REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION IV-A
BATANGAS DISTRICT ENGINEERING OFFICE

OFFICE OF THE DISTRICT ENGINEER


BATANGAS CITY

CONSTRUCTION AND REHABILITATION OF


MULTI-PURPOSE BUILDING STRUCTURE
(COVERED COURT)
AT
BARANGAY TALUDTOD
BALAYAN,

DESIGNED BY:

HERMINIO C. SIMBOL
ARCHITECT

CHECKED BY:

VIVIAN VIENNA B. CASTILLO


ENGINEER

BATANGAS

SUBMITTED BY:

FLORENCIA G. CORDOVA
CHIEF, PLANNING & DESIGN SECTION

RECOMMENDING APPROVAL:

BENCIO A. AGUZAR
OIC - ASSISTANT DISTRICT ENGINEER

APPROVED BY:

JULIANA D. VERGARA
Officer - in - Charge

A
A-1

P E R S P E C T I V E
NTS

28.05 M.

1.50

5.00

.60

EXISTING
BLDG.

5.40
4.00

EXISTING
STAGE

5.40

1.00

7.50

5.40
.50

ELEV. TERRACE
&
COMFORT ROOM

4.50

2.40

PUTOL E/S

.55

EXISTING
SCHOOL
BLDG.

BRGY. TALUDTOD

.50

5.40

SITE

GUIMALAS ROAD

5.40

A
2.00

8.00

15.85

BASKETBALL RING
POST TO BE REMOVED &
RELOCATED

CHAPEL

STAGE

JUAN C.
DE LUNAS
E/S

GUIMALAS
BRIDGE

(SCHOOL
BUILDING)

TO BALAYAN

PALICO - BALAYAN - BATANGAS


C

ITY ROAD

4.70

BARANGAY TALUDTOD

TO CA

LACA

.90

B
A-1

C
A-1

SITE DEVELOPMENT PLAN


NTS

SHEET CONTENT:

PROJECT NAME/ LOCATION:

DESIGNED BY:

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION IV-A
BATANGAS I DISTRICT ENGINEERING OFFICE

OFFICE OF THE DISTRICT ENGINEER


BATANGAS CITY

CONSTRUCTION AND REHABILITATION OF


MULTI-PURPOSE BUILDING STRUCTURE
(COVERED COURT)
AT
BARANGAY TALUDTOD
BALAYAN,

BATANGAS

PERSPECTIVE
SITE DEVELOPMENT PLAN
LOCATION MAP
VICINITY MAP

D
A-1

LOCATION MAP
NTS

SUBMITTED BY:

RECOMMENDING APPROVAL:

V I C I N I T Y

M A P
NTS

SET NO.

APPROVED BY:

SHEET NO.

HERMINIO C. SIMBOL
ARCHITECT II
CHECKED BY:

VIVIAN VIENNA B. CASTILLO


ENGINEER II

FLORENCIA G. CORDOVA
CHIEF, PLANNING & DESIGN SECTION

BENCIO A. AGUZAR
OIC - ASSISTANT DISTRICT ENGINEER

JULIANA D. VERGARA
Officer - in - Charge

A-1
1

SUMMARY OF QUANTITIES

DESCRIPTION

ITEM NO.
A.1.1.

5.40
.50

1.50

5.40
5.00

.60

5.40
4.00

1.00

7.50

5.40
.50

4.50

ELEV. TERRACE
&
COMFORT ROOM

EXISTING
STAGE

EXISTING
BLDG.

5.40

2.40

Qty.

mo.

3.00

Temporary Facilities

802

Excavation

cu.m.

55.95

900

Reinforced Concrete

cu.m.

33.50

Prepainted Metal Sheet

sq.m.

827.88

SPL -1

Steel Works

sq.m.

827.88

SPL - 2

Mobilization / Demobilization

L.S

ALL

SPL - 3

Construction Safety & Health Program

L.S

ALL

SPL - 4

Project Billboard

ea.

2.00

1014

28.05 M.

UNIT

.55

EXISTING
SCHOOL
BLDG.

2.00

.75

.55

DESIGN CRITERIA:

BASKETBALL RING
POST TO BE REMOVED &
RELOCATED

2.00

MATERIALS
1. Steel

2E+8MPa

2. Concrete
3. Reinforcing Concrete

2E+5MPa

Fy
Ft
f'c
fy

248 MPa
124 MPa
21 MPa
276 MPa

DEAD LOAD:

BASKETBALL RING
POST TO BE REMOVED &
RELOCATED

1. Floor finish / toppings


2. GI Roofings
3. Purlins and Accessories
4. Ceiling and Accessories
5. Partitions
6. Weight of concrete

1100 Pa
100 Pa
100 Pa
100 Pa
Pa
24.5 kN/ m^3

LIVE LOAD:

8.00

15.85

.80
R1

STAGE

1. Floor
2. Roof

0 Pa
1000 Pa

WIND LOAD:
1. Velocity

JUAN C.
DE LUNAS
E/S

Zone II

200 kPa

SEISMIC LOAD:
1. Total load

(SCHOOL
BUILDING)

1875 kN

SOIL BEARING CAPACITY


1. Assumed allowable soil bearing capacity

90 kPa

4.70

ALL STRUCTURAL DESIGNS, ANALYSES, COMPUTATIONS AND SPECIFICATIONS SHALL CONFORM AND BE IN
ACCORDANCE WITH THE FOLLOWING BOOKS / CODES.

2.00

2.00

LAWN

LAWN
EXIT / ENTRANCE

PERIMETER FENCE
ROAD EDGE

ROAD SHOULDER

A
A-2

F L O O R
SCALE

P L A N

1:100

M.
NOTE:

SHEET CONTENT:

PROJECT NAME/ LOCATION:

DESIGNED BY:

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION IV-A
BATANGAS I DISTRICT ENGINEERING OFFICE

OFFICE OF THE DISTRICT ENGINEER


BATANGAS CITY

CONSTRUCTION AND REHABILITATION OF


MULTI-PURPOSE BUILDING STRUCTURE
(COVERED COURT)
AT
BARANGAY TALUDTOD
BALAYAN,

BATANGAS

.96

CONCRETE BENCH

.50.46

CONCRETE BENCH

1.50

.90

.70

3.05

1. National structural Codes of the Philippines * * NSCP - C101 - 10 * * 6th Ed * * 2010


2. National Building Code of the Philippines * * 2005
3. ASEP Guide - Earthquake Resistant Design of Structures * * 1991
4. ASEP Handbook for Structural Steel * * 1994
5. American Concrete Institute * * ACI - 318M * * 1995
6. American Institute of Steel Construction * * AISC 9th Ed
7. Design and Construction * * 1985
8. Fundamentals of Reinforced Concrete Design * * 2nd Fd * * 2003
9. Structural Design and Construction * * 2003
10. Reinforced Concrete Design USD * * 1998
11. Structural Engineering and Construction * * 2003
12. Structural analysis (Theory of Structures) * * 1992
13. Design of Concrete Structures * * 1991
14. Fundamentals of Structural Steel Design * * 2006
15. Fundamentals of Reinforced Concrete USD * * 2007
16. Simplified Steel Design ASD * * 2007

FLOOR PLAN
SUMMARY OF QUANTITIES

SUBMITTED BY:

NO FOOTING SHALL REST ON FILL

RECOMMENDING APPROVAL:

SET NO.

APPROVED BY:

SHEET NO.

HERMINIO C. SIMBOL
ARCHITECT II
CHECKED BY:

VIVIAN VIENNA B. CASTILLO


ENGINEER II

FLORENCIA G. CORDOVA
CHIEF, PLANNING & DESIGN SECTION

BENCIO A. AGUZAR
OIC - ASSISTANT DISTRICT ENGINEER

JULIANA D. VERGARA
Officer - in - Charge

A-2
2 8

GA. 26 PREPAINTED LONG SPAN ''DURACURVE''


RIB-TYPE ROOFING SHEET ON 2'' X 6'' X 1.5mm

5.40

1.20

5.40

5.40

5.40

.60 .60

3.50

2.90

TOP LEVEL
OF ROOF

BOTTOM LEVEL OF
ROOF SIDELINE

BOTTOM LEVEL OF
ROOF SIDELINE
1.20

BASKETBALL RING
POST TO BE REMOVED &
RELOCATED

3.00

2.75

VERTICAL FRAMING @ 1.00m / 1.00


M.O.C. (ALL AROUND)

4.90

5.50

4.90

GA. 26 PREPAINTED LONG SPAN


RIB-TYPE ROOFING SHEET SIDEWALL
5.50

27.00
5.40

1.20

2.90

15.85

1.20

.60 .60

3.50

1.20

TOP LEVEL
OF ROOF

GA. 26 PREPAINTED LONG SPAN ''DURACURVE''


RIB-TYPE ROOFING SHEET ON 2'' X 6'' X 1.5mm

BCFFL
BASKETBALL RING
POST TO BE REMOVED &
RELOCATED

5 EQ. BAYS @ 5.40


.40m X .40m RC COLUMN

A
A-3

F R O N T

B
A-3

E L E V A T I O N

SCALE

1:100

M.

GA. 26 PREPAINTED LONG SPAN ''DURACURVE''


RIB-TYPE ROOFING SHEET ON 2'' X 6'' X 1.5mm

1:100

M.

27.00
5.40

5.40

.60

5.40

5.40

5.40

TOP LEVEL
OF ROOF

1.20

15.85

1.20

.60 .60

.60 .60

3.50

2.90

TOP LEVEL
OF ROOF

2.90

.60

3.50

SCALE

GA. 26 PREPAINTED LONG SPAN ''DURACURVE''


RIB-TYPE ROOFING SHEET ON 2'' X 6'' X 1.5mm

BOTTOM LEVEL OF
ROOF SIDELINE

4.90

5.50

BASKETBALL RING
POST TO BE REMOVED &
RELOCATED

3.00

2.75

4.90

1.20

BOTTOM LEVEL OF
ROOF SIDELINE

5.50

RIGHT SIDE ELEVATION

BCFFL
GA. 26 PREPAINTED LONG SPAN
RIB-TYPE ROOFING SHEET SIDEWALL

BASKETBALL RING
POST TO BE REMOVED &
RELOCATED

5 EQ. BAYS @ 5.40


.40m X .40m RC COLUMN

C
A-3

VERTICAL FRAMING @ 1.00m / 1.00


M.O.C. (ALL AROUND)

D
A-3

LEFT SIDE ELEVATION


SCALE

1:100

M.

SHEET CONTENT:

PROJECT NAME/ LOCATION:

DESIGNED BY:

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION IV-A
BATANGAS I DISTRICT ENGINEERING OFFICE

OFFICE OF THE DISTRICT ENGINEER


BATANGAS CITY

CONSTRUCTION AND REHABILITATION OF


MULTI-PURPOSE BUILDING STRUCTURE
(COVERED COURT)
AT
BARANGAY TALUDTOD
BALAYAN,

BATANGAS

FRONT ELEVATION
RIGHT SIDE ELEVATION
LEFT SIDE ELEVATION
REAR ELEVATION

SUBMITTED BY:

R E A R
SCALE

RECOMMENDING APPROVAL:

E L E V A T I O N
1:100

M.

SET NO.

APPROVED BY:

SHEET NO.

HERMINIO C. SIMBOL
ARCHITECT II
CHECKED BY:

VIVIAN VIENNA B. CASTILLO


ENGINEER II

FLORENCIA G. CORDOVA
CHIEF, PLANNING & DESIGN SECTION

BENCIO A. AGUZAR
OIC - ASSISTANT DISTRICT ENGINEER

JULIANA D. VERGARA
Officer - in - Charge

A-3
3 8

1.50
.40

27.00

5.40

5.40

C1/F1

5.40

C1/F1

5.40

C1/F1

TB

C1/F1

TB

5.40

C1/F1

TB

C1/F1

TB

TB
.40

1.50

2 @ .05m, 2 @ .10m, 2 @ .15m, REST @


.25 M.O.C.

BOTH WAYS

2 @ .05m, 2 @ .10m, 2 @ .15m, REST @


.25 M.O.C.

N.G.L.
.35

TB

.20m X .35m TIE BEAM

1.50

TB

15.85

.10

BCFFL

.35

BOTH WAYS

B
TB

TB

C1/F1

TB

C1/F1

TB

C1/F1

A
S-1

C1/F1

TB
C1/F1

C1/F1
1.50

FOUNDATION PLAN
SCALE

1:100

C1/F1

M.

B
S-1

COLUMN & FOOTING DETAIL


SCALE

1:20

M.

REST @ .20 M.O.C.


.20

.35

REST @ .20 M.O.C.

REST @ .20 M.O.C.

C
S-1

DETAIL
SCALE

OF

TIE

BEAM

1:20

M.

SHEET CONTENT:

PROJECT NAME/ LOCATION:


REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION IV-A
BATANGAS I DISTRICT ENGINEERING OFFICE

OFFICE OF THE DISTRICT ENGINEER


BATANGAS CITY

CONSTRUCTION AND REHABILITATION OF FOUNDATION PLAN


COLUMN & FOOTING DETAIL
MULTI-PURPOSE BUILDING STRUCTURE
DETAIL OF TIE BEAM
(COVERED COURT)
AT
BARANGAY TALUDTOD
BALAYAN,

BATANGAS

DESIGNED BY:

SUBMITTED BY:

RECOMMENDING APPROVAL:

SET NO.

APPROVED BY:

SHEET NO.

HERMINIO C. SIMBOL
ARCHITECT II
CHECKED BY:

VIVIAN VIENNA B. CASTILLO


ENGINEER II

FLORENCIA G. CORDOVA
CHIEF, PLANNING & DESIGN SECTION

BENCIO A. AGUZAR

JULIANA D. VERGARA

OIC - ASSISTANT DISTRICT ENGINEER

Officer - in - Charge

S-1
4 8

NUTS AND WASHERS


CONNECTED TO PURLINS

.60

27.00
5.40

5.40

.60

5.40

5.40

WELD W/ 12'' TURNED OVAL


HEAD MACHINE BOLTS

5.40

FULLY WELD

DS

DS

DS

SS-1

DS

SS-1

SS-1

DS

DS

SS-1

2"x6"X1.5MM C PURLINS

SS-1

10mm THK. STEEL CLAMP FULLY WELDED


TO 20mm BASE PLATE W/ ANCHOR BOLTS

GA. 26 PREPAINTED LONG SPAN


RIB-TYPE ROOFING SHEET SIDEWALL
VERTICAL FRAMING @ 1.00m / 1.00
M.O.C. (ALL AROUND)

ANCHOR BOLTS ON
20mm THK. BASE PLATE

15.85

5 EQ. BAYS @ 5.40


.40m X .40m RC COLUMN

CS-1

CS-1

CS-1

CS-1

2'' X 6'' X 1.5mm C-PURLINS @ 1.00 M.O.C.

CS-1

.40
.08

.25

.08
10mm THK. STEEL CLAMP FULLY WELDED
TO 20mm BASE PLATE W/ ANCHOR BOLTS

.07

STD. TURN BUCKLE

DS

DS

SS-1
DS

A
S-2

DS

DS

.20m WIDE X .30m DEEP


INSIDE GUTTER

ROOF FRAMING PLAN


SCALE

1:100

M.

7.93

1.20
.50

PLAN

7.93

.50

.50

.50

.40

.50

GA. 26 PREPAINTED LONG SPAN


''DURACURVE'' RIB-TYPE ROOFING
SHEET ON 2'' X 6'' X 1.5mm C-PURLINS

ANCHOR BOLTS ON
20mm THK. BASE PLATE

SS-1

.07

DS

SS-1

.27

SS-1

.40

SS-1

9.31

.70

WEB MEMBERS

.40

ANCHOR BOLTS ON
20mm THK. BASE PLATE

1.00

8.7

1.00

SPOT DETAIL

TO BCFFL (5.50m)

1.00

1.20

5 EQ. BAYS @ 5.40


.40m X .40m RC COLUMN

BOTTOM LEVEL OF
ROOF SIDE WALL
DOWNSPOUT W/
METAL STRAP @
1.33 M.O.C.

GA. 26 PREPAINTED LONG SPAN


RIB-TYPE ROOFING SHEET SIDEWALL
VERTICAL FRAMING @ 1.00m / 1.00
M.O.C. (ALL AROUND)

.60m WIDE SIDE STRUTS


5 EQ. BAYS @ 5.40
.40m X .40m RC COLUMN

B
S-2

1:50

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION IV-A
BATANGAS I DISTRICT ENGINEERING OFFICE

OFFICE OF THE DISTRICT ENGINEER


BATANGAS CITY

D
S-2

M.

SHEET CONTENT:

PROJECT NAME/ LOCATION:


REPUBLIC OF THE PHILIPPINES

DESIGNED BY:

CONSTRUCTION AND REHABILITATION OF ROOF FRAMING PLAN


HERMINIO C. SIMBOL
TYPICAL DETAIL OF SECTION OF TRUSS
MULTI-PURPOSE BUILDING STRUCTURE SIDE STRUT DETAIL
ARCHITECT II
(COVERED COURT)
CONNECTION DETAIL OF TRUSS
CHECKED BY:
SCHEMATIC TRUSS DIAGRAM
AT
DETAIL OF GUUTER
BARANGAY TALUDTOD

VIVIAN VIENNA B. CASTILLO

BALAYAN,

.25

.08

.40

6mm THK. GUSSET PLATE

TYPICAL DETAIL SECTION OF TRUSS


SCALE

.08

5 EQ. BAYS @ 5.40


.40m X .40m RC COLUMN

BATANGAS

ENGINEER II

SCHEMATIC TRUSS DIAGRAM


SCALE

1:50

SUBMITTED BY:

FLORENCIA G. CORDOVA
CHIEF, PLANNING & DESIGN SECTION

M.

RECOMMENDING APPROVAL:

BENCIO A. AGUZAR
OIC - ASSISTANT DISTRICT ENGINEER

E
S-2

CONNECTION DETAIL OF TRUSS


SCALE

1:10

M.

SET NO.

APPROVED BY:

JULIANA D. VERGARA
Officer - in - Charge

SHEET NO.

S-2
5 8

.60

27.00

5.40

5.40

1.70

6
.60

5.40

5.40

5.40
6mm THK. GUSSET PLATE

DS

DS

DS

DS

DS
4.55

DS

A
GA. 26 PREPAINTED LONG SPAN
RIB-TYPE ROOFING SHEET SIDEWALL

RING & HOLDER

VERTICAL FRAMING @ 1.00m / 1.00


M.O.C. (ALL AROUND)
SLOPE

WEB MEMBERS
SLOPE

2'' x 6'' C PURLINS

C
S-2

B
DS

DS

DS

A
S-3

DS

R O O F
SCALE

DS

SCALE

1:10

2.75m HIGH FROM


FLOOR LEVEL

1.20

.85

.12

BASKETBALL RING DETAIL


SCALE

1:50

M.

M.
2'' X 6'' C - PURLINS W/ 3 12'' X 3 12'' X
6mm X 4'' LONG ANGLE BAR CLEATS
(FULLY WELD)

GA. 26 PLAIN
G.I. GUTTER

.20m WIDE X .30m DEEP


INSIDE GUTTER

.40

M.

.30

5.40
.50

ANCHOR BOLTS ON
20mm THK. BASE PLATE

.40

1.20

.30

.60

.45

1.80

DETAIL OF C-PURLINS CONNECTION

DS

P L A N
1:100

E
S-3

3.00m HIGH FROM


FLOOR LEVEL

GA. 26 PREPAINTED LONG SPAN


''DURACURVE'' RIB-TYPE ROOFING
SHEET ON 2'' X 6'' X 1.5mm C-PURLINS

2.75m HIGH FROM


FLOOR LEVEL

15.85

3.00m HIGH FROM


FLOOR LEVEL

.45

.60

5.00
.50

WEB MEMBERS

15

.50

.40
.15

.40

6mm THK.
GUSSET PLATE

.60

.60

DYNABOLT

CENTER STRUT DETAIL


1:20

3'' X 3'' ANGLE


BAR SUPPORT

M.

SCALE

.60

B
S-3

.1

D
S-2

DESIGNED BY:

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION IV-A
BATANGAS I DISTRICT ENGINEERING OFFICE

OFFICE OF THE DISTRICT ENGINEER


BATANGAS CITY

CONSTRUCTION AND REHABILITATION OF


MULTI-PURPOSE BUILDING STRUCTURE
(COVERED COURT)
AT
BARANGAY TALUDTOD
BALAYAN,

BATANGAS

ROOF PLAN
CENTER STRUT
SIDE STRUT DETAIL
BASKETBALL RING DETAIL
DETAIL OF GUTTER

DYNABOLT

.40m X .40m
COLUMN

.15
5.40

SHEET CONTENT:

.10

0.5 X 0.75 X 5.5mm


ANGLE BAR SUPPORT

4 EQ. BAYS @ 5.25


.40m X .40m RC COLUMN

PROJECT NAME/ LOCATION:

DOWNSPOUT W/
METAL STRAP @
1.33 M.O.C.

.10

6mm THK.
GUSSET PLATE

SIDE STRUT DETAIL


SCALE

1:50

F
S-2

DETAIL OF GUTTER
SCALE

1:20

M.

3'' X 3''ANGLE
BAR SUPPORT

M.

SUBMITTED BY:

RECOMMENDING APPROVAL:

SET NO.

APPROVED BY:

SHEET NO.

HERMINIO C. SIMBOL
ARCHITECT II
CHECKED BY:

VIVIAN VIENNA B. CASTILLO


ENGINEER II

FLORENCIA G. CORDOVA
CHIEF, PLANNING & DESIGN SECTION

BENCIO A. AGUZAR
OIC - ASSISTANT DISTRICT ENGINEER

JULIANA D. VERGARA
Officer - in - Charge

S-3
6 8

28.05 M.
5.40
.50

5.40

1.50

5.00

.60

4.00

.55

5.40

1.00

5.40

7.50

.50

4.50

ELEV. TERRACE
&
COMFORT ROOM

EXISTING
STAGE

EXISTING
BLDG.

2.40

.55

GENERAL NOTES (ELECTRICAL)

HOMERUN CABLES
(BURIED IN 112'' PVC PIPE)
SW2 (WEATHER PROOF,
FLUSHED MOUNTED)

Ckt #3 16Amp. CEE

SW1 (WEATHER PROOF,


FLUSHED MOUNTED)

1.

THE ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH


THESE PLANS AND SPECIFICATIONS. THE APPLICABLE PROVISIONS
OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC).
THE RULES AND REGULATION OF THE LOCAL ENFORCING AUTHORITY
AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY.
THE ELECTRICAL WORKS SHALL BE UNDER IMMEDIATE SUPERVISION
OF A DULY REGISTERED ELECTRICAL ENGINEER.

2.

THE ELECTRICAL SERVICE POWER IS 1-PHASE , 2-WIRE


230 V AC, 60 Hz.

3.

WIRING METHOD SHALL BE AS FOLLOW:


a. FEEDERS AND RISERS - INTERMEDIATE METALLIC CONDUIT

EXISTING
SCHOOL
BLDG.

.75

5.40

BASKETBALL RING
POST TO BE REMOVED &
RELOCATED

b. LIGHTING, POWER RECEPTACLE - POLYVINYL CHLORIDE CONDUIT


4.

ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE


"THW" UNLESS OTHERWISE INDICATED IN THE PLAN. THE MINIMUM
SIZE OF THE WIRE FOR POWER AND LIGHTING CIRCUIT HOME RUN SHALL BE

8.00

15.85

15mm

4.70

STAGE

2.00

TRADE/NOMINAL SIZE.

5.

ALL OUTLET BOXES SHALL BE GALVANIZED GAUGE NO. 16 DEEP TYPE


WITH FACTORY KNOCKOUTS.

6.

ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED TYPE


FOR THE PARTICULAR LOCATION AND PURPOSE OF USAGE.

7.

GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND POWER


CIRCUIT AS PER PHILIPPINE ELECTRICAL CODE REQUIREMENTS.

8.

MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOW:


a. LIGHT SWITCH

1.20 m. ABOVE FINISH FLOOR

b. CONVENIENCE OUTLET

0.30 m. ABOVE FINISH FLOOR

c. PANEL BOARD

1.50 m. ABOVE FINISH FLOOR

SYMBOL

Ckt #4 16Amp. CEE

DESCRIPTION

LAWN

LAWN
EXIT / ENTRANCE

.96

CONCRETE BENCH

SW

WEATHER PROOF SWITCH, FLUSHED MOUNTED


HIGH BAY ALUMINUM LUMINAIRE W/ 250W METAL HALIDE TUBE

1.50

.90

CONCRETE BENCH

.50.46

.70

PERIMETER FENCE

16 Amp CEE OUTLET


PANEL BOARD

ROAD EDGE
ROAD SHOULDER

A
E-1

ELECTRICAL LAYOUT PLAN


SCALE

1:100

M.
SERVICE ENTRANCE
SINGLE PHASE 2 WIRE

LOADS & COMPUTATION

TYPE "F" CONDUIT

NO. OF OUTLET

CKT

DESCRIPTION
CEE @ 16 Amp.

LIGHTING @ 250W
/ OUTLET
LO

VOLTS

WATTS

AMPHERE
PER
CIRCUIT

AMPHERE
PROTECT

SIZE OF
WIRE

MCB

REMARKS

SW

LIGHTING OUTLET

220

1,500

6.82

20

LIGHTING OUTLET

220

1,500

6.82

20

CEE OUTLET

220

16

30

CEE OUTLET

220

16

30

SPARE

SPARE

60 AT

LIGHTING OUTLET

20 AT

20 AT

LIGHTING OUTLET

CEE OUTLET

30 AT

30 AT

CEE OUTLET

SPARE

SPARE

ROYAL CORD
ROYAL CORD
ROYAL CORD
ROYAL CORD

NOTE:
VOLTAGE = 220V AC
MAIN CB = 60 Amp.

SHEET CONTENT:

PROJECT NAME/ LOCATION:

DESIGNED BY:

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION IV-A
BATANGAS I DISTRICT ENGINEERING OFFICE

OFFICE OF THE DISTRICT ENGINEER


BATANGAS CITY

CONSTRUCTION AND REHABILITATION OF


MULTI-PURPOSE BUILDING STRUCTURE
(COVERED COURT)
AT
BARANGAY TALUDTOD
BALAYAN,

BATANGAS

ELECTRICAL LAYOUT PLAN


LOADS & COMPUTATION
RISER DIAGRAM
LEGEND
GENERAL NOTES

SUBMITTED BY:

RECOMMENDING APPROVAL:

SET NO.

APPROVED BY:

SHEET NO.

HERMINIO C. SIMBOL
ARCHITECT II
CHECKED BY:

GINA B. GUINTO
ENGINEER II

FLORENCIA G. CORDOVA
CHIEF, PLANNING & DESIGN SECTION

BENCIO A. AGUZAR
OIC - ASSISTANT DISTRICT ENGINEER

JULIANA D. VERGARA
Officer - in - Charge

E-1
7 8

28.05 M.

1.50

5.00

.60

CB

4.00

5.40

1.00

7.50

CB

5.40
.50

4.50

ELEV. TERRACE
&
COMFORT ROOM

EXISTING
STAGE

EXISTING
BLDG.
TO STREET
DRAINAGE

5.40

CB

2.40

.55

EXISTING
SCHOOL
BLDG.

CB

CB

.75

.50

5.40

CB

.80

15.85

R1

B
CB

CB

CB

CB

CB

CONCRETE BENCH

LAWN

LAWN
EXIT / ENTRANCE

1.50

CONCRETE BENCH

.50.46

TO STREET
DRAINAGE

CB

.96 .70

5.40

B
P-2

ISOMETRIC VIEW
NTS

GENERAL NOTES (PLUMBING)


1.

GRADES OF HORIZONTAL PIPINGS


RUN ALL HORIZONTAL PIPING IN PERFECT ALIGNMENT AND AT A FORM GRADE NOT LESS THAN TWO
PERCENT (2%)

2.

CHANGE IN DIRECTION

PERIMETER FENCE
ROAD EDGE

ROAD SHOULDER

A
P-1

PLUMBING LAYOUT PLAN


SCALE

1:100

WYES, LONG SWEEP QUARTER BEND, SIXTH - EIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF
FLOW IS FROM HORIZONTAL TO VERTICAL A SINGLE 81 BEND COMBINATION MAYBE USED ON VERTICAL
STACK AND SHORT QUARTER BENDS MAYBE USED ON WASTE LINE, TEE AND CROSSES MAYBE USED
IN BENT PIPES.

M.

0.60
.40

0.10

3.

PROHIBITED FITTINGS
NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL AND WASTE LINES, THE
DRILLINGS AND TAPPING OF HOUSE DRAIN, WASTE OR VENT PIPES OF SADDLE HUB AND BEND PROHIBITED.

4.

PIPE CLEAN - OUTS


CLEAN - OUTS ARE REQUIRED UNDER FOLLOWING CONDITIONS:
A) EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWO AND ONE HALF (22 21)
B) ONE AND ONE-HALF METERS (1.50M.) INSIDE THE PROPERTY LINES BEFORE THE HOUSE DRAINAGE
CONNECTION.
C) EVERY FIFTEEN METERS (15.00M) IN HORIZONTAL RUN OF PIPES
D) AT THE END OF ANY HORIZONTAL PIPE LINES.

5.

THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED.

6.

NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF THE SEWAGE AND THE
UNDER PART OF VAULT ROOF SLAB.

7.

NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.

8.

ALL PLUMBING WORKS SHALL BE UNDER THE SUPERVISION OF A LICENSED MASTER PLUMBING AND
LICENSED PLUMBING CONTRACTOR.

0.10

0.10

0.60

0.40

VAR.

0.10

0.10

0.10

PLAN

SECTION

C
P-1

CATCH

BASIN

SCALE

DETAIL

1:10

M.

SHEET CONTENT:

PROJECT NAME/ LOCATION:

DESIGNED BY:

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION IV-A
BATANGAS I DISTRICT ENGINEERING OFFICE

OFFICE OF THE DISTRICT ENGINEER


BATANGAS CITY

CONSTRUCTION AND REHABILITATION OF


MULTI-PURPOSE BUILDING STRUCTURE
(COVERED COURT)
AT
BARANGAY TALUDTOD
BALAYAN,

BATANGAS

PLUMBING LAYOUT
DETAIL OF CHB LINE CANAL W/
STEEL GRATING
GENERAL NOTES (PLUMBING)

SUBMITTED BY:

RECOMMENDING APPROVAL:

SET NO.

APPROVED BY:

SHEET NO.

HERMINIO C. SIMBOL
ARCHITECT II
CHECKED BY:

VIVIAN VIENNA B. CASTILLO


ENGINEER II

FLORENCIA G. CORDOVA
CHIEF, PLANNING & DESIGN SECTION

BENCIO A. AGUZAR
OIC - ASSISTANT DISTRICT ENGINEER

JULIANA D. VERGARA
Officer - in - Charge

P-1