Вы находитесь на странице: 1из 2

Assignment-1

Precede the assignment by adding your roll number to discharge given in the table
below:
Discharge at 1 week (Q) =900 + Roll number = ..m 3/s
Table:
Week
1
2
3
4
5
6
7
8
9
10
11
12
13

Average
discharge
(Q),m3/s
900
920
900
830
705
600
525
750
810
830
1020
1080
1160

Week
14
15
16
17
18
19
20
21
22
23
24
25
26

Average
discharge
(Q),m3/s
1150
1050
915
840
605
535
490
350
300
470
500
665
700

Other data:
Net Head (H) = 120 m
Conveyance efficiency (conveyance) = 70%
Turbine efficiency=85%
Generator efficiency=80%

Plot Hydrograph.
Plot Flow duration curve.
Plot Power duration curve.
Plot the 10% of the time occurring discharge in the hydrograph.
Plot the 80% of the time occurring discharge in the hydrograph.
Plot the 50% of the time occurring discharge in the hydrograph.
Write the discussion about choosing the design 10%, 50% and 80%
occurrence discharge.
By taking the firm discharge as 100% of time occurring discharge and design
discharge as 50% of time occurring discharge, calculate the firm and
secondary (in GW) in the tabular form.
Calculate Firm and Secondary energy (in GWh) for the period of 26 weeks in
the tabular form.

If the firm power is required to be increased to [450 MW + (Roll Number)] for


that all period of 26 weeks, calculate the volume of storage required

Вам также может понравиться