El_Gouna Desalination

Plants
Total desalination plants in all
El_gouna
can produce about 11,000m3/day

Utilities Area 1
Desalination Plant

Desalination Plants
El_Gouna have 17 desalination plant with capacity 11000m3 /
d.
All use RO ( reverse osmosis ) technique .
7 units Brackish water supplied by wells in the mountain ( 3
km from el_gouna ) with TDS 6,000 8,000 ppm .
10 units sea water supplied by beach well with TDS 28,000 36,000 ppm .
El_Gouna takes about 500 m3 / d from hurghada pipe line for
worker drink and beverage

Utilities Area 1
Brackish water desalination :- ( 4,000
m3/day )
6 Plants * 500 m3/day (3000 m3/day )
1 Plants * 1000 m3/day
can not run all the plants because of the
shortage of quantity produced from the
.deep wells

Utilities Area 1
Brackish water desalination
Two Units 500 m3 / d start up in Jul. 1995

Utilities Area 1
Brackish water desalination
One Unit 500 m3 / d start up in Apr. 1997

Utilities Area 1
Brackish water desalination
Three Units each 500 m3 / d start up in May.
1998

Utilities Area 1
Brackish water desalination
One Unit 1000 m3 / d start up in Jun. 1999

Utilities Area 1
Sea Water desalination:- ( 5,500 m3/day )
m3/day (2,500 m3/day ) 500 * 5
m3/day (3,000 m3/day ) 1,000 * 3

Utilities area 1
Building Containes 2 Units * 500 m

/d

One unit started up in Dec.. 2001 with PX ,


and the other started in Jan. 2005 with PX .

Utility Area 1
Building Containes 3 Units * 500 m

/d

One unit started up in Jul.. 2006 with PX ,


One unit started in Oct. 2006 with PX ,
And One Unit started up in May 2007 with turbo .

Utility area 1
Building Containes 2 Units * 1000 m

/d

One unit started up in Sep. 2007 with turbo ,


And the other Unit started up in Jul. 2008 with turbo .

Utility area 1
One Unit Containerized started up in Aug. 2009 with turbo .

Utilities Area 2
Building Containes 2 Units * 1000m

/d

One unit started up in Jun.. 2010 with turbo,


and the other started in Jun 2011 with turbo .

Utilities area 2
Building Containes 3 water tanks
One for salty water
One for sweet water
One for reject water

Reject water Ponds


The salty reject from the brackish plants are about
18,000 ppm ,
These collected in tank then falls to channels to ponds .

Reject water Ponds


Mullet ,Telapia and bass fishes grouth in these salty water
.

Reject water Ponds


the reject water ponds becomes a very nice High Park
.area

Sweet Water Product


To El_Gouna growth need a more and more of water.
These different from summer time to winter time
Total Water Consuption 2012
Jan.
233,782

165,029

Feb.
146,723

216,569

148,889
130,331

179,636
186,787

213,568

Mar.
Apr.
May.
Jun.
Jul.
Aug.
Sep.

Sweet Water Product


El_Gouna was needed to increase the capacity of the
desalination plants ( 500 1000 ) m 3 / d each year .
But due to the current condition wasn t happened in the
previous two years .

Total Water Consuption 2010

197,837
204,845161,799

151,475
213,233
200,030
207,867
195,234
229,929
216,847
231,411
218,904

Jan.

Feb.

Mar.

Apr.

May.

Jun.

Jul.

Aug.

Sep.

Oct.

Nov.

Dec.

Total Water Consuption 2011

170,268 171,050
127,640
157,112
199,870
179,844
200,201
239,998 185,316
224,600
197,790
177,599

Jan.

Feb.

Mar.

Apr.

May.

Jun.

Jul.

Aug.

Sep.

Oct.

Nov.

Dec.