, Area A7

0%

27-Jun-13

01-Jul-13

15-Dec-13

17-Dec-13

19

980

NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1271

Painting Ceiling, Area A8

0%

01-Jul-13

06-Jul-13

19-Dec-13

22-Dec-13

19

981

NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1281

Painting Ceiling, Area A9

0%

06-Jul-13

09-Jul-13

23-Dec-13

25-Dec-13

19

982

NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1291

Painting Ceiling, Area A10

0%

09-Jul-13

13-Jul-13

26-Dec-13

29-Dec-13

19

983
984
985

PHASE 1 LOWER BASEMENT - PAINTING WALLS


PRIMER & FIRST COATS
NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2400

Painting Walls & Columns, Area A7

369
90
9

8.01%

297
56
8

12-Jun-12
12-Jun-12
14-Aug-12

17-Aug-13
24-Sep-12
23-Aug-12

15-Dec-12
15-Dec-12
26-Dec-12

31-Jan-13
31-Jan-13
31-Jan-13

15-Jan-14
06-Apr-13
10-Feb-13

0
146
168

Painting Walls & Columns, Area A7

986

NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2360

Painting Walls & Columns, Area A3

5%

03-Jul-12

12-Jul-12

15-Dec-12

31-Jan-13

10-Feb-13

163

Painting Walls & Columns, Area A3

987

NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2370

Painting Walls & Columns, Area A4

5%

14-Jul-12

23-Jul-12

15-Dec-12

31-Jan-13

10-Feb-13

150

Painting Walls & Columns, Area A4

988

NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2380

Painting Walls & Columns, Area A5

5%

24-Jul-12

02-Aug-12

12-Jan-13

31-Jan-13

10-Feb-13

175

Painting Walls & Columns, Area A5

989

NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2390

Painting Walls & Columns, Area A6

5%

04-Aug-12

13-Aug-12

21-Dec-12

31-Jan-13

10-Feb-13

181

Painting Walls & Columns, Area A6

990

NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2410

Painting Walls & Columns, Area A8

5%

25-Aug-12

03-Sep-12

15-Dec-12

31-Jan-13

10-Feb-13

193

Painting Walls & Columns, Area A8

991

NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2420

Painting Walls & Columns, Area A9

5%

04-Sep-12

13-Sep-12

21-Dec-12

31-Jan-13

10-Feb-13

107

Painting Walls & Columns, Area A9

Painting Ceiling, Area A10


Painting Ceiling, Area A1
Painting Ceiling, Area A2
Painting Ceiling, Area A1
Painting Ceiling, Area A2
Painting Ceiling, Area A3
Painting Ceiling, Area A4
Painting Ceiling, Area A5
Painting Ceiling, Area A6
Painting Ceiling, Area A7
Painting Ceiling, Area A8
Painting Ceiling, Area A9
Painting Ceiling, Area A10

Feb

Construction of North East Underground Carpark Contract No. XC10101100


#

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

992

NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2430

Painting Walls & Columns, Area A10

0%

15-Sep-12

24-Sep-12

13-Feb-13

24-Feb-13

105

993

NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2340

Painting Walls & Columns, Area A1

0%

12-Jun-12

21-Jun-12

17-Mar-13

26-Mar-13

110

994

NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2350

Painting Walls & Columns, Area A2

0%

23-Jun-12

02-Jul-12

27-Mar-13

06-Apr-13

110

995
996

FINAL COAT
NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2341

Painting Walls & Columns, Area A1

30
3

0%

30
3

13-Jul-13
13-Jul-13

17-Aug-13
16-Jul-13

11-Dec-13
11-Dec-13

15-Jan-14
14-Dec-13

0
0

997

NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2351

Painting Walls & Columns, Area A2

0%

16-Jul-13

20-Jul-13

15-Dec-13

17-Dec-13

998

NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2361

Painting Walls & Columns, Area A3

0%

20-Jul-13

23-Jul-13

19-Dec-13

22-Dec-13

999

NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2371

Painting Walls & Columns, Area A4

0%

23-Jul-13

27-Jul-13

23-Dec-13

25-Dec-13

1000

NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2381

Painting Walls & Columns, Area A5

0%

27-Jul-13

30-Jul-13

26-Dec-13

29-Dec-13

1001

NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2391

Painting Walls & Columns, Area A6

0%

30-Jul-13

03-Aug-13

30-Dec-13

01-Jan-14

1002

NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2401

Painting Walls & Columns, Area A7

0%

03-Aug-13

06-Aug-13

02-Jan-14

05-Jan-14

1003

NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2411

Painting Walls & Columns, Area A8

0%

06-Aug-13

10-Aug-13

06-Jan-14

08-Jan-14

1004

NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2421

Painting Walls & Columns, Area A9

0%

10-Aug-13

13-Aug-13

09-Jan-14

12-Jan-14

NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2431

Painting Walls & Columns, Area A10

1005

WBS

WBS Name

Activity ID

Activity Name

BL Project
Duration

Activity % Remaining
Complete Duration

Actual Start

Actual
Finish

0%

13-Aug-13

17-Aug-13

13-Jan-14

15-Jan-14

1006
1007

PHASE 1 LOWER BASEMENT - PAINTING FLOORS


NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2740
- PAINTING FLOORS
Painting Floors, Area A1

97
10

0%

40
4

01-Dec-12
01-Dec-12

23-Mar-13
11-Dec-12

29-Aug-13
29-Aug-13

17-Oct-13
03-Sep-13

35
35

1008

NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2750
- PAINTING FLOORS
Painting Floors, Area A2

10

0%

12-Dec-12

23-Dec-12

03-Sep-13

08-Sep-13

35

1009

NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2760
- PAINTING FLOORS
Painting Floors, Area A3

10

0%

24-Dec-12

03-Jan-13

08-Sep-13

12-Sep-13

35

1010

NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2770
- PAINTING FLOORS
Painting Floors, Area A4

10

0%

05-Jan-13

15-Jan-13

12-Sep-13

17-Sep-13

35

1011

NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2780
- PAINTING FLOORS
Painting Floors, Area A5

10

0%

16-Jan-13

27-Jan-13

17-Sep-13

22-Sep-13

35

1012

NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2790
- PAINTING FLOORS
Painting Floors, Area A6

10

0%

28-Jan-13

07-Feb-13

22-Sep-13

26-Sep-13

35

1013

NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2800
- PAINTING FLOORS
Painting Floors, Area A7

10

0%

09-Feb-13

19-Feb-13

26-Sep-13

01-Oct-13

35

1014

NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2810
- PAINTING FLOORS
Painting Floors, Area A8

0%

20-Feb-13

02-Mar-13

01-Oct-13

06-Oct-13

35

1015

NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2820
- PAINTING FLOORS
Painting Floors, Area A9

0%

03-Mar-13

12-Mar-13

06-Oct-13

10-Oct-13

35

1016

NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2830
- PAINTING FLOORS
Painting Floors, Area A10

0%

13-Mar-13

23-Mar-13

10-Oct-13

17-Oct-13

35

0%

24
4

09-Jun-12
09-Jun-12

01-Sep-12
14-Jun-12

23-Apr-13
23-Apr-13

20-May-13
27-Apr-13

57
57

1017
1018

PHASE 1 LOWER BASEMENT - TILING


NECP-Rebase_06Sep12-4.CO.1.7.1.9
PHASE 1 LOWER BASEMENT
NECOBFW1800
- TILING

Tiling, Area A1

73
6

1019

NECP-Rebase_06Sep12-4.CO.1.7.1.9
PHASE 1 LOWER BASEMENT
NECOBFW1810
- TILING

Tiling, Area A2

0%

16-Jun-12

21-Jun-12

28-Apr-13

01-May-13

57

1020

NECP-Rebase_06Sep12-4.CO.1.7.1.9
PHASE 1 LOWER BASEMENT
NECOBFW1820
- TILING

Tiling, Area A5

0%

28-Jun-12

04-Jul-12

02-May-13

06-May-13

57

1021

NECP-Rebase_06Sep12-4.CO.1.7.1.9
PHASE 1 LOWER BASEMENT
NECOBFW1830
- TILING

Tiling, Area A6

0%

05-Jul-12

11-Jul-12

07-May-13

11-May-13

57

1022

NECP-Rebase_06Sep12-4.CO.1.7.1.9
PHASE 1 LOWER BASEMENT
NECOBFW1840
- TILING

Tiling, Area A9

0%

19-Aug-12

25-Aug-12

12-May-13

15-May-13

57

NECP-Rebase_06Sep12-4.CO.1.7.1.9
PHASE 1 LOWER BASEMENT
NECOBFW1850
- TILING

Tiling, Area A10

1023

0%

26-Aug-12

01-Sep-12

16-May-13

20-May-13

57

1024
1025

PHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORS
NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3140
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A1

92
6

0%

50
5

12-Dec-12
12-Dec-12

28-Mar-13
18-Dec-12

03-Sep-13
03-Sep-13

03-Nov-13
09-Sep-13

35
35

1026

NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3150
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A2

0%

24-Dec-12

30-Dec-12

09-Sep-13

15-Sep-13

35

1027

NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3160
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A3

0%

05-Jan-13

10-Jan-13

15-Sep-13

21-Sep-13

35

1028

NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3170
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A4

0%

16-Jan-13

22-Jan-13

21-Sep-13

26-Sep-13

35

1029

NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3180
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A5

0%

28-Jan-13

03-Feb-13

26-Sep-13

02-Oct-13

35

1030

NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3190
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A6

0%

09-Feb-13

13-Feb-13

02-Oct-13

08-Oct-13

35

1031

NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3200
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A7

0%

20-Feb-13

25-Feb-13

08-Oct-13

16-Oct-13

35

1032

NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3210
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A8

0%

03-Mar-13

07-Mar-13

16-Oct-13

22-Oct-13

35

1033

NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3220
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A9

0%

13-Mar-13

18-Mar-13

22-Oct-13

28-Oct-13

35

1034

NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3230
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A10

0%

24-Mar-13

28-Mar-13

28-Oct-13

03-Nov-13

35

18
6

0%

38
6

18-Mar-13
18-Mar-13

07-Apr-13
24-Mar-13

08-Sep-13
08-Sep-13

24-Oct-13
15-Sep-13

57
53

0%

1035
1036
1037
1038
1039
1040
1041

PHASE 1 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENS


NECP-Rebase_06Sep12-4.CO.1.7.1.16
PHASE 1 LOWER BASEMENT
NECOBFW3620
- TIMBER DOORS
Timber
AND
Doors
LOUVER
and Louver
SCREENS
Screens, Area A1-A2
NECP-Rebase_06Sep12-4.CO.1.7.1.16
PHASE 1 LOWER BASEMENT
NECOBFW3630
- TIMBER DOORS
Timber
AND
Doors
LOUVER
and Louver
SCREENS
Screens, Area A7-A8
NECP-Rebase_06Sep12-4.CO.1.7.1.16
PHASE 1 LOWER BASEMENT
NECOBFW3640
- TIMBER DOORS
Timber
AND
Doors
LOUVER
and Louver
SCREENS
Screens, Area A9-A10
PHASE 1 LOWER BASEMENT - STEEL DOORS AND LOUVERS
NECP-Rebase_06Sep12-4.CO.1.7.1.35
PHASE 1 LOWER BASEMENT
NECOBFW3730
- STEEL DOORS
Steel
AND
Doors
LOUVERS
and Louvers, Area A1-A5
NECP-Rebase_06Sep12-4.CO.1.7.1.35
PHASE 1 LOWER BASEMENT
NECOBFW3740
- STEEL DOORS
Steel
AND
Doors
LOUVERS
and Louvers, Area A6-A10

Page 10 of 19/27-Feb-13 09:03

Execution Programme Level 3

25-Mar-13

31-Mar-13

06-Oct-13

15-Oct-13

59

0%

01-Apr-13

07-Apr-13

17-Oct-13

24-Oct-13

57

19
10

0%

29
10

27-Mar-13
27-Mar-13

17-Apr-13
07-Apr-13

22-Sep-13
22-Sep-13

28-Oct-13
03-Oct-13

39
49

0%

08-Apr-13

17-Apr-13

17-Oct-13

28-Oct-13

39

1042
1043

PHASE 1 LOWER BASEMENT - HANDRAILS


NECP-Rebase_06Sep12-4.CO.1.7.1.15
PHASE 1 LOWER BASEMENT
NECOBFW3500
- HANDRAILS Handrails, Area A1-A2

27
9

0%

21
7

30-Mar-13
30-Mar-13

29-Apr-13
08-Apr-13

26-Oct-13
26-Oct-13

19-Nov-13
03-Nov-13

45
35

1044

NECP-Rebase_06Sep12-4.CO.1.7.1.15
PHASE 1 LOWER BASEMENT
NECOBFW3510
- HANDRAILS Handrails, Area A5-A6

0%

09-Apr-13

18-Apr-13

03-Nov-13

11-Nov-13

45

1045

NECP-Rebase_06Sep12-4.CO.1.7.1.15
PHASE 1 LOWER BASEMENT
NECOBFW3520
- HANDRAILS Handrails, Area A9-A10

0%

20-Apr-13

29-Apr-13

11-Nov-13

19-Nov-13

45

22
8

05-Jun-13
05-Jun-13

30-Jun-13
13-Jun-13

17-Oct-13
17-Oct-13

12-Nov-13
27-Oct-13

35
35

1046
1047

PHASE 1 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORS


NECP-Rebase_06Sep12-4.CO.1.7.1.36
PHASE 1 LOWER BASEMENT
NECOBFW3810
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
A1-A4

22
8

0%

1048

NECP-Rebase_06Sep12-4.CO.1.7.1.36
PHASE 1 LOWER BASEMENT
NECOBFW3820
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
A5-A7

0%

1049

NECP-Rebase_06Sep12-4.CO.1.7.1.36
PHASE 1 LOWER BASEMENT
NECOBFW3830
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
A8-A10

22-Jun-13

27-Oct-13

04-Nov-13

35

0%

23-Jun-13

30-Jun-13

04-Nov-13

12-Nov-13

35

1050
1051
1052

Upper Basement Floor


PHASE 1 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDS
NECP-Rebase_06Sep12-4.CO.1.7.2.12
PHASE 1 UPPER BASEMENT
NECOBFW1660
- PLASTERWORKS,
Plasterworks,
GYPSUMGypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A1

313
59
10

0%

277
59
10

02-Sep-12
09-Sep-12
09-Sep-12

15-Jun-13

02-Sep-13
15-Nov-12
19-Sep-12

13-Feb-13
18-Apr-13
18-Apr-13

05-Jan-14
25-Jun-13
29-Apr-13

13
63
46

1053

NECP-Rebase_06Sep12-4.CO.1.7.2.12
PHASE 1 UPPER BASEMENT
NECOBFW1670
- PLASTERWORKS,
Plasterworks,
GYPSUMGypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A2

10

0%

10

20-Sep-12

01-Oct-12

30-Apr-13

11-May-13

46

1054

NECP-Rebase_06Sep12-4.CO.1.7.2.12
PHASE 1 UPPER BASEMENT
NECOBFW1680
- PLASTERWORKS,
Plasterworks,
GYPSUMGypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A3

10

0%

10

02-Oct-12

13-Oct-12

12-May-13

22-May-13

46

1055

NECP-Rebase_06Sep12-4.CO.1.7.2.12
PHASE 1 UPPER BASEMENT
NECOBFW1690
- PLASTERWORKS,
Plasterworks,
GYPSUMGypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A4

10

0%

10

14-Oct-12

24-Oct-12

23-May-13

03-Jun-13

46

1056

NECP-Rebase_06Sep12-4.CO.1.7.2.12
PHASE 1 UPPER BASEMENT
NECOBFW1700
- PLASTERWORKS,
Plasterworks,
GYPSUMGypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A7

10

0%

10

25-Oct-12

05-Nov-12

04-Jun-13

15-Jun-13

63

1057

NECP-Rebase_06Sep12-4.CO.1.7.2.12
PHASE 1 UPPER BASEMENT
NECOBFW1710
- PLASTERWORKS,
Plasterworks,
GYPSUMGypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A8

0%

06-Nov-12

15-Nov-12

16-Jun-13

25-Jun-13

63

10-Sep-12
10-Sep-12
10-Sep-12

02-Sep-13
23-Dec-12
19-Sep-12

13-Feb-13
13-Feb-13
13-Feb-13

01-Jan-14
24-Apr-13
20-Feb-13

16
87
84

1058
1059
1060

PHASE 1 UPPER BASEMENT - PAINTING CEILING


PRIMER & FIRST COATS
NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1300

Painting Ceiling, Area A1

306
90
9

0%

274
60
6

1061

NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1310

Painting Ceiling, Area A2

0%

20-Sep-12

30-Sep-12

20-Feb-13

27-Feb-13

84

1062

NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1320

Painting Ceiling, Area A3

0%

01-Oct-12

10-Oct-12

27-Feb-13

06-Mar-13

84

1063

NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1330

Painting Ceiling, Area A4

0%

11-Oct-12

21-Oct-12

06-Mar-13

13-Mar-13

84

1064

NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1340

Painting Ceiling, Area A5

0%

22-Oct-12

31-Oct-12

13-Mar-13

20-Mar-13

84

1065

NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1350

Painting Ceiling, Area A6

0%

01-Nov-12

11-Nov-12

20-Mar-13

27-Mar-13

87

1066

NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1360

Painting Ceiling, Area A7

0%

12-Nov-12

21-Nov-12

27-Mar-13

03-Apr-13

87

1067

NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1370

Painting Ceiling, Area A8

0%

22-Nov-12

02-Dec-12

03-Apr-13

10-Apr-13

87

1068

NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1380

Painting Ceiling, Area A9

0%

03-Dec-12

12-Dec-12

10-Apr-13

17-Apr-13

87

1069

NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1390

Painting Ceiling, Area A10

0%

13-Dec-12

23-Dec-12

17-Apr-13

24-Apr-13

87

1070
1071

FINAL COAT
NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1301

Painting Ceiling, Area A1

30
3

0%

30
3

29-Jul-13
29-Jul-13

02-Sep-13
01-Aug-13

27-Nov-13
27-Nov-13

01-Jan-14
30-Nov-13

16
13

1072

NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1311

Painting Ceiling, Area A2

0%

01-Aug-13

05-Aug-13

01-Dec-13

03-Dec-13

16

1073

NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1321

Painting Ceiling, Area A3

0%

05-Aug-13

08-Aug-13

04-Dec-13

07-Dec-13

16

1074

NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1331

Painting Ceiling, Area A4

0%

08-Aug-13

12-Aug-13

08-Dec-13

10-Dec-13

16

1075

NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1341

Painting Ceiling, Area A5

0%

12-Aug-13

15-Aug-13

11-Dec-13

14-Dec-13

16

1076

NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1351

Painting Ceiling, Area A6

0%

15-Aug-13

19-Aug-13

15-Dec-13

17-Dec-13

16

1077

NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1361

Painting Ceiling, Area A7

0%

19-Aug-13

22-Aug-13

19-Dec-13

22-Dec-13

16

1078

NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1371

Painting Ceiling, Area A8

0%

22-Aug-13

26-Aug-13

23-Dec-13

25-Dec-13

16

1079

NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1381

Painting Ceiling, Area A9

0%

26-Aug-13

29-Aug-13

26-Dec-13

29-Dec-13

16

1080

NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1391

Painting Ceiling, Area A10

0%

29-Aug-13

02-Sep-13

30-Dec-13

01-Jan-14

16

1081
1082
1083

PHASE 1 UPPER BASEMENT - PAINTING WALLS


PRIMER & FIRST COATS
NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2440

Painting Walls & Columns, Area A1

216
90
9

0%

212
93
9

24-Dec-12
24-Dec-12
24-Dec-12

02-Sep-13
07-Apr-13
02-Jan-13

30-Apr-13
30-Apr-13
30-Apr-13

05-Jan-14
15-Aug-13
09-May-13

13
46
49

1084

NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2450

Painting Walls & Columns, Area A2

0%

03-Jan-13

13-Jan-13

12-May-13

21-May-13

48

1085

NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2460

Painting Walls & Columns, Area A3

0%

14-Jan-13

23-Jan-13

23-May-13

02-Jun-13

47

1086

NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2470

Painting Walls & Columns, Area A4

0%

24-Jan-13

03-Feb-13

04-Jun-13

13-Jun-13

46

1087

NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2480

Painting Walls & Columns, Area A5

0%

04-Feb-13

13-Feb-13

15-Jun-13

24-Jun-13

46

1088

NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2490

Painting Walls & Columns, Area A6

0%

14-Feb-13

24-Feb-13

25-Jun-13

04-Jul-13

46

1089

NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2500

Painting Walls & Columns, Area A7

0%

25-Feb-13

06-Mar-13

06-Jul-13

15-Jul-13

46

1090

NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2510

Painting Walls & Columns, Area A8

0%

07-Mar-13

17-Mar-13

16-Jul-13

25-Jul-13

46

1091

NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2520

Painting Walls & Columns, Area A9

0%

18-Mar-13

27-Mar-13

27-Jul-13

05-Aug-13

46

1092

NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2530

Painting Walls & Columns, Area A10

0%

28-Mar-13

07-Apr-13

06-Aug-13

15-Aug-13

46

1093
1094

FINAL COAT
NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2441

Painting Walls & Columns, Area A1

30
3

0%

30
3

29-Jul-13
29-Jul-13

02-Sep-13
01-Aug-13

01-Dec-13
01-Dec-13

05-Jan-14
03-Dec-13

13
13

1095

NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2451

Painting Walls & Columns, Area A2

0%

01-Aug-13

05-Aug-13

04-Dec-13

07-Dec-13

13

1096

NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2461

Painting Walls & Columns, Area A3

0%

05-Aug-13

08-Aug-13

08-Dec-13

10-Dec-13

13

1097

NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2471

Painting Walls & Columns, Area A4

0%

08-Aug-13

12-Aug-13

11-Dec-13

14-Dec-13

13

1098

NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2481

Painting Walls & Columns, Area A5

0%

12-Aug-13

15-Aug-13

15-Dec-13

17-Dec-13

13

1099

NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2491

Painting Walls & Columns, Area A6

0%

15-Aug-13

19-Aug-13

19-Dec-13

22-Dec-13

13

1100

NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2501

Painting Walls & Columns, Area A7

0%

19-Aug-13

22-Aug-13

23-Dec-13

25-Dec-13

13

1101

NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2511

Painting Walls & Columns, Area A8

0%

22-Aug-13

26-Aug-13

26-Dec-13

29-Dec-13

13

1102

NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2521

Painting Walls & Columns, Area A9

0%

26-Aug-13

29-Aug-13

30-Dec-13

01-Jan-14

13

2013
Jan

Feb

Mar

Apr

May

2014

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Painting Walls & Columns, Area A10


Painting Walls & Columns, Area A1
Painting Walls & Columns, Area A2
Painting Walls & Columns, Area A1
Painting Walls & Columns, Area A2
Painting Walls & Columns, Area A3
Painting Walls & Columns, Area A4
Painting Walls & Columns, Area A5
Painting Walls & Columns, Area A6
Painting Walls & Columns, Area A7
Painting Walls & Columns, Area A8
Painting Walls & Columns, Area A9
Painting Walls & Columns, Area A10
Painting Floors, Area A1
Painting Floors, Area A2
Painting Floors, Area A3
Painting Floors, Area A4
Painting Floors, Area A5
Painting Floors, Area A6
Painting Floors, Area A7
Painting Floors, Area A8
Painting Floors, Area A9
Painting Floors, Area A10
Tiling, Area A1
Tiling, Area A2
Tiling, Area A5
Tiling, Area A6
Tiling, Area A9
Tiling, Area A10
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A1
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A2
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A3
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A4
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A5
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A6
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A7
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A8
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A9
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A10
Timber Doors and Louver Screens, Area A1-A2
Timber Doors and Louver Screens, Area A7-A8
Timber Doors and Louver Screens, Area A9-A10
Steel Doors and Louvers, Area A1-A5
Steel Doors and Louvers, Area A6-A10
Handrails, Area A1-A2
Handrails, Area A5-A6
Handrails, Area A9-A10
Skirtings, Walkway Grilles, Bollards, Column Protectors, A1-A4
Skirtings, Walkway Grilles, Bollards, Column Protectors, A5-A7
Skirtings, Walkway Grilles, Bollards, Column Protectors, A8-A10

Plasterworks, Gypsum Boards, Plasterboards, Area A1


Plasterworks, Gypsum Boards, Plasterboards, Area A2
Plasterworks, Gypsum Boards, Plasterboards, Area A3
Plasterworks, Gypsum Boards, Plasterboards, Area A4
Plasterworks, Gypsum Boards, Plasterboards, Area A7
Plasterworks, Gypsum Boards, Plasterboards, Area A8

Painting Ceiling, Area A1


Painting Ceiling, Area A2
Painting Ceiling, Area A3
Painting Ceiling, Area A4
Painting Ceiling, Area A5
Painting Ceiling, Area A6
Painting Ceiling, Area A7
Painting Ceiling, Area A8
Painting Ceiling, Area A9
Painting Ceiling, Area A10
Painting Ceiling, Area A1
Painting Ceiling, Area A2
Painting Ceiling, Area A3
Painting Ceiling, Area A4
Painting Ceiling, Area A5
Painting Ceiling, Area A6
Painting Ceiling, Area A7
Painting Ceiling, Area A8
Painting Ceiling, Area A9
Painting Ceiling, Area A10

Painting Walls & Columns, Area A1


Painting Walls & Columns, Area A2
Painting Walls & Columns, Area A3
Painting Walls & Columns, Area A4
Painting Walls & Columns, Area A5
Painting Walls & Columns, Area A6
Painting Walls & Columns, Area A7
Painting Walls & Columns, Area A8
Painting Walls & Columns, Area A9
Painting Walls & Columns, Area A10
Painting Walls & Columns, Area A1
Painting Walls & Columns, Area A2
Painting Walls & Columns, Area A3
Painting Walls & Columns, Area A4
Painting Walls & Columns, Area A5
Painting Walls & Columns, Area A6
Painting Walls & Columns, Area A7
Painting Walls & Columns, Area A8
Painting Walls & Columns, Area A9

Construction of North East Underground Carpark Contract No. XC10101100


#
1103

WBS

WBS Name

Activity ID

NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2531

Activity Name

BL Project
Duration

Painting Walls & Columns, Area A10

Activity % Remaining
Complete Duration

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

0%

29-Aug-13

02-Sep-13

Actual Start

Actual
Finish

02-Jan-14

05-Jan-14

13

08-Apr-13
08-Apr-13

21-Jul-13
17-Apr-13

08-Oct-13
08-Oct-13

26-Nov-13
15-Oct-13

46
32

1104
1105

PHASE 1 UPPER BASEMENT - PAINTING FLOORS


NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2840
- PAINTING FLOORS
Painting Floors, Area A1

90
9

0%

40
4

1106

NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2850
- PAINTING FLOORS
Painting Floors, Area A2

0%

18-Apr-13

28-Apr-13

15-Oct-13

20-Oct-13

42

1107

NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2860
- PAINTING FLOORS
Painting Floors, Area A3

0%

29-Apr-13

08-May-13

20-Oct-13

24-Oct-13

42

1108

NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2870
- PAINTING FLOORS
Painting Floors, Area A4

0%

09-May-13

19-May-13

24-Oct-13

29-Oct-13

43

1109

NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2880
- PAINTING FLOORS
Painting Floors, Area A5

0%

20-May-13

29-May-13

29-Oct-13

03-Nov-13

43

1110

NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2890
- PAINTING FLOORS
Painting Floors, Area A6

0%

30-May-13

09-Jun-13

03-Nov-13

07-Nov-13

43

1111

NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2900
- PAINTING FLOORS
Painting Floors, Area A7

0%

10-Jun-13

19-Jun-13

07-Nov-13

12-Nov-13

43

1112

NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2910
- PAINTING FLOORS
Painting Floors, Area A8

0%

20-Jun-13

30-Jun-13

12-Nov-13

17-Nov-13

45

1113

NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2920
- PAINTING FLOORS
Painting Floors, Area A9

0%

01-Jul-13

10-Jul-13

17-Nov-13

21-Nov-13

45

1114

NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2930
- PAINTING FLOORS
Painting Floors, Area A10

0%

11-Jul-13

21-Jul-13

21-Nov-13

26-Nov-13

46

02-Sep-12
02-Sep-12

20-Nov-12
09-Sep-12

21-May-13
21-May-13

06-Jul-13
25-May-13

102
57

1115
1116

PHASE 1 UPPER BASEMENT - TILING


NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1860
- TILING

Tiling, Area A1

69
7

0%

40
4

1117

NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1870
- TILING

Tiling, Area A2

0%

10-Sep-12

17-Sep-12

26-May-13

29-May-13

57

1118

NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1880
- TILING

Tiling, Area A3

0%

18-Sep-12

25-Sep-12

30-May-13

03-Jun-13

57

1119

NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1890
- TILING

Tiling, Area A4

0%

26-Sep-12

03-Oct-12

04-Jun-13

08-Jun-13

57

1120

NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1900
- TILING

Tiling, Area A5

0%

04-Oct-12

11-Oct-12

09-Jun-13

12-Jun-13

57

1121

NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1910
- TILING

Tiling, Area A6

0%

13-Oct-12

20-Oct-12

13-Jun-13

17-Jun-13

102

1122

NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1920
- TILING

Tiling, Area A7

0%

21-Oct-12

28-Oct-12

18-Jun-13

22-Jun-13

102

1123

NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1930
- TILING

Tiling, Area A8

0%

29-Oct-12

05-Nov-12

23-Jun-13

26-Jun-13

102

1124

NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1940
- TILING

Tiling, Area A9

0%

06-Nov-12

13-Nov-12

27-Jun-13

01-Jul-13

102

1125

NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1950
- TILING

Tiling, Area A10

0%

14-Nov-12

20-Nov-12

02-Jul-13

06-Jul-13

102

18-Apr-13
18-Apr-13

20-Jun-13
24-Apr-13

15-Oct-13
15-Oct-13

12-Dec-13
21-Oct-13

32
32

1126
1127

PHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORS
NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3240
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A1

55
6

0%

50
5

1128

NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3250
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A2

0%

25-Apr-13

01-May-13

21-Oct-13

27-Oct-13

32

1129

NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3260
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A3

0%

02-May-13

08-May-13

27-Oct-13

02-Nov-13

32

1130

NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3270
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A4

0%

09-May-13

15-May-13

02-Nov-13

07-Nov-13

32

1131

NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3280
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A5

0%

16-May-13

22-May-13

07-Nov-13

13-Nov-13

32

1132

NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3290
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A6

0%

23-May-13

28-May-13

13-Nov-13

19-Nov-13

32

1133

NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3300
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A7

0%

29-May-13

03-Jun-13

19-Nov-13

25-Nov-13

32

1134

NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3310
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A8

0%

04-Jun-13

09-Jun-13

25-Nov-13

01-Dec-13

32

1135

NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3320
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A9

0%

10-Jun-13

15-Jun-13

01-Dec-13

07-Dec-13

32

1136

0%

16-Jun-13

20-Jun-13

07-Dec-13

12-Dec-13

32

1137
1138

PHASE 1 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENS


NECP-Rebase_06Sep12-4.CO.1.7.2.21
PHASE 1 UPPER BASEMENT
NECOBFW3650
- TIMBER DOORS
Timber
ANDDoors
LOUVER
and Louver
SCREENS
Screens, Area A3-A4

59
6

0%

25
6

20-May-13
20-May-13

27-Jul-13
26-May-13

29-Oct-13
29-Oct-13

27-Nov-13
05-Nov-13

45
53

1139

NECP-Rebase_06Sep12-4.CO.1.7.2.21
PHASE 1 UPPER BASEMENT
NECOBFW3660
- TIMBER DOORS
Timber
ANDDoors
LOUVER
and Louver
SCREENS
Screens, Area A7-A8

0%

01-Jul-13

07-Jul-13

12-Nov-13

19-Nov-13

47

1140

NECP-Rebase_06Sep12-4.CO.1.7.2.21
PHASE 1 UPPER BASEMENT
NECOBFW3670
- TIMBER DOORS
Timber
ANDDoors
LOUVER
and Louver
SCREENS
Screens, Area A9-A10

0%

22-Jul-13

27-Jul-13

21-Nov-13

27-Nov-13

45

45
9

0%

12
6

30-May-13
30-May-13

21-Jul-13
09-Jun-13

28-Oct-13
28-Oct-13

11-Nov-13
04-Nov-13

39
39

1141
1142

NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3330
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A10

PHASE 1 UPPER BASEMENT - STEEL DOORS AND LOUVERS


NECP-Rebase_06Sep12-4.CO.1.7.2.37
PHASE 1 UPPER BASEMENT
NECOBFW3750
- STEEL DOORS
Steel
AND
Doors
LOUVERS
and Louvers, Area A1-A5

Page 11 of 19/27-Feb-13 09:03

Execution Programme Level 3


2013
Jan

Feb

Mar

Apr

May

2014

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Painting Floors, Area A2


Painting Floors, Area A3
Painting Floors, Area A4
Painting Floors, Area A5
Painting Floors, Area A6
Painting Floors, Area A7
Painting Floors, Area A8
Painting Floors, Area A9
Painting Floors, Area A10
Tiling, Area A1
Tiling, Area A2
Tiling, Area A3
Tiling, Area A4
Tiling, Area A5
Tiling, Area A6
Tiling, Area A7
Tiling, Area A8
Tiling, Area A9
Tiling, Area A10
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A1
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A2
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A3
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A4
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A5
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A6
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A7
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A8
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A9
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area A10
Timber Doors and Louver Screens, Area A3-A4
Timber Doors and Louver Screens, Area A7-A8
Timber Doors and Louver Screens, Area A9-A10
Steel Doors and Louvers, Area A1-A5

0%

15-Jul-13

21-Jul-13

04-Nov-13

11-Nov-13

39

Steel Doors and Louvers, Area A6-A10

PHASE 1 UPPER BASEMENT - HANDRAILS


NECP-Rebase_06Sep12-4.CO.1.7.2.20
PHASE 1 UPPER BASEMENT
NECOBFW3530
- HANDRAILS Handrails, Area A1-A2

52
9

0%

29
7

02-May-13
02-May-13

01-Jul-13
12-May-13

03-Nov-13
03-Nov-13

07-Dec-13
11-Nov-13

37
35

Handrails, Area A1-A2

1146

NECP-Rebase_06Sep12-4.CO.1.7.2.20
PHASE 1 UPPER BASEMENT
NECOBFW3540
- HANDRAILS Handrails, Area A5-A6

0%

29-May-13

08-Jun-13

19-Nov-13

27-Nov-13

38

1147

NECP-Rebase_06Sep12-4.CO.1.7.2.20
PHASE 1 UPPER BASEMENT
NECOBFW3550
- HANDRAILS Handrails, Area A9-A10

0%

22-Jun-13

01-Jul-13

28-Nov-13

07-Dec-13

37

PHASE 1 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORS


NECP-Rebase_06Sep12-4.CO.1.7.2.38
PHASE 1 UPPER BASEMENT
NECOBFW3840
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
A1-A4

23
8

0%

23
8

01-Jul-13
01-Jul-13

27-Jul-13
09-Jul-13

12-Nov-13
12-Nov-13

09-Dec-13
21-Nov-13

35
35

NECP-Rebase_06Sep12-4.CO.1.7.2.38
PHASE 1 UPPER BASEMENT
NECOBFW3850
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
A5-A7

0%

18-Jul-13

21-Nov-13

01-Dec-13

35

NECP-Rebase_06Sep12-4.CO.1.7.2.38
PHASE 1 UPPER BASEMENT
NECOBFW3860
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
A8-A10

0%

20-Jul-13

27-Jul-13

01-Dec-13

09-Dec-13

35

224
105
Glazing System - Internal Glazed Screen, Area A1, A9-A10 Lower Bsmt; A1-A2/A5-A6/A7-A8
26
0% Grd Flr 26

17-Nov-12
17-Nov-12

04-Aug-13
16-Dec-12

26-Jun-13
26-Jun-13

28-Oct-13
25-Jul-13

59
107

1148
1149
1150
1151

NECP-Rebase_06Sep12-4.CO.1.7.2.37
PHASE 1 UPPER BASEMENT
NECOBFW3760
- STEEL DOORS
Steel
AND
Doors
LOUVERS
and Louvers, Area A6-A10

10-Jul-13

Handrails, Area A5-A6


Handrails, Area A9-A10
Skirtings, Walkway Grilles, Bollards, Column Protectors, A1-A4
Skirtings, Walkway Grilles, Bollards, Column Protectors, A5-A7
Skirtings, Walkway Grilles, Bollards, Column Protectors, A8-A10

1152
1153

PHASE 1 - FINISHING WORKS


NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1040

1154

NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1120

Softwood Framing, Joinery Panels, WC Partitions, Area A1-A2 Lower Bsmt; Area
20 A1-A2/A9-A10
0%
Upper
20Bsmt24-Mar-13

15-Apr-13

13-Jul-13

04-Aug-13

97

1155

NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1130

Sandstone Cladding, Area A1-A2 Grd Flr (PMS)

11

0%

11

24-Mar-13

04-Apr-13

22-Aug-13

03-Sep-13

57

1156

NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1080

Steel Cladding and Panels (PMS)

14

0%

14

18-Mar-13

02-Apr-13

23-Sep-13

08-Oct-13

57

1157

NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1180

Ticket Office Counters & Windows, Area A1 Upper Bsmt (PMS)

0%

30-Jun-13

09-Jul-13

09-Oct-13

21-Oct-13

57

Ticket Office Counters & Windows, Area A1 Upper Bsmt (PMS)

1158

NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1140

Backlit Feature Wall, Area A1-A2 Grd Flr (PMS)

Backlit Feature Wall, Area A1-A2 Grd Flr (PMS)

1159

NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1150

Road Markings, Area A1-A10 Lower Bsmt, A1-A10 Upper Bsmt

1160

NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1160

Bench, Area A1-A2, Area A5-A6, Area A7-A8 Grd Flr

1161

NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1170

0%

10-Jul-13

16-Jul-13

15-Oct-13

21-Oct-13

57

15

0%

12

10-Jul-13

27-Jul-13

15-Oct-13

28-Oct-13

57

0%

16-Jul-13

21-Jul-13

15-Oct-13

20-Oct-13

59

Signages and Wayfinding, Area A1-A10 Lower Bsmt; Area A1-A10 Upper Bsmt
12

0%

12

22-Jul-13

04-Aug-13

15-Oct-13

28-Oct-13

59

91
20

0%

111
20

16-Apr-13
16-Apr-13

30-Jul-13
08-May-13

20-Aug-13
20-Aug-13

31-Dec-13
12-Sep-13

12
83

Glazing System - Internal Glazed Screen, Area A1, A9-A10 Lower Bsmt; A1-A2/A5-A6/A7-A8 Grd Flr
Softwood Framing, Joinery Panels, WC Partitions, Area A1-A2 Lower Bsmt; Area A1-A2/A9-A10 Upper Bsmt
Sandstone Cladding, Area A1-A2 Grd Flr (PMS)
Steel Cladding and Panels (PMS)

Road Markings, Area A1-A10 Lower Bsmt, A1-A10 Upper Bsmt


Bench, Area A1-A2, Area A5-A6, Area A7-A8 Grd Flr
Signages and Wayfinding, Area A1-A10 Lower Bsmt; Area A1-A10 Upper Bsmt

1162
1163

Furniture, Fittings & Equipment


NECP-Rebase_06Sep12-4.CO.1.4
Furniture, Fittings & Equipment
NECOBFFE1010

1164

NECP-Rebase_06Sep12-4.CO.1.4
Furniture, Fittings & Equipment
NECOBFFE1030

Kitchen Equipment (Concourse Pantry)

0%

16-Apr-13

21-Apr-13

22-Aug-13

27-Aug-13

112

Kitchen Equipment (Concourse Pantry)

1165

NECP-Rebase_06Sep12-4.CO.1.4
Furniture, Fittings & Equipment
NECOBFFE1040

Furniture (Concourse Pantry)

0%

16-Apr-13

21-Apr-13

28-Aug-13

02-Sep-13

112

Furniture (Concourse Pantry)

1166

NECP-Rebase_06Sep12-4.CO.1.4
Furniture, Fittings & Equipment
NECOBFFE1000

Benches (Concourse Pantry)

0%

22-Jul-13

30-Jul-13

19-Sep-13

28-Sep-13

88

1167

NECP-Rebase_06Sep12-4.CO.1.4
Furniture, Fittings & Equipment
NECOBFFE1020

Security Control Equipment (Concourse Pantry)

14

0%

14

16-Apr-13

01-May-13

15-Dec-13

31-Dec-13

480

296

22-Feb-12

03-Sep-13

03-Jan-12

31-Jan-13

14-Jan-14

296
296
296
296

22-Feb-12
22-Feb-12
22-Feb-12
22-Feb-12

02-Feb-13
02-Feb-13
02-Feb-13
02-Feb-13

03-Jan-12
03-Jan-12
03-Jan-12
03-Jan-12

31-Jan-13
31-Jan-13
17-Jun-13
17-Jun-13

24-Jul-13
24-Jul-13
24-Jul-13
24-Jul-13

151
75
75
75

1168
1169
1170
1171
1172

PHASE 2 WORKS
M6-Const. Compl. of Remaining Works Phase 1 & 2 Fit Out, MEP, Facade, Ext'l Works, Test, Commission
Lower Basement Floor
PHASE 2 - DEWATERING
NECP-Rebase_06Sep12-4.CO.2.1.2.13
PHASE 2 - DEWATERINGNECOSPE25
Dewatering Works

1173
1174
1175

PHASE 2 - EXCAVATION
Area 19
NECP-Rebase_06Sep12-4.CO.2.1.2.6.1
Area 19
NECOEX2000

1176
1177

Area 22
NECP-Rebase_06Sep12-4.CO.2.1.2.6.3
Area 22
NECOEX2020

1178
1179
1180

Sanitary Fixtures & Fittings, Accessories (Concourse Pantry)

Sanitary Fixtures & Fittings, Accessories (Concourse Pantry)

Benches (Concourse Pantry)


Security Control Equipment (Concourse Pantry)

89%

150
150
33
33

Excavation Area 34

10
5
5

95%

0
0
0

22-Feb-12
22-Feb-12
22-Feb-12

04-Mar-12
27-Feb-12
27-Feb-12

12-Jan-12
12-Jan-12
12-Jan-12

31-Jan-13
31-Jan-13
31-Jan-13

31-Jan-13
31-Jan-13
31-Jan-13

23
23
23

Excavation Area 34

Excavation Area 31

5
5

95%

0
0

28-Feb-12
28-Feb-12

04-Mar-12
04-Mar-12

17-Jan-12
17-Jan-12

31-Jan-13
31-Jan-13

31-Jan-13
31-Jan-13

23
23

Excavation Area 31

17-Nov-12
31-Dec-12
31-Dec-12

31-Jan-13
31-Jan-13
31-Jan-13

06-Feb-13
06-Feb-13
06-Feb-13

34
25
25

RC Retaining Wall Lower Basement, Area 32

PHASE 2 - LOWER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNS


Area 22/(Area 31)
NECP-Rebase_06Sep12-4.CO.2.1.2.11.3
Area 22/(Area 31)
NECOLBWC2035 RC Retaining Wall Lower Basement, Area 32

Dewatering Works

30%

6
6
6

RC Retaining Wall, Lower Basement, Area 36

0
0

40%

5
5

21-Dec-12
21-Dec-12

31-Jan-13
31-Jan-13

05-Feb-13
05-Feb-13

35
35

RC Retaining Wall, Lower Basement, Area 36

RC Retaining Wall, Lower Basement, Area 45 and 46

0
0

40%

5
5

17-Nov-12
17-Nov-12

31-Jan-13
31-Jan-13

05-Feb-13
05-Feb-13

19
19

RC Retaining Wall, Lower Basement, Area 45 and 46

Area 41/(Area 41)


NECP-Rebase_06Sep12-4.CO.2.1.2.11.23
Area 41/(Area 41)
NECOLBWC2440

RC Retaining Wall, Lower Basement, Area 44

0
0

30%

6
6

15-Dec-12
15-Dec-12

31-Jan-13
31-Jan-13

06-Feb-13
06-Feb-13

7
7

RC Retaining Wall, Lower Basement, Area 44

Area 40/(Area 40)


NECP-Rebase_06Sep12-4.CO.2.1.2.11.22
Area 40/(Area 40)
NECOLBWC2420

RC Retaining Wall, Lower Basement, Area 42 and 43

0
0

75%

2
2

05-Dec-12
05-Dec-12

31-Jan-13
31-Jan-13

02-Feb-13
02-Feb-13

22
22

RC Retaining Wall, Lower Basement, Area 42 and 43

249
64
14
14

13-Mar-12
17-Jul-12
17-Jul-12
17-Jul-12

29-Dec-12
30-Sep-12
02-Aug-12
02-Aug-12

03-Sep-12
26-Nov-12
10-Dec-12
10-Dec-12

31-Jan-13
31-Jan-13
31-Jan-13
31-Jan-13

08-Jul-13
18-May-13
16-Mar-13
16-Mar-13

165
137
2
0

1181
1182

Area 20/(Area 35)


NECP-Rebase_06Sep12-4.CO.2.1.2.11.15
Area 20/(Area 35)
NECOLBWC2245

1183
1184

Area 42/(Area 42)


NECP-Rebase_06Sep12-4.CO.2.1.2.11.24
Area 42/(Area 42)
NECOLBWC2460

1185
1186
1187
1188

0
0
0

1189
1190
1191
1192

Upper Basement Floor


PHASE 2 - UPPER BASEMENT SLABS
Area B1 (A24/A26)
NECP-Rebase_06Sep12-4.CO.2.1.3.10.2
Area B1 (A24/A26)
NECOLBSS2000

0%

136
92
38
38

1193

NECP-Rebase_06Sep12-4.CO.2.1.3.10.2
Area B1 (A24/A26)
NECOLBSS2001

Small power conduits

0%

25-Jul-12

30-Jul-12

10-Mar-13

14-Mar-13

Small power conduits

1194

NECP-Rebase_06Sep12-4.CO.2.1.3.10.2
Area B1 (A24/A26)
NECOLBSS2002

Security system conduits

0%

25-Jul-12

30-Jul-12

10-Mar-13

14-Mar-13

Security system conduits

1195

NECP-Rebase_06Sep12-4.CO.2.1.3.10.2
Area B1 (A24/A26)
NECOLBSS2003

Earthing conduits

0%

25-Jul-12

30-Jul-12

10-Mar-13

14-Mar-13

Earthing conduits

1196

NECP-Rebase_06Sep12-4.CO.2.1.3.10.2
Area B1 (A24/A26)
NECOLBSS2004

Lighting conduits

0%

25-Jul-12

30-Jul-12

10-Mar-13

14-Mar-13

Lighting conduits

1197

NECP-Rebase_06Sep12-4.CO.2.1.3.10.2
Area B1 (A24/A26)
NECOLBSS2005

Fire Alaram conduits

0%

25-Jul-12

30-Jul-12

10-Mar-13

14-Mar-13

Fire Alaram conduits

1198

NECP-Rebase_06Sep12-4.CO.2.1.3.10.2
Area B1 (A24/A26)
NECOLBSS2006

Telephone conduits

0%

25-Jul-12

30-Jul-12

10-Mar-13

14-Mar-13

1199
1200

Area B2 (A25/A26)
NECP-Rebase_06Sep12-4.CO.2.1.3.10.5
Area B2 (A25/A26)
NECOLBSS2050

14
14

0%

29
29

13-Sep-12
13-Sep-12

30-Sep-12
30-Sep-12

31-Jan-13
31-Jan-13

05-Mar-13
05-Mar-13

16
-9

1201

NECP-Rebase_06Sep12-4.CO.2.1.3.10.5
Area B2 (A25/A26)
NECOLBSS2051

Small power conduits

0%

22-Sep-12

26-Sep-12

27-Feb-13

04-Mar-13

18

Small power conduits

1202

NECP-Rebase_06Sep12-4.CO.2.1.3.10.5
Area B2 (A25/A26)
NECOLBSS2052

Security system conduits

0%

22-Sep-12

26-Sep-12

27-Feb-13

04-Mar-13

18

Security system conduits

1203

NECP-Rebase_06Sep12-4.CO.2.1.3.10.5
Area B2 (A25/A26)
NECOLBSS2053

Earthing conduits

0%

22-Sep-12

26-Sep-12

27-Feb-13

04-Mar-13

18

Earthing conduits

1204

NECP-Rebase_06Sep12-4.CO.2.1.3.10.5
Area B2 (A25/A26)
NECOLBSS2054

Lighting conduits

0%

22-Sep-12

26-Sep-12

27-Feb-13

04-Mar-13

18

Lighting conduits

1205

NECP-Rebase_06Sep12-4.CO.2.1.3.10.5
Area B2 (A25/A26)
NECOLBSS2055

Fire Alaram conduits

0%

22-Sep-12

26-Sep-12

27-Feb-13

04-Mar-13

18

Fire Alaram conduits

1206

NECP-Rebase_06Sep12-4.CO.2.1.3.10.5
Area B2 (A25/A26)
NECOLBSS2056

Telephone conduits

0%

22-Sep-12

26-Sep-12

27-Feb-13

04-Mar-13

18

1207
1208

Area 24
NECP-Rebase_06Sep12-4.CO.2.1.3.10.11
Area 24
NECOLBSS2316

RC Suspended Slab, Upper Basement, Area 24

0
0

0%

22
22

31-Jan-13
31-Jan-13

25-Feb-13
25-Feb-13

21
2

1209

NECP-Rebase_06Sep12-4.CO.2.1.3.10.11
Area 24
NECOLBSS2326

Small power conduits

0%

19-Feb-13

24-Feb-13

23

Small power conduits

1210

NECP-Rebase_06Sep12-4.CO.2.1.3.10.11
Area 24
NECOLBSS2336

Security system conduits

0%

19-Feb-13

24-Feb-13

23

Security system conduits

1211

NECP-Rebase_06Sep12-4.CO.2.1.3.10.11
Area 24
NECOLBSS2346

Earthing conduits

0%

19-Feb-13

24-Feb-13

23

Earthing conduits

1212

NECP-Rebase_06Sep12-4.CO.2.1.3.10.11
Area 24
NECOLBSS2356

Lighting conduits

0%

19-Feb-13

24-Feb-13

23

Lighting conduits

1213

NECP-Rebase_06Sep12-4.CO.2.1.3.10.11
Area 24
NECOLBSS2366

Fire Alarm conduits

0%

19-Feb-13

24-Feb-13

23

Fire Alarm conduits

1214

NECP-Rebase_06Sep12-4.CO.2.1.3.10.11
Area 24
NECOLBSS2376

Telephone conduits

0%

19-Feb-13

24-Feb-13

23

Telephone conduits

RC Suspended Slab, Upper Basement, Area 22

RC Suspended Slab, Upper Basement, Area 23

26-Nov-12
26-Nov-12

10-Dec-12
10-Dec-12

Feb

Painting Floors, Area A1

1144
1145

1143

Jan

Painting Walls & Columns, Area A10

RC Suspended Slab, Upper Basement, Area 22

Telephone conduits
RC Suspended Slab, Upper Basement, Area 23

Telephone conduits
RC Suspended Slab, Upper Basement, Area 24

Construction of North East Underground Carpark Contract No. XC10101100


#

WBS

WBS Name

Activity ID

BL Project
Duration

Activity % Remaining
Complete Duration

RC Suspended Slab, Upper Basement, Area 25

0
0

0%

15
15

Early Start

Early Finish

Total
Float

31-Jan-13
31-Jan-13

17-Feb-13
17-Feb-13

26
19

NECP-Rebase_06Sep12-4.CO.2.1.3.10.12
Area 25
NECOLBSS2396

Small power conduits

0%

NECP-Rebase_06Sep12-4.CO.2.1.3.10.12
Area 25
NECOLBSS2406

Security system conduits

0%

NECP-Rebase_06Sep12-4.CO.2.1.3.10.12
Area 25
NECOLBSS2416

Earthing conduits

0%

11-Feb-13

16-Feb-13

28

Small power conduits

11-Feb-13

16-Feb-13

28

Security system conduits

11-Feb-13

16-Feb-13

28

1220

NECP-Rebase_06Sep12-4.CO.2.1.3.10.12
Area 25
NECOLBSS2426

Lighting conduits

1221

NECP-Rebase_06Sep12-4.CO.2.1.3.10.12
Area 25
NECOLBSS2436

Fire Alarm conduits

Earthing conduits

0%

11-Feb-13

16-Feb-13

28

Lighting conduits

0%

11-Feb-13

16-Feb-13

28

1222

NECP-Rebase_06Sep12-4.CO.2.1.3.10.12
Area 25
NECOLBSS2446

Telephone conduits

Fire Alarm conduits

0%

11-Feb-13

16-Feb-13

28

1223
1224

Area 26
NECP-Rebase_06Sep12-4.CO.2.1.3.10.13
Area 26
NECOLBSS2456

Telephone conduits

RC Suspended Slab, Upper Basement, Area 26

0
0

0%

8
8

19-Feb-13
19-Feb-13

28-Feb-13
28-Feb-13

20
7

1225
1226

NECP-Rebase_06Sep12-4.CO.2.1.3.10.13
Area 26
NECOLBSS2466

Small power conduits

0%

21-Feb-13

26-Feb-13

22

Small power conduits

NECP-Rebase_06Sep12-4.CO.2.1.3.10.13
Area 26
NECOLBSS2476

Security system conduits

0%

21-Feb-13

26-Feb-13

22

Security system conduits

1227

NECP-Rebase_06Sep12-4.CO.2.1.3.10.13
Area 26
NECOLBSS2486

Earthing conduits

0%

21-Feb-13

26-Feb-13

22

Earthing conduits

1228

NECP-Rebase_06Sep12-4.CO.2.1.3.10.13
Area 26
NECOLBSS2496

Lighting conduits

0%

21-Feb-13

26-Feb-13

22

Lighting conduits

1229

NECP-Rebase_06Sep12-4.CO.2.1.3.10.13
Area 26
NECOLBSS2506

Fire Alarm conduits

0%

21-Feb-13

26-Feb-13

22

Fire Alarm conduits

NECP-Rebase_06Sep12-4.CO.2.1.3.10.13
Area 26
NECOLBSS2516

Telephone conduits

Telephone conduits

1215
1216

Area 25
NECP-Rebase_06Sep12-4.CO.2.1.3.10.12
Area 25
NECOLBSS2386

1217
1218
1219

1230

Activity Name

BL Project
Start

BL Project
Finish

Actual Start
26-Nov-12
26-Nov-12

Actual
Finish

2013
Jan

Feb

Mar

Apr

0%

21-Feb-13

26-Feb-13

22

0
0

0%

21
21

31-Mar-13
31-Mar-13

23-Apr-13
23-Apr-13

137
137

1233
1234

Vehicular Ramp - Axis A-B/36-41 (At Raft Foundation 26)


NECP-Rebase_06Sep12-4.CO.2.1.3.10.15
Vehicular Ramp - Axis A-B/36-41
NECOLBSS3090
(At Raft Foundation
RC Ramp,
26) Axis A-B/36-41 (at Raft Foundation 26)

0
0

0%

21
21

24-Apr-13
24-Apr-13

18-May-13
18-May-13

137
137

214
Powerfloat Concrete Finishes, Lower Basement & Upper Basement Floors 214

62%

38
38

13-Mar-12
13-Mar-12

18-Nov-12
18-Nov-12

03-Sep-12
03-Sep-12

31-Jan-13
31-Jan-13

16-Mar-13
16-Mar-13

175
175

25%

45
4
4

02-Aug-12
26-Aug-12
26-Aug-12

10-Nov-12
01-Sep-12
01-Sep-12

17-Nov-12
03-Dec-12
03-Dec-12

31-Jan-13
31-Jan-13
31-Jan-13

24-Mar-13
04-Feb-13
04-Feb-13

0
27
27

RC Columns Upper Basement, Area 20

25%

4
4

04-Nov-12
04-Nov-12

10-Nov-12
10-Nov-12

03-Dec-12
03-Dec-12

31-Jan-13
31-Jan-13

04-Feb-13
04-Feb-13

37
37

RC Columns Upper Basement, Area 21

20-Aug-12
20-Aug-12

26-Aug-12
26-Aug-12

19-Mar-13
19-Mar-13

24-Mar-13
24-Mar-13

0
0

29-Oct-12
29-Oct-12

07-Nov-12
07-Nov-12

06-Mar-13
06-Mar-13

19-Mar-13
14-Mar-13

0
-9

14-Mar-13

19-Mar-13

28-Feb-13
13-Mar-13

14-Mar-13
14-Mar-13

-6
-9

28-Feb-13

05-Mar-13

31-Jan-13
31-Jan-13

19-Mar-13
05-Feb-13

0
36

14-Mar-13

19-Mar-13

31-Jan-13
31-Jan-13

06-Mar-13
06-Feb-13

8
32

28-Feb-13

06-Mar-13

31-Jan-13
31-Jan-13
31-Jan-13

14-Apr-13
17-Mar-13
17-Mar-13

18
42
14

1237
1238
1239

PHASE 2 - UPPER BASEMENT RETAINING WALLS, FIRE STAIRS/LIFTS & COLUMNS


Area 25
NECP-Rebase_06Sep12-4.CO.2.1.3.9.5
Area 25
NECOUBWC2080 RC Columns Upper Basement, Area 20

1240
1241

Area 26
NECP-Rebase_06Sep12-4.CO.2.1.3.9.17
Area 26
NECOUBWC2270

1242
1243

Area 24
NECP-Rebase_06Sep12-4.CO.2.1.3.9.4
Area 24
NECOUBWC2060

1244
1245

Area 23
NECP-Rebase_06Sep12-4.CO.2.1.3.9.16
Area 23
NECOUBWC2250

1246

NECP-Rebase_06Sep12-4.CO.2.1.3.9.16
Area 23
NECOUBWC2260

1247
1248

Area 19
NECP-Rebase_06Sep12-4.CO.2.1.3.9.1
Area 19
NECOUBWC2000

1249

NECP-Rebase_06Sep12-4.CO.2.1.3.9.1
Area 19
NECOUBWC2010

1250
1251

Area 20
NECP-Rebase_06Sep12-4.CO.2.1.3.9.15
Area 20
NECOUBWC2235

1252

NECP-Rebase_06Sep12-4.CO.2.1.3.9.15
Area 20
NECOUBWC2240

1253
1254

Area 21
NECP-Rebase_06Sep12-4.CO.2.1.3.9.2
Area 21
NECOUBWC2020

1255
1256
1257
1258

NECP-Rebase_06Sep12-4.CO.2.1.3.9.2
Area 21
NECOUBWC2030

85
5
5

RC Columns Upper Basement, Area 21

5
5

RC Columns Upper Basement, Area 22

5
5

0%

5
5

RC Retaining Wall, Upper Basement, Area 23

8
8

0%

12
8

RC Columns Upper Basement, Area 23

0%

29-Oct-12

04-Nov-12

RC Retaining Wall, Upper Basement, Area 24

8
8

75%

13
2

02-Aug-12
02-Aug-12

12-Aug-12
12-Aug-12

RC Columns Upper Basement, Area 24

0%

02-Aug-12

08-Aug-12

5
0

29-Oct-12

40%

41
5

23-Oct-12

RC Retaining Wall, Upper Basement, Area 25


RC Columns Upper Basement, Area 25

0%

23-Oct-12

29-Oct-12

RC Retaining Wall, Upper Basement, Area 26

8
8

30%

30
6

08-Aug-12
08-Aug-12

18-Aug-12
18-Aug-12

RC Columns Upper Basement, Area 26

PHASE 2 - GROUND FLOOR SLABS (incl. Protective Screed)


Area B10
NECP-Rebase_06Sep12-4.CO.2.1.3.8.10
Area B10
NECOUBSS2090
RC Suspended Slab, Ground Floor, Area 17

0%

08-Aug-12

14-Aug-12

108
14
14

11-Aug-12
28-Nov-12
28-Nov-12

15-Dec-12
15-Dec-12
15-Dec-12

05-Dec-12
05-Dec-12
17-Nov-12
17-Nov-12
15-Dec-12
15-Dec-12

RC Ramp, Axis A-B/36-41 (at Raft Foundation 26)


Powerfloat Concrete Finishes, Lower Basement & Upper Basement Floors

RC Columns Upper Basement, Area 22


RC Retaining Wall, Upper Basement, Area 23
RC Columns Upper Basement, Area 23
RC Retaining Wall, Upper Basement, Area 24
RC Columns Upper Basement, Area 24
RC Retaining Wall, Upper Basement, Area 25
RC Columns Upper Basement, Area 25
RC Retaining Wall, Upper Basement, Area 26
RC Columns Upper Basement, Area 26

0%

1259

NECP-Rebase_06Sep12-4.CO.2.1.3.8.10
Area B10
NECOUBSS2091

Small power conduits

0%

06-Dec-12

11-Dec-12

11-Mar-13

16-Mar-13

44

Small power conduits

1260

NECP-Rebase_06Sep12-4.CO.2.1.3.8.10
Area B10
NECOUBSS2092

Security system conduits

0%

06-Dec-12

11-Dec-12

11-Mar-13

16-Mar-13

44

Security system conduits

1261

NECP-Rebase_06Sep12-4.CO.2.1.3.8.10
Area B10
NECOUBSS2093

Earthing conduits

0%

06-Dec-12

11-Dec-12

11-Mar-13

16-Mar-13

44

Earthing conduits

1262

NECP-Rebase_06Sep12-4.CO.2.1.3.8.10
Area B10
NECOUBSS2094

Lighting conduits

0%

06-Dec-12

11-Dec-12

11-Mar-13

16-Mar-13

44

Lighting conduits

1263

NECP-Rebase_06Sep12-4.CO.2.1.3.8.10
Area B10
NECOUBSS2095

Fire Alarm conduits

0%

06-Dec-12

11-Dec-12

11-Mar-13

16-Mar-13

44

Fire Alarm conduits

1264

NECP-Rebase_06Sep12-4.CO.2.1.3.8.10
Area B10
NECOUBSS2096

Telephone conduits

0%

06-Dec-12

11-Dec-12

11-Mar-13

16-Mar-13

44

Telephone conduits

1265
1266

Area 17
NECP-Rebase_06Sep12-4.CO.2.1.3.8.11
Area 17
NECOUBSS2596

RC Suspended Slab, Ground Floor, Area 18

0
0

0%

6
6

28-Feb-13
28-Feb-13

06-Mar-13
06-Mar-13

16
16

1267

NECP-Rebase_06Sep12-4.CO.2.1.3.8.11
Area 17
NECOUBSS2606

Small power conduits

0%

03-Mar-13

04-Mar-13

16

Small power conduits

1268

NECP-Rebase_06Sep12-4.CO.2.1.3.8.11
Area 17
NECOUBSS2616

Security system conduits

0%

03-Mar-13

04-Mar-13

16

Security system conduits

1269

NECP-Rebase_06Sep12-4.CO.2.1.3.8.11
Area 17
NECOUBSS2626

Earthing conduits

0%

03-Mar-13

04-Mar-13

16

Earthing conduits

1270

NECP-Rebase_06Sep12-4.CO.2.1.3.8.11
Area 17
NECOUBSS2636

Lighting conduits

0%

03-Mar-13

04-Mar-13

16

Lighting conduits

1271

NECP-Rebase_06Sep12-4.CO.2.1.3.8.11
Area 17
NECOUBSS2646

Fire Alarm conduits

0%

03-Mar-13

04-Mar-13

16

Fire Alarm conduits

1272

NECP-Rebase_06Sep12-4.CO.2.1.3.8.11
Area 17
NECOUBSS2656

Telephone conduits

0%

03-Mar-13

04-Mar-13

16

Telephone conduits

1273
1274

Area B7
NECP-Rebase_06Sep12-4.CO.2.1.3.8.4
Area B7
NECOUBSS2030

14
14

0%

35
35

15-Sep-12
15-Sep-12

01-Oct-12
01-Oct-12

31-Jan-13
31-Jan-13

12-Mar-13
12-Mar-13

1
0

1275

NECP-Rebase_06Sep12-4.CO.2.1.3.8.4
Area B7
NECOUBSS2031

Small power conduits

0%

23-Sep-12

27-Sep-12

06-Mar-13

11-Mar-13

Small power conduits

1276

NECP-Rebase_06Sep12-4.CO.2.1.3.8.4
Area B7
NECOUBSS2032

Security system conduits

0%

23-Sep-12

27-Sep-12

06-Mar-13

11-Mar-13

Security system conduits

1277

NECP-Rebase_06Sep12-4.CO.2.1.3.8.4
Area B7
NECOUBSS2033

Earthing conduits

0%

24-Sep-12

29-Sep-12

06-Mar-13

11-Mar-13

Earthing conduits

1278

NECP-Rebase_06Sep12-4.CO.2.1.3.8.4
Area B7
NECOUBSS2034

Lighting conduits

0%

24-Sep-12

29-Sep-12

06-Mar-13

11-Mar-13

Lighting conduits

1279

NECP-Rebase_06Sep12-4.CO.2.1.3.8.4
Area B7
NECOUBSS2035

Fire Alaram conduits

0%

24-Sep-12

29-Sep-12

06-Mar-13

11-Mar-13

Fire Alaram conduits

1280

NECP-Rebase_06Sep12-4.CO.2.1.3.8.4
Area B7
NECOUBSS2036

Telephone conduits

0%

24-Sep-12

29-Sep-12

06-Mar-13

11-Mar-13

Telephone conduits

1281
1282

Area B8
NECP-Rebase_06Sep12-4.CO.2.1.3.8.9
Area B8
NECOUBSS2080

14
14

20%

8
8

12-Nov-12
12-Nov-12

28-Nov-12
28-Nov-12

19-Mar-13
19-Mar-13

27-Mar-13
27-Mar-13

0
0

1283

NECP-Rebase_06Sep12-4.CO.2.1.3.8.9
Area B8
NECOUBSS2081

Small power conduits

0%

20-Nov-12

25-Nov-12

21-Mar-13

26-Mar-13

Small power conduits

1284

NECP-Rebase_06Sep12-4.CO.2.1.3.8.9
Area B8
NECOUBSS2082

Security system conduits

0%

20-Nov-12

25-Nov-12

21-Mar-13

26-Mar-13

Security system conduits

1285

NECP-Rebase_06Sep12-4.CO.2.1.3.8.9
Area B8
NECOUBSS2083

Earthing conduits

0%

20-Nov-12

25-Nov-12

21-Mar-13

26-Mar-13

Earthing conduits

1286

NECP-Rebase_06Sep12-4.CO.2.1.3.8.9
Area B8
NECOUBSS2084

Lighting conduits

0%

20-Nov-12

25-Nov-12

21-Mar-13

26-Mar-13

Lighting conduits

1287

NECP-Rebase_06Sep12-4.CO.2.1.3.8.9
Area B8
NECOUBSS2085

Fire Alaram conduits

0%

20-Nov-12

25-Nov-12

21-Mar-13

26-Mar-13

Fire Alaram conduits

1288

NECP-Rebase_06Sep12-4.CO.2.1.3.8.9
Area B8
NECOUBSS2086

Telephone conduits

0%

20-Nov-12

25-Nov-12

21-Mar-13

26-Mar-13

1289
1290

Area B5
NECP-Rebase_06Sep12-4.CO.2.1.3.8.3
Area B5
NECOUBSS2020

14
14

25%

6
6

03-Sep-12
03-Sep-12

19-Sep-12
19-Sep-12

06-Mar-13
06-Mar-13

12-Mar-13
12-Mar-13

9
9

1291

NECP-Rebase_06Sep12-4.CO.2.1.3.8.3
Area B5
NECOUBSS2021

Small power conduits

0%

11-Sep-12

16-Sep-12

06-Mar-13

11-Mar-13

Small power conduits

1292

NECP-Rebase_06Sep12-4.CO.2.1.3.8.3
Area B5
NECOUBSS2022

Security system conduits

0%

11-Sep-12

16-Sep-12

06-Mar-13

11-Mar-13

Security system conduits

1293

NECP-Rebase_06Sep12-4.CO.2.1.3.8.3
Area B5
NECOUBSS2023

Earthing conduits

0%

12-Sep-12

17-Sep-12

06-Mar-13

11-Mar-13

Earthing conduits

1294

NECP-Rebase_06Sep12-4.CO.2.1.3.8.3
Area B5
NECOUBSS2024

Lighting conduits

0%

12-Sep-12

17-Sep-12

06-Mar-13

11-Mar-13

Lighting conduits

1295

NECP-Rebase_06Sep12-4.CO.2.1.3.8.3
Area B5
NECOUBSS2025

Fire Alaram conduits

0%

12-Sep-12

17-Sep-12

06-Mar-13

11-Mar-13

Fire Alaram conduits

1296

NECP-Rebase_06Sep12-4.CO.2.1.3.8.3
Area B5
NECOUBSS2026

Telephone conduits

06-Mar-13

11-Mar-13

Telephone conduits

1297
1298

Area B6
NECP-Rebase_06Sep12-4.CO.2.1.3.8.8
Area B6
NECOUBSS2070

20-Mar-13
20-Mar-13

27-Mar-13
27-Mar-13

0
0

1299

NECP-Rebase_06Sep12-4.CO.2.1.3.8.8
Area B6
NECOUBSS2071

1300

NECP-Rebase_06Sep12-4.CO.2.1.3.8.8
Area B6
NECOUBSS2072

1301
1302
1303

RC Suspended Slab, Ground Floor, Area 20

RC Suspended Slab, Ground Floor, Area 21

29-Dec-12
29-Dec-12

05-Jan-13
05-Jan-13

30-Dec-12
30-Dec-12

RC Suspended Slab, Ground Floor, Area 17

RC Suspended Slab, Ground Floor, Area 18

RC Suspended Slab, Ground Floor, Area 19

RC Suspended Slab, Ground Floor, Area 20

Telephone conduits
RC Suspended Slab, Ground Floor, Area 21

0%

12-Sep-12

17-Sep-12

14
14

20%

6
6

31-Oct-12
31-Oct-12

17-Nov-12
17-Nov-12

Small power conduits

0%

08-Nov-12

13-Nov-12

21-Mar-13

26-Mar-13

Small power conduits

Security system conduits

0%

08-Nov-12

13-Nov-12

21-Mar-13

26-Mar-13

Security system conduits

NECP-Rebase_06Sep12-4.CO.2.1.3.8.8
Area B6
NECOUBSS2073

Earthing conduits

0%

08-Nov-12

13-Nov-12

21-Mar-13

26-Mar-13

Earthing conduits

NECP-Rebase_06Sep12-4.CO.2.1.3.8.8
Area B6
NECOUBSS2074

Lighting conduits

0%

08-Nov-12

13-Nov-12

21-Mar-13

26-Mar-13

Lighting conduits

NECP-Rebase_06Sep12-4.CO.2.1.3.8.8
Area B6
NECOUBSS2075

Fire Alaram conduits

0%

08-Nov-12

13-Nov-12

21-Mar-13

26-Mar-13

Fire Alaram conduits

1304

NECP-Rebase_06Sep12-4.CO.2.1.3.8.8
Area B6
NECOUBSS2076

Telephone conduits

0%

08-Nov-12

13-Nov-12

21-Mar-13

26-Mar-13

1305
1306

Area B3
NECP-Rebase_06Sep12-4.CO.2.1.3.8.2
Area B3
NECOUBSS2010

14
14

0%

10
10

22-Aug-12
22-Aug-12

08-Sep-12
08-Sep-12

09-Mar-13
09-Mar-13

19-Mar-13
19-Mar-13

0
0

1307

NECP-Rebase_06Sep12-4.CO.2.1.3.8.2
Area B3
NECOUBSS2011

Small power conduits

0%

30-Aug-12

05-Sep-12

14-Mar-13

18-Mar-13

Small power conduits

1308

NECP-Rebase_06Sep12-4.CO.2.1.3.8.2
Area B3
NECOUBSS2012

Security system conduits

0%

30-Aug-12

05-Sep-12

14-Mar-13

18-Mar-13

Security system conduits

1309

NECP-Rebase_06Sep12-4.CO.2.1.3.8.2
Area B3
NECOUBSS2013

Earthing conduits

0%

30-Aug-12

05-Sep-12

14-Mar-13

18-Mar-13

Earthing conduits

1310

NECP-Rebase_06Sep12-4.CO.2.1.3.8.2
Area B3
NECOUBSS2014

Lighting conduits

0%

30-Aug-12

05-Sep-12

14-Mar-13

18-Mar-13

Lighting conduits

RC Suspended Slab, Ground Floor, Area 22

RC Suspended Slab, Ground Floor, Area 24B

04-Jan-13
04-Jan-13

RC Suspended Slab, Ground Floor, Area 22

Telephone conduits
RC Suspended Slab, Ground Floor, Area 24B

1311

NECP-Rebase_06Sep12-4.CO.2.1.3.8.2
Area B3
NECOUBSS2015

Fire Alaram conduits

0%

30-Aug-12

05-Sep-12

14-Mar-13

18-Mar-13

Fire Alaram conduits

1312

NECP-Rebase_06Sep12-4.CO.2.1.3.8.2
Area B3
NECOUBSS2016

Telephone conduits

0%

30-Aug-12

05-Sep-12

14-Mar-13

18-Mar-13

Telephone conduits

1313
1314

Area B4
NECP-Rebase_06Sep12-4.CO.2.1.3.8.7
Area B4
NECOUBSS2060

14
14

0%

14
14

20-Oct-12
20-Oct-12

05-Nov-12
05-Nov-12

30-Mar-13
30-Mar-13

14-Apr-13
14-Apr-13

4
4

1315

NECP-Rebase_06Sep12-4.CO.2.1.3.8.7
Area B4
NECOUBSS2061

0%

28-Oct-12

01-Nov-12

06-Apr-13

10-Apr-13

Small power conduits

RC Suspended Slab, Ground Floor, Area 23


Small power conduits

RC Suspended Slab, Ground Floor, Area 23

1316

NECP-Rebase_06Sep12-4.CO.2.1.3.8.7
Area B4
NECOUBSS2062

Security system conduits

0%

28-Oct-12

01-Nov-12

06-Apr-13

10-Apr-13

Security system conduits

1317

NECP-Rebase_06Sep12-4.CO.2.1.3.8.7
Area B4
NECOUBSS2063

Earthing conduits

0%

28-Oct-12

01-Nov-12

06-Apr-13

10-Apr-13

Earthing conduits

1318

NECP-Rebase_06Sep12-4.CO.2.1.3.8.7
Area B4
NECOUBSS2064

Lighting conduits

0%

28-Oct-12

01-Nov-12

06-Apr-13

10-Apr-13

Lighting conduits

1319

NECP-Rebase_06Sep12-4.CO.2.1.3.8.7
Area B4
NECOUBSS2065

Fire Alaram conduits

0%

28-Oct-12

01-Nov-12

06-Apr-13

10-Apr-13

Fire Alaram conduits

1320

NECP-Rebase_06Sep12-4.CO.2.1.3.8.7
Area B4
NECOUBSS2066

Telephone conduits

0%

28-Oct-12

01-Nov-12

06-Apr-13

10-Apr-13

1321
1322

Area B1
NECP-Rebase_06Sep12-4.CO.2.1.3.8.1
Area B1
NECOUBSS2000

14
14

0%

7
7

11-Aug-12
11-Aug-12

27-Aug-12
27-Aug-12

17-Mar-13
17-Mar-13

24-Mar-13
24-Mar-13

0
0

1323

NECP-Rebase_06Sep12-4.CO.2.1.3.8.1
Area B1
NECOUBSS2001

Small power conduits

0%

19-Aug-12

23-Aug-12

19-Mar-13

23-Mar-13

Small power conduits

1324

NECP-Rebase_06Sep12-4.CO.2.1.3.8.1
Area B1
NECOUBSS2002

Security system conduits

0%

19-Aug-12

23-Aug-12

19-Mar-13

23-Mar-13

Security system conduits

1325

NECP-Rebase_06Sep12-4.CO.2.1.3.8.1
Area B1
NECOUBSS2003

Earthing conduits

0%

19-Aug-12

23-Aug-12

19-Mar-13

23-Mar-13

Earthing conduits

RC Suspended Slab, Ground Floor, Area 25

2014
Jul

RC Ramp, Axis L-M/36-41 (at Raft Foundation 25)

63
39
39

RC Suspended Slab, Ground Floor, Area 19

29-Dec-12
07-Jan-13
07-Jan-13

Jun

RC Suspended Slab, Upper Basement, Area 26

Vehicular Ramp - Axis L-M/36-41 (At Raft Foundation 25)


NECP-Rebase_06Sep12-4.CO.2.1.3.10.14
Vehicular Ramp - Axis L-M/36-41
NECOLBSS3080
(At Raft Foundation
RC Ramp,
25) Axis L-M/36-41 (at Raft Foundation 25)

PHASE 2 - POWERFLOAT FINISHES


NECP-Rebase_06Sep12-4.CO.2.1.3.22
PHASE 2 - POWERFLOAT
NECOBFW2200
FINISHES

May

RC Suspended Slab, Upper Basement, Area 25

1231
1232

1235
1236

Page 12 of 19/27-Feb-13 09:03

Execution Programme Level 3

Telephone conduits
RC Suspended Slab, Ground Floor, Area 25

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Construction of North East Underground Carpark Contract No. XC10101100


#

WBS

WBS Name

Activity ID

Activity Name

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

1326

NECP-Rebase_06Sep12-4.CO.2.1.3.8.1
Area B1
NECOUBSS2004

Lighting conduits

0%

19-Aug-12

23-Aug-12

19-Mar-13

23-Mar-13

Lighting conduits

1327

NECP-Rebase_06Sep12-4.CO.2.1.3.8.1
Area B1
NECOUBSS2005

Fire Alaram conduits

0%

19-Aug-12

23-Aug-12

19-Mar-13

23-Mar-13

Fire Alaram conduits

1328

NECP-Rebase_06Sep12-4.CO.2.1.3.8.1
Area B1
NECOUBSS2006

Telephone conduits

Telephone conduits

1329
1330

Area B2
NECP-Rebase_06Sep12-4.CO.2.1.3.8.6
Area B2
NECOUBSS2050

BL Project
Duration

Activity % Remaining
Complete Duration

Actual Start

Actual
Finish

2013

1331

NECP-Rebase_06Sep12-4.CO.2.1.3.8.6
Area B2
NECOUBSS2051

1332

NECP-Rebase_06Sep12-4.CO.2.1.3.8.6
Area B2
NECOUBSS2052

1333
1334
1335

Jan

Feb

Mar

Apr

May

0%

19-Aug-12

23-Aug-12

19-Mar-13

23-Mar-13

14
14

0%

7
7

08-Oct-12
08-Oct-12

24-Oct-12
24-Oct-12

20-Mar-13
20-Mar-13

27-Mar-13
27-Mar-13

0
0

Small power conduits

0%

16-Oct-12

21-Oct-12

23-Mar-13

26-Mar-13

Small power conduits

Security system conduits

0%

16-Oct-12

21-Oct-12

23-Mar-13

26-Mar-13

Security system conduits

NECP-Rebase_06Sep12-4.CO.2.1.3.8.6
Area B2
NECOUBSS2053

Earthing conduits

0%

16-Oct-12

21-Oct-12

23-Mar-13

26-Mar-13

Earthing conduits

NECP-Rebase_06Sep12-4.CO.2.1.3.8.6
Area B2
NECOUBSS2054

Lighting conduits

0%

16-Oct-12

21-Oct-12

23-Mar-13

26-Mar-13

Lighting conduits

NECP-Rebase_06Sep12-4.CO.2.1.3.8.6
Area B2
NECOUBSS2055

Fire Alaram conduits

0%

16-Oct-12

21-Oct-12

23-Mar-13

26-Mar-13

Fire Alaram conduits

1336

NECP-Rebase_06Sep12-4.CO.2.1.3.8.6
Area B2
NECOUBSS2056

Telephone conduits

0%

16-Oct-12

21-Oct-12

23-Mar-13

26-Mar-13

Telephone conduits

1337
1338

Area 26
NECP-Rebase_06Sep12-4.CO.2.1.3.8.13
Area 26
NECOUBSS2456

RC Suspended Slab, Ground Floor, Area 26

0
0

0%

10
10

19-Mar-13
19-Mar-13

30-Mar-13
30-Mar-13

0
0

1339

NECP-Rebase_06Sep12-4.CO.2.1.3.8.13
Area 26
NECOUBSS2466

Small power conduits

0%

25-Mar-13

28-Mar-13

Small power conduits

1340

NECP-Rebase_06Sep12-4.CO.2.1.3.8.13
Area 26
NECOUBSS2476

Security system conduits

0%

25-Mar-13

28-Mar-13

Security system conduits

1341

NECP-Rebase_06Sep12-4.CO.2.1.3.8.13
Area 26
NECOUBSS2486

Earthing conduits

0%

25-Mar-13

28-Mar-13

Earthing conduits

1342

NECP-Rebase_06Sep12-4.CO.2.1.3.8.13
Area 26
NECOUBSS2496

Lighting conduits

0%

25-Mar-13

28-Mar-13

Lighting conduits

1343

NECP-Rebase_06Sep12-4.CO.2.1.3.8.13
Area 26
NECOUBSS2506

Fire Alarm conduits

0%

25-Mar-13

28-Mar-13

Fire Alarm conduits

NECP-Rebase_06Sep12-4.CO.2.1.3.8.13
Area 26
NECOUBSS2516

Telephone conduits

25-Mar-13

28-Mar-13

Telephone conduits

26-Mar-13
18-Jun-13

08-Jul-13
08-Jul-13

165
75

1344

RC Suspended Slab, Ground Floor, Area 24A

Page 13 of 19/27-Feb-13 09:03

Execution Programme Level 3

0%

1345
1346

PHASE 2 - BACKFILLING TO RETAINING WALLS AROUND BUILDING


NECP-Rebase_06Sep12-4.CO.2.1.3.14
PHASE 2 - BACKFILLINGNECOEX2310
TO RETAINING WALLS
Backfilling
AROUND
Around
BUILDING
Building, Area 25 - Area 26

100
20

12.5%

90
18

03-Sep-12
03-Sep-12

29-Dec-12
26-Sep-12

1347

NECP-Rebase_06Sep12-4.CO.2.1.3.14
PHASE 2 - BACKFILLINGNECOEX2350
TO RETAINING WALLS
Backfilling
AROUND
Around
BUILDING
Building, Area 16 - Area 17

20

0%

20

05-Dec-12

29-Dec-12

26-Mar-13

17-Apr-13

145

1348

NECP-Rebase_06Sep12-4.CO.2.1.3.14
PHASE 2 - BACKFILLINGNECOEX2340
TO RETAINING WALLS
Backfilling
AROUND
Around
BUILDING
Building, Area 19 - Area 20

20

0%

20

12-Nov-12

05-Dec-12

18-Apr-13

11-May-13

175

1349

NECP-Rebase_06Sep12-4.CO.2.1.3.14
PHASE 2 - BACKFILLINGNECOEX2330
TO RETAINING WALLS
Backfilling
AROUND
Around
BUILDING
Building, Area 21 - Area 22

20

0%

20

20-Oct-12

12-Nov-12

12-May-13

03-Jun-13

175

1350

NECP-Rebase_06Sep12-4.CO.2.1.3.14
PHASE 2 - BACKFILLINGNECOEX2320
TO RETAINING WALLS
Backfilling
AROUND
Around
BUILDING
Building, Area 23 - Area 24

20

0%

20

26-Sep-12

20-Oct-12

04-Jun-13

26-Jun-13

175

123
123
38
25

15-Aug-12
15-Aug-12
15-Aug-12
15-Aug-12

06-Jan-13
06-Jan-13
27-Sep-12
13-Sep-12

31-Jan-13
31-Jan-13
16-Apr-13
16-Apr-13

27-May-13
27-May-13
01-May-13
29-Apr-13

123
123
139
0

06-Nov-12
06-Nov-12

Jul

0%

Installation of Sanitary pipes

17

0%

09-Sep-12

27-Sep-12

25-Apr-13

01-May-13

139

Installation of Sanitary pipes

Small power conduits

17

0%

06-Sep-12

25-Sep-12

25-Apr-13

01-May-13

139

Small power conduits

1357

NECP-Rebase_06Sep12-4.CO.2.1.4.7.1
LB Area B1 - B2
NECOBW1021

Installation of Rainwater Pipes

17

0%

27-Aug-12

16-Sep-12

25-Apr-13

01-May-13

139

Installation of Rainwater Pipes

1358
1359

LB Area B5 - B6
NECP-Rebase_06Sep12-4.CO.2.1.4.7.2
LB Area B5 - B6
NECOBW1030

Blockwork, Lower Basement, Area 18 - Area 19

30
25

0%

14
12

13-Sep-12
13-Sep-12

17-Oct-12
13-Oct-12

30-Apr-13
30-Apr-13

15-May-13
13-May-13

133
1

1360

NECP-Rebase_06Sep12-4.CO.2.1.4.7.2
LB Area B5 - B6
NECOBW1032

Installation of Sanitary pipes

16

0%

29-Sep-12

16-Oct-12

09-May-13

15-May-13

133

Installation of Sanitary pipes

1361

NECP-Rebase_06Sep12-4.CO.2.1.4.7.2
LB Area B5 - B6
NECOBW1033

Small power conduits

16

0%

30-Sep-12

17-Oct-12

09-May-13

15-May-13

133

Small power conduits

1362

NECP-Rebase_06Sep12-4.CO.2.1.4.7.2
LB Area B5 - B6
NECOBW1072

Installation of Rainwater Pipes

16

0%

26-Sep-12

15-Oct-12

09-May-13

15-May-13

1363
1364

LB Area B7 - B8
NECP-Rebase_06Sep12-4.CO.2.1.4.7.4
LB Area B7 - B8
NECOBW1040

Blockwork, Lower Basement, Area 16 - Area17

31
25

10%

13
11

13-Oct-12
13-Oct-12

17-Nov-12
11-Nov-12

31-Jan-13
31-Jan-13

14-Feb-13
12-Feb-13

62
56

1365

NECP-Rebase_06Sep12-4.CO.2.1.4.7.4
LB Area B7 - B8
NECOBW1042

Installation of Sanitary pipes

16

0%

27-Oct-12

13-Nov-12

07-Feb-13

14-Feb-13

62

Installation of Sanitary pipes

1366

NECP-Rebase_06Sep12-4.CO.2.1.4.7.4
LB Area B7 - B8
NECOBW1043

Small power conduits

16

0%

30-Oct-12

17-Nov-12

07-Feb-13

14-Feb-13

62

Small power conduits

1367
1368

LB Area B9 - B10
NECP-Rebase_06Sep12-4.CO.2.1.4.7.6
LB Area B9 - B10
NECOBW1050

Blockwork, Lower Basement, Area 14 - Area15

27
25

0%

14
12

11-Nov-12
11-Nov-12

12-Dec-12
10-Dec-12

03-Apr-13
03-Apr-13

18-Apr-13
16-Apr-13

14
14

1369

NECP-Rebase_06Sep12-4.CO.2.1.4.7.6
LB Area B9 - B10
NECOBW1052

Installation of Sanitary pipes

16

0%

24-Nov-12

12-Dec-12

13-Apr-13

18-Apr-13

14

Installation of Sanitary pipes

1370

NECP-Rebase_06Sep12-4.CO.2.1.4.7.6
LB Area B9 - B10
NECOBW1053

Small power conduits

16

0%

24-Nov-12

12-Dec-12

13-Apr-13

18-Apr-13

14

Small power conduits

1371
1372

UB Area B1 - B2
NECP-Rebase_06Sep12-4.CO.2.1.4.7.3
UB Area B1 - B2
NECOBW1060

Blockwork, Upper Basement, Area 25 - Area 26

27
25

0%

14
12

09-Sep-12
09-Sep-12

10-Oct-12
08-Oct-12

24-Apr-13
24-Apr-13

09-May-13
07-May-13

2
2

1373

NECP-Rebase_06Sep12-4.CO.2.1.4.7.3
UB Area B1 - B2
NECOBW1062

Installation of Sanitary pipes

16

0%

22-Sep-12

10-Oct-12

04-May-13

09-May-13

Installation of Sanitary pipes

1374

NECP-Rebase_06Sep12-4.CO.2.1.4.7.3
UB Area B1 - B2
NECOBW1063

Small power conduits

16

0%

22-Sep-12

10-Oct-12

04-May-13

09-May-13

Small power conduits

1375

NECP-Rebase_06Sep12-4.CO.2.1.4.7.3
UB Area B1 - B2
NECOBW1061

Installation of Rainwater Pipes

16

0%

22-Sep-12

10-Oct-12

04-May-13

09-May-13

Installation of Rainwater Pipes

1376
1377

UB Area B5 - B6
NECP-Rebase_06Sep12-4.CO.2.1.4.7.5
UB Area B5 - B6
NECOBW1070

Blockworks, Upper Basement, Area 21 - Area 22

27
25

0%

15
12

08-Oct-12
08-Oct-12

08-Nov-12
06-Nov-12

11-May-13
11-May-13

27-May-13
23-May-13

1
2

1378

NECP-Rebase_06Sep12-4.CO.2.1.4.7.5
UB Area B5 - B6
NECOBW1065

Installation of Sanitary pipes

17

0%

20-Oct-12

08-Nov-12

21-May-13

27-May-13

Installation of Sanitary pipes

1379

NECP-Rebase_06Sep12-4.CO.2.1.4.7.5
UB Area B5 - B6
NECOBW1066

Small power conduits

17

0%

20-Oct-12

08-Nov-12

21-May-13

27-May-13

Small power conduits

1380

NECP-Rebase_06Sep12-4.CO.2.1.4.7.5
UB Area B5 - B6
NECOBW1064

Installation of Rainwater Pipes

17

0%

20-Oct-12

08-Nov-12

21-May-13

27-May-13

1381
1382

UB Area B7 - B8
NECP-Rebase_06Sep12-4.CO.2.1.4.7.7
UB Area B7 - B8
NECOBW1080

Blockworks, Upper Basement, Area B19 - Area 20

30
25

5%

13
11

06-Nov-12
06-Nov-12

10-Dec-12
05-Dec-12

31-Jan-13
31-Jan-13

16-Feb-13
13-Feb-13

98
98

Blockwork, Lower Basement, Area 24 - Area 25 - Area 26

Blockwork, Lower Basement, Area 18 - Area 19

Installation of Rainwater Pipes


Blockwork, Lower Basement, Area 16 - Area17

Blockwork, Lower Basement, Area 14 - Area15

Blockwork, Upper Basement, Area 25 - Area 26

Blockworks, Upper Basement, Area 21 - Area 22

Installation of Rainwater Pipes


Blockworks, Upper Basement, Area B19 - Area 20

NECP-Rebase_06Sep12-4.CO.2.1.4.7.7
UB Area B7 - B8
NECOBW1082

Installation of Sanitary pipes

16

0%

19-Nov-12

08-Dec-12

09-Feb-13

16-Feb-13

98

Installation of Sanitary pipes

1384

NECP-Rebase_06Sep12-4.CO.2.1.4.7.7
UB Area B7 - B8
NECOBW1083

Small power conduits

16

0%

22-Nov-12

10-Dec-12

09-Feb-13

16-Feb-13

98

Small power conduits

1385
1386

UB Area B9 - B10
NECP-Rebase_06Sep12-4.CO.2.1.4.7.8
UB Area B9 - B10
NECOBW1090

Blockwork, Upper Basement, Area 16 - Area 17

27
25

0%

14
12

05-Dec-12
05-Dec-12

06-Jan-13
03-Jan-13

11-Apr-13
11-Apr-13

27-Apr-13
24-Apr-13

97
68

1387

NECP-Rebase_06Sep12-4.CO.2.1.4.7.8
UB Area B9 - B10
NECOBW1092

Installation of Sanitary pipes

16

0%

18-Dec-12

06-Jan-13

21-Apr-13

27-Apr-13

97

Installation of Sanitary pipes

1388

NECP-Rebase_06Sep12-4.CO.2.1.4.7.8
UB Area B9 - B10
NECOBW1093

Small power conduits

16

0%

18-Dec-12

06-Jan-13

21-Apr-13

27-Apr-13

97

Small power conduits

Steel frame for Walkway Canopies (Frijns)

35
35

0%

35
35

16-Jan-13
16-Jan-13

26-Feb-13
26-Feb-13

08-May-13
08-May-13

17-Jun-13
17-Jun-13

79
79

1391
1392

Gate House
NECP-Rebase_06Sep12-4.CO.2.2
Gate House

NECOCW130

Concrete Base, Gate House

78
15

0%

183
15

24-Mar-13
24-Mar-13

22-Jun-13
09-Apr-13

20-May-13
20-May-13

22-Dec-13
05-Jun-13

0
107

1393

NECP-Rebase_06Sep12-4.CO.2.2
Gate House

NECOCW140

Walls, Screeds, Gate House

10

0%

10

10-Apr-13

21-Apr-13

06-Jun-13

17-Jun-13

107

1394

NECP-Rebase_06Sep12-4.CO.2.2
Gate House

NECOMEP230

MEP Works, Gate House

15

0%

15

22-Apr-13

08-May-13

18-Jun-13

04-Jul-13

107

1395

NECP-Rebase_06Sep12-4.CO.2.2
Gate House

NECOBFW220

GRC Cladding/Tiles/Ceiling/Windows/Doors, Gate House

30

0%

30

30-Apr-13

03-Jun-13

26-Jun-13

30-Jul-13

107

NECP-Rebase_06Sep12-4.CO.2.2
Gate House

NECOMEP240

System Control Equipment, Gate House

25

1396

0%

25

25-May-13

22-Jun-13

23-Nov-13

22-Dec-13

1397
1398
1399
1400

MEP Works
Lower Basement Floor
PHASE 2 LOWER BASEMENT - BLACK STEEL PIPES
NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2400
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B1

292
286
75
8

0%

218
218
70
7

14-Aug-12
14-Aug-12
12-Sep-12
12-Sep-12

21-Jul-13
13-Jul-13
09-Dec-12
22-Sep-12

25-Apr-13
25-Apr-13
25-Apr-13
25-Apr-13

07-Jan-14
07-Jan-14
15-Jul-13
02-May-13

5
5
56
42

1401

NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2410
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B2

0%

22-Sep-12

01-Oct-12

04-May-13

11-May-13

42

1402

NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2420
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B3

0%

01-Oct-12

10-Oct-12

12-May-13

19-May-13

42

1403

NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2430
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B4

0%

10-Oct-12

20-Oct-12

20-May-13

27-May-13

56

1404

NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2440
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B5

0%

20-Oct-12

29-Oct-12

28-May-13

04-Jun-13

56

1405

NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2450
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B6

0%

29-Oct-12

06-Nov-12

05-Jun-13

12-Jun-13

56

1406

NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2460
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B7

0%

06-Nov-12

14-Nov-12

13-Jun-13

20-Jun-13

56

1407

NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2470
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B8

0%

14-Nov-12

22-Nov-12

22-Jun-13

29-Jun-13

56

1408

NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2480
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B9

0%

22-Nov-12

01-Dec-12

30-Jun-13

07-Jul-13

56

1409

NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2490
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B10

0%

01-Dec-12

09-Dec-12

08-Jul-13

15-Jul-13

56

110
110
7

12-Sep-12
12-Sep-12
12-Sep-12

19-Jan-13
19-Jan-13
20-Sep-12

25-Apr-13
25-Apr-13
25-Apr-13

03-Jul-13
03-Jul-13
01-May-13

89
66
42

1410
1411
1412

PHASE 2 LOWER BASEMENT - PIPE INSTALLATION (SANITARY, FIRE FIGHTING & WATER SUPPLY)
FIRE FIGHTING
NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4440
Fire fighting pipe installation - Area B1

0%

60
60
6

1413

NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4450

Fire fighting pipe installation - Area B2

0%

10-Nov-12

18-Nov-12

02-May-13

08-May-13

58

1414

NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4460

Fire fighting pipe installation - Area B3

0%

18-Nov-12

26-Nov-12

09-May-13

15-May-13

59

1415

NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4470

Fire fighting pipe installation - Area B4

0%

26-Nov-12

05-Dec-12

16-May-13

22-May-13

60

1416

NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4480

Fire fighting pipe installation - Area B5

0%

05-Dec-12

13-Dec-12

23-May-13

29-May-13

61

1417

NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4490

Fire fighting pipe installation - Area B6

0%

13-Dec-12

22-Dec-12

30-May-13

05-Jun-13

62

1418

NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4500

Fire fighting pipe installation - Area B7

0%

22-Dec-12

29-Dec-12

06-Jun-13

12-Jun-13

63

1419

NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4510

Fire fighting pipe installation - Area B8

0%

29-Dec-12

05-Jan-13

13-Jun-13

19-Jun-13

64

1420

NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4520

Fire fighting pipe installation - Area B9

0%

05-Jan-13

12-Jan-13

20-Jun-13

26-Jun-13

65

1421

NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4530

Fire fighting pipe installation - Area B10

0%

12-Jan-13

19-Jan-13

27-Jun-13

03-Jul-13

66

1422
1423

SANITARY
NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2300

Sanitary pipe installation - Area B1

110
7

0%

60
6

12-Sep-12
12-Sep-12

19-Jan-13
20-Sep-12

25-Apr-13
25-Apr-13

03-Jul-13
01-May-13

81
81

1424

NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2310

Sanitary pipe installation - Area B2

0%

10-Nov-12

18-Nov-12

02-May-13

08-May-13

81

1425

NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2320

Sanitary pipe installation - Area B3

0%

18-Nov-12

26-Nov-12

09-May-13

15-May-13

81

1426

NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2330

Sanitary pipe installation - Area B4

0%

26-Nov-12

04-Dec-12

16-May-13

22-May-13

81

1427

NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2340

Sanitary pipe installation - Area B5

0%

04-Dec-12

12-Dec-12

23-May-13

29-May-13

81

1428

NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2350

Sanitary pipe installation - Area B6

0%

12-Dec-12

20-Dec-12

30-May-13

05-Jun-13

81

1429

NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2360

Sanitary pipe installation - Area B7

0%

20-Dec-12

27-Dec-12

06-Jun-13

12-Jun-13

81

1430

NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2370

Sanitary pipe installation - Area B8

0%

29-Dec-12

05-Jan-13

13-Jun-13

19-Jun-13

81

1431

NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2380

Sanitary pipe installation - Area B9

0%

05-Jan-13

12-Jan-13

20-Jun-13

26-Jun-13

81

1432

NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2390

Sanitary pipe installation - Area B10

0%

12-Jan-13

19-Jan-13

27-Jun-13

03-Jul-13

81

1433
1434

WATER SUPPLY
NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4540

Water supply pipe installation - Area B1

110
7

0%

60
6

12-Sep-12
12-Sep-12

19-Jan-13
20-Sep-12

25-Apr-13
25-Apr-13

03-Jul-13
01-May-13

89
42

1435

NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4550

Water supply pipe installation - Area B2

0%

10-Nov-12

18-Nov-12

02-May-13

08-May-13

89

1436

NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4560

Water supply pipe installation - Area B3

0%

18-Nov-12

26-Nov-12

09-May-13

15-May-13

89

Feb

Backfilling Around Building, Area 23 - Area 24

NECP-Rebase_06Sep12-4.CO.2.1.4.7.1
LB Area B1 - B2
NECOBW1023

Steel Frame for Walkway Canopies


NECP-Rebase_06Sep12-4.CO.2.P2
Steel Frame for Walkway Canopies
NECOCW120

Jan

Backfilling Around Building, Area 21 - Area 22

NECP-Rebase_06Sep12-4.CO.2.1.4.7.1
LB Area B1 - B2
NECOBW1022

1389
1390

Dec

Backfilling Around Building, Area 25 - Area 26

1356

Nov

Backfilling Around Building, Area 19 - Area 20

1355

1383

Oct

Backfilling Around Building, Area 16 - Area 17

100
100
14
12

19-Jan-13
19-Jan-13

Sep

RC Suspended Slab, Ground Floor, Area 26

Blockworks and Services


PHASE 2 - BLOCKWORK & SERVICES
LB Area B1 - B2
NECP-Rebase_06Sep12-4.CO.2.1.4.7.1
LB Area B1 - B2
NECOBW1020

12-Jan-13
12-Jan-13

Aug

RC Suspended Slab, Ground Floor, Area 24A

1351
1352
1353
1354

Blockwork, Lower Basement, Area 24 - Area 25 - Area 26

12-Jan-13
12-Jan-13

2014

Jun

Blockwork, Upper Basement, Area 16 - Area 17

Steel frame for Walkway Canopies (Frijns)


Concrete Base, Gate House
Walls, Screeds, Gate House
MEP Works, Gate House
GRC Cladding/Tiles/Ceiling/Windows/Doors, Gate House
System Control Equipment, Gate House

Black Steel Pipes, CHW, Area B1


Black Steel Pipes, CHW, Area B2
Black Steel Pipes, CHW, Area B3
Black Steel Pipes, CHW, Area B4
Black Steel Pipes, CHW, Area B5
Black Steel Pipes, CHW, Area B6
Black Steel Pipes, CHW, Area B7
Black Steel Pipes, CHW, Area B8
Black Steel Pipes, CHW, Area B9
Black Steel Pipes, CHW, Area B10

Fire fighting pipe installation - Area B1


Fire fighting pipe installation - Area B2
Fire fighting pipe installation - Area B3
Fire fighting pipe installation - Area B4
Fire fighting pipe installation - Area B5
Fire fighting pipe installation - Area B6
Fire fighting pipe installation - Area B7
Fire fighting pipe installation - Area B8
Fire fighting pipe installation - Area B9
Fire fighting pipe installation - Area B10
Sanitary pipe installation - Area B1
Sanitary pipe installation - Area B2
Sanitary pipe installation - Area B3
Sanitary pipe installation - Area B4
Sanitary pipe installation - Area B5
Sanitary pipe installation - Area B6
Sanitary pipe installation - Area B7
Sanitary pipe installation - Area B8
Sanitary pipe installation - Area B9
Sanitary pipe installation - Area B10
Water supply pipe installation - Area B1
Water supply pipe installation - Area B2
Water supply pipe installation - Area B3

Construction of North East Underground Carpark Contract No. XC10101100


#

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

1437

NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4570

Water supply pipe installation - Area B4

0%

26-Nov-12

05-Dec-12

16-May-13

22-May-13

89

1438

NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4580

Water supply pipe installation - Area B5

0%

05-Dec-12

13-Dec-12

23-May-13

29-May-13

89

1439

NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4590

Water supply pipe installation - Area B6

0%

13-Dec-12

22-Dec-12

30-May-13

05-Jun-13

89

1440

NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4600

Water supply pipe installation - Area B7

0%

22-Dec-12

29-Dec-12

06-Jun-13

12-Jun-13

89

1441

NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4610

Water supply pipe installation - Area B8

0%

29-Dec-12

05-Jan-13

13-Jun-13

19-Jun-13

89

1442

NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4620

Water supply pipe installation - Area B9

0%

05-Jan-13

12-Jan-13

20-Jun-13

26-Jun-13

89

NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4630

Water supply pipe installation - Area B10

1443

WBS

WBS Name

Activity ID

Activity Name

BL Project
Duration

Activity % Remaining
Complete Duration

Actual Start

Actual
Finish

0%

12-Jan-13

19-Jan-13

27-Jun-13

03-Jul-13

89

1444
1445

PHASE 2 LOWER BASEMENT - SPRINKLER SYSTEM


NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2305
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B1

100
8

0%

70
7

10-Oct-12
10-Oct-12

04-Feb-13
20-Oct-12

20-May-13
20-May-13

08-Aug-13
27-May-13

42
42

1446

NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2315
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B2

0%

18-Nov-12

27-Nov-12

28-May-13

04-Jun-13

42

1447

NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2325
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B3

0%

27-Nov-12

06-Dec-12

05-Jun-13

12-Jun-13

42

1448

NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2335
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B4

0%

06-Dec-12

16-Dec-12

13-Jun-13

20-Jun-13

42

1449

NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2345
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B5

0%

16-Dec-12

25-Dec-12

22-Jun-13

29-Jun-13

42

1450

NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2355
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B6

0%

25-Dec-12

02-Jan-13

30-Jun-13

07-Jul-13

42

1451

NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2365
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B7

0%

02-Jan-13

10-Jan-13

08-Jul-13

15-Jul-13

42

1452

NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2375
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B8

0%

10-Jan-13

19-Jan-13

16-Jul-13

23-Jul-13

42

1453

NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2385
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B9

0%

19-Jan-13

27-Jan-13

24-Jul-13

31-Jul-13

42

1454

NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2395
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B10

0%

27-Jan-13

04-Feb-13

01-Aug-13

08-Aug-13

42

12-Sep-12
12-Sep-12
12-Sep-12

09-Apr-13
27-Jan-13
22-Sep-12

25-Apr-13
25-Apr-13
25-Apr-13

17-Oct-13
15-Jul-13
02-May-13

52
54
54

1455
1456
1457

PHASE 2 LOWER BASEMENT - DUCTS


INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2405

AC Ducts Installation - Area B1

180
117
8

0%

149
70
7

1458

NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2415

AC Ducts Installation - Area B2

0%

10-Nov-12

19-Nov-12

04-May-13

11-May-13

54

1459

NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2425

AC Ducts Installation - Area B3

0%

19-Nov-12

28-Nov-12

12-May-13

19-May-13

54

1460

NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2435

AC Ducts Installation - Area B4

0%

28-Nov-12

08-Dec-12

20-May-13

27-May-13

54

1461

NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2445

AC Ducts Installation - Area B5

0%

08-Dec-12

17-Dec-12

28-May-13

04-Jun-13

54

1462

NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2455

AC Ducts Installation - Area B6

0%

17-Dec-12

25-Dec-12

05-Jun-13

12-Jun-13

54

1463

NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2465

AC Ducts Installation - Area B7

0%

25-Dec-12

02-Jan-13

13-Jun-13

20-Jun-13

54

1464

NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2475

AC Ducts Installation - Area B8

0%

02-Jan-13

10-Jan-13

22-Jun-13

29-Jun-13

54

1465

NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2485

AC Ducts Installation - Area B9

0%

10-Jan-13

19-Jan-13

30-Jun-13

07-Jul-13

54

1466

NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2495

AC Ducts Installation - Area B10

0%

19-Jan-13

27-Jan-13

08-Jul-13

15-Jul-13

54

1467
1468

INSULATION
NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4640

AC Ducts Insulation works - Area B1

76
8

0%

70
7

12-Jan-13
12-Jan-13

09-Apr-13
20-Jan-13

27-Jul-13
27-Jul-13

17-Oct-13
03-Aug-13

52
41

1469

NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4650

AC Ducts Insulation works - Area B2

0%

21-Jan-13

29-Jan-13

04-Aug-13

11-Aug-13

41

1470

NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4660

AC Ducts Insulation works - Area B3

0%

31-Jan-13

09-Feb-13

12-Aug-13

19-Aug-13

41

1471

NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4670

AC Ducts Insulation works - Area B4

0%

10-Feb-13

18-Feb-13

20-Aug-13

27-Aug-13

50

1472

NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4680

AC Ducts Insulation works - Area B5

0%

19-Feb-13

27-Feb-13

28-Aug-13

04-Sep-13

52

1473

NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4690

AC Ducts Insulation works - Area B6

0%

28-Feb-13

07-Mar-13

05-Sep-13

12-Sep-13

52

1474

NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4700

AC Ducts Insulation works - Area B7

0%

09-Mar-13

16-Mar-13

14-Sep-13

21-Sep-13

52

1475

NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4710

AC Ducts Insulation works - Area B8

0%

17-Mar-13

24-Mar-13

22-Sep-13

29-Sep-13

52

1476

NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4720

AC Ducts Insulation works - Area B9

0%

25-Mar-13

01-Apr-13

30-Sep-13

07-Oct-13

52

1477

NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4730

AC Ducts Insulation works - Area B10

0%

02-Apr-13

09-Apr-13

08-Oct-13

17-Oct-13

52

06-Apr-13
06-Apr-13

15-May-13
22-Apr-13

06-Oct-13
06-Oct-13

18-Nov-13
26-Oct-13

41
17

1478
1479

PHASE 2 LOWER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENT


NECP-Rebase_06Sep12-4.CO.2.5.1.32
PHASE 2 LOWER BASEMENT
NECOMEP2600
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area B1-B4

35
15

0%

35
15

1480

NECP-Rebase_06Sep12-4.CO.2.5.1.32
PHASE 2 LOWER BASEMENT
NECOMEP2610
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area B5-B7

10

0%

10

23-Apr-13

04-May-13

26-Oct-13

06-Nov-13

41

1481

NECP-Rebase_06Sep12-4.CO.2.5.1.32
PHASE 2 LOWER BASEMENT
NECOMEP2620
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area B8-B10

10

0%

10

05-May-13

15-May-13

06-Nov-13

18-Nov-13

41

28-Jan-13
28-Jan-13

03-Mar-13
07-Feb-13

20-Aug-13
20-Aug-13

24-Sep-13
01-Sep-13

75
57

1482
1483
1484

PHASE 2 LOWER BASEMENT - SANITARY, RAINWATER INSTALLATIONS


NECP-Rebase_06Sep12-4.CO.2.5.1.33
PHASE 2 LOWER BASEMENT
NECOMEP2630
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area B1-B4

30
10

0%

30
10

NECP-Rebase_06Sep12-4.CO.2.5.1.33
PHASE 2 LOWER BASEMENT
NECOMEP2640
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area B5-B7

10

0%

NECP-Rebase_06Sep12-4.CO.2.5.1.33
PHASE 2 LOWER BASEMENT
NECOMEP2650
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area B8-B10

10

10

09-Feb-13

19-Feb-13

01-Sep-13

12-Sep-13

75

0%

10

20-Feb-13

03-Mar-13

12-Sep-13

24-Sep-13

75

1486
1487

PHASE 2 LOWER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATION


NECP-Rebase_06Sep12-4.CO.2.5.1.34
PHASE 2 LOWER BASEMENT
NECOMEP2660
- COLD WATER,
Cold
HOT
Water,
WATER,
Hot Water
FIREFIGHTING
& Firefighting
INSTALLATION
Installation, Area B1-B4

22
8

0%

22
7

09-Feb-13
09-Feb-13

05-Mar-13
17-Feb-13

26-Aug-13
26-Aug-13

19-Sep-13
02-Sep-13

89
78

1488

NECP-Rebase_06Sep12-4.CO.2.5.1.34
PHASE 2 LOWER BASEMENT
NECOMEP2670
- COLD WATER,
Cold
HOT
Water,
WATER,
Hot Water
FIREFIGHTING
& Firefighting
INSTALLATION
Installation, Area B5-B7

0%

18-Feb-13

25-Feb-13

03-Sep-13

10-Sep-13

90

1489

NECP-Rebase_06Sep12-4.CO.2.5.1.34
PHASE 2 LOWER BASEMENT
NECOMEP2680
- COLD WATER,
Cold
HOT
Water,
WATER,
Hot Water
FIREFIGHTING
& Firefighting
INSTALLATION
Installation, Area B8-B10

0%

26-Feb-13

05-Mar-13

12-Sep-13

19-Sep-13

89

07-Feb-13
07-Feb-13
07-Feb-13

23-May-13
07-Apr-13
18-Feb-13

19-Sep-13
19-Sep-13
19-Sep-13

06-Nov-13
23-Oct-13
30-Sep-13

50
22
22

13-Mar-13

01-Oct-13

10-Oct-13

22

1485

1490
1491
1492

PHASE 2 LOWER BASEMENT - BMS


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.1.35.1
WIRING
NECOMEP2143

Building Management System Wiring works, Area B1-B4

91
51
10

0%

40
28
10

1493

NECP-Rebase_06Sep12-4.CO.2.5.1.35.1
WIRING
NECOMEP2153

Building Management System Wiring works, Area B5-B7

0%

04-Mar-13

1494

NECP-Rebase_06Sep12-4.CO.2.5.1.35.1
WIRING
NECOMEP2163

Building Management System Wiring works Area B8-B10

1495
1496

DEVICES INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.35.2
DEVICES INSTALLATIONNECOMEP5450

1497

NECP-Rebase_06Sep12-4.CO.2.5.1.35.2
DEVICES INSTALLATIONNECOMEP5460

1498

NECP-Rebase_06Sep12-4.CO.2.5.1.35.2
DEVICES INSTALLATIONNECOMEP5470

0%

28-Mar-13

07-Apr-13

12-Oct-13

23-Oct-13

22

Building Management System Device Installation, Area B1-B4

27
7

0%

21
7

23-Apr-13
23-Apr-13

23-May-13
30-Apr-13

12-Oct-13
12-Oct-13

06-Nov-13
21-Oct-13

50
24

Building Management System Device Installation, Area B5-B7

0%

05-May-13

12-May-13

22-Oct-13

29-Oct-13

24

Building Management System Device Installation, Area B8-B10

0%

16-May-13

23-May-13

30-Oct-13

06-Nov-13

50

1499
1500

PHASE 2 LOWER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKING


NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2905
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B1

74
8

0%

50
5

01-Jan-13
01-Jan-13

27-Mar-13
09-Jan-13

06-Jun-13
06-Jun-13

04-Aug-13
12-Jun-13

81
79

1501

NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2915
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B2

0%

10-Jan-13

19-Jan-13

12-Jun-13

18-Jun-13

79

1502

NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2925
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B3

0%

20-Jan-13

28-Jan-13

18-Jun-13

24-Jun-13

79

1503

NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2935
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B4

0%

29-Jan-13

06-Feb-13

24-Jun-13

30-Jun-13

79

1504

NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2945
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B5

0%

07-Feb-13

14-Feb-13

30-Jun-13

06-Jul-13

79

1505

NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2955
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B6

0%

16-Feb-13

23-Feb-13

06-Jul-13

11-Jul-13

81

1506

NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2965
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B7

0%

24-Feb-13

03-Mar-13

11-Jul-13

17-Jul-13

81

1507

NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2975
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B8

0%

04-Mar-13

11-Mar-13

17-Jul-13

23-Jul-13

81

1508

NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2985
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B9

0%

12-Mar-13

19-Mar-13

23-Jul-13

29-Jul-13

81

1509

NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2995
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B10

0%

20-Mar-13

27-Mar-13

29-Jul-13

04-Aug-13

81

Bus Duct - Area B1

77
73
7

0%

60
60
6

10-Jan-13
10-Jan-13
10-Jan-13

09-Apr-13
04-Apr-13
17-Jan-13

18-Jul-13
18-Jul-13
18-Jul-13

26-Sep-13
26-Sep-13
25-Jul-13

78
78
67

Bus Duct - Area B2

0%

20-Jan-13

27-Jan-13

25-Jul-13

01-Aug-13

67

Bus Duct - Area B3

0%

29-Jan-13

05-Feb-13

01-Aug-13

08-Aug-13

67

NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2250

Bus Duct - Area B4

0%

07-Feb-13

14-Feb-13

08-Aug-13

15-Aug-13

67

1516

NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2260

Bus Duct - Area B5

0%

16-Feb-13

23-Feb-13

15-Aug-13

22-Aug-13

67

1517

NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2270

Bus Duct - Area B6

0%

24-Feb-13

03-Mar-13

22-Aug-13

29-Aug-13

78

1518

NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2280

Bus Duct - Area B7

0%

04-Mar-13

11-Mar-13

29-Aug-13

05-Sep-13

78

1519

NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2290

Bus Duct - Area B8

0%

12-Mar-13

19-Mar-13

05-Sep-13

12-Sep-13

78

1520

NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2720

Bus Duct - Area B9

0%

20-Mar-13

27-Mar-13

12-Sep-13

19-Sep-13

78

1521

NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2730

Bus Duct - Area B10

1522
1523

BUS BAR
NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4740

1524
1525

1510
1511
1512

PHASE 2 LOWER BASEMENT - BUS DUCT, BUS BAR


BUS DUCT
NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2220

1513

NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2230

1514

NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2240

1515

0%

28-Mar-13

04-Apr-13

19-Sep-13

26-Sep-13

78

Bus Bar - Area B1

70
7

0%

53
5

19-Jan-13
19-Jan-13

09-Apr-13
26-Jan-13

25-Jul-13
25-Jul-13

25-Sep-13
31-Jul-13

78
81

NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4750

Bus Bar - Area B2

0%

27-Jan-13

03-Feb-13

31-Jul-13

06-Aug-13

81

NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4760

Bus Bar - Area B3

0%

04-Feb-13

11-Feb-13

06-Aug-13

12-Aug-13

81

1526

NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4770

Bus Bar - Area B4

0%

12-Feb-13

19-Feb-13

12-Aug-13

18-Aug-13

81

1527

NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4780

Bus Bar - Area B5

0%

20-Feb-13

27-Feb-13

18-Aug-13

24-Aug-13

81

1528

NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4790

Bus Bar - Area B6

0%

28-Feb-13

07-Mar-13

24-Aug-13

29-Aug-13

81

1529

NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4800

Bus Bar - Area B7

0%

09-Mar-13

16-Mar-13

29-Aug-13

04-Sep-13

81

1530

NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4810

Bus Bar - Area B8

0%

17-Mar-13

24-Mar-13

05-Sep-13

11-Sep-13

80

1531

NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4820

Bus Bar - Area B9

0%

25-Mar-13

01-Apr-13

12-Sep-13

18-Sep-13

79

1532

NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4830

Bus Bar - Area B10

0%

02-Apr-13

09-Apr-13

19-Sep-13

25-Sep-13

78

87
40
14

21-Jan-13
21-Jan-13
21-Jan-13

01-May-13
07-Mar-13
05-Feb-13

12-Oct-13
12-Oct-13
12-Oct-13

15-Dec-13
28-Nov-13
29-Oct-13

10
11
0

1533
1534
1535

0%

54
40
14

1536

NECP-Rebase_06Sep12-4.CO.2.5.1.38.1
WIRING
NECOMEP2023

Telephone Wiring works - Area B5-B7

13

0%

13

06-Feb-13

20-Feb-13

30-Oct-13

13-Nov-13

11

1537

NECP-Rebase_06Sep12-4.CO.2.5.1.38.1
WIRING
NECOMEP2033

Telephone Wiring works - Area B8-B10

13

0%

13

21-Feb-13

07-Mar-13

14-Nov-13

28-Nov-13

11

1538
1539

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.38.2
DEVICE INSTALLATION NECOMEP4940

Telephone Device Installation - Area B1-B4

60
14

0%

40
14

21-Feb-13
16-Apr-13

01-May-13
01-May-13

30-Oct-13
30-Oct-13

15-Dec-13
14-Nov-13

10
6

NECP-Rebase_06Sep12-4.CO.2.5.1.38.2
DEVICE INSTALLATION NECOMEP4950

Telephone Device Installation - Area B5-B7

13

0%

NECP-Rebase_06Sep12-4.CO.2.5.1.38.2
DEVICE INSTALLATION NECOMEP4960

Telephone Device Installation - Area B8-B10

13

1540

PHASE 2 LOWER BASEMENT - TELEPHONE CABLE TRAYS INSTALLATION


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.1.38.1
WIRING
NECOMEP2013
Telephone Wiring works - Area B1-B4

13

21-Feb-13

07-Mar-13

16-Nov-13

30-Nov-13

10

0%

13

09-Mar-13

23-Mar-13

01-Dec-13

15-Dec-13

10

1542
1543

PHASE 2 LOWER BASEMENT - HV INSTALLATION (SUBSTATION NO. 2)


NECP-Rebase_06Sep12-4.CO.2.5.1.89
PHASE 2 LOWER BASEMENT
NECOMEP2113
- HV INSTALLATION
Substation
(SUBSTATION
2: Transformer
NO. Installation,
2)
Area B1

90
30

0%

44
30

31-Mar-13
31-Mar-13

13-Jul-13
04-May-13

14-Nov-13
14-Nov-13

05-Jan-14
19-Dec-13

0
0

1544

NECP-Rebase_06Sep12-4.CO.2.5.1.89
PHASE 2 LOWER BASEMENT
NECOMEP2123
- HV INSTALLATION
Substation
(SUBSTATION
2: MV Panels
NO.
Installation,
2)
Area B1

30

0%

30

05-May-13

08-Jun-13

23-Nov-13

28-Dec-13

NECP-Rebase_06Sep12-4.CO.2.5.1.89
PHASE 2 LOWER BASEMENT
NECOMEP2133
- HV INSTALLATION
Substation
(SUBSTATION
2: Switchgear
NO.Installation,
2)
Area B2

30

0%

30

09-Jun-13

13-Jul-13

01-Dec-13

05-Jan-14

0%

35
21

31-Mar-13
31-Mar-13

13-Jul-13
04-May-13

27-Nov-13
27-Nov-13

07-Jan-14
22-Dec-13

5
5

1541

1545
1546
1547

PHASE 2 LOWER BASEMENT - GENERATOR, UPS, BATTERY SYSTEM


NECP-Rebase_06Sep12-4.CO.2.5.1.39
PHASE 2 LOWER BASEMENT
NECOMEP3000
- GENERATOR,
Generator,
UPS, BATTERY
Area B1
SYSTEM

Page 14 of 19/27-Feb-13 09:03

Execution Programme Level 3

90
30

2013
Jan

Feb

Mar

Apr

May

2014

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Water supply pipe installation - Area B4


Water supply pipe installation - Area B5
Water supply pipe installation - Area B6
Water supply pipe installation - Area B7
Water supply pipe installation - Area B8
Water supply pipe installation - Area B9
Water supply pipe installation - Area B10
Sprinkler Head & Accessories, Area B1
Sprinkler Head & Accessories, Area B2
Sprinkler Head & Accessories, Area B3
Sprinkler Head & Accessories, Area B4
Sprinkler Head & Accessories, Area B5
Sprinkler Head & Accessories, Area B6
Sprinkler Head & Accessories, Area B7
Sprinkler Head & Accessories, Area B8
Sprinkler Head & Accessories, Area B9
Sprinkler Head & Accessories, Area B10

AC Ducts Installation - Area B1


AC Ducts Installation - Area B2
AC Ducts Installation - Area B3
AC Ducts Installation - Area B4
AC Ducts Installation - Area B5
AC Ducts Installation - Area B6
AC Ducts Installation - Area B7
AC Ducts Installation - Area B8
AC Ducts Installation - Area B9
AC Ducts Installation - Area B10
AC Ducts Insulation works - Area B1
AC Ducts Insulation works - Area B2
AC Ducts Insulation works - Area B3
AC Ducts Insulation works - Area B4
AC Ducts Insulation works - Area B5
AC Ducts Insulation works - Area B6
AC Ducts Insulation works - Area B7
AC Ducts Insulation works - Area B8
AC Ducts Insulation works - Area B9
AC Ducts Insulation works - Area B10
AC/Refrigeration Equip, Supply & Ventilation Fans, Area B1-B4
AC/Refrigeration Equip, Supply & Ventilation Fans, Area B5-B7
AC/Refrigeration Equip, Supply & Ventilation Fans, Area B8-B10
Sanitary Installation, Rainwater Installations, Area B1-B4
Sanitary Installation, Rainwater Installations, Area B5-B7
Sanitary Installation, Rainwater Installations, Area B8-B10
Cold Water, Hot Water & Firefighting Installation, Area B1-B4
Cold Water, Hot Water & Firefighting Installation, Area B5-B7
Cold Water, Hot Water & Firefighting Installation, Area B8-B10

Building Management System Wiring works, Area B1-B4


Building Management System Wiring works, Area B5-B7
Building Management System Wiring works Area B8-B10
Building Management System Device Installation, Area B1-B4
Building Management System Device Installation, Area B5-B7
Building Management System Device Installation, Area B8-B10
Cable Trays, Cable Ladders, Cable Trunking, Area B1
Cable Trays, Cable Ladders, Cable Trunking, Area B2
Cable Trays, Cable Ladders, Cable Trunking, Area B3
Cable Trays, Cable Ladders, Cable Trunking, Area B4
Cable Trays, Cable Ladders, Cable Trunking, Area B5
Cable Trays, Cable Ladders, Cable Trunking, Area B6
Cable Trays, Cable Ladders, Cable Trunking, Area B7
Cable Trays, Cable Ladders, Cable Trunking, Area B8
Cable Trays, Cable Ladders, Cable Trunking, Area B9
Cable Trays, Cable Ladders, Cable Trunking, Area B10

Bus Duct - Area B1


Bus Duct - Area B2
Bus Duct - Area B3
Bus Duct - Area B4
Bus Duct - Area B5
Bus Duct - Area B6
Bus Duct - Area B7
Bus Duct - Area B8
Bus Duct - Area B9
Bus Duct - Area B10
Bus Bar - Area B1
Bus Bar - Area B2
Bus Bar - Area B3
Bus Bar - Area B4
Bus Bar - Area B5
Bus Bar - Area B6
Bus Bar - Area B7
Bus Bar - Area B8
Bus Bar - Area B9
Bus Bar - Area B10

Telephone Wiring works - Area B1-B4


Telephone Wiring works - Area B5-B7
Telephone Wiring works - Area B8-B10
Telephone Device Installation - Area B1-B4
Telephone Device Installation - Area B5-B7
Telephone Device Installation - Area B8-B10
Substation 2: Transformer Installation, Area B1
Substation 2: MV Panels Installation, Area B1
Substation 2: Switchgear Installation, Area B2
Generator, Area B1

Construction of North East Underground Carpark Contract No. XC10101100


#

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

1548

NECP-Rebase_06Sep12-4.CO.2.5.1.39
PHASE 2 LOWER BASEMENT
NECOMEP3010
- GENERATOR,
UPS,
UPS,Area
BATTERY
B1
SYSTEM

30

0%

21

05-May-13

08-Jun-13

05-Dec-13

30-Dec-13

1549

NECP-Rebase_06Sep12-4.CO.2.5.1.39
PHASE 2 LOWER BASEMENT
NECOMEP3020
- GENERATOR,
Battery
UPS, System,
BATTERY
Area
SYSTEM
A10

30

0%

21

09-Jun-13

13-Jul-13

14-Dec-13

07-Jan-14

149
38
13

0%

105
38
13

14-Aug-12
14-Aug-12
14-Aug-12

04-Feb-13
26-Sep-12
28-Aug-12

25-Apr-13
25-Apr-13
25-Apr-13

26-Aug-13
09-Jun-13
11-May-13

73
90
90

1550
1551
1552

WBS

WBS Name

Activity ID

Activity Name

BL Project
Duration

PHASE 2 LOWER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTS


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.1.40.1
WIRING
NECOMEP3190
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B1-B4

Activity % Remaining
Complete Duration

Actual Start

Actual
Finish

1553

NECP-Rebase_06Sep12-4.CO.2.5.1.40.1
WIRING
NECOMEP3200

Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B5-B7

13

0%

13

29-Aug-12

12-Sep-12

11-May-13

26-May-13

90

1554

NECP-Rebase_06Sep12-4.CO.2.5.1.40.1
WIRING
NECOMEP3210

Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B8-B10

12

0%

12

13-Sep-12

26-Sep-12

26-May-13

09-Jun-13

90

1555
1556

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.40.2
DEVICE INSTALLATION NECOMEP4970

37
Luminaires, Lighting Points, Switch Points, etc Devices installation., Area B1-B4
13

0%

38
13

23-Dec-12
23-Dec-12

04-Feb-13
07-Jan-13

14-Jul-13
14-Jul-13

26-Aug-13
28-Jul-13

73
48

1557

NECP-Rebase_06Sep12-4.CO.2.5.1.40.2
DEVICE INSTALLATION NECOMEP4980

Luminaires, Lighting Points, Switch Points, etc Devices installation, Area B5-B7
13

0%

13

07-Jan-13

22-Jan-13

29-Jul-13

12-Aug-13

73

1558

NECP-Rebase_06Sep12-4.CO.2.5.1.40.2
DEVICE INSTALLATION NECOMEP4990

Luminaires, Lighting Points, Switch Points, etc Devices installation, Area B8-B10
12

0%

12

21-Jan-13

04-Feb-13

13-Aug-13

26-Aug-13

73

81
37
13

01-Nov-12
01-Nov-12
01-Nov-12

04-Feb-13
13-Dec-12
15-Nov-12

03-Oct-13
03-Oct-13
03-Oct-13

01-Dec-13
17-Nov-13
20-Oct-13

0
0
0

1559
1560
1561

0%

49
37
13

1562

NECP-Rebase_06Sep12-4.CO.2.5.1.41.1
WIRING
NECOMEP3320

Switchboard, Small power wiring works, Area B5-B7

12

0%

12

17-Nov-12

29-Nov-12

21-Oct-13

03-Nov-13

1563

NECP-Rebase_06Sep12-4.CO.2.5.1.41.1
WIRING
NECOMEP3330

Switchboard, Small power wiring works, Area B8-B10

12

0%

12

01-Dec-12

13-Dec-12

04-Nov-13

17-Nov-13

1564
1565

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.41.2
DEVICE INSTALLATION NECOMEP5000

Switchboard, Small power Devices installation, Area B1-B4

37
13

0%

36
13

23-Dec-12
23-Dec-12

04-Feb-13
07-Jan-13

21-Oct-13
21-Oct-13

01-Dec-13
04-Nov-13

0
0

1566

PHASE 2 LOWER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATION


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.1.41.1
WIRING
NECOMEP3310
Switchboard, Small power wiring works, Area B1-B4

NECP-Rebase_06Sep12-4.CO.2.5.1.41.2
DEVICE INSTALLATION NECOMEP5010

Switchboard, Small power Devices installation, Area B5-B7

12

0%

12

07-Jan-13

21-Jan-13

04-Nov-13

17-Nov-13

1567

NECP-Rebase_06Sep12-4.CO.2.5.1.41.2
DEVICE INSTALLATION NECOMEP5020

Switchboard, Small power Devices installation, Area B8-B10

12

0%

12

21-Jan-13

04-Feb-13

18-Nov-13

01-Dec-13

1568
1569
1570

PHASE 2 LOWER BASEMENT - SECURITY SYSTEM


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.1.42.1
WIRING
NECOMEP3430

Security System wiring works, Area B1-B4

26
20
7

0%

26
20
7

09-Jan-13
09-Jan-13
09-Jan-13

07-Feb-13
31-Jan-13
16-Jan-13

17-Oct-13
17-Oct-13
17-Oct-13

16-Nov-13
09-Nov-13
24-Oct-13

9
9
7

1571

NECP-Rebase_06Sep12-4.CO.2.5.1.42.1
WIRING
NECOMEP3440

Security System wiring works, Area B5-B7

0%

17-Jan-13

24-Jan-13

26-Oct-13

02-Nov-13

1572

NECP-Rebase_06Sep12-4.CO.2.5.1.42.1
WIRING
NECOMEP3450

Security System wiring works, Area B8-B10

0%

26-Jan-13

31-Jan-13

03-Nov-13

09-Nov-13

1573
1574

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.42.2
DEVICE INSTALLATION NECOMEP5030

Security System Device installation , Area B1-B4

19
7

0%

19
7

17-Jan-13
17-Jan-13

07-Feb-13
24-Jan-13

26-Oct-13
26-Oct-13

16-Nov-13
02-Nov-13

9
7

NECP-Rebase_06Sep12-4.CO.2.5.1.42.2
DEVICE INSTALLATION NECOMEP5040

Security System Device installation , Area B5-B7

0%

14

NECP-Rebase_06Sep12-4.CO.2.5.1.42.2
DEVICE INSTALLATION NECOMEP5050

Security System Device installation , Area B8-B10

1575
1576
1577
1578
1579

26-Jan-13

02-Feb-13

03-Nov-13

10-Nov-13

0%

02-Feb-13

07-Feb-13

10-Nov-13

16-Nov-13

132
21
7

09-Jan-13
09-Jan-13
09-Jan-13

12-Jun-13
02-Feb-13
16-Jan-13

28-Oct-13
28-Oct-13
28-Oct-13

28-Nov-13
20-Nov-13
04-Nov-13

32
0
0

0%

28
21
7

1580

NECP-Rebase_06Sep12-4.CO.2.5.1.43.1
WIRING
NECOMEP3560

Parking Guidance System wiring works, Area B5-B7

0%

17-Jan-13

24-Jan-13

05-Nov-13

12-Nov-13

1581

NECP-Rebase_06Sep12-4.CO.2.5.1.43.1
WIRING
NECOMEP3570

Parking Guidance System wiring works, Area B8-B10

0%

26-Jan-13

02-Feb-13

13-Nov-13

20-Nov-13

1582
1583

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.43.2
DEVICE INSTALLATION NECOMEP5060

Parking Guidance System Device installation, Area B1-B4

47
7

0%

21
7

18-Apr-13
18-Apr-13

12-Jun-13
27-Apr-13

05-Nov-13
05-Nov-13

28-Nov-13
12-Nov-13

32
18

0%

1584

PHASE 2 LOWER BASEMENT - PARKING GUIDANCE SYSTEM


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.1.43.1
WIRING
NECOMEP3550
Parking Guidance System wiring works, Area B1-B4

NECP-Rebase_06Sep12-4.CO.2.5.1.43.2
DEVICE INSTALLATION NECOMEP5070

Parking Guidance System Device installation, Area B5-B7

1585

NECP-Rebase_06Sep12-4.CO.2.5.1.43.2
DEVICE INSTALLATION NECOMEP5080

Parking Guidance System Device installation, Area B8-B10

1586
1587
1588

PHASE 2 LOWER BASEMENT - TELEMETRY/SCADA


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.1.44.1
WIRING
NECOMEP3630

1589
1590

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.44.2
DEVICE INSTALLATION NECOMEP5490

1591
1592
1593

PHASE 2 LOWER BASEMENT - FIRE ALARM SYSTEM


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.1.49.1
WIRING
NECOMEP3670

1594
1595

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.49.2
DEVICE INSTALLATION NECOMEP5480

13-May-13

21-May-13

13-Nov-13

20-Nov-13

33

0%

04-Jun-13

12-Jun-13

21-Nov-13

28-Nov-13

32

Telemetry/SCADA Wiring works, Area B1-B10

30
15
15

0%

30
15
15

19-Jan-13
19-Jan-13
19-Jan-13

21-Feb-13
04-Feb-13
04-Feb-13

30-Sep-13
30-Sep-13
30-Sep-13

05-Nov-13
19-Oct-13
19-Oct-13

14
14
14

Telemetry/SCADA Device Installation, Area B1-B10

15
15

0%

15
15

05-Feb-13
05-Feb-13

21-Feb-13
21-Feb-13

20-Oct-13
20-Oct-13

05-Nov-13
05-Nov-13

14
14

Fire Alarm Wiring works, Area B1-B10

30
15
15

0%

30
15
15

19-Jan-13
19-Jan-13
19-Jan-13

21-Feb-13
04-Feb-13
04-Feb-13

19-Oct-13
19-Oct-13
19-Oct-13

21-Nov-13
04-Nov-13
04-Nov-13

0
0
0

Fire Alarm Devices Installation, Area B1-B10

15
15

0%

15
15

05-Feb-13
05-Feb-13

21-Feb-13
21-Feb-13

05-Nov-13
05-Nov-13

21-Nov-13
21-Nov-13

0
0

06-Jan-13
09-Mar-13
09-Mar-13

21-Jul-13
04-Jun-13
18-Mar-13

09-Jun-13
19-Sep-13
19-Sep-13

31-Dec-13
11-Dec-13
26-Sep-13

7
17
0

1596
1597
1598

Upper Basement Floor


PHASE 2 UPPER BASEMENT - BLACK STEEL PIPES
NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2605
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B1

168
75
8

0%

173
70
7

1599

NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2615
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B2

0%

18-Mar-13

27-Mar-13

28-Sep-13

05-Oct-13

13

1600

NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2625
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B3

0%

27-Mar-13

06-Apr-13

06-Oct-13

15-Oct-13

13

1601

NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2635
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B4

0%

06-Apr-13

15-Apr-13

16-Oct-13

23-Oct-13

13

1602

NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2645
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B5

0%

15-Apr-13

24-Apr-13

24-Oct-13

31-Oct-13

13

1603

NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2655
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B6

0%

24-Apr-13

02-May-13

02-Nov-13

09-Nov-13

13

1604

NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2665
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B7

0%

02-May-13

11-May-13

10-Nov-13

17-Nov-13

17

1605

NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2675
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B8

0%

11-May-13

19-May-13

18-Nov-13

25-Nov-13

17

1606

NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2685
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B9

0%

19-May-13

27-May-13

26-Nov-13

03-Dec-13

17

1607

NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2695
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B10

0%

27-May-13

04-Jun-13

04-Dec-13

11-Dec-13

17

65
65
7

27-Jan-13
27-Jan-13
27-Jan-13

13-Apr-13
13-Apr-13
04-Feb-13

15-Aug-13
15-Aug-13
15-Aug-13

26-Oct-13
26-Oct-13
21-Aug-13

12
12
0

1608
1609
1610

0%

60
60
6

1611

NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2510

Fire Fighting Pipe Installation, Area B2

0%

04-Feb-13

12-Feb-13

22-Aug-13

28-Aug-13

1612

NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2520

Fire Fighting Pipe Installation, Area B3

0%

12-Feb-13

20-Feb-13

29-Aug-13

04-Sep-13

1613

NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2530

Fire Fighting Pipe Installation, Area B4

0%

20-Feb-13

28-Feb-13

05-Sep-13

11-Sep-13

1614

NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2540

Fire Fighting Pipe Installation, Area B5

0%

28-Feb-13

09-Mar-13

12-Sep-13

18-Sep-13

1615

NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2550

Fire Fighting Pipe Installation, Area B6

0%

09-Mar-13

16-Mar-13

19-Sep-13

25-Sep-13

12

1616

NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2560

Fire Fighting Pipe Installation, Area B7

0%

16-Mar-13

23-Mar-13

26-Sep-13

02-Oct-13

12

1617

NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2570

Fire Fighting Pipe Installation, Area B8

0%

23-Mar-13

30-Mar-13

03-Oct-13

09-Oct-13

12

1618

NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2580

Fire Fighting Pipe Installation, Area B9

0%

30-Mar-13

06-Apr-13

10-Oct-13

19-Oct-13

12

1619

NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2590

Fire Fighting Pipe Installation, Area B10

0%

06-Apr-13

13-Apr-13

20-Oct-13

26-Oct-13

12

1620
1621

WATER SUPPLY
NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5600

Water supply Pipe Installation, Area B1

65
7

0%

60
6

27-Jan-13
27-Jan-13

13-Apr-13
04-Feb-13

15-Aug-13
15-Aug-13

26-Oct-13
21-Aug-13

12
12

1622

NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5610

Water supply Pipe Installation, Area B2

0%

04-Feb-13

12-Feb-13

22-Aug-13

28-Aug-13

12

1623

NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5620

Water supply Pipe Installation, Area B3

0%

12-Feb-13

20-Feb-13

29-Aug-13

04-Sep-13

12

1624

NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5630

Water supply Pipe Installation, Area B4

0%

20-Feb-13

28-Feb-13

05-Sep-13

11-Sep-13

12

1625

NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5640

Water supply Pipe Installation, Area B5

0%

28-Feb-13

09-Mar-13

12-Sep-13

18-Sep-13

12

1626

NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5650

Water supply Pipe Installation, Area B6

0%

09-Mar-13

16-Mar-13

19-Sep-13

25-Sep-13

12

1627

NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5660

Water supply Pipe Installation, Area B7

0%

16-Mar-13

23-Mar-13

26-Sep-13

02-Oct-13

12

1628

NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5670

Water supply Pipe Installation, Area B8

0%

23-Mar-13

30-Mar-13

03-Oct-13

09-Oct-13

12

1629

NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5680

Water supply Pipe Installation, Area B9

0%

30-Mar-13

06-Apr-13

10-Oct-13

19-Oct-13

12

NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5690

Water supply Pipe Installation, Area B10

1630

PHASE 2 UPPER BASEMENT - PIPE INSTALLATION (FIRE FIGHTING, SANITARY & WATER SUPPLY)
FIRE FIGHTING
NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2500
Fire Fighting Pipe Installation, Area B1

Page 15 of 19/27-Feb-13 09:03

Execution Programme Level 3

0%

06-Apr-13

13-Apr-13

20-Oct-13

26-Oct-13

12

1631
1632

PHASE 2 UPPER BASEMENT - SPRINKLER SYSTEM


NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2505
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B1

75
8

0%

70
7

24-Apr-13
24-Apr-13

21-Jul-13
04-May-13

28-Sep-13
28-Sep-13

21-Dec-13
05-Oct-13

0
0

1633

NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2515
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B2

0%

04-May-13

13-May-13

06-Oct-13

15-Oct-13

1634

NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2525
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B3

0%

13-May-13

22-May-13

16-Oct-13

23-Oct-13

1635

NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2535
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B4

0%

22-May-13

01-Jun-13

24-Oct-13

31-Oct-13

1636

NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2545
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B5

0%

01-Jun-13

10-Jun-13

02-Nov-13

09-Nov-13

1637

NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2555
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B6

0%

10-Jun-13

18-Jun-13

10-Nov-13

17-Nov-13

1638

NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2565
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B7

0%

18-Jun-13

26-Jun-13

18-Nov-13

25-Nov-13

1639

NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2575
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B8

0%

26-Jun-13

04-Jul-13

26-Nov-13

03-Dec-13

1640

NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2585
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B9

0%

04-Jul-13

13-Jul-13

04-Dec-13

11-Dec-13

1641

NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2595
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B10

0%

13-Jul-13

21-Jul-13

12-Dec-13

21-Dec-13

27-Jan-13
27-Jan-13
27-Jan-13

02-May-13
24-Apr-13
05-Feb-13

16-Jul-13
16-Jul-13
16-Jul-13

15-Oct-13
05-Oct-13
23-Jul-13

54
54
54

1642
1643
1644

PHASE 2 UPPER BASEMENT - DUCTS


INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2705

AC Ducts Installation, Area B1

82
75
8

0%

77
70
7

1645

NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2715

AC Ducts Installation, Area B2

0%

05-Feb-13

14-Feb-13

24-Jul-13

31-Jul-13

54

1646

NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2725

AC Ducts Installation, Area B3

0%

14-Feb-13

24-Feb-13

01-Aug-13

08-Aug-13

54

1647

NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2735

AC Ducts Installation, Area B4

0%

24-Feb-13

05-Mar-13

10-Aug-13

17-Aug-13

54

1648

NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2745

AC Ducts Installation, Area B5

0%

05-Mar-13

14-Mar-13

18-Aug-13

25-Aug-13

54

1649

NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2755

AC Ducts Installation, Area B6

0%

14-Mar-13

23-Mar-13

26-Aug-13

02-Sep-13

54

1650

NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2765

AC Ducts Installation, Area B7

0%

23-Mar-13

31-Mar-13

03-Sep-13

10-Sep-13

54

1651

NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2775

AC Ducts Installation, Area B8

0%

31-Mar-13

08-Apr-13

11-Sep-13

18-Sep-13

54

1652

NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2785

AC Ducts Installation, Area B9

0%

08-Apr-13

16-Apr-13

19-Sep-13

26-Sep-13

54

1653

NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2795

AC Ducts Installation, Area B10

0%

16-Apr-13

24-Apr-13

28-Sep-13

05-Oct-13

54

1654
1655

INSULATION
NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5700

AC Ducts work Insulation, Area B1

74
8

0%

70
7

05-Feb-13
05-Feb-13

02-May-13
14-Feb-13

24-Jul-13
24-Jul-13

15-Oct-13
31-Jul-13

54
77

1656

NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5710

AC Ducts work Insulation, Area B2

0%

14-Feb-13

24-Feb-13

01-Aug-13

08-Aug-13

74

1657

NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5720

AC Ducts work Insulation, Area B3

0%

24-Feb-13

05-Mar-13

10-Aug-13

17-Aug-13

71

1658

NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5730

AC Ducts work Insulation, Area B4

0%

05-Mar-13

14-Mar-13

18-Aug-13

25-Aug-13

67

1659

NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5740

AC Ducts work Insulation, Area B5

0%

14-Mar-13

24-Mar-13

26-Aug-13

02-Sep-13

65

2013
Jan

Feb

Mar

Apr

May

Jun

2014
Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

UPS, Area B1
Battery System, Area A10

Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B1-B4
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B5-B7
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B8-B10
Luminaires, Lighting Points, Switch Points, etc Devices installation., Area B1-B4
Luminaires, Lighting Points, Switch Points, etc Devices installation, Area B5-B7
Luminaires, Lighting Points, Switch Points, etc Devices installation, Area B8-B10

Switchboard, Small power wiring works, Area B1-B4


Switchboard, Small power wiring works, Area B5-B7
Switchboard, Small power wiring works, Area B8-B10
Switchboard, Small power Devices installation, Area B1-B4
Switchboard, Small power Devices installation, Area B5-B7
Switchboard, Small power Devices installation, Area B8-B10

Security System wiring works, Area B1-B4


Security System wiring works, Area B5-B7
Security System wiring works, Area B8-B10
Security System Device installation , Area B1-B4
Security System Device installation , Area B5-B7
Security System Device installation , Area B8-B10

Parking Guidance System wiring works, Area B1-B4


Parking Guidance System wiring works, Area B5-B7
Parking Guidance System wiring works, Area B8-B10
Parking Guidance System Device installation, Area B1-B4
Parking Guidance System Device installation, Area B5-B7
Parking Guidance System Device installation, Area B8-B10

Telemetry/SCADA Wiring works, Area B1-B10


Telemetry/SCADA Device Installation, Area B1-B10

Fire Alarm Wiring works, Area B1-B10


Fire Alarm Devices Installation, Area B1-B10

Black Steel Pipes, CHW, Area B1


Black Steel Pipes, CHW, Area B2
Black Steel Pipes, CHW, Area B3
Black Steel Pipes, CHW, Area B4
Black Steel Pipes, CHW, Area B5
Black Steel Pipes, CHW, Area B6
Black Steel Pipes, CHW, Area B7
Black Steel Pipes, CHW, Area B8
Black Steel Pipes, CHW, Area B9
Black Steel Pipes, CHW, Area B10

Fire Fighting Pipe Installation, Area B1


Fire Fighting Pipe Installation, Area B2
Fire Fighting Pipe Installation, Area B3
Fire Fighting Pipe Installation, Area B4
Fire Fighting Pipe Installation, Area B5
Fire Fighting Pipe Installation, Area B6
Fire Fighting Pipe Installation, Area B7
Fire Fighting Pipe Installation, Area B8
Fire Fighting Pipe Installation, Area B9
Fire Fighting Pipe Installation, Area B10
Water supply Pipe Installation, Area B1
Water supply Pipe Installation, Area B2
Water supply Pipe Installation, Area B3
Water supply Pipe Installation, Area B4
Water supply Pipe Installation, Area B5
Water supply Pipe Installation, Area B6
Water supply Pipe Installation, Area B7
Water supply Pipe Installation, Area B8
Water supply Pipe Installation, Area B9
Water supply Pipe Installation, Area B10
Sprinkler Header & Accessories , Area B1
Sprinkler Header & Accessories , Area B2
Sprinkler Header & Accessories , Area B3
Sprinkler Header & Accessories , Area B4
Sprinkler Header & Accessories , Area B5
Sprinkler Header & Accessories , Area B6
Sprinkler Header & Accessories , Area B7
Sprinkler Header & Accessories , Area B8
Sprinkler Header & Accessories , Area B9
Sprinkler Header & Accessories , Area B10

AC Ducts Installation, Area B1


AC Ducts Installation, Area B2
AC Ducts Installation, Area B3
AC Ducts Installation, Area B4
AC Ducts Installation, Area B5
AC Ducts Installation, Area B6
AC Ducts Installation, Area B7
AC Ducts Installation, Area B8
AC Ducts Installation, Area B9
AC Ducts Installation, Area B10
AC Ducts work Insulation, Area B1
AC Ducts work Insulation, Area B2
AC Ducts work Insulation, Area B3
AC Ducts work Insulation, Area B4
AC Ducts work Insulation, Area B5

Construction of North East Underground Carpark Contract No. XC10101100


#

WBS

WBS Name

Activity ID

Activity Name

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

1660

NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5750

AC Ducts work Insulation, Area B6

0%

23-Mar-13

31-Mar-13

03-Sep-13

10-Sep-13

62

1661

NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5760

AC Ducts work Insulation, Area B7

0%

31-Mar-13

08-Apr-13

11-Sep-13

18-Sep-13

63

1662

NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5770

AC Ducts work Insulation, Area B8

0%

08-Apr-13

16-Apr-13

19-Sep-13

26-Sep-13

68

1663

NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5780

AC Ducts work Insulation, Area B9

0%

16-Apr-13

24-Apr-13

28-Sep-13

05-Oct-13

61

1664

NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5790

AC Ducts work Insulation, Area B10

0%

24-Apr-13

02-May-13

06-Oct-13

15-Oct-13

54

BL Project
Duration

Activity % Remaining
Complete Duration

16-May-13
16-May-13

22-Jun-13
02-Jun-13

26-Oct-13
26-Oct-13

02-Dec-13
12-Nov-13

21
17

03-Jun-13

13-Jun-13

12-Nov-13

24-Nov-13

19

1665
1666

PHASE 2 UPPER BASEMENT - AC, REFRIGERATION, VENTILATION EQUIPMENT


NECP-Rebase_06Sep12-4.CO.2.5.2.71
PHASE 2 UPPER BASEMENT
NECOMEP2805
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area B1-B4

32
15

0%

32
15

1667

NECP-Rebase_06Sep12-4.CO.2.5.2.71
PHASE 2 UPPER BASEMENT
NECOMEP2815
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area B5-B7

10

0%

10

1668

Actual Start

Actual
Finish

0%

15-Jun-13

22-Jun-13

24-Nov-13

02-Dec-13

21

1669
1670

PHASE 2 UPPER BASEMENT - SANITARY, RAINWATER INSTALLATIONS


NECP-Rebase_06Sep12-4.CO.2.5.2.72
PHASE 2 UPPER BASEMENT
NECOMEP2860
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area B1-B4

40
10

0%

30
10

04-Mar-13
04-Mar-13

18-Apr-13
14-Mar-13

01-Sep-13
01-Sep-13

06-Oct-13
12-Sep-13

65
65

1671

NECP-Rebase_06Sep12-4.CO.2.5.2.72
PHASE 2 UPPER BASEMENT
NECOMEP2870
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area B5-B7

10

0%

10

16-Mar-13

26-Mar-13

12-Sep-13

24-Sep-13

65

1672

NECP-Rebase_06Sep12-4.CO.2.5.2.72
PHASE 2 UPPER BASEMENT
NECOMEP2880
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area B8-B10

10

0%

10

08-Apr-13

18-Apr-13

24-Sep-13

06-Oct-13

65

39
8

0%

43
8

06-Mar-13
06-Mar-13

21-Apr-13
14-Mar-13

12-Sep-13
12-Sep-13

03-Nov-13
21-Sep-13

50
70

0%

1673
1674
1675
1676

NECP-Rebase_06Sep12-4.CO.2.5.2.71
PHASE 2 UPPER BASEMENT
NECOMEP2825
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area B8-B10

PHASE 2 UPPER BASEMENT - COLD WATER, HOT WATER, FIREFIGHTING INSTALLATION


NECP-Rebase_06Sep12-4.CO.2.5.2.73
PHASE 2 UPPER BASEMENT
NECOMEP2690
- COLD WATER,
Cold
HOT
Water,
WATER,
Hot Water
FIREF &
IGHTING
Firefighting
INSTALLATION
Installation, Area B1-B4
NECP-Rebase_06Sep12-4.CO.2.5.2.73
PHASE 2 UPPER BASEMENT
NECOMEP2700
- COLD WATER,
Cold
HOT
Water,
WATER,
Hot Water
FIREF &
IGHTING
Firefighting
INSTALLATION
Installation, Area B5-B7

Aug

Sep

Oct

Nov

Dec

Jan

AC Ducts work Insulation, Area B7


AC Ducts work Insulation, Area B8
AC Ducts work Insulation, Area B9
AC Ducts work Insulation, Area B10
AC/Refrigeration Equip, Supply & Ventilation Fans, Area B1-B4
AC/Refrigeration Equip, Supply & Ventilation Fans, Area B5-B7
AC/Refrigeration Equip, Supply & Ventilation Fans, Area B8-B10
Sanitary Installation, Rainwater Installations, Area B1-B4
Sanitary Installation, Rainwater Installations, Area B5-B7
Sanitary Installation, Rainwater Installations, Area B8-B10
Cold Water, Hot Water & Firefighting Installation, Area B1-B4
Cold Water, Hot Water & Firefighting Installation, Area B5-B7

03-Oct-13

12-Oct-13

60

21-Apr-13

27-Oct-13

03-Nov-13

50

Cold Water, Hot Water & Firefighting Installation, Area B8-B10

Building Management System Wiring, Area B1-B4

0%

04-Jul-13
24-Jun-13
03-Jun-13

24-Oct-13
24-Oct-13
24-Oct-13

10-Dec-13
24-Nov-13
03-Nov-13

21
25
22

Building Management System Wiring, Area B1-B4

Building Management System Wiring, Area B5-B7

0%

03-Jun-13

13-Jun-13

04-Nov-13

13-Nov-13

25

Building Management System Wiring, Area B8-B10

0%

13-Jun-13

24-Jun-13

14-Nov-13

24-Nov-13

25

27
9

0%

26
9

03-Jun-13
03-Jun-13

04-Jul-13
13-Jun-13

10-Nov-13
10-Nov-13

10-Dec-13
20-Nov-13

21
17

15-Jun-13

Building Management Device Installation, Area B1-B4

NECP-Rebase_06Sep12-4.CO.2.5.2.74.2
DEVICE INSTALLATION NECOMEP5810

Building Management Device Installation, Area B5-B7

NECP-Rebase_06Sep12-4.CO.2.5.2.74.2
DEVICE INSTALLATION NECOMEP5820

0%

24-Jun-13

21-Nov-13

02-Dec-13

19

Building Management Device Installation, Area B8-B10

0%

24-Jun-13

04-Jul-13

30-Nov-13

10-Dec-13

21

1686
1687

PHASE 2 UPPER BASEMENT - CABLE TRAYS, CABLE LADDERS, CABLE TRUNKING


NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3005
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B1

69
8

0%

50
5

28-Mar-13
28-Mar-13

16-Jun-13
06-Apr-13

06-Jul-13
06-Jul-13

02-Sep-13
11-Jul-13

79
79

1688

NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3015
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B2

0%

07-Apr-13

15-Apr-13

11-Jul-13

17-Jul-13

79

1689

NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3025
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B3

0%

16-Apr-13

24-Apr-13

17-Jul-13

23-Jul-13

79

1690

NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3035
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B4

0%

25-Apr-13

04-May-13

23-Jul-13

29-Jul-13

79

1691

NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3045
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B5

0%

05-May-13

13-May-13

29-Jul-13

04-Aug-13

79

1692

NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3055
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B6

0%

14-May-13

22-May-13

04-Aug-13

10-Aug-13

79

1693

NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3065
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B7

0%

23-May-13

30-May-13

10-Aug-13

15-Aug-13

79

1694

NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3075
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B8

0%

01-Jun-13

08-Jun-13

15-Aug-13

21-Aug-13

79

1695

NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3085
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B9

0%

09-Jun-13

16-Jun-13

21-Aug-13

27-Aug-13

79

1696

NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3095
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B10

0%

01-Apr-13

09-Apr-13

27-Aug-13

02-Sep-13

79

07-Apr-13
07-Apr-13
07-Apr-13

30-Jun-13
30-Jun-13
14-Apr-13

22-Aug-13
22-Aug-13
22-Aug-13

22-Oct-13
22-Oct-13
28-Aug-13

67
67
67

16-Apr-13

23-Apr-13

28-Aug-13

03-Sep-13

67

1697
1698
1699

PHASE 2 UPPER BASEMENT - BUS BAR


BUS BAR - LIGHTING
NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2740

Bus Bar, Area B1

73
73
7

0%

50
50
5

1700

NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2750

Bus Bar, Area B2

0%

1701

NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2760

Bus Bar, Area B3

0%

25-Apr-13

02-May-13

03-Sep-13

09-Sep-13

67

1702

NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2770

Bus Bar, Area B4

0%

05-May-13

12-May-13

09-Sep-13

15-Sep-13

67

1703

NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2780

Bus Bar, Area B5

0%

14-May-13

21-May-13

15-Sep-13

21-Sep-13

67

1704

NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2790

Bus Bar, Area B6

0%

23-May-13

30-May-13

21-Sep-13

26-Sep-13

67

1705

NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2800

Bus Bar, Area B7

0%

01-Jun-13

08-Jun-13

26-Sep-13

02-Oct-13

67

1706

NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2810

Bus Bar, Area B8

0%

09-Jun-13

15-Jun-13

02-Oct-13

08-Oct-13

67

1707

NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2820

Bus Bar, Area B9

0%

17-Jun-13

23-Jun-13

08-Oct-13

16-Oct-13

67

1708

NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2830

Bus Bar, Area B10

0%

24-Jun-13

30-Jun-13

16-Oct-13

22-Oct-13

67

53
40
14

09-Mar-13
09-Mar-13
09-Mar-13

08-May-13
23-Apr-13
24-Mar-13

30-Oct-13
30-Oct-13
30-Oct-13

31-Dec-13
15-Dec-13
14-Nov-13

0
0
0

25-Mar-13

08-Apr-13

16-Nov-13

30-Nov-13

PHASE 2 UPPER BASEMENT - TELEPHONE CABLE TRAYS INSTALLATION


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.2.77.1
WIRING
NECOMEP2043
Telephone Wiring at Cable Trays, Area B1-B4

0%

53
40
14

NECP-Rebase_06Sep12-4.CO.2.5.2.77.1
WIRING
NECOMEP2053

Telephone Wiring at Cable Trays, Area B5-B7

13

0%

13

1713

NECP-Rebase_06Sep12-4.CO.2.5.2.77.1
WIRING
NECOMEP2063

Telephone Wiring at Cable Trays, Area B8-B10

13

0%

13

09-Apr-13

23-Apr-13

01-Dec-13

15-Dec-13

1714
1715

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.77.2
DEVICE INSTALLATION NECOMEP5830

Telephone Devices Installation, Area B1-B4

39
14

0%

39
14

25-Mar-13
25-Mar-13

08-May-13
09-Apr-13

16-Nov-13
16-Nov-13

31-Dec-13
01-Dec-13

0
0

1716

NECP-Rebase_06Sep12-4.CO.2.5.2.77.2
DEVICE INSTALLATION NECOMEP5840

Telephone Devices Installation, Area B5-B7

13

0%

13

09-Apr-13

23-Apr-13

01-Dec-13

15-Dec-13

1717

NECP-Rebase_06Sep12-4.CO.2.5.2.77.2
DEVICE INSTALLATION NECOMEP5850

Telephone Devices Installation, Area B8-B10

13

0%

13

24-Apr-13

08-May-13

16-Dec-13

31-Dec-13

89
38
13

06-Jan-13
06-Jan-13
06-Jan-13

20-Apr-13
19-Feb-13
21-Jan-13

09-Jun-13
09-Jun-13
09-Jun-13

26-Oct-13
23-Jul-13
24-Jun-13

23
90
90

24-Jun-13

09-Jul-13

90

PHASE 2 UPPER BASEMENT - LUMINAIRES, LTG POINTS, SWITCH POINTS


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.2.81.1
WIRING
NECOMEP3220
Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B1-B4

0%

117
38
13

NECP-Rebase_06Sep12-4.CO.2.5.2.81.1
WIRING
NECOMEP3230

Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B5-B7

13

0%

13

21-Jan-13

05-Feb-13

1722

NECP-Rebase_06Sep12-4.CO.2.5.2.81.1
WIRING
NECOMEP3240

Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B8-B10

12

0%

12

05-Feb-13

19-Feb-13

09-Jul-13

23-Jul-13

90

1723
1724

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.81.2
DEVICE INSTALLATION NECOMEP5860

51
Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B1-B413

0%

48
13

19-Feb-13
19-Feb-13

20-Apr-13
06-Mar-13

29-Aug-13
29-Aug-13

26-Oct-13
12-Sep-13

23
42

1725

NECP-Rebase_06Sep12-4.CO.2.5.2.81.2
DEVICE INSTALLATION NECOMEP5870

Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B5-B7
14

0%

14

14-Mar-13

31-Mar-13

12-Sep-13

28-Sep-13

41

1726

NECP-Rebase_06Sep12-4.CO.2.5.2.81.2
DEVICE INSTALLATION NECOMEP5880

Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B8-B10
12

0%

12

06-Apr-13

20-Apr-13

10-Oct-13

26-Oct-13

23

101
37
13

07-Jan-13
07-Jan-13
07-Jan-13

05-May-13
18-Feb-13
21-Jan-13

21-Oct-13
21-Oct-13
21-Oct-13

15-Dec-13
01-Dec-13
03-Nov-13

0
0
0

04-Feb-13

04-Nov-13

17-Nov-13

Building Management System Wiring, Area B5-B7


Building Management System Wiring, Area B8-B10
Building Management Device Installation, Area B1-B4
Building Management Device Installation, Area B5-B7
Building Management Device Installation, Area B8-B10
Cable Trays, Cable Ladders, Cable Trunking, Area B1
Cable Trays, Cable Ladders, Cable Trunking, Area B2
Cable Trays, Cable Ladders, Cable Trunking, Area B3
Cable Trays, Cable Ladders, Cable Trunking, Area B4
Cable Trays, Cable Ladders, Cable Trunking, Area B5
Cable Trays, Cable Ladders, Cable Trunking, Area B6
Cable Trays, Cable Ladders, Cable Trunking, Area B7
Cable Trays, Cable Ladders, Cable Trunking, Area B8
Cable Trays, Cable Ladders, Cable Trunking, Area B9
Cable Trays, Cable Ladders, Cable Trunking, Area B10

Bus Bar, Area B1


Bus Bar, Area B2
Bus Bar, Area B3
Bus Bar, Area B4
Bus Bar, Area B5
Bus Bar, Area B6
Bus Bar, Area B7
Bus Bar, Area B8
Bus Bar, Area B9
Bus Bar, Area B10

Telephone Wiring at Cable Trays, Area B1-B4


Telephone Wiring at Cable Trays, Area B5-B7
Telephone Wiring at Cable Trays, Area B8-B10
Telephone Devices Installation, Area B1-B4
Telephone Devices Installation, Area B5-B7
Telephone Devices Installation, Area B8-B10

Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B1-B4
Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B5-B7
Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B8-B10
Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B1-B4
Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B5-B7
Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B8-B10

0%

48
36
12

NECP-Rebase_06Sep12-4.CO.2.5.2.82.1
WIRING
NECOMEP3350

Switchboard, Small power Wiring Works, Area B5-B7

12

0%

12

22-Jan-13

1731

NECP-Rebase_06Sep12-4.CO.2.5.2.82.1
WIRING
NECOMEP3360

Switchboard, Small power Wiring Works, Area B8-B10

12

0%

12

05-Feb-13

18-Feb-13

18-Nov-13

01-Dec-13

1732
1733

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.82.2
DEVICE INSTALLATION NECOMEP5890

Switchboard, Small power Device Installation, Area B1-B4

51
14

0%

36
12

06-Mar-13
06-Mar-13

05-May-13
23-Mar-13

04-Nov-13
04-Nov-13

15-Dec-13
17-Nov-13

0
0

1734

NECP-Rebase_06Sep12-4.CO.2.5.2.82.2
DEVICE INSTALLATION NECOMEP5900

Switchboard, Small power Device Installation, Area B5-B7

12

0%

12

31-Mar-13

14-Apr-13

18-Nov-13

01-Dec-13

1735

NECP-Rebase_06Sep12-4.CO.2.5.2.82.2
DEVICE INSTALLATION NECOMEP5910

Switchboard, Small power Device Installation, Area B8-B10

13

0%

12

20-Apr-13

05-May-13

02-Dec-13

15-Dec-13

1736
1737
1738

PHASE 2 UPPER BASEMENT - SECURITY SYSTEM


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.2.83.1
WIRING
NECOMEP3460

Security System Wiring, Area B1-B4

44
37
7

0%

28
21
7

05-May-13
05-May-13
05-May-13

24-Jun-13
16-Jun-13
12-May-13

10-Nov-13
10-Nov-13
10-Nov-13

11-Dec-13
03-Dec-13
17-Nov-13

19
19
19

1739

NECP-Rebase_06Sep12-4.CO.2.5.2.83.1
WIRING
NECOMEP3470

Security System Wiring, Area B5-B7

0%

01-Jun-13

08-Jun-13

18-Nov-13

25-Nov-13

19

1740

NECP-Rebase_06Sep12-4.CO.2.5.2.83.1
WIRING
NECOMEP3480

Security System Wiring, Area B8-B10

0%

09-Jun-13

16-Jun-13

26-Nov-13

03-Dec-13

19

Security System Wiring, Area B8-B10

1741
1742

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.83.2
DEVICE INSTALLATION NECOMEP5920

Security System Devices Installation, Area B1-B4

37
7

0%

21
7

13-May-13
13-May-13

24-Jun-13
20-May-13

18-Nov-13
18-Nov-13

11-Dec-13
25-Nov-13

19
23

Security System Devices Installation, Area B1-B4

1743

NECP-Rebase_06Sep12-4.CO.2.5.2.83.2
DEVICE INSTALLATION NECOMEP5930

Security System Devices Installation, Area B5-B7

0%

09-Jun-13

16-Jun-13

26-Nov-13

03-Dec-13

23

1744

NECP-Rebase_06Sep12-4.CO.2.5.2.83.2
DEVICE INSTALLATION NECOMEP5940

Security System Devices Installation, Area B8-B10

0%

17-Jun-13

24-Jun-13

04-Dec-13

11-Dec-13

19

42
36
7

05-May-13
05-May-13
05-May-13

22-Jun-13
15-Jun-13
12-May-13

21-Nov-13
21-Nov-13
21-Nov-13

22-Dec-13
14-Dec-13
28-Nov-13

12
0
0

1730

1745
1746
1747

PHASE 2 UPPER BASEMENT - SWITCH BOARD, SMALL POWER INSTALLATION


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.2.82.1
WIRING
NECOMEP3340
Switchboard, Small power Wiring Works, Area B1-B4

0%

26
20
7

1748

NECP-Rebase_06Sep12-4.CO.2.5.2.84.1
WIRING
NECOMEP3590

Parking Guidance System Wiring works, Area B5-B7

0%

01-Jun-13

08-Jun-13

30-Nov-13

07-Dec-13

1749

NECP-Rebase_06Sep12-4.CO.2.5.2.84.1
WIRING
NECOMEP3600

Parking Guidance System Wiring works, Area B8-B10

0%

09-Jun-13

15-Jun-13

08-Dec-13

14-Dec-13

1750
1751

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.84.2
DEVICE INSTALLATION NECOMEP5950

Parking Guidance System Device Installation, Area B1-B4

35
7

0%

19
7

13-May-13
13-May-13

22-Jun-13
20-May-13

30-Nov-13
30-Nov-13

22-Dec-13
07-Dec-13

12
24

0%

17

1752

PHASE 2 UPPER BASEMENT - PARKING GUIDANCE SYSTEM


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.2.84.1
WIRING
NECOMEP3580
Parking Guidance System Wiring works, Area B1-B4

NECP-Rebase_06Sep12-4.CO.2.5.2.84.2
DEVICE INSTALLATION NECOMEP5960

Parking Guidance System Device Installation, Area B5-B7

1753

NECP-Rebase_06Sep12-4.CO.2.5.2.84.2
DEVICE INSTALLATION NECOMEP5970

Parking Guidance System Device Installation, Area B8-B10

1754
1755
1756

PHASE 2 UPPER BASEMENT - TELEMETRY/SCADA


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.2.85.1
WIRING
NECOMEP3640

09-Jun-13

16-Jun-13

08-Dec-13

15-Dec-13

0%

16-Jun-13

22-Jun-13

15-Dec-13

22-Dec-13

17
10
10

0%

14
7
7

1757
1758

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.85.2
DEVICE INSTALLATION NECOMEP5980

28-Mar-13
28-Mar-13
28-Mar-13

17-Apr-13
09-Apr-13
09-Apr-13

20-Oct-13
20-Oct-13
20-Oct-13

04-Nov-13
27-Oct-13
27-Oct-13

33
33
33

7
7

0%

7
7

09-Apr-13
09-Apr-13

17-Apr-13
17-Apr-13

28-Oct-13
28-Oct-13

04-Nov-13
04-Nov-13

33
33

1759
1760
1761

PHASE 2 UPPER BASEMENT - FIRE ALARM SYSTEM


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.2.86.1
WIRING
NECOMEP3680

Fire Alarm Wiring works, Area B1-B10

30
15
15

0%

30
15
15

05-Feb-13
05-Feb-13
05-Feb-13

11-Mar-13
21-Feb-13
21-Feb-13

05-Nov-13
05-Nov-13
05-Nov-13

09-Dec-13
21-Nov-13
21-Nov-13

0
0
0

1762
1763

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.86.2
DEVICE INSTALLATION NECOMEP5990

Fire Alarm Device Installation, Area B1-B10

15
15

0%

15
15

23-Feb-13
23-Feb-13

11-Mar-13
11-Mar-13

23-Nov-13
23-Nov-13

09-Dec-13
09-Dec-13

0
0

04-Sep-12
04-Sep-12
13-Sep-12
13-Sep-12

03-Sep-13
15-Aug-13
29-Nov-12
23-Sep-12

18-Apr-13
18-Apr-13
30-Apr-13
30-Apr-13

14-Jan-14
12-Jan-14
24-Jun-13
08-May-13

5
7
0
0

Telemetry/SCADA wiring works, Area B1-B10


Telemetry/SCADA Device Installation, Area B1-B10

1764
1765
1766
1767

Internal Finishes
Lower Basement Floor
PHASE 2 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDS
NECP-Rebase_06Sep12-4.CO.2.6.1.28
PHASE 2 LOWER BASEMENT
NECOBFW1720
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area B3

313
296
66
8

0%

230
228
48
8

1768

NECP-Rebase_06Sep12-4.CO.2.6.1.28
PHASE 2 LOWER BASEMENT
NECOBFW1730
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area B4

0%

23-Sep-12

02-Oct-12

09-May-13

18-May-13

1769

NECP-Rebase_06Sep12-4.CO.2.6.1.28
PHASE 2 LOWER BASEMENT
NECOBFW1740
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area B5

0%

13-Oct-12

22-Oct-12

19-May-13

27-May-13

1770

NECP-Rebase_06Sep12-4.CO.2.6.1.28
PHASE 2 LOWER BASEMENT
NECOBFW1750
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area B6

0%

22-Oct-12

31-Oct-12

28-May-13

05-Jun-13

1771

NECP-Rebase_06Sep12-4.CO.2.6.1.28
PHASE 2 LOWER BASEMENT
NECOBFW1760
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area B7

0%

11-Nov-12

20-Nov-12

06-Jun-13

15-Jun-13

1772

NECP-Rebase_06Sep12-4.CO.2.6.1.28
PHASE 2 LOWER BASEMENT
NECOBFW1770
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area B8

0%

20-Nov-12

29-Nov-12

16-Jun-13

24-Jun-13

Feb

AC Ducts work Insulation, Area B6

01-Apr-13

DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.74.2
DEVICE INSTALLATION NECOMEP5800

1727
1728
1729

2014
Jul

13-Apr-13

1682
1683

1721

Jun

23-Mar-13

NECP-Rebase_06Sep12-4.CO.2.5.2.74.1
WIRING
NECOMEP2193

1718
1719
1720

May

23-May-13
23-May-13
23-May-13

NECP-Rebase_06Sep12-4.CO.2.5.2.74.1
WIRING
NECOMEP2183

1712

Apr

1681

1709
1710
1711

Mar

40
27
9

1680

1685

Feb

0%

PHASE 2 UPPER BASEMENT - BMS


WIRING
NECP-Rebase_06Sep12-4.CO.2.5.2.74.1
WIRING
NECOMEP2173

2013
Jan

36
27
9

NECP-Rebase_06Sep12-4.CO.2.5.2.73
PHASE 2 UPPER BASEMENT
NECOMEP2710
- COLD WATER,
Cold
HOT
Water,
WATER,
Hot Water
FIREF &
IGHTING
Firefighting
INSTALLATION
Installation, Area B8-B10

1677
1678
1679

1684

Page 16 of 19/27-Feb-13 09:03

Execution Programme Level 3

Switchboard, Small power Wiring Works, Area B1-B4


Switchboard, Small power Wiring Works, Area B5-B7
Switchboard, Small power Wiring Works, Area B8-B10
Switchboard, Small power Device Installation, Area B1-B4
Switchboard, Small power Device Installation, Area B5-B7
Switchboard, Small power Device Installation, Area B8-B10

Security System Wiring, Area B1-B4


Security System Wiring, Area B5-B7

Security System Devices Installation, Area B5-B7


Security System Devices Installation, Area B8-B10

Parking Guidance System Wiring works, Area B1-B4


Parking Guidance System Wiring works, Area B5-B7
Parking Guidance System Wiring works, Area B8-B10
Parking Guidance System Device Installation, Area B1-B4
Parking Guidance System Device Installation, Area B5-B7
Parking Guidance System Device Installation, Area B8-B10

Telemetry/SCADA wiring works, Area B1-B10


Telemetry/SCADA Device Installation, Area B1-B10

Fire Alarm Wiring works, Area B1-B10


Fire Alarm Device Installation, Area B1-B10

Plasterworks, Gypsum Boards, Plasterboards, Area B3


Plasterworks, Gypsum Boards, Plasterboards, Area B4
Plasterworks, Gypsum Boards, Plasterboards, Area B5
Plasterworks, Gypsum Boards, Plasterboards, Area B6
Plasterworks, Gypsum Boards, Plasterboards, Area B7
Plasterworks, Gypsum Boards, Plasterboards, Area B8

Construction of North East Underground Carpark Contract No. XC10101100


#

WBS

WBS Name

Activity ID

BL Project
Duration

Activity % Remaining
Complete Duration

BL Project
Start

BL Project
Finish

Painting Ceiling, Area B1

296
111
7

0%

228
60
6

04-Sep-12
04-Sep-12
04-Sep-12

15-Aug-13
12-Jan-13
12-Sep-12

Early Start

Early Finish

Total
Float

18-Apr-13
18-Apr-13
18-Apr-13

12-Jan-14
26-Jun-13
24-Apr-13

7
63
42

Painting Ceiling, Area B2

0%

01-Nov-12

Painting Ceiling, Area B3

0%

10-Nov-12

10-Nov-12

25-Apr-13

01-May-13

55

18-Nov-12

02-May-13

08-May-13

56

NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1430

Painting Ceiling, Area B4

0%

NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1440

Painting Ceiling, Area B5

0%

18-Nov-12

26-Nov-12

09-May-13

15-May-13

57

26-Nov-12

04-Dec-12

16-May-13

22-May-13

58

1780

NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1450

Painting Ceiling, Area B6

0%

1781

NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1460

Painting Ceiling, Area B7

0%

04-Dec-12

12-Dec-12

23-May-13

29-May-13

59

12-Dec-12

20-Dec-12

30-May-13

05-Jun-13

60

1782

NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1470

Painting Ceiling, Area B8

0%

20-Dec-12

29-Dec-12

06-Jun-13

12-Jun-13

61

1783

NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1480

Painting Ceiling, Area B9

1784

NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1490

Painting Ceiling, Area B10

0%

29-Dec-12

05-Jan-13

13-Jun-13

19-Jun-13

62

0%

05-Jan-13

12-Jan-13

20-Jun-13

26-Jun-13

63

1785
1786

FINAL COAT
NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1401

Painting Ceiling, Area B1

68
7

0%

30
3

28-May-13
28-May-13

15-Aug-13
05-Jun-13

08-Dec-13
08-Dec-13

12-Jan-14
10-Dec-13

7
7

1787

NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1411

Painting Ceiling, Area B2

0%

05-Jun-13

13-Jun-13

11-Dec-13

14-Dec-13

1788

NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1421

Painting Ceiling, Area B3

0%

13-Jun-13

22-Jun-13

15-Dec-13

17-Dec-13

1789

NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1431

Painting Ceiling, Area B4

0%

22-Jun-13

30-Jun-13

19-Dec-13

22-Dec-13

1790

NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1441

Painting Ceiling, Area B5

0%

30-Jun-13

08-Jul-13

23-Dec-13

25-Dec-13

1791

NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1451

Painting Ceiling, Area B6

0%

08-Jul-13

16-Jul-13

26-Dec-13

29-Dec-13

1792

NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1461

Painting Ceiling, Area B7

0%

16-Jul-13

24-Jul-13

30-Dec-13

01-Jan-14

1793

NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1471

Painting Ceiling, Area B8

0%

24-Jul-13

01-Aug-13

02-Jan-14

05-Jan-14

1794

NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1481

Painting Ceiling, Area B9

0%

01-Aug-13

08-Aug-13

06-Jan-14

08-Jan-14

1795

NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1491

Painting Ceiling, Area B10

0%

08-Aug-13

15-Aug-13

09-Jan-14

12-Jan-14

1796
1797
1798

PHASE 2 LOWER BASEMENT - PAINTING WALLS


PRIMER & FIRST COATS
NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2540

Painting Walls & Columns, Area B1

213
45
5

0%

167
40
4

29-Nov-12
29-Nov-12
29-Nov-12

05-Aug-13
21-Jan-13
05-Dec-12

25-Jun-13
25-Jun-13
25-Jun-13

08-Jan-14
10-Aug-13
29-Jun-13

10
0
0

1799

NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2550

Painting Walls & Columns, Area B2

0%

05-Dec-12

11-Dec-12

30-Jun-13

03-Jul-13

1800

NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2560

Painting Walls & Columns, Area B3

0%

11-Dec-12

17-Dec-12

04-Jul-13

08-Jul-13

1801

NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2570

Painting Walls & Columns, Area B4

0%

17-Dec-12

23-Dec-12

09-Jul-13

13-Jul-13

1802

NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2580

Painting Walls & Columns, Area B5

0%

23-Dec-12

29-Dec-12

14-Jul-13

17-Jul-13

1803

NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2590

Painting Walls & Columns, Area B6

0%

29-Dec-12

02-Jan-13

18-Jul-13

22-Jul-13

1804

NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2600

Painting Walls & Columns, Area B7

0%

02-Jan-13

07-Jan-13

23-Jul-13

27-Jul-13

1805

NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2610

Painting Walls & Columns, Area B8

0%

07-Jan-13

12-Jan-13

28-Jul-13

31-Jul-13

1806

NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2620

Painting Walls & Columns, Area B9

0%

12-Jan-13

16-Jan-13

01-Aug-13

05-Aug-13

1807

NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2630

Painting Walls & Columns, Area B10

0%

16-Jan-13

21-Jan-13

06-Aug-13

10-Aug-13

1808
1809

FINAL COAT
NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2541

Painting Walls & Columns, Area B1

46
5

0%

40
4

12-Jun-13
12-Jun-13

05-Aug-13
18-Jun-13

23-Nov-13
23-Nov-13

08-Jan-14
26-Nov-13

10
10

1810

NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2551

Painting Walls & Columns, Area B2

0%

18-Jun-13

24-Jun-13

27-Nov-13

01-Dec-13

10

1811

NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2561

Painting Walls & Columns, Area B3

0%

24-Jun-13

30-Jun-13

02-Dec-13

05-Dec-13

10

1812

NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2571

Painting Walls & Columns, Area B4

0%

30-Jun-13

07-Jul-13

07-Dec-13

10-Dec-13

10

1813

NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2581

Painting Walls & Columns, Area B5

0%

07-Jul-13

13-Jul-13

11-Dec-13

15-Dec-13

10

1814

NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2591

Painting Walls & Columns, Area B6

0%

13-Jul-13

17-Jul-13

16-Dec-13

21-Dec-13

10

1815

NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2601

Painting Walls & Columns, Area B7

0%

17-Jul-13

22-Jul-13

22-Dec-13

25-Dec-13

10

1816

NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2611

Painting Walls & Columns, Area B8

0%

22-Jul-13

27-Jul-13

26-Dec-13

30-Dec-13

10

1817

NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2621

Painting Walls & Columns, Area B9

0%

27-Jul-13

31-Jul-13

31-Dec-13

04-Jan-14

10

NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2631

Painting Walls & Columns, Area B10

1773
1774
1775

PHASE 2 LOWER BASEMENT - PAINTING CEILING


PRIMER & FIRST COATS
NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1400

1776

NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1410

1777

NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1420

1778
1779

1818

Activity Name

Actual Start

Actual
Finish

0%

31-Jul-13

05-Aug-13

05-Jan-14

08-Jan-14

10

1819
1820

PHASE 2 LOWER BASEMENT - PAINTING FLOORS


NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW2940
- PAINTING FLOORS
Painting Floors, Area B1

52
6

0%

53
4

19-Feb-13
19-Feb-13

21-Apr-13
26-Feb-13

20-Aug-13
20-Aug-13

22-Oct-13
24-Aug-13

52
41

1821

NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW2950
- PAINTING FLOORS
Painting Floors, Area B2

0%

26-Feb-13

05-Mar-13

25-Aug-13

28-Aug-13

41

1822

NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW2960
- PAINTING FLOORS
Painting Floors, Area B3

0%

05-Mar-13

11-Mar-13

29-Aug-13

02-Sep-13

41

1823

NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW2970
- PAINTING FLOORS
Painting Floors, Area B4

0%

11-Mar-13

17-Mar-13

03-Sep-13

07-Sep-13

41

1824

NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW2980
- PAINTING FLOORS
Painting Floors, Area B5

0%

17-Mar-13

23-Mar-13

08-Sep-13

11-Sep-13

41

1825

NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW2990
- PAINTING FLOORS
Painting Floors, Area B6

0%

23-Mar-13

28-Mar-13

12-Sep-13

16-Sep-13

61

1826

NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW3000
- PAINTING FLOORS
Painting Floors, Area B7

0%

28-Mar-13

03-Apr-13

22-Sep-13

25-Sep-13

58

1827

NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW3010
- PAINTING FLOORS
Painting Floors, Area B8

0%

03-Apr-13

09-Apr-13

26-Sep-13

30-Sep-13

59

1828

NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW3020
- PAINTING FLOORS
Painting Floors, Area B9

0%

09-Apr-13

15-Apr-13

01-Oct-13

05-Oct-13

60

1829

NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW3030
- PAINTING FLOORS
Painting Floors, Area B10

0%

15-Apr-13

21-Apr-13

19-Oct-13

22-Oct-13

52

0%

40
4

21-Nov-12
21-Nov-12

29-Jan-13
27-Nov-12

13-Jun-13
13-Jun-13

29-Jul-13
17-Jun-13

97
57

1830
1831

PHASE 2 LOWER BASEMENT - TILING


NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW1960
- TILING

Tiling, Area B1

60
6

1832

NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW1970
- TILING

Tiling, Area B2

0%

28-Nov-12

04-Dec-12

18-Jun-13

22-Jun-13

57

1833

NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW1980
- TILING

Tiling, Area B3

0%

05-Dec-12

11-Dec-12

23-Jun-13

26-Jun-13

57

1834

NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW1990
- TILING

Tiling, Area B4

0%

12-Dec-12

18-Dec-12

27-Jun-13

01-Jul-13

57

1835

NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW2190
- TILING

Tiling, Area B5

0%

19-Dec-12

25-Dec-12

02-Jul-13

06-Jul-13

57

1836

NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW2210
- TILING

Tiling, Area B6

0%

26-Dec-12

01-Jan-13

07-Jul-13

10-Jul-13

97

1837

NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW2220
- TILING

Tiling, Area B7

0%

02-Jan-13

08-Jan-13

11-Jul-13

15-Jul-13

97

1838

NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW2230
- TILING

Tiling, Area B8

0%

09-Jan-13

15-Jan-13

16-Jul-13

20-Jul-13

97

1839

NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW2240
- TILING

Tiling, Area B9

0%

16-Jan-13

22-Jan-13

21-Jul-13

24-Jul-13

97

1840

NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW2250
- TILING

Tiling, Area B10

0%

23-Jan-13

29-Jan-13

25-Jul-13

29-Jul-13

97

1841
1842

PHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORS
NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3340
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B1

68
7

0%

54
5

17-Mar-13
17-Mar-13

04-Jun-13
25-Mar-13

25-Aug-13
25-Aug-13

28-Oct-13
29-Aug-13

52
56

1843

NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3350
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B2

0%

25-Mar-13

02-Apr-13

31-Aug-13

04-Sep-13

56

1844

NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3360
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B3

0%

02-Apr-13

10-Apr-13

05-Sep-13

10-Sep-13

56

1845

NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3370
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B4

0%

10-Apr-13

18-Apr-13

11-Sep-13

16-Sep-13

56

1846

NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3380
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B5

0%

18-Apr-13

27-Apr-13

17-Sep-13

22-Sep-13

56

1847

NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3390
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B6

0%

27-Apr-13

05-May-13

23-Sep-13

28-Sep-13

56

1848

NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3400
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B7

0%

05-May-13

13-May-13

29-Sep-13

03-Oct-13

56

1849

NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3410
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B8

0%

13-May-13

21-May-13

05-Oct-13

09-Oct-13

56

1850

NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3420
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B9

0%

21-May-13

28-May-13

10-Oct-13

17-Oct-13

56

1851

0%

28-May-13

04-Jun-13

23-Oct-13

28-Oct-13

52

1852
1853

PHASE 2 LOWER BASEMENT - TIMBER DOORS AND LOUVER SCREENS


NECP-Rebase_06Sep12-4.CO.2.6.1.34
PHASE 2 LOWER BASEMENT
NECOBFW3680
- TIMBER DOORS
Timber
AND
Doors
LOUVER
and Louver
SCREENS
Screens, Area B1-B2

18
6

0%

18
6

21-Apr-13
21-Apr-13

12-May-13
28-Apr-13

29-Aug-13
29-Aug-13

18-Sep-13
04-Sep-13

59
59

1854

NECP-Rebase_06Sep12-4.CO.2.6.1.34
PHASE 2 LOWER BASEMENT
NECOBFW3690
- TIMBER DOORS
Timber
AND
Doors
LOUVER
and Louver
SCREENS
Screens, Area B7-B8

0%

28-Apr-13

05-May-13

05-Sep-13

11-Sep-13

59

1855

NECP-Rebase_06Sep12-4.CO.2.6.1.34
PHASE 2 LOWER BASEMENT
NECOBFW3700
- TIMBER DOORS
Timber
AND
Doors
LOUVER
and Louver
SCREENS
Screens, Area B9-B10

0%

05-May-13

12-May-13

12-Sep-13

18-Sep-13

59

18
9

0%

12
6

22-Jul-13
22-Jul-13

11-Aug-13
31-Jul-13

11-Nov-13
11-Nov-13

25-Nov-13
18-Nov-13

39
39

1856
1857
1858

NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3430
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B10

PHASE 2 LOWER BASEMENT - STEEL DOORS AND LOUVERS


NECP-Rebase_06Sep12-4.CO.2.6.1.39
PHASE 2 LOWER BASEMENT
NECOBFW3770
- STEEL DOORS
Steel
AND
Doors
LOUVERS
and Louvers, Area B1-B5
NECP-Rebase_06Sep12-4.CO.2.6.1.39
PHASE 2 LOWER BASEMENT
NECOBFW3780
- STEEL DOORS
Steel
AND
Doors
LOUVERS
and Louvers, Area B6-B10

Page 17 of 19/27-Feb-13 09:03

Execution Programme Level 3


2013
Jan

Feb

Mar

Apr

May

2014

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Painting Ceiling, Area B1


Painting Ceiling, Area B2
Painting Ceiling, Area B3
Painting Ceiling, Area B4
Painting Ceiling, Area B5
Painting Ceiling, Area B6
Painting Ceiling, Area B7
Painting Ceiling, Area B8
Painting Ceiling, Area B9
Painting Ceiling, Area B10
Painting Ceiling, Area B1
Painting Ceiling, Area B2
Painting Ceiling, Area B3
Painting Ceiling, Area B4
Painting Ceiling, Area B5
Painting Ceiling, Area B6
Painting Ceiling, Area B7
Painting Ceiling, Area B8
Painting Ceiling, Area B9
Painting Ceiling, Area B10

Painting Walls & Columns, Area B1


Painting Walls & Columns, Area B2
Painting Walls & Columns, Area B3
Painting Walls & Columns, Area B4
Painting Walls & Columns, Area B5
Painting Walls & Columns, Area B6
Painting Walls & Columns, Area B7
Painting Walls & Columns, Area B8
Painting Walls & Columns, Area B9
Painting Walls & Columns, Area B10
Painting Walls & Columns, Area B1
Painting Walls & Columns, Area B2
Painting Walls & Columns, Area B3
Painting Walls & Columns, Area B4
Painting Walls & Columns, Area B5
Painting Walls & Columns, Area B6
Painting Walls & Columns, Area B7
Painting Walls & Columns, Area B8
Painting Walls & Columns, Area B9
Painting Walls & Columns, Area B10
Painting Floors, Area B1
Painting Floors, Area B2
Painting Floors, Area B3
Painting Floors, Area B4
Painting Floors, Area B5
Painting Floors, Area B6
Painting Floors, Area B7
Painting Floors, Area B8
Painting Floors, Area B9
Painting Floors, Area B10
Tiling, Area B1
Tiling, Area B2
Tiling, Area B3
Tiling, Area B4
Tiling, Area B5
Tiling, Area B6
Tiling, Area B7
Tiling, Area B8
Tiling, Area B9
Tiling, Area B10
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B1
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B2
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B3
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B4
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B5
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B6
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B7
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B8
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B9
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B10
Timber Doors and Louver Screens, Area B1-B2
Timber Doors and Louver Screens, Area B7-B8
Timber Doors and Louver Screens, Area B9-B10
Steel Doors and Louvers, Area B1-B5
Steel Doors and Louvers, Area B6-B10

0%

01-Aug-13

11-Aug-13

18-Nov-13

25-Nov-13

39

1859
1860

PHASE 2 LOWER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORS


NECP-Rebase_06Sep12-4.CO.2.6.1.40
PHASE 2 LOWER BASEMENT
NECOBFW3870
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
B1-B4

22
8

0%

22
8

21-Apr-13
21-Apr-13

16-May-13
30-Apr-13

26-Sep-13
26-Sep-13

23-Oct-13
05-Oct-13

68
66

1861

NECP-Rebase_06Sep12-4.CO.2.6.1.40
PHASE 2 LOWER BASEMENT
NECOBFW3880
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
B5-B7

0%

30-Apr-13

08-May-13

06-Oct-13

15-Oct-13

68

1862

NECP-Rebase_06Sep12-4.CO.2.6.1.40
PHASE 2 LOWER BASEMENT
NECOBFW3890
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
B8-B10

0%

08-May-13

16-May-13

16-Oct-13

23-Oct-13

68

Skirtings, Walkway Grilles, Bollards, Column Protectors, B8-B10

01-Aug-13
11-Jul-13

11-Nov-13
11-Nov-13

02-Dec-13
18-Nov-13

35
35

Handrails, Area B1-B2

1863
1864

PHASE 2 LOWER BASEMENT - HANDRAILS


NECP-Rebase_06Sep12-4.CO.2.6.1.33
PHASE 2 LOWER BASEMENT
NECOBFW3560
- HANDRAILS Handrails, Area B1-B2

27
9

0%

18
6

02-Jul-13
02-Jul-13

1865

NECP-Rebase_06Sep12-4.CO.2.6.1.33
PHASE 2 LOWER BASEMENT
NECOBFW3570
- HANDRAILS Handrails, Area B5-B6

0%

13-Jul-13

22-Jul-13

18-Nov-13

25-Nov-13

35

1866

NECP-Rebase_06Sep12-4.CO.2.6.1.33
PHASE 2 LOWER BASEMENT
NECOBFW3580
- HANDRAILS Handrails, Area B9-B10

0%

23-Jul-13

01-Aug-13

25-Nov-13

02-Dec-13

35

239
23
8

0%

223
15
8

29-Nov-12
29-Nov-12
29-Nov-12

03-Sep-13
26-Dec-12
09-Dec-12

27-Apr-13
25-Jun-13
25-Jun-13

14-Jan-14
11-Jul-13
03-Jul-13

5
14
14

1867
1868
1869
1870

Upper Basement Floor


PHASE 2 UPPER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDS
NECP-Rebase_06Sep12-4.CO.2.6.2.21
PHASE 2 UPPER BASEMENT
NECOBFW1780
- PLASTERWORKS,
Plasterworks,
GYPSUMGypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area B7
NECP-Rebase_06Sep12-4.CO.2.6.2.21
PHASE 2 UPPER BASEMENT
NECOBFW1790
- PLASTERWORKS,
Plasterworks,
GYPSUMGypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area B8

0%

18-Dec-12

26-Dec-12

04-Jul-13

11-Jul-13

14

Painting Ceiling, Area B1

199
68
7

0%

223
60
6

12-Jan-13
12-Jan-13
12-Jan-13

01-Sep-13
01-Apr-13
20-Jan-13

27-Apr-13
27-Apr-13
27-Apr-13

14-Jan-14
04-Jul-13
02-May-13

0
97
85

Painting Ceiling, Area B2

0%

20-Jan-13

28-Jan-13

04-May-13

09-May-13

85

Painting Ceiling, Area B3

0%

28-Jan-13

05-Feb-13

11-May-13

16-May-13

85

NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1530

Painting Ceiling, Area B4

0%

05-Feb-13

13-Feb-13

18-May-13

23-May-13

85

NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1540

Painting Ceiling, Area B5

0%

13-Feb-13

21-Feb-13

25-May-13

30-May-13

85

1878

NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1550

Painting Ceiling, Area B6

0%

21-Feb-13

02-Mar-13

01-Jun-13

06-Jun-13

97

1879

NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1560

Painting Ceiling, Area B7

0%

02-Mar-13

10-Mar-13

08-Jun-13

13-Jun-13

97

1880

NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1570

Painting Ceiling, Area B8

0%

10-Mar-13

18-Mar-13

15-Jun-13

20-Jun-13

97

1881

NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1580

Painting Ceiling, Area B9

0%

18-Mar-13

25-Mar-13

22-Jun-13

27-Jun-13

97

1882

NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1590

Painting Ceiling, Area B10

0%

25-Mar-13

01-Apr-13

29-Jun-13

04-Jul-13

97

30

13-Jun-13

01-Sep-13

10-Dec-13

14-Jan-14

1871
1872
1873

PHASE 2 UPPER BASEMENT - PAINTING CEILING


PRIMER & FIRST COAT
NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1500

1874

NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1510

1875

NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1520

1876
1877

1883

FINAL COAT

68

Feb

Skirtings, Walkway Grilles, Bollards, Column Protectors, B1-B4


Skirtings, Walkway Grilles, Bollards, Column Protectors, B5-B7

Handrails, Area B5-B6


Handrails, Area B9-B10

Plasterworks, Gypsum Boards, Plasterboards, Area B7


Plasterworks, Gypsum Boards, Plasterboards, Area B8

Painting Ceiling, Area B1


Painting Ceiling, Area B2
Painting Ceiling, Area B3
Painting Ceiling, Area B4
Painting Ceiling, Area B5
Painting Ceiling, Area B6
Painting Ceiling, Area B7
Painting Ceiling, Area B8
Painting Ceiling, Area B9
Painting Ceiling, Area B10

Construction of North East Underground Carpark Contract No. XC10101100


#

WBS

WBS Name

Activity ID

Activity Name

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

1884

NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1501

Painting Ceiling, Area B1

0%

13-Jun-13

22-Jun-13

10-Dec-13

12-Dec-13

1885

NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1511

Painting Ceiling, Area B2

0%

22-Jun-13

30-Jun-13

14-Dec-13

16-Dec-13

1886

NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1521

Painting Ceiling, Area B3

0%

30-Jun-13

08-Jul-13

17-Dec-13

21-Dec-13

1887

NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1531

Painting Ceiling, Area B4

0%

08-Jul-13

16-Jul-13

22-Dec-13

24-Dec-13

1888

NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1541

Painting Ceiling, Area B5

0%

16-Jul-13

24-Jul-13

25-Dec-13

28-Dec-13

1889

NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1551

Painting Ceiling, Area B6

0%

24-Jul-13

01-Aug-13

29-Dec-13

31-Dec-13

1890

NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1561

Painting Ceiling, Area B7

0%

01-Aug-13

10-Aug-13

01-Jan-14

04-Jan-14

1891

NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1571

Painting Ceiling, Area B8

0%

10-Aug-13

18-Aug-13

05-Jan-14

07-Jan-14

1892

NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1581

Painting Ceiling, Area B9

0%

18-Aug-13

25-Aug-13

08-Jan-14

11-Jan-14

1893

NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1591

Painting Ceiling, Area B10

0%

25-Aug-13

01-Sep-13

12-Jan-14

14-Jan-14

1894
1895
1896

PHASE 2 UPPER BASEMENT - PAINTING WALLS


PRIMER & FIRST COATS
NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2640

Painting Walls & Columns, Area B1

177
64
5

0%

123
52
4

21-Jan-13
21-Jan-13
21-Jan-13

15-Aug-13
06-Apr-13
27-Jan-13

11-Aug-13
11-Aug-13
11-Aug-13

04-Jan-14
09-Oct-13
14-Aug-13

14
18
0

1897

NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2650

Painting Walls & Columns, Area B2

0%

28-Jan-13

03-Feb-13

15-Aug-13

19-Aug-13

1898

NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2660

Painting Walls & Columns, Area B3

0%

05-Feb-13

11-Feb-13

20-Aug-13

24-Aug-13

1899

NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2670

Painting Walls & Columns, Area B4

0%

13-Feb-13

19-Feb-13

25-Aug-13

28-Aug-13

1900

NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2680

Painting Walls & Columns, Area B5

0%

21-Feb-13

27-Feb-13

29-Aug-13

02-Sep-13

1901

NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2690

Painting Walls & Columns, Area B6

0%

02-Mar-13

06-Mar-13

03-Sep-13

07-Sep-13

22

1902

NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2700

Painting Walls & Columns, Area B7

0%

10-Mar-13

14-Mar-13

08-Sep-13

11-Sep-13

24

1903

NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2710

Painting Walls & Columns, Area B8

0%

18-Mar-13

23-Mar-13

26-Sep-13

30-Sep-13

14

1904

NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2720

Painting Walls & Columns, Area B9

0%

25-Mar-13

30-Mar-13

01-Oct-13

05-Oct-13

16

1905

NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2730

Painting Walls & Columns, Area B10

0%

01-Apr-13

06-Apr-13

06-Oct-13

09-Oct-13

18

1906
1907

FINAL COAT
NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2641

Painting Walls & Columns, Area B1

45
5

0%

40
4

24-Jun-13
24-Jun-13

15-Aug-13
30-Jun-13

18-Nov-13
18-Nov-13

04-Jan-14
21-Nov-13

14
14

1908

NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2651

Painting Walls & Columns, Area B2

0%

30-Jun-13

06-Jul-13

23-Nov-13

26-Nov-13

14

1909

NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2661

Painting Walls & Columns, Area B3

0%

06-Jul-13

11-Jul-13

27-Nov-13

01-Dec-13

14

1910

NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2671

Painting Walls & Columns, Area B4

0%

11-Jul-13

17-Jul-13

02-Dec-13

05-Dec-13

14

1911

NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2681

Painting Walls & Columns, Area B5

0%

17-Jul-13

23-Jul-13

07-Dec-13

10-Dec-13

14

1912

NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2691

Painting Walls & Columns, Area B6

0%

23-Jul-13

28-Jul-13

11-Dec-13

15-Dec-13

14

1913

NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2701

Painting Walls & Columns, Area B7

0%

28-Jul-13

01-Aug-13

16-Dec-13

21-Dec-13

14

1914

NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2711

Painting Walls & Columns, Area B8

0%

01-Aug-13

06-Aug-13

22-Dec-13

25-Dec-13

14

1915

NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2721

Painting Walls & Columns, Area B9

0%

06-Aug-13

11-Aug-13

26-Dec-13

30-Dec-13

14

1916

NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2731

Painting Walls & Columns, Area B10

0%

11-Aug-13

15-Aug-13

31-Dec-13

04-Jan-14

14

BL Project
Duration

Activity % Remaining
Complete Duration

Actual Start

Actual
Finish

21-Apr-13
21-Apr-13

22-Jun-13
28-Apr-13

23-Sep-13
23-Sep-13

16-Dec-13
26-Sep-13

21
32

1917
1918

PHASE 2 UPPER BASEMENT - PAINTING FLOORS


NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3040
- PAINTING FLOORS
Painting Floors, Area B1

54
6

0%

71
4

1919

NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3050
- PAINTING FLOORS
Painting Floors, Area B2

0%

21-Apr-13

28-Apr-13

01-Oct-13

05-Oct-13

29

1920

NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3060
- PAINTING FLOORS
Painting Floors, Area B3

0%

28-Apr-13

05-May-13

16-Oct-13

20-Oct-13

22

1921

NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3070
- PAINTING FLOORS
Painting Floors, Area B4

0%

05-May-13

11-May-13

24-Oct-13

28-Oct-13

19

1922

NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3080
- PAINTING FLOORS
Painting Floors, Area B5

0%

14-May-13

19-May-13

02-Nov-13

05-Nov-13

16

1923

NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3090
- PAINTING FLOORS
Painting Floors, Area B6

0%

23-May-13

28-May-13

10-Nov-13

13-Nov-13

13

1924

NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3100
- PAINTING FLOORS
Painting Floors, Area B7

0%

01-Jun-13

05-Jun-13

18-Nov-13

21-Nov-13

30

1925

NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3110
- PAINTING FLOORS
Painting Floors, Area B8

0%

09-Jun-13

13-Jun-13

26-Nov-13

30-Nov-13

27

1926

NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3120
- PAINTING FLOORS
Painting Floors, Area B9

0%

17-Jun-13

22-Jun-13

04-Dec-13

08-Dec-13

24

1927

NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3130
- PAINTING FLOORS
Painting Floors, Area B10

0%

17-Jun-13

22-Jun-13

12-Dec-13

16-Dec-13

21

Tiling, Area B1

45
6

0%

40
5

30-Jan-13
30-Jan-13

23-Mar-13
05-Feb-13

07-Jul-13
07-Jul-13

21-Aug-13
11-Jul-13

57
57

NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2270
- TILING

Tiling, Area B2

0%

06-Feb-13

12-Feb-13

13-Jul-13

17-Jul-13

57

NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2280
- TILING

Tiling, Area B3

0%

13-Feb-13

19-Feb-13

18-Jul-13

23-Jul-13

57

1932

NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2290
- TILING

Tiling, Area B4

0%

20-Feb-13

26-Feb-13

24-Jul-13

29-Jul-13

57

1933

NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2300
- TILING

Tiling, Area B5

0%

27-Feb-13

05-Mar-13

30-Jul-13

04-Aug-13

57

1934

NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2310
- TILING

Tiling, Area B6

0%

06-Mar-13

11-Mar-13

05-Aug-13

10-Aug-13

57

1935

NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2320
- TILING

Tiling, Area B7

0%

12-Mar-13

17-Mar-13

11-Aug-13

15-Aug-13

57

1936

NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2330
- TILING

Tiling, Area B8

0%

18-Mar-13

23-Mar-13

17-Aug-13

21-Aug-13

57

1928
1929

PHASE 2 UPPER BASEMENT - TILING


NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2260
- TILING

1930
1931

1937
1938

PHASE 2 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORS
NECP-Rebase_06Sep12-4.CO.2.6.2.25
PHASE 2 UPPER BASEMENT
NECOBFW3440
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area B5

40
7

0%

40
5

04-Jun-13
04-Jun-13

21-Jul-13
12-Jun-13

06-Nov-13
06-Nov-13

23-Dec-13
11-Nov-13

24
34

1939

NECP-Rebase_06Sep12-4.CO.2.6.2.25
PHASE 2 UPPER BASEMENT
NECOBFW3450
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area B6

0%

12-Jun-13

20-Jun-13

14-Nov-13

19-Nov-13

32

1940

NECP-Rebase_06Sep12-4.CO.2.6.2.25
PHASE 2 UPPER BASEMENT
NECOBFW3460
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area B7

0%

20-Jun-13

29-Jun-13

23-Nov-13

27-Nov-13

30

1941

NECP-Rebase_06Sep12-4.CO.2.6.2.25
PHASE 2 UPPER BASEMENT
NECOBFW3470
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area B8

0%

29-Jun-13

07-Jul-13

01-Dec-13

05-Dec-13

28

1942

NECP-Rebase_06Sep12-4.CO.2.6.2.25
PHASE 2 UPPER BASEMENT
NECOBFW3480
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area B9

0%

07-Jul-13

14-Jul-13

09-Dec-13

14-Dec-13

26

1943

NECP-Rebase_06Sep12-4.CO.2.6.2.25
PHASE 2 UPPER BASEMENT
NECOBFW3490
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area B10

0%

14-Jul-13

21-Jul-13

17-Dec-13

23-Dec-13

24

27
6

0%

12
6

29-May-13
29-May-13

29-Jun-13
04-Jun-13

14-Nov-13
14-Nov-13

27-Nov-13
20-Nov-13

13
13

1944
1945
1946
1947
1948
1949

PHASE 2 UPPER BASEMENT - TIMBER DOORS AND LOUVER SCREENS


NECP-Rebase_06Sep12-4.CO.2.6.2.27
PHASE 2 UPPER BASEMENT
NECOBFW3710
- TIMBER DOORS
Timber
ANDDoors
LOUVER
and Louver
SCREENS
Screens, Area B5-B6
NECP-Rebase_06Sep12-4.CO.2.6.2.27
PHASE 2 UPPER BASEMENT
NECOBFW3720
- TIMBER DOORS
Timber
ANDDoors
LOUVER
and Louver
SCREENS
Screens, Area B9-B10
PHASE 2 UPPER BASEMENT - STEEL DOORS AND LOUVERS
NECP-Rebase_06Sep12-4.CO.2.6.2.41
PHASE 2 UPPER BASEMENT
NECOBFW3790
- STEEL DOORS
Steel
AND
Doors
LOUVERS
and Louvers, Area B1-B5
NECP-Rebase_06Sep12-4.CO.2.6.2.41
PHASE 2 UPPER BASEMENT
NECOBFW3800
- STEEL DOORS
Steel
AND
Doors
LOUVERS
and Louvers, Area B6-B10

0%

23-Jun-13

29-Jun-13

21-Nov-13

27-Nov-13

13

17
9

0%

30
6

12-Aug-13
12-Aug-13

31-Aug-13
21-Aug-13

18-Nov-13
18-Nov-13

24-Dec-13
25-Nov-13

21
39

0%

22-Aug-13

31-Aug-13

17-Dec-13

24-Dec-13

21

1950
1951

PHASE 2 UPPER BASEMENT - SKIRTINGS, WALKWAY GRILLES, BOLLARDS, COLUMN PROTECTORS


NECP-Rebase_06Sep12-4.CO.2.6.2.42
PHASE 2 UPPER BASEMENT
NECOBFW3900
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
B1-B4

23
8

0%

23
8

16-May-13
16-May-13

12-Jun-13
26-May-13

06-Oct-13
06-Oct-13

03-Nov-13
16-Oct-13

66
66

1952

NECP-Rebase_06Sep12-4.CO.2.6.2.42
PHASE 2 UPPER BASEMENT
NECOBFW3910
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
B5-B7

0%

26-May-13

04-Jun-13

17-Oct-13

26-Oct-13

66

1953

NECP-Rebase_06Sep12-4.CO.2.6.2.42
PHASE 2 UPPER BASEMENT
NECOBFW3920
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
B8-B10

0%

04-Jun-13

12-Jun-13

27-Oct-13

03-Nov-13

66

18-Nov-13
18-Nov-13

09-Dec-13
25-Nov-13

35
35

1954
1955

PHASE 2 UPPER BASEMENT - HANDRAILS


NECP-Rebase_06Sep12-4.CO.2.6.2.26
PHASE 2 UPPER BASEMENT
NECOBFW3590
- HANDRAILS Handrails, Area B1-B2

27
9

0%

18
6

03-Aug-13
03-Aug-13

02-Sep-13
12-Aug-13

1956

NECP-Rebase_06Sep12-4.CO.2.6.2.26
PHASE 2 UPPER BASEMENT
NECOBFW3600
- HANDRAILS Handrails, Area B5-B6

0%

13-Aug-13

22-Aug-13

25-Nov-13

02-Dec-13

35

1957

NECP-Rebase_06Sep12-4.CO.2.6.2.26
PHASE 2 UPPER BASEMENT
NECOBFW3610
- HANDRAILS Handrails, Area B9-B10

0%

24-Aug-13

02-Sep-13

02-Dec-13

09-Dec-13

35

121
20

0%

85
20

16-Apr-13
16-Apr-13

03-Sep-13
08-May-13

05-Aug-13
05-Aug-13

13-Nov-13
27-Aug-13

57
97

1958
1959
1960

PHASE 2 - FINISHING WORKS


NECP-Rebase_06Sep12-4.CO.2.6.2.6
PHASE 2 - FINISHING WORKS
NECOBFW2100

Softwood Framing, Joinery Panels, WC Partitions

Page 18 of 19/27-Feb-13 09:03

Execution Programme Level 3


2013
Jan

Feb

Mar

Apr

May

Jun

2014
Jul

Aug

Sep

Oct

Nov

Dec

Jan
Painting Ceiling, Area B2
Painting Ceiling, Area B3
Painting Ceiling, Area B4
Painting Ceiling, Area B5
Painting Ceiling, Area B6
Painting Ceiling, Area B7
Painting Ceiling, Area B8

Painting Ceiling, Area B9


Painting Ceiling, Area B10

Painting Walls & Columns, Area B1


Painting Walls & Columns, Area B2
Painting Walls & Columns, Area B3
Painting Walls & Columns, Area B4
Painting Walls & Columns, Area B5
Painting Walls & Columns, Area B6
Painting Walls & Columns, Area B7
Painting Walls & Columns, Area B8
Painting Walls & Columns, Area B9
Painting Walls & Columns, Area B10
Painting Walls & Columns, Area B1
Painting Walls & Columns, Area B2
Painting Walls & Columns, Area B3
Painting Walls & Columns, Area B4
Painting Walls & Columns, Area B5
Painting Walls & Columns, Area B6
Painting Walls & Columns, Area B7
Painting Walls & Columns, Area B8
Painting Walls & Columns, Area B9
Painting Walls & Columns, Area B10
Painting Floors, Area B1
Painting Floors, Area B2
Painting Floors, Area B3
Painting Floors, Area B4
Painting Floors, Area B5
Painting Floors, Area B6
Painting Floors, Area B7
Painting Floors, Area B8
Painting Floors, Area B9
Painting Floors, Area B10
Tiling, Area B1
Tiling, Area B2
Tiling, Area B3
Tiling, Area B4
Tiling, Area B5
Tiling, Area B6
Tiling, Area B7
Tiling, Area B8
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B5
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B6
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B7
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B8
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B9
Vehicle Stoppers, Speed Breakers, Tactile Surface Indicators, Area B10
Timber Doors and Louver Screens, Area B5-B6
Timber Doors and Louver Screens, Area B9-B10
Steel Doors and Louvers, Area B1-B5
Steel Doors and Louvers, Area B6-B10
Skirtings, Walkway Grilles, Bollards, Column Protectors, B1-B4
Skirtings, Walkway Grilles, Bollards, Column Protectors, B5-B7
Skirtings, Walkway Grilles, Bollards, Column Protectors, B8-B10
Handrails, Area B1-B2
Handrails, Area B5-B6
Handrails, Area B9-B10
Softwood Framing, Joinery Panels, WC Partitions
Road Markings, Area B1-B10 Lower Bsmt; Area B1-B10 Upper Bsmt

NECP-Rebase_06Sep12-4.CO.2.6.2.6
PHASE 2 - FINISHING WORKS
NECOBFW2130

Road Markings, Area B1-B10 Lower Bsmt; Area B1-B10 Upper Bsmt

15

0%

12

18-Aug-13

03-Sep-13

29-Oct-13

11-Nov-13

57

1961

NECP-Rebase_06Sep12-4.CO.2.6.2.6
PHASE 2 - FINISHING WORKS
NECOBFW2150

Signages and Wayfinding,Area B1-B10 Lower Bsmt; Area B1-B10 Upper Bsmt
12

0%

12

05-Aug-13

18-Aug-13

31-Oct-13

13-Nov-13

57

1962
1963

Furniture, Fittings & Equipment


NECP-Rebase_06Sep12-4.CO.2.3
Furniture, Fittings & Equipment
NECOBFFE2050

93
7

0%

128
7

22-Apr-13
20-May-13

07-Aug-13
27-May-13

10-Aug-13
10-Aug-13

08-Jan-14
17-Aug-13

10
107

1964

NECP-Rebase_06Sep12-4.CO.2.3
Furniture, Fittings & Equipment
NECOBFFE2040

Furniture (Gate House), Grd Floor

0%

09-May-13

14-May-13

03-Sep-13

08-Sep-13

112

1965

NECP-Rebase_06Sep12-4.CO.2.3
Furniture, Fittings & Equipment
NECOBFFE2010

Sanitary Fixtures & Fittings, Accessories (Gate House), Grd Floor

20

0%

20

09-May-13

01-Jun-13

12-Sep-13

06-Oct-13

83

Sanitary Fixtures & Fittings, Accessories (Gate House), Grd Floor

1966

NECP-Rebase_06Sep12-4.CO.2.3
Furniture, Fittings & Equipment
NECOBFFE2060

Vehicular Sliding Gates/Chaotic Pattern, Upper Bsmt (Alumco)

14

0%

14

28-May-13

12-Jun-13

19-Sep-13

05-Oct-13

79

Vehicular Sliding Gates/Chaotic Pattern, Upper Bsmt (Alumco)

1967

NECP-Rebase_06Sep12-4.CO.2.3
Furniture, Fittings & Equipment
NECOBFFE2000

Benches (Gate House), Grd Floor

0%

31-Jul-13

07-Aug-13

29-Sep-13

06-Oct-13

88

1968

NECP-Rebase_06Sep12-4.CO.2.3
Furniture, Fittings & Equipment
NECOBFFE2030

Kitchen Equipment (Gate House), Grd Floor

0%

22-Apr-13

27-Apr-13

06-Oct-13

12-Oct-13

83

1969

NECP-Rebase_06Sep12-4.CO.2.3
Furniture, Fittings & Equipment
NECOBFFE2020

Security Control Equipment (Gate House), Grd Floor

14

0%

14

13-Jun-13

29-Jun-13

24-Dec-13

08-Jan-14

188

20-Sep-12

03-Aug-13

22-May-13

30-Dec-13

18

1970

Vehicular Traffic Barrier (Gate House), Grd Floor

271

EXTERNAL WORKS

1971
1972

Phase 1 Exterior Fire System


NECP-Rebase_06Sep12-4.CO.5.27
Phase 1 Exterior Fire System
NECOMEP1060

Exterior Fire Pipe & Accessories, Axis 28-1 (Phase 1)

16
16

0%

16
16

13-Apr-13
13-Apr-13

01-May-13
01-May-13

27-Oct-13
27-Oct-13

13-Nov-13
13-Nov-13

18
18

1973
1974

Phase 2 Exterior Fire System


NECP-Rebase_06Sep12-4.CO.5.58
Phase 2 Exterior Fire System
NECOMEP2000

Exterior Fire Pipe & Accessories, Axis 53-28 (Phase 2)

16
16

0%

16
16

01-May-13
01-May-13

20-May-13
20-May-13

14-Nov-13
14-Nov-13

02-Dec-13
02-Dec-13

18
18

1975
1976

Infrastructure Utilitles
NECP-Rebase_06Sep12-4.CO.5.1
Infrastructure Utilitles

NECOEXT1000

Trench Excavation

90
25

0%

77
25

20-Sep-12
20-Sep-12

03-Jan-13
20-Oct-12

22-May-13
22-May-13

19-Aug-13
19-Jun-13

11
11

NECP-Rebase_06Sep12-4.CO.5.1
Infrastructure Utilitles

NECOEXT1110

Rainwater, Sanitary, Drainage, Firefighting, etc., Axis 28-1 (Phase 1)

35

0%

35

20-Oct-12

NECP-Rebase_06Sep12-4.CO.5.1
Infrastructure Utilitles

NECOEXT1120

Rainwater, Sanitary, Drainage, Firefighting, etc., Axis 53-28 (Phase 2)

30

0%

30

29-Nov-12

03-Jan-13

16-Jul-13

19-Aug-13

11

03-Mar-13
26-Mar-13

29-May-13
16-Apr-13

19-Sep-13
19-Sep-13

02-Dec-13
09-Oct-13

41
48

1977
1978

29-Nov-12

05-Jun-13

15-Jul-13

11

1979
1980

Concrete Works
NECP-Rebase_06Sep12-4.CO.5.2
Concrete Works

NECOEXT1240

Concrete Slab 3, Approach Road from Huwar St.

75
18

0%

62
18

1981

NECP-Rebase_06Sep12-4.CO.5.2
Concrete Works

NECOEXT1170

Retaining Wall, Type 3 (6.0m ht x 1.25 thk x 30.7m length)

25

0%

18

03-Mar-13

01-Apr-13

29-Sep-13

21-Oct-13

18

1982

NECP-Rebase_06Sep12-4.CO.5.2
Concrete Works

NECOEXT1250

Concrete Slab 2, Approach Road from Huwar St.

18

0%

18

16-Apr-13

07-May-13

10-Oct-13

02-Nov-13

49

1983

NECP-Rebase_06Sep12-4.CO.5.2
Concrete Works

NECOEXT1180

Retaining Wall, Type 2 (5.0m ht x 0.90m thk x 30m length)

25

0%

18

01-Apr-13

30-Apr-13

22-Oct-13

11-Nov-13

18

1984

NECP-Rebase_06Sep12-4.CO.5.2
Concrete Works

NECOEXT1260

Concrete Slab 1, Approach Road from Huwar St.

18

0%

18

07-May-13

28-May-13

03-Nov-13

23-Nov-13

49

1985

NECP-Rebase_06Sep12-4.CO.5.2
Concrete Works

NECOEXT1190

Retaining Wall, Type 1 (3.3m ht x 0.60m thk x 40m length)

25

1986
1987

Roadworks
NECP-Rebase_06Sep12-4.CO.5.3
Roadworks

NECOEXT1130

1988

NECP-Rebase_06Sep12-4.CO.5.3
Roadworks

1989

NECP-Rebase_06Sep12-4.CO.5.3
Roadworks

1990
1991

0%

18

30-Apr-13

29-May-13

12-Nov-13

02-Dec-13

18

Grade Fillings, Axis 28-1 (Phase 1)

167
25

0%

140
21

03-Jan-13
03-Jan-13

17-Jul-13
02-Feb-13

16-Jul-13
16-Jul-13

29-Dec-13
08-Aug-13

19
48

NECOEXT1140

Grade Fillings, Axis 53-28 (Phase 2)

25

0%

21

02-Feb-13

03-Mar-13

10-Aug-13

02-Sep-13

48

NECOEXT1150

Sub-base, Axis 28-1 (Phase 1)

20

0%

07-Feb-13

03-Mar-13

10-Aug-13

17-Aug-13

54

NECP-Rebase_06Sep12-4.CO.5.3
Roadworks

NECOEXT1160

Sub-base, Axis 53-28 (Phase 2)

20

0%

14

03-Mar-13

26-Mar-13

03-Sep-13

18-Sep-13

48

NECP-Rebase_06Sep12-4.CO.5.3
Roadworks

NECOEXT1200

Kerbs, Edgings, Axis 28-1 (Phase 1)

34

0%

30

04-Mar-13

13-Apr-13

03-Sep-13

07-Oct-13

57

1992

NECP-Rebase_06Sep12-4.CO.5.3
Roadworks

NECOEXT1270

Asphalt Works, Axis 28-1 (Phase 1)

33

0%

26-Mar-13

04-May-13

19-Sep-13

26-Sep-13

78

1993

NECP-Rebase_06Sep12-4.CO.5.3
Roadworks

NECOEXT1280

Asphalt Works, Axis 53-28 (Phase 2)

33

0%

14

04-May-13

11-Jun-13

28-Sep-13

15-Oct-13

78

1994

NECP-Rebase_06Sep12-4.CO.5.3
Roadworks

NECOEXT1210

Kerbs, Edgings, Axis 53-28 (Phase 2)

30

0%

30

13-Apr-13

18-May-13

08-Oct-13

13-Nov-13

57

Feb

Painting Ceiling, Area B1

Signages and Wayfinding,Area B1-B10 Lower Bsmt; Area B1-B10 Upper Bsmt
Vehicular Traffic Barrier (Gate House), Grd Floor
Furniture (Gate House), Grd Floor

Benches (Gate House), Grd Floor


Kitchen Equipment (Gate House), Grd Floor
Security Control Equipment (Gate House), Grd Floor

Exterior Fire Pipe & Accessories, Axis 28-1 (Phase 1)


Exterior Fire Pipe & Accessories, Axis 53-28 (Phase 2)
Trench Excavation
Rainwater, Sanitary, Drainage, Firefighting, etc., Axis 28-1 (Phase 1)
Rainwater, Sanitary, Drainage, Firefighting, etc., Axis 53-28 (Phase 2)
Concrete Slab 3, Approach Road from Huwar St.
Retaining Wall, Type 3 (6.0m ht x 1.25 thk x 30.7m length)
Concrete Slab 2, Approach Road from Huwar St.
Retaining Wall, Type 2 (5.0m ht x 0.90m thk x 30m length)
Concrete Slab 1, Approach Road from Huwar St.
Retaining Wall, Type 1 (3.3m ht x 0.60m thk x 40m length)
Grade Fillings, Axis 28-1 (Phase 1)
Grade Fillings, Axis 53-28 (Phase 2)
Sub-base, Axis 28-1 (Phase 1)
Sub-base, Axis 53-28 (Phase 2)
Kerbs, Edgings, Axis 28-1 (Phase 1)
Asphalt Works, Axis 28-1 (Phase 1)
Asphalt Works, Axis 53-28 (Phase 2)
Kerbs, Edgings, Axis 53-28 (Phase 2)

Construction of North East Underground Carpark Contract No. XC10101100


#

Activity ID

Activity Name

BL Project
Start

BL Project
Finish

Early Start

Early Finish

Total
Float

1995

NECP-Rebase_06Sep12-4.CO.5.3
Roadworks

NECOEXT1220

Traffic Signs, Steel Parapets, Wheel Stoppers, Speed Humps, Axis 6-1 (Phase
221)

0%

20

29-May-13

24-Jun-13

03-Dec-13

26-Dec-13

18

1996

NECP-Rebase_06Sep12-4.CO.5.3
Roadworks

NECOEXT1230

Traffic Signs, Steel Parapets, Wheel Stoppers, Speed Humps, Axis 53-28 (Phase
20 2)

0%

20

24-Jun-13

17-Jul-13

05-Dec-13

29-Dec-13

18

1997
1998

Street Lightings
NECP-Rebase_06Sep12-4.CO.5.4
Street Lightings

NECOEXT1290

106
Cable Trench, Ducts, Cables, and interface infrastructure with PMS, Axis 28-14
25

0%

85
25

01-Apr-13
01-Apr-13

03-Aug-13
30-Apr-13

19-Sep-13
19-Sep-13

30-Dec-13
20-Oct-13

18
48

1999

NECP-Rebase_06Sep12-4.CO.5.4
Street Lightings

NECOEXT1300

Cable Trench, Ducts, Cables, and interface infrastructure with PMS, Axis 14-1
20

0%

20

30-Apr-13

23-May-13

07-Oct-13

31-Oct-13

48

2000

NECP-Rebase_06Sep12-4.CO.5.4
Street Lightings

NECOEXT1310

Cable Trench, Ducts, Cables, Axis 53-40

25

0%

25

23-May-13

22-Jun-13

15-Oct-13

12-Nov-13

48

2001

NECP-Rebase_06Sep12-4.CO.5.4
Street Lightings

NECOEXT1320

Cable Trench, Ducts, Cables, Axis 40-28

20

0%

20

22-Jun-13

15-Jul-13

02-Nov-13

24-Nov-13

48

2002

NECP-Rebase_06Sep12-4.CO.5.4
Street Lightings

NECOEXT1090

Street Lighting Poles

14

0%

14

17-Jul-13

03-Aug-13

14-Dec-13

30-Dec-13

18

2003
2004

WBS

WBS Name

BL Project
Duration

CHANGE REQUEST 1 (ROADWORKS) & CHANGE REQUEST 4 (INFRASTRUCTURES)

Activity % Remaining
Complete Duration

Actual
Finish

89

28-Jun-12

09-Feb-13

22-May-13

09-Feb-13

22-May-13

89

28-Jun-12

NECP-Rebase_06Sep12-4.2.1
General

NEVN2RW1000

Milestone CR1-1: Issue Change Request No. 1

100%

28-Jun-12

2006

NECP-Rebase_06Sep12-4.2.1
General

NEVN2RW1005

Milestone CR4-1: Issue Change Request No. 4

0%

2007

NECP-Rebase_06Sep12-4.2.1
General

NEVN2RW1010

Milestone CR1-2: Complete Concrete Works at Axis A1-A3/A1-C1

0%

07-Mar-13

40

2008

NECP-Rebase_06Sep12-4.2.1
General

NEVN2RW1020

Milestone CR1-3: Complete Roadworks to Student Male Housing

0%

22-May-13

2009

Actual Start

2005

General

09-Feb-13

35

09-Feb-13

20-Mar-13

2010

NECP-Rebase_06Sep12-4.2.2
Submittals

NEVN2RW2000

Submit Shop Drawings

0%

09-Feb-13

16-Feb-13

Submittals

2013
Jan

Feb

Mar

Apr

May

Milestone CR1-3: Complete Roadworks to Student Male Housing


Submit Shop Drawings
Approve Shop Drawings

Approve Shop Drawings

0%

14

17-Feb-13

04-Mar-13

Submit Materials

0%

17-Feb-13

24-Feb-13

14

Approve Materials

0%

14

05-Mar-13

20-Mar-13

Approve Materials

2014

NECP-Rebase_06Sep12-4.2.2
Submittals

NEVN2RW2040

Complete Submittals and Approvals

0%

20-Mar-13

Complete Submittals and Approvals

01-Apr-13

14-May-13

2017
2018
2019

02-Jul-12

100%

NECP-Rebase_06Sep12-4.2.5
Concrete Works at Axis A1-A3/A1-C1
NEVN2RW5005

Complete Area 17 Raft Foundation Works

100%

NECP-Rebase_06Sep12-4.2.5
Concrete Works at Axis A1-A3/A1-C1
NEVN2RW5010

Backfill Around Area 12/13 Ground Slab Retaining Wall/External RC Staircases0

0%

38

01-Apr-13

14-May-13

83

16-Feb-13

22-May-13

Infrastructure Works

2020
2021
2022

Storm Water Pipes


ESVC PIPES 200 & 150 MM DIA.
NECP-Rebase_06Sep12-4.2.6.1.3
ESVC PIPES 200 & 150 MM
NEVN2RW8000
DIA.

2023

0
0
0

0%

83
36
7

16-Feb-13
11-Apr-13
11-Apr-13

22-May-13
22-May-13
18-Apr-13

7
7
7

NECP-Rebase_06Sep12-4.2.6.1.3
ESVC PIPES 200 & 150 MM
NEVN2RW8010
DIA.

Install Stormwater ESVC Pipes, 150/200mm dia x 275 lm

0%

14

20-Apr-13

05-May-13

2024

NECP-Rebase_06Sep12-4.2.6.1.3
ESVC PIPES 200 & 150 MM
NEVN2RW8020
DIA.

Install PCC Manholes 200mm dia, 6 nos.; Kerb Inlet Chambers 150mm dia, 120nos

0%

18

28-Apr-13

18-May-13

2025

NECP-Rebase_06Sep12-4.2.6.1.3
ESVC PIPES 200 & 150 MM
NEVN2RW8030
DIA.

Backfill Trench, Stormwater Pipes, 150/200mm dia x 158 lm

0%

14

07-May-13

22-May-13

0
0

0%

40
7

16-Feb-13
16-Feb-13

02-Apr-13
23-Feb-13

8
7

2026
2027

ESVC PIPES 1200 MM DIA. (M icro-Tunneling)


NECP-Rebase_06Sep12-4.2.6.1.1
ESVC PIPES 1200 MM DIA.
NEVN2RW6000
(Micro-Tunneling) Excavate Trench for Thrust Block, 1200mm

2028

NECP-Rebase_06Sep12-4.2.6.1.1
ESVC PIPES 1200 MM DIA.
NEVN2RW6010
(Micro-Tunneling) Construct RC Thrust Block, 1200mm dia

0%

24-Feb-13

05-Mar-13

2029

NECP-Rebase_06Sep12-4.2.6.1.1
ESVC PIPES 1200 MM DIA.
NEVN2RW6020
(Micro-Tunneling) Pipe Jacking/Install RC Sleeves + MH, GRP Pipes, 1200mm dia x 147 lm

0%

21

06-Mar-13

30-Mar-13

2030

NECP-Rebase_06Sep12-4.2.6.1.1
ESVC PIPES 1200 MM DIA.
NEVN2RW6030
(Micro-Tunneling) Backfill Trench, 1200mm dia x 8 lm

0%

27-Mar-13

02-Apr-13

0
0

0%

40
7

24-Feb-13
24-Feb-13

10-Apr-13
03-Mar-13

7
7

2031
2032

ESVC PIPES 1000 MM DIA. (M icro-Tunneling)


NECP-Rebase_06Sep12-4.2.6.1.2
ESVC PIPES 1000 MM DIA.
NEVN2RW7000
(Micro-Tunneling) Excavate Trench for Thrust Block, 1000mm

2033

NECP-Rebase_06Sep12-4.2.6.1.2
ESVC PIPES 1000 MM DIA.
NEVN2RW7010
(Micro-Tunneling) Construct RC Thrust Block, 1000mm dia

0%

04-Mar-13

13-Mar-13

2034

NECP-Rebase_06Sep12-4.2.6.1.2
ESVC PIPES 1000 MM DIA.
NEVN2RW7020
(Micro-Tunneling) Pipe Jacking/Install RC Sleeves + MH, GRP Pipes, 1000mm dia x 63 lm

0%

21

14-Mar-13

07-Apr-13

2035

NECP-Rebase_06Sep12-4.2.6.1.2
ESVC PIPES 1000 MM DIA.
NEVN2RW7030
(Micro-Tunneling) Backfill Trench, 1000mm dia x 6 lm

0%

04-Apr-13

10-Apr-13

2036
2037

Street Lighting
NECP-Rebase_06Sep12-4.2.6.2
Street Lighting

NEVN2RW8500

Excavate Trench, Lighting Cables, 100 lm

0
0

0%

23
3

13-Apr-13
13-Apr-13

08-May-13
15-Apr-13

19
19

2038

NECP-Rebase_06Sep12-4.2.6.2
Street Lighting

NEVN2RW8510

Lay DB Lighting Cables, 100 lm

0%

16-Apr-13

23-Apr-13

19

2039

NECP-Rebase_06Sep12-4.2.6.2
Street Lighting

NEVN2RW8520

Backfill Trench, Lighting Cables, 100 lm

0%

24-Apr-13

30-Apr-13

19

2040

NECP-Rebase_06Sep12-4.2.6.2
Street Lighting

NEVN2RW8530

Install Lighting Footings, 10 m High, 4 nos.

0%

01-May-13

08-May-13

19

36

06-Apr-13

16-May-13

12

27-Apr-13
27-Apr-13

16-May-13
02-May-13

12
12

2041

Roadworks - Student Male Housing

2042
2043

Footways
NECP-Rebase_06Sep12-4.2.7.2
Footways

NEVN2RW9050

Install PCC Kerbs and Edgings (200 lm)

0
0

0%

18
6

2044

NECP-Rebase_06Sep12-4.2.7.2
Footways

NEVN2RW9060

Spread Concrete Mortar Base (152 m2)

0%

04-May-13

09-May-13

12

2045

NECP-Rebase_06Sep12-4.2.7.2
Footways

NEVN2RW9070

Install PCC Paving Bricks (200 lm)

0%

11-May-13

16-May-13

12

2046
2047

Roads
NECP-Rebase_06Sep12-4.2.7.1
Roads

NEVN2RW9000

Earthworks Filling and Sloping of Edges (1,200 m2)

0
0

0%

36
6

06-Apr-13
06-Apr-13

16-May-13
11-Apr-13

11
11

2048

NECP-Rebase_06Sep12-4.2.7.1
Roads

NEVN2RW9010

Lay Sub-base and Road Base Course (240 m3)

0%

12

13-Apr-13

25-Apr-13

11

2049

NECP-Rebase_06Sep12-4.2.7.1
Roads

NEVN2RW9020

Install Road Kerbs and Edgings

0%

12

20-Apr-13

02-May-13

11

2050

NECP-Rebase_06Sep12-4.2.7.1
Roads

NEVN2RW9030

Lay Asphalt Wearing Course (800 m2)

0%

12

27-Apr-13

09-May-13

11

NECP-Rebase_06Sep12-4.2.7.1
Roads

NEVN2RW9040

Install Speed Humps, Traffic Signs, and Road Markings

0%

2051
2052

TIE-IN WORKS

2053

UTILITY TIE-INS

204

6
29

11-May-13

16-May-13

11

03-Jan-13

28-Aug-13

05-Dec-13

08-Jan-14

Backfill Around Area 12/13 Ground Slab Retaining Wall/External RC Staircases

Excavate Trench, Stormwater Pipes, 150/200mm dia x 158 lm


Install Stormwater ESVC Pipes, 150/200mm dia x 275 lm
Install PCC Manholes 200mm dia, 6 nos.; Kerb Inlet Chambers 150mm dia, 12 nos
Backfill Trench, Stormwater Pipes, 150/200mm dia x 158 lm
Excavate Trench for Thrust Block, 1200mm
Construct RC Thrust Block, 1200mm dia
Pipe Jacking/Install RC Sleeves + MH, GRP Pipes, 1200mm dia x 147 lm
Backfill Trench, 1200mm dia x 8 lm
Excavate Trench for Thrust Block, 1000mm
Construct RC Thrust Block, 1000mm dia
Pipe Jacking/Install RC Sleeves + MH, GRP Pipes, 1000mm dia x 63 lm
Backfill Trench, 1000mm dia x 6 lm
Excavate Trench, Lighting Cables, 100 lm
Lay DB Lighting Cables, 100 lm
Backfill Trench, Lighting Cables, 100 lm
Install Lighting Footings, 10 m High, 4 nos.

Install PCC Kerbs and Edgings (200 lm)


Spread Concrete Mortar Base (152 m2)
Install PCC Paving Bricks (200 lm)
Earthworks Filling and Sloping of Edges (1,200 m2)
Lay Sub-base and Road Base Course (240 m3)
Install Road Kerbs and Edgings
Lay Asphalt Wearing Course (800 m2)
Install Speed Humps, Traffic Signs, and Road Markings

29

03-Jan-13

28-Aug-13

05-Dec-13

08-Jan-14

2054

NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS

NECOTIW1010

Storm Water Drainage Tie-in

0%

21-Aug-13

28-Aug-13

05-Dec-13

12-Dec-13

30

2055

NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS

NECOTIW1040

Domestic Water Piping Tie -in

0%

26-Aug-13

28-Aug-13

05-Dec-13

08-Dec-13

34

2056

NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS

NECOTIW1070

Waste Water Drainage Tie-in

0%

03-Jan-13

12-Jan-13

05-Dec-13

12-Dec-13

30

Waste Water Drainage Tie-in

2057

NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS

NECOTIW1020

Chilled Water Piping Tie-in

0%

26-Aug-13

28-Aug-13

12-Dec-13

15-Dec-13

28

Chilled Water Piping Tie-in

2058

NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS

NECOTIW1050

IT/ Telecom Tie-in

0%

25-Jun-13

27-Jun-13

12-Dec-13

15-Dec-13

28

IT/ Telecom Tie-in

2059

NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS

NECOTIW1060

Security System Tie-in

0%

26-Aug-13

28-Aug-13

12-Dec-13

15-Dec-13

28

Security System Tie-in

2060

NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS

NECOTIW1030

Fire Water/Irrigation Piping Tie-in

0%

26-Aug-13

28-Aug-13

02-Jan-14

05-Jan-14

11

2061

NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS

NECOTIW1000

Primary Power Tie-in

0%

14-Jul-13

16-Jul-13

06-Jan-14

08-Jan-14

59

20-May-13

28-Aug-13

10-Nov-13

18-Jan-14

2062
2063

204

Submit Materials

29-Jul-12

Excavate Trench, Stormwater Pipes, 150/200mm dia x 158 lm

87

TESTING & COMMISSIONING

87

Feb

Milestone CR1-2: Complete Concrete Works at Axis A1-A3/A1-C1

NEVN2RW2030

Start Area 17 Raft Foundation Works

Jan

Milestone CR4-1: Issue Change Request No. 4

NEVN2RW2020

NECP-Rebase_06Sep12-4.2.5
Concrete Works at Axis A1-A3/A1-C1
NEVN2RW5000

Dec

Street Lighting Poles

NEVN2RW2010

Concrete Works at Axis A1-A3/A1-C1

Nov

Cable Trench, Ducts, Cables, Axis 40-28

NECP-Rebase_06Sep12-4.2.2
Submittals

2016

Oct

Cable Trench, Ducts, Cables, Axis 53-40

NECP-Rebase_06Sep12-4.2.2
Submittals

02-Jul-12

Sep

Cable Trench, Ducts, Cables, and interface infrastructure with PMS, Axis 14-1

NECP-Rebase_06Sep12-4.2.2
Submittals

Aug

Cable Trench, Ducts, Cables, and interface infrastructure with PMS, Axis 28-14

2011

38

2014
Jul

Traffic Signs, Steel Parapets, Wheel Stoppers, S

2013

Jun

Traffic Signs, Steel Parapets, Wheel Stoppers, Sp

2012

2015

Page 19 of 19/27-Feb-13 09:03

Execution Programme Level 3

Storm Water Drainage Tie-in


Domestic Water Piping Tie -in

Fire Water/Irrigation Piping Tie-in


Primary Power Tie-in

59

20-May-13

28-Aug-13

10-Nov-13

18-Jan-14

0%

55
45

20-May-13
20-May-13

28-Aug-13
29-Jul-13

10-Nov-13
10-Nov-13

13-Jan-14
01-Jan-14

0
0

Pipeline Pressure/Vacuum and Leak Tests, Drying Out, Inert and Chemical Cleansing
60

0%

45

28-May-13

06-Aug-13

18-Nov-13

09-Jan-14

Pipeline Pressure/Vacuum and Leak Te

NECP-Rebase_06Sep12-4.TC.PRC.1
PRE-COMMISSIONING NETCPC1030

Systematic Conformity Tests, Mechl and Electrical Equipment

40

0%

40

30-Jun-13

14-Aug-13

23-Nov-13

08-Jan-14

Systematic Conformity Tests, Mechl and

2068

NECP-Rebase_06Sep12-4.TC.PRC.1
PRE-COMMISSIONING NETCPC1040

Static, De-energized Tests, Mechl and Electrical Equipment

40

0%

40

14-Jul-13

28-Aug-13

27-Nov-13

13-Jan-14

Static, De-energized Tests, Mechl a

2069
2070

SYSTEM COMMISSIONING
NECP-Rebase_06Sep12-4.TC.PRC.2
SYSTEM COMMISSIONING
NEPCSC1010

Overall System Commissioning

30
30

0%

30
30

25-Jul-13
25-Jul-13

28-Aug-13
28-Aug-13

14-Dec-13
14-Dec-13

18-Jan-14
18-Jan-14

0
0

Overall System Commissioning

126

124

11-Apr-13

04-Sep-13

26-Aug-13

20-Jan-14

120

120

11-Apr-13

28-Aug-13

26-Aug-13

16-Jan-14

120

11-Apr-13

28-Aug-13

26-Aug-13

16-Jan-14

90

16-May-13

28-Aug-13

30-Sep-13

16-Jan-14

90

16-May-13

28-Aug-13

30-Sep-13

16-Jan-14

86

12-Jun-13

28-Aug-13

05-Oct-13

16-Jan-14

05-Oct-13

TESTING & COMMISSIONING

2064
2065

PRE-COMMISSIONING
NECP-Rebase_06Sep12-4.TC.PRC.1
PRE-COMMISSIONING NETCPC1010

2066

NECP-Rebase_06Sep12-4.TC.PRC.1
PRE-COMMISSIONING NETCPC1020

2067

2071
2072
2073
2074
2075
2076
2077
2078
2079
2080
2081
2082
2083
2084

Pipeline Flushing, Cleaning, De-watering

HANDOVER
AS-BUILT DRAWINGS
NECP-Rebase_06Sep12-4.OA.1
AS-BUILT DRAWINGS

NEOA20

Submit As-Built Drawings

NEOA30

Submit O&M Manuals

NECP-Rebase_06Sep12-4.OA.3
TRAINING

NEOA35

Submit Training Schedule

NECP-Rebase_06Sep12-4.OA.3
TRAINING

NEOA40

NECP-Rebase_06Sep12-4.OA.3
TRAINING

NEOA50

0%
0%

0%

Prepare Training Materials

0%

30-Jul-13

05-Aug-13

16-Dec-13

24-Dec-13

Conduct On-Site Training

20

0%

20

06-Aug-13

28-Aug-13

24-Dec-13

16-Jan-14

60

27-Jun-13

04-Sep-13

11-Nov-13

20-Jan-14

60

27-Jun-13

04-Sep-13

11-Nov-13

20-Jan-14

26

26

06-Aug-13

04-Sep-13

22-Dec-13

20-Jan-14

26

26

06-Aug-13

04-Sep-13

22-Dec-13

20-Jan-14

26

06-Aug-13

04-Sep-13

22-Dec-13

20-Jan-14

60

CLOSE OUT REPORT


NEOA60

Submit Project Closing Out Report

DEMOBILIZATION
DEMOBILIZATION
NECP-Rebase_06Sep12-4.DEM.1
DEMOBILIZATION

90
66

TRAINING

NECP-Rebase_06Sep12-4.OA.2
CLOSE OUT REPORT

120
90

O&M MANUALS
NECP-Rebase_06Sep12-4.OA.4
O&M MANUALS

87
60

NEGEDM10

Cleaning Works, Demobilization

60

26

0%

0%

12-Jun-13

Pipeline Flushing, Cleaning, De-watering

Submit As-Built Drawings


Submit O&M Manuals
Submit Training Schedule
Prepare Training Materials
Conduct On-Site Training
Submit Project Closing Out Report

Cleaning Works, Demobilization

Вам также может понравиться