CORTE
D8
653,468.89
150.00
M3/HM
EXC. 336
ZARANDA EST.
653,468.89
150.00
150.00
M3/HM
M3/HM
CF 962
653,468.89
70.00
M3/HM
2 CONFORMACION DE MATERIAL
CONFORMACION
MOTONIVELADORA 140H
RODILLO LISO
CISTERNA AGUA 5000 GLN
534,763.21
329.67
329.67
329.67
M3/HM
M3/HM
M3/HM
3 TRANSPORTE DE MATERIAL
CORTE
CAMION VOLQUETE 15 M3
15,321,971.93
1,143.48
M3/HM
ZARANDEO
CARGUIO
Meses
9.00
Meses
9.00
9.00
Meses
9.00
Meses
9.00
9.00
9.00
Meses
9.00
Cant. EQ.
Cant. EQ.
2.00
HM x Mes
Costo HM
260.00
140.00
Parcial
655,200.00
2.00
2.00
HM x Mes
Costo HM
260.00
125.45
260.00
25.00
Parcial
587,127.27
117,000.00
4.00
HM x Mes
Costo HM
260.00
84.55
Parcial
791,345.45
Cant. EQ.
2,150,672.73
Cant. EQ.
1.00
1.00
1.00
HM x Mes
Costo HM
260.00
79.55
260.00
48.18
260.00
48.41
Parcial
186,136.36
112,745.45
113,277.27
412,159.09
Cant. EQ.
58.00
HM x Mes
Costo HM
260.00
59.55
Parcial
8,081,509.09
8,081,509.09
71.00
10,644,340.91
CD
15,887,075.98
CI
4,766,122.80
20,653,198.78
ALCANCE DE PROYECTO
ALCANCE
Extraccin y produccin de material en canteras, para construccin de sub base y base de vas con un ancho efectivo de 9.00 m. Considerar sub base un
espesor de 0.30 m y la base un espesor de 0.15 m.
METAS
* Extraccin y produccin de materialen cantera paal: 653,000.00 m3.
* Transporte de material seleccionado; 534,000.00 m3.
* Conformacin y compactacin de sub base y base; 534,000.00 m3.
RESTRICCIONES
* El cliente entregar liberada las canteras y el costo por el material es responsabilidad del cliente.
* El cliente garantiza la potencia de la cantera.
* Las pruebas de calidad (densidad de campo), se realizarn cada 2 km.
* El cliente entregar el terreno a nivel de subrasante con el perfilado y compactado que la norma de calidad requiere. San Martn verificar previo al proceso
constructivo de sub base.
* El cliente entrega el agua en un punto especfico del proyecto.
* La conformacin y compactacin de la sub base ser en capas de 0.30 m y la base en capas de 0.15 m.
HITOS
PRESUPUESTO
WBS
CONSTRUCCION DE BASE Y SUB BASE DE VAS - AGROLMOS S. A.
GERENCIA DE PROYECTO
0.00
270 DIAS
ENTREAGBLES SM
0.01
270 DIAS
ENTREGABLES CLIENTE
0.02
270 DIAS
TRABAJOS PRELIMINARES
1.00
270 DIAS
MOVILIZACION Y DESMOVILIZACION
1.01
270 DIAS
270 DIAS
ACCESOS A CANTERAS
1.03
270 DIAS
CALIDAD
2.00
270 DIAS
3.00
ESTUDIO DE CANTERAS
2.01
270 DIAS
270 DIAS
4.00
3.01
2.02
270 DIAS
VIAS OESTE
270 DIAS
5.00
SUB BASE
270 DIAS
4.01
270 DIAS
4.02
MATERIAL BASE
3.02
VIAS ESTE
MANTENIMIENTO DE VIAS
270 DIAS
5.01
270 DIAS
5.02
BASE
270 DIAS
SUB BASE
270 DIAS
6.00
270 DIAS
6.01
270 DIAS
6.02
BASE
270 DIAS
RIEGO DE VAS
270 DIAS
MTO
PROYECTO:
CLIENTE:
AGROLMOS S. A.
UBICACIN:
ITEM
DESCRIPCION
UNIDAD
CANTIDAD
GLB
1.00
GLB
1.00
KM
5.00
2.00 CALIDAD
2.01 ESTUDIO DE CANTERAS
UND
2.00
UND
54.00
M3
434,568.57
M3
359,642.95
M3
218,900.33
M3
175,120.26
M3
M3/KM
142,050.11
M2
371,372.83
M3
69,168.19
M3/KM
M2
4,164,482.87
4.02 BASE
2,027,803.75
348,162.03
M3
M3/KM
217,592.84
M2
568,870.18
M3
105,952.07
M3/KM
M2
533,315.79
KM
100.54
MES
6,139,964.19
5.02 BASE
2,989,721.12
METRADOS DE OBRA
PROYECTO:
CLIENTE:
AGROLMOS S. A.
UBICACIN:
Item
1
Descripcin
Total
1.00
TOTAL
GLB
1.00
Item
1
Descripcin
Total
1.00
TOTAL
GLB
1.00
Item
1
Descripcin
Total
5.00
TOTAL
KM
5.00
2.00 CALIDAD
2.01 ESTUDIO DE CANTERAS
Item
Descripcin
Total
1.00
1.00
TOTAL
UND
2.00
Item
Longitud (Km)
Control de Calidad
105.00
1 ensayo cada 2 Km
1.00
Total
2.00
53.50
TOTAL
UND
54.00
Item
Va
Progresivas
Inicio
Final
Longitud
% Comp. y % Desp.
Prod.
Area
Volumen
FRENTE OESTE
1
K1
00+000
08+813.78
8,813.78
3.06
45%
39,106.74
K2
00+000
08+655.64
8,655.64
3.06
45%
38,405.07
K3
00+000
08+655.64
8,655.64
3.06
45%
38,405.07
K4
00+000
03+917.73
3,917.73
3.06
45%
17,382.97
R1
00+000
02+153.72
2,153.72
3.06
45%
9,556.06
R2
00+000
06+488.16
6,488.16
3.06
45%
28,787.97
M3
171,643.88
SUB TOTAL
FRENTE ESTE
1
K5
00+000
10+984.62
10,984.62
3.06
45%
48,738.76
K6
00+000
10+838.02
10,838.02
3.06
45%
48,088.29
K7
00+000
09+984.80
9,984.80
3.06
45%
44,302.56
K8
00+000
09+984.80
9,984.80
3.06
45%
44,302.56
K9
00+000
07+364.74
7,364.74
3.06
45%
32,677.35
R3
00+000
06+359.00
6,359.00
3.06
45%
28,214.88
METRADOS DE OBRA
PROYECTO:
CLIENTE:
AGROLMOS S. A.
UBICACIN:
R4
00+000
03+388.16
3,388.16
3.06
45%
R5
00+000
00+353.17
353.17
3.06
45%
1,567.02
SUB TOTAL
M3
262,924.68
TOTAL
M3
434,568.57
15,033.27
Item
Va
Progresivas
Inicio
Final
Longitud
% Comp. y % Desp.
Prod.
Area
Volumen
FRENTE OESTE
1
K1
00+000
08+813.78
8,813.78
3.06
20%
32,364.20
K2
00+000
08+655.64
8,655.64
3.06
20%
31,783.51
K3
00+000
08+655.64
8,655.64
3.06
20%
31,783.51
K4
00+000
03+917.73
3,917.73
3.06
20%
14,385.90
R1
00+000
02+153.72
2,153.72
3.06
20%
7,908.46
R2
00+000
06+488.16
6,488.16
3.06
20%
23,824.52
M3
142,050.11
SUB TOTAL
FRENTE ESTE
1
K5
00+000
10+984.62
10,984.62
3.06
20%
40,335.52
K6
00+000
10+838.02
10,838.02
3.06
20%
39,797.21
K7
00+000
09+984.80
9,984.80
3.06
20%
36,664.19
K8
00+000
09+984.80
9,984.80
3.06
20%
36,664.19
K9
00+000
07+364.74
7,364.74
3.06
20%
27,043.33
R3
00+000
06+359.00
6,359.00
3.06
20%
23,350.25
R4
00+000
03+388.16
3,388.16
3.06
20%
12,441.32
R5
00+000
00+353.17
353.17
3.06
20%
1,296.84
SUB TOTAL
M3
217,592.84
TOTAL
M3
359,642.95
Item
Va
Progresivas
Inicio
Final
Longitud
% Comp. y % Desp.
Prod.
Area
Volumen
FRENTE OESTE
1
K1
00+000
08+813.78
8,813.78
1.49
50%
19,698.80
K2
00+000
08+655.64
8,655.64
1.49
50%
19,345.36
K3
00+000
08+655.64
8,655.64
1.49
50%
19,345.36
K4
00+000
03+917.73
3,917.73
1.49
50%
8,756.13
R1
00+000
02+153.72
2,153.72
1.49
50%
4,813.56
R2
00+000
06+488.16
6,488.16
1.49
50%
14,501.04
M3
86,460.24
SUB TOTAL
FRENTE ESTE
1
K5
00+000
10+984.62
10,984.62
1.49
50%
24,550.63
K6
00+000
10+838.02
10,838.02
1.49
50%
24,222.97
K7
00+000
09+984.80
9,984.80
1.49
50%
22,316.03
K8
00+000
09+984.80
9,984.80
1.49
50%
22,316.03
K9
00+000
07+364.74
7,364.74
1.49
50%
16,460.19
R3
00+000
06+359.00
6,359.00
1.49
50%
14,212.37
R4
00+000
03+388.16
3,388.16
1.49
50%
7,572.54
R5
00+000
00+353.17
353.17
1.49
50%
789.33
SUB TOTAL
M3
132,440.09
TOTAL
M3
218,900.33
METRADOS DE OBRA
PROYECTO:
CLIENTE:
AGROLMOS S. A.
UBICACIN:
Item
Va
Progresivas
Inicio
Final
Longitud
% Comp. y % Desp.
Prod.
Area
Volumen
FRENTE OESTE
1
K1
00+000
08+813.78
8,813.78
1.49
20%
15,759.04
K2
00+000
08+655.64
8,655.64
1.49
20%
15,476.28
K3
00+000
08+655.64
8,655.64
1.49
20%
15,476.28
K4
00+000
03+917.73
3,917.73
1.49
20%
7,004.90
R1
00+000
02+153.72
2,153.72
1.49
20%
3,850.85
R2
00+000
06+488.16
6,488.16
1.49
20%
11,600.83
M3
69,168.19
SUB TOTAL
FRENTE ESTE
1
K5
00+000
10+984.62
10,984.62
1.49
20%
19,640.50
K6
00+000
10+838.02
10,838.02
1.49
20%
19,378.38
K7
00+000
09+984.80
9,984.80
1.49
20%
17,852.82
K8
00+000
09+984.80
9,984.80
1.49
20%
17,852.82
K9
00+000
07+364.74
7,364.74
1.49
20%
13,168.16
R3
00+000
06+359.00
6,359.00
1.49
20%
11,369.89
R4
00+000
03+388.16
3,388.16
1.49
20%
6,058.03
R5
00+000
00+353.17
353.17
1.49
20%
631.47
SUB TOTAL
M3
105,952.07
TOTAL
M3
175,120.26
Item
Va
Volumen
FRENTE OESTE
1
K1
32,364.20
K2
31,783.51
K3
31,783.51
K4
14,385.90
R1
7,908.46
R2
23,824.52
TOTAL
4.01.02
M3
142,050.11
Va
Longitud Tramo
(Km)
Longitud Vas
Distancia Media
K1
8.81
23.00
27.41
32,364.20
K2
8.66
25.20
29.53
31,783.51
938,497.76
K3
8.66
27.40
31.73
31,783.51
1,008,421.49
K4
3.92
29.60
31.56
14,385.90
454,002.82
R1
2.15
30.70
31.78
7,908.46
251,306.02
R2
6.49
23.00
26.24
23,824.52
625,252.70
M3/KM
4,164,482.87
Item
Volumen / Tramo
Volumen / Distancia
FRENTE OESTE
TOTAL
4.01.03
887,002.07
Item
Va
Ancho Capa 1
Ancho Capa 2
Area
K1
8,813.78
9.60
0.00
84,612.29
K2
8,655.64
9.60
0.00
83,094.14
K3
8,655.64
9.60
0.00
83,094.14
FRENTE OESTE
METRADOS DE OBRA
PROYECTO:
CLIENTE:
AGROLMOS S. A.
UBICACIN:
K4
3,917.73
9.60
0.00
37,610.21
R1
2,153.72
9.60
0.00
20,675.71
R2
6,488.16
9.60
0.00
TOTAL
62,286.34
M2
371,372.83
4.02 BASE
4.02.01
Item
Va
Volumen
FRENTE OESTE
1
K1
15,759.04
K2
15,476.28
K3
15,476.28
K4
7,004.90
R1
3,850.85
R2
11,600.83
TOTAL
4.02.02
M3
69,168.19
Va
Longitud Tramo
(Km)
Longitud Vas
Distancia Media
K1
8.81
23.00
27.41
15,759.04
431,906.24
K2
8.66
25.20
29.53
15,476.28
456,980.94
K3
8.66
27.40
31.73
15,476.28
491,028.76
K4
3.92
29.60
31.56
7,004.90
221,066.73
R1
2.15
30.70
31.78
3,850.85
122,367.96
R2
6.49
23.00
26.24
11,600.83
304,453.11
M3/KM
2,027,803.75
Item
Volumen / Tramo
Volumen / Distancia
FRENTE OESTE
TOTAL
4.02.03
Item
Va
Ancho Capa
Area
K1
8,813.78
9.00
79,324.02
K2
8,655.64
9.00
77,900.76
K3
8,655.64
9.00
77,900.76
K4
3,917.73
9.00
35,259.57
R1
2,153.72
9.00
19,383.48
R2
6,488.16
9.00
FRENTE OESTE
TOTAL
58,393.44
M2
348,162.03
Item
Va
Volumen
FRENTE ESTE
1
K5
40,335.52
K6
39,797.21
K7
36,664.19
K8
36,664.19
K9
27,043.33
R3
23,350.25
R4
12,441.32
METRADOS DE OBRA
PROYECTO:
CLIENTE:
AGROLMOS S. A.
UBICACIN:
1,296.84
TOTAL
5.01.02
M3
217,592.84
Item
Va
Longitud Tramo
(Km)
Longitud Vas
Distancia Media
Volumen / Tramo
Volumen / Distancia
FRENTE ESTE
1
K5
10.98
29.60
35.09
40,335.52
1,415,466.73
K6
10.84
27.40
32.82
39,797.21
1,306,105.01
K7
9.98
25.20
30.19
36,664.19
1,106,979.76
K8
9.98
23.00
27.99
36,664.19
1,026,318.55
K9
7.36
7.00
10.68
27,043.33
288,886.81
R3
6.36
24.10
27.28
23,350.25
636,983.09
R4
3.39
23.20
24.89
12,441.32
309,715.30
R5
0.35
38.00
38.18
1,296.84
49,508.93
M3/KM
6,139,964.19
TOTAL
5.01.03
Item
Va
Ancho Capa 1
Ancho Capa 2
Area
K5
10,984.62
9.60
0.00
105,452.35
K6
10,838.02
9.60
0.00
104,044.99
K7
9,984.80
9.60
0.00
95,854.08
K8
9,984.80
9.60
0.00
95,854.08
K9
7,364.74
9.60
0.00
70,701.50
R3
6,359.00
9.60
0.00
61,046.40
R4
3,388.16
9.60
0.00
32,526.34
R5
353.17
9.60
0.00
FRENTE ESTE
TOTAL
3,390.43
M2
568,870.18
5.02 BASE
5.02.01
Item
Va
Volumen
FRENTE ESTE
1
K5
19,640.50
K6
19,378.38
K7
17,852.82
K8
17,852.82
K9
13,168.16
R3
11,369.89
R4
6,058.03
R5
631.47
TOTAL
5.02.02
M3
105,952.07
Item
Va
Longitud Tramo
(Km)
Longitud Vas
Distancia Media
Volumen / Tramo
Volumen / Distancia
FRENTE ESTE
1
K5
10.98
29.60
35.09
19,640.50
689,230.53
K6
10.84
27.40
32.82
19,378.38
635,979.24
K7
9.98
25.20
30.19
17,852.82
539,019.56
K8
9.98
23.00
27.99
17,852.82
499,743.35
K9
7.36
7.00
10.68
13,168.16
140,667.11
METRADOS DE OBRA
PROYECTO:
CLIENTE:
AGROLMOS S. A.
UBICACIN:
R3
6.36
24.10
27.28
11,369.89
310,164.97
R4
3.39
23.20
24.89
6,058.03
150,809.09
R5
0.35
38.00
38.18
631.47
24,107.29
M3/KM
2,989,721.12
TOTAL
5.02.03
Item
Va
Ancho Capa
Area
K5
10,984.62
9.00
98,861.58
K6
10,838.02
9.00
97,542.18
K7
9,984.80
9.00
89,863.20
K8
9,984.80
9.00
89,863.20
K9
7,364.74
9.00
66,282.66
R3
6,359.00
9.00
57,231.00
R4
3,388.16
9.00
30,493.44
R5
353.17
9.00
FRENTE ESTE
TOTAL
3,178.53
M2
533,315.79
Item
Va
Longitud
Total
K1
8.81
8.81
K2
8.66
8.66
K3
8.66
8.66
K4
3.92
3.92
R1
2.15
2.15
R2
6.49
6.49
K5
10.98
10.98
K6
10.84
10.84
K7
9.98
9.98
K8
9.98
9.98
K9
7.36
7.36
R3
6.36
6.36
R4
3.39
3.39
R5
0.35
0.35
C. Paal
2.60
FRENTE OESTE
FRENTE ESTE
OTROS
1
2.60
TOTAL
KM
100.54
Item
1
Descripcin
Movilizacin y desmovilizacin de equipo
Total
9.00
TOTAL
MES
9.00
Partida
Rendimiento
GLB
0.20
Descripcion de recurso
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Subcontratos
MOVILIZACION DE EQUIPOS L AMARILLA
GLB
40.0000
MOVILIZACION DE VOLQUETES
GLB
30.0000
GLB
40.0000
DESMOVILIZACION DE VOLQUETES
GLB
30.0000
Materiales
Equipos
Partida
Rendimiento
GLB
0.20
Descripcion de recurso
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Subcontratos
CAMPAMENTO
GLB
1.0000
OFICINAS
GLB
1.0000
LABORATORIOS
GLB
1.0000
GLB
1.0000
GLB
1.0000
Materiales
Equipos
Partida
Rendimiento
KM
Descripcion de recurso
0.40
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
1.00
OPERARIO
HH
0.0000
OFICIAL
HH
2.00
40.0000
AYUDANTE (PISO)
HH
4.00
80.0000
HH
4.00
80.0000
HH
8.00
160.0000
Materiales
20.0000
HERRAMIENTAS MANUALES
%MO
5%
TRACTOR D8
HM
1.00
20.0000
MOTONIVELADORA 140 H
HM
1.00
20.0000
RODILLO LISO
HM
1.00
20.0000
CARGADOR FRONTAL
HM
1.00
20.0000
CAMION VOLQUETE
HM
4.00
80.0000
Partida
Rendimiento
0.20
Descripcion de recurso
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Subcontratos
ESTUDIO DE CANTERAS
GLB
1.0000
Materiales
Equipos
Partida
Rendimiento
Descripcion de recurso
4.00
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Subcontratos
DENSIDAD DE CAMPO
GLB
1.0000
%MO
5%
Materiales
Equipos
HERRAMIENTAS MANUALES
Partida
3.01.01
Rendimiento
M3
2,160.00
Descripcion de recurso
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
1.00
0.0037
OPERARIO
HH
0.0000
OFICIAL (CONTROLADOR)
HH
1.00
0.0037
AYUDANTE (PISO)
HH
3.00
0.0111
HH
3.00
0.0111
HH
3.00
0.0111
3.00
0.0111
Materiales
Equipos
HERRAMIENTAS MANUALES
%MO
TRACTOR D8
Partida
5%
HM
3.01.02
Rendimiento
M3
2,880.00
Descripcion de recurso
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
1.00
0.0028
OPERARIO
HH
0.0000
OFICIAL (CONTROLADOR)
HH
1.00
0.0028
AYUDANTE (PISO)
HH
4.00
0.0111
HH
4.00
0.0111
HH
2.00
0.0056
Materiales
Equipos
HERRAMIENTAS MANUALES
%MO
5%
EXCAVADORA 336
HM
4.00
0.0111
ZARANDA ESTATICA
HM
4.00
0.0111
HM
8.00
0.0222
Partida
3.02.01
Rendimiento
Descripcion de recurso
1,440.00
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
1.00
0.0056
OPERARIO
HH
0.0000
OFICIAL (CONTROLADOR)
HH
1.00
0.0056
AYUDANTE (PISO)
HH
2.00
0.0111
HH
2.00
0.0111
HH
2.00
0.0111
2.00
0.0111
Materiales
Equipos
HERRAMIENTAS MANUALES
%MO
TRACTOR D8
Partida
5%
HM
3.02.02
Rendimiento
M3
1,120.00
Descripcion de recurso
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
1.00
0.0071
OPERARIO
HH
0.0000
OFICIAL (CONTROLADOR)
HH
1.00
0.0071
AYUDANTE (PISO)
HH
2.00
0.0143
HH
2.00
0.0143
HH
6.00
0.0429
Materiales
Equipos
HERRAMIENTAS MANUALES
%MO
5%
EXCAVADORA 336
HM
2.00
0.0143
ZARANDA ESTATICA
HM
2.00
0.0143
HM
4.00
0.0286
Partida
4.01.01
Rendimiento
M3
Descripcion de recurso
801.37
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
1.00
0.0100
OPERARIO
HH
0.0000
OFICIAL (CONTROLADOR)
HH
1.00
0.0100
AYUDANTE (PISO)
HH
0.0000
HH
1.00
0.0100
HH
4.00
0.0399
Materiales
HERRAMIENTAS MANUALES
%MO
5%
HM
1.00
0.0100
CAMION VOLQUETE DE 15 M3
HM
2.50
0.0250
Partida
4.01.02
Rendimiento
20,661.15
Descripcion de recurso
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
1.00
0.0004
OPERARIO
HH
0.0000
OFICIAL (CONTROLADOR)
HH
2.00
0.0008
AYUDANTE (PISO)
HH
0.0000
HH
5.00
0.0019
HH
20.00
0.0077
Materiales
Equipos
HERRAMIENTAS MANUALES
%MO
CAMION VOLQUETE DE 15 M3
Partida
HM
4.01.03
5%
20.00
0.0077
Rendimiento
M2
Descripcion de recurso
1,714.29
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
2.00
0.0093
OPERARIO
HH
2.00
0.0093
OFICIAL (CONTROLADOR)
HH
2.00
0.0093
AYUDANTE (PISO)
HH
12.00
0.0560
HH
6.00
0.0280
HH
6.00
0.0280
Materiales
AGUA
M3
0.02
Equipos
HERRAMIENTAS MANUALES
%MO
5%
MOTONIVELADORA 140 H
HM
2.00
0.0093
RODILLO LISO
HM
2.00
0.0093
CISTERNA DE AGUA
HM
2.00
0.0093
Partida
4.02.01
Rendimiento
M3
801.37
Descripcion de recurso
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
1.00
0.0100
OPERARIO
OFICIAL (CONTROLADOR)
HH
0.0000
HH
1.00
0.0100
AYUDANTE (PISO)
HH
0.0000
HH
1.00
0.0100
HH
4.00
0.0399
Materiales
Equipos
HERRAMIENTAS MANUALES
%MO
5%
HM
1.00
0.0100
CAMION VOLQUETE DE 15 M3
HM
2.50
0.0250
Partida
4.02.02
Rendimiento
14,462.80
Descripcion de recurso
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
1.00
0.0006
OPERARIO
OFICIAL (CONTROLADOR)
HH
0.0000
HH
1.00
0.0006
AYUDANTE (PISO)
HH
0.0000
HH
4.00
0.0022
HH
14.00
0.0077
14.00
0.0077
Materiales
Equipos
HERRAMIENTAS MANUALES
%MO
CAMION VOLQUETE DE 15 M3
Partida
4.02.03
Rendimiento
5%
HM
Descripcion de recurso
2,400.00
Costo Unitario $
Unidad
Mano de Obra
Cuadrilla
Cantidad
CAPATAZ
HH
2.00
0.0067
OPERARIO
HH
2.00
0.0067
OFICIAL (CONTROLADOR)
HH
2.00
0.0067
AYUDANTE (PISO)
HH
12.00
0.0400
HH
6.00
0.0200
HH
6.00
0.0200
Materiales
AGUA
M3
0.01
Equipos
HERRAMIENTAS MANUALES
%MO
5%
MOTONIVELADORA 140 H
HM
2.00
0.0067
RODILLO LISO
HM
2.00
0.0067
CISTERNA DE AGUA
HM
2.00
0.0067
Partida
5.01.01
Rendimiento
M3
801.37
Descripcion de recurso
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
1.00
0.0100
OPERARIO
HH
0.0000
OFICIAL (CONTROLADOR)
HH
1.00
0.0100
AYUDANTE (PISO)
HH
0.0000
HH
1.00
0.0100
HH
4.00
0.0399
Materiales
Equipos
HERRAMIENTAS MANUALES
%MO
5%
HM
1.00
0.0100
CAMION VOLQUETE DE 15 M3
HM
2.50
0.0250
Partida
5.01.02
Rendimiento
Descripcion de recurso
27,837.43
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
1.00
0.0003
OPERARIO
HH
0.0000
OFICIAL (CONTROLADOR)
HH
2.00
0.0006
AYUDANTE (PISO)
HH
0.0000
HH
7.00
0.0020
HH
27.00
0.0078
HERRAMIENTAS MANUALES
%MO
CAMION VOLQUETE DE 15 M3
Partida
HM
5.01.03
5%
27.00
0.0078
Rendimiento
M2
2,571.43
Descripcion de recurso
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
3.00
0.0093
OPERARIO
HH
3.00
0.0093
OFICIAL (CONTROLADOR)
HH
3.00
0.0093
AYUDANTE (PISO)
HH
18.00
0.0560
HH
9.00
0.0280
HH
9.00
0.0280
Materiales
AGUA
M3
0.02
Equipos
HERRAMIENTAS MANUALES
%MO
5%
MOTONIVELADORA 140 H
HM
3.00
0.0093
RODILLO LISO
HM
3.00
0.0093
CISTERNA DE AGUA
HM
3.00
0.0093
Partida
5.02.01
Rendimiento
M3
Descripcion de recurso
801.37
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
1.00
0.0100
OPERARIO
HH
0.0000
OFICIAL (CONTROLADOR)
HH
1.00
0.0100
AYUDANTE (PISO)
HH
0.0000
HH
1.00
0.0100
HH
4.00
0.0399
Materiales
Equipos
HERRAMIENTAS MANUALES
%MO
5%
HM
1.00
0.0100
CAMION VOLQUETE DE 15 M3
HM
2.50
0.0250
Partida
5.02.02
Rendimiento
13,403.21
Descripcion de recurso
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
1.00
0.0006
OPERARIO
HH
0.0000
OFICIAL (CONTROLADOR)
HH
1.00
0.0006
AYUDANTE (PISO)
HH
0.0000
HH
3.00
0.0018
HH
13.00
0.0078
13.00
0.0078
Materiales
Equipos
HERRAMIENTAS MANUALES
%MO
CAMION VOLQUETE DE 15 M3
Partida
5%
HM
5.02.03
Rendimiento
M2
Descripcion de recurso
2,400.00
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
2.00
0.0067
OPERARIO
HH
2.00
0.0067
OFICIAL (CONTROLADOR)
HH
2.00
0.0067
AYUDANTE (PISO)
HH
12.00
0.0400
HH
4.00
0.0133
HH
6.00
0.0200
Materiales
AGUA
M3
0.01
Equipos
HERRAMIENTAS MANUALES
%MO
5%
MOTONIVELADORA 140 H
HM
2.00
0.0067
RODILLO LISO
HM
2.00
0.0067
CISTERNA DE AGUA
HM
2.00
0.0067
Partida
Rendimiento
KM
0.37
Descripcion de recurso
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Mano de Obra
CAPATAZ
HH
1.00
OPERARIO
HH
21.6216
0.0000
OFICIAL
HH
1.00
21.6216
AYUDANTE (PISO)
HH
6.00
129.7297
HH
4.00
86.4865
HH
7.00
151.3514
Materiales
Equipos
HERRAMIENTAS MANUALES
%MO
5%
MOTONIVELADORA 140 H
HM
1.00
21.6216
RODILLO LISO
HM
1.00
21.6216
CISTERNA DE AGUA
HM
1.00
21.6216
CAMION VOLQUETE DE 15 M3
HM
4.00
86.4865
Partida
Rendimiento
MES
Descripcion de recurso
1.00
Costo Unitario $
Unidad
Cuadrilla
Cantidad
Subcontratos
MOVILIZACION Y DESMOVILIZACION DE ERQUIPOS
Materiales
Equipos
GLB
3.0000
OS
298,000.00
Costo Unitario $
Precio
Parcial
298,000.00
3,200.00
128,000.00
700.00
21,000.00
3,200.00
128,000.00
700.00
21,000.00
-
591,666.67
Costo Unitario $
Precio
Parcial
591,666.67
277,777.78
277,777.78
111,111.11
111,111.11
21,111.11
21,111.11
15,000.00
15,000.00
166,666.67
166,666.67
14,438.10
Costo Unitario $
Precio
Parcial
3,519.40
11.53
-
230.60
-
8.98
359.20
6.78
542.40
6.78
542.40
11.53
1,844.80
-
OS
10,918.70
3,519.40
175.97
140.00
2,800.00
77.50
1,550.00
47.18
943.64
91.73
1,834.55
45.18
3,614.55
5,500.00
Costo Unitario $
Precio
Parcial
5,500.00
5,500.00
-
610.00
Costo Unitario $
Precio
Parcial
610.00
610.00
-
OS
1.93
Costo Unitario $
Precio
Parcial
0.35
11.53
0.04
10.10
8.98
0.03
6.78
0.08
6.78
0.08
11.53
0.13
1.57
0.35
0.02
140.00
1.56
-
3.72
Costo Unitario $
Precio
Parcial
0.27
11.53
0.03
8.98
0.02
6.78
0.08
6.78
0.08
11.53
0.06
3.45
0.27
0.01
113.45
1.26
12.00
0.13
91.73
2.04
-
1.97
Costo Unitario $
Precio
Parcial
0.39
11.53
0.06
OS
8.98
0.05
6.78
0.08
6.78
0.08
11.53
0.13
1.58
0.39
0.02
140.00
1.56
-
5.29
Costo Unitario $
Precio
Parcial
0.83
11.53
0.08
8.98
0.06
6.78
0.10
6.78
0.10
11.53
0.49
4.45
0.83
0.04
113.45
1.62
12.00
0.17
91.73
2.62
-
2.81
Costo Unitario $
Precio
Parcial
0.73
11.53
0.12
8.98
0.09
6.78
6.78
0.07
11.53
0.46
-
OS
2.08
0.73
0.04
91.73
0.92
45.18
1.13
-
0.47
Costo Unitario $
Precio
Parcial
0.11
11.53
0.00
8.98
0.01
6.78
6.78
0.01
11.53
0.09
0.36
0.11
0.01
45.18
0.35
-
2.83
Costo Unitario $
Precio
Parcial
1.18
11.53
0.11
10.10
0.09
8.98
0.08
6.78
0.38
6.78
0.19
11.53
0.32
-
1.65
1.18
0.06
77.50
0.72
47.18
0.44
45.91
0.43
OS
2.81
Costo Unitario $
Precio
Parcial
0.73
11.53
0.12
10.10
8.98
0.09
6.78
6.78
0.07
11.53
0.46
2.08
0.73
0.04
91.73
0.92
45.18
1.13
-
0.47
Costo Unitario $
Precio
Parcial
0.12
11.53
0.01
10.10
8.98
0.00
6.78
6.78
0.02
11.53
0.09
0.36
0.12
0.01
45.18
0.35
-
2.02
Costo Unitario $
Precio
Parcial
0.84
OS
11.53
0.08
10.10
0.07
8.98
0.06
6.78
0.27
6.78
0.14
11.53
0.23
-
1.18
0.84
0.04
77.50
0.52
47.18
0.31
45.91
0.31
-
2.81
Costo Unitario $
Precio
Parcial
0.73
11.53
0.12
10.10
8.98
0.09
6.78
6.78
0.07
11.53
0.46
2.08
0.73
0.04
91.73
0.92
45.18
1.13
-
0.47
Costo Unitario $
Precio
Parcial
0.11
11.53
0.00
10.10
8.98
0.01
6.78
6.78
0.01
11.53
0.09
OS
0.36
0.11
0.01
45.18
0.35
2.83
Costo Unitario $
Precio
Parcial
1.18
11.53
0.11
10.10
0.09
8.98
0.08
6.78
0.38
6.78
0.19
11.53
0.32
-
1.65
1.18
0.06
77.50
0.72
47.18
0.44
45.91
0.43
2.81
Costo Unitario $
Precio
Parcial
0.73
11.53
0.12
8.98
0.09
6.78
6.78
0.07
11.53
0.46
2.08
0.73
0.04
91.73
0.92
45.18
1.13
OS
0.47
Costo Unitario $
Precio
Parcial
0.11
11.53
0.01
8.98
0.01
6.78
6.78
0.01
11.53
0.09
0.36
0.11
0.01
45.18
0.35
-
1.97
Costo Unitario $
Precio
Parcial
0.80
11.53
0.08
10.10
0.07
8.98
0.06
6.78
0.27
6.78
0.09
11.53
0.23
-
1.18
0.80
0.04
77.50
0.52
47.18
0.31
45.91
0.31
-
OS
12,146.79
Costo Unitario $
Precio
Parcial
3,654.49
11.53
249.30
8.98
194.16
6.78
879.57
6.78
586.38
11.53
1,745.08
8,492.31
3,654.49
182.72
75.00
1,621.62
48.18
1,041.77
48.41
1,046.68
53.18
4,599.51
-
28,650.00
Costo Unitario $
Precio
Parcial
28,650.00
9,550.00
28,650.00
-
Presupuesto de Obra
PROYECTO:
CLIENTE:
AGROLMOS S. A.
UBICACIN:
ITEM
DESCRIPCION
UNIDAD
CANTIDAD
P. UNITARIO
PARCIAL
961,857.15
GLB
1.00
298,000.00
298,000.00
GLB
1.00
591,666.67
591,666.67
KM
5.00
14,438.10
72,190.49
UND
2.00
5,500.00
UND
54.00
610.00
2.00 CALIDAD
43,940.00
11,000.00
32,940.00
3,531,871.08
2,174,872.18
M3
434,568.57
1.93
837,862.68
M3
359,642.95
3.72
1,337,009.50
M3
218,900.33
1.97
M3
175,120.26
5.29
1,356,998.91
430,776.99
926,221.92
5,258,925.75
3,405,085.85
M3
142,050.11
2.81
M3/KM
399,559.50
4,164,482.87
0.47
1,954,861.42
M2
371,372.83
2.83
1,050,664.92
M3
69,168.19
2.81
194,556.75
M3/KM
2,027,803.75
0.47
955,712.89
M2
348,162.03
2.02
4.02 BASE
1,853,839.91
703,570.26
7,849,332.88
5,093,360.33
M3
217,592.84
2.81
M3/KM
612,046.61
6,139,964.19
0.47
2,871,901.59
M2
568,870.18
2.83
1,609,412.13
M3
105,952.07
2.81
298,022.70
M3/KM
2,989,721.12
0.47
1,405,529.68
M2
533,315.79
1.97
1,052,420.17
KM
100.54
12,146.79
MES
9.00
28,650.00
5.02 BASE
2,755,972.54
1,479,112.63
COSTO DIRECTO
1,221,262.63
257,850.00
$19,125,039.49
GASTOS GENERALES
29.20%
$5,584,031.61
RIESGOS
1.20%
$229,500.47
SAN JUAN
3.50%
$669,376.38
COSTO INDIRECTO
33.90%
$6,482,908.46
UTILIDAD
12.00%
DESCUENTO COMERCIAL
$2,295,004.74
$27,902,952.70
PRESUPUESTO TOTAL
-4.00%
$1,116,118.11
$26,786,834.59
Presupuesto
PROYECTO:
CLIENTE:
AGROLMOS S. A.
UBICACIN:
ITEM
DESCRIPCION
UNIDAD
CANTIDAD
GLB
P. UNITARIO
PARCIAL
1.00
1,005,797.15
M3
534,763.21
4,123,516.13
M3
534,763.21
8,988,013.68
M2
1,821,720.83
5,007,712.53
COSTO DIRECTO
19,125,039.49
COSTOS INDIRECTOS
8,777,913.20
TOTAL
27,902,952.69
DESCRIPCION
UNIDAD
CANTIDAD
KM
P. UNITARIO
1.00
284,892.68
PARCIAL
284,892.68
DESCRIPCION
UNIDAD
CANTIDAD
ML
P. UNITARIO
1.00
284.89
PARCIAL
284.89
DESCRIPCION
1.00 CONSTRUCCION DE BASE Y SUB BASE DE VIAS
CONSIDERACIONES
1. Inicio inemdiato de otorgarse carta de intensin.
2. No solicitaremos adelanto.
3. De otorgarse la buena pro SM ofrece la ingeniera de detalle de las vas a construir.
4. El costo del material en cantera y la potencia son responsabilidad del cliente.
5. SM realizar la verificacin de la calidad de subrasante antes del proceso constructivo.
EVALUAR
1. Posibilidad de ejecutar a tiempo y material.
2. Disponibilidad inmediata de recursos.
UNIDAD
M2
CANTIDAD
P. UNITARIO
1.00
31.65
PARCIAL
31.65
Item
Longitud
(km)
Va
Total
(km)
FRENTE OESTE
1
K1
8.81
8.81
K2
8.66
8.66
K3
8.66
8.66
K4
3.92
3.92
R1
2.15
2.15
R2
6.49
6.49
K5
10.98
10.98
K6
10.84
10.84
K7
9.98
9.98
K8
9.98
9.98
K9
7.36
7.36
R3
6.36
6.36
R4
3.39
3.39
R5
0.35
0.35
FRENTE ESTE
TOTAL (km)
97.94
ITEM
1.00
1.01
1.02
1.03
2.00
2.01
2.02
3.00
3.01
3.01.01
3.01.02
3.02
3.02.01
3.02.02
4.00
4.01
4.01.01
4.01.02
4.01.03
4.02
4.02.01
4.02.02
4.02.03
5.00
5.01
5.01.01
5.01.02
5.01.03
5.02
5.02.01
5.02.02
5.02.03
6.00
6.01
6.02
DESCRIPCION
UNIDAD
TRABAJOS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION
GLB
GLB
ACCESOS A CANTERAS
KM
CALIDAD
ESTUDIO DE CANTERAS
UND
UND
MOVIMIENTO DE TIERRAS
MATERIAL SUB BASE
EXPLOTACION DE MATERIAL EN CANTERA PARA SUB BASE
M3
M3
MATERIAL BASE
EXPLOTACION DE MATERIAL EN CANTERA PARA BASE
M3
M3
VIAS OESTE
SUB BASE
TRANSPORTE DE MATERIAL < 1.00 KM, INCLUYE CARGUIO
M3
M3/KM
M2
BASE
TRANSPORTE DE MATERIAL < 1.00 KM, INCLUYE CARGUIO
M3
M3/KM
M2
VIAS ESTE
SUB BASE
TRANSPORTE DE MATERIAL < 1.00 KM, INCLUYE CARGUIO
M3
M3/KM
M2
BASE
TRANSPORTE DE MATERIAL < 1.00 KM, INCLUYE CARGUIO
M3
M3/KM
M2
MANTENIMIENTO DE VIAS
MANTENIMIENTO DE VIAS PROCESO CONSTRUCTIVO
KM
RIEGO DE VAS
MES
CANTIDAD
DURACION
1.00
1.00
1.00
1.00
5.00
12.50
2.00
1.00
54.00
1.00
434,568.57
201.19
359,642.95
124.88
218,900.33
152.01
175,120.26
156.36
142,050.11
177.26
4,164,482.87
201.56
371,372.83
216.63
69,168.19
86.31
2,027,803.75
140.21
348,162.03
145.07
217,592.84
271.53
6,139,964.19
220.57
568,870.18
221.23
105,952.07
132.21
2,989,721.12
223.06
533,315.79
222.21
100.54
1.00
9.00
270.00
GLB
GLB
KM
5.00
CANTIDAD
2.00 CALIDAD
UND
2.00
UND
54.00
-
M3
M3
175,120.26
CANTIDAD
4.00 VIAS OESTE
HH
4.01.01
M3
142,050.11
CANTIDAD
HH
4.01.02
M3/KM
4,164,482.87
CANTIDAD
HH
4.01.03
M2
371,372.83
CANTIDAD
4.02 BASE
M3
69,168.19
CANTIDAD
HH
4.02.02
M3/KM
2,027,803.75
CANTIDAD
HH
4.02.03
M2
348,162.03
CANTIDAD
5.00 VIAS ESTE
M3
HH
TRANSPORTE DE MATERIAL > 1.00 KM
M3/KM
6,139,964.19
CANTIDAD
HH
5.01.03
M2
568,870.18
CANTIDAD
5.02 BASE
M3
105,952.07
CANTIDAD
HH
5.02.02
M3/KM
2,989,721.12
CANTIDAD
HH
5.02.03
M2
533,315.79
CANTIDAD
6.00 MANTENIMIENTO DE VIAS
KM
100.54
CANTIDAD
MES
SUB TOTAL
TOTAL
CANTIDAD DE MANO DE OBRA, MATERIAL Y EQUIPOS - REFERENCIAL
CISTERNA DE AGUA
CAMION VOLQUETE DE 15 M3
ZARANDA ESTATICA
EXCAVADORA 336
100.000
100.000
100.000
100.000
400.000
0.000
0.481
0.481
0.481
0.481
1.923
HM
0.000
0.000
0.000
0.000
0.004
0.011
0.011
0.011
0.000
1,609.513
0.004
0.000
1,609.513
4,828.540
4,828.540
4,828.540
0.000
4,828.540
7.738
0.000
7.738
23.214
23.214
23.214
0.000
23.214
0.003
0.011
0.011
0.006
0.000
0.000
999.008
3,996.033
3,996.033
1,998.016
0.000
0.006
0.011
0.011
0.011
0.000
1,216.113
0.000
1,216.113
2,432.226
2,432.226
2,432.226
0.000
2,432.226
5.847
0.000
5.847
11.693
11.693
11.693
0.000
11.693
0.007
0.014
0.014
0.043
0.000
1,250.859
0.000
1,250.859
2,501.718
2,501.718
7,505.154
0.000
6.014
0.000
6.014
12.027
12.027
36.082
0.000
0.003
0.006
0.007
0.010
0.000
0.010
0.000
0.010
0.040
0.000
1,418.073
0.000
1,418.073
0.000
1,418.073
5,672.292
0.000
6.818
0.000
6.818
0.000
6.818
27.271
0.000
0.000
0.000
0.001
0.000
0.002
0.008
0.000
1,612.488
0.000
3,224.977
0.000
8,062.442
32,249.768
0.000
7.752
0.000
15.505
0.000
38.762
155.047
0.000
0.009
0.009
0.009
0.056
0.028
0.028
3,466.146
3,466.146
3,466.146
20,796.879
10,398.439
10,398.439
5,570.592
16.664
16.664
16.664
99.985
49.992
49.992
M3
26.782
0.015
0.010
0.000
0.010
0.000
0.010
0.040
0.000
690.500
0.000
690.500
0.000
690.500
2,761.998
0.000
3.320
0.000
3.320
0.000
3.320
13.279
0.000
0.001
0.000
0.001
0.000
0.002
0.008
0.000
1,121.666
0.000
1,121.666
0.000
4,486.662
15,703.319
0.000
5.393
0.000
5.393
0.000
21.570
75.497
0.000
0.007
0.007
0.007
0.040
0.020
0.020
2,321.080
2,321.080
2,321.080
13,926.481
6,963.241
6,963.241
2,611.215
11.159
11.159
11.159
66.954
33.477
33.477
M3
12.554
0.008
0.010
0.000
0.010
0.000
0.010
0.040
0.000
2,172.209
0.000
2,172.209
0.000
2,172.209
8,688.836
0.000
10.443
0.000
10.443
0.000
10.443
41.773
0.000
0.000
0.000
0.001
0.000
0.002
0.008
0.000
1,764.520
0.000
3,529.041
0.000
12,351.642
47,642.047
0.000
8.483
0.000
16.967
0.000
59.383
229.048
0.000
0.009
0.009
0.009
0.056
0.028
0.028
5,309.455
5,309.455
5,309.455
31,856.730
15,928.365
15,928.365
8,533.053
25.526
25.526
25.526
153.157
76.579
76.579
M3
41.024
0.015
0.010
0.000
0.010
0.000
0.010
0.040
0.000
1,057.710
0.000
1,057.710
0.000
1,057.710
4,230.838
0.000
5.085
0.000
5.085
0.000
5.085
20.341
0.000
0.001
0.000
0.001
0.000
0.002
0.008
0.000
1,784.481
0.000
1,784.481
0.000
5,353.443
23,198.252
0.000
8.579
0.000
8.579
0.000
25.738
111.530
0.000
0.007
0.007
0.007
0.040
0.013
0.020
3,555.439
3,555.439
3,555.439
21,332.632
7,110.877
10,666.316
3,999.868
17.093
17.093
17.093
102.561
34.187
51.280
M3
19.230
0.008
21.622
0.000
21.622
129.730
86.486
151.351
0.000
2,173.881
0.000
2,173.881
13,043.284
8,695.523
15,217.165
0.000
10.451
0.000
10.451
62.708
41.805
73.159
0.000
HH
6.02 RIEGO DE VAS
RODILLO LISO
0.000
3.846
HM
0.011
HM
0.011
0.011
0.022
3,996.033
3,996.033
7,992.066
HM
0.011
0.000
0.000
HM
0.000
0.014
0.014
0.029
2,501.718
2,501.718
5,003.436
24.055
0.000
0.000
0.000
0.000
0.010
0.025
1,418.073
3,545.182
0.000
0.000
0.000
6.818
17.044
0.000
0.000
0.000
0.000
155.047
0.000
0.000
HM
HM
0.000
0.008
32,249.768
HM
0.009
0.009
3,466.146
3,466.146
0.000
16.664
16.664
0.000
0.000
0.000
0.009
3,466.146
HM
0.010
0.025
690.500
1,726.249
3.320
HM
8.299
0.008
15,703.319
0.000
HM
0.000
0.000
0.000
75.497
0.000
0.000
0.007
0.007
2,321.080
2,321.080
0.000
11.159
11.159
0.007
0.010
0.025
2,172.209
5,430.522
0.000
0.000
0.000
10.443
26.108
0.000
0.000
0.000
0.000
229.048
0.000
0.000
2,321.080
HM
HM
0.008
47,642.047
HM
0.009
0.009
5,309.455
5,309.455
0.000
25.526
25.526
0.009
0.010
0.025
1,057.710
2,644.274
0.000
0.000
0.000
5.085
12.713
0.000
0.000
0.000
0.000
111.530
0.000
0.000
5,309.455
HM
HM
0.008
23,198.252
HM
0.000
0.007
0.007
3,555.439
3,555.439
17.093
17.093
0.007
3,555.439
HH
800.000
1.923
HH
5.02.01
80.000
400.000
1.923
217,592.84
CANTIDAD
5.01.02
20.000
400.000
0.962
HH
5.01.01
20.000
200.000
0.000
HH
4.02.01
20.000
0.000
0.481
218,900.33
HH
20.000
100.000
999.008
CANTIDAD
3.02.02
0.000
HH
M3
160.000
HM
359,642.95
-
80.000
HH
434,568.57
M3
80.000
HH
PRODUCCION DE MATERIAL EN CANTERA PARA SUB BASE
40.000
HM
CANTIDAD
3.01.02
0.000
HH
HH
3.01.01
20.000
HM
1.00
HH
MOTONIVELADORA 140 H
HM
1.00
HH
TRACTOR D8
HH
EQUIPOS (HM)
AGUA
MATERIALES
AYUDANTE (PISO)
OFICIAL
OPERARIO
METRADO
UNIDAD
TRABAJOS PRELIMINARES
PARTIDA
1.00
CAPATAZ
MO (HH)
ITEM
HM
0.000
21.622
21.622
2,173.881
2,173.881
10.451
10.451
0.000
86.486
21.622
8,695.523
2,173.881
41.805
HM
9.00
HH
HH
UND
32,565.431
14,652.120
156.565
70.443
36,042.439 115,114.521
508,818.416
173.281
553.435
97,789.931
212,653.972
470.144
1,022.375
M3
M3
UND
20,714.729
20,714.729
99.590
HM
HM
UND
7,360.765
16,926.001
16,926.001
35.388
81.375
81.375
6,497.751 6,497.751
230,703.398
31.239
31.239
18,433.992
141,235.136
16,826.001
88.625
679.015
80.894