Вы находитесь на странице: 1из 6
PREPARED BY | Surapong | 03.Apr.2008 oz (CHECKED BY ESJeong 08.Apr.2008 CHER APPROVED BY ESJeong o.apr.2008 PLANT Il DEBOTTLENECK PROJECT ceRTiFIEDBY | ESJeong | 93.Apr2008 shedden uhde REV. DATE CHECKED | APPROVED DESCRIPTION A 1tFeb2008_| ESJeong | ESJeong Issued for Approval oO 03.Apr.2008_| ESJeong ESJeong Issued for Construction PTT CHEMICAL PUBLIC COMPANY LIMITED METHOD STATEMENT OF EXCAVATION AND SOIL PROTECTION WORK (8004-S-11-A248-004 ) AREA CODE TWRE JOB NO. PLANT 2 CONTRACT NO. PTT CHEM JOB NO. THAIWOO REE ENGINEERING CO., LTD 080040 ECEIVE = 4 APR 2006 prwdsdddt Method Statement for Rev. 0 Excavation and Soil Protection Work Date : 03.Apr. 2608 TABLE OF CONTENTS 4.0 General 2.0 Main Equipment 3,0 Survey Work 4.0 Step of work Excavation and Soil Protection 5.0 Flood protection and dewatering 6.0 Safety Attachment Construction sequence sketch & Method Statement for Rev. 0 Excavation and Soil Protection Work Gate : 03.Apr. 2008 1.0 General This Method statement describes the Construction Sequence, Procedure and Material for Excavation and Shoring work at Plant 2 Debottleneck Project The Method statement is to give a general guideline for the construction. The details of the procedure may be modified based on actual site requirement. 2.0 Main Equipment 2.4 Backhoe 2.2 Plate compactor 2.3 Dump Truck (6 Wheel) ‘ 2.4 Submersible Pump 2.5 Air compreser 3.0 Survey Work 3.4 Activity - Survey marking existing facilities Elevation and demolition area 8.2 Equipment and Tool ~ Theodolite (Elevation) 1ea - Theodolite (Alignment) tea 4.0 Step of work Excavation and Soil Protectiox. 4.1 All obstruction to be diverted or protected. 4.2 Demolish paved concrete 4,3 Excavated soll from top ground level to ~ 0.60 m. by Backhoe or labour 4A Installation chicken net and coat with cement motar 25 mm. thickness layer by layer. 4.5 Continue excavated soil to design level. 4.6 Prepare for the flood protection. 4,7 Surveyor marked and checked location and elevation of the excavation work. 4.8 Repeat above procedure down to 1.54 m. depth 5.0 Flood Protection and dewatering Flood protection will be provided for protect from rainy. Provided the temporary sump or temporary gutter at the working area. With submersible pump sufficiently capacity for dewatering the are during the construction process and rainy. BZ Method Statement for Rev. 0 Excavation and Soil Protection Work. Date : 03.Apr. 2008 6.0 Safety 6.1 All equipment will be checked prior to use. All electrical cables will be undamaged, with proper connectors. PPE will be issued to all personnel. 6.2 Work permit shall be submit for approved before start work. 6.3 All electric hand tolls, electric equipment, ladder, scaffolding must be inspected and got approval before using. 6.4 House keeping must be performed daily. 6.5 Foreman and safety person must stand by at all time. 6.6 Located and protected the excavation area by temporary fence 6.7 Around the excavation area must be installed the waming sign. Method Statement for Rev.0 f Excavation and Soil Protection Work Date : 03.Apr. 2008 Attachment Construction sequence sketch Coat with cemant motra 25 mm. thickness. Dowol = 300 mm, @ $00 mm, Chicken Net Underground pipe 24" ane DETAIL SOIL PROTECTION UNDERGROUND PIPE

Вам также может понравиться