Академический Документы
Профессиональный Документы
Культура Документы
Puteri
Kota
Perdana
tari
Presint 16
Silikon
Presint 1
Presint 9
Taman
Aman Putra
Lingkaran
Taman Putra
Perdana
Persiaran Bestari
Presint 10
mur
int Ti
way
Hgh
r Po
Cybe
aran
Ceria
h
ga
en
nT
ga
un
Hub
Universiti
Multimedia
Malaysia
Palm Garden
Golf Club
Presint 11
Lingk
atan
Taman Desa
Ayer Hitam
23527
Persiaran Neutron
Taman
Wetland
Taman Meranti
Permai
kon
Jalan Sili
WP
Lebu
tara
aU
hray
PUTRAJAYA
CYBERJAYA
atan
-Sel
TAPAK
CADANGAN
UPM
SERDANG
Taman Pinggiran
Putra
iaran
Pers
el
ra-S
Uta
Taman
Putra Prima
Bandar Bukit
Puchong
Taman
Puchong
Utama
an
Taman
Tasik Prima
ep
nS
Taman
Puchong Prima
Saujana
Putra
Taman
Universiti Indah
Taman Lestari
Perdana
Saujana
Puchong
iara
Taman Puchong
Perdana
rs
Pe
Putra
Heights
PUCHONG
Persia
ran Bes
Taman
Puchong
Permai
Presint 3
Persiaran Multimedia
PUTRAJAYA
Presint 18
Hub
n
Jala
a
ltimedi
ran Mu
a1
Faun
Persia
arat
TAPAK
CADANGAN
Ceria
aran
Persi
Presint 5
Kampung
Cheeding
B
Point
yber
ngah
nC
kara
Ling
n Te
unga
Presint 4
Presint 6
34
235
23531
Taman
Dengkil Jaya
DENGKIL
PELAN KUNCI
PELAN LOKASI
23526
25
23512
235
WID
24'
ARM
ET
MAC
AD
RO
AC
IDE
50' W
D
ROA
TAR
IDE
20' W
NE
KLA
BAC
ING
WALK
SLOP
ANE
CKL
E BA
ID
20' W
23513
24
5
23
ENTRANCE-1
3
52
23
TBM G1 (AL=17.056m)
EARTHWORK NOTES :
1. THE CONTRACTOR SHALL CARRY OUT THE EARTHWORKS (INCLUSIVE OF REMOVAL
OF UNSUITABLE MATERIAL) ACCORDING TO THE FORMATION LEVEL INDICATED.
2. FILLED MATERIAL SHALL BE FREE FROM TREE STUMPS, ROOTS AND OTHER UNSUITABLE MATERIALS.
3. CONTACTOR TO NOTE THE EXTEND OF SWAMPY LAND AND ASCERTAIN THE SITE CONDITION
ON THE SUITABILITY OF EARTH MOVING EQUIPMENT TO BE USED.
22
30
4. FILLING OTHERS THAN ROCKS SHALL BE IN HORIZONTAL LAYERS OF NOT MORE THAN 225mm
IN DEPTH AND COMPACTED WITH MIN. 20 TONS ROLLER.
5. WHERE CUT OR FILL ENCROACH INTO NEIGHBOURING LOTS, PERMISSION SHALL BE OBTAINED
FROM THE OWNER.
6. COMPACTION TEST SHALL FOLLOW SPECIFICATION OR AS APPROVED BY THE S.O.
Q
292 39'
SITE PLAN
(HS(D) 7819 ) PT 12199
SKALA 1 : 750
7. CONTRACTOR MAY CONSTRUCT TEMPORARY EARTH DRAIN FOR DRAINING SWAMP LAND
TROUGH EXISTING WATER COURSES FOR EASE OF CONSTRUCTION AND TO CONTROL
SILTATION AND EROSION BY WAY OF SILT TRAPS, DITCHES ETC. TO THE APPROVAL OF THE S0.
LOCATION TO BE CONFIRMED BY SO PRIOR TO START WORK.
8. THE FINISHED LEVEL OF THE PROPOSED ROADS AND PLATFORM LEVELS ARE SUCH THAT THEY WILL
PERMIT CONNECTION OF ROADS TO ADJOINING EXISTING OR FUTURE ROADS.
9. NO PONDING WILL OCCUR AS A RESULT OF THE PROPOSED EARTHWORKS.
10. NO ENROACHMENT INTO ADJACENT LOT WILL OCCUR.