Вы находитесь на странице: 1из 1

Bandar

Puteri

Kota
Perdana

tari

Presint 16

Silikon

Presint 1

Presint 9

Taman
Aman Putra

Lingkaran

Taman Putra
Perdana

Persiaran Bestari

Presint 10

mur
int Ti

way
Hgh

r Po
Cybe
aran

Ceria

h
ga
en
nT
ga
un
Hub

Universiti
Multimedia
Malaysia

Palm Garden
Golf Club

Presint 11

Lingk

atan

Taman Desa
Ayer Hitam

23527

Persiaran Neutron

Taman
Wetland

Taman Meranti
Permai

kon
Jalan Sili

WP

Lebu
tara
aU
hray

PUTRAJAYA

CYBERJAYA

atan
-Sel

TAPAK
CADANGAN

UPM
SERDANG

Taman Pinggiran
Putra

iaran
Pers

el
ra-S
Uta

Taman
Putra Prima

Bandar Bukit
Puchong

Taman
Puchong
Utama

an

Taman
Tasik Prima

ep
nS

Taman
Puchong Prima

Saujana
Putra

Majlis Perbandaran Sepang

Taman
Universiti Indah
Taman Lestari
Perdana

Saujana
Puchong

iara

Taman Puchong
Perdana

rs
Pe

Putra
Heights

PUCHONG

Persia
ran Bes

Taman
Puchong
Permai

Presint 3

Persiaran Multimedia

PUTRAJAYA
Presint 18

Hub

n
Jala

a
ltimedi
ran Mu

a1
Faun

Persia

arat

TAPAK
CADANGAN

Ceria
aran
Persi

Presint 5

Kampung
Cheeding

B
Point
yber

ngah

nC
kara
Ling

n Te
unga

Presint 4
Presint 6

34
235
23531

Taman
Dengkil Jaya
DENGKIL

PELAN KUNCI

PELAN LOKASI

23526

25

23512

235

WID
24'
ARM

ET

MAC

AD
RO
AC

IDE

50' W

D
ROA

TAR

IDE
20' W

NE

KLA

BAC

24' WIDE TARMAC ROAD


WAY

ING

WALK

SLOP

ANE
CKL

E BA

ID
20' W

23513

24

5
23

ENTRANCE-1
3

52
23

TBM G1 (AL=17.056m)

Paku Atas Sump

EARTHWORK NOTES :
1. THE CONTRACTOR SHALL CARRY OUT THE EARTHWORKS (INCLUSIVE OF REMOVAL
OF UNSUITABLE MATERIAL) ACCORDING TO THE FORMATION LEVEL INDICATED.
2. FILLED MATERIAL SHALL BE FREE FROM TREE STUMPS, ROOTS AND OTHER UNSUITABLE MATERIALS.
3. CONTACTOR TO NOTE THE EXTEND OF SWAMPY LAND AND ASCERTAIN THE SITE CONDITION
ON THE SUITABILITY OF EARTH MOVING EQUIPMENT TO BE USED.

22

30

4. FILLING OTHERS THAN ROCKS SHALL BE IN HORIZONTAL LAYERS OF NOT MORE THAN 225mm
IN DEPTH AND COMPACTED WITH MIN. 20 TONS ROLLER.
5. WHERE CUT OR FILL ENCROACH INTO NEIGHBOURING LOTS, PERMISSION SHALL BE OBTAINED
FROM THE OWNER.
6. COMPACTION TEST SHALL FOLLOW SPECIFICATION OR AS APPROVED BY THE S.O.

Q
292 39'

SITE PLAN
(HS(D) 7819 ) PT 12199

SKALA 1 : 750

Land Area : 62939 M2 (6.2930 ha / 15.5525 acre)

7. CONTRACTOR MAY CONSTRUCT TEMPORARY EARTH DRAIN FOR DRAINING SWAMP LAND
TROUGH EXISTING WATER COURSES FOR EASE OF CONSTRUCTION AND TO CONTROL
SILTATION AND EROSION BY WAY OF SILT TRAPS, DITCHES ETC. TO THE APPROVAL OF THE S0.
LOCATION TO BE CONFIRMED BY SO PRIOR TO START WORK.
8. THE FINISHED LEVEL OF THE PROPOSED ROADS AND PLATFORM LEVELS ARE SUCH THAT THEY WILL
PERMIT CONNECTION OF ROADS TO ADJOINING EXISTING OR FUTURE ROADS.
9. NO PONDING WILL OCCUR AS A RESULT OF THE PROPOSED EARTHWORKS.
10. NO ENROACHMENT INTO ADJACENT LOT WILL OCCUR.

Вам также может понравиться