Академический Документы
Профессиональный Документы
Культура Документы
ofWork
a.
Pavement
@ceimmediatelypriortomil1ing;,millsurfacesasdirectedbytheCity;repair
sweep entire milled
all baie failures, large cracks and surface deterioration; crackseal; adjust structures;
surface immediately prior to tacking & paving; level with Mass Top Mix only if necessary and directed
by city; and resurface with 2 inches of Mass Top or as directed by the City)
b.
Estimated
Paving
Tonnaee
street
Length
(feet)
Area
Width
(feet) (SY)
Pomeroy
8,237
30
27,457
3051
Elm Street
9,800
40
43,556
4840
Lebanon
6,610
17,627
1,959
Brooks
1,500
27
4,500
500
Dowse
212
45
1,060
118
Overlay
full depth and cut and patch repairs, adjust structures, sweep existing surface immediately
priorio tacking & paving, tacking & paving, level (if necessary) and overlay with Mass Top Mix,)
@"t"
Estimated
c.
Area
Width
(feet) (SY)
Street
Length
(feet)
Cooper
725
32
2578
215
Marshall
687
32
2443
204
Fenn
3200
35
12,444
1037
Pavement Reclamation
Paving
Tonnage
& Resurfacing
Length
)116.
width
Estimated
Paving
d.
Length
(feet)
Woodleigh
Savoy
tt75
554
Width
Area
(feet)
(sYr
18
2350
t4
862
Chipseal
(adjust sfructures only if necessary, swee,p existing surface immediately prior to applicatiorq
chipseal, sweep excess)
Street
Length
(feet)
Leona
3655
Harryel
3s32
Elaine
Width Area
(feet) (SY)
Estimated
Leveling
Tonnase
30
12,183
25
98n
200
2000
22
4889
274
Pine Grove
2650
25
7361
4t2
Wendell
2875
35
11,181
626
Bromback
2440
20
5422
304
Otis
s00
20
1111
62
Hampshire
742
23
1896
106
Walden
Alcott
I 885
265
32
6702
32
942
682
37s
53
f.
Double Chipseal
(adjust sttrctures as n@essary, swe,p existing surface immediatelypriorto applicatiorq
chiPseal' swee,
excess)
Street
Ingth
(fwt)
Width Area
(feet) (Sln
Savoy
550
30
1833
Woodleigh
1155
22
2823
Estimated
Leveling
Tonnage
103
158