WBS
WBS Name
Activity ID
Activity Name
BL Project
Duration
Activity % Remaining
Complete Duration
BL Project
Start
BL Project
Finish
Actual Start
626
301
06-Sep-11
04-Sep-13
06-Sep-11
626
301
06-Sep-11
04-Sep-13
626
198
06-Sep-11
04-Sep-13
ENGINEERING
IFC DRAWINGS
IFC DRAWINGS AVAILABILITY
20-Jan-14
30-May-13
20-Jan-14
31-Jan-13
10-Apr-13
75
31-Jan-13
01-Jan-14
11
06-Sep-11
617
285
06-Sep-11
25-Aug-13
06-Sep-11
06-Sep-11
06-Sep-11
06-Sep-11
06-Sep-11
0
540
0
285
06-Sep-11
05-Dec-11
06-Sep-11
25-Aug-13
06-Sep-11
19-Jan-12
06-Sep-11
205
205
12
20-Nov-12
20-Nov-12
20-Nov-12
17-Jul-13
17-Jul-13
04-Dec-12
09-Nov-12
09-Nov-12
01-Jan-14
11
31-Jan-13
31-Jan-13
31-Jan-13
27-Mar-13
27-Mar-13
13-Feb-13
59
59
0
03-Mar-13
14-Feb-13
02-Mar-13
18
17-Jun-13
01-Jul-13
26-Feb-13
11-Mar-13
59
01-Jul-13
17-Jul-13
12-Mar-13
27-Mar-13
59
04-Dec-12
03-Jan-13
09-Nov-12
03-Dec-12
04-Feb-13
12
04-Dec-12
18-Dec-12
09-Nov-12
12-Feb-13
21-Nov-12
0%
0%
14
14-Feb-13
14
NECP-Rebase_06Sep12-4.EN.SDS.1.3
GROUND LEVEL
NEENSDS1550
12
0%
12
15
NECP-Rebase_06Sep12-4.EN.SDS.1.3
GROUND LEVEL
NEENSDS1580
14
0%
14
16
17
100%
32
0
18
NECP-Rebase_06Sep12-4.EN.SDS.1.3.4
Issues on Round About Dimensions
NEENSDS1710
(Elevated Roadway)
PIL Confirmed (thru RFI-03-0188 Rev A dtd 04Feb12) UB Columns Set Out is 0
Acceptable
0%
19
NECP-Rebase_06Sep12-4.EN.SDS.1.3.4
Issues on Round About Dimensions
NEENSDS1720
(Elevated Roadway)
PIL To Confirm (thru RFI-03-0188 Rev A dtd 04Feb12) GF Beams Set Out by 11Feb13
0
0%
20
NECP-Rebase_06Sep12-4.EN.SDS.1.3.4
Issues on Round About Dimensions
NEENSDS1540
(Elevated Roadway)
Roadworks Layout & Details
12
0%
14
Feb
Mar
Apr
0
0
04-Feb-13
11-Feb-13
25-Feb-13
26-Feb-13
13-Mar-13
0%
24-Feb-13
24-Feb-13
24-Feb-13
01-Jan-14
19-Mar-13
03-Mar-13
11
62
55
14
0%
14
10-Mar-12
25-Mar-12
04-Mar-13
19-Mar-13
62
21
7
0%
21
7
10-Mar-12
10-Mar-12
02-Apr-12
17-Mar-12
04-Mar-13
04-Mar-13
27-Mar-13
11-Mar-13
55
55
14
0%
14
18-Mar-12
02-Apr-12
12-Mar-13
27-Mar-13
55
27-Jul-13
27-Jul-13
25-Aug-13
29-Jul-13
23-Nov-13
23-Nov-13
01-Jan-14
25-Nov-13
11
28
NECP-Rebase_06Sep12-4.EN.SDS.3.2
UPPER BASEMENT
NEENSDS400
29
30
GROUND LEVEL
NECP-Rebase_06Sep12-4.EN.SDS.3.3
GROUND LEVEL
NEENSDS1440
26
3
0%
34
3
31
NECP-Rebase_06Sep12-4.EN.SDS.3.3
GROUND LEVEL
NEENSDS1490
Chilled Water System Layout & Tie-In Details, Ground Level Approval
14
0%
14
10-Aug-13
25-Aug-13
26-Nov-13
11-Dec-13
28
32
NECP-Rebase_06Sep12-4.EN.SDS.3.3
GROUND LEVEL
NEENSDS1470
0%
06-Aug-13
08-Aug-13
12-Dec-13
15-Dec-13
11
33
NECP-Rebase_06Sep12-4.EN.SDS.3.3
GROUND LEVEL
NEENSDS1520
Irrigation Main Line Layout & Tie-In Details, Ground Level Approval
14
0%
14
10-Aug-13
25-Aug-13
16-Dec-13
01-Jan-14
11
50%
53
53
4
06-Dec-11
12-Dec-11
20-Dec-11
18-Apr-12
28-Mar-12
27-Dec-11
19-Jan-12
19-Jan-12
02-Sep-12
31-Jan-13
31-Jan-13
31-Jan-13
02-Apr-13
02-Apr-13
04-Feb-13
87
54
54
24-Jun-12
07-Jan-12
39
NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS490
40
31-Jan-13
12-Feb-13
14
0%
14
28-Dec-11
12-Jan-12
04-Feb-13
20-Feb-13
54
0%
12-Dec-11
19-Dec-11
20-Feb-13
27-Feb-13
NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS460
0%
26-Feb-12
04-Mar-12
26-Feb-13
05-Mar-13
41
NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS780
Parking Guidance Layout & Single Line Diagram, Lower Basement Approval 14
0%
14
20-Dec-11
04-Jan-12
28-Feb-13
16-Mar-13
42
NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS470
43
NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS750
Security System Layout & Single Line Diagram, Lower Basement Approval
44
NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS1620
45
NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS760
46
NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS1660
47
48
IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals
49
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS550
Letter 0295-13 dtd Substations:
04Feb13): Re-Submittals
HV SWGRs, &XFMRs,
Approvals
Generators, MV Panels Layout & Details, Lower
5
Basement
85%
0%
05-Mar-12
12-Mar-12
06-Mar-13
13-Mar-13
14
0%
14
05-Mar-12
20-Mar-12
06-Mar-13
21-Mar-13
0%
01-Feb-12
08-Feb-12
07-Mar-13
14-Mar-13
56
0%
14
13-Mar-12
28-Mar-12
14-Mar-13
30-Mar-13
0%
14
09-Feb-12
25-Feb-12
16-Mar-13
31-Mar-13
56
53
1
22-Dec-11
02-Jan-12
16-Feb-12
07-Jan-12
19-Jan-12
19-Jan-12
31-Jan-13
31-Jan-13
02-Apr-13
31-Jan-13
0
17
14
49
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS840
Letter 0295-13 dtd Substations:
04Feb13): Re-Submittals
HV SWGRs, &XFMRs,
Approvals
Generators, MV Panels Layout & Details, 14
Lower Basement
85% Approval
2
08-Jan-12
23-Jan-12
30-Jan-12
14-Feb-13
17-Feb-13
17
50
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS540
Letter 0295-13 dtd LV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Lower Basement (w/ Substation Issue in UB 7Slab Area
21.43%
13)
25-Dec-11
01-Jan-12
17-Jun-12
11-Mar-13
17-Mar-13
51
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS830
Letter 0295-13 dtd LV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Lower Basement Approval (w/ Substation Issue
14 in 21.43%
UB Slab Area 13)11
02-Jan-12
17-Jan-12
24-Jun-12
21-Mar-13
02-Apr-13
52
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS430
Letter 0295-13 dtd Lighting
04Feb13):
Layout
Re-Submittals
& Single Line
& Approvals
Diagram, Lower Basement
0%
13
28-Dec-11
04-Jan-12
08-Feb-12
31-Jan-13
14-Feb-13
53
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS520
Letter 0295-13 dtd HV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Lower Basement
0%
25
22-Dec-11
29-Dec-11
20-Aug-12
31-Jan-13
28-Feb-13
54
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS1670
Letter 0295-13 dtd Issue
04Feb13):
IFC-9Re-Submittals
Drawings (MEP)
& Approvals
55
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS720
Letter 0295-13 dtd Lighting
04Feb13):
Layout
Re-Submittals
& Single Line
& Approvals
Diagram, Lower Basement Approval
28-Mar-12
56
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS1610
Letter 0295-13 dtd Bus
04Feb13):
Ducts/Bus
Re-Submittals
Bars Layout
& Approvals
& Details, Lower Basement
57
0%
04-Feb-13
14
0%
14
05-Jan-12
21-Jan-12
20-Feb-13
07-Mar-13
0%
24-Jan-12
31-Jan-12
27-Feb-13
06-Mar-13
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS810
Letter 0295-13 dtd HV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Lower Basement Approval
14
0%
14
31-Dec-11
15-Jan-12
02-Mar-13
17-Mar-13
58
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5
IFC-9 DRAWINGS (ASTAD
NEENSDS1650
Letter 0295-13 dtd Bus
04Feb13):
Ducts/Bus
Re-Submittals
Bars Layout
& Approvals
& Details, Lower Basement Approval
14
0%
14
01-Feb-12
16-Feb-12
07-Mar-13
23-Mar-13
59
60
Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5.1
Under Review - PIL Release
NEENSDS1680
Date to ASTAD dtd
MV
22Jan13,
Switchgear
Assumed
UnderASTAD
ReviewApproval
by ASTAD,
Date:
Assumed
21Feb13
Approval:21Feb13
21
0
24-Dec-11
16-Jan-12
21-Feb-13
0%
21
0
18-Mar-13
21-Feb-13
0
0
61
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5.1
Under Review - PIL Release
NEENSDS530
Date to ASTAD dtd
MV
22Jan13,
Layout &Assumed
Single Line
ASTAD
Diagram,
Approval
Lower
Date:
Basement
21Feb13
(w/ Substation Issue in UB7Slab Area0%
13)
62
NECP-Rebase_06Sep12-4.EN.SDS.2.1.5.1
Under Review - PIL Release
NEENSDS820
Date to ASTAD dtd
MV
22Jan13,
Layout &Assumed
Single Line
ASTAD
Diagram,
Approval
Lower
Date:
Basement
21Feb13
Approval
24-Dec-11
31-Dec-11
0%
14
01-Jan-12
16-Jan-12
116
Emergency Lighting Layout & Single Line Diagram, Upper Basement Approval14
20%
53
11
06-Dec-11
29-Feb-12
18-Apr-12
15-Mar-12
17-Jun-12
18-Jun-12
NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS950
14
10%
13
02-Apr-12
17-Apr-12
18-Jun-12
NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS610
0%
08-Jan-12
15-Jan-12
67
NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS570
0%
06-Dec-11
68
NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS620
0%
16-Jan-12
69
NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS630
0%
16-Jan-12
70
NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS900
Security System Layout & Single Line Diagram, Upper Basement Approval
14
0%
14
71
NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS860
14
0%
14
72
NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS640
0%
73
NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS910
0%
74
NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS920
14
0%
75
NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS930
Parking Guidance Layout & Single Line Diagram, Upper Basement Approval 14
0%
76
77
IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals
106
NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS690
Letter 0295-13 dtd LV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Upper Basement (w/ Substation Issue in UB 7Slab Area
20%
13)
02-Mar-13
18-Mar-13
02-Apr-13
13-Feb-13
87
20
31-Jan-13
14-Feb-13
31-Jan-13
07-Feb-13
18
13-Dec-11
04-Feb-13
12-Feb-13
67
23-Jan-12
09-Feb-13
16-Feb-13
18
23-Jan-12
09-Feb-13
16-Feb-13
18
08-Mar-12
24-Mar-12
09-Feb-13
24-Feb-13
22
22-Feb-12
08-Mar-12
12-Feb-13
28-Feb-13
67
24-Jan-12
31-Jan-12
17-Feb-13
24-Feb-13
18
14
03-Apr-12
18-Apr-12
17-Feb-13
04-Mar-13
22
14
17-Mar-12
01-Apr-12
17-Feb-13
04-Mar-13
112
14
25-Mar-12
09-Apr-12
25-Feb-13
12-Mar-13
18
53
6
14-Dec-11
14-Feb-12
15-Apr-12
21-Feb-12
17-Jun-12
17-Jun-12
31-Jan-13
11-Mar-13
02-Apr-13
17-Mar-13
0
0
78
NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS980
Letter 0295-13 dtd LV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Upper Basement Approval (w/ Substation Issue
14 in UB20%
Slab Area 13)11
22-Feb-12
08-Mar-12
21-Jun-12
20-Mar-13
02-Apr-13
79
NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS870
Letter 0295-13 dtd Lighting
04Feb13):
Layout
Re-Submittals
& Single Line
& Approvals
Diagram, Upper Basement Approval
13-Feb-12
28-Feb-12
22-Jul-12
31-Jan-13
14-Feb-13
18
66
14
10%
80
NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS580
Letter 0295-13 dtd Lighting
04Feb13):
Layout
Re-Submittals
& Single Line
& Approvals
Diagram, Upper Basement
81
NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS650
Letter 0295-13 dtd Telephone/Structured
04Feb13): Re-Submittals
Cabling
& Approvals
Layout & Details, Upper Basement
82
NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS940
Letter 0295-13 dtd Telephone/Structured
04Feb13): Re-Submittals
Cabling
& Approvals
Layout & Details, Upper Basement Approval
83
NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS670
Letter 0295-13 dtd HV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Upper Basement (w/ Substation Issue in UB7Slab Area0%
13)
84
NECP-Rebase_06Sep12-4.EN.SDS.2.2.1
IFC-9 DRAWINGS (ASTAD
NEENSDS960
Letter 0295-13 dtd HV
04Feb13):
Layout &Re-Submittals
Single Line Diagram,
& Approvals
Upper Basement Approval
85
86
Under Review - PIL Release Date to ASTAD dtd 22Jan13, Assumed ASTAD Approval Date: 21Feb13
21
NECP-Rebase_06Sep12-4.EN.SDS.2.2.1.1
Under Review - PIL Release
NEENSDS680
Date to ASTAD dtd
MV
22Jan13,
Layout &Assumed
Single Line
ASTAD
Diagram,
Approval
Upper
Date:
Basement
21Feb13
(w/ Substation Issue in UB7Slab Area0%
13)
87
NECP-Rebase_06Sep12-4.EN.SDS.2.2.1.1
Under Review - PIL Release
NEENSDS970
Date to ASTAD dtd
MV
22Jan13,
Layout &Assumed
Single Line
ASTAD
Diagram,
Approval
Upper
Date:
Basement
21Feb13
Approval
10%
14-Dec-11
21-Dec-11
07-Feb-13
14-Feb-13
18
0%
24-Jan-12
31-Jan-12
17-Feb-13
24-Feb-13
18
14
0%
14
31-Mar-12
15-Apr-12
25-Feb-13
12-Mar-13
18
09-Feb-12
16-Feb-12
26-Feb-13
05-Mar-13
14
18-Feb-12
04-Mar-12
06-Mar-13
21-Mar-13
21
7
12-Feb-12
12-Feb-12
06-Mar-12
19-Feb-12
28-Feb-13
28-Feb-13
24-Mar-13
07-Mar-13
0
0
09-Mar-13
24-Mar-13
31-Jan-13
31-Jan-13
21-Mar-13
07-Feb-13
70
32
14
0%
14
0%
14
20-Feb-12
06-Mar-12
35
7
5%
43
7
22-Feb-12
01-Mar-12
02-Apr-12
08-Mar-12
14
88
89
GROUND LEVEL
NECP-Rebase_06Sep12-4.EN.SDS.2.3
GROUND LEVEL
NEENSDS1380
90
NECP-Rebase_06Sep12-4.EN.SDS.2.3
GROUND LEVEL
NEENSDS1410
91
92
IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals
NECP-Rebase_06Sep12-4.EN.SDS.2.3.1
IFC-9 DRAWINGS (ASTAD
NEENSDS1370
Letter 0295-13 dtd HV
04Feb13):
Cable Routing
Re-Submittals
and Details,
& Approvals
Ground Level
93
NECP-Rebase_06Sep12-4.EN.SDS.2.3.1
IFC-9 DRAWINGS (ASTAD
NEENSDS1400
Letter 0295-13 dtd HV
04Feb13):
Cable Routing
Re-Submittals
and Details,
& Approvals
Ground Level Approval
94
NECP-Rebase_06Sep12-4.EN.SDS.2.3.1
IFC-9 DRAWINGS (ASTAD
NEENSDS1390
Letter 0295-13 dtd Telephone
04Feb13): Routing
Re-Submittals
& Details,
& Approvals
Ground Level
95
NECP-Rebase_06Sep12-4.EN.SDS.2.3.1
IFC-9 DRAWINGS (ASTAD
NEENSDS1420
Letter 0295-13 dtd Telephone
04Feb13): Routing
Re-Submittals
& Details,
& Approvals
Ground Level Approval
96
97
98
13
17-Jul-12
31-Jan-13
31-Jan-13
65
30-Aug-12
30-Aug-12
0%
14
10-Mar-12
25-Mar-12
07-Feb-13
24-Feb-13
32
35
7
50%
29
4
22-Feb-12
22-Feb-12
02-Apr-12
29-Feb-12
30-Aug-12
30-Aug-12
17-Feb-13
02-Mar-13
21-Mar-13
05-Mar-13
70
2
14
50%
01-Mar-12
17-Mar-12
06-Sep-12
14-Mar-13
21-Mar-13
0%
10-Mar-12
17-Mar-12
17-Feb-13
24-Feb-13
78
14
0%
14
18-Mar-12
02-Apr-12
25-Feb-13
12-Mar-13
78
221
221
14
10%
82
82
13
05-Dec-11
05-Dec-11
05-Dec-11
18-Aug-12
18-Aug-12
20-Dec-11
13-Nov-12
13-Nov-12
13-Nov-12
31-Jan-13
31-Jan-13
31-Jan-13
06-May-13
06-May-13
14-Feb-13
212
198
86
23-Nov-12
06-Feb-13
21-Feb-13
109
31-Jan-13
07-Feb-13
13
99
NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1240
14
10%
13
25-Jul-12
09-Aug-12
100
NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1000
0%
05-Dec-11
12-Dec-11
101
NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1060
0%
25-Jul-12
01-Aug-12
31-Jan-13
07-Feb-13
259
102
NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1010
0%
22-Dec-11
29-Dec-11
09-Feb-13
16-Feb-13
13
Actual Work
Remaining Work
Critical Remaining Work
Feb
03-Mar-13
UPPER BASEMENT
NECP-Rebase_06Sep12-4.EN.SDS.2.2
UPPER BASEMENT
NEENSDS890
Jan
23-Feb-13
63
64
14
Dec
03-Jan-13
25-Aug-13
25-Mar-12
08-Mar-12
NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS710
Nov
PIL To Confirm (thru RFI-03-0188 Rev A dtd 04Feb12) GF Beams Set Out by 11Feb13
01-Mar-12
01-Mar-12
01-Mar-12
NECP-Rebase_06Sep12-4.EN.SDS.2.1
LOWER BASEMENT
NEENSDS800
Oct
PIL Confirmed (thru RFI-03-0188 Rev A dtd 04Feb12) UB Columns Set Out is Acceptable
18-Dec-12
38
Sep
14
37
Aug
265
21
7
116
93
7
2014
Jul
0%
Jun
465
21
7
NECP-Rebase_06Sep12-4.EN.SDS.1.3.4
Issues on Round About Dimensions
NEENSDS1570
(Elevated Roadway)
Roadworks Layout & Details Approval
MECHANICAL - SHOP DRAWINGS SUBMITTALS & APPROVALS
LOWER BASEMENT
NECP-Rebase_06Sep12-4.EN.SDS.3.1
LOWER BASEMENT
NEENSDS210
HVAC Equipment Layout & Details, Lower Basement
May
13-Mar-13
0
Terna Rqstd (thru RFI-03-0169 Rev A dtd 03Dec12) Dimensions of Round About
28
34
35
36
2013
Jan
28-Jan-13
31-Jan-13
14
UPPER BASEMENT
NECP-Rebase_06Sep12-4.EN.SDS.3.2
UPPER BASEMENT
NEENSDS270
31-Jan-13
06-Sep-11
18-Jan-12
26
27
06-Sep-11
06-Sep-11
NECP-Rebase_06Sep12-4.EN.SDS.1.3
GROUND LEVEL
NEENSDS1560
NECP-Rebase_06Sep12-4.EN.SDS.3.1
LOWER BASEMENT
NEENSDS340
13
25
Total
Float
20-Jan-14
60
48
48
12
22
23
24
Early Finish
31-Jan-13
21
Early Start
07-Sep-12
Actual
Finish
116
10
11
12
Security System Layout & Single Line Diagram, Upper Basement Approval
Cable Tray Layout & Details, Upper Basement Approval
Parking Guidance Layout & Single Line Diagram, Upper Basement
BMS/Telemetry/SCADA Layout & Single Line Diagram, Upper Basement Approval
Photovoltaic Layout & Single Line Diagram, PMS Approval
Parking Guidance Layout & Single Line Diagram, Upper Basement Approval
LV Layout & Single Line Diagram, Upper Basement (w/ Substation Issue in UB Slab Area 13)
LV Layout & Single Line Diagram, Upper Basement Approval (w/ Substation Issue in UB Slab Area 13)
TERNA
Milestone
Date
26-Feb-13
Revision
Data Date: 31-Jan-13
(Based on 06Sep12 Submitted Forecast Schedule)
Checked
DS
Approved
AT
WBS
WBS Name
Activity ID
Activity Name
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
103
NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1190
BL Project
Duration
14
0%
14
13-Dec-11
28-Dec-11
09-Feb-13
24-Feb-13
78
104
NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1250
14
0%
14
02-Aug-12
18-Aug-12
09-Feb-13
24-Feb-13
259
105
NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1020
0%
31-Dec-11
07-Jan-12
17-Feb-13
24-Feb-13
43
106
NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1200
14
0%
14
31-Dec-11
15-Jan-12
17-Feb-13
04-Mar-13
50
107
NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1210
14
0%
14
08-Jan-12
23-Jan-12
25-Feb-13
12-Mar-13
43
108
NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1040
0%
09-Jul-12
16-Jul-12
13-Apr-13
20-Apr-13
87
109
NECP-Rebase_06Sep12-4.EN.SDS.4.1
LOWER BASEMENT
NEENSDS1230
0%
14
17-Jul-12
01-Aug-12
110
111
UPPER BASEMENT
NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1320
143
14
10%
78
13
05-Dec-11
12-Apr-12
19-May-12
28-Apr-12
112
NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1070
0%
05-Dec-11
113
NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1120
0%
05-Jan-12
114
NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1080
0%
115
NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1140
0%
116
NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1260
14
0%
14
117
NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1310
0%
14
118
NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1090
0%
Activity % Remaining
Complete Duration
Actual Start
Actual
Finish
2013
Jan
Feb
Mar
Apr
May
21-Apr-13
06-May-13
87
02-May-13
02-May-13
216
109
12-Dec-11
31-Jan-13
07-Feb-13
20
12-Jan-12
31-Jan-13
07-Feb-13
71
13-Dec-11
20-Dec-11
09-Feb-13
16-Feb-13
13
22-Jan-12
29-Jan-12
09-Feb-13
16-Feb-13
266
13-Dec-11
28-Dec-11
09-Feb-13
24-Feb-13
78
03-May-12
19-May-12
09-Feb-13
24-Feb-13
148
28-Dec-11
04-Jan-12
17-Feb-13
24-Feb-13
13
0%
28-Dec-11
04-Jan-12
17-Feb-13
24-Feb-13
57
14
0%
14
29-Dec-11
14-Jan-12
17-Feb-13
04-Mar-13
20
121
NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1280
14
0%
14
14-Jan-12
29-Jan-12
25-Feb-13
12-Mar-13
13
122
NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1290
14
0%
14
22-Jan-12
06-Feb-12
25-Feb-13
12-Mar-13
57
123
NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1330
14
0%
14
05-Mar-12
20-Mar-12
25-Feb-13
12-Mar-13
259
124
125
GROUND LEVEL
NECP-Rebase_06Sep12-4.EN.SDS.4.3
GROUND LEVEL
NEENSDS1150
35
7
0%
21
7
14-Jan-12
14-Jan-12
22-Feb-12
21-Jan-12
31-Jan-13
31-Jan-13
24-Feb-13
07-Feb-13
71
71
126
NECP-Rebase_06Sep12-4.EN.SDS.4.3
GROUND LEVEL
NEENSDS1170
0%
30-Jan-12
06-Feb-12
31-Jan-13
07-Feb-13
27
127
NECP-Rebase_06Sep12-4.EN.SDS.4.3
GROUND LEVEL
NEENSDS1340
14
0%
14
22-Jan-12
06-Feb-12
09-Feb-13
24-Feb-13
71
128
NECP-Rebase_06Sep12-4.EN.SDS.4.3
GROUND LEVEL
NEENSDS1360
14
0%
14
07-Feb-12
22-Feb-12
09-Feb-13
24-Feb-13
27
230
169
19-Dec-11
11-Sep-12
31-Jan-13
15-Aug-13
108
69
7
0%
35
7
24-Jun-12
24-Jun-12
11-Sep-12
01-Jul-12
31-Jan-13
31-Jan-13
12-Mar-13
07-Feb-13
135
45
132
NECP-Rebase_06Sep12-4.EN.MSS.2
MECHANICAL - METHODNEENMSS230
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Fans Installation
133
NECP-Rebase_06Sep12-4.EN.MSS.2
MECHANICAL - METHODNEENMSS300
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for HVAC Equipment Installation Approval
134
NECP-Rebase_06Sep12-4.EN.MSS.2
MECHANICAL - METHODNEENMSS240
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Pumps Installation
135
NECP-Rebase_06Sep12-4.EN.MSS.2
MECHANICAL - METHODNEENMSS310
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Fans Installation Approval
0%
18-Jul-12
25-Jul-12
09-Feb-13
16-Feb-13
45
14
0%
14
02-Jul-12
17-Jul-12
09-Feb-13
24-Feb-13
52
0%
19-Aug-12
26-Aug-12
17-Feb-13
24-Feb-13
135
14
0%
14
26-Jul-12
11-Aug-12
17-Feb-13
04-Mar-13
45
136
NECP-Rebase_06Sep12-4.EN.MSS.2
MECHANICAL - METHODNEENMSS320
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Pumps Installation Approval
14
0%
14
27-Aug-12
11-Sep-12
25-Feb-13
12-Mar-13
135
137
138
130
7
0%
169
7
19-Dec-11
19-Dec-11
17-May-12
26-Dec-11
31-Jan-13
31-Jan-13
15-Aug-13
07-Feb-13
58
18
139
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS370
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Switchgears Installation
140
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS470
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Lifts & Escalators Installation Approval
141
142
0%
27-Dec-11
03-Jan-12
09-Feb-13
16-Feb-13
18
14
0%
14
26-Feb-12
12-Mar-12
09-Feb-13
24-Feb-13
119
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS380
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Transformers Installation
0%
02-Jan-12
09-Jan-12
17-Feb-13
24-Feb-13
18
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS390
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Generators Installation
0%
10-Jan-12
17-Jan-12
25-Feb-13
04-Mar-13
18
143
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS400
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Parking Guidance System Installation
0%
18-Jan-12
25-Jan-12
05-Mar-13
12-Mar-13
18
144
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS500
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Generators Installation Approval
14
0%
14
18-Feb-12
04-Mar-12
05-Mar-13
20-Mar-13
118
145
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS410
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Security System Installation
0%
26-Jan-12
02-Feb-12
13-Mar-13
20-Mar-13
80
146
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS420
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for UPS Installation
0%
04-Feb-12
11-Feb-12
21-Mar-13
28-Mar-13
80
147
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS430
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Panel Boards Installation
0%
12-Feb-12
19-Feb-12
30-Mar-13
06-Apr-13
80
148
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS530
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for UPS Installation Approval
14
0%
14
24-Apr-12
09-May-12
30-Mar-13
14-Apr-13
164
149
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS540
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Panel Boards Installation Approval
14
0%
14
26-Apr-12
12-May-12
07-Apr-13
22-Apr-13
80
150
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS480
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Switchgears Installation Approval
14
0%
14
01-Feb-12
16-Feb-12
20-Apr-13
05-May-13
128
151
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS490
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Transformers Installation Approval
14
0%
14
01-Feb-12
16-Feb-12
08-May-13
23-May-13
119
152
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS520
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Security System Installation Approval
14
0%
14
02-May-12
17-May-12
06-Jul-13
21-Jul-13
40
153
NECP-Rebase_06Sep12-4.EN.MSS.4
ELECTRICAL - METHODNEENMSS510
STATEMENT SUBMITTALS
Method Statement
& APPROVALS
for Parking Guidance System Installation Approval
14
0%
14
26-Jan-12
11-Feb-12
31-Jul-13
15-Aug-13
18
21
7
0%
21
7
24-Mar-12
24-Mar-12
16-Apr-12
31-Mar-12
12-Mar-13
12-Mar-13
04-Apr-13
19-Mar-13
222
222
14
0%
222
154
155
156
157
158
159
160
161
162
163
164
165
166
PROCUREMENT
MATERIAL SUBMITTALS & APPROVALS
CIVIL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALS
NECP-Rebase_06Sep12-4.PR.MTS.BM
CIVIL - BULK MATERIALSNEPRMTS380
RFQ & SUBMITTALS
Heavy
& APPROVALS
Duty Rubber Vehicle Stoppers
NECP-Rebase_06Sep12-4.PR.MTS.BM
CIVIL - BULK MATERIALSNEPRMTS430
RFQ & SUBMITTALS
Heavy
& APPROVALS
Duty Rubber Vehicle Stoppers Approval
MECHANICAL - BULK MATERIALS RFQ & SUBMITTALS & APPROVALS
NECP-Rebase_06Sep12-4.PR.MTS.2
MECHANICAL - BULK MATERIALS
NEPRMTS520
RFQ & SUBMITTALS
Ductile Iron&Pipes
APPROVALS
& Fittings (Extl Firefighting) Approval
NECP-Rebase_06Sep12-4.PR.MTS.2
MECHANICAL - BULK MATERIALS
NEPRMTS570
RFQ & SUBMITTALS
FM200 Gas&Fire
APPROVALS
Suppression Approval
FINISHES - BULK MATERIAL RFQ , SUBMITTALS & APPROVALS
NECP-Rebase_06Sep12-4.PR.MTS.6
FINISHES - BULK MATERIAL
NEPRMTS680
RFQ , SUBMITTALS
Signages
& APPROVALS
& Wayfinding
14
01-Apr-12
16-Apr-12
20-Mar-13
04-Apr-13
541
223
13-Sep-11
04-Jun-13
21-Nov-11
31-Jan-13
20-Oct-13
54
117
61
13-Sep-11
26-Jan-12
21-Nov-11
31-Jan-13
11-Apr-13
134
21
7
0%
21
7
06-Oct-11
06-Oct-11
30-Oct-11
13-Oct-11
31-Jan-13
31-Jan-13
24-Feb-13
07-Feb-13
103
103
14
0%
14
15-Oct-11
30-Oct-11
09-Feb-13
24-Feb-13
103
72
14
50%
13
7
29-Sep-11
29-Sep-11
21-Dec-11
15-Oct-11
14-May-12
14-May-12
31-Jan-13
31-Jan-13
14-Feb-13
07-Feb-13
32
23
14
10%
13
06-Dec-11
21-Dec-11
30-Jul-12
31-Jan-13
14-Feb-13
32
26
5
15%
61
4
29-Oct-11
06-Nov-11
27-Nov-11
10-Nov-11
09-May-12
09-May-12
31-Jan-13
31-Jan-13
11-Apr-13
05-Feb-13
87
109
14
0%
14
12-Nov-11
27-Nov-11
05-Feb-13
21-Feb-13
109
18-Mar-13
167
NECP-Rebase_06Sep12-4.PR.MTS.6
FINISHES - BULK MATERIAL
NEPRMTS730
RFQ , SUBMITTALS
Signages
& APPROVALS
& Wayfinding Approval
168
NECP-Rebase_06Sep12-4.PR.MTS.6
FINISHES - BULK MATERIAL
NEPRMTS2760
RFQ , SUBMITTALS
Assumed
& APPROVALS
ASTAD CR Issuance date: 18Mar13 - Change Specs for Barriers/Bollards/Column
0
0% Protectors
0
169
NECP-Rebase_06Sep12-4.PR.MTS.6
FINISHES - BULK MATERIAL
NEPRMTS660
RFQ , SUBMITTALS
Stainless
& APPROVALS
Steel Barriers/Bollards (CR awaited from ASTAD)
0%
29-Oct-11
05-Nov-11
19-Mar-13
26-Mar-13
87
170
NECP-Rebase_06Sep12-4.PR.MTS.6
FINISHES - BULK MATERIAL
NEPRMTS670
RFQ , SUBMITTALS
Stainless
& APPROVALS
Steel Column Protectors (CR awaited from ASTAD)
0%
29-Oct-11
05-Nov-11
19-Mar-13
26-Mar-13
87
171
NECP-Rebase_06Sep12-4.PR.MTS.6
FINISHES - BULK MATERIAL
NEPRMTS710
RFQ , SUBMITTALS
Stainless
& APPROVALS
Steel Barriers/Bollards Approval (CR awaited from ASTAD)
14
0%
14
06-Nov-11
21-Nov-11
27-Mar-13
11-Apr-13
87
NECP-Rebase_06Sep12-4.PR.MTS.6
FINISHES - BULK MATERIAL
NEPRMTS720
RFQ , SUBMITTALS
Stainless
& APPROVALS
Steel Column Protectors Approval (CR awaited from ASTAD)
14
0%
14
06-Nov-11
21-Nov-11
172
173
174
27-Mar-13
11-Apr-13
87
04-Jun-12
29-Jul-12
31-Jan-13
31-Jan-13
24-Feb-13
14-Feb-13
174
30
Assumed ASTAD CR Issuance date: 18Mar13 - Change Specs for Barriers/Bollards/Column Protectors
AHUs Approval (Rejected Vendor: Johnson Control-York; see Act ID NEPRMTS1666 Approve New Vendor: Euroclima)
175
NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS830
ITEMS SUBMITTALS
Duct Mounted
& APPROVALS
Extract Fans Approval
14
10%
13
28-Dec-11
12-Jan-12
12-Nov-12
31-Jan-13
14-Feb-13
47
176
NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS840
ITEMS SUBMITTALS
Jet Fans
& APPROVALS
Approval
14
10%
13
28-Dec-11
12-Jan-12
12-Nov-12
31-Jan-13
14-Feb-13
62
177
NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS1840
ITEMS SUBMITTALS
Sewage
& APPROVALS
Ejector Pumps Approval
14
10%
13
04-Jan-12
19-Jan-12
04-Jun-12
31-Jan-13
14-Feb-13
157
178
NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS740
ITEMS SUBMITTALS
Sound&Attenuators
APPROVALS
0%
06-Dec-11
11-Dec-11
31-Jan-13
05-Feb-13
41
179
NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS760
ITEMS SUBMITTALS
Air Curtain
& APPROVALS
0%
20-Dec-11
27-Dec-11
31-Jan-13
07-Feb-13
52
180
NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS1810
ITEMS SUBMITTALS
Water&Filter
APPROVALS
Pumps
0%
04-Jan-12
10-Jan-12
31-Jan-13
06-Feb-13
55
181
NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS1820
ITEMS SUBMITTALS
Condensate
& APPROVALS
Pumps
0%
04-Jan-12
10-Jan-12
31-Jan-13
06-Feb-13
55
Condensate Pumps
182
NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS800
ITEMS SUBMITTALS
Sound&Attenuators
APPROVALS
Approval
14
0%
14
12-Dec-11
27-Dec-11
06-Feb-13
21-Feb-13
41
183
NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS1870
ITEMS SUBMITTALS
Water&Filter
APPROVALS
Pumps Approval
14
0%
14
11-Jan-12
26-Jan-12
07-Feb-13
23-Feb-13
175
184
NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS1880
ITEMS SUBMITTALS
Condensate
& APPROVALS
Pumps Approval
14
0%
14
11-Jan-12
26-Jan-12
07-Feb-13
23-Feb-13
55
185
NECP-Rebase_06Sep12-4.PR.MTS.9
MECHANICAL - LONG LEAD
NEPRMTS820
ITEMS SUBMITTALS
Air Curtain
& APPROVALS
Approval
14
0%
14
28-Dec-11
12-Jan-12
09-Feb-13
24-Feb-13
52
79
7
40%
39
4
13-Sep-11
21-Sep-11
13-Dec-11
28-Sep-11
21-Nov-11
23-Nov-11
31-Jan-13
31-Jan-13
17-Mar-13
05-Feb-13
1
22
186
187
188
NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS970
ITEMS SUBMITTALS
Telemetry/Scada
& APPROVALS
(BMS) & Accessories
40%
20-Nov-11
27-Nov-11
03-Jan-12
31-Jan-13
05-Feb-13
11
189
NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS990
ITEMS SUBMITTALS
Parking
& APPROVALS
Guidance System & Accessories
40%
20-Nov-11
24-Nov-11
05-Dec-11
31-Jan-13
03-Feb-13
190
NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS930
ITEMS SUBMITTALS
LV Cables
& APPROVALS
& Accessories
0%
25
08-Oct-11
12-Oct-11
02-May-12
31-Jan-13
28-Feb-13
191
NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS950
ITEMS SUBMITTALS
Light &
Fittings
APPROVALS
& Accessories
0%
14
19-Oct-11
26-Oct-11
21-Nov-11
31-Jan-13
16-Feb-13
192
NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS1150
ITEMS SUBMITTALS
Parking
& APPROVALS
Guidance System & Accessories Approval
14
0%
14
26-Nov-11
11-Dec-11
04-Feb-13
19-Feb-13
193
NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS1040
ITEMS SUBMITTALS
MV Panels
& APPROVALS
& Accessories Approval
14
0%
14
29-Sep-11
15-Oct-11
05-Feb-13
21-Feb-13
22
194
NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS1130
ITEMS SUBMITTALS
Telemetry/Scada
& APPROVALS
(BMS) & Accessories Approval
14
0%
14
28-Nov-11
13-Dec-11
05-Feb-13
21-Feb-13
11
195
NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS1110
ITEMS SUBMITTALS
Light &
Fittings
APPROVALS
& Accessories Approval
14
0%
14
27-Oct-11
12-Nov-11
17-Feb-13
04-Mar-13
196
NECP-Rebase_06Sep12-4.PR.MTS.11
ELECTRICAL - LONG LEAD
NEPRMTS1090
ITEMS SUBMITTALS
LV Cables
& APPROVALS
& Accessories Approval
14
0%
14
13-Oct-11
29-Oct-11
05-Jul-12
02-Mar-13
17-Mar-13
197
198
IFC-9 DRAWINGS (ASTAD Letter 0295-13 dtd 04Feb13): Re-Submittals & Approvals
79
NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS1010
Letter 0295-13 dtd Distribution
04Feb13): Re-Submittals
Boards & Accessories
& Approvals
(w/ Substation Issue in UB Slab Area 13) 7
42.86%
32
4
13-Sep-11
29-Sep-11
13-Dec-11
06-Oct-11
23-Nov-11
23-Nov-11
31-Jan-13
31-Jan-13
09-Mar-13
04-Feb-13
0
0
199
NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS1140
Letter 0295-13 dtd Security
04Feb13):
System
Re-Submittals
& Accessories
& Approvals
Approval
14
10%
13
28-Nov-11
13-Dec-11
22-Nov-12
11-Feb-13
25-Feb-13
200
NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS860
Letter 0295-13 dtd HV
04Feb13):
Switchgear
Re-Submittals
& Accessories
& Approvals
0%
18
13-Sep-11
20-Sep-11
24-Nov-11
31-Jan-13
20-Feb-13
201
NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS940
Letter 0295-13 dtd Bus
04Feb13):
Ducts/Bus
Re-Submittals
Bars & Accessories
& Approvals
0%
13-Oct-11
18-Oct-11
26-Nov-11
31-Jan-13
10-Feb-13
202
NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS980
Letter 0295-13 dtd Security
04Feb13):
System
Re-Submittals
& Accessories
& Approvals
0%
20-Nov-11
27-Nov-11
203
NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS1170
Letter 0295-13 dtd Distribution
04Feb13): Re-Submittals
Boards & Accessories
& Approvals
Approval (w/ Substation Issue in UB Slab Area
14 13)
0%
14
08-Oct-11
23-Oct-11
204
NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS1100
Letter 0295-13 dtd Bus
04Feb13):
Ducts/Bus
Re-Submittals
Bars & Accessories
& Approvals
Approval
14
0%
14
19-Oct-11
03-Nov-11
205
NECP-Rebase_06Sep12-4.PR.MTS.11.1
IFC-9 DRAWINGS (ASTAD
NEPRMTS1020
Letter 0295-13 dtd HV
04Feb13):
Switchgear
Re-Submittals
& Accessories
& Approvals
Approval
14
0%
14
21-Sep-11
06-Oct-11
206
207
Await Reply from ASTAD re: Terna Letter 112/113 dtd 06Jan13, Assumed ASTAD Approval Date: 06Mar13
NECP-Rebase_06Sep12-4.PR.MTS.11.1.2
Await Reply from ASTAD re:
NEPRMTS985
Terna Letter 112/113
Fire
dtd
Alarm
06Jan13,
System
Assumed
& Accessories
ASTAD Approval Date: 06Mar13
21
7
100%
0
0
20-Nov-11
20-Nov-11
13-Dec-11
27-Nov-11
01-Dec-11
01-Dec-11
13-Sep-12
208
NECP-Rebase_06Sep12-4.PR.MTS.11.1.2
Await Reply from ASTAD re:
NEPRMTS1145
Terna Letter 112/113
Fire
dtd
Alarm
06Jan13,
System
Assumed
& Accessories
ASTAD Approval Date: 06Mar13
14
100%
28-Nov-11
13-Dec-11
14-Sep-12
10-Jan-13
209
NECP-Rebase_06Sep12-4.PR.MTS.11.1.2
Await Reply from ASTAD re:
NEENSDS1690
Terna Letter 112/113
Await
dtd ASTAD
06Jan13,
Reply
Assumed
to Terna
ASTAD
LetterApproval
112/113,Date:
Assumed
06Mar13
Approval: 06Mar13
0%
0
20-Jun-12
210
211
212
MATERIAL PROCUREMENT
CIVIL - BULK MATERIALS - RELEASE OF ORDER FOR VENDOR/SUPPLIER/MANUFACTURER
NECP-Rebase_06Sep12-4.PR.MT.BM
CIVIL - BULK MATERIALSNEPRMTS1300
- RELEASE OF ORDER
PO for
FOR
Heavy
VENDOR/SUPPLIER/MANUFACTURER
Duty Rubber Vehicle Stoppers
420
223
01-Feb-12
04-Jun-13
10
10
6
6
19-Mar-12
19-Mar-12
29-Mar-12
29-Mar-12
0%
03-Dec-11
03-Dec-12
31-Jan-13
10-Feb-13
05-Feb-13
20-Feb-13
11-Feb-13
26-Feb-13
21-Feb-13
09-Mar-13
06-Mar-13
06-Mar-13
Distribution Boards & Accessories Approval (w/ Substation Issue in UB Slab Area 13)
Bus Ducts/Bus Bars & Accessories Approval
HV Switchgear & Accessories Approval
31-Jan-13
20-Oct-13
54
25-Feb-13
25-Feb-13
03-Mar-13
03-Mar-13
103
103
Oct
NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1270
Sep
NECP-Rebase_06Sep12-4.EN.SDS.4.2
UPPER BASEMENT
NEENSDS1100
Aug
119
130
131
2014
Jul
31-Jan-13
17-Apr-13
29-Nov-12
29-Nov-12
Jun
120
129
Nov
Dec
Jan
Feb
WBS
WBS Name
Activity ID
Activity Name
BL Project
Duration
Activity % Remaining
Complete Duration
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
90
90
0%
90
90
05-May-12
05-May-12
16-Aug-12
16-Aug-12
04-Mar-13
04-Mar-13
16-Jun-13
16-Jun-13
103
103
213
214
215
216
217
NECP-Rebase_06Sep12-4.PR.MT.2
MECHANICAL - BULK MATERIALS
NEPRMTS1360
- RELEASEPO
OFfor
ORDER
Ductile FOR
Iron Pipes
VENDOR/SUPPLIER/MANUFACTURER
& Fittings
Actual Start
Actual
Finish
133
6
13-May-12
26-May-12
10-Jun-12
10-Jun-12
31-Jan-13
31-Jan-13
04-Jul-13
06-Feb-13
23
37
14
0%
13-May-12
28-May-12
29-Jun-13
04-Jul-13
23
218
219
182
90
50%
223
30
14-Feb-12
14-Feb-12
12-Sep-12
28-May-12
20-Jun-12
09-Nov-12
31-Jan-13
31-Jan-13
20-Oct-13
06-Mar-13
23
57
220
NECP-Rebase_06Sep12-4.PR.MT.3
MECHANICAL - BULK MATERIALS
NEPRMTS1470
- MANUFACTURING
Manufacture
&&
DELIVERY
Deliver AC Ducts & Accessories
75
50%
38
22-May-12
16-Aug-12
13-Aug-12
31-Jan-13
16-Mar-13
102
221
NECP-Rebase_06Sep12-4.PR.MT.3
MECHANICAL - BULK MATERIALS
NEPRMTS1435
- MANUFACTURING
Manufacture
&&
DELIVERY
Deliver Copper Pipes & Fittings
90
50%
45
31-May-12
12-Sep-12
20-Jun-12
31-Jan-13
24-Mar-13
180
222
NECP-Rebase_06Sep12-4.PR.MT.3
MECHANICAL - BULK MATERIALS
NEPRMTS1450
- MANUFACTURING
Manufacture
&&
DELIVERY
Deliver GRP Pipes & Fittings
75
20%
60
04-Jun-12
29-Aug-12
16-Jan-13
31-Jan-13
10-Apr-13
186
223
NECP-Rebase_06Sep12-4.PR.MT.3
MECHANICAL - BULK MATERIALS
NEPRMTS1440
- MANUFACTURING
Manufacture
&&
DELIVERY
Deliver Extra Strength Vitrified Clay (ESVC) Pipes & Fittings (Changed
75
to 0%
GRP by ASTAD)
75
11-Jun-12
05-Sep-12
07-Feb-13
05-May-13
37
224
NECP-Rebase_06Sep12-4.PR.MT.3
MECHANICAL - BULK MATERIALS
NEPRMTS1480
- MANUFACTURING
Manufacture
&&
DELIVERY
Deliver FM200 Gas Fire Suppression
60
0%
60
08-Apr-12
16-Jun-12
14-Feb-13
25-Apr-13
32
NECP-Rebase_06Sep12-4.PR.MT.3
MECHANICAL - BULK MATERIALS
NEPRMTS1430
- MANUFACTURING
Manufacture
&&
DELIVERY
Deliver Ductile Iron Pipes & Fittings (Extl Fire Line)
225
90
0%
90
29-May-12
10-Sep-12
06-Jul-13
20-Oct-13
23
226
227
90
14
0%
16
6
25-Nov-12
25-Nov-12
09-Mar-13
10-Dec-12
02-May-13
02-May-13
20-May-13
09-May-13
99
109
228
NECP-Rebase_06Sep12-4.PR.MT.6
FINISHES - BULK MATERIALS
NEPRMTS1570
- RELEASE OFPO
ORDER
for Stainless
FOR VENDOR/SUPPLIER/MANUFACTURER
Steel Barriers/Bollards
14
0%
05-Feb-13
20-Feb-13
07-May-13
13-May-13
87
229
NECP-Rebase_06Sep12-4.PR.MT.6
FINISHES - BULK MATERIALS
NEPRMTS1580
- RELEASE OFPO
ORDER
for Stainless
FOR VENDOR/SUPPLIER/MANUFACTURER
Steel Column Protectors
14
0%
21-Feb-13
09-Mar-13
14-May-13
20-May-13
87
04-Jun-13
27-May-12
16-Aug-12
19-Oct-12
06-Feb-13
06-Feb-13
15-Aug-13
04-Mar-13
108
71
16-Aug-12
2013
Jan
Feb
Mar
Apr
May
Manufacture & Deliver Extra Strength Vitrified Clay (ESVC) Pipes & Fittings (Changed to GRP by ASTAD)
Manufacture & Deliver FM200 Gas Fire Suppression
Manufacture & Deliver Ductile Iron Pipes & Fittings (Extl Fire Line)
PO for Signages & Wayfinding
PO for Stainless Steel Barriers/Bollards
PO for Stainless Steel Column Protectors
NECP-Rebase_06Sep12-4.PR.MT.7
FINISHES - BULK MATERIALS
NEPRMTS1610
- MANUFACTURING
Manufacture
& DELIVERY
& Deliver Tiling Materials
60
25%
34
31-Mar-12
07-Jun-12
14-Mar-13
22-Apr-13
57
233
NECP-Rebase_06Sep12-4.PR.MT.7
FINISHES - BULK MATERIALS
NEPRMTS1620
- MANUFACTURING
Manufacture
& DELIVERY
& Deliver Stainless Steel Barriers/Bollards
75
0%
75
21-Feb-13
19-May-13
14-May-13
08-Aug-13
93
234
NECP-Rebase_06Sep12-4.PR.MT.7
FINISHES - BULK MATERIALS
NEPRMTS1630
- MANUFACTURING
Manufacture
& DELIVERY
& Deliver Stainless Steel Column Protectors
75
0%
75
10-Mar-13
04-Jun-13
21-May-13
15-Aug-13
87
NECP-Rebase_06Sep12-4.PR.MT.7
FINISHES - BULK MATERIALS
NEPRMTS1640
- MANUFACTURING
Manufacture
& DELIVERY
& Deliver Signages & Wayfinding
70
15-Jan-13
06-Apr-13
26-May-13
15-Aug-13
109
11-Feb-13
21-Mar-13
11-Feb-13
-33
-33
0%
33
0
238
NECP-Rebase_06Sep12-4.PR.MT.9
MECHANICAL - LONG LEAD
NEPRMTS1664
ITEMS - RELEASE
Re-submit
OF ORDER
AHU FOR
New Vendor
VENDOR/SUPPLIER/MANUFACTURER
(Euroclima)
0%
15
11-Feb-13
28-Feb-13
-33
239
NECP-Rebase_06Sep12-4.PR.MT.9
MECHANICAL - LONG LEAD
NEPRMTS1666
ITEMS - RELEASE
Approve
OF ORDER
AHU New
FOR
Vendor
VENDOR/SUPPLIER/MANUFACTURER
(Euroclima)
0%
14
28-Feb-13
17-Mar-13
-33
240
NECP-Rebase_06Sep12-4.PR.MT.9
MECHANICAL - LONG LEAD
NEPRMTS1668
ITEMS - RELEASE
POOF
for AHU
ORDER
NewFOR
Vendor
VENDOR/SUPPLIER/MANUFACTURER
(Euroclima)
0%
17-Mar-13
21-Mar-13
-33
238
120
10-Mar-12
10-Mar-12
11-Dec-12
26-Jul-12
09-Nov-12
09-Nov-12
31-Jan-13
31-Jan-13
08-Aug-13
10-Apr-13
63
85
110
50%
162
60
243
NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1960
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Sewage Ejector Pumps (Faisal)
120
50%
60
24-Mar-12
09-Aug-12
09-Nov-12
31-Jan-13
10-Apr-13
244
NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1970
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Stormwater Pumps (Faisal)
120
50%
60
07-Apr-12
23-Aug-12
09-Nov-12
31-Jan-13
10-Apr-13
110
245
NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1980
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Booster Pumps (Faisal)
120
50%
60
07-Apr-12
23-Aug-12
09-Nov-12
31-Jan-13
10-Apr-13
165
246
NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1950
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Fire Pumps (NAFFCO)
180
10%
162
24-Mar-12
18-Oct-12
18-Jan-13
31-Jan-13
07-Aug-13
63
247
NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1740
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Duct Mounted Extract Fans (Techview)
60
0%
60
11-Apr-12
19-Jun-12
14-Feb-13
25-Apr-13
47
248
NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1750
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Jet Fans (Techview)
90
0%
60
19-Apr-12
01-Aug-12
14-Feb-13
25-Apr-13
90
249
NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1710
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Sound Attenuators (Techview)
60
0%
60
11-Apr-12
19-Jun-12
23-Feb-13
02-May-13
41
250
NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1990
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Water Filter Pumps (Faisal), Not Long Lead Item
120
0%
30
25-Jul-12
11-Dec-12
24-Feb-13
30-Mar-13
175
Manufacture & Deliver Water Filter Pumps (Faisal), Not Long Lead Item
251
NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS2000
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Condensate Pumps (Techview), Not Long Lead Item 70
0%
30
25-Jul-12
14-Oct-12
24-Feb-13
30-Mar-13
113
Manufacture & Deliver Condensate Pumps (Techview), Not Long Lead Item
NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1730
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver Air Curtain (Berner)
120
0%
25-Feb-13
09-Jun-13
52
NECP-Rebase_06Sep12-4.PR.MT.10
MECHANICAL - LONG LEAD
NEPRMTS1720
ITEMS - MANUFACTURING
Manufacture && DELIVERY
Deliver AHUs (New Vendor: Euroclima)
120
21-Mar-13
08-Aug-13
09-Mar-13
09-Mar-13
06-Apr-13
14-Mar-13
0
0
16-Mar-13
21-Mar-13
252
253
254
255
256
257
258
259
90
19-Apr-12
0%
120
19-Apr-12
05-Sep-12
18
6
11-Apr-12
11-Apr-12
01-May-12
17-Apr-12
25-Sep-12
0%
25
6
0%
25-Sep-12
05-Sep-12
24-Apr-12
01-May-12
0%
24-Apr-12
01-May-12
333
150
50%
206
75
01-Feb-12
26-Feb-12
23-Feb-13
18-Aug-12
31-Jul-12
31-Jul-12
75
26-Feb-12
18-Aug-12
31-Jul-12
31-Jan-13
28-Apr-13
86
10%
81
24-Apr-12
19-Nov-12
25-Sep-12
16-May-13
18-Aug-13
56
262
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2180
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Transformer & Accessories (Eng'g Supplies) (w/ Substation
180
Issue5%
by Kahramaa)
171
01-Feb-12
28-Aug-12
28-Jan-13
31-Jan-13
18-Aug-13
45
263
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2200
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Generators & Accessories (Qatar Site Power)
210
5%
114
18-Feb-12
18-Oct-12
21-Jan-13
31-Jan-13
12-Jun-13
106
264
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2320
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Photo Voltaic System & Accessories (Enviromena)
120
0%
60
08-May-12
24-Sep-12
31-Jan-13
10-Apr-13
80
265
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2210
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Distribution Boards & Accessories (Al Naema)
90
0%
120
26-Apr-12
08-Aug-12
21-Feb-13
10-Jul-13
266
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2305
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Fire Alarm System & Accessories (NAFFCO)
90
0%
90
11-Nov-12
23-Feb-13
07-Mar-13
19-Jun-13
30
267
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2170
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver HV Switchgear & Accessories (Gulf Lights) (w/ Substation
180 Issue by
0%Kahramaa)
150
01-Feb-12
28-Aug-12
10-Mar-13
31-Aug-13
268
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2270
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Light Fittings & Accessories (w/ IFC-9 Drawings issue)
120
0%
120
18-Apr-12
04-Sep-12
16-Mar-13
01-Aug-13
269
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2190
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver MV Panels & Accessories (Al Naema)
150
0%
120
09-Feb-12
01-Aug-12
19-Mar-13
05-Aug-13
270
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2300
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Security System & Accessories (CHIP)
90
0%
90
02-May-12
14-Aug-12
23-Mar-13
04-Jul-13
271
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2260
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Bus Ducts/Bus Bars & Accessories (Gulf Lights)
90
0%
90
11-Apr-12
24-Jul-12
24-Mar-13
06-Jul-13
272
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2240
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver HV Cables & Accessories (Elsewedy) (w/ IFC-9 Drawings
120 issue) 0%
90
25-Mar-12
11-Aug-12
25-Mar-13
07-Jul-13
273
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2250
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver LV Cables & Accessories (Elsewedy) (w/ IFC-9 Drawings
90 issue) 0%
90
04-Apr-12
17-Jul-12
03-Apr-13
16-Jul-13
274
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2290
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Telemetry/Scada (BMS) & Accessories (Siemens)
150
02-May-12
14-Aug-12
07-Apr-13
28-Sep-13
277
278
0%
90
30-Apr-12
12-Aug-12
156
04-Jun-12
04-May-13
19-Jun-12
11-Dec-12
11-Dec-12
150
0
0%
112
0
279
NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2520
ITEMS DELIVERY
Condensate
MILESTONES
Pumps (Techview)
0%
280
NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2460
ITEMS DELIVERY
Sump
MILESTONES
Pumps (Faisal)
0%
281
NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2480
ITEMS DELIVERY
Sewage
MILESTONES
Ejector Pumps (Faisal)
0%
282
NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2490
ITEMS DELIVERY
Stormwater
MILESTONES
Pumps (Faisal)
283
NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2500
ITEMS DELIVERY
Booster
MILESTONES
Pumps (Faisal)
284
23-Apr-12
12-Jun-13
24-Sep-13
30-Mar-13
28-Sep-13
21
30-Mar-13
08-Aug-13
30-Mar-13
63
175
14-Oct-12
30-Mar-13
113
26-Jul-12
10-Apr-13
85
09-Aug-12
10-Apr-13
110
0%
23-Aug-12
10-Apr-13
110
0%
23-Aug-12
10-Apr-13
165
NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2440
ITEMS DELIVERY
Duct
MILESTONES
Mounted Extract Fans (Techview)
0%
19-Jun-12
25-Apr-13
47
285
NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2450
ITEMS DELIVERY
JetMILESTONES
Fans (Techview)
0%
01-Aug-12
25-Apr-13
90
286
NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2410
ITEMS DELIVERY
Sound
MILESTONES
Attenuators (Techview)
0%
19-Jun-12
02-May-13
41
287
NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2430
ITEMS DELIVERY
AirMILESTONES
Curtain (Berner)
0%
05-Sep-12
09-Jun-13
52
288
NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2470
ITEMS DELIVERY
Fire
MILESTONES
Pumps (NAFFCO)
0%
18-Oct-12
07-Aug-13
63
289
NECP-Rebase_06Sep12-4.PR.DM.1
MECHANICAL - LONG LEAD
NEPRMTS2420
ITEMS DELIVERY
AHUs
MILESTONES
(New Vendor: Euroclima)
0%
05-Sep-12
08-Aug-13
249
0
0%
146
0
28-Sep-13
10-Apr-13
21
80
290
291
90
286
50%
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2310
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Parking Guidance System & Accessories (CHIP)
180
21
65
150
276
06-Apr-13
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2280
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver UPS/Battery System & Accessories (Gulf Lights)
275
28-Sep-13
28-Apr-13
NECP-Rebase_06Sep12-4.PR.MT.12
ELECTRICAL - LONG LEAD
NEPRMTS2230
ITEMS - MANUFACTURING
Manufacture&&DELIVERY
Deliver Escalators & Accessories (Schindler)
0%
31-Jan-13
31-Jan-13
261
90
31-Mar-13
260
17-Jul-12
04-May-13
24-Sep-12
10-Apr-13
292
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2580
ITEMS DELIVERYElevators
MILESTONES
& Accessories (Schindler)
0%
18-Aug-12
65
293
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2590
ITEMS DELIVERYEscalators
MILESTONES
& Accessories (Schindler)
0%
18-Aug-12
28-Apr-13
86
294
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2560
ITEMS DELIVERYGenerators
MILESTONES
& Accessories (Qatar Site Power)
0%
18-Oct-12
12-Jun-13
106
295
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2665
ITEMS DELIVERYFire
MILESTONES
Alarm System & Accessories (NAFFCO)
0%
04-May-13
19-Jun-13
30
296
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2660
ITEMS DELIVERYSecurity
MILESTONES
System & Accessories (CHIP)
0%
14-Aug-12
04-Jul-13
297
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2620
ITEMS DELIVERYBus
MILESTONES
Ducts/Bus Bars & Accessories (Gulf Lights)
0%
24-Jul-12
06-Jul-13
298
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2600
ITEMS DELIVERYHV
MILESTONES
Cables & Accessories (Elsewedy)
0%
11-Aug-12
07-Jul-13
299
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2570
ITEMS DELIVERYDistribution
MILESTONES
Boards & Accessories (Al Naema)
0%
08-Aug-12
10-Jul-13
300
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2610
ITEMS DELIVERYLVMILESTONES
Cables & Accessories (Elsewedy)
0%
17-Jul-12
16-Jul-13
301
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2630
ITEMS DELIVERYLight
MILESTONES
Fittings & Accessories
0%
04-Sep-12
04-Aug-13
302
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2550
ITEMS DELIVERYMV
MILESTONES
Panels & Accessories (Al Naema)
0%
01-Aug-12
05-Aug-13
303
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2540
ITEMS DELIVERYTransformer
MILESTONES
& Accessories (Eng'g Supplies) (w/ Substation Issue by Kahramaa)
0
0%
28-Aug-12
18-Aug-13
45
304
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2640
ITEMS DELIVERYUPS/Battery
MILESTONES
System & Accessories (Gulf Lights)
0%
19-Nov-12
18-Aug-13
56
305
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2530
ITEMS DELIVERYHV
MILESTONES
Switchgear & Accessories (Gulf Lights) (w/ Substation Issue by Kahramaa)0
0%
28-Aug-12
31-Aug-13
306
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2670
ITEMS DELIVERYParking
MILESTONES
Guidance System & Accessories (CHIP)
0%
12-Aug-12
24-Sep-13
307
NECP-Rebase_06Sep12-4.PR.DM.2
ELECTRICAL - LONG LEAD
NEPRMTS2650
ITEMS DELIVERYTelemetry/Scada
MILESTONES (BMS) & Accessories (Siemens)
0%
14-Aug-12
28-Sep-13
245
0
0
0
01-May-13
14
100%
308
309
04-Jun-12
17-Mar-13
17-Mar-13
28-Apr-13
23-Apr-12
01-May-13
23-Apr-12
310
NECP-Rebase_06Sep12-4.PR.DM.3
FINISHES - LONG LEAD NEPRMTS2690
ITEMS DELIVERY MILESTONES
Aluminum Chaotic Facade (Alumco)
0%
17-Jul-12
01-May-13
14
311
NECP-Rebase_06Sep12-4.PR.DM.3
FINISHES - LONG LEAD NEPRMTS2700
ITEMS DELIVERY MILESTONES
Glazing (Curtain Wall, Sliding Doors, Edge Glass, Rooflights) (Alumco)
0%
12-Jun-12
01-May-13
14
312
NECP-Rebase_06Sep12-4.PR.DM.3
FINISHES - LONG LEAD NEPRMTS2710
ITEMS DELIVERY MILESTONES
Aluminum/Steel Doors (by S/C), Louver Screens (Alumco)
0%
04-Jun-12
01-May-13
313
323
98
08-Dec-11
19-Dec-12
12-Feb-12
31-Jan-13
26-May-13
109
323
0
08-Dec-11
08-Dec-11
19-Dec-12
12-Feb-12
12-Feb-12
31-Jan-13
26-May-13
109
100%
98
0
Tiles, Wall
0%
14
22-Mar-12
22-Mar-12
31-Jan-13
16-Feb-13
57
Tiles, Wall
0%
14
11-Mar-12
11-Mar-12
31-Jan-13
16-Feb-13
85
NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS260
0%
14
14-Feb-12
14-Feb-12
31-Jan-13
16-Feb-13
73
NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS290
Gypsum Ceiling
0%
14
11-Mar-12
11-Mar-12
31-Jan-13
16-Feb-13
20
Gypsum Ceiling
320
NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS130
Toilet Tiles
0%
14
22-Mar-12
22-Mar-12
17-Feb-13
04-Mar-13
57
Toilet Tiles
321
NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS230
Tactile Tiles
0%
14
22-Mar-12
22-Mar-12
17-Feb-13
04-Mar-13
85
Tactile Tiles
322
NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS310
0%
14
11-Mar-12
11-Mar-12
17-Feb-13
04-Mar-13
20
MOCK UPS
314
315
316
NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS80
317
NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS210
318
319
Concrete Formwork
Dec
232
241
242
Nov
19-Mar-12
19-Mar-12
70
Oct
164
23
0%
Sep
25%
0
0
Aug
380
60
Jul
PO for Extra Strength Vitrified Clay (ESVC) Pipes & Fittings (Changed to GRP by ASTAD)
236
237
2014
Jun
230
231
235
Jan
Feb
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
323
NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS140
0%
14
31-Mar-12
31-Mar-12
05-Mar-13
20-Mar-13
57
324
NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS240
0%
14
22-Mar-12
22-Mar-12
05-Mar-13
20-Mar-13
85
325
NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS250
0%
14
22-Mar-12
22-Mar-12
05-Mar-13
20-Mar-13
85
326
NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS320
Alucore Ceiling
0%
14
29-Feb-12
29-Feb-12
05-Mar-13
20-Mar-13
20
Alucore Ceiling
327
NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS270
0%
14
22-Mar-12
22-Mar-12
21-Mar-13
06-Apr-13
57
328
NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS200
GRC
0%
14
31-Mar-12
31-Mar-12
07-Apr-13
22-Apr-13
57
NECP-Rebase_06Sep12-4.PR.1.1
MOCK UPS - COMPLETION/APPROVAL
NEPRMTS330
0%
14
19-Dec-12
19-Dec-12
09-May-13
26-May-13
109
34
30-Oct-11
29-Dec-12
13-Dec-12
31-Jan-13
11-Mar-13
82
13-Dec-12
329
330
331
WBS
WBS Name
Activity ID
Activity Name
366
34
30-Oct-11
29-Dec-12
10
10
02-Dec-12
02-Dec-12
12-Dec-12
12-Dec-12
366
Pre-qualification of Subcontractor - BMS Approval (same as Telemetry by Siemens)
14
50%
34
7
30-Oct-11
30-Oct-11
29-Dec-12
14-Nov-11
NECP-Rebase_06Sep12-4.SC.1.2
PRE-QUALIFICATION APPROVALS
NESBPQS200
50%
15-Dec-11
21-Jan-13
NECP-Rebase_06Sep12-4.SC.1.2
PRE-QUALIFICATION APPROVALS
NESBPQS190
14
0%
14
13-Nov-11
28-Nov-11
25-Dec-12
NECP-Rebase_06Sep12-4.SC.1.2
PRE-QUALIFICATION APPROVALS
NESBPQS230
14
0%
14
13-Dec-12
29-Dec-12
24
10
100%
21
0
26-Dec-11
26-Dec-11
22-Jan-12
05-Jan-12
13-Dec-12
13-Dec-12
14
50%
0%
334
335
PRE-QUALIFICATION APPROVALS
NECP-Rebase_06Sep12-4.SC.1.2
PRE-QUALIFICATION APPROVALS
NESBPQS180
336
337
338
342
343
344
345
Actual Start
0%
PRE-QUALIFICATION OF SUBCONTRACTORS
PRE-QUALIFICATION SUBMITTALS
NECP-Rebase_06Sep12-4.SC.1.PQS
PRE-QUALIFICATION SUBMITTALS
NESBPQS120
341
Activity % Remaining
Complete Duration
366
332
333
339
340
BL Project
Duration
SUBCONTRACTING
CHANGE IN MANUFACTURER by ASTAD (Terna Letter 0118 dtd 24Jan13): Re-Submittals & Approvals
NECP-Rebase_06Sep12-4.SC.1.1
CHANGE IN MANUFACTURER
NESBPQS110
by ASTAD (Terna
Pre-qualification
Letter 0118 dtd
of Subcontractor
24Jan13): Re-Submittals
- Security System
& Approvals
(CHIP)
NECP-Rebase_06Sep12-4.SC.1.1
CHANGE IN MANUFACTURER
NESBPQS220
by ASTAD (Terna
Pre-qualification
Letter 0118 dtd
of Subcontractor
24Jan13): Re-Submittals
- Security System
& Approvals
Approval (CHIP)
NECP-Rebase_06Sep12-4.SC.1.1
CHANGE IN MANUFACTURER
NESBPQS250
by ASTAD (Terna
Await
Letter
Reply
0118
to Terna
dtd 24Jan13):
Letter 118,
Re-Submittals
Assumed Approval:
& Approvals
24Feb13
10
10
30-Nov-11
Actual
Finish
24-Dec-12
24-Dec-12
31-Jan-13
11-Mar-13
82
12-Feb-13
12-Feb-13
23-Feb-13
23-Feb-13
82
82
31-Jan-13
31-Jan-13
11-Mar-13
07-Feb-13
82
43
31-Jan-13
2013
Jan
Feb
Mar
Apr
May
Aug
Sep
Oct
Nov
Dec
Jan
106
16-Feb-13
36
11-Mar-13
82
31-Jan-13
24-Feb-13
07-Feb-13
0
Pre-qualification of Subcontractor - Security System (CHIP)
07-Jan-12
22-Jan-12
25-Dec-12
31-Jan-13
24-Feb-13
22-Sep-11
29-Aug-13
22-Sep-11
19-Aug-13
08-Jan-14
10
255
16-Jan-12
09-Nov-12
22-Feb-12
605
119
22-Sep-11
29-Aug-13
22-Sep-11
19-Aug-13
08-Jan-14
10
538
0
25-Oct-11
13-Jul-13
28-Nov-12
25-Oct-11
100%
116
0
25-Oct-11
14
15-Sep-12
346
347
348
NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO40
100%
349
NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO120
100%
29-Sep-12
350
NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO100
0%
03-Jan-13
19-Aug-13
11
351
NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO20
0%
11-Jun-13
15-Oct-13
82
352
NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO70
0%
11-Jun-13
15-Oct-13
82
353
NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO110
0%
11-Jun-13
15-Oct-13
82
354
NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO130
0%
11-Jun-13
15-Oct-13
82
355
NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO140
0%
11-Jun-13
15-Oct-13
82
356
NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO60
0%
22-Jun-13
02-Dec-13
37
357
NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO80
0%
03-Jan-13
04-Dec-13
30
358
NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO30
0%
22-Jun-13
11-Dec-13
28
359
NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO90
0%
24-Jun-13
11-Dec-13
28
360
NECP-Rebase_06Sep12-4.3.ICO.1
EDUCATION CITY PROJECTS
NECOICO50
361
362
GOVERNMENT AUTHORITIES
NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO150
363
NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO180
364
NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO190
365
366
28-Nov-12
19-Aug-13
05-Jan-14
13
South Campus People Mover Station, (PMs Rail Works)
25-Oct-11
29-Sep-12
100%
100%
22-Sep-11
22-Sep-11
100%
14-Nov-11
14-Nov-11
NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO170
0%
29-Aug-13
29-Aug-13
NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO240
0%
29-Aug-13
29-Aug-13
367
NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO160
0%
11-Jun-13
15-Oct-13
82
368
NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO200
0%
11-Jun-13
15-Oct-13
82
369
NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO210
0%
12-Jan-13
12-Dec-13
32
370
NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO220
0%
27-Jun-13
15-Dec-13
30
371
NECP-Rebase_06Sep12-4.3.ICO.2
GOVERNMENT AUTHORITIES
NECOICO230
0%
16-Jul-13
08-Jan-14
10
4
372
373
CONSTRUCTION/INSTALLATION
29-Aug-13
8
10
22-Sep-11
08-Jan-14
111
0
29-Aug-13
25-Sep-11
05-Jan-14
0%
13-Jul-13
605
0
22-Sep-11
15-Dec-11
607
297
27-Sep-11
03-Sep-13
28-Dec-11
31-Jan-13
15-Jan-14
605
297
27-Sep-11
02-Sep-13
28-Dec-11
31-Jan-13
15-Jan-14
374
375
376
M2-Const. Compl. of Demol., Diversion of Exstg Services, Temp. Serv Conn., Excav Phase (1) Axis 1-29
PHASE 1 - DEWATERING
NECP-Rebase_06Sep12-4.CO.1.5.9
PHASE 1 - DEWATERINGNECOSDE100
Dewatering Works
265
265
265
72.45%
73
73
73
27-Sep-11
27-Sep-11
27-Sep-11
31-Jul-12
31-Jul-12
31-Jul-12
28-Dec-11
28-Dec-11
28-Dec-11
31-Jan-13
31-Jan-13
31-Jan-13
25-Apr-13
25-Apr-13
25-Apr-13
14
14
14
377
378
379
380
381
M3-Const. Compl. of Phase (1) Axis 1-29 RC Substruc. & Superstr. incl. Blockwork & All Reqd Services
Upper Basement Floor
PHASE 1 - UPPER BASEMENT SLABS
Area A12
NECP-Rebase_06Sep12-4.CO.1.8.2.8.12
Area A12
NECOLBSS2176
RC Suspended Slab, Upper Basement Area A12
218
211
0
0
0
29-Dec-11
29-Dec-11
08-Sep-12
30-Aug-12
30-Mar-12
30-Mar-12
05-Sep-12
05-Sep-12
05-Sep-12
31-Jan-13
31-Jan-13
31-Jan-13
31-Jan-13
31-Jan-13
26-May-13
22-Apr-13
22-Apr-13
23-Feb-13
23-Feb-13
6
33
33
42
42
PHASE 1 WORKS
Dewatering Works
0%
99
70
70
20
20
382
NECP-Rebase_06Sep12-4.CO.1.8.2.8.12
Area A12
NECOLBSS2186
0%
18
12-Sep-12
31-Jan-13
21-Feb-13
42
383
NECP-Rebase_06Sep12-4.CO.1.8.2.8.12
Area A12
NECOLBSS2196
0%
18
12-Sep-12
31-Jan-13
21-Feb-13
42
384
NECP-Rebase_06Sep12-4.CO.1.8.2.8.12
Area A12
NECOLBSS2206
Earthing conduits
0%
18
12-Sep-12
31-Jan-13
21-Feb-13
42
Earthing conduits
385
NECP-Rebase_06Sep12-4.CO.1.8.2.8.12
Area A12
NECOLBSS2216
Lighting conduits
0%
18
12-Sep-12
31-Jan-13
21-Feb-13
42
Lighting conduits
386
NECP-Rebase_06Sep12-4.CO.1.8.2.8.12
Area A12
NECOLBSS2226
0%
18
12-Sep-12
31-Jan-13
21-Feb-13
42
NECP-Rebase_06Sep12-4.CO.1.8.2.8.12
Area A12
NECOLBSS2236
Telephone conduits
12-Sep-12
Telephone conduits
387
0%
18
31-Jan-13
21-Feb-13
42
388
389
0
0
0%
21
21
05-Mar-13
05-Mar-13
28-Mar-13
28-Mar-13
0
0
390
391
0
0
0%
21
21
30-Mar-13
30-Mar-13
22-Apr-13
22-Apr-13
33
33
131
Powerfloat Concrete Finishes, Lower Basement & Upper Basement Floors 131
92.37%
10
10
29-Dec-11
29-Dec-11
29-May-12
29-May-12
30-Mar-12
30-Mar-12
12-Feb-13
12-Feb-13
23-Feb-13
23-Feb-13
76
76
6
6
0
3
3
0
24-Apr-12
24-Apr-12
30-Apr-12
30-Apr-12
95%
17-Oct-12
17-Oct-12
17-Oct-12
31-Jan-13
31-Jan-13
31-Jan-13
03-Feb-13
03-Feb-13
31-Jan-13
37
37
40
56.01%
24-Apr-12
30-Apr-12
19-Nov-12
31-Jan-13
03-Feb-13
37
0
0
0
07-Dec-12
07-Dec-12
07-Dec-12
31-Jan-13
31-Jan-13
31-Jan-13
16-Mar-13
05-Feb-13
05-Feb-13
42
71
63
392
393
394
395
396
397
398
399
400
NECP-Rebase_06Sep12-4.CO.1.8.2.2.12
Area 12
NECOUBWC1190
50%
38
5
5
401
NECP-Rebase_06Sep12-4.CO.1.8.2.1.12
Area A12
NECOUBSS2186
50%
12-Dec-12
31-Jan-13
02-Feb-13
74
402
NECP-Rebase_06Sep12-4.CO.1.8.2.1.12
Area A12
NECOUBSS2196
50%
12-Dec-12
31-Jan-13
02-Feb-13
74
403
NECP-Rebase_06Sep12-4.CO.1.8.2.1.12
Area A12
NECOUBSS2206
Earthing conduits
50%
12-Dec-12
31-Jan-13
02-Feb-13
74
Earthing conduits
404
NECP-Rebase_06Sep12-4.CO.1.8.2.1.12
Area A12
NECOUBSS2216
Lighting conduits
50%
12-Dec-12
31-Jan-13
02-Feb-13
74
Lighting conduits
405
NECP-Rebase_06Sep12-4.CO.1.8.2.1.12
Area A12
NECOUBSS2226
50%
12-Dec-12
31-Jan-13
02-Feb-13
74
406
NECP-Rebase_06Sep12-4.CO.1.8.2.1.12
Area A12
NECOUBSS2236
Telephone conduits
50%
12-Dec-12
31-Jan-13
02-Feb-13
74
Telephone conduits
407
408
Area A13
NECP-Rebase_06Sep12-4.CO.1.8.2.1.13
Area A13
NECOUBSS2246
0
0
0%
15
8
26-Feb-13
26-Feb-13
16-Mar-13
07-Mar-13
42
37
409
NECP-Rebase_06Sep12-4.CO.1.8.2.1.13
Area A13
NECOUBSS2256
0%
02-Mar-13
06-Mar-13
50
410
NECP-Rebase_06Sep12-4.CO.1.8.2.1.13
Area A13
NECOUBSS2266
0%
02-Mar-13
06-Mar-13
50
411
NECP-Rebase_06Sep12-4.CO.1.8.2.1.13
Area A13
NECOUBSS2276
Earthing conduits
0%
02-Mar-13
06-Mar-13
50
Earthing conduits
412
NECP-Rebase_06Sep12-4.CO.1.8.2.1.13
Area A13
NECOUBSS2286
Lighting conduits
0%
02-Mar-13
06-Mar-13
50
Lighting conduits
413
NECP-Rebase_06Sep12-4.CO.1.8.2.1.13
Area A13
NECOUBSS2296
0%
02-Mar-13
06-Mar-13
50
414
NECP-Rebase_06Sep12-4.CO.1.8.2.1.13
Area A13
NECOUBSS2306
Telephone conduits
0%
12-Mar-13
16-Mar-13
42
95
19
12.5%
54
17
13-May-12
09-Aug-12
30-Aug-12
30-Aug-12
07-Nov-12
14-Nov-12
31-Jan-13
16-Mar-13
03-Apr-13
03-Apr-13
3
3
415
416
Telephone conduits
Backfilling Around Building, Area 12 - Area 13 - Area 14
Backfilling Around Building, Area 1 - Area 2
417
NECP-Rebase_06Sep12-4.CO.1.8.2.9
PHASE 1 - BACKFILLINGNECOEX1210
(incl. Waterproofing)Backfilling
TO RETAINING
AroundWALLS
Building,AROUND
Area 1 - Area
BUILDING
2
19
11.25%
17
13-May-12
03-Jun-12
07-Nov-12
31-Jan-13
19-Feb-13
418
NECP-Rebase_06Sep12-4.CO.1.8.2.9
PHASE 1 - BACKFILLINGNECOEX1220
(incl. Waterproofing)Backfilling
TO RETAINING
AroundWALLS
Building,AROUND
Area 3 - Area
BUILDING
4
19
3%
18
04-Jun-12
25-Jun-12
30-Jan-13
19-Feb-13
12-Mar-13
19
3%
18
21-Nov-12
19-Feb-13
19
419
420
NECP-Rebase_06Sep12-4.CO.1.8.2.9
PHASE 1 - BACKFILLINGNECOEX1230
(incl. Waterproofing)Backfilling
TO RETAINING
AroundWALLS
Building,AROUND
Area 5 - Area
BUILDING
6 - Area 8 - Area 9
26-Jun-12
17-Jul-12
0%
19
18-Jul-12
08-Aug-12
147
147
25
23
50%
99
99
8
6
21-Mar-12
21-Mar-12
09-Apr-12
09-Apr-12
08-Sep-12
08-Sep-12
07-May-12
05-May-12
16
0%
19-Apr-12
07-May-12
16
0%
19-Apr-12
07-May-12
25
23
15%
12
10
02-Jun-12
02-Jun-12
30-Jun-12
27-Jun-12
NECP-Rebase_06Sep12-4.CO.1.8.3.8.4
LB Area A5 - A6
NECOCW72
16
0%
12-Jun-12
NECP-Rebase_06Sep12-4.CO.1.8.3.8.4
LB Area A5 - A6
NECOCW73
16
0%
12-Jun-12
25
23
15%
12
10
06-May-12
06-May-12
03-Jun-12
31-May-12
16
0%
16-May-12
03-Jun-12
NECP-Rebase_06Sep12-4.CO.1.8.2.9
PHASE 1 - BACKFILLINGNECOEX1240
(incl. Waterproofing)Backfilling
TO RETAINING
AroundWALLS
Building,AROUND
Area 8 - Area
BUILDING
9 - Area 10 - Area 11
421
422
423
424
425
NECP-Rebase_06Sep12-4.CO.1.8.3.8.1
LB Area A1 - A2
NECOCW52
426
NECP-Rebase_06Sep12-4.CO.1.8.3.8.1
LB Area A1 - A2
NECOCW53
427
428
LB Area A5 - A6
NECP-Rebase_06Sep12-4.CO.1.8.3.8.4
LB Area A5 - A6
NECOCW70
429
430
431
432
LB Area A3 - A4
NECP-Rebase_06Sep12-4.CO.1.8.3.8.2
LB Area A3 - A4
NECOCW60
433
NECP-Rebase_06Sep12-4.CO.1.8.3.8.2
LB Area A3 - A4
NECOCW62
Feb
07-Feb-13
2014
Jul
GRC
31-Jan-13
24-Dec-12
Jun
24-Feb-13
119
605
PRE-CONSTRUCTION
12-Mar-13
12-Mar-13
03-Apr-13
31-Jan-13
31-Jan-13
31-Jan-13
31-Jan-13
26-May-13
26-May-13
09-Feb-13
06-Feb-13
6
6
46
46
03-Feb-13
09-Feb-13
46
03-Feb-13
09-Feb-13
46
31-Jan-13
31-Jan-13
14-Feb-13
12-Feb-13
91
64
30-Jun-12
07-Feb-13
14-Feb-13
78
30-Jun-12
07-Feb-13
14-Feb-13
91
31-Jan-13
31-Jan-13
14-Feb-13
12-Feb-13
91
78
07-Feb-13
14-Feb-13
78
29-Nov-12
29-Nov-12
06-Dec-12
06-Dec-12
02-Jan-13
02-Jan-13
27-Dec-12
27-Dec-12
WBS
WBS Name
Activity ID
BL Project
Start
BL Project
Finish
0%
16-May-12
03-Jun-12
24
22
40%
9
7
28-Jun-12
28-Jun-12
25-Jul-12
23-Jul-12
16
0%
08-Jul-12
16
0%
08-Jul-12
24
22
0%
14
12
NECP-Rebase_06Sep12-4.CO.1.8.3.8.8
LB Area A9 - A10
NECOCW92
16
0%
NECP-Rebase_06Sep12-4.CO.1.8.3.8.8
LB Area A9 - A10
NECOCW93
16
0%
0
0
NECP-Rebase_06Sep12-4.CO.1.8.3.8.10
LB Area A11 - A12 - A13 NECOCW233
446
NECP-Rebase_06Sep12-4.CO.1.8.3.8.10
LB Area A11 - A12 - A13 NECOCW243
447
448
UB Area A1 - A2
NECP-Rebase_06Sep12-4.CO.1.8.3.8.3
UB Area A1 - A2
NECOCW170
449
450
434
NECP-Rebase_06Sep12-4.CO.1.8.3.8.2
LB Area A3 - A4
NECOCW63
435
436
LB Area A7 - A8
NECP-Rebase_06Sep12-4.CO.1.8.3.8.6
LB Area A7 - A8
NECOCW80
437
NECP-Rebase_06Sep12-4.CO.1.8.3.8.6
LB Area A7 - A8
NECOCW82
438
NECP-Rebase_06Sep12-4.CO.1.8.3.8.6
LB Area A7 - A8
NECOCW83
439
440
LB Area A9 - A10
NECP-Rebase_06Sep12-4.CO.1.8.3.8.8
LB Area A9 - A10
NECOCW90
441
442
443
444
445
Activity Name
BL Project
Duration
Early Start
Early Finish
Total
Float
07-Feb-13
14-Feb-13
91
31-Jan-13
31-Jan-13
11-Feb-13
09-Feb-13
94
69
25-Jul-12
04-Feb-13
11-Feb-13
94
25-Jul-12
04-Feb-13
11-Feb-13
94
24-Jul-12
24-Jul-12
20-Aug-12
18-Aug-12
09-Feb-13
09-Feb-13
25-Feb-13
23-Feb-13
82
69
02-Aug-12
20-Aug-12
18-Feb-13
25-Feb-13
69
02-Aug-12
20-Aug-12
18-Feb-13
25-Feb-13
82
0%
14
12
24-Mar-13
24-Mar-13
09-Apr-13
07-Apr-13
38
37
0%
02-Apr-13
09-Apr-13
37
16
Activity % Remaining
Complete Duration
0%
25
23
20%
99
10
21-Mar-12
21-Mar-12
18-Apr-12
16-Apr-12
NECP-Rebase_06Sep12-4.CO.1.8.3.8.3
UB Area A1 - A2
NECOCW171
16
0%
01-Apr-12
NECP-Rebase_06Sep12-4.CO.1.8.3.8.3
UB Area A1 - A2
NECOCW172
16
0%
01-Apr-12
451
NECP-Rebase_06Sep12-4.CO.1.8.3.8.3
UB Area A1 - A2
NECOCW173
16
0%
01-Apr-12
452
453
Siemens PMS Control Room (Manager's Room) - Assumed CR Issuance Date: 31Mar13
0
NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1
Siemens PMS Control Room
NECOCW303
(Manager's Room)Await
- Assumed
CR for CR
Blockwork
Issuance
Re-configuration
Date: 31Mar13(Managers Room), Siemens Control 0Room
0%
48
0
Actual Start
Actual
Finish
29-Nov-12
29-Nov-12
2013
Jan
Feb
Mar
18-Apr-12
06-Feb-13
13-Feb-13
93
18-Apr-12
06-Feb-13
13-Feb-13
93
18-Apr-12
06-Feb-13
13-Feb-13
90
31-Mar-13
26-May-13
31-Mar-13
0
0
31-Mar-13
08-Apr-13
08-Apr-13
24-Apr-13
456
NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1
Siemens PMS Control Room
NECOCW333
(Manager's Room)Blockwork
- Assumed
Re-configuration
CR Issuance Date:
(Managers
31Mar13
Room), Siemens Control Room
0%
21
24-Apr-13
19-May-13
457
NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1
Siemens PMS Control Room
NECOCW343
(Manager's Room)Small
- Assumed
power conduits
CR Issuance
(Managers
Date: 31Mar13
Room), Siemens Control Room
0%
19-May-13
26-May-13
25
23
0%
14
12
17-Apr-12
17-Apr-12
15-May-12
13-May-12
11-Feb-13
11-Feb-13
27-Feb-13
25-Feb-13
81
37
Submit Shop Dwgs, Blockwork Re-configuration (Managers Room), Siemens Control Room
Approve Shop Dwgs, Blockwork Re-configuration (Managers Room), Siemens Control Room
Blockwork Re-configuration (Managers Room), Siemens Control Room
Small power conduits (Managers Room), Siemens Control Room
460
NECP-Rebase_06Sep12-4.CO.1.8.3.8.5
UB Area A3 - A4
NECOCW181
16
0%
28-Apr-12
15-May-12
20-Feb-13
27-Feb-13
81
461
NECP-Rebase_06Sep12-4.CO.1.8.3.8.5
UB Area A3 - A4
NECOCW182
16
0%
28-Apr-12
15-May-12
20-Feb-13
27-Feb-13
81
462
NECP-Rebase_06Sep12-4.CO.1.8.3.8.5
UB Area A3 - A4
NECOCW183
16
0%
28-Apr-12
15-May-12
20-Feb-13
27-Feb-13
73
463
464
UB Area A5 - A6
NECP-Rebase_06Sep12-4.CO.1.8.3.8.7
UB Area A5 - A6
NECOCW190
25
23
0%
14
12
14-May-12
14-May-12
11-Jun-12
09-Jun-12
25-Feb-13
25-Feb-13
13-Mar-13
11-Mar-13
67
37
465
NECP-Rebase_06Sep12-4.CO.1.8.3.8.7
UB Area A5 - A6
NECOCW191
16
0%
24-May-12
11-Jun-12
06-Mar-13
13-Mar-13
67
466
NECP-Rebase_06Sep12-4.CO.1.8.3.8.7
UB Area A5 - A6
NECOCW192
16
0%
24-May-12
11-Jun-12
06-Mar-13
13-Mar-13
67
467
NECP-Rebase_06Sep12-4.CO.1.8.3.8.7
UB Area A5 - A6
NECOCW193
16
0%
24-May-12
11-Jun-12
06-Mar-13
13-Mar-13
67
468
469
UB Area A8 - A9
NECP-Rebase_06Sep12-4.CO.1.8.3.8.9
UB Area A8 - A9
NECOCW200
24
22
0%
14
12
10-Jun-12
10-Jun-12
07-Jul-12
04-Jul-12
11-Mar-13
11-Mar-13
27-Mar-13
25-Mar-13
55
37
470
NECP-Rebase_06Sep12-4.CO.1.8.3.8.9
UB Area A8 - A9
NECOCW202
16
0%
19-Jun-12
07-Jul-12
20-Mar-13
27-Mar-13
55
471
NECP-Rebase_06Sep12-4.CO.1.8.3.8.9
UB Area A8 - A9
NECOCW203
16
0%
19-Jun-12
07-Jul-12
20-Mar-13
27-Mar-13
55
472
473
56
22
0%
14
12
05-Jul-12
05-Jul-12
08-Sep-12
30-Jul-12
25-Mar-13
25-Mar-13
10-Apr-13
08-Apr-13
37
37
474
NECP-Rebase_06Sep12-4.CO.1.8.3.8.11
UB Area A10 - A11
NECOCW212
16
0%
21-Aug-12
08-Sep-12
03-Apr-13
10-Apr-13
37
475
NECP-Rebase_06Sep12-4.CO.1.8.3.8.11
UB Area A10 - A11
NECOCW213
14
21-Aug-12
05-Sep-12
476
477
478
479
03-Apr-13
10-Apr-13
37
0%
14
12
01-Apr-13
01-Apr-13
17-Apr-13
15-Apr-13
37
37
NECP-Rebase_06Sep12-4.CO.1.8.3.8.13
UB Area A12 - A13
NECOCW263
0%
10-Apr-13
17-Apr-13
37
NECP-Rebase_06Sep12-4.CO.1.8.3.8.13
UB Area A12 - A13
NECOCW273
0%
10-Apr-13
17-Apr-13
37
0
0
100%
0
0
25-Nov-12
25-Nov-12
28-Jan-13
09-Dec-12
NECP-Rebase_06Sep12-4.CO.1.10
M4a-Receipt of Revised IFC
NECOLBSS3010
Drawgs for Substation
Approve
in UB
Revised
Slab Area
Shop
12Dwgs, Upper Basement Slab Area 12
100%
10-Dec-12
27-Dec-12
NECP-Rebase_06Sep12-4.CO.1.10
M4a-Receipt of Revised IFC
NECOLBSS3020
Drawgs for Substation
Re-Submit
in UB Slab
Revised
AreaShop
12 Dwgs, Upper Basement Slab Area 12
100%
28-Dec-12
13-Jan-13
484
NECP-Rebase_06Sep12-4.CO.1.10
M4a-Receipt of Revised IFC
NECOLBSS3030
Drawgs for Substation
Approve
in UB
Re-Submitted
Slab Area 12Revised Shop Dwgs, Upper Basement Slab Area 12
100%
14-Jan-13
28-Jan-13
0
0
0
0
0%
103
103
21
7
31-Jan-13
31-Jan-13
31-Jan-13
31-Jan-13
30-May-13
30-May-13
24-Feb-13
07-Feb-13
0
0
0
0
0%
14
09-Feb-13
24-Feb-13
0%
45
45
25-Feb-13
25-Feb-13
17-Apr-13
17-Apr-13
0
0
09-Apr-13
09-Apr-13
30-May-13
30-May-13
0
0
NECP-Rebase_06Sep12-4.CO.1.1.1.15
External Staircase Shop Dwgs
NEENSDS1740
Submittals & Approvals
External RC Staircase Layout & Details Approval
490
491
492
493
0
0
0
0
0%
0
0
08-Sep-12
08-Sep-12
29-Oct-12
22-Sep-12
100%
0
0
496
NECP-Rebase_06Sep12-4.CO.1.9
M5a-Official Receipt of Approval
NECOUBSS3010
for Embedded Approve
Items & Fenestrations
Revised Shop for
Dwgs,
GF Slab
Ground
Areas
Floor
1 Slab Area 1
100%
23-Sep-12
06-Oct-12
497
NECP-Rebase_06Sep12-4.CO.1.9
M5a-Official Receipt of Approval
NECOUBSS3020
for Embedded Re-Submit
Items & Fenestrations
Revised Shop
for Dwgs,
GF Slab
Ground
Areas Floor
1
Slab Area 1
100%
07-Oct-12
14-Oct-12
498
NECP-Rebase_06Sep12-4.CO.1.9
M5a-Official Receipt of Approval
NECOUBSS3030
for Embedded Approve
Items & Fenestrations
Re-Submitted for
Revised
GF Slab
Shop
Areas
Dwgs,
1 Ground Floor Slab Area 1
100%
0
0
13-Oct-12 08-Dec-12
Revised Shop Dwgs, Ground Floor Slab Area 2
13-Oct-12 Submit
28-Oct-12
499
500
M5a-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 1
NECP-Rebase_06Sep12-4.CO.1.9
M5a-Official Receipt of Approval
NECOUBSS3000
for Embedded Submit
Items &Revised
Fenestrations
Shop Dwgs,
for GFGround
Slab Areas
Floor1 Slab Area 1
45
45
483
494
495
0%
482
489
0
0
M4b-Const. Compl. of Phase (1) West Elevation Facade Axis A-M, Bkfl & All Necessary External Works
West Facade Elevation
External Staircase Shop Dwgs Submittals & Approvals
NECP-Rebase_06Sep12-4.CO.1.1.1.15
External Staircase Shop Dwgs
NEENSDS1730
Submittals & Approvals
External RC Staircase Layout & Details
100%
0
0
501
NECP-Rebase_06Sep12-4.CO.1.12
M5b-Official Receipt of Approval
NECOUBSS3050
for Embedded Approve
Items & Fenestrations
Revised Shop for
Dwgs,
GF Slab
Ground
Areas
Floor
2 Slab Area 2
100%
29-Oct-12
502
NECP-Rebase_06Sep12-4.CO.1.12
M5b-Official Receipt of Approval
NECOUBSS3060
for Embedded Re-Submit
Items & Fenestrations
Revised Shop
for Dwgs,
GF Slab
Ground
Areas Floor
2
Slab Area 2
100%
14-Nov-12
21-Nov-12
503
NECP-Rebase_06Sep12-4.CO.1.12
M5b-Official Receipt of Approval
NECOUBSS3070
for Embedded Approve
Items & Fenestrations
Re-Submitted for
Revised
GF Slab
Shop
Areas
Dwgs,
2 Ground Floor Slab Area 2
100%
22-Nov-12
08-Dec-12
100%
35
0
504
505
M5b-Official Receipt of Approval for Embedded Items & Fenestrations for GF Slab Areas 2
NECP-Rebase_06Sep12-4.CO.1.12
M5b-Official Receipt of Approval
NECOUBSS3040
for Embedded Submit
Items &Revised
Fenestrations
Shop Dwgs,
for GFGround
Slab Areas
Floor2 Slab Area 2
21-Feb-12
17-Jul-12
03-Sep-12
03-Sep-12
02-Dec-12
NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS1332
& ResumeSubmit
PMS Steel
New Structure
Shop Drawings,
Fabrication
PMS Structural Steel Works
100%
03-Dec-12
16-Dec-12
507
NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS1333
& ResumeApprove
PMS Steel
NewStructure
Shop Drawings,
Fabrication
PMS Structural Steel Works
100%
17-Dec-12
23-Dec-12
508
NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS1334
& ResumeRe-submit
PMS SteelNew
Structure
Shop Drawings,
FabricationPMS Structural Steel Works
100%
24-Dec-12
30-Dec-12
509
NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS1335
& ResumeApprove
PMS Steel
Re-submitted
Structure Fabrication
New Shop Drawings, PMS Structural Steel Works
100%
31-Dec-12
06-Jan-13
510
NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS1336
& ResumeResume:
PMS Steel
Manufacture
Structure Fabrication
& Deliver Structural Steel (Frijns)
43.55%
35
511
NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS2370
& ResumeManufacture
PMS Steel Structure
& Deliver Fabrication
Aluminum Chaotic Facade (Alumco)
120
0%
30
29-Feb-12
17-Jul-12
NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS2380
& ResumeManufacture
PMS Steel Structure
& Deliver Fabrication
Glazing (Curtain Wall, Sliding Doors, Edge Glass, Rooflights)
90
(Alumco)
0%
30
29-Feb-12
12-Jun-12
NECP-Rebase_06Sep12-4.CO.1.11
M5c.1-Complete 90-Day Suspension
NEPRMTS2390
& ResumeManufacture
PMS Steel Structure
& Deliver Fabrication
Aluminum/Steel Doors (by S/C), Louver Screens (Alumco)
90
30
21-Feb-12
04-Jun-12
513
514
515
0%
07-Jan-13
21
0
506
512
02-Jan-13
02-Jan-13
07-May-13
9
Suspend: Manufacture & Deliver Structural Steel (for 90 Days from 03Sep12)
Submit New Shop Drawings, PMS Structural Steel Works
Approve New Shop Drawings, PMS Structural Steel Works
Re-submit New Shop Drawings, PMS Structural Steel Works
Approve Re-submitted New Shop Drawings, PMS Structural Steel Works
07-May-13
28-Mar-13
01-May-13
14
28-Mar-13
01-May-13
14
Manufacture & Deliver Glazing (Curtain Wall, Sliding Doors, Edge Glass, Rooflights) (Alumco)
28-Mar-13
01-May-13
03-Mar-13
27-Mar-13
NECP-Rebase_06Sep12-4.CO.1.13
M5c.2-Suspend AluminumNECOCW293
Painting from Grey toASTAD
White Release Order: 03Mar13 (Assumed Decision Date of Aluminum Painting
0 of Structures
0% from Grey
0 to White)
03-Mar-13
NECP-Rebase_06Sep12-4.CO.1.13
M5c.2-Suspend AluminumNEPRMTS2730
Painting from Grey toSubmit
White New Color, PMS Structural Steel Works
0%
04-Mar-13
11-Mar-13
518
NECP-Rebase_06Sep12-4.CO.1.13
M5c.2-Suspend AluminumNEPRMTS2740
Painting from Grey toApprove
White New Color, PMS Structural Steel Works
0%
14
12-Mar-13
27-Mar-13
22-Mar-12
22-Mar-12
28-Nov-12
28-Nov-12
22-Mar-12
23-Dec-12
23-Dec-12
28-Mar-13
28-Mar-13
28-Aug-13
28-Aug-13
28-Mar-12
16-May-12
17-Jan-13
100%
131
131
0
43
44%
24
0%
14
60
0%
45
24-May-12
01-Aug-12
14
0%
14
17-May-12
02-Jun-12
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOMEP250
33
0%
33
03-Jun-12
527
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW370
Aluminum Louvers, Aluminum Panels, Cladding, Handrails & Metal works (Alumco)
40
0%
40
11-Jun-12
528
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW430
Ceiling
45
0%
67
05-Sep-12
529
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW380
Glazing (Alumco)
30
0%
30
09-Jul-12
12-Aug-12
530
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW390
Screeds, Ramps
29
0%
29
17-Jul-12
531
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW410
55
0%
30
532
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW400
Tiling
50
0%
30
533
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOCW160
30
0%
30
534
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOMEP260
Electrical Works
45
0%
535
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOMEP270
Photovoltaic installations
50
536
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOMEP280
12
537
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW420
Joinery
11
538
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW440
Access Walkways
15
539
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOMEP290
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW450
522
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOCW150
523
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW345
524
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW360
525
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOBFW350
526
540
23-Dec-12
28-Mar-13
25-Apr-13
27-Apr-13
12-May-13
04-May-13
24-Jun-13
39
13-May-13
28-May-13
10-Jul-12
13-May-13
19-Jun-13
26-Jul-12
29-May-13
14-Jul-13
27-Oct-12
01-Jun-13
17-Aug-13
15-Jun-13
18-Jul-13
19-Aug-12
23-Jun-13
25-Jul-13
10
13-Aug-12
15-Oct-12
23-Jun-13
27-Jul-13
02-Aug-12
29-Sep-12
26-Jun-13
30-Jul-13
10
Tiling
16-Aug-12
19-Sep-12
26-Jun-13
30-Jul-13
10
30
28-Aug-12
18-Oct-12
26-Jun-13
30-Jul-13
Electrical Works
0%
15
25-Sep-12
21-Nov-12
14-Jul-13
30-Jul-13
Photovoltaic installations
0%
12
20-Aug-12
02-Sep-12
27-Jul-13
08-Aug-13
12
0%
11
20-Aug-12
01-Sep-12
27-Jul-13
07-Aug-13
13
0%
15
20-Sep-12
07-Oct-12
31-Jul-13
17-Aug-13
10
30
0%
15
20-Oct-12
22-Nov-12
10-Aug-13
26-Aug-13
0%
24-Nov-12
28-Nov-12
24-Aug-13
28-Aug-13
0
0
0%
49
21
30-Jun-13
30-Jun-13
25-Aug-13
23-Jul-13
124
124
543
NECP-Rebase_06Sep12-4.CO.1.14
Architectural Works at AxisNECOCW32
A-M/1
0%
14
24-Jul-13
08-Aug-13
124
544
NECP-Rebase_06Sep12-4.CO.1.14
Architectural Works at AxisNECOCW33
A-M/1
0%
14
10-Aug-13
25-Aug-13
124
08-May-13
08-Aug-13
78
ASTAD Release Order: 03Mar13 (Assumed Decision Date of Aluminum Painting of Structures from Grey to White)
0
0
Completion of All Phase 1 Concrete Works - incl. Grd Floor Slabs Area 1 & 2
541
542
545
Manufacture & Deliver Aluminum/Steel Doors (by S/C), Louver Screens (Alumco)
ASTAD Hold Order: 02Jan13 (Suspend Aluminum Painting of Structures from Grey to White)
517
M5d-Const. Compl. of People Mover Station (Fit Out, MEP, Facade & All Necessary External Works)
215
People Mover Station (PMS)
215
NECP-Rebase_06Sep12-4.CO.1.2.1
People Mover Station (PMS)
NECOCW40
Completion of All Phase 1 Concrete Works - incl. Grd Floor Slabs Area 1 & 2 0
28-Mar-13
516
519
520
521
80
80
12-Sep-12
15-Dec-12
Nov
UB Area A3 - A4
NECP-Rebase_06Sep12-4.CO.1.8.3.8.5
UB Area A3 - A4
NECOCW180
485
486
487
488
Oct
458
459
Sep
6
37
Aug
38
14
2014
Jul
09-Apr-13
NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1
Siemens PMS Control Room
NECOCW323
(Manager's Room)Approve
- Assumed
ShopCR
Dwgs,
Issuance
Blockwork
Date: Re-configuration
31Mar13
(Managers Room), Siemens0Control Room
0%
Jun
26-May-13
11-Feb-13
NECP-Rebase_06Sep12-4.CO.1.8.3.8.3.1
Siemens PMS Control Room
NECOCW313
(Manager's Room)Submit
- Assumed
Shop CR
Dwgs,
Issuance
Blockwork
Date:
Re-configuration
31Mar13
(Managers Room), Siemens Control
0
Room
0%
May
02-Apr-13
455
Apr
31-Jan-13
31-Jan-13
06-Dec-12
06-Dec-12
454
480
481
Dec
Jan
Feb
Activity ID
Activity Name
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
546
NECP-Rebase_06Sep12-4.CO.1.P11
Roofing & Facade
NECOBFW30
20
0%
20
12-Sep-12
06-Oct-12
08-May-13
30-May-13
78
547
NECP-Rebase_06Sep12-4.CO.1.P11
Roofing & Facade
NECOBFW60
20
0%
20
06-Oct-12
29-Oct-12
01-Jun-13
23-Jun-13
78
NECP-Rebase_06Sep12-4.CO.1.P11
Roofing & Facade
NECOBFW40
20
0%
NECP-Rebase_06Sep12-4.CO.1.P11
Roofing & Facade
NECOBFW50
20
548
549
550
551
552
WBS
WBS Name
BL Project
Duration
Actual Start
Actual
Finish
20
29-Oct-12
21-Nov-12
24-Jun-13
16-Jul-13
78
0%
20
21-Nov-12
15-Dec-12
17-Jul-13
08-Aug-13
78
70
35
0%
70
35
02-Aug-12
02-Aug-12
23-Oct-12
12-Sep-12
28-Mar-13
28-Mar-13
17-Jun-13
07-May-13
79
78
2013
Jan
Feb
Mar
Apr
May
2014
Jun
Jul
Aug
Sep
35
0%
35
12-Sep-12
23-Oct-12
08-May-13
17-Jun-13
79
NECOBFW300
108
14
0%
94
14
03-Apr-13
03-Apr-13
06-Aug-13
18-Apr-13
18-Jun-13
18-Jun-13
05-Oct-13
03-Jul-13
88
79
555
NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre
NECOBFW310
14
0%
14
20-Apr-13
05-May-13
04-Jul-13
20-Jul-13
79
556
NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre
NECOBFW320
14
0%
14
06-May-13
21-May-13
04-Jul-13
20-Jul-13
79
557
NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre
NECOBFW330
14
0%
14
22-May-13
06-Jun-13
21-Jul-13
05-Aug-13
79
558
NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre
NECOBFW260
18
0%
18
08-Jun-13
27-Jun-13
06-Aug-13
26-Aug-13
79
559
NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre
NECOBFW240
14
0%
14
29-Jun-13
14-Jul-13
27-Aug-13
11-Sep-13
79
560
NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre
NECOBFW270
20
0%
20
29-Jun-13
21-Jul-13
27-Aug-13
18-Sep-13
79
561
NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre
NECOBFW280
Doors
10
0%
10
22-Jul-13
01-Aug-13
19-Sep-13
30-Sep-13
88
562
NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre
NECOBFW290
Removable Panels
14
0%
14
22-Jul-13
06-Aug-13
19-Sep-13
05-Oct-13
88
16-May-12
17-Jun-12
25-Jun-12
25-Jun-12
21-May-13
21-May-13
22-Sep-12
03-Jul-12
31-Jan-13
31-Jan-13
02-May-13
02-May-13
30-Nov-13
26-Nov-13
23-Jul-13
11-May-13
40
43
32
32
318
291
77
8
0%
258
255
70
7
567
NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1515
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A2
0%
04-Jul-12
12-Jul-12
11-May-13
19-May-13
32
568
NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1525
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A3
0%
14-Jul-12
22-Jul-12
19-May-13
27-May-13
32
569
NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1535
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A4
0%
23-Jul-12
31-Jul-12
27-May-13
04-Jun-13
32
570
NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1545
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A5
0%
01-Aug-12
09-Aug-12
04-Jun-13
12-Jun-13
32
571
NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1555
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A6
0%
11-Aug-12
19-Aug-12
12-Jun-13
20-Jun-13
32
572
NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1565
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A7
0%
20-Aug-12
28-Aug-12
20-Jun-13
29-Jun-13
32
573
NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1575
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A8
0%
29-Aug-12
05-Sep-12
29-Jun-13
07-Jul-13
32
574
NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1585
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A9
0%
06-Sep-12
13-Sep-12
07-Jul-13
15-Jul-13
32
575
NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1595
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A10
0%
15-Sep-12
22-Sep-12
15-Jul-13
23-Jul-13
32
143
79
7
17-Jun-12
17-Jun-12
17-Jun-12
29-Nov-12
16-Sep-12
24-Jun-12
25-Apr-13
25-Apr-13
25-Apr-13
29-Aug-13
04-Jul-13
02-May-13
35
42
32
576
577
578
29-Dec-12
29-Dec-12
0%
108
60
6
579
NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1310
0%
25-Jun-12
02-Jul-12
02-May-13
09-May-13
42
580
NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1320
0%
03-Jul-12
10-Jul-12
09-May-13
16-May-13
42
581
NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1330
0%
11-Jul-12
18-Jul-12
16-May-13
23-May-13
42
582
NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1340
0%
19-Jul-12
26-Jul-12
23-May-13
30-May-13
42
583
NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1350
0%
30-Jul-12
06-Aug-12
30-May-13
06-Jun-13
42
584
NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1360
0%
09-Aug-12
16-Aug-12
06-Jun-13
13-Jun-13
42
585
NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1370
0%
20-Aug-12
26-Aug-12
13-Jun-13
20-Jun-13
42
586
NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1380
0%
30-Aug-12
05-Sep-12
20-Jun-13
27-Jun-13
42
587
NECP-Rebase_06Sep12-4.CO.1.6.1.8.1
FIRE FIGHTING PIPES NECOMEP1390
0%
10-Sep-12
16-Sep-12
27-Jun-13
04-Jul-13
42
588
589
SANITARY PIPES
NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1301
79
7
0%
60
6
17-Jun-12
17-Jun-12
16-Sep-12
24-Jun-12
25-Apr-13
25-Apr-13
04-Jul-13
02-May-13
33
32
590
NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1311
0%
25-Jun-12
02-Jul-12
02-May-13
09-May-13
33
591
NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1321
0%
03-Jul-12
10-Jul-12
09-May-13
16-May-13
33
592
NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1331
0%
11-Jul-12
18-Jul-12
16-May-13
23-May-13
33
593
NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1341
0%
19-Jul-12
26-Jul-12
23-May-13
30-May-13
33
594
NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1351
0%
30-Jul-12
06-Aug-12
30-May-13
06-Jun-13
33
595
NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1361
0%
09-Aug-12
16-Aug-12
06-Jun-13
13-Jun-13
33
596
NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1371
0%
20-Aug-12
26-Aug-12
13-Jun-13
20-Jun-13
33
597
NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1381
0%
30-Aug-12
05-Sep-12
20-Jun-13
27-Jun-13
33
598
NECP-Rebase_06Sep12-4.CO.1.6.1.8.2
SANITARY PIPES
NECOMEP1391
599
600
WATER SUPPLY
NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6030
601
602
0%
10-Sep-12
16-Sep-12
27-Jun-13
04-Jul-13
33
62
7
0%
54
6
19-Sep-12
19-Sep-12
29-Nov-12
26-Sep-12
27-Jun-13
27-Jun-13
29-Aug-13
04-Jul-13
35
33
NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6040
0%
27-Sep-12
04-Oct-12
04-Jul-13
11-Jul-13
33
NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6050
0%
06-Oct-12
13-Oct-12
11-Jul-13
18-Jul-13
33
603
NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6060
0%
14-Oct-12
21-Oct-12
18-Jul-13
25-Jul-13
33
604
NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6070
0%
22-Oct-12
29-Oct-12
25-Jul-13
01-Aug-13
33
605
NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6080
0%
30-Oct-12
06-Nov-12
01-Aug-13
08-Aug-13
33
606
NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6090
0%
07-Nov-12
14-Nov-12
08-Aug-13
15-Aug-13
33
607
NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6000
0%
15-Nov-12
22-Nov-12
15-Aug-13
22-Aug-13
33
608
NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6010
0%
24-Nov-12
29-Nov-12
22-Aug-13
29-Aug-13
33
609
NECP-Rebase_06Sep12-4.CO.1.6.1.8.3
WATER SUPPLY
NECOMEP6020
0%
24-Nov-12
29-Nov-12
22-Aug-13
29-Aug-13
35
610
611
612
125
77
8
0%
66
60
6
25-Jun-12
25-Jun-12
25-Jun-12
17-Nov-12
22-Sep-12
03-Jul-12
04-May-13
04-May-13
04-May-13
18-Jul-13
11-Jul-13
09-May-13
59
41
41
613
NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1610
0%
04-Jul-12
12-Jul-12
11-May-13
16-May-13
41
614
NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1620
0%
14-Jul-12
22-Jul-12
18-May-13
23-May-13
41
615
NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1630
0%
23-Jul-12
31-Jul-12
25-May-13
30-May-13
41
616
NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1640
0%
01-Aug-12
09-Aug-12
01-Jun-13
06-Jun-13
41
617
NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1650
0%
11-Aug-12
19-Aug-12
08-Jun-13
13-Jun-13
41
618
NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1660
0%
20-Aug-12
28-Aug-12
15-Jun-13
20-Jun-13
41
619
NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1670
0%
29-Aug-12
05-Sep-12
22-Jun-13
27-Jun-13
41
620
NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1680
0%
06-Sep-12
13-Sep-12
29-Jun-13
04-Jul-13
41
621
NECP-Rebase_06Sep12-4.CO.1.6.1.9.1
INSTALLATION
NECOMEP1690
0%
15-Sep-12
22-Sep-12
06-Jul-13
11-Jul-13
41
622
623
INSULATION
NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5090
79
8
0%
60
6
18-Aug-12
18-Aug-12
17-Nov-12
26-Aug-12
11-May-13
11-May-13
18-Jul-13
16-May-13
59
54
624
NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5100
0%
27-Aug-12
04-Sep-12
18-May-13
23-May-13
54
625
NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5110
0%
05-Sep-12
13-Sep-12
25-May-13
30-May-13
54
626
NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5120
0%
15-Sep-12
23-Sep-12
01-Jun-13
06-Jun-13
54
627
NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5130
AC Ducts Insulation-Area A5
0%
24-Sep-12
02-Oct-12
08-Jun-13
13-Jun-13
59
628
NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5140
0%
03-Oct-12
13-Oct-12
15-Jun-13
20-Jun-13
59
629
NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5150
0%
14-Oct-12
23-Oct-12
22-Jun-13
27-Jun-13
59
630
NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5160
0%
24-Oct-12
31-Oct-12
29-Jun-13
04-Jul-13
59
631
NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5170
0%
01-Nov-12
08-Nov-12
06-Jul-13
11-Jul-13
59
632
NECP-Rebase_06Sep12-4.CO.1.6.1.9.2
INSULATION
NECOMEP5180
0%
10-Nov-12
17-Nov-12
13-Jul-13
18-Jul-13
59
633
634
92
10
0%
90
9
11-Aug-12
11-Aug-12
25-Nov-12
21-Aug-12
12-Jun-13
12-Jun-13
25-Sep-13
23-Jun-13
94
69
635
NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1315
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A2
10
0%
22-Aug-12
02-Sep-12
23-Jun-13
03-Jul-13
69
636
NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1325
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A3
0%
03-Sep-12
12-Sep-12
03-Jul-13
14-Jul-13
69
637
NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1335
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A4
0%
13-Sep-12
23-Sep-12
14-Jul-13
24-Jul-13
69
638
NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1345
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A5
0%
24-Sep-12
03-Oct-12
24-Jul-13
04-Aug-13
69
639
NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1355
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A6
0%
04-Oct-12
14-Oct-12
04-Aug-13
14-Aug-13
94
640
NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1365
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A7
0%
15-Oct-12
24-Oct-12
14-Aug-13
25-Aug-13
94
641
NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1375
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A8
0%
25-Oct-12
04-Nov-12
25-Aug-13
04-Sep-13
94
642
NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1385
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A9
0%
05-Nov-12
14-Nov-12
04-Sep-13
15-Sep-13
94
643
0%
15-Nov-12
25-Nov-12
15-Sep-13
25-Sep-13
94
644
645
35
15
0%
35
15
21-Oct-12
21-Oct-12
29-Nov-12
06-Nov-12
08-Aug-13
08-Aug-13
18-Sep-13
26-Aug-13
17
1
646
NECP-Rebase_06Sep12-4.CO.1.6.1.11
PHASE 1 LOWER BASEMENT
NECOMEP1810
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip/Pumps,
EQUIPMENT
Supply & Ventilation Fans, Area A5-A7
10
0%
10
07-Nov-12
18-Nov-12
26-Aug-13
07-Sep-13
17
647
NECP-Rebase_06Sep12-4.CO.1.6.1.11
PHASE 1 LOWER BASEMENT
NECOMEP1820
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip/Pumps,
EQUIPMENT
Supply & Ventilation Fans, Area A8-A10
10
0%
10
19-Nov-12
29-Nov-12
07-Sep-13
18-Sep-13
17
0%
46
10
12-Sep-12
12-Sep-12
20-Nov-12
23-Sep-12
23-May-13
23-May-13
16-Jul-13
04-Jun-13
57
73
NECP-Rebase_06Sep12-4.CO.1.6.1.12
PHASE 1 LOWER BASEMENT
NECOMEP1240
- SANITARY, RAINWATER
Sump Pumps,Sewage
INSTALLATIONS
Ejector pumps,Stormwater Pumps Installations, Area A5-A7
10
0%
NECP-Rebase_06Sep12-4.CO.1.6.1.12
PHASE 1 LOWER BASEMENT
NECOMEP1250
- SANITARY, RAINWATER
Sump Pumps,Sewage
INSTALLATIONS
Ejector pumps,Stormwater Pumps Installations, Area A8-A10
10
648
649
650
651
NECP-Rebase_06Sep12-4.CO.1.6.1.10
PHASE 1 LOWER BASEMENT
NECOMEP1395
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A10
652
653
654
655
NECP-Rebase_06Sep12-4.CO.1.6.1.13.1
WIRING
NECOMEP1213
656
NECP-Rebase_06Sep12-4.CO.1.6.1.13.1
WIRING
NECOMEP1223
10
29-Oct-12
08-Nov-12
13-Jun-13
25-Jun-13
65
0%
10
10-Nov-12
20-Nov-12
04-Jul-13
16-Jul-13
57
103
54
10
0%
108
28
10
11-Aug-12
11-Aug-12
11-Aug-12
08-Dec-12
11-Oct-12
21-Aug-12
17-Jul-13
17-Jul-13
17-Jul-13
21-Nov-13
18-Aug-13
28-Jul-13
0
0
0
0%
08-Sep-12
17-Sep-12
29-Jul-13
07-Aug-13
0%
02-Oct-12
11-Oct-12
08-Aug-13
18-Aug-13
Dec
Interpretive Centre
NECP-Rebase_06Sep12-4.CO.1.3
Interpretive Centre
MEP Works
Lower Basement Floor
PHASE 1 LOWER BASEMENT - BLACK STEEL PIPES
NECP-Rebase_06Sep12-4.CO.1.6.1.1
PHASE 1 LOWER BASEMENT
NECOMEP1505
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area A1
Nov
553
554
563
564
565
566
Oct
Jan
Feb
WBS
WBS Name
Activity ID
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.13.2
DEVICE INSTALLATION NECOMEP5200
Activity Name
BL Project
Duration
Activity % Remaining
Complete Duration
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
27
7
0%
64
7
07-Nov-12
19-Nov-12
08-Dec-12
26-Nov-12
07-Sep-13
07-Sep-13
21-Nov-13
15-Sep-13
0
33
30
Actual Start
Actual
Finish
NECP-Rebase_06Sep12-4.CO.1.6.1.13.2
DEVICE INSTALLATION NECOMEP5210
0%
01-Dec-12
08-Dec-12
18-Sep-13
26-Sep-13
NECP-Rebase_06Sep12-4.CO.1.6.1.13.2
DEVICE INSTALLATION NECOMEP5190
0%
07-Nov-12
14-Nov-12
14-Nov-13
21-Nov-13
56
8
16-Dec-12
16-Dec-12
12-Jan-13
24-Dec-12
08-Aug-13
08-Aug-13
12-Oct-13
17-Aug-13
33
63
18-Aug-13
NECP-Rebase_06Sep12-4.CO.1.6.1.14
PHASE 1 LOWER BASEMENT
NECOMEP1500
- COLD WATER,
Cold
HOT
Water
WATER,
& HotFIREFIGHTING
Water Pipe, Booster
INSTALLATION
Pumps & Firefighting Pumps Installation,
7 Area A5-A7
0%
2013
Jan
Feb
Mar
Apr
25-Aug-13
67
12-Jan-13
03-Oct-13
12-Oct-13
33
8.99%
01-Oct-12
31-Jul-12
29-Dec-12
29-Dec-12
31-Jan-13
31-Jan-13
02-Jun-13
06-Feb-13
72
153
8.99%
01-Aug-12
09-Aug-12
22-Jan-13
31-Jan-13
06-Feb-13
138
8.99%
11-Aug-12
19-Aug-12
07-Jan-13
31-Jan-13
06-Feb-13
171
NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1755
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A6
8.99%
20-Aug-12
28-Aug-12
20-Jan-13
31-Jan-13
06-Feb-13
171
NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1765
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A7
8.99%
29-Aug-12
06-Sep-12
17-Jan-13
31-Jan-13
06-Feb-13
148
671
NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1775
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A8
8.99%
08-Sep-12
15-Sep-12
20-Jan-13
31-Jan-13
06-Feb-13
140
672
NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1785
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A9
8.99%
16-Sep-12
23-Sep-12
19-Jan-13
31-Jan-13
06-Feb-13
151
673
NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1795
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A10
0%
24-Sep-12
01-Oct-12
13-Feb-13
20-Feb-13
145
674
NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1705
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A1
0%
04-Jul-12
12-Jul-12
19-May-13
26-May-13
54
675
NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1715
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A2
0%
14-Jul-12
22-Jul-12
26-May-13
02-Jun-13
54
25-Jul-12
25-Jul-12
25-Jul-12
17-Oct-12
17-Oct-12
01-Aug-12
06-Aug-13
06-Aug-13
06-Aug-13
16-Oct-13
16-Oct-13
12-Aug-13
0
0
18
NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1735
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A4
668
NECP-Rebase_06Sep12-4.CO.1.6.1.15
PHASE 1 LOWER BASEMENT
NECOMEP1745
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area A5
669
670
676
677
678
73
73
7
0%
60
60
6
679
NECP-Rebase_06Sep12-4.CO.1.6.1.16.1
BUS DUCT
NECOMEP3800
0%
02-Aug-12
09-Aug-12
13-Aug-13
19-Aug-13
18
680
NECP-Rebase_06Sep12-4.CO.1.6.1.16.1
BUS DUCT
NECOMEP3820
0%
19-Aug-12
26-Aug-12
27-Aug-13
02-Sep-13
12
681
NECP-Rebase_06Sep12-4.CO.1.6.1.16.1
BUS DUCT
NECOMEP3840
0%
04-Sep-12
11-Sep-12
10-Sep-13
16-Sep-13
682
NECP-Rebase_06Sep12-4.CO.1.6.1.16.1
BUS DUCT
NECOMEP3860
0%
20-Sep-12
27-Sep-12
24-Sep-13
30-Sep-13
683
NECP-Rebase_06Sep12-4.CO.1.6.1.16.1
BUS DUCT
NECOMEP3870
0%
29-Sep-12
07-Oct-12
01-Oct-13
07-Oct-13
684
NECP-Rebase_06Sep12-4.CO.1.6.1.16.1
BUS DUCT
NECOMEP3880
685
686
BUS BAR
NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3690
687
688
0%
08-Oct-12
17-Oct-12
08-Oct-13
16-Oct-13
73
7
0%
60
6
25-Jul-12
25-Jul-12
17-Oct-12
01-Aug-12
06-Aug-13
06-Aug-13
16-Oct-13
12-Aug-13
0
0
NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3700
0%
02-Aug-12
09-Aug-12
13-Aug-13
19-Aug-13
NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3710
0%
11-Aug-12
18-Aug-12
20-Aug-13
26-Aug-13
689
NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3720
0%
19-Aug-12
26-Aug-12
27-Aug-13
02-Sep-13
690
NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3730
0%
27-Aug-12
03-Sep-12
03-Sep-13
09-Sep-13
691
NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3740
0%
04-Sep-12
11-Sep-12
10-Sep-13
16-Sep-13
692
NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3750
0%
12-Sep-12
19-Sep-12
17-Sep-13
23-Sep-13
693
NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3760
0%
20-Sep-12
27-Sep-12
24-Sep-13
30-Sep-13
694
NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3770
0%
29-Sep-12
07-Oct-12
01-Oct-13
07-Oct-13
695
NECP-Rebase_06Sep12-4.CO.1.6.1.16.2
BUS BAR
NECOMEP3780
0%
08-Oct-12
17-Oct-12
08-Oct-13
16-Oct-13
69
62
18
11-Aug-12
11-Aug-12
11-Aug-12
29-Oct-12
21-Oct-12
30-Aug-12
17-Jul-13
17-Jul-13
17-Jul-13
24-Sep-13
16-Sep-13
06-Aug-13
52
15
15
696
697
698
0%
60
53
18
699
NECP-Rebase_06Sep12-4.CO.1.6.1.17.1
WIRING
NECOMEP1903
18
0%
18
08-Sep-12
27-Sep-12
07-Aug-13
27-Aug-13
15
700
NECP-Rebase_06Sep12-4.CO.1.6.1.17.1
WIRING
NECOMEP1913
17
0%
17
02-Oct-12
21-Oct-12
28-Aug-13
16-Sep-13
15
701
702
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.17.2
DEVICE INSTALLATION NECOMEP5220
51
7
0%
42
7
01-Sep-12
01-Sep-12
29-Oct-12
08-Sep-12
07-Aug-13
07-Aug-13
24-Sep-13
14-Aug-13
52
57
NECP-Rebase_06Sep12-4.CO.1.6.1.17.2
DEVICE INSTALLATION NECOMEP5230
0%
NECP-Rebase_06Sep12-4.CO.1.6.1.17.2
DEVICE INSTALLATION NECOMEP5240
703
704
705
706
707
708
709
710
29-Sep-12
06-Oct-12
28-Aug-13
04-Sep-13
54
0%
22-Oct-12
29-Oct-12
17-Sep-13
24-Sep-13
52
135
45
0%
35
21
24-Oct-12
24-Oct-12
30-Mar-13
15-Dec-12
02-Oct-13
02-Oct-13
13-Nov-13
28-Oct-13
0
0
NECP-Rebase_06Sep12-4.CO.1.6.1.87
PHASE 1 LOWER BASEMENT
NECOMEP1113
- HV INSTALLATION
Substation
(SUBSTATION
1: Transformer
NO. Installation,
1)
Area A10
45
0%
21
16-Dec-12
05-Feb-13
10-Oct-13
05-Nov-13
NECP-Rebase_06Sep12-4.CO.1.6.1.87
PHASE 1 LOWER BASEMENT
NECOMEP1123
- HV INSTALLATION
Substation
(SUBSTATION
1: MV Panels
NO.
Installation,
1)
Area A10
45
0%
21
06-Feb-13
30-Mar-13
21-Oct-13
13-Nov-13
45
14
0%
45
14
03-Jan-13
03-Jan-13
25-Feb-13
20-Jan-13
29-Apr-13
29-Apr-13
19-Jun-13
14-May-13
65
65
711
NECP-Rebase_06Sep12-4.CO.1.6.1.18
PHASE 1 LOWER BASEMENT
NECOMEP2850
- ELEVATORS Car, Area A2 & Area A10
10
0%
10
20-Jan-13
31-Jan-13
15-May-13
26-May-13
65
712
NECP-Rebase_06Sep12-4.CO.1.6.1.18
PHASE 1 LOWER BASEMENT
NECOMEP2890
- ELEVATORS Hoist Machine, Lift Cables, Area A2 & Area A10
0%
31-Jan-13
09-Feb-13
27-May-13
03-Jun-13
65
713
NECP-Rebase_06Sep12-4.CO.1.6.1.18
PHASE 1 LOWER BASEMENT
NECOMEP2900
- ELEVATORS Electrical, Controls, Area A2 & Area A10
0%
09-Feb-13
17-Feb-13
04-Jun-13
11-Jun-13
65
714
NECP-Rebase_06Sep12-4.CO.1.6.1.18
PHASE 1 LOWER BASEMENT
NECOMEP2910
- ELEVATORS Frames, Doors, Area A2 & Area A10
0%
17-Feb-13
25-Feb-13
12-Jun-13
19-Jun-13
65
24-Oct-12
24-Oct-12
30-Mar-13
15-Dec-12
17-Oct-13
17-Oct-13
26-Nov-13
10-Nov-13
0
0
26-Oct-13
18-Nov-13
715
716
135
45
0%
35
21
717
NECP-Rebase_06Sep12-4.CO.1.6.1.19
PHASE 1 LOWER BASEMENT
NECOMEP2980
- GENERATOR,
UPS,
UPS,Area
BATTERY
A10 SYSTEM
45
0%
21
16-Dec-12
05-Feb-13
718
NECP-Rebase_06Sep12-4.CO.1.6.1.19
PHASE 1 LOWER BASEMENT
NECOMEP2990
- GENERATOR,
Battery
UPS, System,
BATTERY
Area
SYSTEM
A10
45
0%
21
06-Feb-13
30-Mar-13
03-Nov-13
26-Nov-13
719
720
30
6
10-Feb-13
10-Feb-13
16-Mar-13
16-Feb-13
13-May-13
13-May-13
16-Jun-13
19-May-13
74
74
0%
0%
17-Feb-13
24-Feb-13
20-May-13
27-May-13
74
NECP-Rebase_06Sep12-4.CO.1.6.1.20
PHASE 1 LOWER BASEMENT
NECOMEP3050
- ESCALATORS
Steps Assembly, Area A1-Area A2
0%
25-Feb-13
04-Mar-13
28-May-13
04-Jun-13
74
723
NECP-Rebase_06Sep12-4.CO.1.6.1.20
PHASE 1 LOWER BASEMENT
NECOMEP3060
- ESCALATORS
Handrail, Area A1-Area A2
0%
05-Mar-13
09-Mar-13
05-Jun-13
09-Jun-13
74
724
NECP-Rebase_06Sep12-4.CO.1.6.1.20
PHASE 1 LOWER BASEMENT
NECOMEP3070
- ESCALATORS
Electrical, Controls, Area A1-Area A2
0%
10-Mar-13
16-Mar-13
10-Jun-13
16-Jun-13
74
66
41
13
18-Jul-12
18-Jul-12
18-Jul-12
02-Oct-12
03-Sep-12
01-Aug-12
17-Jul-13
17-Jul-13
17-Jul-13
09-Sep-13
27-Aug-13
30-Jul-13
0
4
0
0%
NECP-Rebase_06Sep12-4.CO.1.6.1.21.1
WIRING
NECOMEP3140
12
0%
12
02-Aug-12
15-Aug-12
31-Jul-13
13-Aug-13
729
NECP-Rebase_06Sep12-4.CO.1.6.1.21.1
WIRING
NECOMEP3150
12
0%
12
21-Aug-12
03-Sep-12
14-Aug-13
27-Aug-13
730
731
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.21.2
DEVICE INSTALLATION NECOMEP5250
24
7
0%
31
7
05-Sep-12
05-Sep-12
02-Oct-12
12-Sep-12
05-Aug-13
05-Aug-13
09-Sep-13
12-Aug-13
0
0
732
NECP-Rebase_06Sep12-4.CO.1.6.1.21.2
DEVICE INSTALLATION NECOMEP5260
0%
13-Sep-12
20-Sep-12
25-Aug-13
01-Sep-13
733
NECP-Rebase_06Sep12-4.CO.1.6.1.21.2
DEVICE INSTALLATION NECOMEP5270
0%
25-Sep-12
02-Oct-12
02-Sep-13
09-Sep-13
52
38
13
04-Aug-12
04-Aug-12
04-Aug-12
02-Oct-12
16-Sep-12
18-Aug-12
25-Jul-13
25-Jul-13
25-Jul-13
17-Sep-13
04-Sep-13
07-Aug-13
0
0
0
734
735
736
0%
47
36
12
737
NECP-Rebase_06Sep12-4.CO.1.6.1.22.1
WIRING
NECOMEP3260
13
0%
12
19-Aug-12
02-Sep-12
08-Aug-13
21-Aug-13
738
NECP-Rebase_06Sep12-4.CO.1.6.1.22.1
WIRING
NECOMEP3270
12
0%
12
03-Sep-12
16-Sep-12
22-Aug-13
04-Sep-13
739
740
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.22.2
DEVICE INSTALLATION NECOMEP5280
39
7
0%
21
7
19-Aug-12
19-Aug-12
02-Oct-12
26-Aug-12
25-Aug-13
25-Aug-13
17-Sep-13
01-Sep-13
0
0
741
NECP-Rebase_06Sep12-4.CO.1.6.1.22.2
DEVICE INSTALLATION NECOMEP5290
0%
03-Sep-12
10-Sep-12
02-Sep-13
09-Sep-13
742
NECP-Rebase_06Sep12-4.CO.1.6.1.22.2
DEVICE INSTALLATION NECOMEP5300
0%
25-Sep-12
02-Oct-12
10-Sep-13
17-Sep-13
743
744
745
28
21
7
0%
65
21
7
16-Sep-12
16-Sep-12
16-Sep-12
17-Oct-12
09-Oct-12
23-Sep-12
07-Sep-13
07-Sep-13
07-Sep-13
23-Nov-13
30-Sep-13
14-Sep-13
0
0
0
746
NECP-Rebase_06Sep12-4.CO.1.6.1.23.1
WIRING
NECOMEP3380
0%
24-Sep-12
01-Oct-12
15-Sep-13
22-Sep-13
747
NECP-Rebase_06Sep12-4.CO.1.6.1.23.1
WIRING
NECOMEP3390
0%
02-Oct-12
09-Oct-12
23-Sep-13
30-Sep-13
748
749
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.23.2
DEVICE INSTALLATION NECOMEP5320
21
7
0%
44
7
24-Sep-12
02-Oct-12
17-Oct-12
09-Oct-12
01-Oct-13
01-Oct-13
23-Nov-13
08-Oct-13
0
0
750
NECP-Rebase_06Sep12-4.CO.1.6.1.23.2
DEVICE INSTALLATION NECOMEP5330
0%
10-Oct-12
17-Oct-12
09-Oct-13
19-Oct-13
751
NECP-Rebase_06Sep12-4.CO.1.6.1.23.2
DEVICE INSTALLATION NECOMEP5310
0%
24-Sep-12
01-Oct-12
16-Nov-13
23-Nov-13
174
21
7
16-Sep-12
16-Sep-12
16-Sep-12
06-Apr-13
09-Oct-12
23-Sep-12
07-Sep-13
07-Sep-13
07-Sep-13
21-Nov-13
30-Sep-13
14-Sep-13
0
0
0
752
753
754
0%
64
21
7
755
NECP-Rebase_06Sep12-4.CO.1.6.1.24.1
WIRING
NECOMEP3500
0%
24-Sep-12
01-Oct-12
15-Sep-13
22-Sep-13
756
NECP-Rebase_06Sep12-4.CO.1.6.1.24.1
WIRING
NECOMEP3510
0%
02-Oct-12
09-Oct-12
23-Sep-13
30-Sep-13
757
758
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.24.2
DEVICE INSTALLATION NECOMEP5340
63
7
0%
21
7
23-Jan-13
23-Jan-13
06-Apr-13
30-Jan-13
29-Oct-13
29-Oct-13
21-Nov-13
05-Nov-13
0
0
759
NECP-Rebase_06Sep12-4.CO.1.6.1.24.2
DEVICE INSTALLATION NECOMEP5350
0%
26-Feb-13
05-Mar-13
06-Nov-13
13-Nov-13
760
NECP-Rebase_06Sep12-4.CO.1.6.1.24.2
DEVICE INSTALLATION NECOMEP5360
0%
30-Mar-13
06-Apr-13
14-Nov-13
21-Nov-13
761
762
763
31
15
15
0%
31
15
15
07-Nov-12
07-Nov-12
07-Nov-12
12-Dec-12
24-Nov-12
24-Nov-12
26-Aug-13
26-Aug-13
26-Aug-13
30-Sep-13
11-Sep-13
11-Sep-13
43
0
0
764
765
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.25.2
DEVICE INSTALLATION NECOMEP5380
16
16
0%
16
16
25-Nov-12
25-Nov-12
12-Dec-12
12-Dec-12
12-Sep-13
12-Sep-13
30-Sep-13
30-Sep-13
43
43
766
767
768
0%
30
15
15
24-Nov-12
24-Nov-12
24-Nov-12
21-May-13
10-Dec-12
10-Dec-12
11-Sep-13
11-Sep-13
11-Sep-13
17-Oct-13
28-Sep-13
28-Sep-13
30
0
0
154
15
15
Jan
NECP-Rebase_06Sep12-4.CO.1.6.1.20
PHASE 1 LOWER BASEMENT
NECOMEP3040
- ESCALATORS
Gear Assembly, Area A1-Area A2
728
Dec
722
47
36
12
Nov
721
Oct
Cold Water & Hot Water Pipe, Booster Pumps & Firefighting Pumps Installation, Area A8-A10
30
6
725
726
727
Sep
Cold Water & Hot Water Pipe, Booster Pumps & Firefighting Pumps Installation, Area A5-A7
01-Jan-13
04-Jul-12
23-Jul-12
667
Aug
05-Jan-13
77
8
2014
Jul
Cold Water & Hot Water Pipe, Booster Pumps & Firefighting Pumps Installation, Area A1-A4
25-Dec-12
Jun
NECP-Rebase_06Sep12-4.CO.1.6.1.14
PHASE 1 LOWER BASEMENT
NECOMEP1510
- COLD WATER,
Cold
HOT
Water
WATER,
& HotFIREFIGHTING
Water Pipe, Booster
INSTALLATION
Pumps & Firefighting Pumps Installation,
7 Area A8-A10
0%
665
666
May
105
5
664
Feb
WBS
WBS Name
Activity ID
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.1.26.2
DEVICE INSTALLATION NECOMEP5370
Activity Name
BL Project
Duration
Activity % Remaining
Complete Duration
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
15
15
0%
15
15
05-May-13
05-May-13
21-May-13
21-May-13
Actual Start
Actual
Finish
29-Sep-13
29-Sep-13
17-Oct-13
17-Oct-13
30
30
12-Mar-13
23-Jul-13
23-Jul-13
30-Nov-13
15-Oct-13
31-Jul-13
40
32
32
771
772
773
295
81
8
0%
223
70
7
16-May-12
29-Sep-12
29-Sep-12
24-Apr-13
31-Dec-12
07-Oct-12
774
NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1615
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A2
0%
08-Oct-12
16-Oct-12
31-Jul-13
08-Aug-13
32
775
NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1625
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A3
0%
17-Oct-12
25-Oct-12
08-Aug-13
17-Aug-13
32
776
NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1635
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A4
0%
27-Oct-12
04-Nov-12
17-Aug-13
25-Aug-13
32
777
NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1645
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A5
0%
05-Nov-12
13-Nov-12
25-Aug-13
02-Sep-13
32
778
NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1655
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A6
0%
14-Nov-12
22-Nov-12
02-Sep-13
10-Sep-13
32
779
NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1665
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A7
0%
24-Nov-12
02-Dec-12
10-Sep-13
18-Sep-13
32
780
NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1675
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A8
0%
03-Dec-12
10-Dec-12
18-Sep-13
26-Sep-13
32
781
NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1685
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A9
0%
13-Dec-12
20-Dec-12
26-Sep-13
05-Oct-13
32
782
NECP-Rebase_06Sep12-4.CO.1.6.2.47
PHASE 1 UPPER BASEMENT
NECOMEP1695
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area A10
0%
24-Dec-12
31-Dec-12
05-Oct-13
15-Oct-13
32
87
87
7
20-Sep-12
20-Sep-12
20-Sep-12
30-Dec-12
30-Dec-12
27-Sep-12
04-Jul-13
04-Jul-13
04-Jul-13
19-Sep-13
12-Sep-13
11-Jul-13
48
54
42
783
784
785
0%
66
60
6
786
NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3900
0%
01-Oct-12
08-Oct-12
11-Jul-13
18-Jul-13
48
787
NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3910
0%
11-Oct-12
18-Oct-12
18-Jul-13
25-Jul-13
50
788
NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3920
0%
22-Oct-12
29-Oct-12
25-Jul-13
01-Aug-13
52
789
NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3930
0%
01-Nov-12
08-Nov-12
01-Aug-13
08-Aug-13
54
790
NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3940
0%
12-Nov-12
19-Nov-12
08-Aug-13
15-Aug-13
54
791
NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3950
0%
22-Nov-12
29-Nov-12
15-Aug-13
22-Aug-13
54
792
NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3960
0%
03-Dec-12
09-Dec-12
22-Aug-13
29-Aug-13
54
793
NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3970
0%
13-Dec-12
19-Dec-12
29-Aug-13
05-Sep-13
54
794
NECP-Rebase_06Sep12-4.CO.1.6.2.45.2
FIRE FIGHTING
NECOMEP3980
0%
24-Dec-12
30-Dec-12
05-Sep-13
12-Sep-13
54
795
796
WATER SUPPLY
NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP3990
87
7
0%
66
6
20-Sep-12
20-Sep-12
30-Dec-12
27-Sep-12
04-Jul-13
04-Jul-13
19-Sep-13
11-Jul-13
48
42
797
NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4000
0%
01-Oct-12
08-Oct-12
11-Jul-13
18-Jul-13
48
798
NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4010
0%
11-Oct-12
18-Oct-12
21-Jul-13
28-Jul-13
48
799
NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4020
0%
22-Oct-12
29-Oct-12
30-Jul-13
06-Aug-13
48
800
NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4030
0%
01-Nov-12
08-Nov-12
08-Aug-13
15-Aug-13
48
801
NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4040
0%
12-Nov-12
19-Nov-12
15-Aug-13
22-Aug-13
48
802
NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4050
0%
22-Nov-12
29-Nov-12
22-Aug-13
29-Aug-13
48
803
NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4060
0%
03-Dec-12
09-Dec-12
29-Aug-13
05-Sep-13
48
804
NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4070
0%
13-Dec-12
19-Dec-12
05-Sep-13
12-Sep-13
48
805
NECP-Rebase_06Sep12-4.CO.1.6.2.45.3
WATER SUPPLY
NECOMEP4080
0%
24-Dec-12
30-Dec-12
12-Sep-13
19-Sep-13
48
806
807
92
10
0%
70
7
01-Jan-13
01-Jan-13
17-Apr-13
12-Jan-13
02-Sep-13
02-Sep-13
25-Nov-13
10-Sep-13
44
44
808
NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1415
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A2
10
0%
13-Jan-13
23-Jan-13
10-Sep-13
18-Sep-13
44
809
NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1425
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A3
0%
24-Jan-13
03-Feb-13
18-Sep-13
26-Sep-13
44
810
NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1435
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A4
0%
04-Feb-13
13-Feb-13
26-Sep-13
05-Oct-13
44
811
NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1445
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A5
0%
14-Feb-13
24-Feb-13
05-Oct-13
15-Oct-13
44
812
NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1455
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A6
0%
25-Feb-13
06-Mar-13
15-Oct-13
23-Oct-13
44
813
NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1465
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A7
0%
07-Mar-13
17-Mar-13
23-Oct-13
31-Oct-13
44
814
NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1475
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A8
0%
18-Mar-13
27-Mar-13
31-Oct-13
09-Nov-13
44
815
NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1485
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A9
0%
28-Mar-13
07-Apr-13
09-Nov-13
17-Nov-13
44
816
NECP-Rebase_06Sep12-4.CO.1.6.2.46
PHASE 1 UPPER BASEMENT
NECOMEP1495
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area A10
0%
08-Apr-13
17-Apr-13
17-Nov-13
25-Nov-13
44
84
77
8
0%
66
60
6
24-Dec-12
24-Dec-12
24-Dec-12
31-Mar-13
23-Mar-13
01-Jan-13
13-Jul-13
13-Jul-13
13-Jul-13
26-Sep-13
19-Sep-13
18-Jul-13
61
61
41
0%
02-Jan-13
10-Jan-13
20-Jul-13
25-Jul-13
42
0%
12-Jan-13
20-Jan-13
27-Jul-13
01-Aug-13
43
NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1730
0%
21-Jan-13
29-Jan-13
03-Aug-13
08-Aug-13
53
823
NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1740
0%
30-Jan-13
07-Feb-13
10-Aug-13
15-Aug-13
56
824
NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1750
0%
09-Feb-13
17-Feb-13
17-Aug-13
22-Aug-13
57
825
NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1760
0%
18-Feb-13
26-Feb-13
24-Aug-13
29-Aug-13
58
826
NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1770
0%
27-Feb-13
06-Mar-13
31-Aug-13
05-Sep-13
59
827
NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1780
0%
07-Mar-13
14-Mar-13
07-Sep-13
12-Sep-13
60
828
NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1790
829
830
INSULATION
NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4090
831
832
817
818
819
820
NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1710
821
NECP-Rebase_06Sep12-4.CO.1.6.2.48.1
INSTALLATION
NECOMEP1720
822
0%
16-Mar-13
23-Mar-13
14-Sep-13
19-Sep-13
61
76
8
0%
60
6
02-Jan-13
02-Jan-13
31-Mar-13
10-Jan-13
20-Jul-13
20-Jul-13
26-Sep-13
25-Jul-13
61
41
NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4100
0%
12-Jan-13
20-Jan-13
27-Jul-13
01-Aug-13
42
NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4110
0%
21-Jan-13
30-Jan-13
03-Aug-13
08-Aug-13
43
833
NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4120
0%
30-Jan-13
07-Feb-13
10-Aug-13
15-Aug-13
53
834
NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4130
0%
09-Feb-13
17-Feb-13
17-Aug-13
22-Aug-13
56
835
NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4140
0%
18-Feb-13
26-Feb-13
24-Aug-13
29-Aug-13
57
836
NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4150
0%
27-Feb-13
07-Mar-13
31-Aug-13
05-Sep-13
58
837
NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4160
0%
07-Mar-13
14-Mar-13
07-Sep-13
12-Sep-13
59
838
NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4170
0%
16-Mar-13
24-Mar-13
14-Sep-13
19-Sep-13
60
839
NECP-Rebase_06Sep12-4.CO.1.6.2.48.2
INSULATION
NECOMEP4180
0%
24-Mar-13
31-Mar-13
21-Sep-13
26-Sep-13
61
09-Feb-13
09-Feb-13
04-Apr-13
25-Feb-13
18-Sep-13
18-Sep-13
31-Oct-13
06-Oct-13
49
17
09-Mar-13
19-Mar-13
06-Oct-13
20-Oct-13
26
840
841
48
15
0%
35
15
842
NECP-Rebase_06Sep12-4.CO.1.6.2.50
PHASE 1 UPPER BASEMENT
NECOMEP1840
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area A5-A7
10
0%
10
NECP-Rebase_06Sep12-4.CO.1.6.2.50
PHASE 1 UPPER BASEMENT
NECOMEP1850
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area A8-A10
10
843
0%
10
25-Mar-13
04-Apr-13
20-Oct-13
31-Oct-13
49
844
845
30
10
0%
30
10
24-Dec-12
24-Dec-12
27-Jan-13
03-Jan-13
16-Jul-13
16-Jul-13
20-Aug-13
28-Jul-13
57
57
846
NECP-Rebase_06Sep12-4.CO.1.6.2.51
PHASE 1 UPPER BASEMENT
NECOMEP1270
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area A5-A7
10
0%
10
05-Jan-13
15-Jan-13
28-Jul-13
08-Aug-13
57
847
NECP-Rebase_06Sep12-4.CO.1.6.2.51
PHASE 1 UPPER BASEMENT
NECOMEP1280
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area A8-A10
10
0%
10
16-Jan-13
27-Jan-13
08-Aug-13
20-Aug-13
57
07-Feb-13
21-Jan-13
18-Aug-13
18-Aug-13
28-Sep-13
25-Aug-13
72
63
848
849
23
8
0%
36
7
13-Jan-13
13-Jan-13
850
NECP-Rebase_06Sep12-4.CO.1.6.2.52
PHASE 1 UPPER BASEMENT
NECOMEP1530
- COLD WATER,
Cold
HOT
Water,
WATER,
Hot Water
FIREF &
IGHTING
Firefighting
INSTALLATION
Installation, Area A5-A7
0%
22-Jan-13
30-Jan-13
29-Aug-13
07-Sep-13
83
851
NECP-Rebase_06Sep12-4.CO.1.6.2.52
PHASE 1 UPPER BASEMENT
NECOMEP1540
- COLD WATER,
Cold
HOT
Water,
WATER,
Hot Water
FIREF &
IGHTING
Firefighting
INSTALLATION
Installation, Area A8-A10
0%
31-Jan-13
07-Feb-13
19-Sep-13
28-Sep-13
72
08-Nov-12
08-Nov-12
08-Nov-12
15-Apr-13
10-Jan-13
18-Nov-12
19-Aug-13
19-Aug-13
19-Aug-13
09-Nov-13
18-Sep-13
28-Aug-13
49
22
11
852
853
854
136
55
9
0%
68
27
9
855
NECP-Rebase_06Sep12-4.CO.1.6.2.53.1
WIRING
NECOMEP1243
0%
06-Dec-12
16-Dec-12
29-Aug-13
08-Sep-13
11
856
NECP-Rebase_06Sep12-4.CO.1.6.2.53.1
WIRING
NECOMEP1253
0%
01-Jan-13
10-Jan-13
09-Sep-13
18-Sep-13
22
857
858
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.53.2
DEVICE INSTALLATION NECOMEP5400
42
7
0%
27
7
26-Feb-13
26-Feb-13
15-Apr-13
05-Mar-13
06-Oct-13
06-Oct-13
09-Nov-13
16-Oct-13
49
29
859
NECP-Rebase_06Sep12-4.CO.1.6.2.53.2
DEVICE INSTALLATION NECOMEP5410
0%
20-Mar-13
27-Mar-13
20-Oct-13
28-Oct-13
26
860
NECP-Rebase_06Sep12-4.CO.1.6.2.53.2
DEVICE INSTALLATION NECOMEP5420
0%
08-Apr-13
15-Apr-13
31-Oct-13
09-Nov-13
49
02-Oct-12
02-Oct-12
31-Dec-12
10-Oct-12
02-May-13
02-May-13
11-Jul-13
09-May-13
67
67
861
862
78
8
0%
60
6
863
NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1815
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A2
0%
11-Oct-12
20-Oct-12
09-May-13
16-May-13
67
864
NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1825
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A3
0%
21-Oct-12
29-Oct-12
16-May-13
23-May-13
67
865
NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1835
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A4
0%
30-Oct-12
07-Nov-12
23-May-13
30-May-13
67
866
NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1845
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A5
0%
08-Nov-12
17-Nov-12
30-May-13
06-Jun-13
67
867
NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1855
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A6
0%
18-Nov-12
26-Nov-12
06-Jun-13
13-Jun-13
67
868
NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1865
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A7
0%
27-Nov-12
05-Dec-12
13-Jun-13
20-Jun-13
67
869
NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1875
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A8
0%
06-Dec-12
13-Dec-12
20-Jun-13
27-Jun-13
67
870
NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1885
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A9
0%
15-Dec-12
22-Dec-12
27-Jun-13
04-Jul-13
67
871
NECP-Rebase_06Sep12-4.CO.1.6.2.54
PHASE 1 UPPER BASEMENT
NECOMEP1895
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area A10
0%
24-Dec-12
31-Dec-12
04-Jul-13
11-Jul-13
67
11-Oct-12
11-Oct-12
11-Oct-12
08-Jan-13
08-Jan-13
18-Oct-12
09-May-13
09-May-13
09-May-13
18-Jul-13
18-Jul-13
16-May-13
67
67
67
21-Oct-12
28-Oct-12
16-May-13
23-May-13
67
872
873
874
77
77
7
0%
60
60
6
875
NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1910
0%
876
NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1920
0%
30-Oct-12
06-Nov-12
23-May-13
30-May-13
67
877
NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1930
0%
08-Nov-12
15-Nov-12
30-May-13
06-Jun-13
67
878
NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1940
0%
18-Nov-12
25-Nov-12
06-Jun-13
13-Jun-13
67
879
NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1950
0%
27-Nov-12
04-Dec-12
13-Jun-13
20-Jun-13
67
2013
Jan
Feb
Mar
Apr
May
2014
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
880
NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1960
0%
06-Dec-12
13-Dec-12
20-Jun-13
27-Jun-13
67
881
NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1970
0%
15-Dec-12
22-Dec-12
27-Jun-13
04-Jul-13
67
NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1980
0%
NECP-Rebase_06Sep12-4.CO.1.6.2.55.1
BUS BAR LIGHTING
NECOMEP1990
882
883
884
885
886
WBS
WBS Name
Activity ID
Activity Name
BL Project
Duration
Activity % Remaining
Complete Duration
Actual Start
Actual
Finish
04-Jul-13
2013
Jan
Feb
Mar
Apr
May
2014
Jun
Jul
Aug
Sep
Oct
Nov
Dec
23-Dec-12
30-Dec-12
11-Jul-13
67
0%
01-Jan-13
08-Jan-13
11-Jul-13
18-Jul-13
67
136
63
18
08-Nov-12
08-Nov-12
06-Dec-12
15-Apr-13
20-Jan-13
26-Dec-12
08-Sep-13
08-Sep-13
08-Sep-13
19-Oct-13
08-Oct-13
28-Sep-13
66
33
42
0%
887
NECP-Rebase_06Sep12-4.CO.1.6.2.56.1
WIRING
NECOMEP4310
17
0%
17
01-Jan-13
20-Jan-13
09-Sep-13
28-Sep-13
11
888
NECP-Rebase_06Sep12-4.CO.1.6.2.56.1
WIRING
NECOMEP4290
19
0%
19
08-Nov-12
29-Nov-12
17-Sep-13
08-Oct-13
15
889
890
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.56.2
DEVICE INSTALLATION NECOMEP1933
37
7
0%
16
7
04-Mar-13
07-Mar-13
15-Apr-13
14-Mar-13
29-Sep-13
29-Sep-13
19-Oct-13
06-Oct-13
66
42
NECP-Rebase_06Sep12-4.CO.1.6.2.56.2
DEVICE INSTALLATION NECOMEP1943
0%
NECP-Rebase_06Sep12-4.CO.1.6.2.56.2
DEVICE INSTALLATION NECOMEP1923
892
893
894
08-Apr-13
29-Sep-13
06-Oct-13
75
0%
04-Mar-13
11-Mar-13
09-Oct-13
19-Oct-13
15
24
7
0%
24
7
20-Jan-13
20-Jan-13
17-Feb-13
28-Jan-13
15-Apr-13
15-May-13
15-May-13
11-Jun-13
22-May-13
78
78
895
NECP-Rebase_06Sep12-4.CO.1.6.2.57
PHASE 1 UPPER BASEMENT
NECOMEP2930
- ELEVATORS Car, Area A1
0%
28-Jan-13
03-Feb-13
23-May-13
28-May-13
78
896
NECP-Rebase_06Sep12-4.CO.1.6.2.57
PHASE 1 UPPER BASEMENT
NECOMEP2940
- ELEVATORS Hoist Machine, Lift Cables, Area A1
0%
03-Feb-13
07-Feb-13
29-May-13
02-Jun-13
78
897
NECP-Rebase_06Sep12-4.CO.1.6.2.57
PHASE 1 UPPER BASEMENT
NECOMEP2950
- ELEVATORS Electrical, Controls, Area A1
0%
07-Feb-13
12-Feb-13
03-Jun-13
06-Jun-13
78
898
NECP-Rebase_06Sep12-4.CO.1.6.2.57
PHASE 1 UPPER BASEMENT
NECOMEP2960
- ELEVATORS Frames, Doors, Area A1
0%
12-Feb-13
17-Feb-13
08-Jun-13
11-Jun-13
78
30
6
0%
30
6
17-Mar-13
17-Mar-13
20-Apr-13
23-Mar-13
17-Jun-13
17-Jun-13
21-Jul-13
23-Jun-13
74
74
899
900
901
NECP-Rebase_06Sep12-4.CO.1.6.2.59
PHASE 1 UPPER BASEMENT
NECOMEP3090
- ESCALATORSGear Assembly, Area A1-Area A2
0%
24-Mar-13
31-Mar-13
24-Jun-13
01-Jul-13
74
902
NECP-Rebase_06Sep12-4.CO.1.6.2.59
PHASE 1 UPPER BASEMENT
NECOMEP3100
- ESCALATORSSteps Assembly, Area A1-Area A2
0%
01-Apr-13
08-Apr-13
02-Jul-13
09-Jul-13
74
903
NECP-Rebase_06Sep12-4.CO.1.6.2.59
PHASE 1 UPPER BASEMENT
NECOMEP3110
- ESCALATORSHandrail, Area A1-Area A2
0%
09-Apr-13
13-Apr-13
10-Jul-13
14-Jul-13
74
904
905
906
907
NECP-Rebase_06Sep12-4.CO.1.6.2.59
PHASE 1 UPPER BASEMENT
NECOMEP3120
- ESCALATORSElectrical, Controls, Area A1-Area A2
0%
14-Apr-13
20-Apr-13
15-Jul-13
21-Jul-13
74
287
77
13
16-May-12
16-May-12
16-May-12
15-Apr-13
13-Aug-12
30-May-12
12-Mar-13
12-Mar-13
12-Mar-13
24-Aug-13
25-Apr-13
27-Mar-13
46
90
90
05-Jul-12
19-Jul-12
27-Mar-13
11-Apr-13
90
0%
141
38
13
NECP-Rebase_06Sep12-4.CO.1.6.2.60.1
WIRING
NECOMEP3170
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A5-A7
13
0%
13
909
NECP-Rebase_06Sep12-4.CO.1.6.2.60.1
WIRING
NECOMEP3180
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A8-A10
12
0%
12
31-Jul-12
13-Aug-12
11-Apr-13
25-Apr-13
90
910
911
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.60.2
DEVICE INSTALLATION NECOMEP4320
61
7
0%
61
7
04-Feb-13
04-Feb-13
15-Apr-13
11-Feb-13
15-Jun-13
15-Jun-13
24-Aug-13
22-Jun-13
46
86
912
NECP-Rebase_06Sep12-4.CO.1.6.2.60.2
DEVICE INSTALLATION NECOMEP4330
0%
07-Mar-13
14-Mar-13
16-Jul-13
23-Jul-13
66
913
NECP-Rebase_06Sep12-4.CO.1.6.2.60.2
DEVICE INSTALLATION NECOMEP4340
0%
08-Apr-13
15-Apr-13
17-Aug-13
24-Aug-13
46
188
39
13
17-Sep-12
17-Sep-12
17-Sep-12
23-Apr-13
31-Oct-12
01-Oct-12
05-Sep-13
05-Sep-13
05-Sep-13
27-Oct-13
19-Oct-13
18-Sep-13
0
0
0
02-Oct-12
16-Oct-12
19-Sep-13
02-Oct-13
908
914
915
916
0%
43
36
12
NECP-Rebase_06Sep12-4.CO.1.6.2.61.1
WIRING
NECOMEP3290
13
0%
12
918
NECP-Rebase_06Sep12-4.CO.1.6.2.61.1
WIRING
NECOMEP3300
13
0%
12
17-Oct-12
31-Oct-12
03-Oct-13
19-Oct-13
919
920
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.61.2
DEVICE INSTALLATION NECOMEP4350
61
7
0%
31
7
12-Feb-13
12-Feb-13
23-Apr-13
19-Feb-13
19-Sep-13
19-Sep-13
27-Oct-13
26-Sep-13
0
10
921
NECP-Rebase_06Sep12-4.CO.1.6.2.61.2
DEVICE INSTALLATION NECOMEP4360
0%
16-Mar-13
23-Mar-13
03-Oct-13
10-Oct-13
922
NECP-Rebase_06Sep12-4.CO.1.6.2.61.2
DEVICE INSTALLATION NECOMEP4370
0%
16-Apr-13
23-Apr-13
20-Oct-13
27-Oct-13
923
924
925
136
53
7
0%
45
38
7
08-Nov-12
08-Nov-12
08-Nov-12
15-Apr-13
08-Jan-13
15-Nov-12
07-Oct-13
07-Oct-13
07-Oct-13
30-Nov-13
21-Nov-13
16-Oct-13
12
12
4
926
NECP-Rebase_06Sep12-4.CO.1.6.2.62.1
WIRING
NECOMEP3410
0%
06-Dec-12
13-Dec-12
06-Nov-13
13-Nov-13
927
NECP-Rebase_06Sep12-4.CO.1.6.2.62.1
WIRING
NECOMEP3420
928
929
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.62.2
DEVICE INSTALLATION NECOMEP4380
930
931
917
932
933
934
935
0%
01-Jan-13
08-Jan-13
14-Nov-13
21-Nov-13
12
61
7
0%
21
7
04-Feb-13
04-Feb-13
15-Apr-13
11-Feb-13
06-Nov-13
06-Nov-13
30-Nov-13
13-Nov-13
12
11
NECP-Rebase_06Sep12-4.CO.1.6.2.62.2
DEVICE INSTALLATION NECOMEP4390
0%
07-Mar-13
14-Mar-13
14-Nov-13
21-Nov-13
NECP-Rebase_06Sep12-4.CO.1.6.2.62.2
DEVICE INSTALLATION NECOMEP4400
0%
08-Apr-13
15-Apr-13
23-Nov-13
30-Nov-13
12
136
53
7
0%
28
21
7
08-Nov-12
08-Nov-12
08-Nov-12
15-Apr-13
08-Jan-13
15-Nov-12
01-Oct-13
01-Oct-13
01-Oct-13
04-Nov-13
27-Oct-13
08-Oct-13
33
0
0
0%
10-Dec-12
17-Dec-12
09-Oct-13
19-Oct-13
936
NECP-Rebase_06Sep12-4.CO.1.6.2.63.1
WIRING
NECOMEP3540
937
938
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.63.2
DEVICE INSTALLATION NECOMEP4410
939
940
941
942
943
944
945
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.64.2
DEVICE INSTALLATION NECOMEP5430
946
947
948
949
950
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.1.6.2.65.2
DEVICE INSTALLATION NECOMEP5440
Jan
34
27
18
891
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A1-A4
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A5-A7
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area A8-A10
Luminaires, Lighting Points, Switch Points, etc., Area A1-A4
Luminaires, Lighting Points, Switch Points, etc., Area A5-A7
Luminaires, Lighting Points, Switch Points, etc., Area A8-A10
0%
01-Jan-13
08-Jan-13
20-Oct-13
27-Oct-13
61
7
0%
21
7
04-Feb-13
04-Feb-13
15-Apr-13
11-Feb-13
09-Oct-13
09-Oct-13
04-Nov-13
19-Oct-13
33
33
NECP-Rebase_06Sep12-4.CO.1.6.2.63.2
DEVICE INSTALLATION NECOMEP4420
0%
07-Mar-13
14-Mar-13
20-Oct-13
27-Oct-13
26
NECP-Rebase_06Sep12-4.CO.1.6.2.63.2
DEVICE INSTALLATION NECOMEP4430
0%
08-Apr-13
15-Apr-13
28-Oct-13
04-Nov-13
33
0%
30
15
15
01-Jan-13
01-Jan-13
01-Jan-13
24-Apr-13
17-Jan-13
17-Jan-13
12-Sep-13
12-Sep-13
12-Sep-13
19-Oct-13
29-Sep-13
29-Sep-13
47
14
14
08-Apr-13
08-Apr-13
24-Apr-13
24-Apr-13
30-Sep-13
30-Sep-13
19-Oct-13
19-Oct-13
47
47
98
15
15
15
15
0%
15
15
98
15
15
0%
30
15
15
01-Jan-13
01-Jan-13
01-Jan-13
24-Apr-13
17-Jan-13
17-Jan-13
29-Sep-13
29-Sep-13
29-Sep-13
04-Nov-13
17-Oct-13
17-Oct-13
33
0
0
15
15
0%
15
15
08-Apr-13
08-Apr-13
24-Apr-13
24-Apr-13
19-Oct-13
19-Oct-13
04-Nov-13
04-Nov-13
33
33
08-May-12
08-May-12
08-May-12
08-May-12
02-Sep-13
17-Aug-13
08-Sep-12
19-May-12
31-Jan-13
31-Jan-13
10-Feb-13
10-Feb-13
15-Jan-14
15-Jan-14
17-Apr-13
20-Feb-13
4
4
46
46
12-Dec-12
12-Dec-12
951
952
953
954
Internal Finishes
Lower Basement Floor
PHASE 1 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDS
NECP-Rebase_06Sep12-4.CO.1.7.1.2
PHASE 1 LOWER BASEMENT
NECOBFW1600
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A1
413
399
106
10
0%
297
297
58
10
955
NECP-Rebase_06Sep12-4.CO.1.7.1.2
PHASE 1 LOWER BASEMENT
NECOBFW1610
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A2
10
0%
10
20-May-12
30-May-12
21-Feb-13
04-Mar-13
46
956
NECP-Rebase_06Sep12-4.CO.1.7.1.2
PHASE 1 LOWER BASEMENT
NECOBFW1620
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A5
10
0%
10
28-Jun-12
09-Jul-12
05-Mar-13
16-Mar-13
46
957
NECP-Rebase_06Sep12-4.CO.1.7.1.2
PHASE 1 LOWER BASEMENT
NECOBFW1630
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A6
10
0%
10
10-Jul-12
21-Jul-12
17-Mar-13
27-Mar-13
46
958
NECP-Rebase_06Sep12-4.CO.1.7.1.2
PHASE 1 LOWER BASEMENT
NECOBFW1640
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A9
0%
19-Aug-12
28-Aug-12
28-Mar-13
07-Apr-13
46
959
NECP-Rebase_06Sep12-4.CO.1.7.1.2
PHASE 1 LOWER BASEMENT
NECOBFW1650
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A10
0%
29-Aug-12
08-Sep-12
08-Apr-13
17-Apr-13
46
28-May-12
28-May-12
30-Jul-12
13-Jul-13
09-Sep-12
08-Aug-12
12-Dec-12
12-Dec-12
26-Dec-12
31-Jan-13
31-Jan-13
31-Jan-13
29-Dec-13
18-Mar-13
06-Feb-13
19
108
137
960
961
962
352
90
9
15%
282
40
5
963
NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1220
12.01%
18-Jun-12
27-Jun-12
15-Dec-12
31-Jan-13
06-Feb-13
113
964
NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1230
12.01%
28-Jun-12
08-Jul-12
15-Dec-12
31-Jan-13
06-Feb-13
119
965
NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1240
12.01%
09-Jul-12
18-Jul-12
12-Dec-12
31-Jan-13
06-Feb-13
125
966
NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1250
12.01%
19-Jul-12
29-Jul-12
21-Dec-12
31-Jan-13
06-Feb-13
131
967
NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1270
12.01%
09-Aug-12
19-Aug-12
15-Jan-13
31-Jan-13
06-Feb-13
143
968
NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1280
12.01%
20-Aug-12
29-Aug-12
21-Dec-12
31-Jan-13
06-Feb-13
84
969
NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1290
0%
30-Aug-12
09-Sep-12
06-Feb-13
13-Feb-13
84
970
NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1190
0%
28-May-12
06-Jun-12
05-Mar-13
11-Mar-13
71
971
NECP-Rebase_06Sep12-4.CO.1.7.1.8.1
PRIMER & FIRST COATSNECOBFW1210
0%
07-Jun-12
17-Jun-12
12-Mar-13
18-Mar-13
72
972
973
FINAL COAT
NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1191
31
3
0%
30
3
06-Jun-13
06-Jun-13
13-Jul-13
10-Jun-13
24-Nov-13
24-Nov-13
29-Dec-13
26-Nov-13
19
0
974
NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1211
0%
10-Jun-13
13-Jun-13
27-Nov-13
30-Nov-13
975
NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1221
0%
13-Jun-13
17-Jun-13
01-Dec-13
03-Dec-13
976
NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1231
0%
17-Jun-13
20-Jun-13
04-Dec-13
07-Dec-13
977
NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1241
0%
20-Jun-13
24-Jun-13
08-Dec-13
10-Dec-13
978
NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1251
0%
24-Jun-13
27-Jun-13
11-Dec-13
14-Dec-13
19
979
NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1261
0%
27-Jun-13
01-Jul-13
15-Dec-13
17-Dec-13
19
980
NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1271
0%
01-Jul-13
06-Jul-13
19-Dec-13
22-Dec-13
19
981
NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1281
0%
06-Jul-13
09-Jul-13
23-Dec-13
25-Dec-13
19
982
NECP-Rebase_06Sep12-4.CO.1.7.1.8.2
FINAL COAT
NECOBFW1291
0%
09-Jul-13
13-Jul-13
26-Dec-13
29-Dec-13
19
983
984
985
369
90
9
8.01%
297
56
8
12-Jun-12
12-Jun-12
14-Aug-12
17-Aug-13
24-Sep-12
23-Aug-12
15-Dec-12
15-Dec-12
26-Dec-12
31-Jan-13
31-Jan-13
31-Jan-13
15-Jan-14
06-Apr-13
10-Feb-13
0
146
168
986
NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2360
5%
03-Jul-12
12-Jul-12
15-Dec-12
31-Jan-13
10-Feb-13
163
987
NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2370
5%
14-Jul-12
23-Jul-12
15-Dec-12
31-Jan-13
10-Feb-13
150
988
NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2380
5%
24-Jul-12
02-Aug-12
12-Jan-13
31-Jan-13
10-Feb-13
175
989
NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2390
5%
04-Aug-12
13-Aug-12
21-Dec-12
31-Jan-13
10-Feb-13
181
990
NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2410
5%
25-Aug-12
03-Sep-12
15-Dec-12
31-Jan-13
10-Feb-13
193
991
NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2420
5%
04-Sep-12
13-Sep-12
21-Dec-12
31-Jan-13
10-Feb-13
107
Feb
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
992
NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2430
0%
15-Sep-12
24-Sep-12
13-Feb-13
24-Feb-13
105
993
NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2340
0%
12-Jun-12
21-Jun-12
17-Mar-13
26-Mar-13
110
994
NECP-Rebase_06Sep12-4.CO.1.7.1.1.1
PRIMER & FIRST COATSNECOBFW2350
0%
23-Jun-12
02-Jul-12
27-Mar-13
06-Apr-13
110
995
996
FINAL COAT
NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2341
30
3
0%
30
3
13-Jul-13
13-Jul-13
17-Aug-13
16-Jul-13
11-Dec-13
11-Dec-13
15-Jan-14
14-Dec-13
0
0
997
NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2351
0%
16-Jul-13
20-Jul-13
15-Dec-13
17-Dec-13
998
NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2361
0%
20-Jul-13
23-Jul-13
19-Dec-13
22-Dec-13
999
NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2371
0%
23-Jul-13
27-Jul-13
23-Dec-13
25-Dec-13
1000
NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2381
0%
27-Jul-13
30-Jul-13
26-Dec-13
29-Dec-13
1001
NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2391
0%
30-Jul-13
03-Aug-13
30-Dec-13
01-Jan-14
1002
NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2401
0%
03-Aug-13
06-Aug-13
02-Jan-14
05-Jan-14
1003
NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2411
0%
06-Aug-13
10-Aug-13
06-Jan-14
08-Jan-14
1004
NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2421
0%
10-Aug-13
13-Aug-13
09-Jan-14
12-Jan-14
NECP-Rebase_06Sep12-4.CO.1.7.1.1.2
FINAL COAT
NECOBFW2431
1005
WBS
WBS Name
Activity ID
Activity Name
BL Project
Duration
Activity % Remaining
Complete Duration
Actual Start
Actual
Finish
0%
13-Aug-13
17-Aug-13
13-Jan-14
15-Jan-14
1006
1007
97
10
0%
40
4
01-Dec-12
01-Dec-12
23-Mar-13
11-Dec-12
29-Aug-13
29-Aug-13
17-Oct-13
03-Sep-13
35
35
1008
NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2750
- PAINTING FLOORS
Painting Floors, Area A2
10
0%
12-Dec-12
23-Dec-12
03-Sep-13
08-Sep-13
35
1009
NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2760
- PAINTING FLOORS
Painting Floors, Area A3
10
0%
24-Dec-12
03-Jan-13
08-Sep-13
12-Sep-13
35
1010
NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2770
- PAINTING FLOORS
Painting Floors, Area A4
10
0%
05-Jan-13
15-Jan-13
12-Sep-13
17-Sep-13
35
1011
NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2780
- PAINTING FLOORS
Painting Floors, Area A5
10
0%
16-Jan-13
27-Jan-13
17-Sep-13
22-Sep-13
35
1012
NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2790
- PAINTING FLOORS
Painting Floors, Area A6
10
0%
28-Jan-13
07-Feb-13
22-Sep-13
26-Sep-13
35
1013
NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2800
- PAINTING FLOORS
Painting Floors, Area A7
10
0%
09-Feb-13
19-Feb-13
26-Sep-13
01-Oct-13
35
1014
NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2810
- PAINTING FLOORS
Painting Floors, Area A8
0%
20-Feb-13
02-Mar-13
01-Oct-13
06-Oct-13
35
1015
NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2820
- PAINTING FLOORS
Painting Floors, Area A9
0%
03-Mar-13
12-Mar-13
06-Oct-13
10-Oct-13
35
1016
NECP-Rebase_06Sep12-4.CO.1.7.1.10
PHASE 1 LOWER BASEMENT
NECOBFW2830
- PAINTING FLOORS
Painting Floors, Area A10
0%
13-Mar-13
23-Mar-13
10-Oct-13
17-Oct-13
35
0%
24
4
09-Jun-12
09-Jun-12
01-Sep-12
14-Jun-12
23-Apr-13
23-Apr-13
20-May-13
27-Apr-13
57
57
1017
1018
Tiling, Area A1
73
6
1019
NECP-Rebase_06Sep12-4.CO.1.7.1.9
PHASE 1 LOWER BASEMENT
NECOBFW1810
- TILING
Tiling, Area A2
0%
16-Jun-12
21-Jun-12
28-Apr-13
01-May-13
57
1020
NECP-Rebase_06Sep12-4.CO.1.7.1.9
PHASE 1 LOWER BASEMENT
NECOBFW1820
- TILING
Tiling, Area A5
0%
28-Jun-12
04-Jul-12
02-May-13
06-May-13
57
1021
NECP-Rebase_06Sep12-4.CO.1.7.1.9
PHASE 1 LOWER BASEMENT
NECOBFW1830
- TILING
Tiling, Area A6
0%
05-Jul-12
11-Jul-12
07-May-13
11-May-13
57
1022
NECP-Rebase_06Sep12-4.CO.1.7.1.9
PHASE 1 LOWER BASEMENT
NECOBFW1840
- TILING
Tiling, Area A9
0%
19-Aug-12
25-Aug-12
12-May-13
15-May-13
57
NECP-Rebase_06Sep12-4.CO.1.7.1.9
PHASE 1 LOWER BASEMENT
NECOBFW1850
- TILING
1023
0%
26-Aug-12
01-Sep-12
16-May-13
20-May-13
57
1024
1025
PHASE 1 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORS
NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3140
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A1
92
6
0%
50
5
12-Dec-12
12-Dec-12
28-Mar-13
18-Dec-12
03-Sep-13
03-Sep-13
03-Nov-13
09-Sep-13
35
35
1026
NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3150
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A2
0%
24-Dec-12
30-Dec-12
09-Sep-13
15-Sep-13
35
1027
NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3160
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A3
0%
05-Jan-13
10-Jan-13
15-Sep-13
21-Sep-13
35
1028
NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3170
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A4
0%
16-Jan-13
22-Jan-13
21-Sep-13
26-Sep-13
35
1029
NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3180
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A5
0%
28-Jan-13
03-Feb-13
26-Sep-13
02-Oct-13
35
1030
NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3190
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A6
0%
09-Feb-13
13-Feb-13
02-Oct-13
08-Oct-13
35
1031
NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3200
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A7
0%
20-Feb-13
25-Feb-13
08-Oct-13
16-Oct-13
35
1032
NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3210
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A8
0%
03-Mar-13
07-Mar-13
16-Oct-13
22-Oct-13
35
1033
NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3220
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A9
0%
13-Mar-13
18-Mar-13
22-Oct-13
28-Oct-13
35
1034
NECP-Rebase_06Sep12-4.CO.1.7.1.14
PHASE 1 LOWER BASEMENT
NECOBFW3230
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area A10
0%
24-Mar-13
28-Mar-13
28-Oct-13
03-Nov-13
35
18
6
0%
38
6
18-Mar-13
18-Mar-13
07-Apr-13
24-Mar-13
08-Sep-13
08-Sep-13
24-Oct-13
15-Sep-13
57
53
0%
1035
1036
1037
1038
1039
1040
1041
25-Mar-13
31-Mar-13
06-Oct-13
15-Oct-13
59
0%
01-Apr-13
07-Apr-13
17-Oct-13
24-Oct-13
57
19
10
0%
29
10
27-Mar-13
27-Mar-13
17-Apr-13
07-Apr-13
22-Sep-13
22-Sep-13
28-Oct-13
03-Oct-13
39
49
0%
08-Apr-13
17-Apr-13
17-Oct-13
28-Oct-13
39
1042
1043
27
9
0%
21
7
30-Mar-13
30-Mar-13
29-Apr-13
08-Apr-13
26-Oct-13
26-Oct-13
19-Nov-13
03-Nov-13
45
35
1044
NECP-Rebase_06Sep12-4.CO.1.7.1.15
PHASE 1 LOWER BASEMENT
NECOBFW3510
- HANDRAILS Handrails, Area A5-A6
0%
09-Apr-13
18-Apr-13
03-Nov-13
11-Nov-13
45
1045
NECP-Rebase_06Sep12-4.CO.1.7.1.15
PHASE 1 LOWER BASEMENT
NECOBFW3520
- HANDRAILS Handrails, Area A9-A10
0%
20-Apr-13
29-Apr-13
11-Nov-13
19-Nov-13
45
22
8
05-Jun-13
05-Jun-13
30-Jun-13
13-Jun-13
17-Oct-13
17-Oct-13
12-Nov-13
27-Oct-13
35
35
1046
1047
22
8
0%
1048
NECP-Rebase_06Sep12-4.CO.1.7.1.36
PHASE 1 LOWER BASEMENT
NECOBFW3820
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
A5-A7
0%
1049
NECP-Rebase_06Sep12-4.CO.1.7.1.36
PHASE 1 LOWER BASEMENT
NECOBFW3830
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
A8-A10
22-Jun-13
27-Oct-13
04-Nov-13
35
0%
23-Jun-13
30-Jun-13
04-Nov-13
12-Nov-13
35
1050
1051
1052
313
59
10
0%
277
59
10
02-Sep-12
09-Sep-12
09-Sep-12
15-Jun-13
02-Sep-13
15-Nov-12
19-Sep-12
13-Feb-13
18-Apr-13
18-Apr-13
05-Jan-14
25-Jun-13
29-Apr-13
13
63
46
1053
NECP-Rebase_06Sep12-4.CO.1.7.2.12
PHASE 1 UPPER BASEMENT
NECOBFW1670
- PLASTERWORKS,
Plasterworks,
GYPSUMGypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A2
10
0%
10
20-Sep-12
01-Oct-12
30-Apr-13
11-May-13
46
1054
NECP-Rebase_06Sep12-4.CO.1.7.2.12
PHASE 1 UPPER BASEMENT
NECOBFW1680
- PLASTERWORKS,
Plasterworks,
GYPSUMGypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A3
10
0%
10
02-Oct-12
13-Oct-12
12-May-13
22-May-13
46
1055
NECP-Rebase_06Sep12-4.CO.1.7.2.12
PHASE 1 UPPER BASEMENT
NECOBFW1690
- PLASTERWORKS,
Plasterworks,
GYPSUMGypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A4
10
0%
10
14-Oct-12
24-Oct-12
23-May-13
03-Jun-13
46
1056
NECP-Rebase_06Sep12-4.CO.1.7.2.12
PHASE 1 UPPER BASEMENT
NECOBFW1700
- PLASTERWORKS,
Plasterworks,
GYPSUMGypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A7
10
0%
10
25-Oct-12
05-Nov-12
04-Jun-13
15-Jun-13
63
1057
NECP-Rebase_06Sep12-4.CO.1.7.2.12
PHASE 1 UPPER BASEMENT
NECOBFW1710
- PLASTERWORKS,
Plasterworks,
GYPSUMGypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area A8
0%
06-Nov-12
15-Nov-12
16-Jun-13
25-Jun-13
63
10-Sep-12
10-Sep-12
10-Sep-12
02-Sep-13
23-Dec-12
19-Sep-12
13-Feb-13
13-Feb-13
13-Feb-13
01-Jan-14
24-Apr-13
20-Feb-13
16
87
84
1058
1059
1060
306
90
9
0%
274
60
6
1061
NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1310
0%
20-Sep-12
30-Sep-12
20-Feb-13
27-Feb-13
84
1062
NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1320
0%
01-Oct-12
10-Oct-12
27-Feb-13
06-Mar-13
84
1063
NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1330
0%
11-Oct-12
21-Oct-12
06-Mar-13
13-Mar-13
84
1064
NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1340
0%
22-Oct-12
31-Oct-12
13-Mar-13
20-Mar-13
84
1065
NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1350
0%
01-Nov-12
11-Nov-12
20-Mar-13
27-Mar-13
87
1066
NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1360
0%
12-Nov-12
21-Nov-12
27-Mar-13
03-Apr-13
87
1067
NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1370
0%
22-Nov-12
02-Dec-12
03-Apr-13
10-Apr-13
87
1068
NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1380
0%
03-Dec-12
12-Dec-12
10-Apr-13
17-Apr-13
87
1069
NECP-Rebase_06Sep12-4.CO.1.7.2.11.1
PRIMER & FIRST COATSNECOBFW1390
0%
13-Dec-12
23-Dec-12
17-Apr-13
24-Apr-13
87
1070
1071
FINAL COAT
NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1301
30
3
0%
30
3
29-Jul-13
29-Jul-13
02-Sep-13
01-Aug-13
27-Nov-13
27-Nov-13
01-Jan-14
30-Nov-13
16
13
1072
NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1311
0%
01-Aug-13
05-Aug-13
01-Dec-13
03-Dec-13
16
1073
NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1321
0%
05-Aug-13
08-Aug-13
04-Dec-13
07-Dec-13
16
1074
NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1331
0%
08-Aug-13
12-Aug-13
08-Dec-13
10-Dec-13
16
1075
NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1341
0%
12-Aug-13
15-Aug-13
11-Dec-13
14-Dec-13
16
1076
NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1351
0%
15-Aug-13
19-Aug-13
15-Dec-13
17-Dec-13
16
1077
NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1361
0%
19-Aug-13
22-Aug-13
19-Dec-13
22-Dec-13
16
1078
NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1371
0%
22-Aug-13
26-Aug-13
23-Dec-13
25-Dec-13
16
1079
NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1381
0%
26-Aug-13
29-Aug-13
26-Dec-13
29-Dec-13
16
1080
NECP-Rebase_06Sep12-4.CO.1.7.2.11.2
FINAL COAT
NECOBFW1391
0%
29-Aug-13
02-Sep-13
30-Dec-13
01-Jan-14
16
1081
1082
1083
216
90
9
0%
212
93
9
24-Dec-12
24-Dec-12
24-Dec-12
02-Sep-13
07-Apr-13
02-Jan-13
30-Apr-13
30-Apr-13
30-Apr-13
05-Jan-14
15-Aug-13
09-May-13
13
46
49
1084
NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2450
0%
03-Jan-13
13-Jan-13
12-May-13
21-May-13
48
1085
NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2460
0%
14-Jan-13
23-Jan-13
23-May-13
02-Jun-13
47
1086
NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2470
0%
24-Jan-13
03-Feb-13
04-Jun-13
13-Jun-13
46
1087
NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2480
0%
04-Feb-13
13-Feb-13
15-Jun-13
24-Jun-13
46
1088
NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2490
0%
14-Feb-13
24-Feb-13
25-Jun-13
04-Jul-13
46
1089
NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2500
0%
25-Feb-13
06-Mar-13
06-Jul-13
15-Jul-13
46
1090
NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2510
0%
07-Mar-13
17-Mar-13
16-Jul-13
25-Jul-13
46
1091
NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2520
0%
18-Mar-13
27-Mar-13
27-Jul-13
05-Aug-13
46
1092
NECP-Rebase_06Sep12-4.CO.1.7.2.17.1
PRIMER & FIRST COATSNECOBFW2530
0%
28-Mar-13
07-Apr-13
06-Aug-13
15-Aug-13
46
1093
1094
FINAL COAT
NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2441
30
3
0%
30
3
29-Jul-13
29-Jul-13
02-Sep-13
01-Aug-13
01-Dec-13
01-Dec-13
05-Jan-14
03-Dec-13
13
13
1095
NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2451
0%
01-Aug-13
05-Aug-13
04-Dec-13
07-Dec-13
13
1096
NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2461
0%
05-Aug-13
08-Aug-13
08-Dec-13
10-Dec-13
13
1097
NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2471
0%
08-Aug-13
12-Aug-13
11-Dec-13
14-Dec-13
13
1098
NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2481
0%
12-Aug-13
15-Aug-13
15-Dec-13
17-Dec-13
13
1099
NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2491
0%
15-Aug-13
19-Aug-13
19-Dec-13
22-Dec-13
13
1100
NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2501
0%
19-Aug-13
22-Aug-13
23-Dec-13
25-Dec-13
13
1101
NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2511
0%
22-Aug-13
26-Aug-13
26-Dec-13
29-Dec-13
13
1102
NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2521
0%
26-Aug-13
29-Aug-13
30-Dec-13
01-Jan-14
13
2013
Jan
Feb
Mar
Apr
May
2014
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
WBS
WBS Name
Activity ID
NECP-Rebase_06Sep12-4.CO.1.7.2.17.2
FINAL COAT
NECOBFW2531
Activity Name
BL Project
Duration
Activity % Remaining
Complete Duration
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
0%
29-Aug-13
02-Sep-13
Actual Start
Actual
Finish
02-Jan-14
05-Jan-14
13
08-Apr-13
08-Apr-13
21-Jul-13
17-Apr-13
08-Oct-13
08-Oct-13
26-Nov-13
15-Oct-13
46
32
1104
1105
90
9
0%
40
4
1106
NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2850
- PAINTING FLOORS
Painting Floors, Area A2
0%
18-Apr-13
28-Apr-13
15-Oct-13
20-Oct-13
42
1107
NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2860
- PAINTING FLOORS
Painting Floors, Area A3
0%
29-Apr-13
08-May-13
20-Oct-13
24-Oct-13
42
1108
NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2870
- PAINTING FLOORS
Painting Floors, Area A4
0%
09-May-13
19-May-13
24-Oct-13
29-Oct-13
43
1109
NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2880
- PAINTING FLOORS
Painting Floors, Area A5
0%
20-May-13
29-May-13
29-Oct-13
03-Nov-13
43
1110
NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2890
- PAINTING FLOORS
Painting Floors, Area A6
0%
30-May-13
09-Jun-13
03-Nov-13
07-Nov-13
43
1111
NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2900
- PAINTING FLOORS
Painting Floors, Area A7
0%
10-Jun-13
19-Jun-13
07-Nov-13
12-Nov-13
43
1112
NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2910
- PAINTING FLOORS
Painting Floors, Area A8
0%
20-Jun-13
30-Jun-13
12-Nov-13
17-Nov-13
45
1113
NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2920
- PAINTING FLOORS
Painting Floors, Area A9
0%
01-Jul-13
10-Jul-13
17-Nov-13
21-Nov-13
45
1114
NECP-Rebase_06Sep12-4.CO.1.7.2.18
PHASE 1 UPPER BASEMENT
NECOBFW2930
- PAINTING FLOORS
Painting Floors, Area A10
0%
11-Jul-13
21-Jul-13
21-Nov-13
26-Nov-13
46
02-Sep-12
02-Sep-12
20-Nov-12
09-Sep-12
21-May-13
21-May-13
06-Jul-13
25-May-13
102
57
1115
1116
Tiling, Area A1
69
7
0%
40
4
1117
NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1870
- TILING
Tiling, Area A2
0%
10-Sep-12
17-Sep-12
26-May-13
29-May-13
57
1118
NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1880
- TILING
Tiling, Area A3
0%
18-Sep-12
25-Sep-12
30-May-13
03-Jun-13
57
1119
NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1890
- TILING
Tiling, Area A4
0%
26-Sep-12
03-Oct-12
04-Jun-13
08-Jun-13
57
1120
NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1900
- TILING
Tiling, Area A5
0%
04-Oct-12
11-Oct-12
09-Jun-13
12-Jun-13
57
1121
NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1910
- TILING
Tiling, Area A6
0%
13-Oct-12
20-Oct-12
13-Jun-13
17-Jun-13
102
1122
NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1920
- TILING
Tiling, Area A7
0%
21-Oct-12
28-Oct-12
18-Jun-13
22-Jun-13
102
1123
NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1930
- TILING
Tiling, Area A8
0%
29-Oct-12
05-Nov-12
23-Jun-13
26-Jun-13
102
1124
NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1940
- TILING
Tiling, Area A9
0%
06-Nov-12
13-Nov-12
27-Jun-13
01-Jul-13
102
1125
NECP-Rebase_06Sep12-4.CO.1.7.2.13
PHASE 1 UPPER BASEMENT
NECOBFW1950
- TILING
0%
14-Nov-12
20-Nov-12
02-Jul-13
06-Jul-13
102
18-Apr-13
18-Apr-13
20-Jun-13
24-Apr-13
15-Oct-13
15-Oct-13
12-Dec-13
21-Oct-13
32
32
1126
1127
PHASE 1 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORS
NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3240
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A1
55
6
0%
50
5
1128
NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3250
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A2
0%
25-Apr-13
01-May-13
21-Oct-13
27-Oct-13
32
1129
NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3260
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A3
0%
02-May-13
08-May-13
27-Oct-13
02-Nov-13
32
1130
NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3270
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A4
0%
09-May-13
15-May-13
02-Nov-13
07-Nov-13
32
1131
NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3280
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A5
0%
16-May-13
22-May-13
07-Nov-13
13-Nov-13
32
1132
NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3290
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A6
0%
23-May-13
28-May-13
13-Nov-13
19-Nov-13
32
1133
NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3300
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A7
0%
29-May-13
03-Jun-13
19-Nov-13
25-Nov-13
32
1134
NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3310
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A8
0%
04-Jun-13
09-Jun-13
25-Nov-13
01-Dec-13
32
1135
NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3320
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A9
0%
10-Jun-13
15-Jun-13
01-Dec-13
07-Dec-13
32
1136
0%
16-Jun-13
20-Jun-13
07-Dec-13
12-Dec-13
32
1137
1138
59
6
0%
25
6
20-May-13
20-May-13
27-Jul-13
26-May-13
29-Oct-13
29-Oct-13
27-Nov-13
05-Nov-13
45
53
1139
NECP-Rebase_06Sep12-4.CO.1.7.2.21
PHASE 1 UPPER BASEMENT
NECOBFW3660
- TIMBER DOORS
Timber
ANDDoors
LOUVER
and Louver
SCREENS
Screens, Area A7-A8
0%
01-Jul-13
07-Jul-13
12-Nov-13
19-Nov-13
47
1140
NECP-Rebase_06Sep12-4.CO.1.7.2.21
PHASE 1 UPPER BASEMENT
NECOBFW3670
- TIMBER DOORS
Timber
ANDDoors
LOUVER
and Louver
SCREENS
Screens, Area A9-A10
0%
22-Jul-13
27-Jul-13
21-Nov-13
27-Nov-13
45
45
9
0%
12
6
30-May-13
30-May-13
21-Jul-13
09-Jun-13
28-Oct-13
28-Oct-13
11-Nov-13
04-Nov-13
39
39
1141
1142
NECP-Rebase_06Sep12-4.CO.1.7.2.19
PHASE 1 UPPER BASEMENT
NECOBFW3330
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area A10
Feb
Mar
Apr
May
2014
Jun
Jul
Aug
Sep
Oct
Nov
Dec
0%
15-Jul-13
21-Jul-13
04-Nov-13
11-Nov-13
39
52
9
0%
29
7
02-May-13
02-May-13
01-Jul-13
12-May-13
03-Nov-13
03-Nov-13
07-Dec-13
11-Nov-13
37
35
1146
NECP-Rebase_06Sep12-4.CO.1.7.2.20
PHASE 1 UPPER BASEMENT
NECOBFW3540
- HANDRAILS Handrails, Area A5-A6
0%
29-May-13
08-Jun-13
19-Nov-13
27-Nov-13
38
1147
NECP-Rebase_06Sep12-4.CO.1.7.2.20
PHASE 1 UPPER BASEMENT
NECOBFW3550
- HANDRAILS Handrails, Area A9-A10
0%
22-Jun-13
01-Jul-13
28-Nov-13
07-Dec-13
37
23
8
0%
23
8
01-Jul-13
01-Jul-13
27-Jul-13
09-Jul-13
12-Nov-13
12-Nov-13
09-Dec-13
21-Nov-13
35
35
NECP-Rebase_06Sep12-4.CO.1.7.2.38
PHASE 1 UPPER BASEMENT
NECOBFW3850
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
A5-A7
0%
18-Jul-13
21-Nov-13
01-Dec-13
35
NECP-Rebase_06Sep12-4.CO.1.7.2.38
PHASE 1 UPPER BASEMENT
NECOBFW3860
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
A8-A10
0%
20-Jul-13
27-Jul-13
01-Dec-13
09-Dec-13
35
224
105
Glazing System - Internal Glazed Screen, Area A1, A9-A10 Lower Bsmt; A1-A2/A5-A6/A7-A8
26
0% Grd Flr 26
17-Nov-12
17-Nov-12
04-Aug-13
16-Dec-12
26-Jun-13
26-Jun-13
28-Oct-13
25-Jul-13
59
107
1148
1149
1150
1151
NECP-Rebase_06Sep12-4.CO.1.7.2.37
PHASE 1 UPPER BASEMENT
NECOBFW3760
- STEEL DOORS
Steel
AND
Doors
LOUVERS
and Louvers, Area A6-A10
10-Jul-13
1152
1153
1154
NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1120
Softwood Framing, Joinery Panels, WC Partitions, Area A1-A2 Lower Bsmt; Area
20 A1-A2/A9-A10
0%
Upper
20Bsmt24-Mar-13
15-Apr-13
13-Jul-13
04-Aug-13
97
1155
NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1130
11
0%
11
24-Mar-13
04-Apr-13
22-Aug-13
03-Sep-13
57
1156
NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1080
14
0%
14
18-Mar-13
02-Apr-13
23-Sep-13
08-Oct-13
57
1157
NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1180
0%
30-Jun-13
09-Jul-13
09-Oct-13
21-Oct-13
57
1158
NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1140
1159
NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1150
1160
NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1160
1161
NECP-Rebase_06Sep12-4.CO.1.7.2.8
PHASE 1 - FINISHING WORKS
NECOBFW1170
0%
10-Jul-13
16-Jul-13
15-Oct-13
21-Oct-13
57
15
0%
12
10-Jul-13
27-Jul-13
15-Oct-13
28-Oct-13
57
0%
16-Jul-13
21-Jul-13
15-Oct-13
20-Oct-13
59
Signages and Wayfinding, Area A1-A10 Lower Bsmt; Area A1-A10 Upper Bsmt
12
0%
12
22-Jul-13
04-Aug-13
15-Oct-13
28-Oct-13
59
91
20
0%
111
20
16-Apr-13
16-Apr-13
30-Jul-13
08-May-13
20-Aug-13
20-Aug-13
31-Dec-13
12-Sep-13
12
83
Glazing System - Internal Glazed Screen, Area A1, A9-A10 Lower Bsmt; A1-A2/A5-A6/A7-A8 Grd Flr
Softwood Framing, Joinery Panels, WC Partitions, Area A1-A2 Lower Bsmt; Area A1-A2/A9-A10 Upper Bsmt
Sandstone Cladding, Area A1-A2 Grd Flr (PMS)
Steel Cladding and Panels (PMS)
1162
1163
1164
NECP-Rebase_06Sep12-4.CO.1.4
Furniture, Fittings & Equipment
NECOBFFE1030
0%
16-Apr-13
21-Apr-13
22-Aug-13
27-Aug-13
112
1165
NECP-Rebase_06Sep12-4.CO.1.4
Furniture, Fittings & Equipment
NECOBFFE1040
0%
16-Apr-13
21-Apr-13
28-Aug-13
02-Sep-13
112
1166
NECP-Rebase_06Sep12-4.CO.1.4
Furniture, Fittings & Equipment
NECOBFFE1000
0%
22-Jul-13
30-Jul-13
19-Sep-13
28-Sep-13
88
1167
NECP-Rebase_06Sep12-4.CO.1.4
Furniture, Fittings & Equipment
NECOBFFE1020
14
0%
14
16-Apr-13
01-May-13
15-Dec-13
31-Dec-13
480
296
22-Feb-12
03-Sep-13
03-Jan-12
31-Jan-13
14-Jan-14
296
296
296
296
22-Feb-12
22-Feb-12
22-Feb-12
22-Feb-12
02-Feb-13
02-Feb-13
02-Feb-13
02-Feb-13
03-Jan-12
03-Jan-12
03-Jan-12
03-Jan-12
31-Jan-13
31-Jan-13
17-Jun-13
17-Jun-13
24-Jul-13
24-Jul-13
24-Jul-13
24-Jul-13
151
75
75
75
1168
1169
1170
1171
1172
PHASE 2 WORKS
M6-Const. Compl. of Remaining Works Phase 1 & 2 Fit Out, MEP, Facade, Ext'l Works, Test, Commission
Lower Basement Floor
PHASE 2 - DEWATERING
NECP-Rebase_06Sep12-4.CO.2.1.2.13
PHASE 2 - DEWATERINGNECOSPE25
Dewatering Works
1173
1174
1175
PHASE 2 - EXCAVATION
Area 19
NECP-Rebase_06Sep12-4.CO.2.1.2.6.1
Area 19
NECOEX2000
1176
1177
Area 22
NECP-Rebase_06Sep12-4.CO.2.1.2.6.3
Area 22
NECOEX2020
1178
1179
1180
89%
150
150
33
33
Excavation Area 34
10
5
5
95%
0
0
0
22-Feb-12
22-Feb-12
22-Feb-12
04-Mar-12
27-Feb-12
27-Feb-12
12-Jan-12
12-Jan-12
12-Jan-12
31-Jan-13
31-Jan-13
31-Jan-13
31-Jan-13
31-Jan-13
31-Jan-13
23
23
23
Excavation Area 34
Excavation Area 31
5
5
95%
0
0
28-Feb-12
28-Feb-12
04-Mar-12
04-Mar-12
17-Jan-12
17-Jan-12
31-Jan-13
31-Jan-13
31-Jan-13
31-Jan-13
23
23
Excavation Area 31
17-Nov-12
31-Dec-12
31-Dec-12
31-Jan-13
31-Jan-13
31-Jan-13
06-Feb-13
06-Feb-13
06-Feb-13
34
25
25
Dewatering Works
30%
6
6
6
0
0
40%
5
5
21-Dec-12
21-Dec-12
31-Jan-13
31-Jan-13
05-Feb-13
05-Feb-13
35
35
0
0
40%
5
5
17-Nov-12
17-Nov-12
31-Jan-13
31-Jan-13
05-Feb-13
05-Feb-13
19
19
0
0
30%
6
6
15-Dec-12
15-Dec-12
31-Jan-13
31-Jan-13
06-Feb-13
06-Feb-13
7
7
0
0
75%
2
2
05-Dec-12
05-Dec-12
31-Jan-13
31-Jan-13
02-Feb-13
02-Feb-13
22
22
249
64
14
14
13-Mar-12
17-Jul-12
17-Jul-12
17-Jul-12
29-Dec-12
30-Sep-12
02-Aug-12
02-Aug-12
03-Sep-12
26-Nov-12
10-Dec-12
10-Dec-12
31-Jan-13
31-Jan-13
31-Jan-13
31-Jan-13
08-Jul-13
18-May-13
16-Mar-13
16-Mar-13
165
137
2
0
1181
1182
1183
1184
1185
1186
1187
1188
0
0
0
1189
1190
1191
1192
0%
136
92
38
38
1193
NECP-Rebase_06Sep12-4.CO.2.1.3.10.2
Area B1 (A24/A26)
NECOLBSS2001
0%
25-Jul-12
30-Jul-12
10-Mar-13
14-Mar-13
1194
NECP-Rebase_06Sep12-4.CO.2.1.3.10.2
Area B1 (A24/A26)
NECOLBSS2002
0%
25-Jul-12
30-Jul-12
10-Mar-13
14-Mar-13
1195
NECP-Rebase_06Sep12-4.CO.2.1.3.10.2
Area B1 (A24/A26)
NECOLBSS2003
Earthing conduits
0%
25-Jul-12
30-Jul-12
10-Mar-13
14-Mar-13
Earthing conduits
1196
NECP-Rebase_06Sep12-4.CO.2.1.3.10.2
Area B1 (A24/A26)
NECOLBSS2004
Lighting conduits
0%
25-Jul-12
30-Jul-12
10-Mar-13
14-Mar-13
Lighting conduits
1197
NECP-Rebase_06Sep12-4.CO.2.1.3.10.2
Area B1 (A24/A26)
NECOLBSS2005
0%
25-Jul-12
30-Jul-12
10-Mar-13
14-Mar-13
1198
NECP-Rebase_06Sep12-4.CO.2.1.3.10.2
Area B1 (A24/A26)
NECOLBSS2006
Telephone conduits
0%
25-Jul-12
30-Jul-12
10-Mar-13
14-Mar-13
1199
1200
Area B2 (A25/A26)
NECP-Rebase_06Sep12-4.CO.2.1.3.10.5
Area B2 (A25/A26)
NECOLBSS2050
14
14
0%
29
29
13-Sep-12
13-Sep-12
30-Sep-12
30-Sep-12
31-Jan-13
31-Jan-13
05-Mar-13
05-Mar-13
16
-9
1201
NECP-Rebase_06Sep12-4.CO.2.1.3.10.5
Area B2 (A25/A26)
NECOLBSS2051
0%
22-Sep-12
26-Sep-12
27-Feb-13
04-Mar-13
18
1202
NECP-Rebase_06Sep12-4.CO.2.1.3.10.5
Area B2 (A25/A26)
NECOLBSS2052
0%
22-Sep-12
26-Sep-12
27-Feb-13
04-Mar-13
18
1203
NECP-Rebase_06Sep12-4.CO.2.1.3.10.5
Area B2 (A25/A26)
NECOLBSS2053
Earthing conduits
0%
22-Sep-12
26-Sep-12
27-Feb-13
04-Mar-13
18
Earthing conduits
1204
NECP-Rebase_06Sep12-4.CO.2.1.3.10.5
Area B2 (A25/A26)
NECOLBSS2054
Lighting conduits
0%
22-Sep-12
26-Sep-12
27-Feb-13
04-Mar-13
18
Lighting conduits
1205
NECP-Rebase_06Sep12-4.CO.2.1.3.10.5
Area B2 (A25/A26)
NECOLBSS2055
0%
22-Sep-12
26-Sep-12
27-Feb-13
04-Mar-13
18
1206
NECP-Rebase_06Sep12-4.CO.2.1.3.10.5
Area B2 (A25/A26)
NECOLBSS2056
Telephone conduits
0%
22-Sep-12
26-Sep-12
27-Feb-13
04-Mar-13
18
1207
1208
Area 24
NECP-Rebase_06Sep12-4.CO.2.1.3.10.11
Area 24
NECOLBSS2316
0
0
0%
22
22
31-Jan-13
31-Jan-13
25-Feb-13
25-Feb-13
21
2
1209
NECP-Rebase_06Sep12-4.CO.2.1.3.10.11
Area 24
NECOLBSS2326
0%
19-Feb-13
24-Feb-13
23
1210
NECP-Rebase_06Sep12-4.CO.2.1.3.10.11
Area 24
NECOLBSS2336
0%
19-Feb-13
24-Feb-13
23
1211
NECP-Rebase_06Sep12-4.CO.2.1.3.10.11
Area 24
NECOLBSS2346
Earthing conduits
0%
19-Feb-13
24-Feb-13
23
Earthing conduits
1212
NECP-Rebase_06Sep12-4.CO.2.1.3.10.11
Area 24
NECOLBSS2356
Lighting conduits
0%
19-Feb-13
24-Feb-13
23
Lighting conduits
1213
NECP-Rebase_06Sep12-4.CO.2.1.3.10.11
Area 24
NECOLBSS2366
0%
19-Feb-13
24-Feb-13
23
1214
NECP-Rebase_06Sep12-4.CO.2.1.3.10.11
Area 24
NECOLBSS2376
Telephone conduits
0%
19-Feb-13
24-Feb-13
23
Telephone conduits
26-Nov-12
26-Nov-12
10-Dec-12
10-Dec-12
Feb
1144
1145
1143
Jan
Telephone conduits
RC Suspended Slab, Upper Basement, Area 23
Telephone conduits
RC Suspended Slab, Upper Basement, Area 24
WBS
WBS Name
Activity ID
BL Project
Duration
Activity % Remaining
Complete Duration
0
0
0%
15
15
Early Start
Early Finish
Total
Float
31-Jan-13
31-Jan-13
17-Feb-13
17-Feb-13
26
19
NECP-Rebase_06Sep12-4.CO.2.1.3.10.12
Area 25
NECOLBSS2396
0%
NECP-Rebase_06Sep12-4.CO.2.1.3.10.12
Area 25
NECOLBSS2406
0%
NECP-Rebase_06Sep12-4.CO.2.1.3.10.12
Area 25
NECOLBSS2416
Earthing conduits
0%
11-Feb-13
16-Feb-13
28
11-Feb-13
16-Feb-13
28
11-Feb-13
16-Feb-13
28
1220
NECP-Rebase_06Sep12-4.CO.2.1.3.10.12
Area 25
NECOLBSS2426
Lighting conduits
1221
NECP-Rebase_06Sep12-4.CO.2.1.3.10.12
Area 25
NECOLBSS2436
Earthing conduits
0%
11-Feb-13
16-Feb-13
28
Lighting conduits
0%
11-Feb-13
16-Feb-13
28
1222
NECP-Rebase_06Sep12-4.CO.2.1.3.10.12
Area 25
NECOLBSS2446
Telephone conduits
0%
11-Feb-13
16-Feb-13
28
1223
1224
Area 26
NECP-Rebase_06Sep12-4.CO.2.1.3.10.13
Area 26
NECOLBSS2456
Telephone conduits
0
0
0%
8
8
19-Feb-13
19-Feb-13
28-Feb-13
28-Feb-13
20
7
1225
1226
NECP-Rebase_06Sep12-4.CO.2.1.3.10.13
Area 26
NECOLBSS2466
0%
21-Feb-13
26-Feb-13
22
NECP-Rebase_06Sep12-4.CO.2.1.3.10.13
Area 26
NECOLBSS2476
0%
21-Feb-13
26-Feb-13
22
1227
NECP-Rebase_06Sep12-4.CO.2.1.3.10.13
Area 26
NECOLBSS2486
Earthing conduits
0%
21-Feb-13
26-Feb-13
22
Earthing conduits
1228
NECP-Rebase_06Sep12-4.CO.2.1.3.10.13
Area 26
NECOLBSS2496
Lighting conduits
0%
21-Feb-13
26-Feb-13
22
Lighting conduits
1229
NECP-Rebase_06Sep12-4.CO.2.1.3.10.13
Area 26
NECOLBSS2506
0%
21-Feb-13
26-Feb-13
22
NECP-Rebase_06Sep12-4.CO.2.1.3.10.13
Area 26
NECOLBSS2516
Telephone conduits
Telephone conduits
1215
1216
Area 25
NECP-Rebase_06Sep12-4.CO.2.1.3.10.12
Area 25
NECOLBSS2386
1217
1218
1219
1230
Activity Name
BL Project
Start
BL Project
Finish
Actual Start
26-Nov-12
26-Nov-12
Actual
Finish
2013
Jan
Feb
Mar
Apr
0%
21-Feb-13
26-Feb-13
22
0
0
0%
21
21
31-Mar-13
31-Mar-13
23-Apr-13
23-Apr-13
137
137
1233
1234
0
0
0%
21
21
24-Apr-13
24-Apr-13
18-May-13
18-May-13
137
137
214
Powerfloat Concrete Finishes, Lower Basement & Upper Basement Floors 214
62%
38
38
13-Mar-12
13-Mar-12
18-Nov-12
18-Nov-12
03-Sep-12
03-Sep-12
31-Jan-13
31-Jan-13
16-Mar-13
16-Mar-13
175
175
25%
45
4
4
02-Aug-12
26-Aug-12
26-Aug-12
10-Nov-12
01-Sep-12
01-Sep-12
17-Nov-12
03-Dec-12
03-Dec-12
31-Jan-13
31-Jan-13
31-Jan-13
24-Mar-13
04-Feb-13
04-Feb-13
0
27
27
25%
4
4
04-Nov-12
04-Nov-12
10-Nov-12
10-Nov-12
03-Dec-12
03-Dec-12
31-Jan-13
31-Jan-13
04-Feb-13
04-Feb-13
37
37
20-Aug-12
20-Aug-12
26-Aug-12
26-Aug-12
19-Mar-13
19-Mar-13
24-Mar-13
24-Mar-13
0
0
29-Oct-12
29-Oct-12
07-Nov-12
07-Nov-12
06-Mar-13
06-Mar-13
19-Mar-13
14-Mar-13
0
-9
14-Mar-13
19-Mar-13
28-Feb-13
13-Mar-13
14-Mar-13
14-Mar-13
-6
-9
28-Feb-13
05-Mar-13
31-Jan-13
31-Jan-13
19-Mar-13
05-Feb-13
0
36
14-Mar-13
19-Mar-13
31-Jan-13
31-Jan-13
06-Mar-13
06-Feb-13
8
32
28-Feb-13
06-Mar-13
31-Jan-13
31-Jan-13
31-Jan-13
14-Apr-13
17-Mar-13
17-Mar-13
18
42
14
1237
1238
1239
1240
1241
Area 26
NECP-Rebase_06Sep12-4.CO.2.1.3.9.17
Area 26
NECOUBWC2270
1242
1243
Area 24
NECP-Rebase_06Sep12-4.CO.2.1.3.9.4
Area 24
NECOUBWC2060
1244
1245
Area 23
NECP-Rebase_06Sep12-4.CO.2.1.3.9.16
Area 23
NECOUBWC2250
1246
NECP-Rebase_06Sep12-4.CO.2.1.3.9.16
Area 23
NECOUBWC2260
1247
1248
Area 19
NECP-Rebase_06Sep12-4.CO.2.1.3.9.1
Area 19
NECOUBWC2000
1249
NECP-Rebase_06Sep12-4.CO.2.1.3.9.1
Area 19
NECOUBWC2010
1250
1251
Area 20
NECP-Rebase_06Sep12-4.CO.2.1.3.9.15
Area 20
NECOUBWC2235
1252
NECP-Rebase_06Sep12-4.CO.2.1.3.9.15
Area 20
NECOUBWC2240
1253
1254
Area 21
NECP-Rebase_06Sep12-4.CO.2.1.3.9.2
Area 21
NECOUBWC2020
1255
1256
1257
1258
NECP-Rebase_06Sep12-4.CO.2.1.3.9.2
Area 21
NECOUBWC2030
85
5
5
5
5
5
5
0%
5
5
8
8
0%
12
8
0%
29-Oct-12
04-Nov-12
8
8
75%
13
2
02-Aug-12
02-Aug-12
12-Aug-12
12-Aug-12
0%
02-Aug-12
08-Aug-12
5
0
29-Oct-12
40%
41
5
23-Oct-12
0%
23-Oct-12
29-Oct-12
8
8
30%
30
6
08-Aug-12
08-Aug-12
18-Aug-12
18-Aug-12
0%
08-Aug-12
14-Aug-12
108
14
14
11-Aug-12
28-Nov-12
28-Nov-12
15-Dec-12
15-Dec-12
15-Dec-12
05-Dec-12
05-Dec-12
17-Nov-12
17-Nov-12
15-Dec-12
15-Dec-12
0%
1259
NECP-Rebase_06Sep12-4.CO.2.1.3.8.10
Area B10
NECOUBSS2091
0%
06-Dec-12
11-Dec-12
11-Mar-13
16-Mar-13
44
1260
NECP-Rebase_06Sep12-4.CO.2.1.3.8.10
Area B10
NECOUBSS2092
0%
06-Dec-12
11-Dec-12
11-Mar-13
16-Mar-13
44
1261
NECP-Rebase_06Sep12-4.CO.2.1.3.8.10
Area B10
NECOUBSS2093
Earthing conduits
0%
06-Dec-12
11-Dec-12
11-Mar-13
16-Mar-13
44
Earthing conduits
1262
NECP-Rebase_06Sep12-4.CO.2.1.3.8.10
Area B10
NECOUBSS2094
Lighting conduits
0%
06-Dec-12
11-Dec-12
11-Mar-13
16-Mar-13
44
Lighting conduits
1263
NECP-Rebase_06Sep12-4.CO.2.1.3.8.10
Area B10
NECOUBSS2095
0%
06-Dec-12
11-Dec-12
11-Mar-13
16-Mar-13
44
1264
NECP-Rebase_06Sep12-4.CO.2.1.3.8.10
Area B10
NECOUBSS2096
Telephone conduits
0%
06-Dec-12
11-Dec-12
11-Mar-13
16-Mar-13
44
Telephone conduits
1265
1266
Area 17
NECP-Rebase_06Sep12-4.CO.2.1.3.8.11
Area 17
NECOUBSS2596
0
0
0%
6
6
28-Feb-13
28-Feb-13
06-Mar-13
06-Mar-13
16
16
1267
NECP-Rebase_06Sep12-4.CO.2.1.3.8.11
Area 17
NECOUBSS2606
0%
03-Mar-13
04-Mar-13
16
1268
NECP-Rebase_06Sep12-4.CO.2.1.3.8.11
Area 17
NECOUBSS2616
0%
03-Mar-13
04-Mar-13
16
1269
NECP-Rebase_06Sep12-4.CO.2.1.3.8.11
Area 17
NECOUBSS2626
Earthing conduits
0%
03-Mar-13
04-Mar-13
16
Earthing conduits
1270
NECP-Rebase_06Sep12-4.CO.2.1.3.8.11
Area 17
NECOUBSS2636
Lighting conduits
0%
03-Mar-13
04-Mar-13
16
Lighting conduits
1271
NECP-Rebase_06Sep12-4.CO.2.1.3.8.11
Area 17
NECOUBSS2646
0%
03-Mar-13
04-Mar-13
16
1272
NECP-Rebase_06Sep12-4.CO.2.1.3.8.11
Area 17
NECOUBSS2656
Telephone conduits
0%
03-Mar-13
04-Mar-13
16
Telephone conduits
1273
1274
Area B7
NECP-Rebase_06Sep12-4.CO.2.1.3.8.4
Area B7
NECOUBSS2030
14
14
0%
35
35
15-Sep-12
15-Sep-12
01-Oct-12
01-Oct-12
31-Jan-13
31-Jan-13
12-Mar-13
12-Mar-13
1
0
1275
NECP-Rebase_06Sep12-4.CO.2.1.3.8.4
Area B7
NECOUBSS2031
0%
23-Sep-12
27-Sep-12
06-Mar-13
11-Mar-13
1276
NECP-Rebase_06Sep12-4.CO.2.1.3.8.4
Area B7
NECOUBSS2032
0%
23-Sep-12
27-Sep-12
06-Mar-13
11-Mar-13
1277
NECP-Rebase_06Sep12-4.CO.2.1.3.8.4
Area B7
NECOUBSS2033
Earthing conduits
0%
24-Sep-12
29-Sep-12
06-Mar-13
11-Mar-13
Earthing conduits
1278
NECP-Rebase_06Sep12-4.CO.2.1.3.8.4
Area B7
NECOUBSS2034
Lighting conduits
0%
24-Sep-12
29-Sep-12
06-Mar-13
11-Mar-13
Lighting conduits
1279
NECP-Rebase_06Sep12-4.CO.2.1.3.8.4
Area B7
NECOUBSS2035
0%
24-Sep-12
29-Sep-12
06-Mar-13
11-Mar-13
1280
NECP-Rebase_06Sep12-4.CO.2.1.3.8.4
Area B7
NECOUBSS2036
Telephone conduits
0%
24-Sep-12
29-Sep-12
06-Mar-13
11-Mar-13
Telephone conduits
1281
1282
Area B8
NECP-Rebase_06Sep12-4.CO.2.1.3.8.9
Area B8
NECOUBSS2080
14
14
20%
8
8
12-Nov-12
12-Nov-12
28-Nov-12
28-Nov-12
19-Mar-13
19-Mar-13
27-Mar-13
27-Mar-13
0
0
1283
NECP-Rebase_06Sep12-4.CO.2.1.3.8.9
Area B8
NECOUBSS2081
0%
20-Nov-12
25-Nov-12
21-Mar-13
26-Mar-13
1284
NECP-Rebase_06Sep12-4.CO.2.1.3.8.9
Area B8
NECOUBSS2082
0%
20-Nov-12
25-Nov-12
21-Mar-13
26-Mar-13
1285
NECP-Rebase_06Sep12-4.CO.2.1.3.8.9
Area B8
NECOUBSS2083
Earthing conduits
0%
20-Nov-12
25-Nov-12
21-Mar-13
26-Mar-13
Earthing conduits
1286
NECP-Rebase_06Sep12-4.CO.2.1.3.8.9
Area B8
NECOUBSS2084
Lighting conduits
0%
20-Nov-12
25-Nov-12
21-Mar-13
26-Mar-13
Lighting conduits
1287
NECP-Rebase_06Sep12-4.CO.2.1.3.8.9
Area B8
NECOUBSS2085
0%
20-Nov-12
25-Nov-12
21-Mar-13
26-Mar-13
1288
NECP-Rebase_06Sep12-4.CO.2.1.3.8.9
Area B8
NECOUBSS2086
Telephone conduits
0%
20-Nov-12
25-Nov-12
21-Mar-13
26-Mar-13
1289
1290
Area B5
NECP-Rebase_06Sep12-4.CO.2.1.3.8.3
Area B5
NECOUBSS2020
14
14
25%
6
6
03-Sep-12
03-Sep-12
19-Sep-12
19-Sep-12
06-Mar-13
06-Mar-13
12-Mar-13
12-Mar-13
9
9
1291
NECP-Rebase_06Sep12-4.CO.2.1.3.8.3
Area B5
NECOUBSS2021
0%
11-Sep-12
16-Sep-12
06-Mar-13
11-Mar-13
1292
NECP-Rebase_06Sep12-4.CO.2.1.3.8.3
Area B5
NECOUBSS2022
0%
11-Sep-12
16-Sep-12
06-Mar-13
11-Mar-13
1293
NECP-Rebase_06Sep12-4.CO.2.1.3.8.3
Area B5
NECOUBSS2023
Earthing conduits
0%
12-Sep-12
17-Sep-12
06-Mar-13
11-Mar-13
Earthing conduits
1294
NECP-Rebase_06Sep12-4.CO.2.1.3.8.3
Area B5
NECOUBSS2024
Lighting conduits
0%
12-Sep-12
17-Sep-12
06-Mar-13
11-Mar-13
Lighting conduits
1295
NECP-Rebase_06Sep12-4.CO.2.1.3.8.3
Area B5
NECOUBSS2025
0%
12-Sep-12
17-Sep-12
06-Mar-13
11-Mar-13
1296
NECP-Rebase_06Sep12-4.CO.2.1.3.8.3
Area B5
NECOUBSS2026
Telephone conduits
06-Mar-13
11-Mar-13
Telephone conduits
1297
1298
Area B6
NECP-Rebase_06Sep12-4.CO.2.1.3.8.8
Area B6
NECOUBSS2070
20-Mar-13
20-Mar-13
27-Mar-13
27-Mar-13
0
0
1299
NECP-Rebase_06Sep12-4.CO.2.1.3.8.8
Area B6
NECOUBSS2071
1300
NECP-Rebase_06Sep12-4.CO.2.1.3.8.8
Area B6
NECOUBSS2072
1301
1302
1303
29-Dec-12
29-Dec-12
05-Jan-13
05-Jan-13
30-Dec-12
30-Dec-12
Telephone conduits
RC Suspended Slab, Ground Floor, Area 21
0%
12-Sep-12
17-Sep-12
14
14
20%
6
6
31-Oct-12
31-Oct-12
17-Nov-12
17-Nov-12
0%
08-Nov-12
13-Nov-12
21-Mar-13
26-Mar-13
0%
08-Nov-12
13-Nov-12
21-Mar-13
26-Mar-13
NECP-Rebase_06Sep12-4.CO.2.1.3.8.8
Area B6
NECOUBSS2073
Earthing conduits
0%
08-Nov-12
13-Nov-12
21-Mar-13
26-Mar-13
Earthing conduits
NECP-Rebase_06Sep12-4.CO.2.1.3.8.8
Area B6
NECOUBSS2074
Lighting conduits
0%
08-Nov-12
13-Nov-12
21-Mar-13
26-Mar-13
Lighting conduits
NECP-Rebase_06Sep12-4.CO.2.1.3.8.8
Area B6
NECOUBSS2075
0%
08-Nov-12
13-Nov-12
21-Mar-13
26-Mar-13
1304
NECP-Rebase_06Sep12-4.CO.2.1.3.8.8
Area B6
NECOUBSS2076
Telephone conduits
0%
08-Nov-12
13-Nov-12
21-Mar-13
26-Mar-13
1305
1306
Area B3
NECP-Rebase_06Sep12-4.CO.2.1.3.8.2
Area B3
NECOUBSS2010
14
14
0%
10
10
22-Aug-12
22-Aug-12
08-Sep-12
08-Sep-12
09-Mar-13
09-Mar-13
19-Mar-13
19-Mar-13
0
0
1307
NECP-Rebase_06Sep12-4.CO.2.1.3.8.2
Area B3
NECOUBSS2011
0%
30-Aug-12
05-Sep-12
14-Mar-13
18-Mar-13
1308
NECP-Rebase_06Sep12-4.CO.2.1.3.8.2
Area B3
NECOUBSS2012
0%
30-Aug-12
05-Sep-12
14-Mar-13
18-Mar-13
1309
NECP-Rebase_06Sep12-4.CO.2.1.3.8.2
Area B3
NECOUBSS2013
Earthing conduits
0%
30-Aug-12
05-Sep-12
14-Mar-13
18-Mar-13
Earthing conduits
1310
NECP-Rebase_06Sep12-4.CO.2.1.3.8.2
Area B3
NECOUBSS2014
Lighting conduits
0%
30-Aug-12
05-Sep-12
14-Mar-13
18-Mar-13
Lighting conduits
04-Jan-13
04-Jan-13
Telephone conduits
RC Suspended Slab, Ground Floor, Area 24B
1311
NECP-Rebase_06Sep12-4.CO.2.1.3.8.2
Area B3
NECOUBSS2015
0%
30-Aug-12
05-Sep-12
14-Mar-13
18-Mar-13
1312
NECP-Rebase_06Sep12-4.CO.2.1.3.8.2
Area B3
NECOUBSS2016
Telephone conduits
0%
30-Aug-12
05-Sep-12
14-Mar-13
18-Mar-13
Telephone conduits
1313
1314
Area B4
NECP-Rebase_06Sep12-4.CO.2.1.3.8.7
Area B4
NECOUBSS2060
14
14
0%
14
14
20-Oct-12
20-Oct-12
05-Nov-12
05-Nov-12
30-Mar-13
30-Mar-13
14-Apr-13
14-Apr-13
4
4
1315
NECP-Rebase_06Sep12-4.CO.2.1.3.8.7
Area B4
NECOUBSS2061
0%
28-Oct-12
01-Nov-12
06-Apr-13
10-Apr-13
1316
NECP-Rebase_06Sep12-4.CO.2.1.3.8.7
Area B4
NECOUBSS2062
0%
28-Oct-12
01-Nov-12
06-Apr-13
10-Apr-13
1317
NECP-Rebase_06Sep12-4.CO.2.1.3.8.7
Area B4
NECOUBSS2063
Earthing conduits
0%
28-Oct-12
01-Nov-12
06-Apr-13
10-Apr-13
Earthing conduits
1318
NECP-Rebase_06Sep12-4.CO.2.1.3.8.7
Area B4
NECOUBSS2064
Lighting conduits
0%
28-Oct-12
01-Nov-12
06-Apr-13
10-Apr-13
Lighting conduits
1319
NECP-Rebase_06Sep12-4.CO.2.1.3.8.7
Area B4
NECOUBSS2065
0%
28-Oct-12
01-Nov-12
06-Apr-13
10-Apr-13
1320
NECP-Rebase_06Sep12-4.CO.2.1.3.8.7
Area B4
NECOUBSS2066
Telephone conduits
0%
28-Oct-12
01-Nov-12
06-Apr-13
10-Apr-13
1321
1322
Area B1
NECP-Rebase_06Sep12-4.CO.2.1.3.8.1
Area B1
NECOUBSS2000
14
14
0%
7
7
11-Aug-12
11-Aug-12
27-Aug-12
27-Aug-12
17-Mar-13
17-Mar-13
24-Mar-13
24-Mar-13
0
0
1323
NECP-Rebase_06Sep12-4.CO.2.1.3.8.1
Area B1
NECOUBSS2001
0%
19-Aug-12
23-Aug-12
19-Mar-13
23-Mar-13
1324
NECP-Rebase_06Sep12-4.CO.2.1.3.8.1
Area B1
NECOUBSS2002
0%
19-Aug-12
23-Aug-12
19-Mar-13
23-Mar-13
1325
NECP-Rebase_06Sep12-4.CO.2.1.3.8.1
Area B1
NECOUBSS2003
Earthing conduits
0%
19-Aug-12
23-Aug-12
19-Mar-13
23-Mar-13
Earthing conduits
2014
Jul
63
39
39
29-Dec-12
07-Jan-13
07-Jan-13
Jun
May
1231
1232
1235
1236
Telephone conduits
RC Suspended Slab, Ground Floor, Area 25
Aug
Sep
Oct
Nov
Dec
Jan
Feb
WBS
WBS Name
Activity ID
Activity Name
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
1326
NECP-Rebase_06Sep12-4.CO.2.1.3.8.1
Area B1
NECOUBSS2004
Lighting conduits
0%
19-Aug-12
23-Aug-12
19-Mar-13
23-Mar-13
Lighting conduits
1327
NECP-Rebase_06Sep12-4.CO.2.1.3.8.1
Area B1
NECOUBSS2005
0%
19-Aug-12
23-Aug-12
19-Mar-13
23-Mar-13
1328
NECP-Rebase_06Sep12-4.CO.2.1.3.8.1
Area B1
NECOUBSS2006
Telephone conduits
Telephone conduits
1329
1330
Area B2
NECP-Rebase_06Sep12-4.CO.2.1.3.8.6
Area B2
NECOUBSS2050
BL Project
Duration
Activity % Remaining
Complete Duration
Actual Start
Actual
Finish
2013
1331
NECP-Rebase_06Sep12-4.CO.2.1.3.8.6
Area B2
NECOUBSS2051
1332
NECP-Rebase_06Sep12-4.CO.2.1.3.8.6
Area B2
NECOUBSS2052
1333
1334
1335
Jan
Feb
Mar
Apr
May
0%
19-Aug-12
23-Aug-12
19-Mar-13
23-Mar-13
14
14
0%
7
7
08-Oct-12
08-Oct-12
24-Oct-12
24-Oct-12
20-Mar-13
20-Mar-13
27-Mar-13
27-Mar-13
0
0
0%
16-Oct-12
21-Oct-12
23-Mar-13
26-Mar-13
0%
16-Oct-12
21-Oct-12
23-Mar-13
26-Mar-13
NECP-Rebase_06Sep12-4.CO.2.1.3.8.6
Area B2
NECOUBSS2053
Earthing conduits
0%
16-Oct-12
21-Oct-12
23-Mar-13
26-Mar-13
Earthing conduits
NECP-Rebase_06Sep12-4.CO.2.1.3.8.6
Area B2
NECOUBSS2054
Lighting conduits
0%
16-Oct-12
21-Oct-12
23-Mar-13
26-Mar-13
Lighting conduits
NECP-Rebase_06Sep12-4.CO.2.1.3.8.6
Area B2
NECOUBSS2055
0%
16-Oct-12
21-Oct-12
23-Mar-13
26-Mar-13
1336
NECP-Rebase_06Sep12-4.CO.2.1.3.8.6
Area B2
NECOUBSS2056
Telephone conduits
0%
16-Oct-12
21-Oct-12
23-Mar-13
26-Mar-13
Telephone conduits
1337
1338
Area 26
NECP-Rebase_06Sep12-4.CO.2.1.3.8.13
Area 26
NECOUBSS2456
0
0
0%
10
10
19-Mar-13
19-Mar-13
30-Mar-13
30-Mar-13
0
0
1339
NECP-Rebase_06Sep12-4.CO.2.1.3.8.13
Area 26
NECOUBSS2466
0%
25-Mar-13
28-Mar-13
1340
NECP-Rebase_06Sep12-4.CO.2.1.3.8.13
Area 26
NECOUBSS2476
0%
25-Mar-13
28-Mar-13
1341
NECP-Rebase_06Sep12-4.CO.2.1.3.8.13
Area 26
NECOUBSS2486
Earthing conduits
0%
25-Mar-13
28-Mar-13
Earthing conduits
1342
NECP-Rebase_06Sep12-4.CO.2.1.3.8.13
Area 26
NECOUBSS2496
Lighting conduits
0%
25-Mar-13
28-Mar-13
Lighting conduits
1343
NECP-Rebase_06Sep12-4.CO.2.1.3.8.13
Area 26
NECOUBSS2506
0%
25-Mar-13
28-Mar-13
NECP-Rebase_06Sep12-4.CO.2.1.3.8.13
Area 26
NECOUBSS2516
Telephone conduits
25-Mar-13
28-Mar-13
Telephone conduits
26-Mar-13
18-Jun-13
08-Jul-13
08-Jul-13
165
75
1344
0%
1345
1346
100
20
12.5%
90
18
03-Sep-12
03-Sep-12
29-Dec-12
26-Sep-12
1347
NECP-Rebase_06Sep12-4.CO.2.1.3.14
PHASE 2 - BACKFILLINGNECOEX2350
TO RETAINING WALLS
Backfilling
AROUND
Around
BUILDING
Building, Area 16 - Area 17
20
0%
20
05-Dec-12
29-Dec-12
26-Mar-13
17-Apr-13
145
1348
NECP-Rebase_06Sep12-4.CO.2.1.3.14
PHASE 2 - BACKFILLINGNECOEX2340
TO RETAINING WALLS
Backfilling
AROUND
Around
BUILDING
Building, Area 19 - Area 20
20
0%
20
12-Nov-12
05-Dec-12
18-Apr-13
11-May-13
175
1349
NECP-Rebase_06Sep12-4.CO.2.1.3.14
PHASE 2 - BACKFILLINGNECOEX2330
TO RETAINING WALLS
Backfilling
AROUND
Around
BUILDING
Building, Area 21 - Area 22
20
0%
20
20-Oct-12
12-Nov-12
12-May-13
03-Jun-13
175
1350
NECP-Rebase_06Sep12-4.CO.2.1.3.14
PHASE 2 - BACKFILLINGNECOEX2320
TO RETAINING WALLS
Backfilling
AROUND
Around
BUILDING
Building, Area 23 - Area 24
20
0%
20
26-Sep-12
20-Oct-12
04-Jun-13
26-Jun-13
175
123
123
38
25
15-Aug-12
15-Aug-12
15-Aug-12
15-Aug-12
06-Jan-13
06-Jan-13
27-Sep-12
13-Sep-12
31-Jan-13
31-Jan-13
16-Apr-13
16-Apr-13
27-May-13
27-May-13
01-May-13
29-Apr-13
123
123
139
0
06-Nov-12
06-Nov-12
Jul
0%
17
0%
09-Sep-12
27-Sep-12
25-Apr-13
01-May-13
139
17
0%
06-Sep-12
25-Sep-12
25-Apr-13
01-May-13
139
1357
NECP-Rebase_06Sep12-4.CO.2.1.4.7.1
LB Area B1 - B2
NECOBW1021
17
0%
27-Aug-12
16-Sep-12
25-Apr-13
01-May-13
139
1358
1359
LB Area B5 - B6
NECP-Rebase_06Sep12-4.CO.2.1.4.7.2
LB Area B5 - B6
NECOBW1030
30
25
0%
14
12
13-Sep-12
13-Sep-12
17-Oct-12
13-Oct-12
30-Apr-13
30-Apr-13
15-May-13
13-May-13
133
1
1360
NECP-Rebase_06Sep12-4.CO.2.1.4.7.2
LB Area B5 - B6
NECOBW1032
16
0%
29-Sep-12
16-Oct-12
09-May-13
15-May-13
133
1361
NECP-Rebase_06Sep12-4.CO.2.1.4.7.2
LB Area B5 - B6
NECOBW1033
16
0%
30-Sep-12
17-Oct-12
09-May-13
15-May-13
133
1362
NECP-Rebase_06Sep12-4.CO.2.1.4.7.2
LB Area B5 - B6
NECOBW1072
16
0%
26-Sep-12
15-Oct-12
09-May-13
15-May-13
1363
1364
LB Area B7 - B8
NECP-Rebase_06Sep12-4.CO.2.1.4.7.4
LB Area B7 - B8
NECOBW1040
31
25
10%
13
11
13-Oct-12
13-Oct-12
17-Nov-12
11-Nov-12
31-Jan-13
31-Jan-13
14-Feb-13
12-Feb-13
62
56
1365
NECP-Rebase_06Sep12-4.CO.2.1.4.7.4
LB Area B7 - B8
NECOBW1042
16
0%
27-Oct-12
13-Nov-12
07-Feb-13
14-Feb-13
62
1366
NECP-Rebase_06Sep12-4.CO.2.1.4.7.4
LB Area B7 - B8
NECOBW1043
16
0%
30-Oct-12
17-Nov-12
07-Feb-13
14-Feb-13
62
1367
1368
LB Area B9 - B10
NECP-Rebase_06Sep12-4.CO.2.1.4.7.6
LB Area B9 - B10
NECOBW1050
27
25
0%
14
12
11-Nov-12
11-Nov-12
12-Dec-12
10-Dec-12
03-Apr-13
03-Apr-13
18-Apr-13
16-Apr-13
14
14
1369
NECP-Rebase_06Sep12-4.CO.2.1.4.7.6
LB Area B9 - B10
NECOBW1052
16
0%
24-Nov-12
12-Dec-12
13-Apr-13
18-Apr-13
14
1370
NECP-Rebase_06Sep12-4.CO.2.1.4.7.6
LB Area B9 - B10
NECOBW1053
16
0%
24-Nov-12
12-Dec-12
13-Apr-13
18-Apr-13
14
1371
1372
UB Area B1 - B2
NECP-Rebase_06Sep12-4.CO.2.1.4.7.3
UB Area B1 - B2
NECOBW1060
27
25
0%
14
12
09-Sep-12
09-Sep-12
10-Oct-12
08-Oct-12
24-Apr-13
24-Apr-13
09-May-13
07-May-13
2
2
1373
NECP-Rebase_06Sep12-4.CO.2.1.4.7.3
UB Area B1 - B2
NECOBW1062
16
0%
22-Sep-12
10-Oct-12
04-May-13
09-May-13
1374
NECP-Rebase_06Sep12-4.CO.2.1.4.7.3
UB Area B1 - B2
NECOBW1063
16
0%
22-Sep-12
10-Oct-12
04-May-13
09-May-13
1375
NECP-Rebase_06Sep12-4.CO.2.1.4.7.3
UB Area B1 - B2
NECOBW1061
16
0%
22-Sep-12
10-Oct-12
04-May-13
09-May-13
1376
1377
UB Area B5 - B6
NECP-Rebase_06Sep12-4.CO.2.1.4.7.5
UB Area B5 - B6
NECOBW1070
27
25
0%
15
12
08-Oct-12
08-Oct-12
08-Nov-12
06-Nov-12
11-May-13
11-May-13
27-May-13
23-May-13
1
2
1378
NECP-Rebase_06Sep12-4.CO.2.1.4.7.5
UB Area B5 - B6
NECOBW1065
17
0%
20-Oct-12
08-Nov-12
21-May-13
27-May-13
1379
NECP-Rebase_06Sep12-4.CO.2.1.4.7.5
UB Area B5 - B6
NECOBW1066
17
0%
20-Oct-12
08-Nov-12
21-May-13
27-May-13
1380
NECP-Rebase_06Sep12-4.CO.2.1.4.7.5
UB Area B5 - B6
NECOBW1064
17
0%
20-Oct-12
08-Nov-12
21-May-13
27-May-13
1381
1382
UB Area B7 - B8
NECP-Rebase_06Sep12-4.CO.2.1.4.7.7
UB Area B7 - B8
NECOBW1080
30
25
5%
13
11
06-Nov-12
06-Nov-12
10-Dec-12
05-Dec-12
31-Jan-13
31-Jan-13
16-Feb-13
13-Feb-13
98
98
NECP-Rebase_06Sep12-4.CO.2.1.4.7.7
UB Area B7 - B8
NECOBW1082
16
0%
19-Nov-12
08-Dec-12
09-Feb-13
16-Feb-13
98
1384
NECP-Rebase_06Sep12-4.CO.2.1.4.7.7
UB Area B7 - B8
NECOBW1083
16
0%
22-Nov-12
10-Dec-12
09-Feb-13
16-Feb-13
98
1385
1386
UB Area B9 - B10
NECP-Rebase_06Sep12-4.CO.2.1.4.7.8
UB Area B9 - B10
NECOBW1090
27
25
0%
14
12
05-Dec-12
05-Dec-12
06-Jan-13
03-Jan-13
11-Apr-13
11-Apr-13
27-Apr-13
24-Apr-13
97
68
1387
NECP-Rebase_06Sep12-4.CO.2.1.4.7.8
UB Area B9 - B10
NECOBW1092
16
0%
18-Dec-12
06-Jan-13
21-Apr-13
27-Apr-13
97
1388
NECP-Rebase_06Sep12-4.CO.2.1.4.7.8
UB Area B9 - B10
NECOBW1093
16
0%
18-Dec-12
06-Jan-13
21-Apr-13
27-Apr-13
97
35
35
0%
35
35
16-Jan-13
16-Jan-13
26-Feb-13
26-Feb-13
08-May-13
08-May-13
17-Jun-13
17-Jun-13
79
79
1391
1392
Gate House
NECP-Rebase_06Sep12-4.CO.2.2
Gate House
NECOCW130
78
15
0%
183
15
24-Mar-13
24-Mar-13
22-Jun-13
09-Apr-13
20-May-13
20-May-13
22-Dec-13
05-Jun-13
0
107
1393
NECP-Rebase_06Sep12-4.CO.2.2
Gate House
NECOCW140
10
0%
10
10-Apr-13
21-Apr-13
06-Jun-13
17-Jun-13
107
1394
NECP-Rebase_06Sep12-4.CO.2.2
Gate House
NECOMEP230
15
0%
15
22-Apr-13
08-May-13
18-Jun-13
04-Jul-13
107
1395
NECP-Rebase_06Sep12-4.CO.2.2
Gate House
NECOBFW220
30
0%
30
30-Apr-13
03-Jun-13
26-Jun-13
30-Jul-13
107
NECP-Rebase_06Sep12-4.CO.2.2
Gate House
NECOMEP240
25
1396
0%
25
25-May-13
22-Jun-13
23-Nov-13
22-Dec-13
1397
1398
1399
1400
MEP Works
Lower Basement Floor
PHASE 2 LOWER BASEMENT - BLACK STEEL PIPES
NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2400
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B1
292
286
75
8
0%
218
218
70
7
14-Aug-12
14-Aug-12
12-Sep-12
12-Sep-12
21-Jul-13
13-Jul-13
09-Dec-12
22-Sep-12
25-Apr-13
25-Apr-13
25-Apr-13
25-Apr-13
07-Jan-14
07-Jan-14
15-Jul-13
02-May-13
5
5
56
42
1401
NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2410
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B2
0%
22-Sep-12
01-Oct-12
04-May-13
11-May-13
42
1402
NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2420
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B3
0%
01-Oct-12
10-Oct-12
12-May-13
19-May-13
42
1403
NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2430
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B4
0%
10-Oct-12
20-Oct-12
20-May-13
27-May-13
56
1404
NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2440
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B5
0%
20-Oct-12
29-Oct-12
28-May-13
04-Jun-13
56
1405
NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2450
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B6
0%
29-Oct-12
06-Nov-12
05-Jun-13
12-Jun-13
56
1406
NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2460
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B7
0%
06-Nov-12
14-Nov-12
13-Jun-13
20-Jun-13
56
1407
NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2470
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B8
0%
14-Nov-12
22-Nov-12
22-Jun-13
29-Jun-13
56
1408
NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2480
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B9
0%
22-Nov-12
01-Dec-12
30-Jun-13
07-Jul-13
56
1409
NECP-Rebase_06Sep12-4.CO.2.5.1.29
PHASE 2 LOWER BASEMENT
NECOMEP2490
- BLACK STEEL
Black
PIPES
Steel Pipes, CHW, Area B10
0%
01-Dec-12
09-Dec-12
08-Jul-13
15-Jul-13
56
110
110
7
12-Sep-12
12-Sep-12
12-Sep-12
19-Jan-13
19-Jan-13
20-Sep-12
25-Apr-13
25-Apr-13
25-Apr-13
03-Jul-13
03-Jul-13
01-May-13
89
66
42
1410
1411
1412
PHASE 2 LOWER BASEMENT - PIPE INSTALLATION (SANITARY, FIRE FIGHTING & WATER SUPPLY)
FIRE FIGHTING
NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4440
Fire fighting pipe installation - Area B1
0%
60
60
6
1413
NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4450
0%
10-Nov-12
18-Nov-12
02-May-13
08-May-13
58
1414
NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4460
0%
18-Nov-12
26-Nov-12
09-May-13
15-May-13
59
1415
NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4470
0%
26-Nov-12
05-Dec-12
16-May-13
22-May-13
60
1416
NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4480
0%
05-Dec-12
13-Dec-12
23-May-13
29-May-13
61
1417
NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4490
0%
13-Dec-12
22-Dec-12
30-May-13
05-Jun-13
62
1418
NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4500
0%
22-Dec-12
29-Dec-12
06-Jun-13
12-Jun-13
63
1419
NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4510
0%
29-Dec-12
05-Jan-13
13-Jun-13
19-Jun-13
64
1420
NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4520
0%
05-Jan-13
12-Jan-13
20-Jun-13
26-Jun-13
65
1421
NECP-Rebase_06Sep12-4.CO.2.5.1.28.2
FIRE FIGHTING
NECOMEP4530
0%
12-Jan-13
19-Jan-13
27-Jun-13
03-Jul-13
66
1422
1423
SANITARY
NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2300
110
7
0%
60
6
12-Sep-12
12-Sep-12
19-Jan-13
20-Sep-12
25-Apr-13
25-Apr-13
03-Jul-13
01-May-13
81
81
1424
NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2310
0%
10-Nov-12
18-Nov-12
02-May-13
08-May-13
81
1425
NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2320
0%
18-Nov-12
26-Nov-12
09-May-13
15-May-13
81
1426
NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2330
0%
26-Nov-12
04-Dec-12
16-May-13
22-May-13
81
1427
NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2340
0%
04-Dec-12
12-Dec-12
23-May-13
29-May-13
81
1428
NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2350
0%
12-Dec-12
20-Dec-12
30-May-13
05-Jun-13
81
1429
NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2360
0%
20-Dec-12
27-Dec-12
06-Jun-13
12-Jun-13
81
1430
NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2370
0%
29-Dec-12
05-Jan-13
13-Jun-13
19-Jun-13
81
1431
NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2380
0%
05-Jan-13
12-Jan-13
20-Jun-13
26-Jun-13
81
1432
NECP-Rebase_06Sep12-4.CO.2.5.1.28.1
SANITARY
NECOMEP2390
0%
12-Jan-13
19-Jan-13
27-Jun-13
03-Jul-13
81
1433
1434
WATER SUPPLY
NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4540
110
7
0%
60
6
12-Sep-12
12-Sep-12
19-Jan-13
20-Sep-12
25-Apr-13
25-Apr-13
03-Jul-13
01-May-13
89
42
1435
NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4550
0%
10-Nov-12
18-Nov-12
02-May-13
08-May-13
89
1436
NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4560
0%
18-Nov-12
26-Nov-12
09-May-13
15-May-13
89
Feb
NECP-Rebase_06Sep12-4.CO.2.1.4.7.1
LB Area B1 - B2
NECOBW1023
Jan
NECP-Rebase_06Sep12-4.CO.2.1.4.7.1
LB Area B1 - B2
NECOBW1022
1389
1390
Dec
1356
Nov
1355
1383
Oct
100
100
14
12
19-Jan-13
19-Jan-13
Sep
12-Jan-13
12-Jan-13
Aug
1351
1352
1353
1354
12-Jan-13
12-Jan-13
2014
Jun
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
1437
NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4570
0%
26-Nov-12
05-Dec-12
16-May-13
22-May-13
89
1438
NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4580
0%
05-Dec-12
13-Dec-12
23-May-13
29-May-13
89
1439
NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4590
0%
13-Dec-12
22-Dec-12
30-May-13
05-Jun-13
89
1440
NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4600
0%
22-Dec-12
29-Dec-12
06-Jun-13
12-Jun-13
89
1441
NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4610
0%
29-Dec-12
05-Jan-13
13-Jun-13
19-Jun-13
89
1442
NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4620
0%
05-Jan-13
12-Jan-13
20-Jun-13
26-Jun-13
89
NECP-Rebase_06Sep12-4.CO.2.5.1.28.3
WATER SUPPLY
NECOMEP4630
1443
WBS
WBS Name
Activity ID
Activity Name
BL Project
Duration
Activity % Remaining
Complete Duration
Actual Start
Actual
Finish
0%
12-Jan-13
19-Jan-13
27-Jun-13
03-Jul-13
89
1444
1445
100
8
0%
70
7
10-Oct-12
10-Oct-12
04-Feb-13
20-Oct-12
20-May-13
20-May-13
08-Aug-13
27-May-13
42
42
1446
NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2315
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B2
0%
18-Nov-12
27-Nov-12
28-May-13
04-Jun-13
42
1447
NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2325
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B3
0%
27-Nov-12
06-Dec-12
05-Jun-13
12-Jun-13
42
1448
NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2335
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B4
0%
06-Dec-12
16-Dec-12
13-Jun-13
20-Jun-13
42
1449
NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2345
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B5
0%
16-Dec-12
25-Dec-12
22-Jun-13
29-Jun-13
42
1450
NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2355
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B6
0%
25-Dec-12
02-Jan-13
30-Jun-13
07-Jul-13
42
1451
NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2365
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B7
0%
02-Jan-13
10-Jan-13
08-Jul-13
15-Jul-13
42
1452
NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2375
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B8
0%
10-Jan-13
19-Jan-13
16-Jul-13
23-Jul-13
42
1453
NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2385
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B9
0%
19-Jan-13
27-Jan-13
24-Jul-13
31-Jul-13
42
1454
NECP-Rebase_06Sep12-4.CO.2.5.1.30
PHASE 2 LOWER BASEMENT
NECOMEP2395
- SPRINKLER SYSTEM
Sprinkler Head & Accessories, Area B10
0%
27-Jan-13
04-Feb-13
01-Aug-13
08-Aug-13
42
12-Sep-12
12-Sep-12
12-Sep-12
09-Apr-13
27-Jan-13
22-Sep-12
25-Apr-13
25-Apr-13
25-Apr-13
17-Oct-13
15-Jul-13
02-May-13
52
54
54
1455
1456
1457
180
117
8
0%
149
70
7
1458
NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2415
0%
10-Nov-12
19-Nov-12
04-May-13
11-May-13
54
1459
NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2425
0%
19-Nov-12
28-Nov-12
12-May-13
19-May-13
54
1460
NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2435
0%
28-Nov-12
08-Dec-12
20-May-13
27-May-13
54
1461
NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2445
0%
08-Dec-12
17-Dec-12
28-May-13
04-Jun-13
54
1462
NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2455
0%
17-Dec-12
25-Dec-12
05-Jun-13
12-Jun-13
54
1463
NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2465
0%
25-Dec-12
02-Jan-13
13-Jun-13
20-Jun-13
54
1464
NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2475
0%
02-Jan-13
10-Jan-13
22-Jun-13
29-Jun-13
54
1465
NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2485
0%
10-Jan-13
19-Jan-13
30-Jun-13
07-Jul-13
54
1466
NECP-Rebase_06Sep12-4.CO.2.5.1.31.1
INSTALLATION
NECOMEP2495
0%
19-Jan-13
27-Jan-13
08-Jul-13
15-Jul-13
54
1467
1468
INSULATION
NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4640
76
8
0%
70
7
12-Jan-13
12-Jan-13
09-Apr-13
20-Jan-13
27-Jul-13
27-Jul-13
17-Oct-13
03-Aug-13
52
41
1469
NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4650
0%
21-Jan-13
29-Jan-13
04-Aug-13
11-Aug-13
41
1470
NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4660
0%
31-Jan-13
09-Feb-13
12-Aug-13
19-Aug-13
41
1471
NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4670
0%
10-Feb-13
18-Feb-13
20-Aug-13
27-Aug-13
50
1472
NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4680
0%
19-Feb-13
27-Feb-13
28-Aug-13
04-Sep-13
52
1473
NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4690
0%
28-Feb-13
07-Mar-13
05-Sep-13
12-Sep-13
52
1474
NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4700
0%
09-Mar-13
16-Mar-13
14-Sep-13
21-Sep-13
52
1475
NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4710
0%
17-Mar-13
24-Mar-13
22-Sep-13
29-Sep-13
52
1476
NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4720
0%
25-Mar-13
01-Apr-13
30-Sep-13
07-Oct-13
52
1477
NECP-Rebase_06Sep12-4.CO.2.5.1.31.2
INSULATION
NECOMEP4730
0%
02-Apr-13
09-Apr-13
08-Oct-13
17-Oct-13
52
06-Apr-13
06-Apr-13
15-May-13
22-Apr-13
06-Oct-13
06-Oct-13
18-Nov-13
26-Oct-13
41
17
1478
1479
35
15
0%
35
15
1480
NECP-Rebase_06Sep12-4.CO.2.5.1.32
PHASE 2 LOWER BASEMENT
NECOMEP2610
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area B5-B7
10
0%
10
23-Apr-13
04-May-13
26-Oct-13
06-Nov-13
41
1481
NECP-Rebase_06Sep12-4.CO.2.5.1.32
PHASE 2 LOWER BASEMENT
NECOMEP2620
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area B8-B10
10
0%
10
05-May-13
15-May-13
06-Nov-13
18-Nov-13
41
28-Jan-13
28-Jan-13
03-Mar-13
07-Feb-13
20-Aug-13
20-Aug-13
24-Sep-13
01-Sep-13
75
57
1482
1483
1484
30
10
0%
30
10
NECP-Rebase_06Sep12-4.CO.2.5.1.33
PHASE 2 LOWER BASEMENT
NECOMEP2640
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area B5-B7
10
0%
NECP-Rebase_06Sep12-4.CO.2.5.1.33
PHASE 2 LOWER BASEMENT
NECOMEP2650
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area B8-B10
10
10
09-Feb-13
19-Feb-13
01-Sep-13
12-Sep-13
75
0%
10
20-Feb-13
03-Mar-13
12-Sep-13
24-Sep-13
75
1486
1487
22
8
0%
22
7
09-Feb-13
09-Feb-13
05-Mar-13
17-Feb-13
26-Aug-13
26-Aug-13
19-Sep-13
02-Sep-13
89
78
1488
NECP-Rebase_06Sep12-4.CO.2.5.1.34
PHASE 2 LOWER BASEMENT
NECOMEP2670
- COLD WATER,
Cold
HOT
Water,
WATER,
Hot Water
FIREFIGHTING
& Firefighting
INSTALLATION
Installation, Area B5-B7
0%
18-Feb-13
25-Feb-13
03-Sep-13
10-Sep-13
90
1489
NECP-Rebase_06Sep12-4.CO.2.5.1.34
PHASE 2 LOWER BASEMENT
NECOMEP2680
- COLD WATER,
Cold
HOT
Water,
WATER,
Hot Water
FIREFIGHTING
& Firefighting
INSTALLATION
Installation, Area B8-B10
0%
26-Feb-13
05-Mar-13
12-Sep-13
19-Sep-13
89
07-Feb-13
07-Feb-13
07-Feb-13
23-May-13
07-Apr-13
18-Feb-13
19-Sep-13
19-Sep-13
19-Sep-13
06-Nov-13
23-Oct-13
30-Sep-13
50
22
22
13-Mar-13
01-Oct-13
10-Oct-13
22
1485
1490
1491
1492
91
51
10
0%
40
28
10
1493
NECP-Rebase_06Sep12-4.CO.2.5.1.35.1
WIRING
NECOMEP2153
0%
04-Mar-13
1494
NECP-Rebase_06Sep12-4.CO.2.5.1.35.1
WIRING
NECOMEP2163
1495
1496
DEVICES INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.35.2
DEVICES INSTALLATIONNECOMEP5450
1497
NECP-Rebase_06Sep12-4.CO.2.5.1.35.2
DEVICES INSTALLATIONNECOMEP5460
1498
NECP-Rebase_06Sep12-4.CO.2.5.1.35.2
DEVICES INSTALLATIONNECOMEP5470
0%
28-Mar-13
07-Apr-13
12-Oct-13
23-Oct-13
22
27
7
0%
21
7
23-Apr-13
23-Apr-13
23-May-13
30-Apr-13
12-Oct-13
12-Oct-13
06-Nov-13
21-Oct-13
50
24
0%
05-May-13
12-May-13
22-Oct-13
29-Oct-13
24
0%
16-May-13
23-May-13
30-Oct-13
06-Nov-13
50
1499
1500
74
8
0%
50
5
01-Jan-13
01-Jan-13
27-Mar-13
09-Jan-13
06-Jun-13
06-Jun-13
04-Aug-13
12-Jun-13
81
79
1501
NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2915
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B2
0%
10-Jan-13
19-Jan-13
12-Jun-13
18-Jun-13
79
1502
NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2925
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B3
0%
20-Jan-13
28-Jan-13
18-Jun-13
24-Jun-13
79
1503
NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2935
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B4
0%
29-Jan-13
06-Feb-13
24-Jun-13
30-Jun-13
79
1504
NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2945
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B5
0%
07-Feb-13
14-Feb-13
30-Jun-13
06-Jul-13
79
1505
NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2955
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B6
0%
16-Feb-13
23-Feb-13
06-Jul-13
11-Jul-13
81
1506
NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2965
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B7
0%
24-Feb-13
03-Mar-13
11-Jul-13
17-Jul-13
81
1507
NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2975
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B8
0%
04-Mar-13
11-Mar-13
17-Jul-13
23-Jul-13
81
1508
NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2985
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B9
0%
12-Mar-13
19-Mar-13
23-Jul-13
29-Jul-13
81
1509
NECP-Rebase_06Sep12-4.CO.2.5.1.36
PHASE 2 LOWER BASEMENT
NECOMEP2995
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLECable
TRUNKING
Trunking, Area B10
0%
20-Mar-13
27-Mar-13
29-Jul-13
04-Aug-13
81
77
73
7
0%
60
60
6
10-Jan-13
10-Jan-13
10-Jan-13
09-Apr-13
04-Apr-13
17-Jan-13
18-Jul-13
18-Jul-13
18-Jul-13
26-Sep-13
26-Sep-13
25-Jul-13
78
78
67
0%
20-Jan-13
27-Jan-13
25-Jul-13
01-Aug-13
67
0%
29-Jan-13
05-Feb-13
01-Aug-13
08-Aug-13
67
NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2250
0%
07-Feb-13
14-Feb-13
08-Aug-13
15-Aug-13
67
1516
NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2260
0%
16-Feb-13
23-Feb-13
15-Aug-13
22-Aug-13
67
1517
NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2270
0%
24-Feb-13
03-Mar-13
22-Aug-13
29-Aug-13
78
1518
NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2280
0%
04-Mar-13
11-Mar-13
29-Aug-13
05-Sep-13
78
1519
NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2290
0%
12-Mar-13
19-Mar-13
05-Sep-13
12-Sep-13
78
1520
NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2720
0%
20-Mar-13
27-Mar-13
12-Sep-13
19-Sep-13
78
1521
NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2730
1522
1523
BUS BAR
NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4740
1524
1525
1510
1511
1512
1513
NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2230
1514
NECP-Rebase_06Sep12-4.CO.2.5.1.37.1
BUS DUCT
NECOMEP2240
1515
0%
28-Mar-13
04-Apr-13
19-Sep-13
26-Sep-13
78
70
7
0%
53
5
19-Jan-13
19-Jan-13
09-Apr-13
26-Jan-13
25-Jul-13
25-Jul-13
25-Sep-13
31-Jul-13
78
81
NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4750
0%
27-Jan-13
03-Feb-13
31-Jul-13
06-Aug-13
81
NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4760
0%
04-Feb-13
11-Feb-13
06-Aug-13
12-Aug-13
81
1526
NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4770
0%
12-Feb-13
19-Feb-13
12-Aug-13
18-Aug-13
81
1527
NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4780
0%
20-Feb-13
27-Feb-13
18-Aug-13
24-Aug-13
81
1528
NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4790
0%
28-Feb-13
07-Mar-13
24-Aug-13
29-Aug-13
81
1529
NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4800
0%
09-Mar-13
16-Mar-13
29-Aug-13
04-Sep-13
81
1530
NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4810
0%
17-Mar-13
24-Mar-13
05-Sep-13
11-Sep-13
80
1531
NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4820
0%
25-Mar-13
01-Apr-13
12-Sep-13
18-Sep-13
79
1532
NECP-Rebase_06Sep12-4.CO.2.5.1.37.2
BUS BAR
NECOMEP4830
0%
02-Apr-13
09-Apr-13
19-Sep-13
25-Sep-13
78
87
40
14
21-Jan-13
21-Jan-13
21-Jan-13
01-May-13
07-Mar-13
05-Feb-13
12-Oct-13
12-Oct-13
12-Oct-13
15-Dec-13
28-Nov-13
29-Oct-13
10
11
0
1533
1534
1535
0%
54
40
14
1536
NECP-Rebase_06Sep12-4.CO.2.5.1.38.1
WIRING
NECOMEP2023
13
0%
13
06-Feb-13
20-Feb-13
30-Oct-13
13-Nov-13
11
1537
NECP-Rebase_06Sep12-4.CO.2.5.1.38.1
WIRING
NECOMEP2033
13
0%
13
21-Feb-13
07-Mar-13
14-Nov-13
28-Nov-13
11
1538
1539
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.38.2
DEVICE INSTALLATION NECOMEP4940
60
14
0%
40
14
21-Feb-13
16-Apr-13
01-May-13
01-May-13
30-Oct-13
30-Oct-13
15-Dec-13
14-Nov-13
10
6
NECP-Rebase_06Sep12-4.CO.2.5.1.38.2
DEVICE INSTALLATION NECOMEP4950
13
0%
NECP-Rebase_06Sep12-4.CO.2.5.1.38.2
DEVICE INSTALLATION NECOMEP4960
13
1540
13
21-Feb-13
07-Mar-13
16-Nov-13
30-Nov-13
10
0%
13
09-Mar-13
23-Mar-13
01-Dec-13
15-Dec-13
10
1542
1543
90
30
0%
44
30
31-Mar-13
31-Mar-13
13-Jul-13
04-May-13
14-Nov-13
14-Nov-13
05-Jan-14
19-Dec-13
0
0
1544
NECP-Rebase_06Sep12-4.CO.2.5.1.89
PHASE 2 LOWER BASEMENT
NECOMEP2123
- HV INSTALLATION
Substation
(SUBSTATION
2: MV Panels
NO.
Installation,
2)
Area B1
30
0%
30
05-May-13
08-Jun-13
23-Nov-13
28-Dec-13
NECP-Rebase_06Sep12-4.CO.2.5.1.89
PHASE 2 LOWER BASEMENT
NECOMEP2133
- HV INSTALLATION
Substation
(SUBSTATION
2: Switchgear
NO.Installation,
2)
Area B2
30
0%
30
09-Jun-13
13-Jul-13
01-Dec-13
05-Jan-14
0%
35
21
31-Mar-13
31-Mar-13
13-Jul-13
04-May-13
27-Nov-13
27-Nov-13
07-Jan-14
22-Dec-13
5
5
1541
1545
1546
1547
90
30
2013
Jan
Feb
Mar
Apr
May
2014
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
1548
NECP-Rebase_06Sep12-4.CO.2.5.1.39
PHASE 2 LOWER BASEMENT
NECOMEP3010
- GENERATOR,
UPS,
UPS,Area
BATTERY
B1
SYSTEM
30
0%
21
05-May-13
08-Jun-13
05-Dec-13
30-Dec-13
1549
NECP-Rebase_06Sep12-4.CO.2.5.1.39
PHASE 2 LOWER BASEMENT
NECOMEP3020
- GENERATOR,
Battery
UPS, System,
BATTERY
Area
SYSTEM
A10
30
0%
21
09-Jun-13
13-Jul-13
14-Dec-13
07-Jan-14
149
38
13
0%
105
38
13
14-Aug-12
14-Aug-12
14-Aug-12
04-Feb-13
26-Sep-12
28-Aug-12
25-Apr-13
25-Apr-13
25-Apr-13
26-Aug-13
09-Jun-13
11-May-13
73
90
90
1550
1551
1552
WBS
WBS Name
Activity ID
Activity Name
BL Project
Duration
Activity % Remaining
Complete Duration
Actual Start
Actual
Finish
1553
NECP-Rebase_06Sep12-4.CO.2.5.1.40.1
WIRING
NECOMEP3200
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B5-B7
13
0%
13
29-Aug-12
12-Sep-12
11-May-13
26-May-13
90
1554
NECP-Rebase_06Sep12-4.CO.2.5.1.40.1
WIRING
NECOMEP3210
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B8-B10
12
0%
12
13-Sep-12
26-Sep-12
26-May-13
09-Jun-13
90
1555
1556
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.40.2
DEVICE INSTALLATION NECOMEP4970
37
Luminaires, Lighting Points, Switch Points, etc Devices installation., Area B1-B4
13
0%
38
13
23-Dec-12
23-Dec-12
04-Feb-13
07-Jan-13
14-Jul-13
14-Jul-13
26-Aug-13
28-Jul-13
73
48
1557
NECP-Rebase_06Sep12-4.CO.2.5.1.40.2
DEVICE INSTALLATION NECOMEP4980
Luminaires, Lighting Points, Switch Points, etc Devices installation, Area B5-B7
13
0%
13
07-Jan-13
22-Jan-13
29-Jul-13
12-Aug-13
73
1558
NECP-Rebase_06Sep12-4.CO.2.5.1.40.2
DEVICE INSTALLATION NECOMEP4990
Luminaires, Lighting Points, Switch Points, etc Devices installation, Area B8-B10
12
0%
12
21-Jan-13
04-Feb-13
13-Aug-13
26-Aug-13
73
81
37
13
01-Nov-12
01-Nov-12
01-Nov-12
04-Feb-13
13-Dec-12
15-Nov-12
03-Oct-13
03-Oct-13
03-Oct-13
01-Dec-13
17-Nov-13
20-Oct-13
0
0
0
1559
1560
1561
0%
49
37
13
1562
NECP-Rebase_06Sep12-4.CO.2.5.1.41.1
WIRING
NECOMEP3320
12
0%
12
17-Nov-12
29-Nov-12
21-Oct-13
03-Nov-13
1563
NECP-Rebase_06Sep12-4.CO.2.5.1.41.1
WIRING
NECOMEP3330
12
0%
12
01-Dec-12
13-Dec-12
04-Nov-13
17-Nov-13
1564
1565
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.41.2
DEVICE INSTALLATION NECOMEP5000
37
13
0%
36
13
23-Dec-12
23-Dec-12
04-Feb-13
07-Jan-13
21-Oct-13
21-Oct-13
01-Dec-13
04-Nov-13
0
0
1566
NECP-Rebase_06Sep12-4.CO.2.5.1.41.2
DEVICE INSTALLATION NECOMEP5010
12
0%
12
07-Jan-13
21-Jan-13
04-Nov-13
17-Nov-13
1567
NECP-Rebase_06Sep12-4.CO.2.5.1.41.2
DEVICE INSTALLATION NECOMEP5020
12
0%
12
21-Jan-13
04-Feb-13
18-Nov-13
01-Dec-13
1568
1569
1570
26
20
7
0%
26
20
7
09-Jan-13
09-Jan-13
09-Jan-13
07-Feb-13
31-Jan-13
16-Jan-13
17-Oct-13
17-Oct-13
17-Oct-13
16-Nov-13
09-Nov-13
24-Oct-13
9
9
7
1571
NECP-Rebase_06Sep12-4.CO.2.5.1.42.1
WIRING
NECOMEP3440
0%
17-Jan-13
24-Jan-13
26-Oct-13
02-Nov-13
1572
NECP-Rebase_06Sep12-4.CO.2.5.1.42.1
WIRING
NECOMEP3450
0%
26-Jan-13
31-Jan-13
03-Nov-13
09-Nov-13
1573
1574
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.42.2
DEVICE INSTALLATION NECOMEP5030
19
7
0%
19
7
17-Jan-13
17-Jan-13
07-Feb-13
24-Jan-13
26-Oct-13
26-Oct-13
16-Nov-13
02-Nov-13
9
7
NECP-Rebase_06Sep12-4.CO.2.5.1.42.2
DEVICE INSTALLATION NECOMEP5040
0%
14
NECP-Rebase_06Sep12-4.CO.2.5.1.42.2
DEVICE INSTALLATION NECOMEP5050
1575
1576
1577
1578
1579
26-Jan-13
02-Feb-13
03-Nov-13
10-Nov-13
0%
02-Feb-13
07-Feb-13
10-Nov-13
16-Nov-13
132
21
7
09-Jan-13
09-Jan-13
09-Jan-13
12-Jun-13
02-Feb-13
16-Jan-13
28-Oct-13
28-Oct-13
28-Oct-13
28-Nov-13
20-Nov-13
04-Nov-13
32
0
0
0%
28
21
7
1580
NECP-Rebase_06Sep12-4.CO.2.5.1.43.1
WIRING
NECOMEP3560
0%
17-Jan-13
24-Jan-13
05-Nov-13
12-Nov-13
1581
NECP-Rebase_06Sep12-4.CO.2.5.1.43.1
WIRING
NECOMEP3570
0%
26-Jan-13
02-Feb-13
13-Nov-13
20-Nov-13
1582
1583
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.43.2
DEVICE INSTALLATION NECOMEP5060
47
7
0%
21
7
18-Apr-13
18-Apr-13
12-Jun-13
27-Apr-13
05-Nov-13
05-Nov-13
28-Nov-13
12-Nov-13
32
18
0%
1584
NECP-Rebase_06Sep12-4.CO.2.5.1.43.2
DEVICE INSTALLATION NECOMEP5070
1585
NECP-Rebase_06Sep12-4.CO.2.5.1.43.2
DEVICE INSTALLATION NECOMEP5080
1586
1587
1588
1589
1590
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.44.2
DEVICE INSTALLATION NECOMEP5490
1591
1592
1593
1594
1595
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.1.49.2
DEVICE INSTALLATION NECOMEP5480
13-May-13
21-May-13
13-Nov-13
20-Nov-13
33
0%
04-Jun-13
12-Jun-13
21-Nov-13
28-Nov-13
32
30
15
15
0%
30
15
15
19-Jan-13
19-Jan-13
19-Jan-13
21-Feb-13
04-Feb-13
04-Feb-13
30-Sep-13
30-Sep-13
30-Sep-13
05-Nov-13
19-Oct-13
19-Oct-13
14
14
14
15
15
0%
15
15
05-Feb-13
05-Feb-13
21-Feb-13
21-Feb-13
20-Oct-13
20-Oct-13
05-Nov-13
05-Nov-13
14
14
30
15
15
0%
30
15
15
19-Jan-13
19-Jan-13
19-Jan-13
21-Feb-13
04-Feb-13
04-Feb-13
19-Oct-13
19-Oct-13
19-Oct-13
21-Nov-13
04-Nov-13
04-Nov-13
0
0
0
15
15
0%
15
15
05-Feb-13
05-Feb-13
21-Feb-13
21-Feb-13
05-Nov-13
05-Nov-13
21-Nov-13
21-Nov-13
0
0
06-Jan-13
09-Mar-13
09-Mar-13
21-Jul-13
04-Jun-13
18-Mar-13
09-Jun-13
19-Sep-13
19-Sep-13
31-Dec-13
11-Dec-13
26-Sep-13
7
17
0
1596
1597
1598
168
75
8
0%
173
70
7
1599
NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2615
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B2
0%
18-Mar-13
27-Mar-13
28-Sep-13
05-Oct-13
13
1600
NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2625
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B3
0%
27-Mar-13
06-Apr-13
06-Oct-13
15-Oct-13
13
1601
NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2635
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B4
0%
06-Apr-13
15-Apr-13
16-Oct-13
23-Oct-13
13
1602
NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2645
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B5
0%
15-Apr-13
24-Apr-13
24-Oct-13
31-Oct-13
13
1603
NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2655
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B6
0%
24-Apr-13
02-May-13
02-Nov-13
09-Nov-13
13
1604
NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2665
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B7
0%
02-May-13
11-May-13
10-Nov-13
17-Nov-13
17
1605
NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2675
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B8
0%
11-May-13
19-May-13
18-Nov-13
25-Nov-13
17
1606
NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2685
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B9
0%
19-May-13
27-May-13
26-Nov-13
03-Dec-13
17
1607
NECP-Rebase_06Sep12-4.CO.2.5.2.68
PHASE 2 UPPER BASEMENT
NECOMEP2695
- BLACK STEELBlack
PIPES
Steel Pipes, CHW, Area B10
0%
27-May-13
04-Jun-13
04-Dec-13
11-Dec-13
17
65
65
7
27-Jan-13
27-Jan-13
27-Jan-13
13-Apr-13
13-Apr-13
04-Feb-13
15-Aug-13
15-Aug-13
15-Aug-13
26-Oct-13
26-Oct-13
21-Aug-13
12
12
0
1608
1609
1610
0%
60
60
6
1611
NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2510
0%
04-Feb-13
12-Feb-13
22-Aug-13
28-Aug-13
1612
NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2520
0%
12-Feb-13
20-Feb-13
29-Aug-13
04-Sep-13
1613
NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2530
0%
20-Feb-13
28-Feb-13
05-Sep-13
11-Sep-13
1614
NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2540
0%
28-Feb-13
09-Mar-13
12-Sep-13
18-Sep-13
1615
NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2550
0%
09-Mar-13
16-Mar-13
19-Sep-13
25-Sep-13
12
1616
NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2560
0%
16-Mar-13
23-Mar-13
26-Sep-13
02-Oct-13
12
1617
NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2570
0%
23-Mar-13
30-Mar-13
03-Oct-13
09-Oct-13
12
1618
NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2580
0%
30-Mar-13
06-Apr-13
10-Oct-13
19-Oct-13
12
1619
NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2590
0%
06-Apr-13
13-Apr-13
20-Oct-13
26-Oct-13
12
1620
1621
WATER SUPPLY
NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5600
65
7
0%
60
6
27-Jan-13
27-Jan-13
13-Apr-13
04-Feb-13
15-Aug-13
15-Aug-13
26-Oct-13
21-Aug-13
12
12
1622
NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5610
0%
04-Feb-13
12-Feb-13
22-Aug-13
28-Aug-13
12
1623
NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5620
0%
12-Feb-13
20-Feb-13
29-Aug-13
04-Sep-13
12
1624
NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5630
0%
20-Feb-13
28-Feb-13
05-Sep-13
11-Sep-13
12
1625
NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5640
0%
28-Feb-13
09-Mar-13
12-Sep-13
18-Sep-13
12
1626
NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5650
0%
09-Mar-13
16-Mar-13
19-Sep-13
25-Sep-13
12
1627
NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5660
0%
16-Mar-13
23-Mar-13
26-Sep-13
02-Oct-13
12
1628
NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5670
0%
23-Mar-13
30-Mar-13
03-Oct-13
09-Oct-13
12
1629
NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5680
0%
30-Mar-13
06-Apr-13
10-Oct-13
19-Oct-13
12
NECP-Rebase_06Sep12-4.CO.2.5.2.66.3
WATER SUPPLY
NECOMEP5690
1630
PHASE 2 UPPER BASEMENT - PIPE INSTALLATION (FIRE FIGHTING, SANITARY & WATER SUPPLY)
FIRE FIGHTING
NECP-Rebase_06Sep12-4.CO.2.5.2.66.1
FIRE FIGHTING
NECOMEP2500
Fire Fighting Pipe Installation, Area B1
0%
06-Apr-13
13-Apr-13
20-Oct-13
26-Oct-13
12
1631
1632
75
8
0%
70
7
24-Apr-13
24-Apr-13
21-Jul-13
04-May-13
28-Sep-13
28-Sep-13
21-Dec-13
05-Oct-13
0
0
1633
NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2515
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B2
0%
04-May-13
13-May-13
06-Oct-13
15-Oct-13
1634
NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2525
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B3
0%
13-May-13
22-May-13
16-Oct-13
23-Oct-13
1635
NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2535
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B4
0%
22-May-13
01-Jun-13
24-Oct-13
31-Oct-13
1636
NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2545
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B5
0%
01-Jun-13
10-Jun-13
02-Nov-13
09-Nov-13
1637
NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2555
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B6
0%
10-Jun-13
18-Jun-13
10-Nov-13
17-Nov-13
1638
NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2565
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B7
0%
18-Jun-13
26-Jun-13
18-Nov-13
25-Nov-13
1639
NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2575
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B8
0%
26-Jun-13
04-Jul-13
26-Nov-13
03-Dec-13
1640
NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2585
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B9
0%
04-Jul-13
13-Jul-13
04-Dec-13
11-Dec-13
1641
NECP-Rebase_06Sep12-4.CO.2.5.2.67
PHASE 2 UPPER BASEMENT
NECOMEP2595
- SPRINKLER SYSTEM
Sprinkler Header & Accessories , Area B10
0%
13-Jul-13
21-Jul-13
12-Dec-13
21-Dec-13
27-Jan-13
27-Jan-13
27-Jan-13
02-May-13
24-Apr-13
05-Feb-13
16-Jul-13
16-Jul-13
16-Jul-13
15-Oct-13
05-Oct-13
23-Jul-13
54
54
54
1642
1643
1644
82
75
8
0%
77
70
7
1645
NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2715
0%
05-Feb-13
14-Feb-13
24-Jul-13
31-Jul-13
54
1646
NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2725
0%
14-Feb-13
24-Feb-13
01-Aug-13
08-Aug-13
54
1647
NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2735
0%
24-Feb-13
05-Mar-13
10-Aug-13
17-Aug-13
54
1648
NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2745
0%
05-Mar-13
14-Mar-13
18-Aug-13
25-Aug-13
54
1649
NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2755
0%
14-Mar-13
23-Mar-13
26-Aug-13
02-Sep-13
54
1650
NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2765
0%
23-Mar-13
31-Mar-13
03-Sep-13
10-Sep-13
54
1651
NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2775
0%
31-Mar-13
08-Apr-13
11-Sep-13
18-Sep-13
54
1652
NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2785
0%
08-Apr-13
16-Apr-13
19-Sep-13
26-Sep-13
54
1653
NECP-Rebase_06Sep12-4.CO.2.5.2.69.1
INSTALLATION
NECOMEP2795
0%
16-Apr-13
24-Apr-13
28-Sep-13
05-Oct-13
54
1654
1655
INSULATION
NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5700
74
8
0%
70
7
05-Feb-13
05-Feb-13
02-May-13
14-Feb-13
24-Jul-13
24-Jul-13
15-Oct-13
31-Jul-13
54
77
1656
NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5710
0%
14-Feb-13
24-Feb-13
01-Aug-13
08-Aug-13
74
1657
NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5720
0%
24-Feb-13
05-Mar-13
10-Aug-13
17-Aug-13
71
1658
NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5730
0%
05-Mar-13
14-Mar-13
18-Aug-13
25-Aug-13
67
1659
NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5740
0%
14-Mar-13
24-Mar-13
26-Aug-13
02-Sep-13
65
2013
Jan
Feb
Mar
Apr
May
Jun
2014
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
UPS, Area B1
Battery System, Area A10
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B1-B4
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B5-B7
Wiring for Luminaires, Lighting Points, Switch Points, etc., Area B8-B10
Luminaires, Lighting Points, Switch Points, etc Devices installation., Area B1-B4
Luminaires, Lighting Points, Switch Points, etc Devices installation, Area B5-B7
Luminaires, Lighting Points, Switch Points, etc Devices installation, Area B8-B10
WBS
WBS Name
Activity ID
Activity Name
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
1660
NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5750
0%
23-Mar-13
31-Mar-13
03-Sep-13
10-Sep-13
62
1661
NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5760
0%
31-Mar-13
08-Apr-13
11-Sep-13
18-Sep-13
63
1662
NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5770
0%
08-Apr-13
16-Apr-13
19-Sep-13
26-Sep-13
68
1663
NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5780
0%
16-Apr-13
24-Apr-13
28-Sep-13
05-Oct-13
61
1664
NECP-Rebase_06Sep12-4.CO.2.5.2.69.2
INSULATION
NECOMEP5790
0%
24-Apr-13
02-May-13
06-Oct-13
15-Oct-13
54
BL Project
Duration
Activity % Remaining
Complete Duration
16-May-13
16-May-13
22-Jun-13
02-Jun-13
26-Oct-13
26-Oct-13
02-Dec-13
12-Nov-13
21
17
03-Jun-13
13-Jun-13
12-Nov-13
24-Nov-13
19
1665
1666
32
15
0%
32
15
1667
NECP-Rebase_06Sep12-4.CO.2.5.2.71
PHASE 2 UPPER BASEMENT
NECOMEP2815
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area B5-B7
10
0%
10
1668
Actual Start
Actual
Finish
0%
15-Jun-13
22-Jun-13
24-Nov-13
02-Dec-13
21
1669
1670
40
10
0%
30
10
04-Mar-13
04-Mar-13
18-Apr-13
14-Mar-13
01-Sep-13
01-Sep-13
06-Oct-13
12-Sep-13
65
65
1671
NECP-Rebase_06Sep12-4.CO.2.5.2.72
PHASE 2 UPPER BASEMENT
NECOMEP2870
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area B5-B7
10
0%
10
16-Mar-13
26-Mar-13
12-Sep-13
24-Sep-13
65
1672
NECP-Rebase_06Sep12-4.CO.2.5.2.72
PHASE 2 UPPER BASEMENT
NECOMEP2880
- SANITARY, RAINWATER
Sanitary Installation,
INSTALLATIONS
Rainwater Installations, Area B8-B10
10
0%
10
08-Apr-13
18-Apr-13
24-Sep-13
06-Oct-13
65
39
8
0%
43
8
06-Mar-13
06-Mar-13
21-Apr-13
14-Mar-13
12-Sep-13
12-Sep-13
03-Nov-13
21-Sep-13
50
70
0%
1673
1674
1675
1676
NECP-Rebase_06Sep12-4.CO.2.5.2.71
PHASE 2 UPPER BASEMENT
NECOMEP2825
- AC, REFRIGERATION,
AC/Refrigeration
VENTILATION
Equip, Supply
EQUIPMENT
& Ventilation Fans, Area B8-B10
Aug
Sep
Oct
Nov
Dec
Jan
03-Oct-13
12-Oct-13
60
21-Apr-13
27-Oct-13
03-Nov-13
50
0%
04-Jul-13
24-Jun-13
03-Jun-13
24-Oct-13
24-Oct-13
24-Oct-13
10-Dec-13
24-Nov-13
03-Nov-13
21
25
22
0%
03-Jun-13
13-Jun-13
04-Nov-13
13-Nov-13
25
0%
13-Jun-13
24-Jun-13
14-Nov-13
24-Nov-13
25
27
9
0%
26
9
03-Jun-13
03-Jun-13
04-Jul-13
13-Jun-13
10-Nov-13
10-Nov-13
10-Dec-13
20-Nov-13
21
17
15-Jun-13
NECP-Rebase_06Sep12-4.CO.2.5.2.74.2
DEVICE INSTALLATION NECOMEP5810
NECP-Rebase_06Sep12-4.CO.2.5.2.74.2
DEVICE INSTALLATION NECOMEP5820
0%
24-Jun-13
21-Nov-13
02-Dec-13
19
0%
24-Jun-13
04-Jul-13
30-Nov-13
10-Dec-13
21
1686
1687
69
8
0%
50
5
28-Mar-13
28-Mar-13
16-Jun-13
06-Apr-13
06-Jul-13
06-Jul-13
02-Sep-13
11-Jul-13
79
79
1688
NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3015
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B2
0%
07-Apr-13
15-Apr-13
11-Jul-13
17-Jul-13
79
1689
NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3025
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B3
0%
16-Apr-13
24-Apr-13
17-Jul-13
23-Jul-13
79
1690
NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3035
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B4
0%
25-Apr-13
04-May-13
23-Jul-13
29-Jul-13
79
1691
NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3045
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B5
0%
05-May-13
13-May-13
29-Jul-13
04-Aug-13
79
1692
NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3055
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B6
0%
14-May-13
22-May-13
04-Aug-13
10-Aug-13
79
1693
NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3065
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B7
0%
23-May-13
30-May-13
10-Aug-13
15-Aug-13
79
1694
NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3075
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B8
0%
01-Jun-13
08-Jun-13
15-Aug-13
21-Aug-13
79
1695
NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3085
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B9
0%
09-Jun-13
16-Jun-13
21-Aug-13
27-Aug-13
79
1696
NECP-Rebase_06Sep12-4.CO.2.5.2.75
PHASE 2 UPPER BASEMENT
NECOMEP3095
- CABLE TRAYS,
Cable
CABLE
Trays,
LADDERS,
Cable Ladders,
CABLE TRUNKING
Cable Trunking, Area B10
0%
01-Apr-13
09-Apr-13
27-Aug-13
02-Sep-13
79
07-Apr-13
07-Apr-13
07-Apr-13
30-Jun-13
30-Jun-13
14-Apr-13
22-Aug-13
22-Aug-13
22-Aug-13
22-Oct-13
22-Oct-13
28-Aug-13
67
67
67
16-Apr-13
23-Apr-13
28-Aug-13
03-Sep-13
67
1697
1698
1699
73
73
7
0%
50
50
5
1700
NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2750
0%
1701
NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2760
0%
25-Apr-13
02-May-13
03-Sep-13
09-Sep-13
67
1702
NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2770
0%
05-May-13
12-May-13
09-Sep-13
15-Sep-13
67
1703
NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2780
0%
14-May-13
21-May-13
15-Sep-13
21-Sep-13
67
1704
NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2790
0%
23-May-13
30-May-13
21-Sep-13
26-Sep-13
67
1705
NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2800
0%
01-Jun-13
08-Jun-13
26-Sep-13
02-Oct-13
67
1706
NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2810
0%
09-Jun-13
15-Jun-13
02-Oct-13
08-Oct-13
67
1707
NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2820
0%
17-Jun-13
23-Jun-13
08-Oct-13
16-Oct-13
67
1708
NECP-Rebase_06Sep12-4.CO.2.5.2.76.1
BUS BAR - LIGHTING NECOMEP2830
0%
24-Jun-13
30-Jun-13
16-Oct-13
22-Oct-13
67
53
40
14
09-Mar-13
09-Mar-13
09-Mar-13
08-May-13
23-Apr-13
24-Mar-13
30-Oct-13
30-Oct-13
30-Oct-13
31-Dec-13
15-Dec-13
14-Nov-13
0
0
0
25-Mar-13
08-Apr-13
16-Nov-13
30-Nov-13
0%
53
40
14
NECP-Rebase_06Sep12-4.CO.2.5.2.77.1
WIRING
NECOMEP2053
13
0%
13
1713
NECP-Rebase_06Sep12-4.CO.2.5.2.77.1
WIRING
NECOMEP2063
13
0%
13
09-Apr-13
23-Apr-13
01-Dec-13
15-Dec-13
1714
1715
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.77.2
DEVICE INSTALLATION NECOMEP5830
39
14
0%
39
14
25-Mar-13
25-Mar-13
08-May-13
09-Apr-13
16-Nov-13
16-Nov-13
31-Dec-13
01-Dec-13
0
0
1716
NECP-Rebase_06Sep12-4.CO.2.5.2.77.2
DEVICE INSTALLATION NECOMEP5840
13
0%
13
09-Apr-13
23-Apr-13
01-Dec-13
15-Dec-13
1717
NECP-Rebase_06Sep12-4.CO.2.5.2.77.2
DEVICE INSTALLATION NECOMEP5850
13
0%
13
24-Apr-13
08-May-13
16-Dec-13
31-Dec-13
89
38
13
06-Jan-13
06-Jan-13
06-Jan-13
20-Apr-13
19-Feb-13
21-Jan-13
09-Jun-13
09-Jun-13
09-Jun-13
26-Oct-13
23-Jul-13
24-Jun-13
23
90
90
24-Jun-13
09-Jul-13
90
0%
117
38
13
NECP-Rebase_06Sep12-4.CO.2.5.2.81.1
WIRING
NECOMEP3230
Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B5-B7
13
0%
13
21-Jan-13
05-Feb-13
1722
NECP-Rebase_06Sep12-4.CO.2.5.2.81.1
WIRING
NECOMEP3240
Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B8-B10
12
0%
12
05-Feb-13
19-Feb-13
09-Jul-13
23-Jul-13
90
1723
1724
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.81.2
DEVICE INSTALLATION NECOMEP5860
51
Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B1-B413
0%
48
13
19-Feb-13
19-Feb-13
20-Apr-13
06-Mar-13
29-Aug-13
29-Aug-13
26-Oct-13
12-Sep-13
23
42
1725
NECP-Rebase_06Sep12-4.CO.2.5.2.81.2
DEVICE INSTALLATION NECOMEP5870
Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B5-B7
14
0%
14
14-Mar-13
31-Mar-13
12-Sep-13
28-Sep-13
41
1726
NECP-Rebase_06Sep12-4.CO.2.5.2.81.2
DEVICE INSTALLATION NECOMEP5880
Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B8-B10
12
0%
12
06-Apr-13
20-Apr-13
10-Oct-13
26-Oct-13
23
101
37
13
07-Jan-13
07-Jan-13
07-Jan-13
05-May-13
18-Feb-13
21-Jan-13
21-Oct-13
21-Oct-13
21-Oct-13
15-Dec-13
01-Dec-13
03-Nov-13
0
0
0
04-Feb-13
04-Nov-13
17-Nov-13
Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B1-B4
Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B5-B7
Luminaires, Lighting Points, Switch Points, etc. wiring works, Area B8-B10
Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B1-B4
Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B5-B7
Luminaires, Lighting Points, Switch Points, etc. Device Installation, Area B8-B10
0%
48
36
12
NECP-Rebase_06Sep12-4.CO.2.5.2.82.1
WIRING
NECOMEP3350
12
0%
12
22-Jan-13
1731
NECP-Rebase_06Sep12-4.CO.2.5.2.82.1
WIRING
NECOMEP3360
12
0%
12
05-Feb-13
18-Feb-13
18-Nov-13
01-Dec-13
1732
1733
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.82.2
DEVICE INSTALLATION NECOMEP5890
51
14
0%
36
12
06-Mar-13
06-Mar-13
05-May-13
23-Mar-13
04-Nov-13
04-Nov-13
15-Dec-13
17-Nov-13
0
0
1734
NECP-Rebase_06Sep12-4.CO.2.5.2.82.2
DEVICE INSTALLATION NECOMEP5900
12
0%
12
31-Mar-13
14-Apr-13
18-Nov-13
01-Dec-13
1735
NECP-Rebase_06Sep12-4.CO.2.5.2.82.2
DEVICE INSTALLATION NECOMEP5910
13
0%
12
20-Apr-13
05-May-13
02-Dec-13
15-Dec-13
1736
1737
1738
44
37
7
0%
28
21
7
05-May-13
05-May-13
05-May-13
24-Jun-13
16-Jun-13
12-May-13
10-Nov-13
10-Nov-13
10-Nov-13
11-Dec-13
03-Dec-13
17-Nov-13
19
19
19
1739
NECP-Rebase_06Sep12-4.CO.2.5.2.83.1
WIRING
NECOMEP3470
0%
01-Jun-13
08-Jun-13
18-Nov-13
25-Nov-13
19
1740
NECP-Rebase_06Sep12-4.CO.2.5.2.83.1
WIRING
NECOMEP3480
0%
09-Jun-13
16-Jun-13
26-Nov-13
03-Dec-13
19
1741
1742
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.83.2
DEVICE INSTALLATION NECOMEP5920
37
7
0%
21
7
13-May-13
13-May-13
24-Jun-13
20-May-13
18-Nov-13
18-Nov-13
11-Dec-13
25-Nov-13
19
23
1743
NECP-Rebase_06Sep12-4.CO.2.5.2.83.2
DEVICE INSTALLATION NECOMEP5930
0%
09-Jun-13
16-Jun-13
26-Nov-13
03-Dec-13
23
1744
NECP-Rebase_06Sep12-4.CO.2.5.2.83.2
DEVICE INSTALLATION NECOMEP5940
0%
17-Jun-13
24-Jun-13
04-Dec-13
11-Dec-13
19
42
36
7
05-May-13
05-May-13
05-May-13
22-Jun-13
15-Jun-13
12-May-13
21-Nov-13
21-Nov-13
21-Nov-13
22-Dec-13
14-Dec-13
28-Nov-13
12
0
0
1730
1745
1746
1747
0%
26
20
7
1748
NECP-Rebase_06Sep12-4.CO.2.5.2.84.1
WIRING
NECOMEP3590
0%
01-Jun-13
08-Jun-13
30-Nov-13
07-Dec-13
1749
NECP-Rebase_06Sep12-4.CO.2.5.2.84.1
WIRING
NECOMEP3600
0%
09-Jun-13
15-Jun-13
08-Dec-13
14-Dec-13
1750
1751
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.84.2
DEVICE INSTALLATION NECOMEP5950
35
7
0%
19
7
13-May-13
13-May-13
22-Jun-13
20-May-13
30-Nov-13
30-Nov-13
22-Dec-13
07-Dec-13
12
24
0%
17
1752
NECP-Rebase_06Sep12-4.CO.2.5.2.84.2
DEVICE INSTALLATION NECOMEP5960
1753
NECP-Rebase_06Sep12-4.CO.2.5.2.84.2
DEVICE INSTALLATION NECOMEP5970
1754
1755
1756
09-Jun-13
16-Jun-13
08-Dec-13
15-Dec-13
0%
16-Jun-13
22-Jun-13
15-Dec-13
22-Dec-13
17
10
10
0%
14
7
7
1757
1758
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.85.2
DEVICE INSTALLATION NECOMEP5980
28-Mar-13
28-Mar-13
28-Mar-13
17-Apr-13
09-Apr-13
09-Apr-13
20-Oct-13
20-Oct-13
20-Oct-13
04-Nov-13
27-Oct-13
27-Oct-13
33
33
33
7
7
0%
7
7
09-Apr-13
09-Apr-13
17-Apr-13
17-Apr-13
28-Oct-13
28-Oct-13
04-Nov-13
04-Nov-13
33
33
1759
1760
1761
30
15
15
0%
30
15
15
05-Feb-13
05-Feb-13
05-Feb-13
11-Mar-13
21-Feb-13
21-Feb-13
05-Nov-13
05-Nov-13
05-Nov-13
09-Dec-13
21-Nov-13
21-Nov-13
0
0
0
1762
1763
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.86.2
DEVICE INSTALLATION NECOMEP5990
15
15
0%
15
15
23-Feb-13
23-Feb-13
11-Mar-13
11-Mar-13
23-Nov-13
23-Nov-13
09-Dec-13
09-Dec-13
0
0
04-Sep-12
04-Sep-12
13-Sep-12
13-Sep-12
03-Sep-13
15-Aug-13
29-Nov-12
23-Sep-12
18-Apr-13
18-Apr-13
30-Apr-13
30-Apr-13
14-Jan-14
12-Jan-14
24-Jun-13
08-May-13
5
7
0
0
1764
1765
1766
1767
Internal Finishes
Lower Basement Floor
PHASE 2 LOWER BASEMENT - PLASTERWORKS, GYPSUM BOARDS, PLASTERBOARDS
NECP-Rebase_06Sep12-4.CO.2.6.1.28
PHASE 2 LOWER BASEMENT
NECOBFW1720
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area B3
313
296
66
8
0%
230
228
48
8
1768
NECP-Rebase_06Sep12-4.CO.2.6.1.28
PHASE 2 LOWER BASEMENT
NECOBFW1730
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area B4
0%
23-Sep-12
02-Oct-12
09-May-13
18-May-13
1769
NECP-Rebase_06Sep12-4.CO.2.6.1.28
PHASE 2 LOWER BASEMENT
NECOBFW1740
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area B5
0%
13-Oct-12
22-Oct-12
19-May-13
27-May-13
1770
NECP-Rebase_06Sep12-4.CO.2.6.1.28
PHASE 2 LOWER BASEMENT
NECOBFW1750
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area B6
0%
22-Oct-12
31-Oct-12
28-May-13
05-Jun-13
1771
NECP-Rebase_06Sep12-4.CO.2.6.1.28
PHASE 2 LOWER BASEMENT
NECOBFW1760
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area B7
0%
11-Nov-12
20-Nov-12
06-Jun-13
15-Jun-13
1772
NECP-Rebase_06Sep12-4.CO.2.6.1.28
PHASE 2 LOWER BASEMENT
NECOBFW1770
- PLASTERWORKS,
Plasterworks,
GYPSUM
Gypsum
BOARDS,
Boards,
PLASTERBOARDS
Plasterboards, Area B8
0%
20-Nov-12
29-Nov-12
16-Jun-13
24-Jun-13
Feb
01-Apr-13
DEVICE INSTALLATION
NECP-Rebase_06Sep12-4.CO.2.5.2.74.2
DEVICE INSTALLATION NECOMEP5800
1727
1728
1729
2014
Jul
13-Apr-13
1682
1683
1721
Jun
23-Mar-13
NECP-Rebase_06Sep12-4.CO.2.5.2.74.1
WIRING
NECOMEP2193
1718
1719
1720
May
23-May-13
23-May-13
23-May-13
NECP-Rebase_06Sep12-4.CO.2.5.2.74.1
WIRING
NECOMEP2183
1712
Apr
1681
1709
1710
1711
Mar
40
27
9
1680
1685
Feb
0%
2013
Jan
36
27
9
NECP-Rebase_06Sep12-4.CO.2.5.2.73
PHASE 2 UPPER BASEMENT
NECOMEP2710
- COLD WATER,
Cold
HOT
Water,
WATER,
Hot Water
FIREF &
IGHTING
Firefighting
INSTALLATION
Installation, Area B8-B10
1677
1678
1679
1684
WBS
WBS Name
Activity ID
BL Project
Duration
Activity % Remaining
Complete Duration
BL Project
Start
BL Project
Finish
296
111
7
0%
228
60
6
04-Sep-12
04-Sep-12
04-Sep-12
15-Aug-13
12-Jan-13
12-Sep-12
Early Start
Early Finish
Total
Float
18-Apr-13
18-Apr-13
18-Apr-13
12-Jan-14
26-Jun-13
24-Apr-13
7
63
42
0%
01-Nov-12
0%
10-Nov-12
10-Nov-12
25-Apr-13
01-May-13
55
18-Nov-12
02-May-13
08-May-13
56
NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1430
0%
NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1440
0%
18-Nov-12
26-Nov-12
09-May-13
15-May-13
57
26-Nov-12
04-Dec-12
16-May-13
22-May-13
58
1780
NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1450
0%
1781
NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1460
0%
04-Dec-12
12-Dec-12
23-May-13
29-May-13
59
12-Dec-12
20-Dec-12
30-May-13
05-Jun-13
60
1782
NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1470
0%
20-Dec-12
29-Dec-12
06-Jun-13
12-Jun-13
61
1783
NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1480
1784
NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1490
0%
29-Dec-12
05-Jan-13
13-Jun-13
19-Jun-13
62
0%
05-Jan-13
12-Jan-13
20-Jun-13
26-Jun-13
63
1785
1786
FINAL COAT
NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1401
68
7
0%
30
3
28-May-13
28-May-13
15-Aug-13
05-Jun-13
08-Dec-13
08-Dec-13
12-Jan-14
10-Dec-13
7
7
1787
NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1411
0%
05-Jun-13
13-Jun-13
11-Dec-13
14-Dec-13
1788
NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1421
0%
13-Jun-13
22-Jun-13
15-Dec-13
17-Dec-13
1789
NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1431
0%
22-Jun-13
30-Jun-13
19-Dec-13
22-Dec-13
1790
NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1441
0%
30-Jun-13
08-Jul-13
23-Dec-13
25-Dec-13
1791
NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1451
0%
08-Jul-13
16-Jul-13
26-Dec-13
29-Dec-13
1792
NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1461
0%
16-Jul-13
24-Jul-13
30-Dec-13
01-Jan-14
1793
NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1471
0%
24-Jul-13
01-Aug-13
02-Jan-14
05-Jan-14
1794
NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1481
0%
01-Aug-13
08-Aug-13
06-Jan-14
08-Jan-14
1795
NECP-Rebase_06Sep12-4.CO.2.6.1.19.2
FINAL COAT
NECOBFW1491
0%
08-Aug-13
15-Aug-13
09-Jan-14
12-Jan-14
1796
1797
1798
213
45
5
0%
167
40
4
29-Nov-12
29-Nov-12
29-Nov-12
05-Aug-13
21-Jan-13
05-Dec-12
25-Jun-13
25-Jun-13
25-Jun-13
08-Jan-14
10-Aug-13
29-Jun-13
10
0
0
1799
NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2550
0%
05-Dec-12
11-Dec-12
30-Jun-13
03-Jul-13
1800
NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2560
0%
11-Dec-12
17-Dec-12
04-Jul-13
08-Jul-13
1801
NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2570
0%
17-Dec-12
23-Dec-12
09-Jul-13
13-Jul-13
1802
NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2580
0%
23-Dec-12
29-Dec-12
14-Jul-13
17-Jul-13
1803
NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2590
0%
29-Dec-12
02-Jan-13
18-Jul-13
22-Jul-13
1804
NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2600
0%
02-Jan-13
07-Jan-13
23-Jul-13
27-Jul-13
1805
NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2610
0%
07-Jan-13
12-Jan-13
28-Jul-13
31-Jul-13
1806
NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2620
0%
12-Jan-13
16-Jan-13
01-Aug-13
05-Aug-13
1807
NECP-Rebase_06Sep12-4.CO.2.6.1.30.1
PRIMER & FIRST COATSNECOBFW2630
0%
16-Jan-13
21-Jan-13
06-Aug-13
10-Aug-13
1808
1809
FINAL COAT
NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2541
46
5
0%
40
4
12-Jun-13
12-Jun-13
05-Aug-13
18-Jun-13
23-Nov-13
23-Nov-13
08-Jan-14
26-Nov-13
10
10
1810
NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2551
0%
18-Jun-13
24-Jun-13
27-Nov-13
01-Dec-13
10
1811
NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2561
0%
24-Jun-13
30-Jun-13
02-Dec-13
05-Dec-13
10
1812
NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2571
0%
30-Jun-13
07-Jul-13
07-Dec-13
10-Dec-13
10
1813
NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2581
0%
07-Jul-13
13-Jul-13
11-Dec-13
15-Dec-13
10
1814
NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2591
0%
13-Jul-13
17-Jul-13
16-Dec-13
21-Dec-13
10
1815
NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2601
0%
17-Jul-13
22-Jul-13
22-Dec-13
25-Dec-13
10
1816
NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2611
0%
22-Jul-13
27-Jul-13
26-Dec-13
30-Dec-13
10
1817
NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2621
0%
27-Jul-13
31-Jul-13
31-Dec-13
04-Jan-14
10
NECP-Rebase_06Sep12-4.CO.2.6.1.30.2
FINAL COAT
NECOBFW2631
1773
1774
1775
1776
NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1410
1777
NECP-Rebase_06Sep12-4.CO.2.6.1.19.1
PRIMER & FIRST COATSNECOBFW1420
1778
1779
1818
Activity Name
Actual Start
Actual
Finish
0%
31-Jul-13
05-Aug-13
05-Jan-14
08-Jan-14
10
1819
1820
52
6
0%
53
4
19-Feb-13
19-Feb-13
21-Apr-13
26-Feb-13
20-Aug-13
20-Aug-13
22-Oct-13
24-Aug-13
52
41
1821
NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW2950
- PAINTING FLOORS
Painting Floors, Area B2
0%
26-Feb-13
05-Mar-13
25-Aug-13
28-Aug-13
41
1822
NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW2960
- PAINTING FLOORS
Painting Floors, Area B3
0%
05-Mar-13
11-Mar-13
29-Aug-13
02-Sep-13
41
1823
NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW2970
- PAINTING FLOORS
Painting Floors, Area B4
0%
11-Mar-13
17-Mar-13
03-Sep-13
07-Sep-13
41
1824
NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW2980
- PAINTING FLOORS
Painting Floors, Area B5
0%
17-Mar-13
23-Mar-13
08-Sep-13
11-Sep-13
41
1825
NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW2990
- PAINTING FLOORS
Painting Floors, Area B6
0%
23-Mar-13
28-Mar-13
12-Sep-13
16-Sep-13
61
1826
NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW3000
- PAINTING FLOORS
Painting Floors, Area B7
0%
28-Mar-13
03-Apr-13
22-Sep-13
25-Sep-13
58
1827
NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW3010
- PAINTING FLOORS
Painting Floors, Area B8
0%
03-Apr-13
09-Apr-13
26-Sep-13
30-Sep-13
59
1828
NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW3020
- PAINTING FLOORS
Painting Floors, Area B9
0%
09-Apr-13
15-Apr-13
01-Oct-13
05-Oct-13
60
1829
NECP-Rebase_06Sep12-4.CO.2.6.1.31
PHASE 2 LOWER BASEMENT
NECOBFW3030
- PAINTING FLOORS
Painting Floors, Area B10
0%
15-Apr-13
21-Apr-13
19-Oct-13
22-Oct-13
52
0%
40
4
21-Nov-12
21-Nov-12
29-Jan-13
27-Nov-12
13-Jun-13
13-Jun-13
29-Jul-13
17-Jun-13
97
57
1830
1831
Tiling, Area B1
60
6
1832
NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW1970
- TILING
Tiling, Area B2
0%
28-Nov-12
04-Dec-12
18-Jun-13
22-Jun-13
57
1833
NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW1980
- TILING
Tiling, Area B3
0%
05-Dec-12
11-Dec-12
23-Jun-13
26-Jun-13
57
1834
NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW1990
- TILING
Tiling, Area B4
0%
12-Dec-12
18-Dec-12
27-Jun-13
01-Jul-13
57
1835
NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW2190
- TILING
Tiling, Area B5
0%
19-Dec-12
25-Dec-12
02-Jul-13
06-Jul-13
57
1836
NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW2210
- TILING
Tiling, Area B6
0%
26-Dec-12
01-Jan-13
07-Jul-13
10-Jul-13
97
1837
NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW2220
- TILING
Tiling, Area B7
0%
02-Jan-13
08-Jan-13
11-Jul-13
15-Jul-13
97
1838
NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW2230
- TILING
Tiling, Area B8
0%
09-Jan-13
15-Jan-13
16-Jul-13
20-Jul-13
97
1839
NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW2240
- TILING
Tiling, Area B9
0%
16-Jan-13
22-Jan-13
21-Jul-13
24-Jul-13
97
1840
NECP-Rebase_06Sep12-4.CO.2.6.1.29
PHASE 2 LOWER BASEMENT
NECOBFW2250
- TILING
0%
23-Jan-13
29-Jan-13
25-Jul-13
29-Jul-13
97
1841
1842
PHASE 2 LOWER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORS
NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3340
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B1
68
7
0%
54
5
17-Mar-13
17-Mar-13
04-Jun-13
25-Mar-13
25-Aug-13
25-Aug-13
28-Oct-13
29-Aug-13
52
56
1843
NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3350
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B2
0%
25-Mar-13
02-Apr-13
31-Aug-13
04-Sep-13
56
1844
NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3360
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B3
0%
02-Apr-13
10-Apr-13
05-Sep-13
10-Sep-13
56
1845
NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3370
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B4
0%
10-Apr-13
18-Apr-13
11-Sep-13
16-Sep-13
56
1846
NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3380
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B5
0%
18-Apr-13
27-Apr-13
17-Sep-13
22-Sep-13
56
1847
NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3390
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B6
0%
27-Apr-13
05-May-13
23-Sep-13
28-Sep-13
56
1848
NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3400
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B7
0%
05-May-13
13-May-13
29-Sep-13
03-Oct-13
56
1849
NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3410
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B8
0%
13-May-13
21-May-13
05-Oct-13
09-Oct-13
56
1850
NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3420
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B9
0%
21-May-13
28-May-13
10-Oct-13
17-Oct-13
56
1851
0%
28-May-13
04-Jun-13
23-Oct-13
28-Oct-13
52
1852
1853
18
6
0%
18
6
21-Apr-13
21-Apr-13
12-May-13
28-Apr-13
29-Aug-13
29-Aug-13
18-Sep-13
04-Sep-13
59
59
1854
NECP-Rebase_06Sep12-4.CO.2.6.1.34
PHASE 2 LOWER BASEMENT
NECOBFW3690
- TIMBER DOORS
Timber
AND
Doors
LOUVER
and Louver
SCREENS
Screens, Area B7-B8
0%
28-Apr-13
05-May-13
05-Sep-13
11-Sep-13
59
1855
NECP-Rebase_06Sep12-4.CO.2.6.1.34
PHASE 2 LOWER BASEMENT
NECOBFW3700
- TIMBER DOORS
Timber
AND
Doors
LOUVER
and Louver
SCREENS
Screens, Area B9-B10
0%
05-May-13
12-May-13
12-Sep-13
18-Sep-13
59
18
9
0%
12
6
22-Jul-13
22-Jul-13
11-Aug-13
31-Jul-13
11-Nov-13
11-Nov-13
25-Nov-13
18-Nov-13
39
39
1856
1857
1858
NECP-Rebase_06Sep12-4.CO.2.6.1.32
PHASE 2 LOWER BASEMENT
NECOBFW3430
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
TactileSURFACE
Surface Indicators,
INDICATORS
Area B10
Feb
Mar
Apr
May
2014
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
0%
01-Aug-13
11-Aug-13
18-Nov-13
25-Nov-13
39
1859
1860
22
8
0%
22
8
21-Apr-13
21-Apr-13
16-May-13
30-Apr-13
26-Sep-13
26-Sep-13
23-Oct-13
05-Oct-13
68
66
1861
NECP-Rebase_06Sep12-4.CO.2.6.1.40
PHASE 2 LOWER BASEMENT
NECOBFW3880
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
B5-B7
0%
30-Apr-13
08-May-13
06-Oct-13
15-Oct-13
68
1862
NECP-Rebase_06Sep12-4.CO.2.6.1.40
PHASE 2 LOWER BASEMENT
NECOBFW3890
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
B8-B10
0%
08-May-13
16-May-13
16-Oct-13
23-Oct-13
68
01-Aug-13
11-Jul-13
11-Nov-13
11-Nov-13
02-Dec-13
18-Nov-13
35
35
1863
1864
27
9
0%
18
6
02-Jul-13
02-Jul-13
1865
NECP-Rebase_06Sep12-4.CO.2.6.1.33
PHASE 2 LOWER BASEMENT
NECOBFW3570
- HANDRAILS Handrails, Area B5-B6
0%
13-Jul-13
22-Jul-13
18-Nov-13
25-Nov-13
35
1866
NECP-Rebase_06Sep12-4.CO.2.6.1.33
PHASE 2 LOWER BASEMENT
NECOBFW3580
- HANDRAILS Handrails, Area B9-B10
0%
23-Jul-13
01-Aug-13
25-Nov-13
02-Dec-13
35
239
23
8
0%
223
15
8
29-Nov-12
29-Nov-12
29-Nov-12
03-Sep-13
26-Dec-12
09-Dec-12
27-Apr-13
25-Jun-13
25-Jun-13
14-Jan-14
11-Jul-13
03-Jul-13
5
14
14
1867
1868
1869
1870
0%
18-Dec-12
26-Dec-12
04-Jul-13
11-Jul-13
14
199
68
7
0%
223
60
6
12-Jan-13
12-Jan-13
12-Jan-13
01-Sep-13
01-Apr-13
20-Jan-13
27-Apr-13
27-Apr-13
27-Apr-13
14-Jan-14
04-Jul-13
02-May-13
0
97
85
0%
20-Jan-13
28-Jan-13
04-May-13
09-May-13
85
0%
28-Jan-13
05-Feb-13
11-May-13
16-May-13
85
NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1530
0%
05-Feb-13
13-Feb-13
18-May-13
23-May-13
85
NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1540
0%
13-Feb-13
21-Feb-13
25-May-13
30-May-13
85
1878
NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1550
0%
21-Feb-13
02-Mar-13
01-Jun-13
06-Jun-13
97
1879
NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1560
0%
02-Mar-13
10-Mar-13
08-Jun-13
13-Jun-13
97
1880
NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1570
0%
10-Mar-13
18-Mar-13
15-Jun-13
20-Jun-13
97
1881
NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1580
0%
18-Mar-13
25-Mar-13
22-Jun-13
27-Jun-13
97
1882
NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1590
0%
25-Mar-13
01-Apr-13
29-Jun-13
04-Jul-13
97
30
13-Jun-13
01-Sep-13
10-Dec-13
14-Jan-14
1871
1872
1873
1874
NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1510
1875
NECP-Rebase_06Sep12-4.CO.2.6.2.20.1
PRIMER & FIRST COAT NECOBFW1520
1876
1877
1883
FINAL COAT
68
Feb
WBS
WBS Name
Activity ID
Activity Name
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
1884
NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1501
0%
13-Jun-13
22-Jun-13
10-Dec-13
12-Dec-13
1885
NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1511
0%
22-Jun-13
30-Jun-13
14-Dec-13
16-Dec-13
1886
NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1521
0%
30-Jun-13
08-Jul-13
17-Dec-13
21-Dec-13
1887
NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1531
0%
08-Jul-13
16-Jul-13
22-Dec-13
24-Dec-13
1888
NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1541
0%
16-Jul-13
24-Jul-13
25-Dec-13
28-Dec-13
1889
NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1551
0%
24-Jul-13
01-Aug-13
29-Dec-13
31-Dec-13
1890
NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1561
0%
01-Aug-13
10-Aug-13
01-Jan-14
04-Jan-14
1891
NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1571
0%
10-Aug-13
18-Aug-13
05-Jan-14
07-Jan-14
1892
NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1581
0%
18-Aug-13
25-Aug-13
08-Jan-14
11-Jan-14
1893
NECP-Rebase_06Sep12-4.CO.2.6.2.20.2
FINAL COAT
NECOBFW1591
0%
25-Aug-13
01-Sep-13
12-Jan-14
14-Jan-14
1894
1895
1896
177
64
5
0%
123
52
4
21-Jan-13
21-Jan-13
21-Jan-13
15-Aug-13
06-Apr-13
27-Jan-13
11-Aug-13
11-Aug-13
11-Aug-13
04-Jan-14
09-Oct-13
14-Aug-13
14
18
0
1897
NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2650
0%
28-Jan-13
03-Feb-13
15-Aug-13
19-Aug-13
1898
NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2660
0%
05-Feb-13
11-Feb-13
20-Aug-13
24-Aug-13
1899
NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2670
0%
13-Feb-13
19-Feb-13
25-Aug-13
28-Aug-13
1900
NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2680
0%
21-Feb-13
27-Feb-13
29-Aug-13
02-Sep-13
1901
NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2690
0%
02-Mar-13
06-Mar-13
03-Sep-13
07-Sep-13
22
1902
NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2700
0%
10-Mar-13
14-Mar-13
08-Sep-13
11-Sep-13
24
1903
NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2710
0%
18-Mar-13
23-Mar-13
26-Sep-13
30-Sep-13
14
1904
NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2720
0%
25-Mar-13
30-Mar-13
01-Oct-13
05-Oct-13
16
1905
NECP-Rebase_06Sep12-4.CO.2.6.2.23.1
PRIMER & FIRST COATSNECOBFW2730
0%
01-Apr-13
06-Apr-13
06-Oct-13
09-Oct-13
18
1906
1907
FINAL COAT
NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2641
45
5
0%
40
4
24-Jun-13
24-Jun-13
15-Aug-13
30-Jun-13
18-Nov-13
18-Nov-13
04-Jan-14
21-Nov-13
14
14
1908
NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2651
0%
30-Jun-13
06-Jul-13
23-Nov-13
26-Nov-13
14
1909
NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2661
0%
06-Jul-13
11-Jul-13
27-Nov-13
01-Dec-13
14
1910
NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2671
0%
11-Jul-13
17-Jul-13
02-Dec-13
05-Dec-13
14
1911
NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2681
0%
17-Jul-13
23-Jul-13
07-Dec-13
10-Dec-13
14
1912
NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2691
0%
23-Jul-13
28-Jul-13
11-Dec-13
15-Dec-13
14
1913
NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2701
0%
28-Jul-13
01-Aug-13
16-Dec-13
21-Dec-13
14
1914
NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2711
0%
01-Aug-13
06-Aug-13
22-Dec-13
25-Dec-13
14
1915
NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2721
0%
06-Aug-13
11-Aug-13
26-Dec-13
30-Dec-13
14
1916
NECP-Rebase_06Sep12-4.CO.2.6.2.23.2
FINAL COAT
NECOBFW2731
0%
11-Aug-13
15-Aug-13
31-Dec-13
04-Jan-14
14
BL Project
Duration
Activity % Remaining
Complete Duration
Actual Start
Actual
Finish
21-Apr-13
21-Apr-13
22-Jun-13
28-Apr-13
23-Sep-13
23-Sep-13
16-Dec-13
26-Sep-13
21
32
1917
1918
54
6
0%
71
4
1919
NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3050
- PAINTING FLOORS
Painting Floors, Area B2
0%
21-Apr-13
28-Apr-13
01-Oct-13
05-Oct-13
29
1920
NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3060
- PAINTING FLOORS
Painting Floors, Area B3
0%
28-Apr-13
05-May-13
16-Oct-13
20-Oct-13
22
1921
NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3070
- PAINTING FLOORS
Painting Floors, Area B4
0%
05-May-13
11-May-13
24-Oct-13
28-Oct-13
19
1922
NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3080
- PAINTING FLOORS
Painting Floors, Area B5
0%
14-May-13
19-May-13
02-Nov-13
05-Nov-13
16
1923
NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3090
- PAINTING FLOORS
Painting Floors, Area B6
0%
23-May-13
28-May-13
10-Nov-13
13-Nov-13
13
1924
NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3100
- PAINTING FLOORS
Painting Floors, Area B7
0%
01-Jun-13
05-Jun-13
18-Nov-13
21-Nov-13
30
1925
NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3110
- PAINTING FLOORS
Painting Floors, Area B8
0%
09-Jun-13
13-Jun-13
26-Nov-13
30-Nov-13
27
1926
NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3120
- PAINTING FLOORS
Painting Floors, Area B9
0%
17-Jun-13
22-Jun-13
04-Dec-13
08-Dec-13
24
1927
NECP-Rebase_06Sep12-4.CO.2.6.2.24
PHASE 2 UPPER BASEMENT
NECOBFW3130
- PAINTING FLOORS
Painting Floors, Area B10
0%
17-Jun-13
22-Jun-13
12-Dec-13
16-Dec-13
21
Tiling, Area B1
45
6
0%
40
5
30-Jan-13
30-Jan-13
23-Mar-13
05-Feb-13
07-Jul-13
07-Jul-13
21-Aug-13
11-Jul-13
57
57
NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2270
- TILING
Tiling, Area B2
0%
06-Feb-13
12-Feb-13
13-Jul-13
17-Jul-13
57
NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2280
- TILING
Tiling, Area B3
0%
13-Feb-13
19-Feb-13
18-Jul-13
23-Jul-13
57
1932
NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2290
- TILING
Tiling, Area B4
0%
20-Feb-13
26-Feb-13
24-Jul-13
29-Jul-13
57
1933
NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2300
- TILING
Tiling, Area B5
0%
27-Feb-13
05-Mar-13
30-Jul-13
04-Aug-13
57
1934
NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2310
- TILING
Tiling, Area B6
0%
06-Mar-13
11-Mar-13
05-Aug-13
10-Aug-13
57
1935
NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2320
- TILING
Tiling, Area B7
0%
12-Mar-13
17-Mar-13
11-Aug-13
15-Aug-13
57
1936
NECP-Rebase_06Sep12-4.CO.2.6.2.22
PHASE 2 UPPER BASEMENT
NECOBFW2330
- TILING
Tiling, Area B8
0%
18-Mar-13
23-Mar-13
17-Aug-13
21-Aug-13
57
1928
1929
1930
1931
1937
1938
PHASE 2 UPPER BASEMENT - VEHICLE STOPPERS, SPEED BREAKERS, TACTILE SURFACE INDICATORS
NECP-Rebase_06Sep12-4.CO.2.6.2.25
PHASE 2 UPPER BASEMENT
NECOBFW3440
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area B5
40
7
0%
40
5
04-Jun-13
04-Jun-13
21-Jul-13
12-Jun-13
06-Nov-13
06-Nov-13
23-Dec-13
11-Nov-13
24
34
1939
NECP-Rebase_06Sep12-4.CO.2.6.2.25
PHASE 2 UPPER BASEMENT
NECOBFW3450
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area B6
0%
12-Jun-13
20-Jun-13
14-Nov-13
19-Nov-13
32
1940
NECP-Rebase_06Sep12-4.CO.2.6.2.25
PHASE 2 UPPER BASEMENT
NECOBFW3460
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area B7
0%
20-Jun-13
29-Jun-13
23-Nov-13
27-Nov-13
30
1941
NECP-Rebase_06Sep12-4.CO.2.6.2.25
PHASE 2 UPPER BASEMENT
NECOBFW3470
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area B8
0%
29-Jun-13
07-Jul-13
01-Dec-13
05-Dec-13
28
1942
NECP-Rebase_06Sep12-4.CO.2.6.2.25
PHASE 2 UPPER BASEMENT
NECOBFW3480
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area B9
0%
07-Jul-13
14-Jul-13
09-Dec-13
14-Dec-13
26
1943
NECP-Rebase_06Sep12-4.CO.2.6.2.25
PHASE 2 UPPER BASEMENT
NECOBFW3490
- VEHICLE STOPPERS,
Vehicle Stoppers,
SPEED BREAKERS,
Speed Breakers,
TACTILE
Tactile
SURFACE
Surface Indicators,
INDICATORS
Area B10
0%
14-Jul-13
21-Jul-13
17-Dec-13
23-Dec-13
24
27
6
0%
12
6
29-May-13
29-May-13
29-Jun-13
04-Jun-13
14-Nov-13
14-Nov-13
27-Nov-13
20-Nov-13
13
13
1944
1945
1946
1947
1948
1949
0%
23-Jun-13
29-Jun-13
21-Nov-13
27-Nov-13
13
17
9
0%
30
6
12-Aug-13
12-Aug-13
31-Aug-13
21-Aug-13
18-Nov-13
18-Nov-13
24-Dec-13
25-Nov-13
21
39
0%
22-Aug-13
31-Aug-13
17-Dec-13
24-Dec-13
21
1950
1951
23
8
0%
23
8
16-May-13
16-May-13
12-Jun-13
26-May-13
06-Oct-13
06-Oct-13
03-Nov-13
16-Oct-13
66
66
1952
NECP-Rebase_06Sep12-4.CO.2.6.2.42
PHASE 2 UPPER BASEMENT
NECOBFW3910
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
B5-B7
0%
26-May-13
04-Jun-13
17-Oct-13
26-Oct-13
66
1953
NECP-Rebase_06Sep12-4.CO.2.6.2.42
PHASE 2 UPPER BASEMENT
NECOBFW3920
- SKIRTINGS, WALKWAY
Skirtings, Walkway
GRILLES,
Grilles,
BOLLARDS,
Bollards,COLUMN
Column Protectors,
PROTECTORS
B8-B10
0%
04-Jun-13
12-Jun-13
27-Oct-13
03-Nov-13
66
18-Nov-13
18-Nov-13
09-Dec-13
25-Nov-13
35
35
1954
1955
27
9
0%
18
6
03-Aug-13
03-Aug-13
02-Sep-13
12-Aug-13
1956
NECP-Rebase_06Sep12-4.CO.2.6.2.26
PHASE 2 UPPER BASEMENT
NECOBFW3600
- HANDRAILS Handrails, Area B5-B6
0%
13-Aug-13
22-Aug-13
25-Nov-13
02-Dec-13
35
1957
NECP-Rebase_06Sep12-4.CO.2.6.2.26
PHASE 2 UPPER BASEMENT
NECOBFW3610
- HANDRAILS Handrails, Area B9-B10
0%
24-Aug-13
02-Sep-13
02-Dec-13
09-Dec-13
35
121
20
0%
85
20
16-Apr-13
16-Apr-13
03-Sep-13
08-May-13
05-Aug-13
05-Aug-13
13-Nov-13
27-Aug-13
57
97
1958
1959
1960
Feb
Mar
Apr
May
Jun
2014
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Painting Ceiling, Area B2
Painting Ceiling, Area B3
Painting Ceiling, Area B4
Painting Ceiling, Area B5
Painting Ceiling, Area B6
Painting Ceiling, Area B7
Painting Ceiling, Area B8
NECP-Rebase_06Sep12-4.CO.2.6.2.6
PHASE 2 - FINISHING WORKS
NECOBFW2130
Road Markings, Area B1-B10 Lower Bsmt; Area B1-B10 Upper Bsmt
15
0%
12
18-Aug-13
03-Sep-13
29-Oct-13
11-Nov-13
57
1961
NECP-Rebase_06Sep12-4.CO.2.6.2.6
PHASE 2 - FINISHING WORKS
NECOBFW2150
Signages and Wayfinding,Area B1-B10 Lower Bsmt; Area B1-B10 Upper Bsmt
12
0%
12
05-Aug-13
18-Aug-13
31-Oct-13
13-Nov-13
57
1962
1963
93
7
0%
128
7
22-Apr-13
20-May-13
07-Aug-13
27-May-13
10-Aug-13
10-Aug-13
08-Jan-14
17-Aug-13
10
107
1964
NECP-Rebase_06Sep12-4.CO.2.3
Furniture, Fittings & Equipment
NECOBFFE2040
0%
09-May-13
14-May-13
03-Sep-13
08-Sep-13
112
1965
NECP-Rebase_06Sep12-4.CO.2.3
Furniture, Fittings & Equipment
NECOBFFE2010
20
0%
20
09-May-13
01-Jun-13
12-Sep-13
06-Oct-13
83
1966
NECP-Rebase_06Sep12-4.CO.2.3
Furniture, Fittings & Equipment
NECOBFFE2060
14
0%
14
28-May-13
12-Jun-13
19-Sep-13
05-Oct-13
79
1967
NECP-Rebase_06Sep12-4.CO.2.3
Furniture, Fittings & Equipment
NECOBFFE2000
0%
31-Jul-13
07-Aug-13
29-Sep-13
06-Oct-13
88
1968
NECP-Rebase_06Sep12-4.CO.2.3
Furniture, Fittings & Equipment
NECOBFFE2030
0%
22-Apr-13
27-Apr-13
06-Oct-13
12-Oct-13
83
1969
NECP-Rebase_06Sep12-4.CO.2.3
Furniture, Fittings & Equipment
NECOBFFE2020
14
0%
14
13-Jun-13
29-Jun-13
24-Dec-13
08-Jan-14
188
20-Sep-12
03-Aug-13
22-May-13
30-Dec-13
18
1970
271
EXTERNAL WORKS
1971
1972
16
16
0%
16
16
13-Apr-13
13-Apr-13
01-May-13
01-May-13
27-Oct-13
27-Oct-13
13-Nov-13
13-Nov-13
18
18
1973
1974
16
16
0%
16
16
01-May-13
01-May-13
20-May-13
20-May-13
14-Nov-13
14-Nov-13
02-Dec-13
02-Dec-13
18
18
1975
1976
Infrastructure Utilitles
NECP-Rebase_06Sep12-4.CO.5.1
Infrastructure Utilitles
NECOEXT1000
Trench Excavation
90
25
0%
77
25
20-Sep-12
20-Sep-12
03-Jan-13
20-Oct-12
22-May-13
22-May-13
19-Aug-13
19-Jun-13
11
11
NECP-Rebase_06Sep12-4.CO.5.1
Infrastructure Utilitles
NECOEXT1110
35
0%
35
20-Oct-12
NECP-Rebase_06Sep12-4.CO.5.1
Infrastructure Utilitles
NECOEXT1120
30
0%
30
29-Nov-12
03-Jan-13
16-Jul-13
19-Aug-13
11
03-Mar-13
26-Mar-13
29-May-13
16-Apr-13
19-Sep-13
19-Sep-13
02-Dec-13
09-Oct-13
41
48
1977
1978
29-Nov-12
05-Jun-13
15-Jul-13
11
1979
1980
Concrete Works
NECP-Rebase_06Sep12-4.CO.5.2
Concrete Works
NECOEXT1240
75
18
0%
62
18
1981
NECP-Rebase_06Sep12-4.CO.5.2
Concrete Works
NECOEXT1170
25
0%
18
03-Mar-13
01-Apr-13
29-Sep-13
21-Oct-13
18
1982
NECP-Rebase_06Sep12-4.CO.5.2
Concrete Works
NECOEXT1250
18
0%
18
16-Apr-13
07-May-13
10-Oct-13
02-Nov-13
49
1983
NECP-Rebase_06Sep12-4.CO.5.2
Concrete Works
NECOEXT1180
25
0%
18
01-Apr-13
30-Apr-13
22-Oct-13
11-Nov-13
18
1984
NECP-Rebase_06Sep12-4.CO.5.2
Concrete Works
NECOEXT1260
18
0%
18
07-May-13
28-May-13
03-Nov-13
23-Nov-13
49
1985
NECP-Rebase_06Sep12-4.CO.5.2
Concrete Works
NECOEXT1190
25
1986
1987
Roadworks
NECP-Rebase_06Sep12-4.CO.5.3
Roadworks
NECOEXT1130
1988
NECP-Rebase_06Sep12-4.CO.5.3
Roadworks
1989
NECP-Rebase_06Sep12-4.CO.5.3
Roadworks
1990
1991
0%
18
30-Apr-13
29-May-13
12-Nov-13
02-Dec-13
18
167
25
0%
140
21
03-Jan-13
03-Jan-13
17-Jul-13
02-Feb-13
16-Jul-13
16-Jul-13
29-Dec-13
08-Aug-13
19
48
NECOEXT1140
25
0%
21
02-Feb-13
03-Mar-13
10-Aug-13
02-Sep-13
48
NECOEXT1150
20
0%
07-Feb-13
03-Mar-13
10-Aug-13
17-Aug-13
54
NECP-Rebase_06Sep12-4.CO.5.3
Roadworks
NECOEXT1160
20
0%
14
03-Mar-13
26-Mar-13
03-Sep-13
18-Sep-13
48
NECP-Rebase_06Sep12-4.CO.5.3
Roadworks
NECOEXT1200
34
0%
30
04-Mar-13
13-Apr-13
03-Sep-13
07-Oct-13
57
1992
NECP-Rebase_06Sep12-4.CO.5.3
Roadworks
NECOEXT1270
33
0%
26-Mar-13
04-May-13
19-Sep-13
26-Sep-13
78
1993
NECP-Rebase_06Sep12-4.CO.5.3
Roadworks
NECOEXT1280
33
0%
14
04-May-13
11-Jun-13
28-Sep-13
15-Oct-13
78
1994
NECP-Rebase_06Sep12-4.CO.5.3
Roadworks
NECOEXT1210
30
0%
30
13-Apr-13
18-May-13
08-Oct-13
13-Nov-13
57
Feb
Signages and Wayfinding,Area B1-B10 Lower Bsmt; Area B1-B10 Upper Bsmt
Vehicular Traffic Barrier (Gate House), Grd Floor
Furniture (Gate House), Grd Floor
Activity ID
Activity Name
BL Project
Start
BL Project
Finish
Early Start
Early Finish
Total
Float
1995
NECP-Rebase_06Sep12-4.CO.5.3
Roadworks
NECOEXT1220
Traffic Signs, Steel Parapets, Wheel Stoppers, Speed Humps, Axis 6-1 (Phase
221)
0%
20
29-May-13
24-Jun-13
03-Dec-13
26-Dec-13
18
1996
NECP-Rebase_06Sep12-4.CO.5.3
Roadworks
NECOEXT1230
Traffic Signs, Steel Parapets, Wheel Stoppers, Speed Humps, Axis 53-28 (Phase
20 2)
0%
20
24-Jun-13
17-Jul-13
05-Dec-13
29-Dec-13
18
1997
1998
Street Lightings
NECP-Rebase_06Sep12-4.CO.5.4
Street Lightings
NECOEXT1290
106
Cable Trench, Ducts, Cables, and interface infrastructure with PMS, Axis 28-14
25
0%
85
25
01-Apr-13
01-Apr-13
03-Aug-13
30-Apr-13
19-Sep-13
19-Sep-13
30-Dec-13
20-Oct-13
18
48
1999
NECP-Rebase_06Sep12-4.CO.5.4
Street Lightings
NECOEXT1300
Cable Trench, Ducts, Cables, and interface infrastructure with PMS, Axis 14-1
20
0%
20
30-Apr-13
23-May-13
07-Oct-13
31-Oct-13
48
2000
NECP-Rebase_06Sep12-4.CO.5.4
Street Lightings
NECOEXT1310
25
0%
25
23-May-13
22-Jun-13
15-Oct-13
12-Nov-13
48
2001
NECP-Rebase_06Sep12-4.CO.5.4
Street Lightings
NECOEXT1320
20
0%
20
22-Jun-13
15-Jul-13
02-Nov-13
24-Nov-13
48
2002
NECP-Rebase_06Sep12-4.CO.5.4
Street Lightings
NECOEXT1090
14
0%
14
17-Jul-13
03-Aug-13
14-Dec-13
30-Dec-13
18
2003
2004
WBS
WBS Name
BL Project
Duration
Activity % Remaining
Complete Duration
Actual
Finish
89
28-Jun-12
09-Feb-13
22-May-13
09-Feb-13
22-May-13
89
28-Jun-12
NECP-Rebase_06Sep12-4.2.1
General
NEVN2RW1000
100%
28-Jun-12
2006
NECP-Rebase_06Sep12-4.2.1
General
NEVN2RW1005
0%
2007
NECP-Rebase_06Sep12-4.2.1
General
NEVN2RW1010
0%
07-Mar-13
40
2008
NECP-Rebase_06Sep12-4.2.1
General
NEVN2RW1020
0%
22-May-13
2009
Actual Start
2005
General
09-Feb-13
35
09-Feb-13
20-Mar-13
2010
NECP-Rebase_06Sep12-4.2.2
Submittals
NEVN2RW2000
0%
09-Feb-13
16-Feb-13
Submittals
2013
Jan
Feb
Mar
Apr
May
0%
14
17-Feb-13
04-Mar-13
Submit Materials
0%
17-Feb-13
24-Feb-13
14
Approve Materials
0%
14
05-Mar-13
20-Mar-13
Approve Materials
2014
NECP-Rebase_06Sep12-4.2.2
Submittals
NEVN2RW2040
0%
20-Mar-13
01-Apr-13
14-May-13
2017
2018
2019
02-Jul-12
100%
NECP-Rebase_06Sep12-4.2.5
Concrete Works at Axis A1-A3/A1-C1
NEVN2RW5005
100%
NECP-Rebase_06Sep12-4.2.5
Concrete Works at Axis A1-A3/A1-C1
NEVN2RW5010
0%
38
01-Apr-13
14-May-13
83
16-Feb-13
22-May-13
Infrastructure Works
2020
2021
2022
2023
0
0
0
0%
83
36
7
16-Feb-13
11-Apr-13
11-Apr-13
22-May-13
22-May-13
18-Apr-13
7
7
7
NECP-Rebase_06Sep12-4.2.6.1.3
ESVC PIPES 200 & 150 MM
NEVN2RW8010
DIA.
0%
14
20-Apr-13
05-May-13
2024
NECP-Rebase_06Sep12-4.2.6.1.3
ESVC PIPES 200 & 150 MM
NEVN2RW8020
DIA.
Install PCC Manholes 200mm dia, 6 nos.; Kerb Inlet Chambers 150mm dia, 120nos
0%
18
28-Apr-13
18-May-13
2025
NECP-Rebase_06Sep12-4.2.6.1.3
ESVC PIPES 200 & 150 MM
NEVN2RW8030
DIA.
0%
14
07-May-13
22-May-13
0
0
0%
40
7
16-Feb-13
16-Feb-13
02-Apr-13
23-Feb-13
8
7
2026
2027
2028
NECP-Rebase_06Sep12-4.2.6.1.1
ESVC PIPES 1200 MM DIA.
NEVN2RW6010
(Micro-Tunneling) Construct RC Thrust Block, 1200mm dia
0%
24-Feb-13
05-Mar-13
2029
NECP-Rebase_06Sep12-4.2.6.1.1
ESVC PIPES 1200 MM DIA.
NEVN2RW6020
(Micro-Tunneling) Pipe Jacking/Install RC Sleeves + MH, GRP Pipes, 1200mm dia x 147 lm
0%
21
06-Mar-13
30-Mar-13
2030
NECP-Rebase_06Sep12-4.2.6.1.1
ESVC PIPES 1200 MM DIA.
NEVN2RW6030
(Micro-Tunneling) Backfill Trench, 1200mm dia x 8 lm
0%
27-Mar-13
02-Apr-13
0
0
0%
40
7
24-Feb-13
24-Feb-13
10-Apr-13
03-Mar-13
7
7
2031
2032
2033
NECP-Rebase_06Sep12-4.2.6.1.2
ESVC PIPES 1000 MM DIA.
NEVN2RW7010
(Micro-Tunneling) Construct RC Thrust Block, 1000mm dia
0%
04-Mar-13
13-Mar-13
2034
NECP-Rebase_06Sep12-4.2.6.1.2
ESVC PIPES 1000 MM DIA.
NEVN2RW7020
(Micro-Tunneling) Pipe Jacking/Install RC Sleeves + MH, GRP Pipes, 1000mm dia x 63 lm
0%
21
14-Mar-13
07-Apr-13
2035
NECP-Rebase_06Sep12-4.2.6.1.2
ESVC PIPES 1000 MM DIA.
NEVN2RW7030
(Micro-Tunneling) Backfill Trench, 1000mm dia x 6 lm
0%
04-Apr-13
10-Apr-13
2036
2037
Street Lighting
NECP-Rebase_06Sep12-4.2.6.2
Street Lighting
NEVN2RW8500
0
0
0%
23
3
13-Apr-13
13-Apr-13
08-May-13
15-Apr-13
19
19
2038
NECP-Rebase_06Sep12-4.2.6.2
Street Lighting
NEVN2RW8510
0%
16-Apr-13
23-Apr-13
19
2039
NECP-Rebase_06Sep12-4.2.6.2
Street Lighting
NEVN2RW8520
0%
24-Apr-13
30-Apr-13
19
2040
NECP-Rebase_06Sep12-4.2.6.2
Street Lighting
NEVN2RW8530
0%
01-May-13
08-May-13
19
36
06-Apr-13
16-May-13
12
27-Apr-13
27-Apr-13
16-May-13
02-May-13
12
12
2041
2042
2043
Footways
NECP-Rebase_06Sep12-4.2.7.2
Footways
NEVN2RW9050
0
0
0%
18
6
2044
NECP-Rebase_06Sep12-4.2.7.2
Footways
NEVN2RW9060
0%
04-May-13
09-May-13
12
2045
NECP-Rebase_06Sep12-4.2.7.2
Footways
NEVN2RW9070
0%
11-May-13
16-May-13
12
2046
2047
Roads
NECP-Rebase_06Sep12-4.2.7.1
Roads
NEVN2RW9000
0
0
0%
36
6
06-Apr-13
06-Apr-13
16-May-13
11-Apr-13
11
11
2048
NECP-Rebase_06Sep12-4.2.7.1
Roads
NEVN2RW9010
0%
12
13-Apr-13
25-Apr-13
11
2049
NECP-Rebase_06Sep12-4.2.7.1
Roads
NEVN2RW9020
0%
12
20-Apr-13
02-May-13
11
2050
NECP-Rebase_06Sep12-4.2.7.1
Roads
NEVN2RW9030
0%
12
27-Apr-13
09-May-13
11
NECP-Rebase_06Sep12-4.2.7.1
Roads
NEVN2RW9040
0%
2051
2052
TIE-IN WORKS
2053
UTILITY TIE-INS
204
6
29
11-May-13
16-May-13
11
03-Jan-13
28-Aug-13
05-Dec-13
08-Jan-14
29
03-Jan-13
28-Aug-13
05-Dec-13
08-Jan-14
2054
NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS
NECOTIW1010
0%
21-Aug-13
28-Aug-13
05-Dec-13
12-Dec-13
30
2055
NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS
NECOTIW1040
0%
26-Aug-13
28-Aug-13
05-Dec-13
08-Dec-13
34
2056
NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS
NECOTIW1070
0%
03-Jan-13
12-Jan-13
05-Dec-13
12-Dec-13
30
2057
NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS
NECOTIW1020
0%
26-Aug-13
28-Aug-13
12-Dec-13
15-Dec-13
28
2058
NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS
NECOTIW1050
0%
25-Jun-13
27-Jun-13
12-Dec-13
15-Dec-13
28
2059
NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS
NECOTIW1060
0%
26-Aug-13
28-Aug-13
12-Dec-13
15-Dec-13
28
2060
NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS
NECOTIW1030
0%
26-Aug-13
28-Aug-13
02-Jan-14
05-Jan-14
11
2061
NECP-Rebase_06Sep12-4.1.1
UTILITY TIE-INS
NECOTIW1000
0%
14-Jul-13
16-Jul-13
06-Jan-14
08-Jan-14
59
20-May-13
28-Aug-13
10-Nov-13
18-Jan-14
2062
2063
204
Submit Materials
29-Jul-12
87
87
Feb
NEVN2RW2030
Jan
NEVN2RW2020
NECP-Rebase_06Sep12-4.2.5
Concrete Works at Axis A1-A3/A1-C1
NEVN2RW5000
Dec
NEVN2RW2010
Nov
NECP-Rebase_06Sep12-4.2.2
Submittals
2016
Oct
NECP-Rebase_06Sep12-4.2.2
Submittals
02-Jul-12
Sep
Cable Trench, Ducts, Cables, and interface infrastructure with PMS, Axis 14-1
NECP-Rebase_06Sep12-4.2.2
Submittals
Aug
Cable Trench, Ducts, Cables, and interface infrastructure with PMS, Axis 28-14
2011
38
2014
Jul
2013
Jun
2012
2015
59
20-May-13
28-Aug-13
10-Nov-13
18-Jan-14
0%
55
45
20-May-13
20-May-13
28-Aug-13
29-Jul-13
10-Nov-13
10-Nov-13
13-Jan-14
01-Jan-14
0
0
Pipeline Pressure/Vacuum and Leak Tests, Drying Out, Inert and Chemical Cleansing
60
0%
45
28-May-13
06-Aug-13
18-Nov-13
09-Jan-14
NECP-Rebase_06Sep12-4.TC.PRC.1
PRE-COMMISSIONING NETCPC1030
40
0%
40
30-Jun-13
14-Aug-13
23-Nov-13
08-Jan-14
2068
NECP-Rebase_06Sep12-4.TC.PRC.1
PRE-COMMISSIONING NETCPC1040
40
0%
40
14-Jul-13
28-Aug-13
27-Nov-13
13-Jan-14
2069
2070
SYSTEM COMMISSIONING
NECP-Rebase_06Sep12-4.TC.PRC.2
SYSTEM COMMISSIONING
NEPCSC1010
30
30
0%
30
30
25-Jul-13
25-Jul-13
28-Aug-13
28-Aug-13
14-Dec-13
14-Dec-13
18-Jan-14
18-Jan-14
0
0
126
124
11-Apr-13
04-Sep-13
26-Aug-13
20-Jan-14
120
120
11-Apr-13
28-Aug-13
26-Aug-13
16-Jan-14
120
11-Apr-13
28-Aug-13
26-Aug-13
16-Jan-14
90
16-May-13
28-Aug-13
30-Sep-13
16-Jan-14
90
16-May-13
28-Aug-13
30-Sep-13
16-Jan-14
86
12-Jun-13
28-Aug-13
05-Oct-13
16-Jan-14
05-Oct-13
2064
2065
PRE-COMMISSIONING
NECP-Rebase_06Sep12-4.TC.PRC.1
PRE-COMMISSIONING NETCPC1010
2066
NECP-Rebase_06Sep12-4.TC.PRC.1
PRE-COMMISSIONING NETCPC1020
2067
2071
2072
2073
2074
2075
2076
2077
2078
2079
2080
2081
2082
2083
2084
HANDOVER
AS-BUILT DRAWINGS
NECP-Rebase_06Sep12-4.OA.1
AS-BUILT DRAWINGS
NEOA20
NEOA30
NECP-Rebase_06Sep12-4.OA.3
TRAINING
NEOA35
NECP-Rebase_06Sep12-4.OA.3
TRAINING
NEOA40
NECP-Rebase_06Sep12-4.OA.3
TRAINING
NEOA50
0%
0%
0%
0%
30-Jul-13
05-Aug-13
16-Dec-13
24-Dec-13
20
0%
20
06-Aug-13
28-Aug-13
24-Dec-13
16-Jan-14
60
27-Jun-13
04-Sep-13
11-Nov-13
20-Jan-14
60
27-Jun-13
04-Sep-13
11-Nov-13
20-Jan-14
26
26
06-Aug-13
04-Sep-13
22-Dec-13
20-Jan-14
26
26
06-Aug-13
04-Sep-13
22-Dec-13
20-Jan-14
26
06-Aug-13
04-Sep-13
22-Dec-13
20-Jan-14
60
DEMOBILIZATION
DEMOBILIZATION
NECP-Rebase_06Sep12-4.DEM.1
DEMOBILIZATION
90
66
TRAINING
NECP-Rebase_06Sep12-4.OA.2
CLOSE OUT REPORT
120
90
O&M MANUALS
NECP-Rebase_06Sep12-4.OA.4
O&M MANUALS
87
60
NEGEDM10
60
26
0%
0%
12-Jun-13